← Back

C-number: C-30-11-052-L

C-number: C-30-11-052-L-00
Item: #66
Revision: 00
Item Text
66. LICENSE AGREEMENT WITH THE MARICOPA COUNTY MUNICIPAL WATER CONSERVATION DISTRICT NUMBER ONE FOR THE MARICOPA TRAIL IMPROVEMENT PROJECT Approve Maricopa County Parks and Recreation Department License Agreement with Maricopa County Municipal Water Conservation District Number One to accommodate the use of a four foot wide trail crossing of the Beardsley Canal Bridge and Right-of-Way for the trail improvement project for the Maricopa Trail. Maricopa County Parks and Recreation Department will use the licensed property for the sole purpose of the construction, installation, repair, reconstruction, modification, reinstalling, replacement, relocation and removal and the operation, maintenance, and use of a four foot wide trail crossing at Beardsley Canal Bridge and Right-of-Way delineated by a pavement stripe located four feet south of the North bridge rail, and marked with two crosswalk signs, and a crosswalk on the East side of the Bridge. (C-30-11-052-L-00)

C-number: C-30-11-052-L-01
Item: #36
Revision: 01
Item Text
36. AMENDMENT TO LICENSE AGREEMENT WITH THE MARICOPA COUNTY MUNICIPAL WATER CONSERVATION DISTRICT NUMBER ONE FOR THE MARICOPA TRAIL IMPROVEMENT PROJECT Approve Amendment One to the Maricopa County Parks and Recreation Department License Agreement with Maricopa County Municipal Water Conservation District Number One to accommodate the use of a 10-foot wide trail located within the Beardsley Right-of-Way for the trail improvement project for a portion of Segment 12 of the Maricopa Trail. Amendment One is specifically for the portion of Segment 12 of the Maricopa Trail that will be adjacent to the Beardsley Canal, south of Lake Pleasant Regional Park and north of Highway 74. Maricopa County Parks and Recreation Department will use the licensed property for the sole purpose of the construction, installation, repair, reconstruction, modification, reinstalling, replacement, relocation, removal and the operation, maintenance, and use of a 10 foot wide by 1,665-foot long pedestrian trail located within the Beardsley Canal Right-of-Way. Construction will consist of 2-inch decomposed granite surface, 2 metal signs on a 4-foot post that will designate the Maricopa Trail and No Motorized Vehicles at each end of the trail, along with a 1,665-foot long No-Climb Fence along the top bank of the Beardsley Canal. This item is located in Supervisory District 4 . (C-30-11-052-L-01)
Attachments (2)

2 item(s) sharing C-number base C-30-11-052-L