← Back

C-number: C-69-10-016-5

C-number: C-69-10-016-5-00
Item: #F-6
Revision: 00
Item Text
F-6. CONTRACT FOR SONOQUI WASH CHANNELIZATION, PHASE III RIGGS ROAD TO EMPIRE BLVD. Award Contract FCD 2009C011, Sonoqui Wash Channelization, Phase III Riggs Road to Empire Boulevard, to JE Fuller/Hydrology and Geomorphology, Inc., for professional engineering services. This contract is a lump sum of $822,960.45, plus a not-to-exceed amount of $429,574.75 for optional items. These optional items include additional field geotechnical investigations, construction documents for additional system components, plant salvage plans, and post-design services. The total contract amount including optional items will not exceed $1,252,535.20. The contract performance is 371 calendar days effective the date of the Notice to Proceed. This is a qualification-based selection in accordance with Maricopa County Procurement Code, Article 5, Paragraph 504. The Flood Control District of Maricopa County (District) completed the Queen Creek/Sonoqui Wash Hydraulic Master Plan in 2000. The Main Branch of Sonoqui Wash was identified south of Riggs Road upstream to Empire Boulevard as a segment to be channelized to reduce the floodplain delineated in the Master Plan. This branch will be channelized in Phase III. This Agenda item is located in Supervisory District 1. (C-69-10-016-5-00)

1 item(s) sharing C-number base C-69-10-016-5