C-number: C-44-22-095-X
Vote — approved
| Jack Sellers | yes |
| Bill Gates | yes |
| Clint Hickman | yes |
| Steve Gallardo | yes |
6.2 of Appendices A, B, and C – Amend the Flexible Spending Account grace periods to align with the revised definition of the plan year Exhibit A illustrates the employee cost and employer cost to support the medical (including prescription drug and behavioral health) benefits for July 1, 2022 through December 31, 2023. There is no change in rate from FY21-22. (C-31-22-046-X-00) Motion to approve by Supervisor Bill Gates, seconded by Supervisor Clint Hickman Ayes: Jack Sellers, Bill Gates, Clint
Item Text
6. KARSO LANDSCAPE MATERIAL Case #: Z2021017 Supervisor District: 4 Applicant & Owner: Jack Gilmore, Gilmore Planning & Landscape Architecture / Phoenix Materials Inc. Request: Special Use Permit (SUP)to allow Landscape Material Storage & Sales in the Rural-43 Zoning District Site Location: Approx. 2,700 ft. southwest of the SWC of Happy Valley Rd. and 107th Ave., in the Peoria area Commission Recommendation: On 11/4/21, the Commission voted 7-0, to recommend approval of Z2021017 subject to conditions ‘a’ – ‘g’: a. Development of the site shall be in conformance with the Site Plan entitled “Special Use Permit for Karso Landscape Material,” consisting of 1 full-size sheet, dated September 20, 2021, and stamped received September 21, 2021, except as modified by the following conditions. b. Development of the site shall be in substantial conformance with the Narrative Report entitled “ Karso Landscape Material,” consisting of 11 pages, dated September 20, 2021, and stamped received September 21, 2021, except as modified by the following conditions. c. The applicant shall provide documentation of APS and SRP approval of final site plans prior to County approval of any future building permit(s) on the subject property. d. The following Planning Engineering conditions shall apply: 1. More detailed Grading and Drainage plans submitted for acquisition of building permits must indicate removal of the berms along the northern and southern site boundaries; and must indicate that the entire development site will drain to an onsite retention basin, excluding concentrated drainage corridors that convey offsite flows through the site. 2. Retention basins must drain within 36 hours. 3. At the time of application for building permits, the BFE must be calculated based on the profile contained in the FIS for the Agua Fria River. A floodplain use permit will be required concurrent with the required building permit(s). Habitable structures (office trailer) must be elevated to comply with the Floodplain Regulations for Maricopa County. 4. Applicant is responsible for coordination of any offsite and/or intersection improvements that may be required with the City of Peoria due to the site’s proximity to their jurisdiction. 5. Work/improvements within the power line easement on the site is subject to approval by the owner of said easement. 6. Engineering review of planning and/or zoning cases is for conceptual design only. All development and engineering design shall be in conformance with Section 1205 of the Maricopa County Zoning Ordinance; Drainage Policies and Standards; Floodplain Regulations for Maricopa County; MCDOT Roadway Design Manual; and current engineering policies, standards and best practices at the time of application for construction. 7. Based on the conceptual design nature of the information submitted, changes to the site layout may be necessitated by the final engineering design of the site’s drainage infrastructure. 8. Detailed Grading and Drainage (Site Development) Plans must be submitted with the application for Building Permits e. This special use permit is valid for a period of 10 years and shall expire on December 8, 2031, or upon termination of the use for a period of 90 or more days, whichever occurs first. All site improvements associated with the special use permit shall be removed within 90 days of such expiration or termination of use. f. Noncompliance with any Maricopa County Regulation shall be grounds for initiating a revocation of this Special Use Permit as set forth in the Maricopa County Zoning Ordinance. g. The granting of this change in use of the property has been at the request of the applicant, with the consent of the landowner. The granting of this approval allows the property to enjoy uses in excess of those permitted by the zoning existing on the date of application, subject to conditions. In the event of the failure to comply with any condition, and at the time of expiration of the Special Use Permit, the property shall revert to the zoning that existed on the date of application. It is, therefore, stipulated and agreed that either revocation due to the failure to comply with any conditions, or the expiration of the Special Use Permit, does not reduce any rights that existed on the date of application to use, divide, sell or possess the property and that there would be no diminution in value of the property from the value it held on the date of application due to such revocation or expiration of the Special Use Permit. The Special Use Permit enhances the value of the property above its value as of the date the Special Use Permit is granted and reverting to the prior zoning results in the same value of the property as if the Special Use Permit had never been granted. (C-44-22-095-X-00)
Attachments (1)
1 item(s) sharing C-number base C-44-22-095-X