← Back

C-number: C-69-10-010-5

C-number: C-69-10-010-5-00
Item: #F-6
Revision: 00
Item Text
F-6. CONTRACT WITH J2 ENGINEERING AND ENVIRONMENTAL DESIGN FOR DURANGO REGIONAL CONVEYANCE CHANNEL, 75TH AVENUE TO 107TH AVENUE Award Contract FCD 2009C007, Durango Regional Conveyance Channel, 75th Avenue to 107th Avenue Project (Project [#565]) to J2 Engineering and Environmental Design. This contract is a lump sum of $216,099.88, plus a not-to-exceed amount of $61,762.24 for optional items. These optional items include additional critical items survey and mapping, a second PAAC meeting and rights-of-way delineation. The total contract amount including optional items will not exceed $277,862.12. The contract performance is 140 calendar days effective the date of the Notice to Proceed. This is a qualification-based selection in accordance with Maricopa County Procurement Code, Article 5, Paragraph 504. The Durango Area Drainage Master Plan (ADMP) identified flooding problems in the Durango area and recommended solutions to these problems. The Project is to capture and convey the 100-year flood from 75th Avenue to 107th Avenue at the Elwood Street alignment, and detain flows within a basin at 107th Avenue and Elwood Street. This project is located in District 5. (C-69-10-010-5-00)

1 item(s) sharing C-number base C-69-10-010-5