| Steve Gallardo | yes |
| Jack Sellers | yes |
| Bill Gates | yes |
| Clint Hickman | yes |
| Steve Chucri | yes |
64.BIDS AND AWARD FOR SUN CITY DRAIN – OLIVE AVENUE – FROM 103RD AVE TO 99TH AVE Authorize the advertisement of the Invitation for Bids of the Sun City Drain – Olive Avenue – from 103rd Ave to 99th Ave (Project [#337]) and the award of the contract to the lowest responsible bidder, if the bid is not more than ten percent (10%) over the engineer’s estimate. The Project will re-construct the 1,500 ft. long channel along the north side of Olive Ave., from 103rd Ave. to 99th Ave. The existing trapez
Item Text
64. BIDS AND AWARD FOR SUN CITY DRAIN – OLIVE AVENUE – FROM 103RD AVE TO 99TH AVE Authorize the advertisement of the Invitation for Bids of the Sun City Drain – Olive Avenue – from 103rd Ave to 99th Ave (Project [#337]) and the award of the contract to the lowest responsible bidder, if the bid is not more than ten percent (10%) over the engineer’s estimate. The Project will re-construct the 1,500 ft. long channel along the north side of Olive Ave., from 103rd Ave. to 99th Ave. The existing trapezoidal gunite lining, built in the 1960’s, is in a distressed condition and will be removed and replaced with a fiber reinforced shotcrete lining. The project improvements also include a maintenance access ramp to the channel bottom and safety railing; temporary construction perimeter fencing will be required. This channel is owned and maintained by the Flood Control District of Maricopa County (FCDMC), and the project is 100% funded by FCDMC. This Agenda Item impacts Supervisor District 4. (C-69-21-037-X-00)
1 item(s) sharing C-number base C-69-21-037-X