← Back

C-number: C-44-23-010-X

C-number: C-44-23-010-X-00
Item: #7
Revision: 00
Vote — approved
Bill Gates yes
Clint Hickman yes
Jack Sellers yes
Thomas Galvin yes
Steve Gallardo yes
7.CASTLE HOT SPRINGS – MORRISTOWN WCF Case #: Z2022049 Supervisor District: 4 Applicant & Owner: Mike Campbell, Campbell A&Z, LLC / Margaret A. Wilson Request: Modification of Condition of a Special Use Permit (SUP) for an existing Wireless Communications Facility (WCF) in the Rural-43 WHSC zoning district, to extend validity of special use Z 97-36 for an additional 25 years Site Location: Generally located ¼ mile northwest of the NWC of Gates Rd. and the Wickenburg Highway in the Morristown are
Item Text
7. CASTLE HOT SPRINGS – MORRISTOWN WCF Case #: Z2022049 Supervisor District: 4 Applicant & Owner: Mike Campbell, Campbell A&Z, LLC / Margaret A. Wilson Request: Modification of Condition of a Special Use Permit (SUP) for an existing Wireless Communications Facility (WCF) in the Rural-43 WHSC zoning district, to extend validity of special use Z 97-36 for an additional 25 years Site Location: Generally located ¼ mile northwest of the NWC of Gates Rd. and the Wickenburg Highway in the Morristown area Commission Recommendation: On 6/16/22, the Commission voted 7-0, to recommend approval of Z2022049 subject to conditions ‘a’ – ‘f’: a. Development of the site shall be in substantial conformance of the narrative report entitled “Special Use Permit Modification of Condition Project Narrative”, consisting of seven pages dated revised May 10, 2022, and stamped received May 10, 2022. b. The Special Use Permit shall expire on July 27, 2047, or upon cessation of the use for 90 consecutive days, whichever occurs first. The site improvements, including the monopole, shall be removed within 60 days of termination of expiration of the lease. c. Maximum height for a lattice tower of 188 feet in Class 2 of the Wickenburg Highway Scenic Corridor for the Wireless Communication Facility. d. Allow an existing Wireless Communication Facility with a 188-foot-tall lattice tower to be setback a minimum of 16 feet from the east property line. e. The following Planning Engineering condition shall apply: 1. All development and engineering design shall be in conformance with Section 1205 of the Maricopa County Zoning Ordinance; Drainage Policies and Standards; Floodplain Regulations for Maricopa County; MCDOT Roadway Design Manual; and current engineering policies, standards and best practices at the time of application for construction. f. Continued compliance with relevant conditions/stipulations of Z97-36, Z20000028 and Z2002103. (C-44-23-010-X-00)
Attachments (1)

1 item(s) sharing C-number base C-44-23-010-X