C-number: C-64-19-175-M
Vote — approved
| Steve Gallardo | abstain |
| Jack Sellers | abstain |
| Bill Gates | abstain |
| Clint Hickman | yes |
| Steve Chucri | yes |
59.AGREEMENT WITH ROOSEVELT IRRIGATION DISTRICT (RID) FOR PALO VERDE ROAD BRIDGE REPLACEMENT PROJECT Approve the agreement provided by Roosevelt Irrigation District (RID) for the relocation of the check structure downstream of the bridge to upstream, and relocation of the on-bank delivery structures and related piping and appurtenances upstream of the bridge. This is for their engineering services and plan review, and post design costs associated with MCDOT project TT0549. Additional RID project
Item Text
59. AGREEMENT WITH ROOSEVELT IRRIGATION DISTRICT (RID) FOR PALO VERDE ROAD BRIDGE REPLACEMENT PROJECT Approve the agreement provided by Roosevelt Irrigation District (RID) for the relocation of the check structure downstream of the bridge to upstream, and relocation of the on-bank delivery structures and related piping and appurtenances upstream of the bridge. This is for their engineering services and plan review, and post design costs associated with MCDOT project TT0549. Additional RID project costs include a fee for RID project administration, a RID License to construct fee, and the JOC construction costs. The Roosevelt Irrigation District has agreed to construct their own irrigation check structure and canal lining in order to relocate their facilities outside the County’s road improvement project limits. It is necessary to have this work completed during the scheduled 2019 canal dry-up period in order to ensure the scheduled road and bridge construction can take place during the scheduled FY 2020 construction date. Based on the final costs associated with the RID work, formal Board approval is necessary. Supervisory District No. 4 (C-64-19-175-M-00)
Attachments (1)
1 item(s) sharing C-number base C-64-19-175-M