C-number: C-69-10-042-5
Item Text
F-4. CONTRACT WITH GAVAN & BARKER INC. FOR OAK STREET BASIN AND STORM DRAIN DESIGN Award Contract FCD 2009C021, Oak Street Basin and Storm Drain Design to Gavan & Barker, Inc. This contract is a lump sum of $297,353.24 plus a not-to-exceed amount of $107,262.90 for optional design items, plus $40,000.00 for optional post-design services. The total contract amount including optional items will not exceed $444,616.14. The contract performance is 1,066 calendar days effective the date of the Notice to Proceed. This is a qualification-based selection in accordance with Maricopa County Procurement Code, Article 5, Paragraph 504. The Spook Hill Area Drainage Master Plan (ADMP) identified flooding problems in the northeast Mesa area and recommended solutions to these problems. The Project is to capture the 100-year storm flows from the upstream watershed in a storm drain and detention basin system and ultimately drain the system into the Spook Hill Flood Retarding Structure. This project is located in District 2. (C-69-10-042-5-00)
1 item(s) sharing C-number base C-69-10-042-5