C-number: C-64-19-017-5
Vote — approved
| Steve Gallardo | yes |
| Bill Gates | abstain |
| Clint Hickman | abstain |
| and Clint Hickman | yes |
| Denny Barney | abstain |
| Steve Chucri | yes |
44.BID AND AWARD FOR ROADWAY CONSTRUCTION ON MILLER ROAD - TONOPAH SALOME HIGHWAY TO VAN BUREN STREET Approve the solicitation of bids for the Maricopa County Department of Transportation’s construction of roadway including removals, grading, retention basins, roadside channels, asphalt concrete paving, asphalt rubber overlay, aggregate base course, catch basins, concrete asphalt driveways, traffic signing, pavement markings and traffic control. Award the contract to the lowest responsive bidder
Item Text
44. BID AND AWARD FOR ROADWAY CONSTRUCTION ON MILLER ROAD - TONOPAH SALOME HIGHWAY TO VAN BUREN STREET Approve the solicitation of bids for the Maricopa County Department of Transportation’s construction of roadway including removals, grading, retention basins, roadside channels, asphalt concrete paving, asphalt rubber overlay, aggregate base course, catch basins, concrete asphalt driveways, traffic signing, pavement markings and traffic control. Award the contract to the lowest responsive bidder, provided that the lowest bidder does not exceed the Engineer’s estimate by more than ten percent. Funds will be budgeted through the Transportation Department (D640) Transportation Capital Projects fund (234), System Preservation and Reconstruction (SPAR) project, Sub-Project TT0338. The proposed project will pave Miller Road between Tonopah Salome Highway and Van Buren Street to two surfaced travel lanes. Supervisory District No. 4 (C-64-19-017-5-00)
1 item(s) sharing C-number base C-64-19-017-5