← Back

C-number: C-69-01-054

C-number: C-69-01-054-2
Item: #F-3
Revision: 2

Vote: approved

Item Text
F-3. CONTRACT WITH OLSSON ASSOCIATES FOR CAMLEBACK ROAD STORM DRAIN - FINAL DESIGN Award Contract FCD 2008C024, Camelback Road Storm Drain (59th to 75th Avenues) Final Design (Project [#620 – Maryvale Area Drainage Master Plan ] ) to Olsson Associates. The contract is for a lump sum of $654,311.33, plus a not-to-exceed amount of $306,077.29 for optional items. The optional items, which include additional design, survey, plans, meetings, utilities potholing, and geotechnical investigation, and will only be implemented if required. The total contract amount, including the optional items, will not exceed $960,388.62. The contract performance is 378 calendar days effective the date of the Notice to Proceed. This Project is for 10-year-level-of-protection storm drain system along Camelback Road from 59th Avenue to 57th Avenue . The storm drain system will outfall to the existing Bethany Home Outfall Channel system. Both completed systems will combine to provide a 100-year level of protection for many homes in the area, while eliminating a large 100-year floodplain to the south of Camelback Road . The Flood Control District of Maricopa County (District) is the lead agency for the design of the Project. The Cities of Glendale and Phoenix will share in the cost of the design in accordance with Intergovernmental Agreement FCD 2000A013 approved by the District Board of Directors on March 21, 2001 (C-69-01-054-2). This is a qualification-based selection in accordance with Maricopa County Procurement Code, Article 5, Paragraph 504. The Project is located in Supervisor District 5. (C-69-09-043-5-00)

1 item(s) sharing C-number base C-69-01-054