← Back

C-number: C-64-06-176-5

C-number: C-64-06-176-5-01
Item: #77
Revision: 01

Vote: approved

Item Text
77. CHANGE ORDER WITH JACOBS ENGINEERING GROUP (FORMERLY CARTER & BURGESS) Approve Change Order No. 4 with Jacobs Engineering Group (formerly Carter & Burgess) Contract 2005-070 in the amount of $1,305,883.31 for a revised total contract amount of $2,034,796.80. The purpose of the this Change Order is to increase the contract amount by an additional $1,305,883.31 and a time extension of 500 days through June 30, 2010 to perform roadway and drainage design services for the above referenced project in compliance with the terms of the proposed IGA with City of Phoenix. The FY10 budget for County Arterials (ARTS) Project, Job No. T113, MC 85: 91st Avenue to 75th Avenue, will be adjusted next fiscal year after the budget is adopted. Approval of this agenda item is contingent upon the Board adopting the FY10 budget. This project was previously designed to 70% level using County design standards for roadway geometrics and drainage design requirements. Per the proposed IGA with City of Phoenix (COP Approved-Final, BOS Approval-Pending), the design will need to be revised to meet COP requirements, and to improve coordination of required capital improvements provided by fronting developments. Per proposed IGA, COP will annex roadway upon completion of the reconstruction. Deliverables of this contract modification is a revised and an updated preliminary plans and final drainage design that are an integral part of a project scoping document. Supervisory District No. 5. (C-64-06-176-5-01)

1 item(s) sharing C-number base C-64-06-176-5