C-number: C-69-24-002-X

C-number: C-69-24-002-X-00
Item: #132
Revision: 00
Vote — approved
Clint Hickman yes
Jack Sellers yes
Thomas Galvin yes
Bill Gates yes
Steve Gallardo yes
Ayes: Clint Hickman, Jack Sellers, Thomas Galvin, Bill Gates, Steve Gallardo
Item Text
132. IGA FOR THE GRAND AND 83RD AVENUE DRAINAGE IMPROVEMENTS PROJECT Approve IGA FCD 2022A024 for the Grand and 83rd Avenue Drainage Improvements Project (PROJECT) for the Design, Rights-of-Way Acquisition, and Utility Relocations between the City of Peoria (CITY) and the Flood Control District of Maricopa County (DISTRICT). The estimated total PROJECT cost is $4,000,000 and will be shared 65% DISTRICT and 35% CITY. The DISTRICT’s estimated share of the PROJECT’s cost is $2,600,000. CITY will be the lead agency for the PROJECT and will operate and maintain the PROJECT. The DISTRICT does not have any operation or maintenance responsibilities. The Grand and 83rd Avenue Drainage Improvements Project area is located in a developed urban area within the CITY near 83rd and Grand Avenue. The project is intended to mitigate excess stormwater runoff that impacts existing residences, businesses, and educational facilities using primarily retention basins and storm drains. The proposed improvements were studied as part of the City of Peoria Storm Drain Master Plan (PSDMP) prepared in January 2014. This study recommended a retention facility located at the intersection of 83rd Avenue and Varney. However, the CITY is unable to obtain required land at this location. Updating the study, project design, and construction are the next steps for implementing the PSDMP for this area, with the CITY as the lead agency. This Agenda Item impacts Supervisorial District 4. (C-69-24-002-X-00)
Attachments (1)

1 item(s) sharing C-number base C-69-24-002-X