Attachment B - Staff Report - Z-22-20-7.pdf
Extracted text (via pymupdf)
37217 characters
Staff Report Z-71-19-7 and Z-22-20-7
July 24, 2020
Encanto Village Planning
Committee Meeting Date:
August 3, 2020
Historic Preservation Commission
Meeting Date:
August 17, 2020
Planning Commission Hearing
Date:
September 3, 2020
Z-71-19-7
Request From:
Request To:
C-3 (General Commercial District) (1.74 acres)
C-3 DNS / WVR (General Commercial District,
Density Waiver) (1.74 acres)
Z-22-20-7:
Request From:
Request To:
C-3 (General Commercial District) (1.74
acres); Pending C-3 DNS / WVR (1.74 acres)
C-3 DNS / WVR HP (1.74 acres)
Location:
Approximately 250 feet east of the southeast
corner of Grand Avenue and Encanto
Boulevard
Z-71-19-7
Owner:
Applicant:
Representative:
D&J Investment AZ, LLC
Jeffrey Jacobs
Mario Magiamele, Iplan Consulting
Z-22-20-7
Owner:
Applicant:
Representative:
D&J Investment AZ, LLC
City of Phoenix
City of Phoenix
Staff Recommendation:
Approval, subject to stipulations
Attachment B
Staff Report: Z-71-19-7 & Z-22-20-7)
July 24, 2020
Page 2 of 16
General Plan Conformity
General Plan Land Use Map Designation
Commercial
Street Map
Classification
Encanto Boulevard
Collector
33-foot south half street
Grand Avenue
Major Arterial
50 to 55-foot north half street
BUILD THE SUSTAINABLE DESERT CITY CORE VALUE; TREES AND SHADE;
DESIGN PRINCIPLE: Integrate trees and shade into the design of new
development and redevelopment projects throughout Phoenix.
The development, as stipulated, incorporates trees along the perimeter of the site and
over pedestrian ways. This will provide thermal comfort for current and future
residents and create a more comfortable pedestrian environment for passersby.
CELEBRATE OUR DIVERSE COMMUNITIES & NEIGHBORHOODS CORE
VALUE; HISTORIC DISTRICTS; LAND USE PRINCIPLE: Promote land use that
encourages continued use of historic resources through rehabilitation and
adaptive reuse.
The subject contains historic buildings with significance under Criterion A for its
association with tourism in Phoenix during the mid-20th century. Dating to the 1930s,
the property meets the 50-year age requirement and has good historic integrity, with
few alterations taking place since the 1950s. These buildings will be preserved and
maintained as residential dwelling units.
CONNECT PEOPLE AND PLACES CORE VALUE; COMPLETE STREETS;
DESIGN PRINCIPLE: In order to balance a more sustainable transportation
system, development should be designed to include increased amenities for
transit, pedestrian and bicyclists such as shade, water, seating, bus shelters,
wider sidewalks, bike racks, pedestrian scale lighting and way-finding.
The development, as stipulated, is designed to encourage walking and bicycling
through the provision of bicycle parking in addition to porch and patio frontages
oriented to Encanto Boulevard. Together, these features will allow tenants to utilize
pedestrian and bicycle facilities for transportation to nearby amenities including transit
facilities.
Staff Report: Z-71-19-7 & Z-22-20-7)
July 24, 2020
Page 3 of 16
Applicable Plans, Overlays, and Initiatives
Tree and Shade Master Plan: See Background Item No. 10.
Complete Streets Guidelines: See Background Item No. 11.
Reimagine Phoenix: See Background Item No. 12.
Housing Phoenix: See Background Item No. 14
Surrounding Land Uses and Zoning
Land Use
Zoning
On Site
Apartments
C-3
North, across
Encanto Boulevard
Public Services Center – Arizona
Department of Public Safety
C-3
South, across Grand
Avenue and Railroad
Construction, Pipeline, and
Industrial Supply
A-2
East
Lumber Sales and Storage
C-3
West
Car Sales
C-3
C-3 DNS / WVR (General Commercial, Density Waiver)
Utilizing R-3 and R-3A (Multifamily Residential) Standards
Standards
Requirements
Proposed Site Plan
Gross Acreage
-
1.74 acres
Maximum Number of Units
45
35 (Met)
Maximum Density (dwelling
units per acre)
R3-A: Maximum 23.1
dwelling units per acre and
26.4 dwelling units per acre
with bonus
20.11 dwelling units per
acre (Met)
Maximum Lot Coverage
R-3: Maximum 45 percent
17 percent (Met)
Maximum Building Height
R-3: Maximum two stories
or 30 feet for first 150 feet;
then 1 foot in 5 foot
increase to 48 foot high,
four story maximum
20 feet (Met)
Staff Report: Z-71-19-7 & Z-22-20-7)
July 24, 2020
Page 4 of 16
Minimum Perimeter Building
Setbacks (R-3)
Encanto Boulevard
Grand Avenue
20-foot minimum
20-foot minimum
Existing buildings: 5
feet (Not Met*).
Proposed buildings:
15 feet (Not Met*)
Existing buildings: 2
feet (Not Met*). No new
buildings proposed
Minimum Perimeter
Setbacks (R-3)
(East and West)
15 foot minimum
East existing and
proposed buildings: 7
foot minimum (Not
Met*)
West existing buildings:
0 foot minimum (Not
Met*). No new buildings
proposed
Landscape Setback (R-3)
Encanto Boulevard
Grand Avenue
20 foot minimum
20 foot minimum
Existing buildings: 5
feet (Not Met*).
Proposed buildings:
15 feet (Not Met*)
Existing buildings: 0
feet (Not Met*). No new
buildings proposed.
Minimum Open Space (R-3)
Minimum 5 percent of gross
2.52 percent (Not Met*)
Minimum Amenities Provided Minimum 2
Detail not provided
Minimum Parking
Minimum 53 spaces
30 spaces (Not Met*)
*Variance or Site Plan Revision Required
Staff Report: Z-71-19-7 & Z-22-20-7)
July 24, 2020
Page 5 of 16
Background/Issues/Analysis
SUBJECT SITE
1.
The request is to rezone 1.74
acres approximately 250 feet
east of the southeast corner of
Grand Avenue and Encanto
Boulevard from C-3 (General
Commercial) to C-3 DNS /
WVR HP (General Commercial,
Density Waiver, Historic
Preservation Overlay) to allow
for multifamily residential.
The site is home to the historic
Arrow / Rainbow Hotel on
Grand Avenue and is located
within one-half mile of the
Maricopa County Fair Grounds,
Encanto Park, and Metro Tech
High School.
Figure A: Top (Streetview from Encanto Boulevard,
Bottom (Streetview from Grand Avenue)
Source: GoogleEarth
Figure B. Area Wide Context Map
Source: Planning and Development Department
Staff Report: Z-71-19-7 & Z-22-20-7)
July 24, 2020
Page 6 of 16
SURROUNDING LAND USES AND ZONING
2.
To the west is automobile sales
zoned C-3 (General Commercial).
To the east is lumber supply sales
zoned C-3 (General Commercial).
To the north is a Department of
Public Safety facility zoned C-3
(General Commercial). To the south,
across Grand Avenue and the
railroad approximately 250 feet, is
an industrial supply company zoned
A-2 (Heavy Industrial).
Figure C. Zoning Context Map
Source: Planning and Development Department
PRESERVE HISTORIC PHOENIX PLAN
3.
Eligibility
The eligibility criteria for Historic Preservation (HP) overlay zoning and listing on
the Phoenix Historic Property Register are set forth in Section 807.D of the City of
Phoenix Zoning Ordinance. To qualify, a property must demonstrate significance
in local, regional, state, or national history, architecture, archaeology, engineering,
or culture, according to one or more of the following criteria:
A. The property is associated with the events that have made a significant
contribution to the broad pattern of our history;
B. The property is associated with the lives of persons significant in our past;
C. The property embodies the distinctive characteristics of a type, period, or
method of construction, represents the work of a master, possesses high
artistic values, or represents a significant and distinguishable entity whose
components may lack individual distinction; or
D. The property has yielded or may likely yield information integral to the
understanding of our prehistory or history.
In addition to the significance requirement, the property must also be at least 50
years old or have achieved significance within the past 50 years if it is of
exceptional importance. The property must also possess sufficient integrity of
location, design, setting, materials, workmanship, feeling, and association to
convey its significance.
The property at 2262 Grand Avenue, known historically as the Arrow
Motel/Rainbow Motel, is significant under Criterion A for its association with
tourism in Phoenix during the mid-20th century. Dating to the 1930s, the property
meets the 50-year age requirement and has good historic integrity, with few
alterations since the 1950s.
Staff Report: Z-71-19-7 & Z-22-20-7)
July 24, 2020
Page 7 of 16
4.
Significance
In the early 20th century, recreational activities and leisure time became
attainable for a wider swath of the country through shifts in labor laws and
affordable automobiles. Roadsides were adapted into impromptu campgrounds,
then later formal auto courts and motels. A small motel operation could be
erected with a handful of frame-and-canvas cabins. These businesses were
mutable with time and consumer demands; a handful of cabins in a neat row with
carports could be remodeled into a continuous building with carports converted to
rooms. If there was land on which to expand, one row of rooms might be modified
into an L or a U-shape. Amenities were often upgraded along with motel
expansions.
The Arrow Motel/Rainbow Motel, constructed ca. 1937 in adobe, partially
illustrates typical auto court/motel history. When the Arrow Motel opened, its
Grand Avenue frontage was the alignment of U.S. Highways 60, 70 and 89.
Phoenix was a major southwestern crossroads where those highways joined U.S.
Highway 80 at Grand Avenue, 7th Avenue and Van Buren Street. Grand Avenue
and Van Buren Street were once lined with dozens of motels like the Arrow, as
well as much larger and later examples, but these properties have dwindled
drastically in the last 25 years, making the Arrow Motel/Rainbow Motel a rare
surviving property type.
The Arrow Motel/Rainbow Motel was owned by a series of husband-and-wife
teams. The earliest information available indicates six units with open parking
between buildings along the south/southeast property line. By 1949, a seventh
cabin was added with an owner/manager’s unit at the north end of the property.
Unlike other contemporaneous motels, the Arrow never expanded into an L or U-
shape, and never had a pool in the middle of the property.
In 1952, the name was changed from Arrow to Rainbow Motel with new
ownership. Four years later, the parking spaces between cabins were infilled with
smaller living units; two masonry buildings with four units were also constructed at
the northwest corner of the property. In 1967, Grand Avenue was widened and
the 24’ x 24’ attached office at the western end of the original row of cabins was
removed. To replace it, the owners successfully applied for a variance to install a
single-wide trailer with a masonry addition at the center of the property. This
structure remains and has been stylistically integrated into the property.
Grand Avenue was widened again in 2013 to provide a designated right-hand turn
lane onto Encanto Boulevard. The original proposal called for purchase and
demolition of the property by the Arizona Department of Transportation. The
Staff Report: Z-71-19-7 & Z-22-20-7)
July 24, 2020
Page 8 of 16
project was modified to include the removal of only one of the 1952, two-unit
buildings to spare the rest of the motel property. Currently, there are 14 units total
on the property, and the motel functions as an apartment complex.
As part of the proposed two-story, detached apartment complex proposed for the
east (rear) of the lot, the ca. 1976 double-wide mobile home will be removed.
None of the other four buildings on the lot will be disturbed for the proposed
project. The property will still retain its eligibility for historic designation under
Criterion A.
GENERAL PLAN LAND USE MAP DESIGNATIONS
5.
The General Plan Land Use Map
designation for the subject site is
Commercial. Because the
Commercial Land Use designation
accommodates multifamily
residential at varying scales and
levels of intensity,the proposed use
is considered consistent with the
land use designation.
The properties to the north, west,
and east are also designated
Commercial.
The properties to the southwest
beginning at the centerline of Grand
Avenue are designated Industrial.
The properties to the northwest is an
additional Department of Public
Safety facility designated Public /
Quasi Public on the General Plan
Land Use Map.
Figure D: General Plan Land Use Map
Source: City of Phoenix, Planning and
Development Department
Staff Report: Z-71-19-7 & Z-22-20-7)
July 24, 2020
Page 9 of 16
PROPOSAL
6.
Site Plan
The applicant is proposing to
preserve several historic motel
buildings which have already been
converted to apartment. The historic
buildings are not in compliance with
the current setback requirements of
the zoning ordinance as evident in
the development standards table. In
addition to the historic buildings, the
applicant is proposing an additional
two-story building at the northern
portion of the site bringing the total
site to 35 dwelling units.
Staff is recommending a series of
stipulations to promote walking,
bicycling, and public transportation:
Figure E: Conceptual Site Plan
Source: Applicant
• Stipulation No. 2: Detached and shaded sidewalks (75 percent) along
Encanto Boulevard.
• Stipulation No. 3: Parking lots shaded to a minimum of 25 percent by trees.
• Stipulation No. 4: Bicycle parking provided for residents and guests.
• Stipulation No. 6: Restricting the maximum height of solid (opaque) fences
and walls to 36 inches between the front plane of the new buildings and
Encanto Boulevard.
7.
Elevations
The applicant is proposing the
preservation of the existing historic
motel buildings to multifamily and
the construction of two two-story
multifamily buildings. The existing
historic buildings had been
converted to multifamily and no
additional changes are proposed at
this time.
Figure F: Conceptual Building Elevations
Source: Applicant
Staff Report: Z-71-19-7 & Z-22-20-7)
July 24, 2020
Page 10 of 16
The proposed new construction is designed to complement the historic buildings
on the site with stucco, wood accents including balconies, and a similar color
pallet. To add additional visual interest from Encanto Boulevard and to promote
pedestrian activity, staff is recommending Stipulation No. 5 which requires all
units adjacent to Encanto Boulevard to have a porch, patio, windows, or balconies
oriented to the sidewalk.
Figure G: Walkable Urban Code Excerpts. Porch and Patio Frontage Types.
Source: Phoenix Zoning Ordinance, Section 1305 (Walkable Urban Code), Frontage Standards
8.
Applicable Development Standards
C-3 (General Commercial) allows multifamily development at R-3 (Multifamily
Residence District) Standards. An applicant may receive additional density, up to
R-5 (Multifamily Residence District) standards, subject to the approval of a
Density Waiver granted by the City Council.
Staff is recommending Stipulation No. 1 which requires the development utilize
the R-3 (Multifamily Residence District) zoning development standards, the
density maximum permitted in R-3A (Multifamily Residence District) zoning, and
the perimeter landscape planting standards contained in C-3 (General
Commercial District) zoning.
By reference to R-3 (Multifamily Residence District) zoning development
standards, the development is restricted to a maximum height of two stories or 30
feet for the first 150 feet and then a one foot increase in height for every
additional five feet increase in height, to a maximum of 48 feet high up to four
stories. The purpose of this standard is to promote compatibility with the context
of the surrounding area.
9.
Pedestrian Pathways
The site plan depicts a series of pedestrian pathways between all units, the
central amenity area, and the public sidewalks. Staff is recommending Stipulation
No. 7 to require clearly defined and accessible pathways between all building
entrances and exits and the public sidewalks and, where pathways cross
vehicular maneuvering areas.
Staff Report: Z-71-19-7 & Z-22-20-7)
July 24, 2020
Page 11 of 16
STUDIES AND POLICIES
10. Tree and Shade Master Plan:
The Tree and Shade Master Plan encourages treating the urban forest as
infrastructure to ensure the trees are an integral part of the City’s planning and
development process. Sidewalks on the street frontages should be detached from
the curbs to allow trees to be planted on both sides of the sidewalk to provide
thermal comfort for pedestrians and to reduce the urban heat island effect.
Staff is recommending the following stipulations to advance the goals of the Tree
and Shade Master Plan:
• Stipulation No. 1: Utilizing C-3 (General Commercial) landscape standards
for perimeter setbacks which will produce an enhancement over standard
multifamily standards.
• Stipulation No. 2: Requiring detached and shaded sidewalks (75 percent)
along Encanto Boulevard with enhanced tree planting standards.
• Stipulation No. 3: Requiring parking lots be shaded to a minimum of 25
percent by trees.
11. Complete Streets Guidelines:
In 2014, the City of Phoenix City Council adopted the Complete Streets Guiding
Principles. The principles are intended to promote improvements that provide an
accessible, safe, connected transportation system to include all modes, such as
bicycles, pedestrians, transit, and vehicles.
Staff is recommending Stipulation No. 4 which requires bicycle parking provided
for residents and guests. Further, Stipulation No. 5 promotes porches and patios
oriented to Encanto Boulevard which will support bicycling, walking, and public
transit use. Stipulation No. 7 requires a pedestrian connection to the public
sidewalks along both Encanto Boulevard and Grand Avenue.
12. Reimagine Phoenix:
As part of the Reimagine Phoenix Initiative, the City of Phoenix is committed to
increasing the waste diversion rate to 40 percent by 2020 and to better manage
its solid waste resources. The provision of recycling containers was not
addressed in the applicant’s submittals.
13. Housing Phoenix:
In June 2020, the Phoenix City Council approved the Housing Phoenix Plan. This
Plan contains policy initiatives for the development and preservation of housing
with vision of creating a stronger and more vibrant Phoenix through increased
housing options for residents at all income levels and family sizes. Phoenix’s
rapid population growth and housing underproduction has led to a need for over
Staff Report: Z-71-19-7 & Z-22-20-7)
July 24, 2020
Page 12 of 16
163,000 new housing units. Current shortages of housing supply relative to
demand are a primary reason why housing costs are increasing.
The proposed development supports the Plan’s goal of preserving or creating
50,000 housing units by 2030 by contributing to a variety housing types that will
address the supply shortage at a more rapid pace while using vacant land in a
more sustainable fashion.
COMMUNITY CORRESPONDENCE:
14. As of the writing of this report, staff has not received any correspondence
regarding this proposed rezoning application.
INTERDEPARTMENTAL COMMENTS:
15. The City of Phoenix Public Works Department, Flood Plain Management Division,
determined that the site is not in a Special Flood Hazard Area (SFHA), but
located in a Shaded Zone X, on panel 2205 L of the Flood Insurance Rate Maps
(FIRM) dated October 16, 2013.
16. The Public Transit Department did not have any comments or request any
stipulations.
17. The Street Transportation Department provided their standard comment
requesting Stipulation No. 8. The Street Transportation Department’s Pedestrian
Safety Coordinator commented on the following topic areas:
• Delineating all pedestrian pathways with special attention to crossings of
vehicular maneuvering areas (Stipulation No. 7)
• Requiring detached sidewalks with landscaping between the back of curb
and sidewalk (Stipulation No. 2)
• Providing secure bicycle storage on site (Stipulation No. 4)
• If a perimeter fence or wall is desired, it should be view-fence (Stipulation
No. 6).
• Requiring R9-3 and R9-3BP (“Use Crosswalk”) signs along Encanto
Boulevard and Grand Avenue near pedestrian exits.
• Requiring traffic calming at all driveway exits.
The bulleted comments without stipulation references were taken into
consideration and deemed to be most appropriate for the Site Plan Review
process rather than through a zoning entitlement.
18. The Parks and Recreation Department commented that they have no trail or trail
easements relevant to the request.
Staff Report: Z-71-19-7 & Z-22-20-7)
July 24, 2020
Page 13 of 16
19. The Fire Department indicated there are no problems anticipated with the case
and that the site and/or buildings shall comply with the Phoenix Fire Code.
Further, the Department commented that they do not know the water supply at
this site and noted that additional water supply may be required to meet the
required fire flow per the Phoenix Fire Code.
20. The Water Services Department commented that the proposed site has existing
water and sewer mains on site. They also provided a standard comment:
Capacity is a dynamic condition that can change over time due to a variety of
factors. It is the City's intent to provide water and sewer service. However, the
requirements and assurances for water and sewer service are determined during
the site plan application review. For any given property, water and sewer
requirements may vary over time to be less or more restrictive depending on the
status of the City’s water and sewer infrastructure.
OTHER:
21. The site is located in a larger area identified as being archaeologically sensitive. If
further review by the City of Phoenix Archaeology Office determines the site and
immediate area to be archaeologically sensitive, and if no previous archaeological
projects have been conducted within this project area, it is recommended that
archaeological Phase I data testing of this area be conducted. Phase II
archaeological data recovery excavations may be necessary based upon the
results of the testing. A qualified archaeologist must make this determination in
consultation with the City of Phoenix Archaeologist. In the event archaeological
materials are encountered during construction, all ground disturbing activities
must cease within a 33-foot radius of the discovery and the City of Phoenix
Archaeology Office must be notified immediately and allowed time to properly
assess the materials. This is addressed in Stipulation Nos. 10 – 12.
22. The property owner shall record documents that disclose the existence, and
operational characteristics of Sky Harbor Airport to future owners or tenants of the
property. The form and content of such documents shall be according to the
templates and instructions provided which have been reviewed and approved by
the City Attorney. The comment is addressed in Stipulation No. 9.
23. Development and use of the site is subject to all applicable codes and
ordinances. Zoning approval does not negate other ordinance requirements.
Other formal actions such as, but not limited to, zoning adjustments and
abandonments may be required.
Findings
Staff Report: Z-71-19-7 & Z-22-20-7)
July 24, 2020
Page 14 of 16
1.
The development advances the purpose and intent of the Preserve Historic
Phoenix Plan by placing a Historic Preservation Overlay on the site.
2.
The development, as stipulated, is appropriate at this location due to its
compatibility with the surrounding land uses and the inclusion of bicycle and
pedestrian facilities which leverages existing infrastructure.
3.
The development is consistent with the Commercial Designation in the Phoenix
General Plan.
Stipulations
1.
The development shall utilize the standards contained in R-3 (Multifamily
Residence District) zoning development standards with the following exceptions,
as approved or modified by the Planning and Development Department.
a. Density shall be limited to the Planned Residential Development Option of
the R-3A (Multifamily Residence District, Planned Residential District)
zoning standards.
b. Perimeter landscape planting standards shall be installed and maintained
in accordance with C-3 (General Commercial) zoning standards regarding
plant type, size, and quantity. Trees shall be placed in proximity to public
sidewalks to provide enhanced thermal comfort.
2.
The public sidewalk along Encanto Boulevard shall be detached with a minimum
five-foot-wide landscape area located between the sidewalk and back of curb
and planted to the following standards, as approved by the Planning and
Development Department. Where utility conflicts exist, the developer shall work
with the Planning and Development Department on alternative design solutions
consistent with a pedestrian environment.
a. Minimum 3-inch caliper large canopy, single-trunk, shade trees placed a
minimum of 25 feet on center or in equivalent groupings to provide a
minimum of 75 percent shade on adjacent sidewalks.
b. Drought tolerant shrubs and vegetative groundcovers with a maximum
mature height of 24 inches to provide a minimum of 75 percent live
coverage at maturity.
Staff Report: Z-71-19-7 & Z-22-20-7)
July 24, 2020
Page 15 of 16
3.
The parking lot area, including parking spaces and vehicular maneuvering
areas, shall be shaded to a minimum 25 percent at plant maturity. Any trees
located within the perimeter of the parking lot area shall be large canopy shade
with a minimum 2-inch caliper. The above standards shall be approved by the
Planning and Development Department.
4.
The developer shall provide Inverted-U bicycle racks at a rate of 0.25 spaces per
dwelling unit up to a maximum of 50 spaces, as approved by the Planning and
Development Department.
5.
All new dwelling units located within 30 feet of Encanto Boulevard shall
incorporate at least one of the following elements, as approved or modified by
the Planning and Development Department:
a. A patio or porch oriented to Encanto Boulevard and designed to maintain
consistency with the design characteristics of the existing historical
structures on the site. Porches and patios shall have visual or physical
access to the public sidewalk along Encanto Boulevard.
b. Windows and/or balconies with visual access to the public sidewalk along
Encanto Boulevard.
6.
No solid perimeter wall greater than 36 inches in height shall be permitted
between the plane of the buildings and the Encanto Boulevard right of way.
7.
The developer shall provide a system of clearly defined, accessible pathways
constructed of decorative pavers, stamped or colored concrete, or other
pavement treatments that visually contrast with the adjacent parking and drive
aisles surfaces which provide direct connections between all building entrances
and exits and all public sidewalks, as approved or modified by the Planning and
Development Department.
8.
The developer shall construct all streets within and adjacent to the development
with paving, curb, gutter, sidewalk, curb ramps, streetlights, median islands,
landscaping and other incidentals as per plans approved by the Planning and
Development Department. All improvements shall comply with all ADA
accessibility standards.
Staff Report: Z-71-19-7 & Z-22-20-7)
July 24, 2020
Page 16 of 16
9.
The property owner shall record documents that disclose the existence, and
operational characteristics of Sky Harbor International Airport to future owners or
tenants of the property. The form and content of such documents shall be
according to the templates and instructions provided which have been reviewed
and approved by the City Attorney.
10. If determined necessary by the Phoenix Archaeology Office, the applicant shall
conduct Phase I data testing and submit an archaeological survey report of the
development area for review and approval by the City Archaeologist prior to
clearing and grubbing, landscape salvage, and/or grading approval.
11. If Phase I data testing is required, and if, upon review of the results from the
Phase I data testing, the City Archaeologist, in consultation with a qualified
archaeologist, determines such data recovery excavations are necessary, the
applicant shall conduct Phase II archaeological data recovery excavations.
12. In the event archaeological materials are encountered during construction, the
developer shall immediately cease all ground-disturbing activities within a 33-
foot radius of the discovery, notify the City Archaeologist, and allow time for the
Archaeology Office to properly assess the materials.
Author
Nick Klimek
July 24, 2020
Team Leader
Samantha Keating
Exhibits
Zoning sketch map (Z-71-19-7)
Aerial sketch map (Z-71-19-7)
Zoning sketch map (Z-22-20-7)
Aerial sketch map (Z-22-20-7)
Conceptual Site Plan date stamped January 2, 2020 (1 page)
Conceptual Elevations date stamped January 2, 2020 (2 pages)
Historic Preservation Photos (3 pages)
Z-67-86
Z-118-95
*
*
C-3
R-3
C-O
A-2
R-4
R-4
R-3
R-4
C-O
R-5
C-3
GRAND AVE
ENCANTO BLVD
24TH AVE
21ST DR
23RD DR
MONTE VISTA RD
22ND AVE
23RD AVE
Black Canyon/Maricopa
Freeway Specific Plan
I-17
19TH AVE
7TH AVE
CENTRAL AVE
7TH ST
16TH ST
24TH ST
SR 51
MC DOWELL RD
THOMAS RD
INDIAN SCHOOL RD
G
r
an
d
C
a
n
a
l
ENCANTO VILLAGE
CITY COUNCIL DISTRICT: 7
I
APPLICANT'S NAME:
APPLICATION NO.
Z-71-19
GROSS AREA INCLUDING 1/2 STREET
AND ALLEY DEDICATION IS APPROX.
1.74 Acres
MULTIPLES PERMITTED
* Maximum Units Allowed with P.R.D. Bonus
C-3
C-3 DNS/WVR
CONVENTIONAL OPTION
25
75
* UNITS P.R.D. OPTION
30
91
Jeffrey Jacobs
DATE:
2/10/2020
REVISION DATES:
AERIAL PHOTO &
QUARTER SEC. NO.
QS 14-24
ZONING MAP
G-7
REQUESTED CHANGE:
FROM: C-3 ( 1.74 a.c.)
TO:
C-3 DNS/WVR ( 1.74 a.c.)
Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\2019\Z-71-19.mxd
Z-71-19
0.04
0
0.04
0.02
Miles
Z-118-95
Z-67-86
*
*
R-3
R-4
C-O
R-4
C-3
R-3
C-3
R-5
C-O
A-2
R-4
GRAND AVE
ENCANTO BLVD
24TH AVE
21ST DR
23RD DR
MONTE VISTA RD
22ND AVE
23RD AVE
Black Canyon/Maricopa
Freeway Specific Plan
I-17
19TH AVE
7TH AVE
CENTRAL AVE
7TH ST
16TH ST
24TH ST
SR 51
MC DOWELL RD
THOMAS RD
INDIAN SCHOOL RD
G
r
an
d
C
a
n
a
l
ENCANTO VILLAGE
CITY COUNCIL DISTRICT: 7
I
APPLICANT'S NAME:
APPLICATION NO.
Z-71-19
GROSS AREA INCLUDING 1/2 STREET
AND ALLEY DEDICATION IS APPROX.
1.74 Acres
MULTIPLES PERMITTED
* Maximum Units Allowed with P.R.D. Bonus
C-3
C-3 DNS/WVR
CONVENTIONAL OPTION
25
75
* UNITS P.R.D. OPTION
30
91
Jeffrey Jacobs
DATE:
2/10/2020
REVISION DATES:
AERIAL PHOTO &
QUARTER SEC. NO.
QS 14-24
ZONING MAP
G-7
REQUESTED CHANGE:
FROM: C-3 ( 1.74 a.c.)
TO:
C-3 DNS/WVR ( 1.74 a.c.)
Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\2019\Z-71-19.mxd
Z-71-19
0.04
0
0.04
0.02
Miles
Z-67-86
Z-118-95
*
*
C-3
R-3
C-O
A-2
R-4
R-4
R-3
R-4
C-O
R-5
C-3
ENCANTO BLVD
21ST DR
GRAND AVE
23RD AVE
22ND AVE
Black Canyon/Maricopa
Freeway Specific Plan
I-17
19TH AVE
7TH AVE
CENTRAL AVE
7TH ST
16TH ST
24TH ST
SR 51
MC DOWELL RD
THOMAS RD
INDIAN SCHOOL RD
G
r
an
d
C
a
n
a
l
ENCANTO VILLAGE
CITY COUNCIL DISTRICT: 7
I
APPLICANT'S NAME:
APPLICATION NO.
Z-22-20
GROSS AREA INCLUDING 1/2 STREET
AND ALLEY DEDICATION IS APPROX.
1.74 Acres
MULTIPLES PERMITTED
* Maximum Units Allowed with P.R.D. Bonus
C-3 (Pending C-3 DNS/WVR)
C-3 DNS/WVR HP
CONVENTIONAL OPTION
25 ( 75)
75
* UNITS P.R.D. OPTION
30 ( 91)
91
City of Phoenix Historic Pres Commission
DATE:
05/14/2020
REVISION DATES:
AERIAL PHOTO &
QUARTER SEC. NO.
QS 14-24
ZONING MAP
G-7
REQUESTED CHANGE:
FROM: C-3 (Pending C-3 DNS/WVR) ( 1.74 a.c.)
TO:
C-3 DNS/WVR HP ( 1.74 a.c.)
Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\2020\Z-22-20.mxd
Z-22-20
0.035
0
0.035
0.0175
Miles
Z-67-86
Z-118-95
*
*
C-3
R-3
C-O
A-2
R-4
R-4
R-3
R-4
C-O
R-5
C-3
ENCANTO BLVD
21ST DR
GRAND AVE
23RD AVE
22ND AVE
Black Canyon/Maricopa
Freeway Specific Plan
I-17
19TH AVE
7TH AVE
CENTRAL AVE
7TH ST
16TH ST
24TH ST
SR 51
MC DOWELL RD
THOMAS RD
INDIAN SCHOOL RD
G
r
an
d
C
a
n
a
l
ENCANTO VILLAGE
CITY COUNCIL DISTRICT: 7
I
APPLICANT'S NAME:
APPLICATION NO.
Z-22-20
GROSS AREA INCLUDING 1/2 STREET
AND ALLEY DEDICATION IS APPROX.
1.74 Acres
MULTIPLES PERMITTED
* Maximum Units Allowed with P.R.D. Bonus
C-3 (Pending C-3 DNS/WVR)
C-3 DNS/WVR HP
CONVENTIONAL OPTION
25 ( 75)
75
* UNITS P.R.D. OPTION
30 ( 91)
91
City of Phoenix Historic Pres Commission
DATE:
05/14/2020
REVISION DATES:
AERIAL PHOTO &
QUARTER SEC. NO.
QS 14-24
ZONING MAP
G-7
REQUESTED CHANGE:
FROM: C-3 (Pending C-3 DNS/WVR) ( 1.74 a.c.)
TO:
C-3 DNS/WVR HP ( 1.74 a.c.)
Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\2020\Z-22-20.mxd
Z-22-20
0.035
0
0.035
0.0175
Miles
ENCANTO BOULEVARD
GRAND AVENUE
T T
T
Bowman Consulting Group, Ltd.
6751 North Sunset Blvd, Ste 325
Glendale, Arizona 85305
c Bowman Consulting Group, Ltd.
Phone: (480) 629-8830
www.bowmanconsulting.com
CONCEPTUAL LAYOUT
CITY VIEW APARTMENTS
PHOENIX, AZ
MARICOPA COUNTY
----
DAB
DAB
CLN
1" = 20'
N/A
050669-01-001
12/3/2019
1
1
1
F.F.
0'-0"
T.O.PLATE
9'-0"
T.O.PARAPET
22'-0"
F.F 2
11'-0"
T.O.ROOF
20'-0"
F.F.
0'-0"
T.O.PLATE
9'-0"
T.O.PARAPET
22'-0"
F.F 2
11'-0"
T.O.ROOF
20'-0"
F.F.
0'-0"
T.O.PLATE
9'-0"
T.O.PARAPET
22'-0"
F.F 2
11'-0"
T.O.ROOF
20'-0"
F.F.
0'-0"
T.O.PLATE
9'-0"
T.O.PARAPET
22'-0"
F.F 2
11'-0"
T.O.ROOF
20'-0"
F.F.
0'-0"
T.O.PLATE
9'-0"
T.O.PARAPET
22'-0"
F.F 2
11'-0"
T.O.ROOF
20'-0"
F.F.
0'-0"
T.O.PLATE
9'-0"
T.O.PARAPET
22'-0"
F.F 2
11'-0"
T.O.ROOF
20'-0"
F.F.
0'-0"
T.O.PLATE
9'-0"
T.O.PARAPET
22'-0"
F.F 2
11'-0"
T.O.ROOF
20'-0"
F.F.
0'-0"
T.O.PLATE
9'-0"
T.O.PARAPET
22'-0"
F.F 2
11'-0"
T.O.ROOF
20'-0"
2 N CENTRAL SUITE 1800
PHOENIX, ARIZONA 85004
TELEPHONE: 602.568.6392
E-MAIL: admin@rlbarc.com
ARCHITECTURE
CITY VIEW APARTMENTS
2262 GRANDE AVE
PHOENIX, AZ 85009
A2.1
EXTERIOR ELEVATIONS
8 UNIT EAST ELEVATION
1
1
8" = 1'-0"
KEYNOTES
EXTERIOR CEMENT PLASTER - PAINT TAN TO MATCH ADJACENT STRUCTURES
DOOR PER SCHEDULE - BURNT ORANGE TO MATCH ADJACENT STRUCTURES
8 UNIT WEST ELEVATION
3
1
8" = 1'-0"
WINDOW PER SCHEDULE
8 UNIT SOUTH ELEVATION
4
1
8" = 1'-0"
WOOD TRIM - PAINT BURNT ORANGE TO MATCH ADJACENT STRUCTURES
8 UNIT NORTH ELEVATION
2
1
8" = 1'-0"
WOOD RAILING - PAINT BURNT ORANGE TO MATCH ADJACENT STRUCTURES
TYP
TYP
TYP
TYP
TYP
TYP
STAIRWAY/COLUMN IN FOREGROUND
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
6 UNIT EAST SOUTH
9
1
8" = 1'-0"
8 UNIT NORTH ELEVATION
11
1
8" = 1'-0"
8 UNIT WEST ELEVATION
12
1
8" = 1'-0"
6 UNIT EAST ELEVATION
10
1
8" = 1'-0"
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
F.F.
0'-0"
T.O.PLATE
9'-0"
T.O.PARAPET
22'-0"
F.F 2
11'-0"
T.O.ROOF
20'-0"
F.F.
0'-0"
T.O.PLATE
9'-0"
T.O.PARAPET
22'-0"
F.F 2
11'-0"
T.O.ROOF
20'-0"
F.F.
0'-0"
T.O.PLATE
9'-0"
T.O.PARAPET
22'-0"
F.F 2
11'-0"
T.O.ROOF
20'-0"
F.F.
0'-0"
T.O.PLATE
9'-0"
T.O.PARAPET
22'-0"
F.F 2
11'-0"
T.O.ROOF
20'-0"
2 N CENTRAL SUITE 1800
PHOENIX, ARIZONA 85004
TELEPHONE: 602.568.6392
E-MAIL: admin@rlbarc.com
ARCHITECTURE
CITY VIEW APARTMENTS
2262 GRANDE AVE
PHOENIX, AZ 85009
A2.2
EXTERIOR ELEVATIONS
8 UNIT 'L' SOUTH ELEVATION
1
1
8" = 1'-0"
KEYNOTES
EXTERIOR CEMENT PLASTER - PAINT TAN TO MATCH ADJACENT STRUCTURES
DOOR PER SCHEDULE - BURNT ORANGE TO MATCH ADJACENT STRUCTURES
8 UNIT 'L' NORTH ELEVATION
3
1
8" = 1'-0"
WINDOW PER SCHEDULE
8 UNIT NORTH ELEVATION
4
1
8" = 1'-0"
WOOD TRIM - PAINT BURNT ORANGE TO MATCH ADJACENT STRUCTURES
8 UNIT 'L' EAST ELEVATION
2
1
8" = 1'-0"
WOOD RAILING - PAINT BURNT ORANGE TO MATCH ADJACENT STRUCTURES
TYP
TYP
TYP
TYP
TYP
STAIRWAY/COLUMN IN FOREGROUND
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
-
9
1
8" = 1'-0"
-
11
1
8" = 1'-0"
-
12
1
8" = 1'-0"
-
10
1
8" = 1'-0"
TYP
TYP
TYP
Z-22-20-7
SE corner of Grand Avenue and Encanto Boulevard
Arrow Motel/Rainbow Motel
1961 - Historic appearance
2019 - Recent appearance
Z-022-20-7
SE corner of Grand Avenue and Encanto Boulevard
Arrow Motel/Rainbow Motel
2020 – Recent appearance
2020 – Recent appearance
Z-022-20-7
SE corner of Grand Avenue and Encanto Boulevard
Arrow Motel/Rainbow Motel
2020 – Recent appearance
1949 – Newspaper advertisement offering Arrow Motel for sale