Attachment B - Staff Report - Z-116-R-81-6.pdf

City of Phoenix — Formal (2024-05-29)

View PDF Meeting page

Extracted text (via pymupdf) 42162 characters
*REVISED 
Staff Report Z-116-R-81-6 
(Arizona Grand Resort PUD) 
April 8, 2024 
 
South Mountain Village Planning 
Committee Meeting Date: 
April 9, 2024 
Planning Commission Hearing Date: 
May 2, 2024 
Request From: 
 
 
 
 
C-2 PCD (Intermediate Commercial, 
Planned Community District) (1.58 Acres), 
C-O PCD (Commercial Office - Restricted 
Commercial, Planned Community District) 
(0.47 Acres),  
R-5 PCD (Multifamily Residence District, 
Planned Community District) (0.22 Acres), 
PCD SP (Approved C-2 SP PCD) (Planned 
Community District, Special Permit, 
Approved Intermediate Commercial, 
Special Permit, Planned Community 
District) (1.51 Acres), 
PCD (Approved RH M-R PCD) (Planned 
Community District, Approved Resort 
District, Mid-Rise District, Planned 
Community District) (9.04 Acres), 
PCD (Approved C-O M-R SP PCD) 
(Planned Community District, Approved 
Commercial Office - Restricted 
Commercial, Mid-Rise District, Special 
Permit, Planned Community District) (10.45 
Acres), 
PCD SP (Planned Community District, 
Special Permit) (0.04 Acres), 
PCD SP (Approved RH M-R PCD) 
(Planned Community District, Special 
Permit, Approved Resort District, Mid-Rise 
District, Planned Community District) (1.85 
Acres), 
RH PCD (Resort District, Planned 
Community District) (1.62 Acres), 
RH M-R PCD (Resort District, Mid-Rise 
District, Planned Community District) 
(33.15 Acres), and 
ATTACHMENT B

Staff Report: Z-116-R-81-6 
April 8, 2024 
Page 2 of 16 
 
 
General Plan Conformity 
General Plan Land Use Map Designation 
Commercial with a Resort and Residential 
10 to 15 dwelling units per acre 
Street Map 
Classification 
South Arizona Grand 
Parkway 
Private Street 
63.34 full street 
South Pointe Parkway 
East 
Private Street 
Varies 
South Pointe Parkway 
West 
Private Street 
Varies 
South Arizona Grand 
East 
Private Street 
Varies 
STRENGTHEN OUR LOCAL ECONOMY CORE VALUE; TOURISM FACILITIES; 
DESIGN PRINCIPLE: Promote design guidelines in specific districts which support 
and encourage tourism. 
The PUD narrative includes design and development standards that will facilitate the 
expansion and enhancement of the existing Arizona Grand Resort. These standards 
include architectural standards to ensure future developments align with the existing 
resort, along with requirements that will ensure pedestrians can safely traverse shaded 
and well-lit pathways. 
CELEBRATE OUR DIVERSE COMMUNITIES AND NEIGHBORHOODS CORE 
VALUE; HEALTHY NEIGHBORHOODS; DESIGN PRINCIPLE: Establish design 
standards and guidelines for parking lots and structures, setback and build-to 
lines, blank wall space, shade, and other elements affecting pedestrians, to 
RH M-R SP PCD (Resort District, Mid-Rise 
District, Special Permit, Planned 
Community District) (0.77 Acres) 
Request To: 
PUD PCD (60.70 Acres) 
Proposal: 
Major Amendment to the Pointe South 
Mountain PCD for the Arizona Grand 
Resort PUD to allow a mix of uses 
including multifamily residential, hotel, 
restaurants, and ballrooms/conference 
rooms, and various commercial uses. 
Location: 
Approximately 335 feet south of the 
southwest corner of the I-10 Freeway and 
Baseline Road 
Owner: 
*AZ Grand Resort, LLC, c/o Jake Gray 
Applicant/Representative: 
Ed Bull, Burch & Cracchiolo, P.A. 
Staff Recommendation: 
Approval, subject to stipulations

Staff Report: Z-116-R-81-6 
April 8, 2024 
Page 3 of 16 
 
encourage pedestrian activity and identify options for providing pedestrian-
oriented design in different types of development. 
The PUD narrative includes design and development standards to encourage walking, 
bicycling, and transit use. These standards include the provision of bicycle parking, 
shaded sidewalks, and on-site amenities.  
CONNECT PEOPLE AND PLACES CORE VALUE; BICYCLES; DESIGN PRINCIPLE: 
Development should include convenient bicycle parking. 
The proposal includes development standards for bicycle facilities to encourage bicycling 
and transit use. Features include shaded bicycle parking, electric bicycle parking, and a 
bicycle repair station. 
BUILD THE SUSTAINABLE DESERT CITY CORE VALUE; TREES AND SHADE; 
DESIGN PRINCIPLE: Integrate trees and shade into the design of new 
development and redevelopment projects throughout Phoenix. 
The proposal, upon redevelopment, will provide trees and shade over pedestrian 
pathways which will reduce the urban heat island effect while also improving thermal 
comfort to site users and the surrounding neighborhood. 
 
Applicable Plans, Overlays and Initiatives 
Housing Phoenix Plan – See Background Item No. 15 
 
Tree and Shade Master Plan – See Background Item No. 16 
 
Complete Streets Guiding Principles – See Background Item No. 17 
 
Comprehensive Bicycle Master Plan – See Background Item No. 18 
 
Transportation Electrification Action Plan – See Background Item No. 19 
 
Black Canyon / Maricopa Freeway Specific Plan – See Background Item No. 20 
 
Conservation Measures for New Development – See Background Item No. 21 
 
Monarch Butterfly Pledge – See Background Item No. 22 
 
Zero Waste PHX – See Background Item No. 23 
 
Surrounding Land Uses/Zoning 
 
Land Use 
Zoning 
On Site 
Arizona Grand Resort 
Various C-2 (Intermediate Commercial), C-O 
(Commercial Office - Restricted 
Commercial), RH (Resort District), R-5

Staff Report: Z-116-R-81-6 
April 8, 2024 
Page 4 of 16 
 
(Multifamily Residence District), SP (Special 
Permit), M-R (Mid-Rise District), and PCD 
(Planned Community District) districts 
North 
Highline Canal, vacant land, 
offices, and a restaurant 
City of Tempe: CSS (Commercial Shopping 
and Services) and GID (General Industrial 
District 
South 
Golf course, resort facility, 
and multifamily 
RH M-R PCD, A-1 PCD, and RH PCD 
East 
I-10 
Town of Guadalupe: N/A 
West 
Golf course, multifamily, and 
offices 
PCD SP, R-5 PCD, and C-O PCD 
 
Background/Issues/Analysis 
 
SUBJECT SITE 
 
1. 
This is a request to rezone a 60.70-acre site located approximately 335 feet south 
of the southwest corner of the I-10 Freeway and Baseline Road from 1.58 acres of 
C-2 PCD (Intermediate Commercial, Planned Community District), 0.47 acres of C-
O PCD (Commercial Office - Restricted Commercial, Planned Community District), 
0.22 acres of R-5 PCD (Multifamily Residence District, Planned Community 
District), 1.51 acres of PCD SP (Approved C-2 SP PCD) (Planned Community 
District, Special Permit, Approved Intermediate Commercial, Special Permit, 
Planned Community District), 9.04 acres of PCD (Approved RH M-R PCD) 
(Planned Community District, Approved Resort District, Mid-Rise District, Planned 
Community District), 10.45 acres of PCD (Approved C-O M-R SP PCD) (Planned 
Community District, Approved Commercial Office - Restricted Commercial, Mid-
Rise District, Special Permit, Planned Community District), 0.04 acres of PCD SP 
(Planned Community District, Special Permit), 1.85 acres of PCD SP (Approved 
RH M-R PCD) (Planned Community District, Special Permit, Approved Resort 
District, Mid-Rise District, Planned Community District), 1.62 acres of RH PCD 
(Resort District, Planned Community District), 33.15 acres of RH M-R PCD (Resort 
District, Mid-Rise District, Planned Community District), and 0.77 acres of RH M-R 
SP PCD (Resort District, Mid-Rise District, Special Permit, Planned Community 
District) and is currently the Arizona Grand Resort. The requested zoning is PUD 
PCD (Planned Unit Development, Planned Community District). The subject 
request is a Major Amendment to the Pointe South Mountain PCD to allow the 
Arizona Grand Resort PUD which will allow a mix of uses including multifamily 
residential, hotel, restaurants, and ballrooms/conference rooms, and various 
commercial uses.    
 
 
2. 
The General Plan Land Use Map designates the majority of the subject site as 
Commercial with a Resort. A portion of the site to the south is designated as 
Residential 10 to 15 dwelling units per acre. This request is consistent with the 
General Plan Land Use Map designation of commercial and is not consistent with 
the General Plan Land Use Map designation of Residential 10 to 15 dwelling units 
per acre. A General Plan Amendment is not required as the area of the subject site 
designated Residential 10 to 15 dwelling units per acre is under 10 acres at 2.73

Staff Report: Z-116-R-81-6 
April 8, 2024 
Page 5 of 16 
 
acres. The area to the east of the majority of the subject site is in the Town of 
Guadalupe and does not have a General Plan Land Use Map designation. The 
General Plan Land Use Map designation to the east of the noncontiguous southern 
portion of the subject site is Commercial. The area to the north, across the Highline 
Canal, is in the City of Tempe and is designated Mixed-use moderate, up to 25 
dwelling units per acre on Tempe’s General Plan Land Use Map. The Land Use 
Map designations to the west of the subject site are Commercial and Residential 10 
to 15 dwelling units per acres. The Land Use Map designations to the south are 
Commercial, Residential 10 to 15 dwelling units per acre, and Residential 15+ 
dwelling units per acre.  
 
 
General Plan Land Use Map, Source: City of Phoenix Planning and Development Department 
 
 
SURROUNDING LAND USE AND ZONING 
3. 
To the north, across the Highline Canal, is vacant land, offices, and a restaurant in 
the City of Tempe zoned CSS (Commercial Shopping and Services) and GID 
(General Industrial District).  
 
To the east is a golf course zoned RH M-R PCD SP (Resort District, Mid-Rise, 
Planned Community District, Special Permit for a golf course) and the I-10 freeway 
in the Town of Guadalupe. The Town of Guadalupe does not have a zoning 
designation for the I-10 freeway.

Staff Report: Z-116-R-81-6 
April 8, 2024 
Page 6 of 16 
 
To the south is a golf course zoned RH M-R PCD SP (Resort District, Mid-Rise, 
Planned Community District, Special Permit for a golf course), a multifamily 
development zoned RH PCD (Resort District, Planned Community District), and a 
resort facility zoned A-1 PCD (Light Industrial District, Planned Community District). 
 
To the west there is a multifamily development zoned R-5 PCD (Multifamily 
Residence District), and offices zoned C-O PCD (Commercial Office - Restricted 
Commercial, Planned Community District.  
 
Zoning Map, Source: City of Phoenix Planning and Development Department

Staff Report: Z-116-R-81-6 
April 8, 2024 
Page 7 of 16 
 
APPROVAL AND AMENDMENT HISTORY 
*4. 
The subject site is within the 
existing Pointe at South Mountain 
PCD and the proposal is a Major 
Amendment to the PCD. The 
Pointe at South Mountain 
encompasses the Arizona Grand 
Resort and other areas to the 
north and south zoned various 
industrial, commercial, and 
residential zoning districts. Staff 
recommends Stipulation No. 3 to 
require a Master Development 
Plan and a Master Open Space 
Plan be maintained for each phase 
of the development.  
 
City Council has approved several 
amendments on and surrounding 
the site for a variety of uses 
associated with the resort, 
including office, commercial, 
industrial, resort hotel, multifamily 
residential, single-family 
residential, golf course, driving 
range, conference, and exhibition 
uses.   
 
 
PROPOSAL AND DEVELOPMENT STANDARDS 
5. 
The proposal was developed utilizing the PUD zoning district. The Planned Unit 
Development (PUD) is intended to create a built environment that is superior to that 
produced by conventional zoning districts and design guidelines. Using a 
collaborative and comprehensive approach, an applicant authors and proposes 
standards and guidelines that are tailored to the context of a site on a case-by-case 
basis. Where the PUD Development Narrative is silent on a requirement, the 
applicable Zoning Ordinance provisions will be applied. 
 
 
The Pointe at South Mountain PCD, Source: 
Gosnell Development Corporation

Staff Report: Z-116-R-81-6 
April 8, 2024 
Page 8 of 16 
 
6. 
Land Use Plan 
The PUD is divided into nine 
planning areas labeled A though 
I. The conceptual land use plan 
shows the location of a 
proposed new hotel or 
multifamily development in 
Planning Area G, new ballrooms 
and conference spaces in 
Planning Area A, and the 
existing developments on site.  
 
Conceptual Land Use Plan, Source: Swaback Architects and Planners 
7. 
List of Uses 
The PUD allows uses as permitted in the C-2 and RH zoning districts and lists 
additional allowed primary and accessory uses.  
 
The applicant proposes to create more flexibility when conducting temporary 
events within the resort and to reduce the need to pursue use permits since the site

Staff Report: Z-116-R-81-6 
April 8, 2024 
Page 9 of 16 
 
is not in close proximity to residential. There are currently uses that are allowed 
with either an administrative temporary use permit or a use permit. This proposal 
requests some variations to the conditions when approving administrative 
temporary uses and use permits. These variations include items such as adjusted 
times, durations, frequency, distance from a residential use, etc. Also, this process 
would simplify the requests for the applicant by not needing to submit 
administrative temporary use permit and use permit applications. 
 
 
8. 
Development Standards 
The PUD proposes development standards designed to accommodate the future 
development of the Arizona Grand Resort.  
 
Development Standards 
Standard 
Proposed 
Multifamily Density 
190 units 
Hotel Density  
1,000 keys 
Maximum Building Height 
 
Planning Areas A, B, C, G, and I 
90 feet  
Planning Area D and F 
60 feet 
Planning Area E and H 
36 feet 
Maximum Lot Coverage 
50% maximum of the net area of the 
PUD for primary structures plus an 
additional maximum 15% for shade 
canopies. No maximum lot coverage 
cap on any individual development 
site, lot coverage will constitute the 
ground floor footprint of all buildings 
excluding roof 
overhangs, projections, and 
balconies. 
Minimum Building Setbacks 
Adjacent to perimeter public or 
private streets 
30 feet 
Interior front, side and rear yard 
0 feet 
I-10 Frontage 
35 feet 
Minimum Landscape Setbacks 
Adjacent to perimeter public or 
private streets 
10 feet 
Interior front, side and rear yard 
0 feet 
I-10 Frontage 
35 feet 
Planning Areas A and B 
30 feet 
Planning Areas C, D, and I 
0 feet 
 
In order to keep track of the provision of open space, residential units, and hotel 
rooms a Master Development Plan and Master Open Space Plan shall be required 
per Stipulation No. 3.

Staff Report: Z-116-R-81-6 
April 8, 2024 
Page 10 of 16 
 
9. 
Landscape Standards 
The PUD includes landscape standards to provide enhanced shade across the site. 
A minimum 75 percent shade is proposed through either vegetative or structural 
shade if there are future public sidewalks and walkways. The PUD also requires 
landscape setbacks and common open spaces be planted with minimum two-inch 
caliper trees.  
 
Furthermore, the PUD mandates that at least ten percent of the required shrubs 
consist of milkweed or other native nectar species. This provision aims to support 
essential pollinator species during the Monarch Butterfly migration. 
 
 
10. Lighting Standards 
Site lighting shall be provided at building entrances/exits, parking areas, and public 
assembly areas to increase crime prevention through environmental design. 
Additionally, lighting will meet City Code and Zoning Ordinance standards 
 
 
11. Design Guidelines 
The PUD proposes design guidelines to promote the existing Spanish Colonial and 
Spanish Mission style architecture of the resort. Any new buildings/structures shall 
incorporate consistent architectural styles, materials, forms, features, colors and 
compatible elements from the site. Stipulation No. 2 requires that building 
elevations and landscape plans for each phase of development be reviewed by the 
South Mountain Village Planning Committee to ensure quality design and 
consistency with the surrounding area and existing resort prior to final site plan 
approval.

Staff Report: Z-116-R-81-6 
April 8, 2024 
Page 11 of 16 
 
 
Conceptual Elevation Renderings, Source: Swaback Architects and Planners 
 
 
12. Pedestrian Circulation 
The PUD provides a network of shaded pedestrian pathways as shown on the 
pedestrian circulation plan attached as an exhibit.  
 
 
13. Signs 
The PUD proposes on-site signage in accordance with the City of Phoenix sign 
codes, including Phoenix Zoning Ordinance Section 705. Off-premise signs 
(billboards) are also proposed per Section 705.2 of the Phoenix Zoning Ordinance.  
 
 
14. Sustainability 
Required standards include enhanced shade over any new public sidewalks and 
walkways, the use of drought tolerant landscape material within the right-of-way, 
drip irrigation systems, the provision of electrical vehicle charging infrastructure, a 
local shuttle service, and the use of recycling collection. 
 
 
AREA PLANS, OVERLAY DISTRICTS, AND INITIATIVES 
15. Housing Phoenix Plan 
In June 2020, the Phoenix City Council approved the Housing Phoenix Plan. This 
Plan contains policy initiatives for the development and preservation of housing 
with the vision of creating a stronger and more vibrant Phoenix through increased 
housing options for residents at all income levels and family sizes.  Phoenix’s rapid 
population growth and housing underproduction has led to a need for over 163,000 
new housing units. Current shortages of housing supply relative to demand are a 
primary reason why housing costs are increasing.  
 
The proposed development supports the Plan’s goal of preserving or creating 
50,000 housing units by 2030 by contributing to a variety housing types that will 
address the supply shortage at a more rapid pace while using vacant or 
underutilized land in a more sustainable fashion.

Staff Report: Z-116-R-81-6 
April 8, 2024 
Page 12 of 16 
 
16. Tree and Shade Master Plan 
The Tree and Shade Master Plan encourages treating the urban forest as 
infrastructure to ensure the trees are an integral part of the City’s planning and 
development process. Sidewalks on the street frontages should be detached from 
the curbs to allow trees to be planted on both sides of the sidewalk to provide 
thermal comfort for pedestrians and to reduce the urban heat island effect. The 
PUD includes standards for new public sidewalks and walkways constructed after 
the adoption of this PUD to provide a minimum of 75 percent shade. 
 
 
17. Complete Streets Guiding Principles 
In 2014, the City of Phoenix City Council adopted the Complete Streets Guiding 
Principles. The principles are intended to promote improvements that provide an 
accessible, safe, connected transportation system to include all modes, such as 
bicycles, pedestrians, transit, and vehicles. The PUD proposes shaded bicycle 
parking to promote use of alternative transportation options and includes other 
Complete Streets provisions in the Design Guidelines Section of the PUD 
Narrative. 
 
 
18. Comprehensive Bicycle Master Plan 
The City of Phoenix adopted the Comprehensive Bicycle Master Plan in 2014 to 
guide the development of its bikeway system and supportive infrastructure. The 
Comprehensive Bicycle Master Plan supports options for both short- and long-term 
bicycle parking as a means of promoting bicyclist traffic to a variety of destinations. 
The proposal incorporates requirements for shaded bicycle parking and a bicycle 
repair station to encourage multi-modal transportation.  
 
 
19. Transportation Electrification Action Plan 
In June 2022, the Phoenix City Council approved the Transportation Electrification 
Action Plan. The current market desire for the electrification of transportation is 
both a national and global phenomenon, fueled by a desire for better air quality, a 
reduction in carbon emissions, and a reduction in vehicle operating and 
maintenance costs. Businesses, governments and the public are signaling strong 
future demand for electric vehicles (EVs), and many automobile manufacturers 
have declared plans for a transition to fully electric offerings within the coming 
decade. This Plan contains policy initiatives to prepare the City for a future filled 
with more EVs, charging infrastructure and e-mobility equity, and outlines a 
roadmap for a five-step plan to prepare for the EV infrastructure needs of 280,000 
EVs in Phoenix by 2030. One goal of the Plan to accelerate public adoption of 
electric vehicles through workplace, business, and multifamily charging 
infrastructure recommends a standard stipulation for rezoning cases to provide EV 
charging infrastructure. This PUD requires electric vehicle parking and electric 
bicycle parking.  
 
 
20. Black Canyon / Maricopa Freeway Specific Plan 
The Freeway Mitigation Program, created in the City of Phoenix by the 1988 
approval of Proposition 17, authorized general obligation bonds to prepare plans 
and fund projects to mitigate the blighting effects on neighborhoods from existing 
and proposed freeway construction. The Black Canyon/ Maricopa Freeway Specific

Staff Report: Z-116-R-81-6 
April 8, 2024 
Page 13 of 16 
 
Plan study area is 32 miles long from Pinnacle Peak Road at I-17 in the north, to 
Pecos Road at I-10 in the south. Generally, the width of the study area is one-
quarter mile on each side of the freeway.  
 
The subject site is identified in Segment 19 of the specific plan. The PUD 
addresses the plan’s goal of Crime Prevention Through Environmental Design by 
providing site lighting at building entrances/exits, parking areas, and public 
assembly areas. 
 
 
21. Conservation Measures for New Development 
In June 2023, the Phoenix City Council adopted the Conservation Measures for 
New Development policy as part of a resolution addressing the future water 
consumption of new development (Resolution 22129). This resolution addresses 
the future water consumption of new development to support one of the City’s Five 
Core Values in the General Plan which calls for Phoenix to “Build the Sustainable 
Desert City”. The Conservation Measures for New Development policy includes 
direction to develop standards for consideration as stipulations for all rezoning 
cases that will address best practices related to water usage in nine specific 
categories. This is addressed in the PUD Narrative and in Stipulation Nos. 5.a 
through 5.e. 
 
 
22. Monarch Butterfly Pledge 
In April 2021, Mayor Kate Gallego signed the National Wildlife Federation's Mayor's 
Monarch Pledge. This pledge commits the city to take action to support the 
monarch butterfly population. In the United States, loss of milkweed habitat is a 
major factor in the decline of the monarchs. Arizona has at least 29 species of 
milkweed native to the state. Adult monarchs feed on the nectar of many flowers, 
but they breed only where milkweeds are found. To support the monarch butterfly 
population, the PUD narrative addresses the planting of milkweed shrubs, or other 
native nectar plant species, on the subject site. 
 
 
23. Zero Waste PHX 
The City of Phoenix is committed to its waste diversion efforts and has set a goal to 
become a zero waste city, as part of the city’s overall 2050 Environmental 
Sustainability Goals. One of the ways Phoenix can achieve this is to improve and 
Section 716 of the Phoenix Zoning Ordinance expand its recycling and other waste 
diversion programs. The PUD includes provisions for the use of recycling 
collection. 
 
 
COMMUNITY INPUT 
24.  At the time this staff report was written, staff has not received any letters in support 
or opposition to this request.  
 
 
INTERDEPARTMENTAL COMMENTS 
25. The Aviation Department requires that the property owner record a Notice to 
Prospective Purchasers of Proximity to Airport in order to disclose the existence, 
and operational characteristics of City of Phoenix Sky Harbor International Airport

Staff Report: Z-116-R-81-6 
April 8, 2024 
Page 14 of 16 
 
(PHX) to future owners or tenants of the property. This is addressed in Stipulation 
No. 4. 
 
 
26. The Street Transportation Department requested that the developer construct all 
streets with all required elements. This is addressed in Stipulation No. 6. 
 
 
OTHER 
27. The site is located in a larger area identified as being archaeologically sensitive. If 
further review by the City of Phoenix Archaeology Office determines the site and 
immediate area to be archaeologically sensitive, and if no previous archaeological 
projects have been conducted within this project area, it is recommended that 
archaeological Phase I data testing of this area be conducted. Phase II 
archaeological data recovery excavations may be necessary based upon the 
results of the testing. A qualified archaeologist must make this determination in 
consultation with the City of Phoenix Archaeologist. In the event archaeological 
materials are encountered during construction, all ground disturbing activities must 
cease within a 33-foot radius of the discovery and the City of Phoenix Archaeology 
Office must be notified immediately and allowed time to properly assess the 
materials. This is addressed in Stipulation Nos. 7 through 9. 
 
 
28. Staff has not received a completed form for the Waiver of Claims for Diminution in 
Value of Property under Proposition 207 (A.R.S. 12-1131 et seq.), as required by 
the rezoning application process. Therefore, a stipulation has been added to 
require the form be completed and submitted prior to final site plan approval. This 
is addressed in Stipulation No. 10. 
 
 
29. Development and use of the site is subject to all applicable codes and ordinances. 
Zoning approval does not negate other ordinance requirements. Other formal 
actions such as, but not limited to, zoning adjustments and abandonments, may be 
required.   
 
Findings 
 
1. 
The proposal is consistent with several General Plan principles, and City policies 
and initiatives, such as strengthening the local economy through facilitating tourism, 
the provision of shaded walkways, the provision of bicycle facilities, water 
conservation measures, and the inclusion of milkweed or other native nectar 
species in landscaping areas.  
 
 
2. 
The proposed development will provide increased employment opportunities in the 
area. 
 
 
3. 
The proposed PUD sets forth standards that enhance the existing subject site with 
electric vehicle and bicycle parking and will provide improved pedestrian-oriented 
design elements with added shade if there is new development.

Staff Report: Z-116-R-81-6 
April 8, 2024 
Page 15 of 16 
 
Stipulations 
 
1. 
An updated Development Narrative for the Arizona Grand Resort PUD reflecting 
the changes approved through this request shall be submitted to the Planning 
Department within 30 days of City Council approval of this request. The updated 
Development Narrative shall be consistent with Development Narrative date 
stamped March 28, 2024 as modified by the following stipulations.   
 
 
 
a. Front cover: Revise the submittal date information on the bottom to add the 
following: City Council adopted: [Add adoption date]. 
 
 
 
2. 
For each phase of development, the building elevations and landscape plan for 
that phase shall be presented for review and comment to the South Mountain 
Village Planning Committee prior to final site plan approval. 
 
 
3. 
The Pointe South Mountain/Arizona Grand Master Development Plan and Master 
Open Space Plan shall be updated/created to reflect this PCD major amendment 
and maintained for each phase of development. 
 
 
4. 
The property owner shall record documents that disclose the existence, and 
operational characteristics of Phoenix Sky Harbor Airport to future owners or 
tenants of the property. The form and content of such documents shall be 
according to the templates and instructions provided which have been reviewed 
and approved by the City Attorney. 
 
 
5. 
The following stipulations shall only apply to new development, as approved by 
the Planning and Development Department. 
 
 
 
a. 
Landscaping shall be maintained by permanent and automatic/water 
efficient WaterSense labeled irrigation controllers (or similar smart 
controller) to minimize maintenance and irrigation water consumption for all 
on and offsite landscape irrigation. 
 
 
 
 
b. 
Pressure regulating sprinkler heads and drip lines shall be utilized in any 
turf areas to reduce water waste. 
 
 
 
 
c. 
Provide a landscape irrigation plan that includes zones to establish the 
amount of irrigation to apply based on maturity and type of the landscaping. 
Irrigation should be applied efficiently based on the maturity and need for 
the vegetation. 
 
 
 
 
d. 
A minimum of two green infrastructure (GI) techniques for stormwater 
management shall be implemented per the Greater Phoenix Metro Green 
Infrastructure and Low-Impact Development Details for Alternative 
Stormwater Management, as approved or modified by the Planning and 
Development Department.

Staff Report: Z-116-R-81-6 
April 8, 2024 
Page 16 of 16 
 
 
Writer 
Samuel Rogers 
April 8, 2024 
 
Team Leader 
Racelle Escolar  
 
Exhibits  
Sketch Map 
Aerial Map 
Conceptual Land Use Plan date stamped January 11, 2024  
Conceptual Illustrations date stamped January 11, 2024 (5 pages) 
Conceptual Pedestrian Circulation Plan date stamped January 11, 2024 
Arizona Grand Resort PUD date stamped January 11, 2024 
 
e. 
Prior to final site plan approval, documentation shall be provided that 
demonstrates a commitment to participate in the Water Efficiency Checkup 
for a minimum of 15 years, or as approved by the Planning and 
Development Department. 
 
 
6. 
All streets within and adjacent to the development shall be constructed with 
paving, curb, gutter, sidewalk, curb ramps, streetlights, median islands, 
landscaping and other incidentals, as per plans approved by the Planning and 
Development Department. All improvements shall comply with all ADA 
accessibility standards. 
 
 
7. 
If determined necessary by the Phoenix Archaeology Office, the applicant shall 
conduct Phase I data testing and submit an archaeological survey report of the 
development area for review and approval by the City Archaeologist prior to 
clearing and grubbing, landscape salvage, and/or grading approval. 
 
 
8. 
If Phase I data testing is required, and if, upon review of the results from the 
Phase I data testing, the City Archaeologist, in consultation with a qualified 
archaeologist, determines such data recovery excavations are necessary, the 
applicant shall conduct Phase II archaeological data recovery excavations. 
 
 
9. 
In the event archaeological materials are encountered during construction, the 
developer shall immediately cease all ground-disturbing activities within a 33-foot 
radius of the discovery, notify the City Archaeologist, and allow time for the 
Archaeology Office to properly assess the materials. 
 
 
10. 
Prior to final site plan approval, the landowner shall execute a Proposition 207 
waiver of claims form. The waiver shall be recorded with the Maricopa County 
Recorder's Office and delivered to the City to be included in the rezoning 
application file for record.

WINSTON DR
BEVERLY RD
48TH ST
POINTE PKWY
PAD-12 PCD *
Z-116-D-81
C-O SP PCD *
Z-116-D-81
C-2 SP PCD *
Z-116-D-81
RH M-R PCD *
Z-116-N-81
RH M-R PCD *
Z-116-N-81
C-O M-R
SP PCD *
Z-116-H-81
C-O M-R
SP PCD *
Z-116-I-81
§¨¦
10
BROADWAY RD
BASELINE RD
DOBBINS RD
27TH AVE
19TH AVE
7TH AVE
CENTRAL AVE
7TH ST
16TH ST
40TH ST
48TH ST
24TH ST
32ND ST
SOUTHERN AVE
I-10
SOUTH MOUNTAIN VILLAGE
CITY COUNCIL DISTRICT: 6
I
APPLICANT'S NAME:
APPLICATION NO.
Z-116-R-81
GROSS AREA INCLUDING 1/2 STREET
AND ALLEY DEDICATION IS APPROX.
60.70 Acres
MULTIPLES PERMITTED
*   Maximum Units Allowed with P.R.D. Bonus
C-2 PCD, C-O PCD, R-5 PCD, PCD (Approved RH M-R PCD), 
PCD (Approved C-O M-R SP PCD), PCD SP, PCD SP (Approved RH M-R PCD), 
PCD SP (Approved C-2 SP PCD), RH M-R PCD, RH M-R SP PCD. RH PCD,
PUD PCD
CONVENTIONAL OPTION
23, N/A, 9, N/A (181), 
N/A (N/A), N/A, N/A (37),
N/A (22), 663, 15, 32
190
*   UNITS P.R.D. OPTION
27, N/A, 11, N/A (N/A), 
N/A (N/A), N/A, N/A (N/A),
N/A (26), N/A, N/A, N/A
N/A
Ed Bull, Burch & Cracchiolo PA
DATE:
10/05/2023
REVISION DATES:
AERIAL PHOTO &
QUARTER SEC. NO.
QS 01-39, QS 01-40
QS 02-40
ZONING MAP
C-11, D-11
REQUESTED CHANGE:
FROM:
C-2 PCD ( 1.58 a.c.)
C-O PCD ( 0.47 a.c.)
R-5 PCD ( 0.22 a.c.)
PCD (Approved RH M-R PCD) ( 9.04 a.c.)
PCD (Approved C-O M-R SP PCD) ( 10.45 a.c.)
PCD SP ( 0.04 a.c.)
TO: PUD PCD ( 60.70 a.c.)
Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\1981\Z-116-R-81.mxd
Z-116-R-81
0.1
0
0.1
0.05
Miles
PCD SP (Approved RH M-R PCD) ( 1.85 a.c.)
PCD SP (Approved C-2 SP PCD) ( 1.51 a.c.)
RH M-R PCD ( 33.15 a.c.)
RH M-R SP PCD ( 0.77 a.c.)
RH PCD ( 1.62 a.c.)
11/17/2023
4/02/2024

WINSTON DR
BEVERLY RD
48TH ST
POINTE PKWY
PAD-12 PCD *
Z-116-D-81
C-O SP PCD *
Z-116-D-81
C-2 SP PCD *
Z-116-D-81
RH M-R PCD *
Z-116-N-81
RH M-R PCD *
Z-116-N-81
C-O M-R
SP PCD *
Z-116-H-81
C-O M-R
SP PCD *
Z-116-I-81
§¨¦
10
BROADWAY RD
BASELINE RD
DOBBINS RD
27TH AVE
19TH AVE
7TH AVE
CENTRAL AVE
7TH ST
16TH ST
40TH ST
48TH ST
24TH ST
32ND ST
SOUTHERN AVE
I-10
SOUTH MOUNTAIN VILLAGE
CITY COUNCIL DISTRICT: 6
I
APPLICANT'S NAME:
APPLICATION NO.
Z-116-R-81
GROSS AREA INCLUDING 1/2 STREET
AND ALLEY DEDICATION IS APPROX.
60.70 Acres
MULTIPLES PERMITTED
*   Maximum Units Allowed with P.R.D. Bonus
C-2 PCD, C-O PCD, R-5 PCD, PCD (Approved RH M-R PCD), 
PCD (Approved C-O M-R SP PCD), PCD SP, PCD SP (Approved RH M-R PCD), 
PCD SP (Approved C-2 SP PCD), RH M-R PCD, RH M-R SP PCD. RH PCD,
PUD PCD
CONVENTIONAL OPTION
23, N/A, 9, N/A (181), 
N/A (N/A), N/A, N/A (37),
N/A (22), 663, 15, 32
190
*   UNITS P.R.D. OPTION
27, N/A, 11, N/A (N/A), 
N/A (N/A), N/A, N/A (N/A),
N/A (26), N/A, N/A, N/A
N/A
Ed Bull, Burch & Cracchiolo PA
DATE:
10/05/2023
REVISION DATES:
AERIAL PHOTO &
QUARTER SEC. NO.
QS 01-39, QS 01-40
QS 02-40
ZONING MAP
C-11, D-11
REQUESTED CHANGE:
FROM:
C-2 PCD ( 1.58 a.c.)
C-O PCD ( 0.47 a.c.)
R-5 PCD ( 0.22 a.c.)
PCD (Approved RH M-R PCD) ( 9.04 a.c.)
PCD (Approved C-O M-R SP PCD) ( 10.45 a.c.)
PCD SP ( 0.04 a.c.)
TO: PUD PCD ( 60.70 a.c.)
Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\1981\Z-116-R-81.mxd
Z-116-R-81
0.1
0
0.1
0.05
Miles
PCD SP (Approved RH M-R PCD) ( 1.85 a.c.)
PCD SP (Approved C-2 SP PCD) ( 1.51 a.c.)
RH M-R PCD ( 33.15 a.c.)
RH M-R SP PCD ( 0.77 a.c.)
RH PCD ( 1.62 a.c.)
11/17/2023
4/02/2024

ARIZONA GRAND RESORT
Phoenix/Tempe, Arizona  
June 12, 2023
BASELINE ROAD
4
8
WENDLER 
DR
RESORT 
ENTRY
PARKING 
ENTRY
Driveway
Pedestrian Walkway
Pedestrian Walkway
Pedestrian Walkway
Pedestrian Walkway
INTERSTATE 10 EAST
INTERSTATE 10 EAST
Pre-Function
12
13
3
8
9
8
5
5
9
8
6
10
9
1
0’
100’
200’
(CITY OF TEMPE)
7
2
8
8
5
5
(C
(C
(C
(C
(C
(C
(C
(C
(C
(C
(C
( IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
ITY OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF TEMPE)
S POINTE PKWY E
HIGHLINE CANAL
EXISTING GOLF COURSE
EXISTING 
HOTEL 
ROOMS
EXISTING 
HOTEL 
ROOMS
EXISTING 
CONFERENCE 
& BALLROOMS
EXISTING 
VILLAS
EXISTING 
HEALTH 
CLUB
EXISTING 
MAINTENCE 
BLDG.
EXISTING 
HOTEL 
ROOMS
EXISTING 
HOTEL 
ROOMS
EXISTING 
CONFERENCE 
ROOMS
EXISTING 
POOL & 
WATER 
SLIDE
4
7
S POINTE PKWY E
S 48th St
City of Tempe
EXISTING 
LOBBY
EXISTING PARKING
EXISTING 
PARKING
EXISTING 
WATER 
PARK
RUSTLER’S ROOSTE 
RESTAURANT
HIGHLINE CANAL
CONCEPTUAL LAND USE PLAN
ARIZONA GRAND RESORT
Phoenix/Tempe, Arizona  
July 6, 2023. Revised September 28, 2023
7
4
4
4
7
11
Land Use Quantities:
NEW FOOD & BEVERAGE
Maximum 35,000 sf
NEW OUTDOOR TERRACES   
 
Maximum 7,300 sf
EXISTING CONFERENCE 
79,800 sf
NEW CONFERENCE & KITCHEN
Maximum 49,500 sf
NEW EVENT LAWNS 
 
 
 
 
 Maximum 25,300 sf
EXISTING GUESTROOMS 
640 rooms
NEW GUESTROOMS OPTION 
Maximum 460 rooms
(in lieu of multi-family units in Area ‘G’)
OVERALL TOTAL GUESTROOMS 
Maximum 1,100 rooms
NEW MULITI-FAMILY OPTION
Maximum 190 units
(in lieu of hotel rooms in Area ‘G’)
Note:
1.
A connection to the existing pedestrian bridge over the 
Highline Canal shall be maintained and enhanced with land-
scaping such as trees and shrubs and amenities such as a 
paved walkway, benches, lighting and signage.
LEGEND
NEW HOTEL OR MULTI-FAMILY RESIDENCES
NEW BALLROOMS/CONFERENCE
RENOVATED CANYON BALLROOM
THE DISTRICT F&B
APARTMENTS (City of Tempe)
GOLF COTTAGES
OUTDOOR DINING
PARKING
PASEO
BRIDGE OVER THE OASIS WATER PARK
HIGHLINE CANAL
RENOVATED LAS PALMAS BLDG.
TOWER/FOUNTAIN
KITCHEN
ARRIVAL PLAZA
8
7
6
5
4
3
2
1
9
10
12
13
Land Uses
HOTEL or MULTI-FAMILY RESIDENCES
FOOD & BEVERAGE
CONFERENCE
GOLF COTTAGES
PUD BOUNDARY
14
15
14
15
11
7
B A S E L I N E R OA D
S ARIZONA GRAND PKWY (63.5’)
S POINTE PKWY W (50’)
INTERSTATE 10
S POINTE PKWY E
INTERSTATE 10
µ$¶
µ%¶
µ&¶
µ'¶
µ(¶
µ*¶
2
7
µ+¶
µ,¶
µ)¶

Covered Outdoor 
Dining Terrace
Restaurant/Bar
Food Hall, Event & Entertainment Destination
Rooop Bar with Views 
to South Mountain 
Preserve
Covered Outdoor 
Dining Terrace
Splash Pad/Water Feature
Pedestrian Plaza with Special Lighting 
& Casual Dining Furniture 
Special Event Lawn
CONCEPTUAL ILLUSTRATION OF THE FOOD AND BEVERAGE DISTRICT 
European-style food hall, event, and entertainment destination.  Chef-driven restaurants serving a variety of cuisines, two 
bars, live music, and special events.  
Restaurant/Bar with 
Live Music
or
VIEWPOINT

ARIZONA GRAND RESORT 
Phoenix/Tempe, Arizona
June 12, 2023
Event Lawn
Covered Walkway/
Terrace
Entry Portico
Renovated Canyon Ballroom
Covered Walkway
Prefunction Space
Event Lawn 
Pick-Up & Drop-Off
CONCEPTUAL ILLUSTRATION OF THE CONFERENCE, MEETING SPACE & BALLROOMS
New state-of-the-art meeting facilites, pre-function space, outdoor terraces, rooop gardents and event lawns
n
Rooop Terrace with Views to South Mountan Preserve
VIEWPOINT

ARIZONA GRAND RESORT 
Phoenix/Tempe, Arizona
June 12, 2023
Coffee Shop and Outdoor Patio
Luxury Hotel Rooms with Views of South Mountain. 
Rooms on Opposite Side have Views Toward the 
Oasis Waterpark
Porte Cochere
Walkway to 
Waterpark
CONCEPTUAL ILLUSTRATION OF THE NEW HOTEL ROOMS
Southwestern-style design luxury guest rooms with mountain views or views over The Oasis Waterpark.
Iconic Architectural Tower
Covered Walkway
VIEWPOINT

ARIZONA GRAND RESORT 
Phoenix/Tempe, Arizona
June 12, 2023
Terrace on Second Floor
Hotel Rooms Fronting 
Golf Course with Views 
of South Mountain
Covered Outdoor Patio
Two-Story Duplex Type Units
Existing Golf Course Hole #2 
Cart Path to Clubhouse 
CONCEPTUAL ILLUSTRATION OF THE GOLF COTTAGES
Two-story units with dramatic views over the golf course towards South Mountain Preserve.
2
Walkway to Lobby
VIEWPOINT

ARIZONA GRAND RESORT 
Phoenix/Tempe, Arizona
June 12, 2023
Existing Street Trees
Entry Tower with Viewing Platform
Shaded Plaza with Outdoor Furniture 
Existing Traffic Circle on S Pointe Parkway 
Existing Hotel 
CONCEPTUAL ILLUSTRATION OF THE MAIN ENTRY VIEWING TOWER
Major architectural feature to replace existing fountain.  Elevator and stairway to viewing level.  
VIEWPOINT
Pedestrian Plaza

ARIZONA GRAND RESORT
Phoenix/Tempe, Arizona  
June 12, 2023
BASELINE ROAD
4
8
WENDLER 
DR
RESORT 
ENTRY
PARKING 
ENTRY
Driveway
Pedestrian Walkway
Pedestrian Walkway
Pedestrian Walkway
Pedestrian Walkway
INTERSTATE 10 EAST
INTERSTATE 10 EAST
Pre-Function
12
3
9
8
5
5
9
6
10
9
1
0’
100’
200’
(CITY OF TEMPE)
7
2
EXISTING GOLF COURSE
EXISTING 
HOTEL 
ROOMS
EXISTING 
HOTEL 
ROOMS
EXISTING 
CONFERENCE 
ROOMS
EXISTING 
VILLAS
EXISTING 
HEALTH 
CLUB
EXISTING 
WATER 
PARK
EXISTING 
MAINTENCE 
BLDG.
EXISTING 
HOTEL 
ROOMS
EXISTING 
HOTEL 
ROOMS
EXISTING 
CONFERENCE 
ROOMS
EXISTING  
WATER 
PARK
4
S POINTE PKWY E
S 48th St
City of Tempe
8
5
5
(C
(C
(C
(C
(C
(C
(C
(C
(C
(C
(C
(C
( IT
IT
IT
IT
IT
IT
ITY OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF
OF TEMPE
PE)
Cit
Cit
Cit
Citit
Citit
Cit
Ci
Cit
Cit
C
y o
y o
y o
y o
y o
y o
y o
y o
y o
y o
y o
y o
y o
y o
y o
y
f T
f T
f T
f T
f T
f T
f T
f T
f T
f T
f
emp
empe
pe
pe
pe
8
9
EXISTING PARKING
EXISTING 
PARKING
4
4
7
4
7
7
EXISTING 
HOTEL 
ROOMS
Existing Palm Court
STI
NG
N
EX
E
R
8
CONCEPTUAL CIRCULATION PLAN
ARIZONA GRAND RESORT
Phoenix/Tempe, Arizona  
July 6, 2023
4
4
O
 o
 of
8
7
4
7
4
9
9
9
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
E
T
E
ING
ING
IN
ING
NG
NG
ING
IN
ING
NG
ING
ING
NG
ING
NG
ING
NG
NG
I
G
HOTEL 
ROOMS
MS
MS
MS
MS
MS
MS
MS
MS
M
EXIST
E
ING
ONFERENCE
ROOMS
EXISTING
CONFERENCE
9
EXIST
EXIST
XIST
EXIST
EXIST
EXIS
EXIST
EXIST
E
ST
EXIST
EXIST
ST
E
T
EXIST
E
ING
NG
NG
NG
NG
NG
ING
N
IN
ING
NG
NG
NG
IN
ING
NG
NG
NG
NG
NG
N
HOTEL 
ROOMS
ROOMS
ROOMS
ROO
ROOMS
ROO
ROOMS
O
ROOM
ROOM
ROOM
OM
OM
OMS
MS
OMS
OMS
OMS
OM
OMS
O
S
OM
ROOM
OM
R
CO
C
4
CONFERENCE
ROOMS
9
Exist
E
ing Palm C
t
ourt
0
10
10
EXIST
EXIST
EXIST
XIST
EXIST
XI
EXIST
XI
EXIST
EXIST
EXIST
XIST
XI
XI
XI
XIST
XI
X
ING 
ING
IN
IN
IN
WATER
WATER
WATER
WATER
WATE
ATER
WATER
WATER
WATER
WATER
WATER
TER
WATER
WATER
WA
WATE
W
2
3
E
11
CIRCULATION PLAN LEGEND
MAJOR INTERSECTION/ENTRY
PRIVATE STREET
PEDESTRIAN PASEO
PEDESTRIAN NODE OR PLAZA
DROP-OFF & VALET
NEW PARKING
VEHICLE/PEDESTRIAN SHARED STREET 
14
15
8
7
6
5
4
3
2
1
9
10
12
13
14
15
11
7
LEGEND
NEW HOTEL ROOMS OR APARTMENTS
NEW BALLROOMS/CONFERENCE
RENOVATED CANYON BALLROOM
THE DISTRICT F&B
MULTI-FAMILY (City of Tempe)
GOLF COTTAGES
OUTDOOR DINING
PARKING
PASEO
BRIDGE OVER THE OASIS
HIGHLINE CANAL (Buried)
LAS PALMAS EVENT CENTER
TOWER/FOUNTAIN
KITCHEN
PLAZA
15
15
15
15
15
15
15
8
B A S E L I N E R O A D
P u b l i c S t r e e t
INTERSTATE 10
INTERSTATE 10
S ARIZONA GRAND PKWY
S ARIZONA GRAND PKWY
Employee 
Parking
New Hotel 
Guest & 
Visitor 
Parking
New Hotel 
Guest, Visitor, & 
Valet Parking
S POINTE PKWY E
S POINTE PKWY W
Service & 
Deliveries
Entry
Entry
Entry
Arrival
EXISTING 
LOBBY
13
Main 
Entry
 Secondary
Entry
Delivery Truck 
Hammerhead
Pedestrian 
Node
Main 
Pedestrian 
Plaza
Traffic 
Circle
HIGHLINE CANAL
HIGHLINE CANAL
Parking & Service Entry
Speed 
Table
µ$¶
µ%¶
µ&¶
µ'¶
µ(¶
µ)¶
µ*¶
12
µ+¶
µ,¶