← Back

C-number: C-44-27-048-X

C-number: C-44-27-048-X-00
Item: #8
Revision: 00

Vote: approved

Item Text
8. SKYLINE BATTERY ENERGY STORAGE SYSTEM (BESS) (Supervisorial District: 5) Case #: Z260039 Applicant and Owner: Shilpa Shah – Innergex Renewable Development USA, LLC / Fay E. Jolley Webster Living Trust & Jolley Faye/Marie/Willis Hazel/Harris Linzell Request: Zone change from Rural-43 to IND-2 IUPD Site Location: Generally located 640’ east of the NEC of Broadway Rd. & Tuthill Rd. in the Buckeye area Commission Recommendation: On 10/22/26, the Commission voted 7-0 (motion by Commissioner Rochwalik D3, seconded by Commissioner Toma D4) to adopt a motion recommending the Board of Supervisors approve Z260039 subject to conditions ‘a’ to ‘h’: a. Development of the site shall be in substantial conformance with the Zoning Exhibit entitled “Z260039 – Skyline Battery Energy Storage System (BESS) – Zoning Exhibit“, consisting of 1 full-size sheet, dated September 21, 2026 except as modified by the following conditions. Staff may determine slight refinements to remain in substantial conformance with the approved site plan. Minor and major amendments to the site plan will be determined in accordance with Chapter 3 of the Maricopa County Zoning Ordinance. b. Development of the site shall be in substantial conformance with the Narrative Report entitled “Zone Change with Overlay Narrative Report for Case Z260039”, consisting of 18 pages, dated September 21, 2026, except as modified by the following conditions. c. The following IND-2 IUPD standards shall apply: 1. Minimum rear setback – 10’ – Adjacent to rural 2. Maximum lot coverage – 75% 3. Minimum Screening – 6’ solid wall. 4. Landscaping/buffering – There shall be a solid fence, wall and suitable planting six feet in height where the side and rear boundaries are adjacent to rural or residential zoning. All street frontage shall be landscaped with drought-tolerant plants including trees, shrubs or natural vegetation. There shall be a minimum of one tree and three shrubs every 20 feet. Trees shall be a minimum 2-inch caliper at the time of installation. 5. Minimum Parking – 1 maintenance space required for BESS and/or solar power generation uses; all other uses shall conform to Section 802. 6. Additional regulations (MCZO section 506) – BESS and solar power generation activities may be outside of an enclosed building provided the site is screened. d. The IUPD overlay is applied to restrict the use of the site for exclusively to solar power generation, battery energy storage systems (BESS) and ancillary uses. Until such time that the site is served by sewer, the proposed land uses on the site shall be limited to those acceptable to the Maricopa County Environmental Services Department (MCESD) that can be accommodated by onsite septic systems. Any use that requires potable water shall be served by an approved potable water supply prior to establishment of the use. Where the use will serve at least 25 individuals for at least 60 days per year, the potable water supply shall be a public water system. e. Prior to approval of the Plan of Development application, the parcels shall be combined into a single parcel. f. The following Engineering conditions shall apply: 1. Engineering review of planning and/or zoning cases is for conceptual design only. All development and engineering design shall be in conformance with Section 1205 of the Maricopa County Zoning Ordinance; Drainage Policies and Standards; Floodplain Regulations for Maricopa County; MCDOT Roadway Design Manual; and current engineering policies, standards and best practices at the time of application for construction. 2. Based on the conceptual design nature of the information submitted, changes to the site layout may be necessitated by the final engineering design of the site’s drainage infrastructure. 3. Maricopa County does not supply water, fire or sewer services. It is the applicant/owner’s responsibility to coordinate and secure water, fire and sewer services for this site. 4. Sealed final Grading and Drainage (Site Infrastructure) Plans and Sealed Final drainage report must be submitted with the application for Building Permits g. Administrative approval of a Plan of Development will be required prior to approval and issuance of construction permits to develop and establish use of the site. Prior to issuance of a building permit, written confirmation will be required from the emergency fire protection jurisdiction having authority that the facility has been designed in accordance with their regulations and requirements, and that emergency fire protection service will be provided to the facility. Prior to issuance of the certificate of occupancy, local fire protection jurisdiction review and approval will be required. h. The granting of this change in use of the property has been at the request of the applicant, with the consent of the landowner. The granting of this approval allows the property to enjoy uses in excess of those permitted by the zoning existing on the date of application, subject to conditions. In the event of the failure to comply with any condition, the property may be considered for revocation to the zoning that existed on the date of application. It is, therefore, stipulated and agreed that either revocation due to the failure to comply with any conditions, does not reduce any rights that existed on the date of application to use, divide, sell or possess the property and that there would be no diminution in value of the property from the value it held on the date of application due to such revocation of the Zone Change. The Zone Change enhances the value of the property above its value as of the date the Zone Change is granted and reverting to the prior zoning results in the same value of the property as if the Zone Change had never been granted. (C-44-27-048-X-00)
Attachments (2)

1 item(s) sharing C-number base C-44-27-048-X