Attachment C - VPC Summary-Info Only - Z-37-19-2
Extracted text (via pymupdf)
14250 characters
City of Phoenix • Planning & Development Department 200 West Washington Street, 3rd Floor • Phoenix, Arizona 85003-1611 • (602) 262-6882 Village Planning Committee Meeting Summary Z-37-19-2 INFORMATION ONLY Date of VPC Meeting February 20, 2020 Request From S-1 (156.96 acres) Request To PUD (156.96 acres) Proposed Use Single-family, multifamily, retail, office, and commerce park uses. Location Northeast corner of Central Avenue and Happy Valley Road VPC DISCUSSION: 1 speaker card was submitted in favor, wishing to speak. 40 speaker cards were submitted in opposition, wishing to speak. 3 speaker cards were submitted in opposition, not wishing to speak. A petition in opposition was submitted containing 76 signatures. Mr. David Cisiewski, with the Law Office of David Cisiewski, PLLC, representing the applicant, went over the history of the site and highlighted the history of the site. He explained his client’s proposal for the three-parcel development plan. He also went over where discussions have gone to date with stakeholders in the area. He explained that various chemicals had been used on the site directly related to historic uses on the site. He shared in his presentation several slides that the Arizona Department of Environmental Quality (ADEQ) has presented at a neighborhood meeting prior to this meeting. The slides were color coded and he explained each color-coded area depicted on the maps. He went over the water remediation facility and well system currently operating on the site to clean up a contaminated groundwater plume in the center portion of the site. He went over the ADEQ environmental remediation tactics required to date to include soils contamination remediation, groundwater pump and treat system and went over the Declaration of Environmental Use Restriction (DEUR) documents and their requirements and restrictions for the site. Mr. Cisiewski also talked about the land use request on the site. He went over the open space proposed, which is superior to ordinance standards, he went over lot sizes, which are quite small and went over amenity areas within the open Attachment C Z-37-19-2 Page 2 of 6 City of Phoenix • Planning & Development Department 200 West Washington Street, 3rd Floor • Phoenix, Arizona 85003-1611 • (602) 262-6882 space proposed. He spoke about the proposed trail network internal to the site and connecting to the Sonoran Preserve to the east of the site. He went into a marginal level of detail about the monitoring well sites on the overall site and stated that they cannot be disturbed and that ADEQ was the regulatory agency overseeing the clean-up of the soil and aquifer. He highlighted the water and sewer infrastructure being extended as a result of this development. He went on to talk about the General Plan Amendment case as well and highlighted some of the plan goals he thinks relate to this request. Mr. Ricardo Romero asked if the developer had done a project of this scope in the past. Mr. Cisiewski shared that yes, the developer has done many largescale projects like this one across the country. The development company is K-Hovnanian Homes. He did iterate that they only to residential large scape developments. Mr. Brandon Shipman asked how long the ADEQ monitoring wells will be required to stay on site. Mr. Cisiewski shared that he did not have a definitive answer, but it could be between 5 years and 30 years. Public Comment: Mr. Robert Hanson had concerns about the citizen participation report not being submitted prior to the Village meeting being scheduled for this case for Information Only. He believes staff is undermining the process by letting the applicant go to a Village meeting prior to the citizen participation report is submitted. Mr. David Simmons, staff, explained in detail how the PUD process timeline works and highlighted when the citizen participation report is due to the city. He shared that the hearing dates for recommendation would not be set until the citizen participation report was submitted, among other legal requirements of the process are met as well. He iterated that this case is still in the very early stages of the process and staff was in no way breaking away from the process in any way and that the city follows stringent protocols. Mr. David Riley, member of the public, had 27 speaker cards submitted deferring time to him. Mr. Riley had staff load a power point presentation. He went over who they are as a community, shared that the community as a whole stands opposed to the PUD and GPA requests, went over the history of environmental degradation caused by UPCO et al, highlighted the proposed PUD’s impact on the community including dark skies concerns, trespassing concerns, character of the area being completely changes to a higher density residential character, traffic concerns, health and safety concerns, environmental destruction, and the developer not adhering to existing established plans and promises. He stated that he and his neighbors are opposed to the changes and recommends denial. Z-37-19-2 Page 3 of 6 City of Phoenix • Planning & Development Department 200 West Washington Street, 3rd Floor • Phoenix, Arizona 85003-1611 • (602) 262-6882 Discussion: Ms. Ann O’Brien asked Mr. Riley where he obtained his traffic data in his presentation. Mr. Riley stated that he received the data from Maricopa County and the City of Phoenix. Vice Chair Trilese DiLeo asked how this proposed development was going to make his neighborhood less healthy. Mr. Riley stated that construction on the land would kick up contaminates and make them airborne. He is also concerned about onsite retention of water further contaminating the aquifer in which he and his neighbor’s wells tap into. Mr. Ozzie Virgil asked how many residents live north of the Desert Foothills PUD site. Mr. Riley shared that there are 156 homes north of the site, all of which are in Maricopa County jurisdiction and are all on well as they do not receive city services of any kind. He fears that contaminated ground water flows will move north. Mr. Russell Osborne asked if these were all S-1 lots. Mr. Riley shared that they are all S-1 lots. Mr. Ricardo Romero asked if there had been any discussion with UPCO when they were operating on the site. Mr. Riley shared that as a community, they were not aware of the contamination during UPCO’s operational years. Mr. Virgil asked what the neighbors would like to see built on the site. Mr. Riley stated that they would like to see the site developed with 1 acre lots, similar to their S-1 equivalent lots, but with a large buffer and trail between after the site has been completely remediated. Public Comment: Ms. Julie Bradfeldt stated that she opposes this request. She has concerns about the displacement of wild animals on the site as well as the degradation of native plants on the site. She expressed concerns about disturbing the hillside, the character of the are changing, the lack of connections with the proposed trails system, major concerns about drainage on the site and off site as a result of development, the buffer between the more rural county homes to the north, increase in traffic and lowered property values. Z-37-19-2 Page 4 of 6 City of Phoenix • Planning & Development Department 200 West Washington Street, 3rd Floor • Phoenix, Arizona 85003-1611 • (602) 262-6882 Discussion: Chairman Joseph Grossman asked if her well had been tested. Ms. Bradfeldt shared that her well had not been tested in the last 3-5 years to her knowledge but would appreciate ADEQ do further testing. Vice Cahir Trilese DiLeo asked if a drainage report will be required for the proposed development. Chairman Grossman shared that yes, drainage reports are required for every project in the City of Phoenix. Public Comment: Mr. Doug McCarthy has concerns about traffic, thru traffic, property values and blight in the neighborhood. Mr. Mark Boul shared concerns about an increase in traffic, ingress/egress issues into the neighborhood, lot sizes are too small, character of area changing to more high density residential rather than rural, and dark skies. Ms. Robbin McDermott shared concerns about traffic and safety issues, lack of emergency services in the area, cut thru traffic, trespassing and access to the reserve. Mr. Stewart Hamer is opposed to the proposed height, traffic and drainage. Mr. Ozzie Virgil, committee member, asked Mr. Hamer is he were opposed to 2- story homes in the interior of the proposal. Mr. Hamer shared that he was opposed to any 2-story houses. Mr. Dan Schmerfeld has concerns about further contamination of well water. He shared that his well was tested 15 years ago and all that showed up in the results were silt. He shared that he recently had hi swell tested and it is full of contaminants from the UPCO testing site. He fears for his and his family’s life. He cried. Mr. Bill Levy, committee member, asked where Mr. Schmerfeld lives in relation to this site. Mr. Schmerfeld shared that he lives two blocks north of the site. Mr. Larry Clark shared that he has concerns about increases in crime, traffic increases, emergency response times increasing, trespassing with ATV’s, further contamination in the aquifer due to on site water retention, and traffic. Z-37-19-2 Page 5 of 6 City of Phoenix • Planning & Development Department 200 West Washington Street, 3rd Floor • Phoenix, Arizona 85003-1611 • (602) 262-6882 Chairman Joseph Grossman asked Mr. Clark if he was aware that he would be on a well when he purchased his home. Mr. Clark stated that he was aware but was unaware that his well would dry up and had to redrill a well that was deeper than the first. Mr. Bill Levy, committee member, asked Mr. Clark if he has had his water tested. Mr. Clark stated that he had not had his water tested. Ms. Ellen Clark shared concerns about contamination, disturbing the site will kick-up contaminates on the site and make them air-born, she equated this to the Erin Brockovich case and the cancer clusters in Maryvale. She asked the committee to consider the consequences of unsuspecting families buying into this subdivision and getting cancer. She stated that if this case were to be approved and cancer clusters occur years down the road from children playing in the dirt and drinking the water that this committee will have blood on their hands and anyone involved in eh approval process should be held responsible. Applicants Response: Mr. David Cisiewski explained the public hearing process and exclaimed that we are still at the very early stages of the process. He went over the drainage plan and drainage study requirements set by the City of Phoenix. He shared that ADEQ is the regulatory authority and UPCO is the responsible party for clean-up of the site. He shared that the traffic study has been submitted and is currently in review. He shared that the Streets department have come back with some preliminary comments. He shared that ADEQ has addressed the known contamination issues on the site, hence the restriction of residential on the central portion of the site. He went over the amount of open space proposed as this goes way beyond ordinance requirements for the proposal. Chairman Joseph Grossman asked if there were meeting minutes taken at the first neighborhood meeting. Mr. Cisiewski shared that meeting minutes were taken at the first neighborhood meeting. He stated the second neighborhood meeting will be scheduled after the Information Only Village Planning Committee meeting. Minutes will also be taken at the second neighborhood meeting. The citizen participation report containing both neighborhood meeting minutes will be compiled and submitted to the City of Phoenix. Chairman Grossman asked Mr. Cisiewski to share the traffic study results. Mr. Cisiewski shared that traffic engineers have concluded that current conditions aren’t good, but planned improvements will certainly help. Z-37-19-2 Page 6 of 6 City of Phoenix • Planning & Development Department 200 West Washington Street, 3rd Floor • Phoenix, Arizona 85003-1611 • (602) 262-6882 Chairman Grossman stated that a 50-foot buffer between the existing rural lots to the north are is not sufficient. Mr. Cisiewski shared that they had started with a 25-foot buffer and shared that the actual distance from home to home is 125 feet. Mr. Ozzie Virgil asked about street lights. Mr. Cisiewski stated that all street improvements would meet city standards. Vice Chair Trilese DiLeo asked about street improvements that will cut through the entire site, creating further circulation opportunities for the area. Mr. Cisiewski shared that there is a major wash that cutes through the site, which has made it cost prohibitive to build an internal street network infrastructure on the site. Vice Chair DiLeo asked if the developer would consider making the investment in an internal street network. Mr. Bill Levy asked if the developer was doing a plant inventory and salvage on the site. Mr. Cisiewski stated that they will follow city requirements for plant salvage. Ms. Ann O’Brien asked David Simmons if he could send the committee the presentations related to the Central Foothills PUD. Mr. David Simmons, staff, stated that he would email the power point presentations over to the committee. Ms. O’Brien asked if the developer would consider installing a gate across the county road that would prohibit through traffic. Mr. Cisiewski shared that this is not intended to be a gated community. Ms. O’Brien stated that she has issues with drainage on the site. Mr. Cisiewski stated that the drainage study is underway now. Mr. Levy asked if there is any way the VPC could be notified of the next neighborhood meeting. Mr. Cisiewski said yes, he would inform the VPC of the next neighborhood meeting.