CONDITIONAL APPROVAL – ABND 240026
Your abandonment request was granted CONDITIONAL APPROVAL.
This request will NOT be completed until all the stipulations have been met and this request is
formally adopted by City Council. It is the APPLICANT’S RESPONSIBILITY to ensure that all
stipulations are satisfied. Please contact the Abandonment Coordinator at (602) 262-7403
for questions and notification of your completion of the stipulations.
Upon completion of the stipulations your request will be scheduled for City Council formal
approval. You will receive a copy of the abandonment document after it has been recorded with
Maricopa County.
If the stipulations of abandonment are not completed within two years from the date of your
conditional approval (your expiration date is June 26, 2026), this request will then expire. At
that time a new submittal will be required along with the required payment for the abandonment
process. A one time, one year extension can be requested prior to the expiration date, with
applicable extension fee due.
Attachment B
2
Planning and Development Department
June 26, 2024
Abandonment Staff Report: ABND 240026
Project# 24-558
Council District: 6
Location:
97 Biltmore Estates
Applicant:
Kathleen L. Quirk
Request to abandon:
To abandon a 12-feet by 110-feet public
utility easement (PUE).
Purpose of request:
The applicant states the portion of the
abandonment area does not include utilities.
Further the PUE is within the footprint of
existing house and as such is no longer
warranted.
3
City Staff Comments and Recommendations:
PDD Civil Reviewer – Darren Chapman
Civil recommends approval without stipulation.
Water Services Department – Donald Reynolds
WSD has a stipulation for this abandonment. Please Note: (The substandard water main has
two services off of it. One for the property the other to the property on the south side. Please
verify if these are active or not. If not active, please abandon the existing 4-inch substandard
prior to the Resolution of Abandonment in accordance with plans submitted to and approved by
the Planning and Development Department.) If active see #1 below before PUE can be
abandoned along with the 4” main:
1. The existing water meter(s) shall be relocated onto the public right of way in accordance
with plans submitted to and approved by the Planning and Development Department. All
work is to be done by City forces at no expense to the City of Phoenix.
PDD Site Planner – Dru Maynus
Recommend approval.
4
Street Transportation Department Utility – Rozanna Brown
The City of Phoenix Street Transportation Utility Coordination Section has no comments.
Utility Comments
The request was also routed to outside utility companies for their input. Listed below are the
responses from each utility.
Cox – Zach Lawson
I have reviewed the abandonment request at ABND 240026 APN 164-12-982 in Phoenix,
{Maricopa County}, AZ. Based upon the supplied drawings/exhibits that you’ve submitted it has
been determined that COX has no facilities within the easement and therefore we approve your
request to abandon.
Please note that although Cox Communications approves this abandonment, we do so with the
understanding that we will not assume any construction, relocation and/or repairs costs
associated or in result of this abandonment.
Southwest Gas – Susan R. Mulanax
After reviewing the plans for the above-referenced project, it has been determined that there are
no apparent conflicts between the Southwest Gas system and your proposed abandonment of
the sidewalk easements proposed. Southwest Gas would like to recommend abandonment of
the public sidewalk easements located at the above-referenced locations per the subject ABND
request.
Arizona Public Service – Kimberly Paxson
APS has no objection to this abandonment as the subject property is outside of APS service
territory.
CenturyLink – Tori Jacoby
CenturyLink of Arizona, Inc. d/b/a CENTURYLINK (“CenturyLink”) has reviewed the request for
the subject vacation and has determined that it has no objections with respect to the areas
proposed for vacation as shown and/or described on Exhibit “A”, said Exhibit “A” attached
hereto and incorporated by this reference.
It is the intent and understanding of CenturyLink that this Vacation shall not reduce our rights to
any other existing easement or rights we have on this site or in the area.
This vacation response is submitted WITH THE STIPULATION that if CenturyLink facilities are
found and/or damaged within the vacated area as described, the Applicant will bear the cost of
relocation and repair of said facilities.
If you have any questions please contact Tori Jacoby at (361) 275-4316 or
tori.jacoby@lumen.com.
Salt River Project – Michael Laguna
Salt River Project has no objection to the abandonment of the 12’ Public Utility Easement as
described in Docket 16407-1179 and as shown on the provided survey for 97 Biltmore Estates
Drive. There are no Salt River Project’s facilities within the proposed abandonment area.
5
Stipulations of Conditional Approval
The request of abandonment ABND 240026 is conditionally approved, and the following
stipulation will need to be met:
1. All utilities within the subject PUEs shall be relocated to locations approved by each
affected utility company. All work is to be done by each affected utility company at no
expense to the affected utility company. An appropriate performance agreement, in an
approved form and cost amount, must be posted with the Planning and Development
Department to guarantee the improvements.
2. The existing water meter(s) shall be relocated onto the public right of way in accordance
with plans submitted to and approved by the Planning and Development Department. All
work is to be done by City forces at no expense to the City of Phoenix.
3. The above stipulations must be completed within two years from the conditional
approval decision dated June 26, 2024.
This conditional approval has been reviewed and approved.
Signature: ____________________________________________ Date: ________________
REPORT SUBMITTED BY: Dru Maynus, Abandonment Coordinator
cc
Kathleen L. Quirk, Applicant/Representative
David Dick, Architect, Applicant/Representative
Miguel Victor, Deputy Director of PDD
Aracely Herrera, Site Planning Supervisor, Planner lll
7.10.24