C-number: C-69-14-037-3
Vote: approved
Item Text
F-2. IGA BETWEEN MARICOPA COUNTY AND THE FLOOD CONTROL DISTRICT OF MARICOPA COUNTY FOR THE MOUNTAIN ROAD/ERIE STREET DRAINAGE IMPROVEMENTS DESIGN CONCEPT REPORT Approve Intergovernmental Agreement (IGA) FCD 2013A016 to identify and define the responsibilities of the Flood Control District of Maricopa County (District) and Maricopa County for the cost sharing, development and preparation of the Mountain Road/Erie Street Drainage Improvements Design Concept Report (DCR) . The total project cost is estimated at $100,000 to $125,000. The District’s contribution is estimated to be between $50,000 - $62,500. The DCR is anticipated to be completed by the end of Fiscal Year 2015. The IGA shall become effective as of the date it is approved by both parties, and shall remain in effect until all stipulations have been satisfied or until it is terminated. The East Mesa Area Drainage Master Plan (ADMP) Update identified flooding problems in the southeastern portion of Maricopa County. In particular, the homes and roadways located in the unincorporated area bounded by Williams Field Road, Ray Road, Meridian Road and the Signal Butte alignment flood during nearly every rain event. The East Mesa ADMP Update developed three preliminary solutions to address the frequent flooding issues. This IGA will fund the development of a DCR to analyze and refine the preliminary solutions and select one recommended alternative. The end result of the DCR will be 15% level design drawings and a plan to implement the recommended solution to the flooding problems. This agenda item impacts Supervisorial District 1. (C-69-14-037-3-00)
1 item(s) sharing C-number base C-69-14-037-3