To: From: ATTACHMENT A • City of Phoeni,x PLANtING /INO OMLOFMENT DEPARiMENT Alan Stephenson Deputy City Manager Joshua Bednarek Planning and Development Director Date: December 11, 2024 Subject: ITEM 112 ON THE DECEMBER 18, 2024, FORMAL AGENDA ADOPTION OF LAND USE ASSUMPTIONS AND INFRASTRUCTURE IMPROVEMENTS PLANS Item 112, Adoption of Land Use Assumptions and Infrastructure Improvements Plans, is a request to approve updated Land Use Assumptions (LUA) and Infrastructure Improvements Plans (IIP) (collectively, the Infrastructure Financing Plan or "IFP") in accordance with Arizona Revised Statutes 9-463.05 Development Fees. Approval of the LUAs and IIPs is required prior to approving a development impact fee or updating an existing development impact fee because these plans gather, analyze and present the necessary data to develop the fees. A public hearing on LUAs and IIPs was conducted during the Formal City Council meeting on November 13, 2024. A future public hearing on proposed changes to the city's development impact fees is anticipated on or after January 22, 2025. A second future public hearing and adoption of the impact fees will be scheduled in spring of 2025. Deputy City Manager Stephenson appointed the Impact Fee Ad Hoc Committee to provide input to staff and professional consultants on the underlying assumptions supporting the draft IFP prior to recommendations going to City Council. The Ad Hoc Committee convened fourteen times between January 18, and October 3, 2024. On November 4, 2024, the Ad Hoc Committee submitted written comments that included the following recommendation: The Ad Hoc Committee recommends that staff continue to refine the IFP as needed to ensure new development does not pay more than its proportional share of new public infrastructure required for or impacted by such development. The full Ad Hoc Committee report, along with additional IFP materials, can be found on the web at: www.phoenix.gov/pddsite/Pages/Proposed2025lnfrastructureFinancingP1an Consistent with the Ad Hoc recommendation above, and to ensure the approved LUAs and IIPs are based on the best available information, staff recommends updating and replacing certain assumptions that could affect proposed changes to the city's impact fees. Staff recommends approval of the Land Use Assumptions and Infrastructure Improvements Plans, subject to the following amendments: 1. THE LAND USE ASSUMPTIONS (LUAS) CONTAINED IN EACH INFRASTRUCTURE IMPROVEMENTS PLAN (IIP) SHALL BE REPLACED WITH THE LUAS FROM THE 2025 DEVELOPMENT IMPACT FEE UPDATE, LANO USE ASSUMPTIONS REPORT AS REVISED SEPTEMBER 30, 2024, AND ENCLOSED AS ATTACHMENT A1. A TO THE EXTENT REVISED LUAS AFFECT THE MEASUREMENT OF SERVICE LEVELS, THE SERVICE LEVELS IN EACH IIP SHALL BE REPLACED TO ALIGN City of Phoenix 2025 Development Impact Fee Update LAND USE ASSUMPTIONS REPORT DRAFT 8-2-2024 (Revised 9/30/2024) Prepared by: Business & Strategy Division Growth, Infrastructure & Financial Stability SecƟon ATTACHMENT A1 1 TABLE OF CONTENTS Summary of Land Use AssumpƟons 2 Impact Fee Service Area Building Blocks 3 EsƟmate Year (2025) Land Use AssumpƟons 4 10-Year (2035) Land Use AssumpƟons 4 15-Year (2040) Land Use AssumpƟons 5 Buildout (HypotheƟcal) Land Use AssumpƟons 5 2 SUMMARY OF LAND USE ASSUMPTIONS The land use assumpƟons detailed in this report provide the foundaƟon for evaluaƟng the future demand for public services for which the city collects Development Impact Fees (DIF) and Water Resources AcquisiƟon Fees (WRAF). Land use assumpƟons describe future development in terms of type, size, locaƟon and relaƟve Ɵming. ResidenƟal development has been divided into single-family and mulƟfamily categories and measured in terms of dwelling units. Non-residenƟal development land use is divided into five categories (retail, office, industrial, public and other) measured by structure size or floor area, where 1,000 square feet of floor area is equal to one non-residenƟal development unit. Future development unit values for the City of Phoenix have been derived from county-wide populaƟon forecasts prepared by the Arizona State Demographer’s Office and metro-area employment forecasts prepared by the University of Arizona. New dwelling units and non-residenƟal space have been allocated geographically throughout the city to project future development within development impact fee service areas. The forecasted development units summarized in this report were prepared by Applied Economics, LLC, a local economic research firm. For a more detailed descripƟon of data sources and methods please see supplemental report: Growth Projections and Land Use Assumptions 2024 Update, Applied Economics, July 12, 2024. For this update, growth projecƟons have been prepared to project demand for necessary public services for the ten-year period from 2025 to 2035. • ResidenƟal development has been esƟmated using the 2022 Maricopa County medium-series populaƟon projecƟons prepared by the State Demographer’s Office within the Arizona Office of Economic Opportunity. Down-scaling to Phoenix impact fee service areas and converƟng populaƟon to single family and mulƟfamily units was performed by Applied Economics, LLC. • Non-residenƟal development has been esƟmated based on 2023 metro-area employment by industry data provided by the University of Arizona. Down scaling to Phoenix impact fee service areas and converƟng employment to non-residenƟal development units was performed by Applied Economics, LLC. For all esƟmaƟons, the data is provided at the impact fee area “building block” level. 3 IMPACT FEE SERVICE AREA BUILDING BLOCKS Land use assumpƟons have been summarized in geographic building blocks that can be aggregated to the impact fee service areas applicable to each impact fee program. The impact fee service areas described in this report are based on the areas established in previous plans. The only notable change is a proposed ‘citywide’ impact fee service area for Water Treatment and Wastewater Treatment that would be assessed in the ‘Balance of City’ area. The following table displays how the impact fee “building block” areas are combined to make designated impact fee service areas for each fee category. The building block geographies are provided on Map #1 Impact Fee Service Area Maps, September 19, 2024 or as amended. Impact Fee Category Impact Fee Service Area Building Block Fire Protection, Police, Parks, Library Northwest Northwest & Deer Valley Northeast Northeast & Paradise Ridge Southwest Estrella N, Estrella S, Laveen W & Laveen E Ahwatukee Ahwatukee Major Arterials Northern Northwest, Deer Valley, Northeast & Paradise Ridge Southwest Estrella N, Estrella S, Laveen W & Laveen E Storm Drainage Paradise Ridge Paradise Ridge Estrella Estrella N & Estrella S Laveen Laveen W & Laveen E Water Distribution Northern Northwest, Deer Valley, Northeast, & Paradise Ridge Southern Estrella N, Estrella S, Laveen W, Laveen E, & Ahwatukee Wastewater Collection Northern - WW Northwest, Northeast & Paradise Ridge Estrella South Estrella South Wastewater Treatment North of CAP Canal Northwest, Northeast, & Paradise Ridge South of CAP Canal Deer Valley, Balance of City, Estrella N, Estrella S, Laveen W, Laveen E, & Ahwatukee Water Treatment Citywide All ‘Building Blocks’ & Balance of City Water Resources Acquisition Off-Project Off-Project On-Project On-Project 4 LAND USE ASSUMPTION QUANTITIES BY BUILDING BLOCK It is necessary to esƟmate development units at the beginning of the planning horizon. For this update the starƟng point or “esƟmate year” is assumed to be 2025. At the Ɵme Applied Economics, LLC, iniƟated their study the best available data for exisƟng development units was for 2023. The 2025 esƟmated development units are used to calculate current Levels of Service (LOS) for certain impact fee categories. Estimate Year Land Use Assumptions (2025) (Dwelling Units) (000's Square Feet) SFR MFR Retail Office Industrial Public Other Northwest 10,004 5,108 2,152 263 4,059 1,534 478 Deer Valley 5,195 1,558 5 0 27 188 12 Northeast 20,790 5,680 2,300 1,150 1,556 1,805 1,397 Paradise Ridge 262 4,130 1,542 1,803 0 108 2,244 Estrella North 2,353 657 1,774 12 47,308 621 143 Estrella South 17,128 1,379 1,623 9 18,433 1,552 34 Laveen West 22,435 1,420 2,677 118 1,088 2,135 552 Laveen East 6,851 575 882 7 285 597 35 Ahwatukee 24,405 9,913 3,015 1,661 1,201 2,316 1,135 Balance of City 295,911 244,960 80,067 110,563 114,560 86,994 57,187 Citywide 405,334 275,380 96,037 115,586 188,517 97,850 63,217 Off-Project 209,093 105,345 40,821 38,736 49,216 24,103 25,394 On-Propject 196,264 170,035 55,217 76,851 139,301 73,748 37,879 10-Year Land Use Assumptions (2035) Dwelling Units 000's Square Feet SFR MFR Retail Office Industrial Public Other Northwest 13,047 10,822 3,052 2,388 11,509 1,644 716 Deer Valley 5,281 1,558 5 0 27 316 12 Northeast 33,783 10,696 3,221 2,512 1,819 1,818 1,754 Paradise Ridge 3,200 5,236 1,644 3,934 0 800 2,676 Estrella North 2,765 1,002 1,828 12 51,802 621 143 Estrella South 20,640 3,221 2,042 61 22,292 1,904 34 Laveen West 25,639 4,569 3,759 433 3,144 2,135 1,384 Laveen East 7,887 715 882 7 285 597 35 Ahwatukee 25,195 9,913 3,015 1,661 1,201 2,316 1,135 Balance of City 300,735 271,170 85,080 116,414 123,898 87,984 58,846 Citywide 438,172 318,902 104,528 127,422 215,977 100,135 66,735 Off-Project 234,060 131,988 45,261 47,335 60,589 25,163 26,680 On-Propject 204,135 186,914 59,267 80,088 155,388 74,972 40,110 5 15-Year Land Use Assumptions (2040) Dwelling Units 000's Square Feet SFR MFR Retail Office Industrial Public Other Northwest 15,286 13,179 3,600 4,138 12,509 1,644 1,021 Deer Valley 5,521 1,558 5 0 27 316 12 Northeast 39,090 12,589 3,437 4,115 1,819 1,930 2,022 Paradise Ridge 4,725 5,471 1,701 4,303 0 989 2,676 Estrella North 2,904 1,002 1,828 12 51,926 621 143 Estrella South 21,112 3,507 2,222 61 23,476 2,009 34 Laveen West 25,759 5,375 4,128 599 4,244 2,135 1,498 Laveen East 7,907 715 882 7 285 597 35 Ahwatukee 26,121 9,913 3,015 1,661 1,201 2,316 1,135 Balance of City 301,164 280,493 88,093 119,305 127,760 88,459 59,662 Citywide 449,589 333,802 108,911 134,201 223,247 101,016 68,238 Off-Project 244,762 144,550 46,582 52,547 63,398 25,465 27,323 On-Propject 204,850 189,252 62,329 81,655 159,849 75,551 40,972 Buildout Land Use Assumptions (Full Absorption of Undeveloped Land within Building Block Areas) Dwelling Units 000's Square Feet SFR MFR Retail Office Industrial Public Other Northwest 61,155 33,533 11,655 17,177 42,984 3,789 1,541 Deer Valley 5,534 1,623 5 0 27 316 13 Northeast 54,850 16,924 7,436 11,444 3,568 3,383 2,389 Paradise Ridge 5,355 6,734 3,360 16,140 0 989 2,676 Estrella North 3,205 1,002 1,947 12 51,979 621 143 Estrella South 22,551 3,649 2,452 61 25,559 2,253 56 Laveen West 26,158 6,257 5,549 2,267 7,058 2,385 2,411 Laveen East 8,768 715 934 7 285 607 51 Ahwatukee 26,941 9,913 3,325 1,661 1,201 2,316 1,135 Balance of City 302,008 291,038 97,458 126,908 141,371 89,821 61,438 Citywide 516,525 371,388 134,121 175,677 274,032 106,480 71,853 Off-Project 310,372 177,104 62,507 89,740 102,070 29,472 28,391 On-Propject 206,819 194,284 72,287 85,937 171,962 77,008 43,581 Development Impact Fee Category Property Taxes1 Sales Taxes2 Wtr & Wwtr Rates3 Total (Rounded) Fire Protection NW & DV $79.28 $0.00 N/A $79.00 NE & PR $46.18 $0.00 N/A $46.00 SW $46.18 $18.79 N/A $65.00 AHW $46.18 $19.69 N/A $66.00 Police NW & DV $67.99 $37.23 N/A $105.00 NE & PR $67.99 $37.23 N/A $105.00 SW $67.99 $37.23 N/A $105.00 AHW $67.99 $37.23 N/A $105.00 Parks NW & DV $87.96 $198.40 N/A $286.00 NE & PR $102.31 $198.40 N/A $301.00 SW $94.09 $198.40 N/A $292.00 AHW $87.96 $198.40 N/A $286.00 Library NW & DV $53.16 N/A N/A $53.00 NE & PR $66.65 N/A N/A $67.00 SW $63.57 N/A N/A $64.00 AHW $53.16 N/A N/A $53.00 Major Arterials Northern (NW, DV, NE, PR) N/A N/A N/A $0.00 Storm Drainage Paradise Ridge N/A N/A N/A $0.00 Estrella (EN & ES) N/A N/A N/A $0.00 Laveen (LW & LE) N/A N/A N/A $0.00 Water Transmission Northern N/A N/A $255.56 $256.00 Southern N/A N/A $255.56 $256.00 Water Treatment Citywide N/A N/A $1,518.06 $1,518.00 WW Collection Northern (NW, NE, PR) N/A N/A $242.58 $243.00 Estrella South N/A N/A $242.58 $243.00 WW Treatment North of CAP (NW, NE, PR) N/A N/A $143.96 $144.00 South of CAP (DV, Bal, SW, AHW) N/A N/A $143.96 $144.00 Water Resources Acquisition Off-Project N/A N/A N/A $0.00 On-Project N/A N/A N/A $0.00 SUMMARY OF ALTERNATIVE REVENUE OFFSETS ($/EDU) Note: Summary table from City of Phoenix 2025 Development Impact Fee Update, Alternative Reveneu Offsets Report, December 4, 2024. 1) Property Taxes includes General Obligation bond projects backed by secondary property taxes. 2) Sales Taxes includes bond projects backed by excise taxes and qualifying park projects funded with PPPI tax revenue. 3) Wtr & Wwtr Rates includes revenue bond projects backed by water and sewer rate revenue. ATTACHMENT A2 Development Impact Fee Category Amount Fire Protection NW & DV $0.00 NE & PR $0.00 SW $0.00 AHW $0.00 Police NW & DV $0.00 NE & PR $0.00 SW $0.00 AHW $0.00 Parks NW & DV $824.00 NE & PR $597.00 SW $0.00 AHW $980.00 Library NW & DV $0.00 NE & PR $69.00 SW $0.00 AHW $513.00 Major Arterials Northern (NW, DV, NE, PR) $0.00 Southern (EN, ES, LW, LE) $1,365.00 Storm Drainage Paradise Ridge $0.00 Estrella (EN & ES) $0.00 Laveen (LW & LE) $0.00 Water Transmission Northern $317.00 Southern $496.00 Water Treatment Citywide $975.00 WW Collection Northern (NW, NE, PR) $241.00 Estrella South $449.00 WW Treatment North of CAP (NW, NE, PR) $241.00 South of CAP (DV, Bal, SW, AHW) $241.00 Water Resources Acquisition Off-Project $207.00 On-Project $0.00 SUMMARY OF FUND BALANCE ADJUSTMENTS ($/EDU) Notes: Summary table from City of Phoenix 2025 Development Impact Fee Update, Fund Balance Adjustment Report, December 4, 2024. Fund balances from Schedule A, City of Phoenix Annual Development Impact Fee Report for Fiscal Year Ended June 30,2024 , August 16, 2024. ATTACHMENT A3 kimley-horn.com 1001 West Southern Avenue, Suite 131, Mesa, AZ 85210 480.207.2666 MEMORANDUM To: Adam Miller From: Joel Varner, P.E. Kimley-Horn and Associates, Inc. Date: November 22, 2024 Subject: City of Phoenix Impact Fee Update 2023 – Asphalt Pavement Cost Adjustment The purpose of this memorandum is to summarize the sources and methods used for deriving the unit cost for Asphalt Concrete Pavement included as a part of the City of Phoenix’s Impact Fee Update 2023, and to provide a recommendation for an adjustment to the pavement cost. To develop the recommended pavement unit costs, we collected available bid documents for arterial street constructed projects provided by the City and obtained from other municipalities. Additional bid price data was obtained from both Arizona Department of Transportation’s E2C2 bid price database and Maricopa County Department of Transportation’s Cost Estimate Viewer website. Projects bid within 2021 through 2023 were selected, and an inflation factor was applied to projects bid in 2021 and 2022 to adjust them to 2023 prices. The bid prices were then averaged together to create a single unit price. The pavement structural section utilized for the comparison was 7.5-inches of asphalt concrete (1.5-inches of D-½” Surface Course 6.5-inches of A-1½” Base Course installed in two lifts) over prepared subgrade. Two layers of bituminous tack coat were assumed. This pavement structural section matches previous City of Phoenix Impact Fee updates. It should be noted that the 2023 version of the City of Phoenix Street Planning and Design Guidelines recommends a minimum pavement structural section of 9.0-inches over prepared subgrade, however the thinner section 7.5-inch thick section was utilized for consistency. A review of the unit prices was recently conducted in response to received questions about their derivation. During this review, out team identified outlier bid prices that had the effect of increasing the recommended unit price for subgrade preparation and asphalt pavement above the typical average. We believe removing these outlier bid prices will provide a unit price that is more in line with typical bid prices observed in the last three years. Kimley-Horn reviewed the unit prices for other cost elements, and confirmed the outliers only affected the unit costs for subgrade preparation and asphalt pavement. We believe this is an isolated occurrence that does not have an effect on other updates made as a part of this impact fee update process. Below is a summary of the revised recommended unit prices: Subgrade Preparation: $0.44 per square foot ($4.00 per square yard) Asphalt Pavement: $6.68 per square foot ($60.12 per square yard) / / . . . . . . . . . . l) i v i C ( r e e n i g n E l a n o i e g i s t e r e d P r o f e s R s . S . . A U , R I Z O N A A E R T I F I C O N E T A C . . . . . . e n g i S e t a D d 59483 VARNER JOEL 11 22 24 ATTACHMENT A4