NSA-00-0036
12/2018
 
 
 
Participating Public Agency Service Agreement - 
Sample Exhibit
 
KONE Inc. Proposal to Supply FOR ELEVATOR, ESCALATOR, WALKWAY, AND LIFT, NEW 
CONSTRUCTION, MODERNIZATION, MAINTENANCE, AND REPAIR SERVICES under the Public 
Promise Procurement utilizing the Maricopa County Master Agreement (Reference 230122-RFP). 
 
The parties hereby agree to be bound to the Terms and Conditions of the Maricopa County 
Master Contract (Reference 230122-RFP) (“Contract”), together with those terms and conditions 
contained in this Exhibit 4 (collectively, “Service Agreement”). The terms and conditions 
contained in this Exhibit 4 shall supersede and prevail over the Master Agreement mutually 
accepted by the Participating Public Agency and KONE.

NSA-00-0036
12/2018
 
 
 
 
 
 
 
 
 
ACCEPTANCE 
 
Service Agreement Effective Date: 
Service Agreement Number: TBD 
The parties to this service agreement agree to the conditions contained herein: 
 
 
 
 
Sign for on behalf of Participating Public Agency 
 
 
(Signature) 
(Print Name) 
(Print Title)
Date:  
/  
/  
 
Respectfully submitted,
KONE Inc.
(Submitted By)
(Approved By)
Authorized Representative
(Title)
Date: 
/ 
/

KONE MODERNIZATION PROPOSAL 
  
  
  
Proposal:
Sample Template 
HydroMod DX
Proposal Date: 
TBD

KONE Inc. 
TBD Office 
Address 
City, ST 
Phone # 
email  
www.kone.us 
  
Dear XXX, 
We are pleased to enclose, for your review and consideration, KONE's proposal to modernize your equipment located at the 
following address for the amount of $TBD (excluding sales tax): 
 This proposal is based on 202X installation. 
 This proposal is valid for (30) days. 
 Anticipated downtime: X weeks per unit for modernization + X weeks for inspection. 
Should you have any questions or require additional information, please feel free to contact me directly. 
We look forward to hearing from you and working together on this project. 
Yours sincerely,

www.kone.us 
3(21) 
 
 
 
 
 
 
 
Appendix 1: KONE 24/7 Connected Services 
Appendix 2: Clarifications 
Terms and Conditions (Modernization) 
 
 
 
Table of Contents

www.kone.us 
4(21) 
1.      Why KONE? 
  
KONE in brief 
KONE is a global leader in the elevator 
and escalator industry. Our mission is to 
make cities better places to live.  
Our versatile product portfolio features a 
wide range of innovative products 
including elevators, escalators, 
autowalks, monitoring, access and 
destination control systems. 
  
  
Value for your project 
KONE helps you to reduce operational costs, increase end-user satisfaction and value of your building by providing accessible 
and safe equipment through a professional and trouble-free modernization project. 
  
Increased user satisfaction/minimal disturbance to end-users  
  
  
Improved eco-efficiency, reduced energy consumption   
  
  
Improved safety according to latest standards

www.kone.us 
5(21) 
2.      Ensuring your project success 
  
Project Overview 
  
 KONE Responsibility     
 CUSTOMER Responsibility
                                                                                                                
  KONE and CUSTOMER 
 
 
 
 
Site Cornerstones 
  
By ensuring that these cornerstones are in place you can ensure that your modernization project stays on schedule and that 
KONE technicians can perform their work quickly, safely, and with minimum disruption to building operations. 
  
Site preparation requirements before materials arrive  
 Loading and storage area of suitable size for materials, waste and waste storage, and tools 
 Safe access route for new materials and materials being removed 
 Access permissions and cards or other access devices for KONE technicians 
  
  
Other works as agreed in the project plan, if not managed by KONE 
 Please refer to Appendix 4: 
 
 
 
Project kick-
off 
 
Fully executed 
contract & down 
payment 
 
Materials delivered to 
site and 
modernization starts
 
Project 
completion
 
Detailed site 
survey 
 
Submittals 
approved if 
required 
 
Manufacturing
 
Work by others
 
Installation and 
testing 
 
Third-party inspection 
arranged

www.kone.us 
6(21) 
3.      Your solution 
  
Rated load 
TBD 
Rated speed 
TBD 
Travel height 
TBD 
Number of floors 
TBD floors / TBD front openings / TBD rear opening 
 
 
 
 
  
 
 
 
Electrification 
KONE HydroMod DX 
KONE HydroMod DX is a modular modernization solution for elevator control and electrical 
systems, based on the latest in control technology. This replaces outdated technology such as 
relays and older electronic systems, improving the levels of performance, reliability, safety and 
energy efficiency of your elevator. The modular structure of KONE HydroMod DX is designed to 
correctly interface with many types of existing elevator components, thus ensuring a swift, 
trouble-free installation for the building users. 
 
A new microprocessor-based control system shall be provided to perform the functions of safe 
elevator motion. Included shall be all of the hardware required to connect, transfer and interrupt 
power, and to protect the motor against overloading. Each controller cabinet containing memory 
equipment shall be properly shielded from line pollution. The microcomputer system shall be 
designed to accept reprogramming with minimum system down time. All high voltage (110V or 
above) contact points inside the controller cabinet shall be protected from accidental contact in a 
situation where the controller doors are open. The microprocessor-based control system shall 
utilize on-board diagnostics for servicing, troubleshooting, and adjusting without requiring the use 
of an outside service tool. 
 
 
 
 
Fixtures 
Custom Fixtures 
New signalization shall be provided.  Typical design to include the following: 
 
#4 stainless steel vandal resistant. 
 
Car signalization to include code compliant car operating panel with digital position 
indicator (COP qty to match existing). 
 
Emergency Video Communication per code compliance. 
 
Hall signalization to include new hall stations, Hall lanterns and position indicators 
where required and Code Blue and Pink Operation where required. 
 
Fire Command Panel & Intercom provided where required by code. 
 
Voice Annunciation 
 
Provisions for customer supplied Card Reader inside the Car

www.kone.us 
7(21) 
Doors 
Door Panel(s) 
New car and hoistway door panel(s) shall be provided where applicable. New hoistway door(s) 
shall be UL fire rated 1 1/2 hour. 
KONE ReNova Door Operator (Complete Car and Hoistway replacement) 
A KONE ReNova closed loop permanent magnet PWM high-performance door operator shall be 
provided to open and close the car and hoistway doors simultaneously. Door movement shall be 
cushioned at both limits of travel. An electric contact shall be provided on the car at each car 
entrance to prevent the operation of the elevator unless the car door is closed. The door operator 
shall be arranged so that, in case of interruption or failure of electric power, the doors can be 
readily opened by hand from within the car, in accordance with applicable code. 
 
Emergency devices and keys for opening doors from the landing shall be provided as required by 
the local code. Doors shall open automatically when the car has arrived at or is leveling at the 
respective landings. Door shall close after a predetermined time interval or immediately upon 
pressing of a car button. A door open button shall be provided in the car. Momentary pressing of 
this button shall reopen the doors and reset the time interval. Door hangers and tracks shall be 
provided for each car and hoistway door where applicable. Tracks shall be contoured to match 
the hanger sheaves. The hangers shall be designed for power operation with provisions for 
vertical and lateral adjustment. Hanger sheaves shall have polyurethane tires and pre-lubricated 
sealed-for-life bearings. 
Curtain of Light (3D) 
The elevator car shall be equipped with an electronic protective device extending the full height 
of the car. When activated, this sensor shall prevent the doors from closing or cause them to stop 
and reopen if they are in the process of closing. The doors shall remain open as long as the flow 
of traffic continues and shall close shortly after the last person passes through the door opening. 
 
 
 
 
Shaft equipment 
Guide Shoes 
New roller guide assemblies shall be provided.

www.kone.us 
8(21) 
Hydraulic equipment 
Field Pipe & Accessories 
New field pipe and or accessories shall be provided as required. 
Power Unit 
A hydraulic power unit, especially designed and manufactured for this service, will be furnished. 
For units requiring less than 40hp motors, the motor and pump will be submersed under the oil 
inside the tank in order to provide for sound isolation. For units requiring 40hp and larger motors, 
the motor and pump will be mounted outside of the tank reservoir.  A muffler, designed to reduce 
pulsation and noise which may be present in the flow of hydraulic oil, will be provided in the oil 
line.  
 
Control valves, including safety check valve, up direction valve with high pressure relief including 
up leveling and soft stop features, lowering valve including down leveling and manual leveling 
feature, will be mounted in a compact unit assembly. A valve, designed to shut off the flow of oil 
between the cylinder and the Power Unit, will be provided in the oil line in the machine room. 
Automatic two-way leveling will be provided to automatically stop and maintain the car 
approximately level with the landing, regardless of change in load. 
 
An up traveling car will automatically descend to the lower terminal landing if the hydraulic 
system does not have a sufficient reservoir of oil. Power operated car and hoistway doors will 
automatically open at the lowest terminal landing permitting passenger egress. The doors will 
then automatically close and all control buttons, except the Door Open Button in the car 
operating panel, will be made ineffective.

www.kone.us 
9(21) 
Solution details 
   
Electrification 
 
Product name 
KONE HydroMod DX 
Elevator group size 
TBD 
Number of floors served 
TBD 
Code year 
TBD  
Speed [FPM] 
TBD 
NEMA rating (HW) 
Hoistway rating is NEMA 1. 
NEMA rating (MR) 
Machine room rating is NEMA 1. 
Power supply voltage [v] 
TBD  
Type of power unit 
TBD 
Machine room duct 
KONE will remove all existing wiring, conduit and duct from the 
machine room. New conduit and duct properly sized and 
constructed for the job requirements will be installed (in accordance 
with applicable codes). 
New motor size (hp) 
TBD 
Motor Starts per Hour 
80 Standard 
Card reader provisions 
Controller will be equipped with card reader interface logic. 
Type of curtain of light 
This curtain of light is an electronic sensing device that operates 
across the car entrance. When activated, the curtain of light will 
prevent the doors from closing or cause them to stop and reopen if 
they are in the process of closing. The doors will remain open as 
long as the flow of traffic continues and will close shortly after the 
last person passes through the door opening. A 3-D type will be 
provided. 
Qty of COPs 
TBD 
Interface to Lobby/Fire 
Panel 
TBD 
Traveling cable(s) 
Existing traveling cable(s) will be removed and replaced with new 
traveling cable. In addition to our standard traveling cable, a second 
traveling cable be provided for security and/or card reader 
provisions. 
Battery backup 
TBD 
Medical service 
TBD 
Hoistway duct 
KONE will remove all existing wiring, conduit and duct from the 
hoistway. New conduit and duct properly sized and constructed for 
the job requirements will be installed as required 
 
 
 
 
Fixtures 
 
Product name 
Custom Fixtures 
Number of floors served 
TBD  
Capacity [LBS] 
TBD 
Card reader provisions 
Controller will be equipped with card reader interface logic. 
Qty of COPs 
TBD

www.kone.us 
10(21)
Qty of Car Direction 
lanterns 
TBD 
Qty of new hall stations 
TBD 
Qty of new hall 
lantern/position indicator 
combos 
TBD 
Qty of hoistway access 
switches 
2  
 
 
 
Doors 
 
Product name 
Door Panel(s) 
Number of floors served 
TBD 
Car panel finishing 
material 
New car door panel(s) shall be provided where applicable. New 
door(s) shall be UL fire rated 1 ½ hour. Finish will be #4 stainless 
steel. 
Door type 
TBD 
Hatch panel finishing 
material 
New hatch door panel(s) shall be provided where applicable. New 
door(s) shall be UL fire rated 1 ½ hour. Finish TBD. 
 
 
 
Product name 
KONE ReNova Door Operator 
Number of floors served 
TBD 
NEMA rating (HW) 
Hoistway rating is NEMA 1. 
Door type 
TBD 
Door package type 
KONE ReNova M3 door package includes a new door operator, 
restrictive clutch, car and hoistway door track, car gate switch, car 
and hoistway hangers, car and hoistway door panel adapters, 
hoistway door interlocks and closers, and hoistway pick up rollers. 
Hatch headers 
New hatch headers will be provided as required for the specified 
number of openings.

www.kone.us 
11(21)
Product name 
Curtain of Light 
Number of floors served 
TBD 
Code year 
TBD 
NEMA rating (HW) 
Hoistway rating is NEMA 1. 
Type of curtain of light 
This curtain of light is an electronic sensing device that operates 
across the car entrance. When activated, the curtain of light will 
prevent the doors from closing or cause them to stop and reopen if 
they are in the process of closing. The doors will remain open as 
long as the flow of traffic continues and will close shortly after the 
last person passes through the door opening. A 3-D type will be 
provided. 
 
 
 
 
Shaft equipment
 
Product name 
Guide Shoes 
Capacity [LBS] 
TBD 
Speed [FPM] 
TBD  
Car guide dust covers 
Yes 
Car guide shoes 
adapters 
Yes, where required 
Car guide shoe type 
TBD 
 
 
 
Hydraulic equipment 
 
Product name 
Field Pipe & Accessories 
Capacity [LBS] 
TBD 
Speed [FPM] 
TBD 
Field Pipe Length (in) 
TBD 
Field Pipe Size 
TBD 
Isolation Coupling (Pair) 
Two (2) sound isolation couplings will be provided in the oil line between the power unit and the 
hydraulic cylinder(s). Each coupling will consist of flanges separated by a neoprene seal to absorb 
vibration. 
Mainline Shutoff Valves 
Two manual safety valves will be supplied in the oil line at the jack unit (pit) and in the machine 
room. 
Oil Return Pump 
An electric oil return system consisting of a pump with oil line and necessary fittings will be 
provided to automatically return oil from the cylinder head collector ring to the power unit oil 
reservoir tank. 
 
 
Product name 
Power Unit 
Capacity [LBS] 
TBD 
Speed [FPM] 
TBD 
Type of power unit 
TBD

www.kone.us 
12(21)
New motor size (hp) 
TBD 
Motor Starts per Hour 
80 Standard 
Control Valve OEM 
Maxton 
Down Compensated 
Valve 
A new down compensated valve will be provided which provides a constant rate of speed in the 
down direction with varying loads. 
Field Pipe Length (in) 
TBD 
Field Pipe Size 
TBD 
Jack location 
TBD 
Jack type 
TBD 
Load class 
TBD 
Qty Jacks per Car 
TBD 
Tank Heater 
A tank heater will be provided to keep the temperature of the oil at a proper operating level.

www.kone.us 
13(21)
4.      Commercial Offer 
  
Project notes
  
[Insert project specific notes here]
  
Handover date 
Mutually agreeable project schedule will be determined at time of proposal acceptance. 
Current delivery lead time is TBD weeks from when order receipt, deposit and 
approval of drawings have all been completed. The agreed delivery times for the 
project may need to be extended because of delays caused by measures undertaken to 
stop the spreading of the Coronavirus (2019-nCoV) epidemic, such as mandatory holiday 
extensions and transportation restrictions imposed by authorities in China and other 
countries, and the availability of personnel, logistics providers and supply chains, due to 
the epidemic. 
  
Downtime period 
TBD weeks per unit 
  
  
  
  
Pricing 
  
Equipment 
Price ($) 
Elevator: TBD 
 
$ TBD
 
 
Total Sales Price, net excluding Sales TAX
$ TBD
  
Additional Options for your Consideration 
  
 
Alternates 
Price excl. tax
Alternate 1 
$TBD
Proposal pricing is based on the scope of work as defined herein. Any additional work required will be performed only upon 
e work will 
be promptly reported to the purchaser with recommendations and cost for corrective action.

www.kone.us 
14(21)
Tender Approval 
  
KONE
Name 
Address 
City, ST 
email 
Owner/Representative
Name 
Company 
Address 
City, ST  
 
Submitted by: 
 
Name 
Title 
Date 
 
We accept the offer constituted by this proposal (total sales price of $1,651,120.50) and agree to the conditions contained 
therein. 
  
Approved by Customer 
  
  
  
  
___________________________________________ 
Printed name: 
Title: 
Company name: 
Date:

www.kone.us 
15(21)
Appendix 1: KONE 24/7 Connected Services 
KONE 24/7 Connected Services  improved safety, full transparency, and peace of mind 
  
In addition to a quality modernization project, we would be excited to discuss KONE 
24/7 Connected Services with you and the continuing benefits KONE could bring to 
your business. KONE is leading the industry with KONE 24/7 Connected Services 
using the latest intelligent elevator technology allowing us to predict issues and take 
action before a shutdown occurs. Predictive maintenance allows fewer shutdowns, 
less call-outs, and improved up-time of equipment - all leading to a better user 
experience! 
  
  
  
  
 
  
  
Read more at 
kone.us/connected

www.kone.us 
16(21)
Appendix 2: Clarifications 
1. 
 
  
  
2. 
All new elevator equipment provided shall meet applicable ASME A17.1 code requirements. Any provisions of codes 
applicable to out-of-
permitting and completion are excluded. 
  
  
3. 
Existing cab and entrance dimensions, which may not meet current ADA or stretcher access rules, will be retained as is. 
  
  
4. 
Our proposal includes inspections and testing as required by the AHJ. However, any re-
failures to complete their work or tests in a timely manner will be billed at our regular billing rates. 
  
  
5. 
The ASME code limits changes to the empty car weight + capacity of each elevator to 5% of the originally installed value. If 
past or proposed changes result in a change to the weight or system pressure (for hydraulic) greater than 5% above the 
original design values, the cost of any engineering and of any required modifications to the elevator system or structure 
shall be extra to this proposal scope and pricing. If this situation is discovered during the engineering process, KONE will 
notify purchaser and recommend an alternate design or other changes. 
  
  
6. 
In order to provide best pricing, proposal excludes any extra demobilizations and remobilizations. If we must demobilize 
from the jobsite for any reason outside our control, we shall be compensated at our regular billing rates.  
  
  
7. 
Proposal pricing is based on the scope of work as defined herein. Any additional work required will be performed only upon 
change proposal. Any other deficiencies revealed in the progress of the work 
will be promptly reported to purchaser with recommendations and cost for corrective action. 
  
  
8. 
Asbestos: Notwithstanding anything contained to the contrary within this 
abatement or disturbance of asbestos containing material (ACM) or presumed asbestos containing materials (PACM). Any 
work in a regulated area as defined by Section 1910 or 1926 of the Federal OSHA regulati
scope of work without an applicable change order to reflect the additional costs and time. In accordance with OSHA 
requirements, the Customer shall inform KONE and its employees who will perform work activities in areas which contain 
ACM and/ or PACM of the presence and location of ACM and/or PACM in such areas which may be contacted during work 
times meets applicable OSHA permissible exposure limits (PELs). KONE shall have the right to discontinue its work in any 
location where suspected ACM or PACM is encountered or disturbed. Any asbestos removal or abatement, or delays 
caused by such, required in order for KON
After any removal or abatement, customer shall provide documentation that the asbestos has been abated from the KONE 
work area and air clearance reports shall be made available 
 
  
  
9. 
Purchaser shall provide any security, escort or other building service support personnel required during demolition, 
installation, testing, and inspections. 
  
  
10. For hydraulic elevators, we can assume no responsibility for unusual conditions such as hole cave in and complete 
hydraulic cylinder assembly embedded in concrete. The excavation of the hole to accommodate the new hydraulic cylinder 
assembly is based on encountering soil free of oil, rocks, boulders, building construction members, sand, water, quicksand, 
underground caves and/or any other obstructions or unusual conditions. Should such obstructions or unusual conditions be 
encountered, additional time above or beyond the working days estimated to complete this project may be required. We 
will proceed with this portion of the project on a time and material basis, based on our normal billing rates. 
  
  
11. Proposed solution is subject to a complete engineering review by KONE engineering team to confirm feasibility of products 
proposed. Additional charges may apply for work not included, but required to meet system requirements. Additional 
charges for this work (if applicable) shall be mutually agreed upon.

www.kone.us 
17(21)
Appendix 3: Bid 
(Modernization) 
1. APPLICATION OF THESE TERMS
The parties agree to be bound by the terms and conditions contained 
in the Bid Letter, this Bid Attachment A and Bid Attachment B, 
including the documents incorporated herein by reference (collectively, 
 
 
2. SPECIAL PURCHASING REQUIREMENTS 
This Proposal is made without regard to compliance with any special 
sourcing and/or manufacturing requirements including, but not limited 
to, Buy America, Buy American, U.S. Steel, FAR clauses, minority / 
disadvantaged supplier requirements or similar federal and/or state 
procurement laws. Should such requirements be applicable to this 
Project, KONE reserves the right to modify and/or withdraw its 
Proposal. 
 
3. PROPOSAL CONDITIONS 
The Proposal shall be open for acceptance within the period stated in 
the Bid Letter or, when no period is stated, for a period of 30 days from 
the date of the Bid Letter. Prior to commencing manufacture of the 
equipment d
(i) a fully executed contract; (ii) a schedule acceptable to KONE 
identifying the Equipment installation start date, or alternatively, 
ed by 
Customer, which, as applicable, is incorporated by reference herein; 
(iii) the first payment in Section 4 herein; and (iv) fully approved KONE 
layouts. 
 
4. PAYMENT TERMS 
Payment of the total Price is due within 30 days from invoice date, as 
follows: 
 30% of the Price for engineering, site management, and 
overhead, billable and due upon execution of this Proposal or 
receipt of the subcontract; 
 50% of the Price for material and shipping, billable and due 
upon delivery of material to the jobsite or KONE Distribution 
Center; 
 20% of the Price for Equipment installation, billable and due at 
the billing cycle following the start of installation. 
KONE imposes a surcharge for payments made via credit card that is 
not greater than our cost of acceptance. The surcharge that we 
impose for this type of transaction is a percentage of the amount paid 
via credit card, which will be notified to the Customer at the payment 
portal. KONE reserves the right to delay, suspend, or stop the work, 
including manufacturing, delivery, installation and/or Equipment 
turnover, for non-payment, without liability to KONE or being held in 
default. Simple interest at 1.5% per month shall be charged on 
amounts not paid when due. Payments to KONE are not contingent on 
any third-party payments to Customer. Customer shall reimburse 
KONE for all costs of collection, including courts costs and reasonable 
 
 
Prior to turnover, KONE must be paid in full, less 10% maximum 
retention, the Price including all change orders. Retention shall be due 
and payable within 30 days of execution of the Uniform Final 
Acceptance or Equipment turnover, whichever occurs first. If certified 
payroll reporting is required, KONE will submit the requested reporting 
in the format of the U.S. Department of Labor form WH 347 & WH 348. 
The Price does not include Textura or any other special billing 
requirements, which can be added via change order at a rate of 0.3% 
of the Price. 
 5. INSTALLATION
Customer shall be responsible for procurement and cost of all permits, 
scope of work or other responsibilities include the obligation to utilize 
materials and/or finishes resembling or identical to those pre-existing 
in the building, KONE shall use reasonable efforts to procure such 
materials and Customer acknowledges and accepts that the materials 
and/or finishes reasonably available may not be in all respects 
identical to those pre- existing in the building. This Proposal is 
conditioned upon KONE using its standard installation method. The 
installation of the Equipment shall start after Customer has completed 
all work set forth in Bid Attachment B and any other documents 
incorporated by reference herein. Within two (2) weeks prior to the 
standard visual site survey to verify that the Site Requirements are 
complete and notify Customer if there are outstanding deficiencies 
preventing KONE from beginning installation. 
 
access, working and safety conditions on site, wear and tear of any 
existing structures or surfaces, and planning of any dismantling or 
removal of existing equipment, components and materials, where 
applicable. KONE shall not be deemed to have surveyed any hidden 
structures, latent defects, subsurface conditions, or other non-visible 
matters, including but not limited to searching for hazardous 
substances and/or materials, which shall be subject to Section 16. If 
delay the start of installation and Customer shall be responsible for all 
additional costs incurred by KONE, including without limitation, costs 
associated with: labor reallocation, re- directing materials to and 
storage in a KONE Distribution Center, additional labor for double 
handling of materials, and additional trucking, freight and insurance. 
Once the Site Requirements are completed, the start of installation 
shall be subject to the availability of labor and the delivery of material, 
if applicable. 
 
regular working days, Monday to Friday, statutory holidays excluded. If 
overtime is mutually agreed upon and performed, the additional costs 
rates. If the installation cannot be performed in an uninterrupted 
manner for any reason beyond KONE's control, Customer shall store 
the Equipment at Customer's cost and compensate KONE for any 
costs caused by such delay including, but not limited to, double 
handling of Equipment and demobilization. KONE shall not be required 
to perform overtime or any Customer directed change to its work 
including but not limited to, performing Extra Work without an executed 
for 
Extra Work performed. 
 
KONE shall be entitled to an extension of time and an equitable 
adjustment in the Price, including but not limited to, any increased 
costs of labor, including overtime, resulting from any change of 
schedule, re-direction of KONE personnel to another work area, 
acceleration, or out of sequence work. 
 
KONE shall take reasonable methods to protect its work-in-place while 
KONE is actively on site and until execution of a KONE Uniform Final 
Acceptance, which is incorporated by reference herein. Should 
damage occur to KONE property, material or work-in- place by fire, 
water, theft or vandalism, Customer shall compensate KONE for said 
damages.

www.kone.us 
18(21)
  
Additionally, the Customer is solely responsible for ensuring that the 
equipment maintenance contractor, if not KONE, does not disturb, 
safety policies and procedures to the extent such policies and 
and/or security features of Equipment must be completed before 
Equipment turnover. KONE is not responsible for damages, either to 
Equipment or the building, or for any personal injury or death, arising 
out of or resulting from any code required safety tests performed on 
Equipment or hoistway access granted by Customer to other trades. 
 
6. TEMPORARY USE 
Temporary use of certain types of Equipment may be permitted, 
provided the use period allows adequate time for Equipment 
restoration for final turnover and Custo
Temporary Use Agreement. Temporary use shall be invoiced 
separately and subject to payment terms in Section 4 herein. At the 
end of temporary use, Customer shall return the Equipment to KONE 
in "like new" condition. 
 
7. HAZARDOUS MATERIALS 
scontinue its 
work in any location where suspected HazMat is encountered or 
disturbed. Any HazMat removal or abatement, or delays caused by 
such, required in order for KONE to perform its work shall be 
 HazMat 
abatement occur within the shaft or machine room, Customer shall 
known to be present on site before the start of work, HazMat removal 
or abatement shall be completed prior to KONE scheduling installation 
and delivering material. 
 
8. TITLE AND RISK TO EQUIPMENT 
Title to and ownership of all Equipment intended for incorporation in 
with KONE until final payment is made. 
and Equipment passes to Customer upon delivery to the site or off-site 
storage. 
 
Any tools, devices, or other equipment that KONE uses to perform its 
work or monitor the Equipment remains the sole property of KONE. If 
this Proposal terminates or expires for any reason, Customer will give 
KONE access to the premises to remove such tools, devices or 
 
 
9. TURNOVER 
Prior to turnover, KONE must receive a final punch list. Upon turnover, 
KONE requires a signed Uniform Final Acceptance. KONE shall 
provide its standard electronic O&M manuals with CD-ROMs in 
electronic format, if applicable, upon execution of the Uniform Final 
Acceptance. Standard KONE samples shall be provided upon request. 
No mock-ups or video training are included in the Price. 
 
10. DELAY 
KONE shall not be liable for any loss, damage, claim, or delay due to 
any cause beyond KONE's control, including, but not limited to, acts of 
domestic or foreign government (including a change in law), strikes, 
lockouts, work interruption or other labor disturbance, delays caused 
by others, fire, explosion, theft, floods, inclement weather, riot, civil 
commotion, war, malicious mischief, infectious diseases, epidemic, 
pandemic, quarantine, border or port of entry and exit restrictions or 
acts of God. 
 In the event of such delays, KONE shall be entitled to an extension in 
time equal to the length of such delay affecting KONE and an 
equitable adjustment in the Price. Customer shall compensate KONE 
for labor and material cost escalations resulting from Project delays not 
the end of the current calendar year. Customer is on notice that IUEC 
labor rates increase annually. 
 
11. LIMITED WARRANTY 
For one (1) year after the acceptance date set forth in the signed 
Uniform Final Acceptance, date of Equipment turnover, or date of 
Temporary Use Agreement), whichever occurs first, KONE warrants 
Equipment against defect in workmanship and material. The warranty 
excludes remedy for damage or defect caused by abuse, misuse, 
vandalism, neglect; repairs, alteration or modifications not executed by 
KONE; improper or insufficient maintenance, improper operation, 
characteristics of the building such as electrical power or security 
features, natural or other catastrophe such as flood, fire, or storm, or 
normal wear and tear and normal usage. The warranty excludes 
training or instruction in the proper operation or maintenance of 
Equipment. Specific noise ratings and energy efficiencies cannot be 
guaranteed due to different building characteristics and ambient noise 
cretion, and excludes labor. 
 
12. INDEMNIFICATION 
KONE shall only indemnify and hold Customer harmless for claims, 
to bodily injury, including death, or tangible property damage (other 
t
Customer for any other Claims. Customer agrees to indemnify and 
hold KONE harmless from any Claim for bodily injury, including death, 
or tangible property damage in connection with the use or operation of 
the Equipment. Each party shall defend itself in the event of a Claim. 
 
13. INTELLECTUAL PROPERTY 
KONE shall retain title and ownership of all intellectual property rights 
relating (directly or indirectly) to the Equipment provided by KONE, 
including but not limited to software or firmware (whether in the form of 
source code, object code or other), drawings, technical documentation, 
or other technical information delivered under the Proposal. KONE 
grants Customer a non-exclusive and non-transferable license and 
right to use the software and firmware in connection with the use and 
maintenance of the Equipment. Customer shall not use any drawings, 
technical documentation or other technical information supplied by or 
on behalf of KONE for any purposes other than those directly related 
to the Proposal or to the use and maintenance of the Equipment. 
Customer shall not in any form copy, modify or reverse engineer the 
software, or give access to the software for such use to any third party

www.kone.us 
19(21)
14. INSURANCE
In lieu of any Customer insurance requirements, KONE shall provide 
its standard certificate of insurance, which shall be deemed to satisfy 
all insurance requirements for this Project. KONE shall not provide loss 
runs, insurance rate information, copies of its insurance policies or any 
other information which KONE considers confidential. KONE shall not 
provide coverage for professional (E&O) liability, pollution liability, data 
privacy/security, or no-fault medical payments. If the Project is covered 
by a Wrap Up Insurance Program, KONE agrees to participate 
provided there is no cost to KONE, no reduction in the Price, and 
limits are sufficient to satisfy insurance coverage requirements, 
excess/umbrella liability will not be required or if excess/umbrella is 
typically pr
excess coverage is not AM Best Rated nor licensed to do business 
within the jurisdiction although the carrier has strong Standard & 
request. 
 
15. LIMITATION OF LIABILITY 
In no event shall either party be liable to the other party for any 
consequential, special, punitive, exemplary, liquidated, incidental, or 
indirect damages (including, but not limited to, loss of profits or 
revenue, loss of goodwill, loss of use, increase in financing costs) 
(collectively, "Consequential Damages") that arise out of or relate to 
this Proposal even if such party has been advised of the possibility of 
such Consequential Damages. The limitation set forth in this section 
shall apply whether the claim is based on contract, tort or other theory.
 
16. CONCEALED OR UNKNOWN CONDITIONS 
If during the course of its work, KONE encounters conditions at the site 
that are subsurface, differ materially from what is represented in the 
contract documents, or otherwise concealed physical conditions, 
KONE shall be entitled to an extension of time and additional costs for 
the performance of its work, which shall not be subject to any payment 
conditions or contingencies. 
 
17. TECHNICAL SURVEY 
90-days of the effective contract start date. If a safety hazard or code 
violation is identified during KON
immediately remove the unit from service until repairs are performed. 
KONE is not obligated to perform tests, correct outstanding violations 
or deficiencies that were not addressed by the prior service provider 
and/or the owner, or make related necessary repairs or component 
replacements on the unit. If additional work is necessary, KONE shall 
provide a separate proposal or recommendation for such work. 
Customer agrees to indemnify, defend, and hold KONE harmless for 
any claims arising out of Customer's failure to comply with KONE's 
recommendations and proposal, and any obligation on the part of 
KONE to indemnify or defend Customer with regard to such claim shall 
be null and void. If Customer does not immediately approve 
proposal or recommendation, KONE reserves the right to terminate 
this Proposal/contract without penalty. 
 18. TERMINATION
If a party materially breaches this Proposal, the other party shall 
provide written notice of the breach and a reasonable time to cure the 
breach, but in no event less than 30 days. If the breaching party fails to 
cure the breach within the specified time period, the non-breaching 
party may terminate the Proposal upon 15 days written notice to the 
other party. If KONE notifies Customer of a material breach pursuant 
to this paragraph, KONE may temporarily suspend its work without 
liability. 
 
19. GOVERNING LAW AND DISPUTE RESOLUTION 
The parties agree that this Proposal shall be governed by the laws of 
the state where the Project is located, and venue for disputes shall be 
located in that state. KONE does not agree to participate in arbitration 
proceedings. 
 
20. PRICE ADJUSTMENT 
KONE shall be entitled to an equitable adjustment in the Price, 
including but not limited to, any increased costs between the time the 
Contract is signed and the date of manufacture for materials, labor, or 
shipping, as well as increased costs resulting from any change in law 
or tariffs. 
 
21. 24/7 EMERGENCY VIDEO COMMUNICATIONS 
Applicable only for projects where KONE 24/7 Emergency Video 
Communications is included: The KONE 24/7 Emergency Video 
Communications contract addendum and General Terms and 
Conditions for KONE Digital Services must be signed by the Building 
Owner. This contract addendum requires the Building Owner to pay a 
fee for audio, video, and data connectivity. This payment obligation, 
among other provisions, survives termination of any maintenance 
agreement. 
 
22. MISCELLANEOUS 
This Proposal, including the documents incorporated herein by 
reference, constitutes the entire agreement of the parties and 
supersedes all prior negotiations, understandings, and representations 
whether written or oral in relation to the subject matter hereof. Where a 
conflict or ambiguity exists between this Proposal and any other 
and specifications), the terms and conditions of this Proposal shall 
control. This Proposal may be amended only in writing by the duly 
authorized representative of both parties. This Proposal may be 
executed in one or more counterparts. Each counterpart shall be 
considered an original and all of the counterparts shall constitute a 
single agreement binding all the parties as if all had signed a single 
document. For purposes of executing this Proposal, a document 
signed by electronic means is to be treated as an original document. 
The failure of either party to insist upon performance or strict 
performance of any of the terms or conditions of this Proposal shall not 
be deemed a waiver of any rights or remedies that such party may 
have or a waiver of any subsequent breach or default under this 
Proposal. Neither party may assign or transfer the benefit or burden of 
this Proposal without prior written consent of the other party.

www.kone.us 
20(21)
Appendi
Trades 
The work described below is a summary of work to be performed 
conjunction with the elevator modernization performed by KONE 
electrical, structural and mechanical system upgrades required for 
code compliance, life safety, and proper equipment installation 
and operation. The Authorities Having Jurisdiction (AHJ) may 
require additional remedial or preparatory work. All required 
remedial or preparatory work shall be performed by properly 
licensed trade contractors in compliance with applicable codes 
and based on a schedule of performance that allows for 
uninterrupted progress of the Work. Under no circumstances shall 
KONE be responsible for any cost associated with the 
performance of remedial work by others. Purchaser shall provide 
 
 
1. ELECTRICAL 
 A properly rated three phase fused disconnect switch, 
externally operable and lockable in the open position, 
located as required by code. Accommodate any increases 
in motor size or feeder loads. 
 A dedicated 110 VAC fused disconnect switch, externally 
operable and lockable in the open position adjacent to the 
machine room door for cab lighting and ventilation, located 
as required by code. 
 Shunt-trip disconnect if fire sprinklers are present in 
machine room or hoistway. 
 GFI 120 VAC convenience outlets in machine room and 
pit. 
 Separate outlet in the pit area if a sump pump is installed.
 Telephone line service brought to the elevator machine 
room for emergency communication device. 
 Any required RF shielding of TV or radio transmitters, 
antennae and/or wave-guides. 
 Conduit with pull boxes from each elevator bank to any 
remote fire control or communication panels specified. 
 Provide a separate 15-amp, 115 VAC fused service with 
ground (powered by building emergency power system, 
when available) for KONE 24/7 Emergency 
Communications, when specified. Must include the means 
to disconnect each service and lock-
position (NFPA 70 article 620.22 and 620.53 or CEC 
article 38.22 and 38.53). 
If required by building code: standby/emergency power, sufficiently 
sized to provide power of permanent characteristics to each 
including feeders, transfer switches and auxiliary contact signal 
outputs to elevator controllers. 
 2. MACHINE ROOM 
 A code-compliant machine room. Provide or maintain fire 
rating as required by building code. 
 Fire-rated door for access into the machine room. Door 
shall be self-closing and self-locking, operable from inside 
the room without the use of a key. 
 Independent ventilation or an air conditioning system for 
the elevator machine room, to assure temperature is 
maintained between 65 degrees and 95 degrees 
Fahrenheit. 
 Fire extinguisher inside machine room. 
 
-
 
 Suitable lighting that provides a minimum of 19 ftc at floor.
 Removal of any non-elevator related equipment and 
materials from within the machine room and proper 
disposal of oil and other hazardous or non-hazardous 
substances and materials. 
3. HOISTWAY 
 A code-compliant hoistway, constructed in accordance 
with KONE's requirements and specifications. Provide or 
maintain fire rating as required by building code. 
 Patching of all holes in hoistway walls with fire rated 
material. 
 
 
 Removal of any non-elevator related equipment and 
materials from within the hoistway and proper disposal of 
oil and other hazardous or non-hazardous substances and 
materials. 
 A guarded light fixture and light switch in pit. Switch must 
loor level. 
 A means of displacing water located in the pit and 
containing and disposing of oil, chemicals, and other 
substances in compliance with environmental laws and 
regulations (KONE assumes no responsibility for 
discharge of oil, chemicals, and other substances into 
storm water systems, sanitary sewer systems, retention 
ponds, etc.). Elevator hoistway ventilation to the outside 
atmosphere as required by building code. 
4. FIRE SERVICE 
 Fire alarm smoke detectors with wiring and relays in the 
machine room terminating at elevator controller. 
 Fire alarm initiating devices must be located in front of 
each elevator entrance as well as in the machine room 
and at the top of the hoistway. 
 Where sprinklers exist in the machine room and/or 
hoistway, a f
sprinkler head.

www.kone.us 
21(21)
5. ACCESS INTEGRATION/SECURITY 
 Our proposal includes KONE logic and provisions for the 
specified Touchscreen(s), Keypad Destination Operating 
Panel(s), Monitoring System(s) and Multi-Media 
Equipment. 
 Card Readers and/or any additional required hardware & 
software for proper functionality of access control/security 
system(s) shall be furnished and installed by others. 
 Any required software to ensure proper communication 
between KONE control system(s) and building system(s) 
shall be the responsibility of others. 
 A designated 115V 15A circuit is required at each of the 
remote monitoring stations. 
 KONE recommends a minimum 100 Mbit/s Ethernet for 
each of the following application(s): Integrated 
Touchscreen/Keypad Destination Operating Panels, 
Monitoring System, Multi-Media Equipment, and Card 
Readers. 
6. COUNTERWEIGHTING 
 Pricing is based upon the existing car to counterweight 
weight ratio being consistent with elevator industry 
standards. This is defined as the counterweight weight 
being equal to the empty car weight plus 40%. The actual 
assemblies will be weighed during the modernization 
process. If modifications are required to correct the 
existing weight balance, these modifications will be 
provided at additional cost. 
7. RK1 FUSES AND CIRCUIT BREAKERS 
 Fuses are to be current limiting class RK1 or equivalent. 
Circuit breakers are to have current limiting characteristics 
equivalent to RK1 fuses. Provisions of these fuses are the 
responsibility of others, not KONE. 
 8. GENERAL 
 Access to the building to perform the Work and for 
deliveries with dry, protected storage adjacent to the 
hoistway. 
 Cutting of existing walls, floors and finishes, together with 
all repairs made necessary by such cutting or changes, 
e.g. cutting of lobby walls for flush hall fixtures and 
removal of encroaching lobby features such as wall-
mounted ashtrays. Removal, replacement, and/or repair of 
any mirrors, millwork, plaster, stone or other special hall 
finishes. 
 All work of other trades must be complete and ready at 
time of first elevator inspection, or elevator will not be 
released for operation by the AHJ. If the AHJ does allow 
temporary operation under a Temporary Operating 
Inspection (TOI), any associated costs shall be 
 
 Our tender is based on suitable site conditions, material 
and tooling storage space, and bathroom access being 
available on site. 
 Safe working environment must be provided and 
supported by provision for adequate entrance protection, 
means of hoisting, hoistway dividing screens, and 
protection of floors walls and doors etc. 
 Emergency evacuation procedures to be clearly defined 
where required. Subject to site survey and actions agreed.
 Any portion of the Work that is subject to the permissions 
of local authorities beyond the elevator permits must be 
identified to KONE. Responsibility for permits to be 
agreed. Permits and appropriate signage indicating any 
changes to pedestrian access routes for building users 
must be in place prior to start of the Work. 
 Elevator installation methods requires the integrity of the 
existing Safety Gear and Overspeed protection devices, 
and are therefore subject to verification of suitability prior 
to commencement of the work. Any remedial work 
required or alternative solution is not included in this 
tender. 
 If KONE 24/7 Emergency Video Communications: For 
units with travel greater or equal to 60 ft (18 m), or if 
located in a seismic zone and the code year is 2016 or 
later (regardless the travel): Customer will provide a 
dedicated Windows-based PC or laptop with Chrome 
browser and 24-hour/day Internet access. This computer 
must be accessible by emergency personnel to 
communicate through voice and text with people in the 
elevator and to have a video display of the cab interior.

KONE MODERNIZATION PROPOSAL 
  
  
  
Proposal:
Sample Template 
ReGenerate DX (Gearless)
Proposal Date: 
TBD

KONE Inc. 
TBD Office 
Address 
City, ST 
Phone # 
email 
www.kone.us 
  
Dear XX, 
We are pleased to enclose, for your review and consideration, KONE's proposal to modernize your equipment located at the 
following address for the amount of $TBD (excluding sales tax): 
 This proposal is based on 202X installation. 
 This proposal is valid for (30) days. 
 Anticipated downtime: X weeks per unit for modernization + X weeks for inspection. 
Should you have any questions or require additional information, please feel free to contact me directly. 
We look forward to hearing from you and working together on this project. 
Yours sincerely,

www.kone.us 
3(21) 
 
 
 
 
 
 
 
Appendix 1: KONE 24/7 Connected Services 
Appendix 2: Clarifications 
KONE Inc. General Terms and Conditions (Modernization) 
 
 
 
Table of Contents

www.kone.us 
4(21) 
1.      Why KONE? 
  
KONE in brief 
KONE is a global leader in the elevator 
and escalator industry. Our mission is to 
make cities better places to live.  
Our versatile product portfolio features a 
wide range of innovative products 
including elevators, escalators, 
autowalks, monitoring, access and 
destination control systems. 
  
  
Value for your project 
KONE helps you to reduce operational costs, increase end-user satisfaction and value of your building by providing accessible 
and safe equipment through a professional and trouble-free modernization project. 
  
Increased user satisfaction/minimal disturbance to end-users  
  
  
Improved eco-efficiency, reduced energy consumption   
  
  
Improved safety according to latest standards

www.kone.us 
5(21) 
2.      Ensuring your project success 
  
Project Overview 
  
 KONE Responsibility     
 CUSTOMER Responsibility
                                                                                                                
  KONE and CUSTOMER 
 
 
 
 
Site Cornerstones 
  
By ensuring that these cornerstones are in place you can ensure that your modernization project stays on schedule and that 
KONE technicians can perform their work quickly, safely, and with minimum disruption to building operations. 
  
Site preparation requirements before materials arrive  
 Loading and storage area of suitable size for materials, waste and waste storage, and tools 
 Safe access route for new materials and materials being removed 
 Access permissions and cards or other access devices for KONE technicians 
  
  
Other works as agreed in the project plan, if not managed by KONE 
 Please refer to Appendix 4: 
 
 
 
Project kick-
off 
 
Fully executed 
contract & down 
payment 
 
Materials delivered to 
site and 
modernization starts
 
Project 
completion
 
Detailed site 
survey 
 
Submittals 
approved if 
required 
 
Manufacturing
 
Work by others
 
Installation and 
testing 
 
Third-party inspection 
arranged

www.kone.us 
6(21) 
3.      Your solution 
  
Rated load 
TBD 
Rated speed 
TBD 
Travel height 
TBD 
Number of floors 
TBD floors / TBD front openings / TBD rear opening 
 
 
 
 
  
 
Machine/motor 
KONE MX Machine 
A new KONE MX AC Gearless machine, with permanent magnet synchronous motor, direct 
current electro-mechanical disc brakes and integral traction drive sheave shall be provided. 
Brake shall be spring applied and electrically released and designed to hold car at the floor level 
after coming to rest. The drive sheave shall be accurately turned and grooved for the quantity 
and size of hoist ropes applicable to service. 
 
 
 
Electrification 
KONE ReGenerate DX 
KONE ReGenerate DX is a modular modernization solution for elevator control and electrical 
systems, based on the latest in control technology. This replaces outdated technology such as 
relays and older electronic systems, improving the levels of performance, reliability, safety and 
energy efficiency of your elevator. The modular structure of KONE ReGenerate DX is designed 
to correctly interface with many types of existing elevator components, thus ensuring a swift, 
trouble-free installation for the building users. 
 
A new microprocessor-based control system shall be provided to perform the functions of safe 
elevator motion. Included shall be all of the hardware required to connect, transfer and interrupt 
power, and to protect the motor against overloading. 
 
The control for the hoist motor will be by means of a solid-state drive system. The system will be 
a controlled pulse-width modulated AC vector drive. The variable voltage variable frequency 
drive will convert the AC power supply using a two-step process to a variable voltage variable 
frequency power supply for use by the hoist motor. Varying the frequency and voltage of the 
motor will automatically and continuously control the speed, acceleration and deceleration. The 
system will be closed loop. 
 
Each controller cabinet containing memory equipment shall be properly shielded from line 
pollution. The microcomputer system shall be designed to accept reprogramming with minimum 
system down time. All high voltage (110V or above) contact points inside the controller cabinet 
shall be protected from accidental contact in a situation where the controller doors are open. The 
microprocessor-based control system shall utilize on-board diagnostics for servicing, 
troubleshooting, and adjusting without requiring the use of an outside service tool.

www.kone.us 
7(21) 
Fixtures 
Custom Fixtures 
New signalization shall be provided.  Typical design to include the following: 
 
#4 stainless steel vandal resistant. 
 
Car signalization to include code compliant car operating panel with digital position 
indicator (COP qty to match existing). 
 
Emergency Video Communication per code compliance. 
 
Hall signalization to include new hall stations, Hall lanterns and position indicators 
where required and Code Blue and Pink Operation where required. 
 
Fire Command Panel & Intercom provided where required by code. 
 
Voice Annunciation 
 
Provisions for customer supplied Card Reader inside the Car 
 
 
 
 
Doors 
Door Panel(s) 
New car and hoistway door panel(s) shall be provided where applicable. New hoistway door(s) 
shall be UL fire rated 1 1/2 hour. 
KONE ReNova Door Operator (Complete Car and Hoistway replacement) 
A KONE ReNova closed loop permanent magnet PWM high-performance door operator shall be 
provided to open and close the car and hoistway doors simultaneously. Door movement shall be 
cushioned at both limits of travel. An electric contact shall be provided on the car at each car 
entrance to prevent the operation of the elevator unless the car door is closed. The door operator 
shall be arranged so that, in case of interruption or failure of electric power, the doors can be 
readily opened by hand from within the car, in accordance with applicable code. 
 
Emergency devices and keys for opening doors from the landing shall be provided as required by 
the local code. Doors shall open automatically when the car has arrived at or is leveling at the 
respective landings. Door shall close after a predetermined time interval or immediately upon 
pressing of a car button. A door open button shall be provided in the car. Momentary pressing of 
this button shall reopen the doors and reset the time interval. Door hangers and tracks shall be 
provided for each car and hoistway door where applicable. Tracks shall be contoured to match 
the hanger sheaves. The hangers shall be designed for power operation with provisions for 
vertical and lateral adjustment. Hanger sheaves shall have polyurethane tires and pre-lubricated 
sealed-for-life bearings. 
Curtain of Light (3D) 
The elevator car shall be equipped with an electronic protective device extending the full height 
of the car. When activated, this sensor shall prevent the doors from closing or cause them to stop 
and reopen if they are in the process of closing. The doors shall remain open as long as the flow 
of traffic continues and shall close shortly after the last person passes through the door opening.

www.kone.us 
8(21) 
Shaft equipment 
Comp. Ropes & Chains 
New compensation (ropes or encapsulated chain) as required. 
Guide Shoes 
New roller guide assemblies shall be provided for car and counterweight. 
Governor 
The car safety will be activated by a new speed governor located overhead, driven by a governor 
rope suitably connected to the car safety. The governor will be equipped with rope grip jaws 
designed to clamp the governor rope so as to actuate the car safety upon a predetermined over 
speed downward. The governor will be set at not less than 115% of specified rated car speed 
and not more than the maximum governor tripping speed specified in the code for the specified 
rated car speed. 
 
The rope grip jaws must be positively tripped within the permitted range of speed. The governor 
rope-tripping device will be so designed that no appreciable damage to or deformation of the 
governor rope will result from the stopping action of the device in operating the car safety. The 
governor over speed switches will conform to ANSI A17.1 code requirements and be so located 
and enclosed that excess lubricant will not enter the switch enclosure. 
 
Upon activation of the safety switch, the switch will remain in the open position until manually 
reset. The governor will be accurately adjusted and sealed with tripping speed specified. Date 
tags indicating the test date will be applied. 
Traction Ropes 
New hoist cables shall be provided. The hoisting cables will be designed for elevator service, 
compatible with the hoist machine, and having a factor of safety at least equal to that specified in 
the ANSI code. 
Governor Ropes 
A new governor cable(s) compatible with the specifications for the new governor will be provided. 
The governor cable is to pass over the governor sheave and under a weighted tension device at 
the bottom of the hoist way. During normal operation of each elevator, the governor rope will run 
free and clear of the governor gripping jaws, cable guards and all other stationary parts. A metal 
tag will be attached to the top of the car-releasing carrier, giving the diameter, material of cable, 
and with date of cable installation. Tags will be attached in an approved manner.

www.kone.us 
9(21) 
Solution details 
   
Machine/motor 
 
Product name 
KONE MX Machine 
Elevator group size 
TBD 
Capacity [LBS] 
TBD 
Speed [FPM] 
TBD  
NEMA rating (MR) 
Machine room rating is NEMA 1. 
New roping ratio 
TBD 
KONE MX machine type 
TBD 
Machine Room Location 
TBD 
 
 
 
 
Electrification 
 
Product name 
KONE ReGenerate DX 
Elevator group size 
TBD 
Number of floors served 
TBD 
Code year 
TBD  
Capacity [LBS] 
TBD  
Speed [FPM] 
TBD  
NEMA rating (HW) 
Hoistway rating is NEMA 1. 
NEMA rating (MR) 
Machine room rating is NEMA 1. 
New roping ratio 
TBD 
Power supply voltage [v] 
TBD  
Emergency power 
TBD 
KONE MX machine type 
TBD 
Machine Room Location 
TBD d 
Machine room duct 
KONE will remove all existing wiring, conduit and duct from the 
machine room. New conduit and duct properly sized and 
constructed for the job requirements will be installed (in accordance 
with applicable codes). 
Card reader provisions 
Controller will be equipped with card reader interface logic. 
Qty of COPs 
TBD 
Traveling cable(s) 
Existing traveling cable(s) will be removed and replaced with new 
traveling cable. In addition to our standard traveling cable, a second 
traveling cable be provided for security and/or card reader 
provisions. 
Drive size 
TBD

www.kone.us 
10(21)
Loadweigh device 
A loadweigh device will be provided which will continuously monitor 
the load in the elevator car. The loadweigh device provides 
information necessary for the Bypass Load Feature and the 
Overload Feature to operate. The loadweigh device is also used to 
provide pre-torqueing so higher performance can be achieved. 
Hoistway duct 
KONE will remove all existing wiring, conduit and duct from the 
hoistway. New conduit and duct properly sized and constructed for 
the job requirements will be installed as required 
Voice annunciator 
Logic will be provided for factory-programmed speech synthesizer 
that issues spoken messages including floor arrivals, car departures 
and safe use of the elevator. 
 
 
 
 
Fixtures 
 
Product name 
Custom Fixtures 
Number of floors served 
TBD 
Capacity [LBS] 
TBD  
Card reader provisions 
Controller will be equipped with card reader interface logic. 
Qty of COPs 
TBD 
Qty of Car Direction 
lanterns 
TBD 
Qty of new hall stations 
TBD  
Qty of new hall 
lantern/position indicator 
combos 
TBD 
Qty of hoistway access 
switches 
2  
 
 
 
Doors 
 
Product name 
Door Panel(s) 
Number of floors served 
TBD 
TBD
Car panel finishing 
material 
New car door panel(s) shall be provided where applicable. New 
door(s) shall be UL fire rated 1 ½ hour. Finish will be #4 stainless 
steel. 
Door type 
TBD 
TBD
Hatch panel finishing 
material 
New hatch door panel(s) shall be provided where applicable. New 
door(s) shall be UL fire rated 1 ½ hour. Finish TBD.

www.kone.us 
11(21)
Product name 
KONE ReNova Door Operator 
Number of floors served 
TBD 
NEMA rating (HW) 
Hoistway rating is NEMA 1. 
Door type 
TBD 
Door package type 
KONE ReNova M3 door package includes a new door operator, 
restrictive clutch, car and hoistway door track, car gate switch, car 
and hoistway hangers, car and hoistway door panel adapters, 
hoistway door interlocks and closers, and hoistway pick up rollers. 
Hatch headers 
New hatch headers will be provided as required for the specified 
number of openings. 
 
 
 
Product name 
Curtain of Light 
Number of floors served 
TBD 
Code year 
TBD 
NEMA rating (HW) 
Hoistway rating is NEMA 1. 
Type of curtain of light 
This curtain of light is an electronic sensing device that operates 
across the car entrance. When activated, the curtain of light will 
prevent the doors from closing or cause them to stop and reopen if 
they are in the process of closing. The doors will remain open as 
long as the flow of traffic continues and will close shortly after the 
last person passes through the door opening. A 3-D type will be 
provided. 
 
 
 
 
Shaft equipment 
 
Product name 
Comp. Ropes & Chains 
Capacity [LBS] 
TBD  
Speed [FPM] 
TBD  
New roping ratio 
TBD 
Compensation type 
New Whisper-Flex style compensation will be provided where required to ensure proper counter 
balance in accordance with application criteria. 
Compensation quantity 
TBD 
Guidance system 
TBD 
Hoist cable diameter
TBD
Qty of hoist cables 
TBD

www.kone.us 
12(21)
 
Product name 
Guide Shoes 
Capacity [LBS] 
TBD 
Speed [FPM] 
TBD 
Car guide dust covers 
Yes 
Car guide shoes 
adapters 
Yes, where required 
Car guide shoe type 
TBD 
Counterweight guide 
shoes adapters 
Yes, where required 
Cwt guide dust covers 
Yes 
Counterweight guide 
shoe type 
TBD 
 
 
Product name 
Governor 
Capacity [LBS] 
TBD 
Speed [FPM] 
TBD 
NEMA rating (HW) 
Hoistway rating is NEMA 1. 
NEMA rating (MR) 
Machine room rating is NEMA 1. 
Type of governor(s) 
TBD 
Tension weight 
New 
 
 
Product name 
Traction Ropes 
Capacity [LBS] 
TBD 
New roping ratio 
TBD 
Hoist cable diameter 
TBD 
Qty of hoist cables 
TBD  
Machine Room Location 
TBD 
Shackles 
New shackles will be provided. 
 
 
 
Product name 
Governor Ropes 
Capacity [LBS] 
TBD  
Governor rope 
A new traction steel governor rope of appropriate size to ensure proper operation will be provided. 
As a minimum, the governor rope will comply with the factor of safety requirements of the ASME 
A17.1 safety code for elevators. 
Governor rope diameter 
TBD

www.kone.us 
13(21)
 
4.      Commercial Offer 
  
Project notes
  
[Insert project specific notes here]
  
Handover date 
Mutually agreeable project schedule will be determined at time of proposal acceptance. 
Current delivery lead time is TBD weeks from when order receipt, deposit and 
approval of drawings have all been completed. The agreed delivery times for the 
project may need to be extended because of delays caused by measures undertaken to 
stop the spreading of the Coronavirus (2019-nCoV) epidemic, such as mandatory holiday 
extensions and transportation restrictions imposed by authorities in China and other 
countries, and the availability of personnel, logistics providers and supply chains, due to 
the epidemic. 
  
Downtime period 
TBD weeks per unit 
  
  
  
  
Pricing 
  
Equipment 
Price ($) 
Elevator: TBD 
 
$ TBD
 
 
Total Sales Price, net excluding Sales TAX
$ TBD
  
Additional Options for your Consideration 
  
 
Alternates 
Price excl. tax
Alternate 1 
$TBD
Proposal pricing is based on the scope of work as defined herein. Any additional work required will be performed only upon 
l 
be promptly reported to the purchaser with recommendations and cost for corrective action.

www.kone.us 
14(21)
Tender Approval 
  
KONE
Name 
Address 
City, ST 
email 
Owner/Representative
Name 
Company 
Address 
City, ST  
 
Submitted by: 
 
Name 
Title 
Date 
 
We accept the offer constituted by this proposal (total sales price of $TBD) and agree to the conditions contained therein. 
  
Approved by Customer 
  
  
  
  
___________________________________________ 
Printed name: 
Title: 
Company name: 
Date:

www.kone.us 
15(21)
Appendix 1: KONE 24/7 Connected Services 
KONE 24/7 Connected Services  improved safety, full transparency, and peace of mind 
  
In addition to a quality modernization project, we would be excited to discuss KONE 
24/7 Connected Services with you and the continuing benefits KONE could bring to 
your business. KONE is leading the industry with KONE 24/7 Connected Services 
using the latest intelligent elevator technology allowing us to predict issues and take 
action before a shutdown occurs. Predictive maintenance allows fewer shutdowns, 
less call-outs, and improved up-time of equipment - all leading to a better user 
experience! 
  
  
  
  
 
  
  
Read more at 
kone.us/connected

www.kone.us 
16(21)
Appendix 2: Clarifications 
1. 
 
  
  
2. 
All new elevator equipment provided shall meet applicable ASME A17.1 code requirements. Any provisions of codes 
applicable to out-of-
permitting and completion are excluded. 
  
  
3. 
Existing cab and entrance dimensions, which may not meet current ADA or stretcher access rules, will be retained as is. 
  
  
4. 
Our proposal includes inspections and testing as required by the AHJ. However, any re-testing required due 
failures to complete their work or tests in a timely manner will be billed at our regular billing rates. 
  
  
5. 
The ASME code limits changes to the empty car weight + capacity of each elevator to 5% of the originally installed value. If 
past or proposed changes result in a change to the weight or system pressure (for hydraulic) greater than 5% above the 
original design values, the cost of any engineering and of any required modifications to the elevator system or structure 
shall be extra to this proposal scope and pricing. If this situation is discovered during the engineering process, KONE will 
notify purchaser and recommend an alternate design or other changes. 
  
  
6. 
In order to provide best pricing, proposal excludes any extra demobilizations and remobilizations. If we must demobilize 
from the jobsite for any reason outside our control, we shall be compensated at our regular billing rates.  
  
  
7. 
Proposal pricing is based on the scope of work as defined herein. Any additional work required will be performed only upon 
will be promptly reported to purchaser with recommendations and cost for corrective action. 
  
  
8. 
abatement or disturbance of asbestos containing material (ACM) or presumed asbestos containing materials (PACM). Any 
work in a regul
scope of work without an applicable change order to reflect the additional costs and time. In accordance with OSHA 
requirements, the Customer shall inform KONE and its employees who will perform work activities in areas which contain 
ACM and/ or PACM of the presence and location of ACM and/or PACM in such areas which may be contacted during work 
before entering the area. Other than as expressly disclosed in 
times meets applicable OSHA permissible exposure limits (PELs). KONE shall have the right to discontinue its work in any 
location where suspected ACM or PACM is encountered or disturbed. Any asbestos removal or abatement, or delays 
After any removal or abatement, customer shall provide documentation that the asbestos has been abated from the KONE 
 
  
  
9. 
Purchaser shall provide any security, escort or other building service support personnel required during demolition, 
installation, testing, and inspections. 
  
  
10. For hydraulic elevators, we can assume no responsibility for unusual conditions such as hole cave in and complete 
hydraulic cylinder assembly embedded in concrete. The excavation of the hole to accommodate the new hydraulic cylinder 
assembly is based on encountering soil free of oil, rocks, boulders, building construction members, sand, water, quicksand, 
underground caves and/or any other obstructions or unusual conditions. Should such obstructions or unusual conditions be 
encountered, additional time above or beyond the working days estimated to complete this project may be required. We 
will proceed with this portion of the project on a time and material basis, based on our normal billing rates. 
  
  
11. Proposed solution is subject to a complete engineering review by KONE engineering team to confirm feasibility of products 
proposed. Additional charges may apply for work not included, but required to meet system requirements. Additional 
charges for this work (if applicable) shall be mutually agreed upon.

www.kone.us 
17(21)
(Modernization) 
1. APPLICATION OF THESE TERMS
The parties agree to be bound by the terms and conditions contained 
in the Bid Letter, this Bid Attachment A and Bid Attachment B, 
including the documents incorporated herein by reference (collectively, 
 
 
2. SPECIAL PURCHASING REQUIREMENTS 
This Proposal is made without regard to compliance with any special 
sourcing and/or manufacturing requirements including, but not limited 
to, Buy America, Buy American, U.S. Steel, FAR clauses, minority / 
disadvantaged supplier requirements or similar federal and/or state 
procurement laws. Should such requirements be applicable to this 
Project, KONE reserves the right to modify and/or withdraw its 
Proposal. 
 
3. PROPOSAL CONDITIONS 
The Proposal shall be open for acceptance within the period stated in 
the Bid Letter or, when no period is stated, for a period of 30 days from 
the date of the Bid Letter. Prior to commencing manufacture of the 
(i) a fully executed contract; (ii) a schedule acceptable to KONE 
identifying the Equipment installation start date, or alternatively, 
Customer, which, as applicable, is incorporated by reference herein; 
(iii) the first payment in Section 4 herein; and (iv) fully approved KONE 
layouts. 
 
4. PAYMENT TERMS 
Payment of the total Price is due within 30 days from invoice date, as 
follows: 
 30% of the Price for engineering, site management, and 
overhead, billable and due upon execution of this Proposal or 
receipt of the subcontract; 
 50% of the Price for material and shipping, billable and due 
upon delivery of material to the jobsite or KONE Distribution 
Center; 
 20% of the Price for Equipment installation, billable and due at 
the billing cycle following the start of installation. 
KONE imposes a surcharge for payments made via credit card that is 
not greater than our cost of acceptance. The surcharge that we 
impose for this type of transaction is a percentage of the amount paid 
via credit card, which will be notified to the Customer at the payment 
portal. KONE reserves the right to delay, suspend, or stop the work, 
including manufacturing, delivery, installation and/or Equipment 
turnover, for non-payment, without liability to KONE or being held in 
default. Simple interest at 1.5% per month shall be charged on 
amounts not paid when due. Payments to KONE are not contingent on 
any third-party payments to Customer. Customer shall reimburse 
KONE for all costs of collection, including courts costs and reasonable 
 
 
Prior to turnover, KONE must be paid in full, less 10% maximum 
retention, the Price including all change orders. Retention shall be due 
and payable within 30 days of execution of the Uniform Final 
Acceptance or Equipment turnover, whichever occurs first. If certified 
payroll reporting is required, KONE will submit the requested reporting 
in the format of the U.S. Department of Labor form WH 347 & WH 348. 
The Price does not include Textura or any other special billing 
requirements, which can be added via change order at a rate of 0.3% 
of the Price. 
 5. INSTALLATION
Customer shall be responsible for procurement and cost of all permits, 
scope of work or other responsibilities include the obligation to utilize 
materials and/or finishes resembling or identical to those pre-existing 
in the building, KONE shall use reasonable efforts to procure such 
materials and Customer acknowledges and accepts that the materials 
and/or finishes reasonably available may not be in all respects 
identical to those pre- existing in the building. This Proposal is 
conditioned upon KONE using its standard installation method. The 
installation of the Equipment shall start after Customer has completed 
all work set forth in Bid Attachment B and any other documents 
incorporated by reference herein. Within two (2) weeks prior to the 
standard visual site survey to verify that the Site Requirements are 
complete and notify Customer if there are outstanding deficiencies 
preventing KONE from beginning installation. 
 
access, working and safety conditions on site, wear and tear of any 
existing structures or surfaces, and planning of any dismantling or 
removal of existing equipment, components and materials, where 
applicable. KONE shall not be deemed to have surveyed any hidden 
structures, latent defects, subsurface conditions, or other non-visible 
matters, including but not limited to searching for hazardous 
substances and/or materials, which shall be subject to Section 16. If 
delay the start of installation and Customer shall be responsible for all 
additional costs incurred by KONE, including without limitation, costs 
associated with: labor reallocation, re- directing materials to and 
storage in a KONE Distribution Center, additional labor for double 
handling of materials, and additional trucking, freight and insurance. 
Once the Site Requirements are completed, the start of installation 
shall be subject to the availability of labor and the delivery of material, 
if applicable. 
 
performed during regular union working hours of 
regular working days, Monday to Friday, statutory holidays excluded. If 
overtime is mutually agreed upon and performed, the additional costs 
me 
rates. If the installation cannot be performed in an uninterrupted 
manner for any reason beyond KONE's control, Customer shall store 
the Equipment at Customer's cost and compensate KONE for any 
costs caused by such delay including, but not limited to, double 
handling of Equipment and demobilization. KONE shall not be required 
to perform overtime or any Customer directed change to its work 
including but not limited to, performing Extra Work without an executed 
Extra Work performed. 
 
KONE shall be entitled to an extension of time and an equitable 
adjustment in the Price, including but not limited to, any increased 
costs of labor, including overtime, resulting from any change of 
schedule, re-direction of KONE personnel to another work area, 
acceleration, or out of sequence work. 
 
KONE shall take reasonable methods to protect its work-in-place while 
KONE is actively on site and until execution of a KONE Uniform Final 
Acceptance, which is incorporated by reference herein. Should 
damage occur to KONE property, material or work-in- place by fire, 
water, theft or vandalism, Customer shall compensate KONE for said 
damages.

www.kone.us 
18(21)
  
Additionally, the Customer is solely responsible for ensuring that the 
equipment maintenance contractor, if not KONE, does not disturb, 
safety policies and procedures to the extent such policies and 
and/or security features of Equipment must be completed before 
Equipment turnover. KONE is not responsible for damages, either to 
Equipment or the building, or for any personal injury or death, arising 
out of or resulting from any code required safety tests performed on 
Equipment or hoistway access granted by Customer to other trades. 
 
6. TEMPORARY USE 
Temporary use of certain types of Equipment may be permitted, 
provided the use period allows adequate time for Equipment 
Temporary Use Agreement. Temporary use shall be invoiced 
separately and subject to payment terms in Section 4 herein. At the 
end of temporary use, Customer shall return the Equipment to KONE 
in "like new" condition. 
 
7. HAZARDOUS MATERIALS 
terials (i.e. lead, PCBs) 
work in any location where suspected HazMat is encountered or 
disturbed. Any HazMat removal or abatement, or delays caused by 
such, required in order for KONE to perform its work shall be 
abatement occur within the shaft or machine room, Customer shall 
known to be present on site before the start of work, HazMat removal 
or abatement shall be completed prior to KONE scheduling installation 
and delivering material. 
 
8. TITLE AND RISK TO EQUIPMENT 
Title to and ownership of all Equipment intended for incorporation in 
led or stored on or off site, shall remain 
and Equipment passes to Customer upon delivery to the site or off-site 
storage. 
 
Any tools, devices, or other equipment that KONE uses to perform its 
work or monitor the Equipment remains the sole property of KONE. If 
this Proposal terminates or expires for any reason, Customer will give 
KONE access to the premises to remove such tools, devices or 
 
 
9. TURNOVER 
Prior to turnover, KONE must receive a final punch list. Upon turnover, 
KONE requires a signed Uniform Final Acceptance. KONE shall 
provide its standard electronic O&M manuals with CD-ROMs in 
electronic format, if applicable, upon execution of the Uniform Final 
Acceptance. Standard KONE samples shall be provided upon request. 
No mock-ups or video training are included in the Price. 
 
10. DELAY 
KONE shall not be liable for any loss, damage, claim, or delay due to 
any cause beyond KONE's control, including, but not limited to, acts of 
domestic or foreign government (including a change in law), strikes, 
lockouts, work interruption or other labor disturbance, delays caused 
by others, fire, explosion, theft, floods, inclement weather, riot, civil 
commotion, war, malicious mischief, infectious diseases, epidemic, 
pandemic, quarantine, border or port of entry and exit restrictions or 
acts of God. 
 In the event of such delays, KONE shall be entitled to an extension in 
time equal to the length of such delay affecting KONE and an 
equitable adjustment in the Price. Customer shall compensate KONE 
for labor and material cost escalations resulting from Project delays not 
the end of the current calendar year. Customer is on notice that IUEC 
labor rates increase annually. 
 
11. LIMITED WARRANTY 
For one (1) year after the acceptance date set forth in the signed 
Uniform Final Acceptance, date of Equipment turnover, or date of 
ant to the 
Temporary Use Agreement), whichever occurs first, KONE warrants 
Equipment against defect in workmanship and material. The warranty 
excludes remedy for damage or defect caused by abuse, misuse, 
vandalism, neglect; repairs, alteration or modifications not executed by 
KONE; improper or insufficient maintenance, improper operation, 
characteristics of the building such as electrical power or security 
features, natural or other catastrophe such as flood, fire, or storm, or 
normal wear and tear and normal usage. The warranty excludes 
training or instruction in the proper operation or maintenance of 
Equipment. Specific noise ratings and energy efficiencies cannot be 
guaranteed due to different building characteristics and ambient noise 
remedy is limited to repair or replacement of a 
 
 
12. INDEMNIFICATION 
KONE shall only indemnify and hold Customer harmless for claims, 
to bodily injury, including death, or tangible property damage (other 
Customer for any other Claims. Customer agrees to indemnify and 
hold KONE harmless from any Claim for bodily injury, including death, 
or tangible property damage in connection with the use or operation of 
the Equipment. Each party shall defend itself in the event of a Claim. 
 
13. INTELLECTUAL PROPERTY 
KONE shall retain title and ownership of all intellectual property rights 
relating (directly or indirectly) to the Equipment provided by KONE, 
including but not limited to software or firmware (whether in the form of 
source code, object code or other), drawings, technical documentation, 
or other technical information delivered under the Proposal. KONE 
grants Customer a non-exclusive and non-transferable license and 
right to use the software and firmware in connection with the use and 
maintenance of the Equipment. Customer shall not use any drawings, 
technical documentation or other technical information supplied by or 
on behalf of KONE for any purposes other than those directly related 
to the Proposal or to the use and maintenance of the Equipment. 
Customer shall not in any form copy, modify or reverse engineer the 
software, or give access to the software for such use to any third party

www.kone.us 
19(21)
14. INSURANCE
In lieu of any Customer insurance requirements, KONE shall provide 
its standard certificate of insurance, which shall be deemed to satisfy 
all insurance requirements for this Project. KONE shall not provide loss 
runs, insurance rate information, copies of its insurance policies or any 
other information which KONE considers confidential. KONE shall not 
provide coverage for professional (E&O) liability, pollution liability, data 
privacy/security, or no-fault medical payments. If the Project is covered 
by a Wrap Up Insurance Program, KONE agrees to participate 
provided there is no cost to KONE, no reduction in the Price, and 
limits are sufficient to satisfy insurance coverage requirements, 
excess/umbrella liability will not be required or if excess/umbrella is 
req
excess coverage is not AM Best Rated nor licensed to do business 
within the jurisdiction although the carrier has strong Standard & 
request. 
 
15. LIMITATION OF LIABILITY 
In no event shall either party be liable to the other party for any 
consequential, special, punitive, exemplary, liquidated, incidental, or 
indirect damages (including, but not limited to, loss of profits or 
revenue, loss of goodwill, loss of use, increase in financing costs) 
(collectively, "Consequential Damages") that arise out of or relate to 
this Proposal even if such party has been advised of the possibility of 
such Consequential Damages. The limitation set forth in this section 
shall apply whether the claim is based on contract, tort or other theory.
 
16. CONCEALED OR UNKNOWN CONDITIONS 
If during the course of its work, KONE encounters conditions at the site 
that are subsurface, differ materially from what is represented in the 
contract documents, or otherwise concealed physical conditions, 
KONE shall be entitled to an extension of time and additional costs for 
the performance of its work, which shall not be subject to any payment 
conditions or contingencies. 
 
17. TECHNICAL SURVEY 
90-days of the effective contract start date. If a safety hazard or code 
immediately remove the unit from service until repairs are performed. 
KONE is not obligated to perform tests, correct outstanding violations 
or deficiencies that were not addressed by the prior service provider 
and/or the owner, or make related necessary repairs or component 
replacements on the unit. If additional work is necessary, KONE shall 
provide a separate proposal or recommendation for such work. 
Customer agrees to indemnify, defend, and hold KONE harmless for 
any claims arising out of Customer's failure to comply with KONE's 
recommendations and proposal, and any obligation on the part of 
KONE to indemnify or defend Customer with regard to such claim shall 
proposal or recommendation, KONE reserves the right to terminate 
this Proposal/contract without penalty. 
 18. TERMINATION
If a party materially breaches this Proposal, the other party shall 
provide written notice of the breach and a reasonable time to cure the 
breach, but in no event less than 30 days. If the breaching party fails to 
cure the breach within the specified time period, the non-breaching 
party may terminate the Proposal upon 15 days written notice to the 
other party. If KONE notifies Customer of a material breach pursuant 
to this paragraph, KONE may temporarily suspend its work without 
liability. 
 
19. GOVERNING LAW AND DISPUTE RESOLUTION 
The parties agree that this Proposal shall be governed by the laws of 
the state where the Project is located, and venue for disputes shall be 
located in that state. KONE does not agree to participate in arbitration 
proceedings. 
 
20. PRICE ADJUSTMENT 
KONE shall be entitled to an equitable adjustment in the Price, 
including but not limited to, any increased costs between the time the 
Contract is signed and the date of manufacture for materials, labor, or 
shipping, as well as increased costs resulting from any change in law 
or tariffs. 
 
21. 24/7 EMERGENCY VIDEO COMMUNICATIONS 
Applicable only for projects where KONE 24/7 Emergency Video 
Communications is included: The KONE 24/7 Emergency Video 
Communications contract addendum and General Terms and 
Conditions for KONE Digital Services must be signed by the Building 
Owner. This contract addendum requires the Building Owner to pay a 
fee for audio, video, and data connectivity. This payment obligation, 
among other provisions, survives termination of any maintenance 
agreement. 
 
22. MISCELLANEOUS 
This Proposal, including the documents incorporated herein by 
reference, constitutes the entire agreement of the parties and 
supersedes all prior negotiations, understandings, and representations 
whether written or oral in relation to the subject matter hereof. Where a 
conflict or ambiguity exists between this Proposal and any other 
and specifications), the terms and conditions of this Proposal shall 
control. This Proposal may be amended only in writing by the duly 
authorized representative of both parties. This Proposal may be 
executed in one or more counterparts. Each counterpart shall be 
considered an original and all of the counterparts shall constitute a 
single agreement binding all the parties as if all had signed a single 
document. For purposes of executing this Proposal, a document 
signed by electronic means is to be treated as an original document. 
The failure of either party to insist upon performance or strict 
performance of any of the terms or conditions of this Proposal shall not 
be deemed a waiver of any rights or remedies that such party may 
have or a waiver of any subsequent breach or default under this 
Proposal. Neither party may assign or transfer the benefit or burden of 
this Proposal without prior written consent of the other party.

www.kone.us 
20(21)
Trades 
The work described below is a summary of work to be performed 
conjunction with the elevator modernization performed by KONE 
electrical, structural and mechanical system upgrades required for 
code compliance, life safety, and proper equipment installation 
and operation. The Authorities Having Jurisdiction (AHJ) may 
require additional remedial or preparatory work. All required 
remedial or preparatory work shall be performed by properly 
licensed trade contractors in compliance with applicable codes 
and based on a schedule of performance that allows for 
uninterrupted progress of the Work. Under no circumstances shall 
KONE be responsible for any cost associated with the 
performance of remedial work by others. Purchaser shall provide 
 
 
1. ELECTRICAL 
 A properly rated three phase fused disconnect switch, 
externally operable and lockable in the open position, 
located as required by code. Accommodate any increases 
in motor size or feeder loads. 
 A dedicated 110 VAC fused disconnect switch, externally 
operable and lockable in the open position adjacent to the 
machine room door for cab lighting and ventilation, located 
as required by code. 
 Shunt-trip disconnect if fire sprinklers are present in 
machine room or hoistway. 
 GFI 120 VAC convenience outlets in machine room and 
pit. 
 Separate outlet in the pit area if a sump pump is installed.
 Telephone line service brought to the elevator machine 
room for emergency communication device. 
 Any required RF shielding of TV or radio transmitters, 
antennae and/or wave-guides. 
 Conduit with pull boxes from each elevator bank to any 
remote fire control or communication panels specified. 
 Provide a separate 15-amp, 115 VAC fused service with 
ground (powered by building emergency power system, 
when available) for KONE 24/7 Emergency 
Communications, when specified. Must include the means 
to disconnect each service and lock-
position (NFPA 70 article 620.22 and 620.53 or CEC 
article 38.22 and 38.53). 
If required by building code: standby/emergency power, sufficiently 
sized to provide power of permanent characteristics to each 
usly, upon loss of regular power, 
including feeders, transfer switches and auxiliary contact signal 
outputs to elevator controllers. 
 2. MACHINE ROOM 
 A code-compliant machine room. Provide or maintain fire 
rating as required by building code. 
 Fire-rated door for access into the machine room. Door 
shall be self-closing and self-locking, operable from inside 
the room without the use of a key. 
 Independent ventilation or an air conditioning system for 
the elevator machine room, to assure temperature is 
maintained between 65 degrees and 95 degrees 
Fahrenheit. 
 Fire extinguisher inside machine room. 
 
-
 
 Suitable lighting that provides a minimum of 19 ftc at floor.
 Removal of any non-elevator related equipment and 
materials from within the machine room and proper 
disposal of oil and other hazardous or non-hazardous 
substances and materials. 
3. HOISTWAY 
 A code-compliant hoistway, constructed in accordance 
with KONE's requirements and specifications. Provide or 
maintain fire rating as required by building code. 
 Patching of all holes in hoistway walls with fire rated 
material. 
 
 
 Removal of any non-elevator related equipment and 
materials from within the hoistway and proper disposal of 
oil and other hazardous or non-hazardous substances and 
materials. 
 A guarded light fixture and light switch in pit. Switch must 
 
 A means of displacing water located in the pit and 
containing and disposing of oil, chemicals, and other 
substances in compliance with environmental laws and 
regulations (KONE assumes no responsibility for 
discharge of oil, chemicals, and other substances into 
storm water systems, sanitary sewer systems, retention 
ponds, etc.). Elevator hoistway ventilation to the outside 
atmosphere as required by building code. 
4. FIRE SERVICE 
 Fire alarm smoke detectors with wiring and relays in the 
machine room terminating at elevator controller. 
 Fire alarm initiating devices must be located in front of 
each elevator entrance as well as in the machine room 
and at the top of the hoistway. 
 Where sprinklers exist in the machine room and/or 
sprinkler head.

www.kone.us 
21(21)
5. ACCESS INTEGRATION/SECURITY 
 Our proposal includes KONE logic and provisions for the 
specified Touchscreen(s), Keypad Destination Operating 
Panel(s), Monitoring System(s) and Multi-Media 
Equipment. 
 Card Readers and/or any additional required hardware & 
software for proper functionality of access control/security 
system(s) shall be furnished and installed by others. 
 Any required software to ensure proper communication 
between KONE control system(s) and building system(s) 
shall be the responsibility of others. 
 A designated 115V 15A circuit is required at each of the 
remote monitoring stations. 
 KONE recommends a minimum 100 Mbit/s Ethernet for 
each of the following application(s): Integrated 
Touchscreen/Keypad Destination Operating Panels, 
Monitoring System, Multi-Media Equipment, and Card 
Readers. 
6. COUNTERWEIGHTING 
 Pricing is based upon the existing car to counterweight 
weight ratio being consistent with elevator industry 
standards. This is defined as the counterweight weight 
being equal to the empty car weight plus 40%. The actual 
assemblies will be weighed during the modernization 
process. If modifications are required to correct the 
existing weight balance, these modifications will be 
provided at additional cost. 
7. RK1 FUSES AND CIRCUIT BREAKERS 
 Fuses are to be current limiting class RK1 or equivalent. 
Circuit breakers are to have current limiting characteristics 
equivalent to RK1 fuses. Provisions of these fuses are the 
responsibility of others, not KONE. 
 8. GENERAL 
 Access to the building to perform the Work and for 
deliveries with dry, protected storage adjacent to the 
hoistway. 
 Cutting of existing walls, floors and finishes, together with 
all repairs made necessary by such cutting or changes, 
e.g. cutting of lobby walls for flush hall fixtures and 
removal of encroaching lobby features such as wall-
mounted ashtrays. Removal, replacement, and/or repair of 
any mirrors, millwork, plaster, stone or other special hall 
finishes. 
 All work of other trades must be complete and ready at 
time of first elevator inspection, or elevator will not be 
released for operation by the AHJ. If the AHJ does allow 
temporary operation under a Temporary Operating 
Inspection (TOI), any associated costs shall be 
 
 Our tender is based on suitable site conditions, material 
and tooling storage space, and bathroom access being 
available on site. 
 Safe working environment must be provided and 
supported by provision for adequate entrance protection, 
means of hoisting, hoistway dividing screens, and 
protection of floors walls and doors etc. 
 Emergency evacuation procedures to be clearly defined 
where required. Subject to site survey and actions agreed.
 Any portion of the Work that is subject to the permissions 
of local authorities beyond the elevator permits must be 
identified to KONE. Responsibility for permits to be 
agreed. Permits and appropriate signage indicating any 
changes to pedestrian access routes for building users 
must be in place prior to start of the Work. 
 Elevator installation methods requires the integrity of the 
existing Safety Gear and Overspeed protection devices, 
and are therefore subject to verification of suitability prior 
to commencement of the work. Any remedial work 
required or alternative solution is not included in this 
tender. 
 If KONE 24/7 Emergency Video Communications: For 
units with travel greater or equal to 60 ft (18 m), or if 
located in a seismic zone and the code year is 2016 or 
later (regardless the travel): Customer will provide a 
dedicated Windows-based PC or laptop with Chrome 
browser and 24-hour/day Internet access. This computer 
must be accessible by emergency personnel to 
communicate through voice and text with people in the 
elevator and to have a video display of the cab interior.

Proposal for
Project Name 
ACCOUNT NAME
Attention: Customer Name 
KONE People Flow Solution Proposal 
Date

2(11) 
www.kone.us 
Project Name
 
Account Name 
Attention: Customer Name 
Address 
KONE People Flow Solutions Proposal 
Project Name
Date 
Tender # 
  
Prepared by: 
Salesperson, Title 
  
Phone number 
first.last@kone.com 
  
  
1.       Proposal 
  
Pricing summary 
  
The KONE solution includes design, manufacturing, supply and installation of the following: 
 
 Elevator
 
Equipment name
Solution 
Capacity/Speed 
Landings/Entrances 
Price
Group 1 
Elevator 1 
1 x KONE MonoSpace 
500 DX 
3500 lbs / 350 fpm  
Landings: 12 
Entrances: 12 front / 
0 rear 
$ XXX,XXX.00
  
Total Sales Price, net including TAX
$ XXX,XXX.XX
Additional options 
  
The following options may be added to our proposal if desired. 
  
Validity of proposal 
  
Our proposal is based on the architectural drawings dated XXX and specification (Division 14) dated XXX and meets the 
general intent of the project. Pricing is based on the contents specified in this Proposal and the appendices and Bid 
Attachments, which are incorporated into this Proposal (the “Proposal”). Contract terms shall be in accordance with Bid 
Attachment “A” / KONE Inc. General Terms and Conditions and Bid Attachment “B” / Site Safety Requirements / Work by 
Others, which are incorporated by reference. The pricing included in this Proposal is submitted with the understanding that all 
documents referenced and incorporated will be signed without modification. In the event of conflicts or inconsistencies between 
this Proposal and any other contract document, this Proposal shall supersede and prevail. This Proposal is valid for 30 days.

3(11) 
www.kone.us 
Project Name
 
2.       Your Solution 
  
Elevator Technical Specification 
  
 
Group 1 
 
Elevator 1 
KONE Solution  
 
Machinery location  
 
Capacity (lb) 
 
Speed (fpm)  
 
Travel height (ft)  
 
Stops  
 
Front entrances  
 
Rear entrances  
 
Control system  
 
Regulations  
 
Shaft size (W x D) (ft) 
 
Pit depth (ft)  
 
Clear Height under 
Ceiling (ft) 
 
Power supply, 
machinery (V / Hz)  
 
Car size (WxDxH) (in)  
 
Door opening 
dimensions (WxH) (ft)  
 
Controller location

4(11) 
www.kone.us 
Project Name
 
Design Group 1 – Elevator 1 
 
Do you want to see the 
design in 3D view? 
Click below  
 
 
 
Rear and Side walls 
Front and Side walls 
 
 
 
 
Copy- paste the below url to the web browser if the button failed: 
https://cardesigner.kone.us/#/doc/3575ff8e-0fd4-4537-a193-5d8147cdf4ba 
Disclaimer  text placeholder 
 
 
Materials and design 
  
Please note that all images are for illustration purposes only. Some differences to actual product delivered may exist. 
Elevator 1 
  
Car walls 
 
Front wall 
 
Ceiling 
 
Flooring by others 
 
 
 
Handrail 
 
Skirting 
 
Car Fan 
 
Protection pads 
 
 
 
Door type 
 
Door material

5(11) 
www.kone.us 
Project Name
 
Sill material  
 
 
 
Number of car operating 
panels (COP)  
 
 
COP details 
 
 
Jamb mounted 
destination indicator 
 
Signalization Series 
 
 
 
 
Additional Options 
Hall/Lobby panel included 
Locking of car calls 
switch type  
 
Hazard Avoidance 
Emergency battery drive   
Operation of car 
ventilation  
 
Regenerative drive 
 
 
 
Landing
Floor 
Marking
Landing Sill 
Material  
Finish 
Entrance Frame type 
Hall Lantern / Position 
Indicator 
12 Front
11 
Aluminum 
#4 Brushed Stainless  Knock-down style bolted frames 
Hall Lantern
11 Front
10 
Aluminum 
#4 Brushed Stainless  Knock-down style bolted frames 
Hall Lantern
10 Front
9 
Aluminum 
#4 Brushed Stainless  Knock-down style bolted frames 
Hall Lantern
9 Front 
8 
Aluminum 
#4 Brushed Stainless  Knock-down style bolted frames 
Hall Lantern
8 Front 
7 
Aluminum 
#4 Brushed Stainless  Knock-down style bolted frames 
Hall Lantern
7 Front 
6 
Aluminum 
#4 Brushed Stainless  Knock-down style bolted frames 
Hall Lantern
6 Front 
5 
Aluminum 
#4 Brushed Stainless  Knock-down style bolted frames 
Hall Lantern
5 Front 
4 
Aluminum 
#4 Brushed Stainless  Knock-down style bolted frames 
Hall Lantern
4 Front 
3 
Aluminum 
#4 Brushed Stainless  Knock-down style bolted frames 
Hall Lantern
3 Front 
2 
Aluminum 
#4 Brushed Stainless  Knock-down style bolted frames 
Hall Lantern
2 Front 
*1 
Aluminum 
#4 Brushed Stainless  Knock-down style bolted frames 
Lantern / Position Indicator 
1 Front 
B 
Aluminum 
#4 Brushed Stainless  Knock-down style bolted frames 
Hall Lantern
 
 
 
 
3.       Project-Specific Clarifications 
  
 Project-specific clarifications

6(11) 
www.kone.us 
Project Name
 
4.       Why KONE? 
  
KONE in brief 
KONE is a global leader in the elevator 
and escalator industry. Our versatile 
product portfolio features a wide range of 
innovative products including elevators, 
escalators, and autowalks.   
 
You are supported by our broad district 
and branch network across North 
America.  
  
  
  
  
Product offer 
  
KONE MonoSpace DX® 
A flexible machine room-less traction elevator solution for low to mid-rise buildings. 
 Excellent eco-efficiency – hoisting technology, lighting, and standby solutions for energy 
efficient operation. 
 Superb ride comfort – smooth and quiet operation in compliance with our strict ride-comfort 
standards.  
 Versatile design - a broad set of attractive materials and accessories to create the perfect 
interior for your elevator. 
  
 
  
 
KONE 24/7 Connected Services – improved safety, full transparency, and peace of mind 
  
KONE elevators can be equipped with KONE 24/7 Connected Services. This solution allows our teams to predict issues and act 
before a shutdown occurs. For our customer and building tenants, it means improved reporting and communication on 
maintenance work with full transparency and ease of mind. 
  
 
   
Read more at 
kone.us/connected

7(11) 
www.kone.us 
Project Name
 
5.       Ensuring Project Success 
  
Project Schedule Overview  
  
This Proposal is conditioned upon KONE's standard installation methodology and all work performed during normal business 
hours, excluding IUEC (International Union of Elevator Constructors) holidays. The following schedule is proposed: 
  
 
Preparation of Submittals 
X weeks 
From receipt of contract and first payment. 
  
  
  
Contract Review 
X weeks 
From receipt of full contract package. All referenced documents required.
Approval of Submittals 
TBD 
Mutually agreeable time to incorporate changes to the layout and approve 
the submittals. Approval of Submittals means notification in writing, by the 
Customer or Customer's Agent, that all submittals are approved, and 
manufacturing may commence. All finishes and features are to be 
confirmed at the time of submittal approval. 
  
  
  
Manufacturing and Delivery 
XX weeks 
From receipt of submittal approval and an executed contract. KONE’s 
policy is to release equipment to Manufacturing after the contract is fully 
executed by both parties. Note: KONE's factory has two-week shutdown 
over the months of July and December. Any manufacturing duration that 
falls during these months shall add two weeks to the manufacturing 
time. Delivery times may be extended due to delays caused by measures 
undertaken to stop the spreading of the Coronavirus (2019-nCoV) 
epidemic, availability of personnel, logistics providers, and supply chains.
  
  
  
Notice to commence on site 
and site check
X weeks 
Prior to starting the installation, KONE requires a two-week notice to 
inspect the site to ensure it fulfils the requirements set by KONE for 
commencing installation. Site Check will be performed in the two weeks 
before installation begins. 
  
  
  
Installation 
XX weeks 
Only after the site has passed the Site Check inspection, the installation 
can start. Duration is per unit. If multiple units need to be installed at the 
same time, a Foreman will be required at additional cost - based on 
availability. 
  
  
  
Testing and Commissioning 
XX weeks 
Clean 3-phase power, active phone line to the controller, and all life safety 
provided by others is required prior to testing / commissioning.

8(11) 
www.kone.us 
Project Name
 
Site Preparation 
  
KONE requires the following conditions fulfilled two weeks prior to commencement on site. Please see Bid Attachment “B” / Site 
Safety Requirements / Work by Others for more detailed site requirements. These conditions will be verified during the site 
readiness visit.
  
Adequate access for delivery of elevator material + clean/dry 21’ x 56’ storage space per elevator. 
  
  
The hoistway, pit, and machine room must be clean, dry, and constructed per the approved KONE final layout 
drawings. Any required support for guide rail brackets, divider beams and divider screens from pit floor to the top of the 
hoistway will be provided by others. Note: bracket support points may be required between floors. The hoistway must 
be plumb according to tolerances listed on KONE Final approved layout drawings.
  
  
Removable, OSHA approved barricades must be provided around all hoistway openings. Provide and install full 
entrance protection, made of nylon mesh or reinforced plastic at all hoistway openings per OSHA 1346 1926.502(j). 
Design and install entrance protection in such a way as to allow quick accessibility in and out of the hoistway. 
  
  
Permanent or temporary three-phase and single-phase power of permanent characteristics with disconnect switches. 
  
  
A hoist beam and safety beam (furnished by KONE) must be cut to size and installed in the elevator overhead per the 
approved KONE final layout drawings (hoistbeam capable of supporting the load requirement noted in our shop 
drawings). 
  
  
Applicable work areas must have adequate lighting. 
  
  
Finished floor marks must be visible from the hoistway openings at all landings. 
  
  
 
Warranty / maintenance  
  
Our Proposal includes 12 months of KONE standard maintenance with KONE 24/7 Connected Services, including regular time 
callback service.  
Under no circumstances shall indicators or predictions from KONE 24/7 Connected Services be cause for immediate services. 
They shall be addressed upon the next scheduled maintenance visit, or otherwise at the sole discretion of KONE. The remote 
monitoring devices are provided to the Customer as part of the Services. Customer gives KONE the right to utilize 24/7 
Connected Services to collect, export and use data generated by the use and operation of the equipment. Customer has no 
ownership or proprietary rights to such data, nor the device or software that monitors, analyzes, translates, reports or compiles 
such data.  KONE 24/7 Connected Services, including any data collected, the device(s) to perform the service, and any software 
related thereto shall be the exclusive property of KONE. KONE MAKES NO WARRANTY THAT SERVICES WILL BE 
UNINTERRUPTED OR ERROR-FREE. KONE IS NOT LIABLE FOR ANY DAMAGES RELATING TO LACK OF NETWORK 
COVERAGE AT THE SITE OF THE EQUIPMENT, DUE TO TAMPERING WITH THE REMOTE MONITORING DEVICE, 
INTEROPERABILITY, SERVICE DEFECTS, SERVICE  LEVELS,  DELAYS, SERVICE ERRORS, INTERRUPTIONS OR ANY 
OTHER REASON OUTSIDE OF KONE’S REASONABLE CONTROL. KONE DISCLAIMS ANY LIABILITY FOR DAMAGES OR 
INJURIES (INCLUDING DEATH) ARISING FROM OR IN CONNECTION WITH THE OPERATION OR USE OF THE 
SERVICES SET FORTH HEREIN. 
The Product Warranty is specified in Bid Attachment A. Installation by KONE of any parts covered under the Product Warranty 
on parts will only occur while KONE maintains an active maintenance contract. The Product Warranty and Warranty 
Maintenance commences on the date of acceptance set forth in the Uniform Final Acceptance Form. For long-term reliability, a 
continuing maintenance agreement is necessary. This Proposal is conditioned upon KONE receiving a ten (10) year KONE 
Extended Warranty maintenance contract from ownership prior to the date of acceptance set forth in the Uniform Final 
Acceptance Form.

9(11) 
www.kone.us 
Project Name
 
Price Adjustment 
  
KONE shall be entitled to an equitable adjustment in the Price, including but not limited to, any increased costs between the 
time the Contract is signed and the date of manufacture for materials, labor, or shipping, as well as increased costs resulting 
from any change in law or tariffs. 
Payment terms 
  
Proposal price is valid with the following payment terms (Payment due date is 30 days net, from the date of KONE's invoices): 
30% 
Engineering & Site Management
50% 
Material
20% 
Installation
KONE reserves the right to delay and/or suspend the work, including manufacturing, delivery, installation and/or final turnover of 
the equipment for non-payment. Prior to equipment turnover, KONE must be paid in full including all change orders, less 
retention. Additionally, prior to turnover KONE requires a signed Final Acceptance and receipt of a Final Punchlist from all 
parties. Should you have a requirement other than that shown above; we will be pleased to discuss it with you. 
Sourcing 
  
This Proposal is made without regard to compliance with any special purchasing and/or manufacturing requirements including, 
but not limited to, Buy America, Buy American, U.S. Steel, FAR clauses, minority/disadvantaged supplier requirements or similar 
state procurement laws.  Should such requirements be applicable to this project, KONE reserves the right to modify and/or 
withdraw our Proposal. 
Confidentiality 
  
Any pictures or images included in this Proposal are for information purposes only. This proposal and all attachments are 
intended for the exclusive use of the addressee-recipient. This proposal and attachments are proprietary, confidential, and 
protected by copyright laws of the United States of America and international treaties. Reproducing, copying, disclosing, 
adapting, publishing, or distributing this proposal or the attachments, in whole or part, is prohibited. Copyright © 2020 KONE Inc. 
All rights reserved. 
Completion  
  
The price is based on KONE completing its work by December 31, 20**, and a material manufacturing start, no later than 
six months from the date of this Proposal. The standard wage rate is assumed. If KONE's on-site work is not completed in the 
above calendar year (due to delays by others), you will be responsible for the labor rate increase that occurs on January 1st of 
each following year. 
Storage/delivery/remobilization 
  
This Proposal is based on the site being handed over to KONE in accordance with KONE Site Safety Requirements, per Bid 
Attachment “B,” on the agreed dates. Any changes to such dates are considered a change to the schedule and KONE shall be 
entitled to an extension of time and to recover all costs related to such changes and an extension of time. If the Site 
Requirements are not complete, KONE will not deliver the unit equipment to the job site. If KONE is unable to unload at the 
jobsite on the scheduled date and commence installation immediately, additional costs for off-site storage ($X,XXX / month per 
unit) and labor for double handling of the materials ($X,000) shall be paid to KONE via a Change Order. Should KONE be 
required to demobilize, through no fault of its own, due to any suspension or work stoppage, and after material is delivered to 
the jobsite a charge of $X,000 per crew shall be paid to KONE via a Change Order for each remobilization. Customer shall also 
store and protect the materials and equipment onsite or at a storage facility reasonably acceptable to KONE at Customer’s sole 
risk and cost. If KONE is not able to commence installation on the agreed upon material delivery date or if KONE’s work cannot 
be performed in an uninterrupted manner, labor may be reallocated to other projects and may not be available to reallocate to 
this project for several weeks. KONE is not responsible for any delay to the project resulting from labor reallocation because of 
Site Requirements not being complete by the material delivery date.

10(11) 
www.kone.us 
Project Name
 
Operator time 
  
No operator time is included in this proposal. If the General Contractor or another subcontractor requires access to the shaft 
or the use of the elevator platform for any reason prior to Final Acceptance, KONE will provide an operator per the standard 
hourly rate of $XX0/hour for straight time or $X00/hour for overtime. Availability of an operator will be determined at the time of 
the request. KONE’s installation schedule shall be extended by the time needed by other trades for access to the shaft. 
Temporary construction time use 
  
This proposal does not include provisions for temporary use of the elevator(s). Should temporary use be required, a monthly fee 
($X,X00), costs of temporary inspections / re-inspections ($X,X00), and a hoistway screening cost (if applicable) will apply per 
elevator. Any additional cost for screening the hoistway (if applicable) and readjusting / refurbishment will be paid by customer. 
The General Contractor will provide: 
 Protection of the elevator(s) 
 Protection of hoistway openings 
 Electrical service 
 Temporary car enclosure 
 Operator 
 Two-way voice communication boxes at each landing 
The KONE Temporary Acceptance Form shall be executed before any elevator is placed into temporary service. Please note 
that KONE requires two weeks minimum to refurbish the elevator(s) to a “like new” state prior to final turnover. 
Hoistway cleaning 
  
KONE is unable to estimate the cleanliness of an elevator hoistway on a construction site, as the amount of debris/dust is 
dependent on work completed by other trades within the building. As such, KONE has not included any costs for clean down of 
the elevator shaft but can provide a price if conditions warrant. 
Other trade work 
  
No additional time or costs (outside of the equipment installation and inspection time) have been included in this proposal for 
coordination with the life safety system, security system, or any other trades. KONE shall be entitled to an extension of time and 
/ or additional costs incurred by additional time expended for coordination with other trades. 
Phone 
  
This proposal includes one standard, hands-free ADA compliant speakerphone per cab. It will automatically dial to a determined 
location. A KONE Care – Emergency Phone Monitoring or Wireless Phone service agreement must be completed, (either 
accepting or denying KONE’s monitoring service) two weeks prior to final inspection. 
Inspections 
  
This Proposal includes one final inspection by the elevator code authority, per elevator, during normal working hours. Prior to 
scheduling the elevator final inspection with the Authority Having Jurisdiction (AHJ), building life safety including fire alarm and 
dedicated phone lines for each elevator must be fully operational. If the final inspection fails due to KONE’s sole responsibility, 
KONE shall pay for the cost of re-inspection(s). Should re-inspection be required due to deficiencies by others, you will be 
responsible for the cost of re-inspection(s). All other testing will be provided for additional cost at normal KONE billing rates. 
During the final testing, a representative of the fire-life-safety contractors will be required (at no cost to KONE) while testing the 
elevators. No overtime has been included in this Proposal. 
Changes to the work 
  
KONE shall not be required to proceed with any Customer requested change to its Work (“Extra Work”) until such Extra Work is 
evidenced in a mutually acceptable Change Order and signed by both parties. This includes, but is not limited to, any changes 
or revisions, accelerations, resequencing, suspension of KONE’s schedule of Work or other delays outside of KONE’s control. 
However, should KONE agree to proceed with Extra Work pursuant to a Construction Change Directive or Field Order without a 
fully executed Change Order, such agreement by KONE is conditioned on the Extra Work being converted promptly to a fully 
executed Change Order. KONE shall not be obligated to continue performance of Extra Work if the estimated value of 
unexecuted Change Orders exceeds 10% of the Agreement Price, or if there is a reasonable safety concern, a product

11(11) 
www.kone.us 
Project Name
 
limitation, or it is unreasonable to proceed. No action by KONE, including but not limited to KONE performing Extra Work without 
an executed Change Order, shall be construed to be a waiver of Subcontractor’s right to seek payment for the Extra Work 
performed, or to obtain a Change Order at a later date. Customer shall remain directly liable to KONE for payment for changed 
or Extra Work ordered by the Customer for delays caused by Customer or others subordinated to Customer. 
 
 
6.       Proposal Acceptance 
  
We have read in full and accept the content of this Proposal and all attachments. 
 
Project Name: Project Name 
 
Proposal No: Tender # 
 
Site Address:   
 
Total Sales Price: $ 
  
Customer 
 
ACCOUNT NAME 
 
Date 
  
  
  
  
  
______________________________ 
  
Signature 
  
  
  
  
  
______________________________ 
  
Printed name

Bid Attachment “A” / KONE Inc. General Terms and Conditions (New Equipment)
Bid Attachment A, Version 14.2 – 05.04.2022 USK NEB 
p.1/2 
1. 
APPLICATION OF THESE TERMS 
The parties agree to be bound by the terms and conditions contained in the Bid Letter, 
this Bid Attachment A and Bid Attachment B, including the documents incorporated 
herein by reference (collectively, the “Proposal”). 
 
2. 
SPECIAL PURCHASING REQUIREMENTS 
This Proposal is made without regard to compliance with any special sourcing and/or 
manufacturing requirements including, but not limited to, Buy America, Buy 
American, U.S. Steel, FAR clauses, minority / disadvantaged supplier requirements or 
similar federal and/or state procurement laws. Should such requirements be applicable 
to this Project, KONE reserves the right to modify and/or withdraw its Proposal. 
 
3. 
PROPOSAL CONDITIONS 
The Proposal shall be open for acceptance within 30 days from the date of the Bid Letter 
unless stated otherwise. Prior to commencing manufacturing, KONE must have (i) a 
fully executed contract; (ii) a schedule acceptable to KONE identifying the Equipment 
installation start date, or alternatively, KONE’s letter specifying the ship date (“Ship 
Date Letter”) signed by Customer, which, as applicable, is incorporated by reference 
herein; (iii) the first payment in Section 4 herein; and (iv) fully approved KONE 
layouts. 
 
4. 
PAYMENT TERMS 
Payment of the total Price is due within 30 days from invoice date, as follows: 
 
30% of the Price for engineering, site management, and overhead, billable and 
due upon execution of this Proposal or receipt of the subcontract; 
 
50% of the Price for material and shipping, billable and due upon delivery of 
material to the jobsite or KONE Distribution Center; 
 
20% of the Price for Equipment installation, billable and due at the billing cycle 
following the start of installation. 
KONE imposes a surcharge for payments made via credit card that is not greater than 
our cost of acceptance. The surcharge that we impose for this type of transaction is a 
percentage of the amount paid via credit card, which will be notified to the Customer 
at the payment portal. KONE reserves the right to delay, suspend, or stop the work, 
including manufacturing, delivery, installation and/or Equipment turnover, for non-
payment, without liability to KONE or being held in default. Simple interest at 1.5% 
per month shall be charged on amounts not paid when due. Payments to KONE are not 
contingent on any third-party payments to Customer. Customer shall reimburse KONE 
for all costs of collection, including courts costs and reasonable attorneys’ fees. 
Prior to turnover, KONE must be paid in full, less 10% maximum retention, the Price 
including all change orders. Retention shall be due and payable within 30 days of 
execution of the Uniform Final Acceptance, which is incorporated by reference herein, 
or Equipment turnover, whichever occurs first. 
If certified payroll reporting is required, KONE will submit reporting in the format of the 
U.S. Department of Labor form WH 347 & WH 348. The Price does not include Textura 
or any other special billing requirements, which can be added at a rate of 0.3% of the 
Price. 
 
5. 
INSTALLATION 
Customer shall be responsible for procurement and cost of all permits, except permits 
related to installation of the Equipment. This Proposal is conditioned upon KONE 
using its standard installation method. The installation of the Equipment shall start after 
Customer has completed all work set forth in Bid Attachment B and any other 
documents describing site requirements (“Site Requirements”), all of which are 
incorporated by reference herein. Within two (2) weeks prior to the scheduled delivery 
date for KONE’s materials, KONE shall verify that the Site Requirements are complete 
and notify Customer if there are outstanding deficiencies preventing KONE from 
beginning installation. If there are any deficiencies, KONE shall be entitled to delay 
the start of installation and Customer shall be responsible for all additional costs 
incurred by KONE, including without limitation, costs associated with: labor 
reallocation, re-directing materials to and storage in a KONE Distribution Center, 
additional labor for double handling of materials, and additional trucking, freight and 
insurance. Once the Site Requirements are completed, the start of installation shall be 
subject to the availability of labor and the delivery of material. KONE shall not 
participate in a composite clean-up crew or any costs thereto. KONE shall not 
attend jobsite meetings until mobilized onsite.
 
KONE’s work shall be performed during regular union working hours of regular 
working days, Monday to Friday, statutory holidays excluded. If overtime is mutually 
agreed upon and performed, the additional costs for such work shall be added to the 
Price at KONE’s standard overtime rates. If the installation cannot be performed in an 
uninterrupted manner for any reason beyond KONE's control, Customer shall store the 
Equipment at Customer's cost and compensate KONE for any costs caused by such 
delay including, but not limited to, double handling of Equipment and demobilization. 
KONE shall not be required to perform overtime or any Customer directed change to 
its work (“Extra Work”) without an executed change order. No action by KONE, 
including but not limited to, performing Extra Work without an executed change order, 
shall be a waiver of KONE’s right to seek payment for Extra Work performed. KONE 
shall be entitled to an extension of time and an equitable adjustment in the Price, 
including but not limited to, any increased costs of labor, including overtime, resulting 
from any change of schedule, re-direction of KONE personnel to another work area, 
acceleration, or out of sequence work. 
KONE shall take reasonable methods to protect its work-in-place while KONE is actively 
on site and until execution of a KONE Uniform Final Acceptance. Should damage occur 
to KONE property, material or work-in- place by fire, water, theft or vandalism, 
Customer shall compensate KONE for said damages. KONE shall abide by Customer’s 
safety policies and procedures to the extent such policies and procedures are not in 
conflict with KONE’s Safety Policy. Testing and/or security features of Equipment 
must be completed before Equipment turnover. KONE is not responsible for damages, 
either to Equipment or the building, or for any personal injury or death, arising out of or 
resulting from any code required safety tests performed on Equipment or hoistway 
access granted by Customer to other trades prior to Equipment turnover. 
 
6. 
TEMPORARY USE 
Temporary use of Equipment may be permitted, provided the use period allows 
adequate time for Equipment restoration for final turnover and Customer executes 
KONE’s Temporary Use Agreement. Temporary use shall be invoiced separately and 
subject to payment terms in Section 4 herein. At the end of temporary use, Customer 
shall return the Equipment to KONE in "like new" condition. 
 
7. 
HAZARDOUS MATERIALS 
KONE’s work shall not include any abatement or disturbance of asbestos containing 
material (“ACM”), presumed asbestos containing materials (“PACM”), or other 
hazardous materials (i.e. lead, PCBs) (collectively “HazMat”). KONE shall have the 
right to discontinue its work in any location where suspected HazMat is encountered 
or disturbed. Any HazMat removal or abatement, or delays caused by such, required in 
order for KONE to perform its work shall be Customer’s sole responsibility and 
expense. Should any HazMat abatement occur within the shaft or machine room, 
Customer shall execute KONE’s Hoistway or Pit Access Request. If any HazMat is 
known to be present on site before the start of work, HazMat removal or abatement 
shall be completed prior to KONE scheduling installation and delivering material. 
8. 
TITLE AND RISK TO EQUIPMENT 
Title to and ownership of all Equipment intended for incorporation in KONE’s work, 
whether installed or stored on or off site, shall remain with KONE until final payment 
is made Risk of loss in KONE’s work and Equipment passes to Customer upon delivery 
to the site or off-site storage. 
Any tools, devices, or other equipment that KONE uses to perform its work or monitor 
the Equipment remains the sole property of KONE. If this Proposal terminates or 
expires for any reason, Customer will give KONE access to the premises to remove 
such tools, devices or equipment at KONE’s expense. 
 
9. 
TURNOVER 
 
Prior to turnover, KONE must receive a final punchlist. Upon turnover, KONE requires 
a signed Uniform Final Acceptance. KONE shall provide its standard electronic O&M 
manual on a flash drive. Standard KONE samples shall be provided upon request. No 
mock-ups or video training are included in the Price.

Bid Attachment “A” / KONE Inc. General Terms and Conditions (New Equipment)
Bid Attachment A, Version 14.2 – 05.04.2022 USK NEB 
p.2/2 
10. DELAY 
KONE shall not be liable for any loss, damage, claim, or delay due to any cause beyond 
KONE's control, including, but not limited to, acts of domestic or foreign government 
(including a change in law), strikes, lockouts, work interruption or other labor 
disturbance, delays caused by others, fire, explosion, theft, floods, inclement weather, 
riot, civil commotion, war, malicious mischief, infectious diseases, epidemic, pandemic, 
quarantine, border or port of entry and exit restrictions or acts of God.  In the event of 
such delays, KONE shall be entitled to an extension in time equal to the length of such 
delay affecting KONE and an equitable adjustment in the Price. Customer shall 
compensate KONE for labor and material cost escalations resulting from Project delays 
not caused by KONE, which extend completion of KONE’s work beyond the end of the 
current calendar year.  Customer is on notice that IUEC labor rates increase annually. 
 
11. LIMITED WARRANTY 
For one (1) year after the acceptance date set forth in the signed Uniform Final 
Acceptance, date of Equipment turnover, or date of Customer’s use of Equipment 
(unless such use is pursuant to the Temporary Use Agreement), whichever occurs first, 
KONE warrants Equipment against defect in workmanship and material. The warranty 
excludes remedy for damage or defect caused by abuse, misuse, vandalism, neglect; 
repairs, alteration or modifications not executed by KONE; improper or insufficient 
maintenance, improper operation, characteristics of the building such as electrical 
power or security features, natural or other catastrophe such as flood, fire, or storm, or 
normal wear and tear and normal usage. The warranty excludes training or instruction 
in the proper operation or maintenance of Equipment. Specific noise ratings and energy 
efficiencies cannot be guaranteed due to different building characteristics and ambient 
noise levels. Customer’s remedy is limited to repair or replacement of a defective part, 
in KONE’s sole discretion, and excludes labor. KONE DISCLAIMS ANY OTHER 
WARRANTY OF ANY KIND, EITHER EXPRESSED OR IMPLIED, INCLUDING 
WITHOUT 
LIMITATION, 
THE 
IMPLIED 
WARRANTIES 
OF 
MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, OR NON- 
INFRINGEMENT. 
 
12. INDEMNIFICATION 
KONE shall only indemnify and hold Customer harmless for claims, damages, losses 
or expenses, but excluding loss of use (“Claims”) due to bodily injury, including death, 
or tangible property damage (other than the Project or KONE’s work itself) to the 
extent caused by KONE’s negligent acts or omissions. KONE shall not indemnify 
Customer for any other Claims. Customer agrees to indemnify and hold KONE 
harmless from any Claim for bodily injury, including death, or tangible property 
damage in connection with the use or operation of the Equipment. Each party shall 
defend itself in the event of a Claim. 
 
13. INTELLECTUAL PROPERTY 
KONE shall retain title and ownership of all intellectual property rights relating 
(directly or indirectly) to the Equipment provided by KONE, including but not limited 
to software or firmware (whether in the form of source code, object code or other), 
drawings, technical documentation, or other technical information delivered under the 
Proposal. KONE grants Customer a non-exclusive and non-transferable license and 
right to use the software and firmware in connection with the use and maintenance of 
the Equipment. Customer shall not use any drawings, technical documentation or other 
technical information supplied by or on behalf of KONE for any purposes other than 
those directly related to the Proposal or to the use and maintenance of the Equipment. 
Customer shall not in any form copy, modify or reverse engineer the software, or give 
access to the software for such use to any third party without KONE’s prior written 
consent.  
 
14. INSURANCE 
In lieu of any Customer insurance requirements, KONE shall provide its standard 
certificate of insurance, which shall be deemed to satisfy all insurance requirements for 
this Project. KONE shall not provide loss runs insurance rate information, copies of its 
insurance policies or any other information which KONE considers confidential. 
KONE shall not provide coverage for professional (E&O) liability, pollution liability, 
data privacy/security, or no-fault medical payments. If the Project is covered by a Wrap 
Up Insurance Program, KONE agrees to participate provided there is no cost to KONE, 
no reduction in the Price, and subject to KONE’s review of the proposed program.   If 
KONE’s primary limits are sufficient to satisfy insurance coverage requirements, 
excess/umbrella liability will not be required or if excess/umbrella is required, KONE’s 
excess coverage does not follow form although typically provides broader coverage 
than KONE’s primary policies.  The excess coverage is not AM Best Rated nor 
licensed to do business within the jurisdiction although the carrier has strong Standard 
& Poor’s and Moody’s financial ratings that may be evidenced upon request. 
15. LIMITATION OF LIABILITY 
In no event shall either party be liable to the other party for any consequential, special, 
punitive, exemplary, liquidated, incidental, or indirect damages (including, but not 
limited to, loss of profits or revenue, loss of goodwill, loss of use, increase in financing 
costs) (collectively, "Consequential Damages") that arise out of or relate to this 
Proposal even if such party has been advised of the possibility of such Consequential 
Damages. The limitation set forth in this section shall apply whether the claim is based 
on contract, tort or other theory.  
 
16. CONCEALED OR UNKNOWN CONDITIONS 
If during the course of its work, KONE encounters conditions at the site that are 
subsurface, differ materially from what is represented in the contract documents, or 
otherwise concealed physical conditions, KONE shall be entitled to an extension of time 
and additional costs for the performance of its work, which shall not be subject to any 
payment conditions or contingencies. 
 
17. BACKCHARGES 
KONE shall not be responsible for backcharges unless Customer provides at least 2 
business days’ written notice prior to incurring such charges, supporting documentation 
and such charges directly arise out of KONE’s failure to perform under the Proposal. 
 
18. TERMINATION 
If a party materially breaches this Proposal, the other party shall provide written notice 
of the breach and a reasonable time to cure the breach, but in no event less than 30 
days. If the breaching party fails to cure the breach within the specified time period, the 
non-breaching party may terminate the Proposal upon 15 days written notice to the other 
party. If KONE notifies Customer of a material breach pursuant to this paragraph, KONE 
may temporarily suspend its work without liability. 
 
19. GOVERNING LAW AND DISPUTE RESOLUTION 
The parties agree that this Proposal shall be governed by the laws of the state where 
the Project is located, and venue for disputes shall be located in that state. KONE does 
not agree to participate in arbitration proceedings. 
 
20. PRICE ADJUSTMENT 
 
KONE shall be entitled to an equitable adjustment in the Price, including but not 
limited to, any increased costs between the time the Contract is signed and the date of 
manufacture for materials, labor, or shipping, as well as increased costs resulting from 
any change in law or tariffs. 
 
21. 24/7 EMERGENCY VIDEO COMMUNICATIONS 
 
Applicable only for projects where KONE 24/7 Emergency Video Communications is 
included: The KONE 24/7 Emergency Video Communications contract addendum and 
General Terms and Conditions for KONE Digital Services must be signed by the 
Building Owner. This contract addendum requires the Building Owner to pay a fee for 
audio, video, and data connectivity. This payment obligation, among other provisions, 
survives termination of any maintenance agreement. 
 
22. MISCELLANEOUS 
This Proposal, including the documents incorporated herein by reference, constitutes 
the entire agreement of the parties and supersedes all prior negotiations, 
understandings, and representations whether written or oral in relation to the subject 
matter hereof. Where a conflict or ambiguity exists between this Proposal and any other 
contract document (including but not limited to, Customer’s drawings and 
specifications), the terms and conditions of this Proposal shall control. This Proposal 
may be amended only in writing by the duly authorized representative of both parties. 
This Proposal may be executed in one or more counterparts. Each counterpart shall be 
considered an original and all of the counterparts shall constitute a single agreement 
binding all the parties as if all had signed a single document. For purposes of executing 
this Proposal, a document signed by electronic means is to be treated as an original 
document. The failure of either party to insist upon performance or strict performance 
of any of the terms or conditions of this Proposal shall not be deemed a waiver of any 
rights or remedies that such party may have or a waiver of any subsequent breach or 
default under this Proposal. Neither party may assign or transfer the benefit or burden 
of this Proposal without prior written consent of the other party.

Advanced People Flow (APF) Attachment to Bid “B”
Work by Others 
CONSTR-07-0666 (2021-1 -2 ) Advanced People Flow (APF)
1
Purchaser to provide the following in accordance with code requirements 
NOTE: All Work by Others is required to be completed two (2) weeks prior to the start of APF installation. 
KONE Access Control (if provided) 
1. General: provide IP addresses per KONE LAN
schedule. IP addresses are required for, but not
limited to, KONE Group Controllers (KGC),
KONE Interface Controllers (KIC), LAN
Destination Operating Panels (DOP), LAN
Destination Guidance Displays (DGD), and LAN
InfoScreen.
If KONE Access 500: provide two (2) dedicated
15 amp 120 VAC fused service with ground in the
control space connected   to designated ACS
cabinet(s) per the ACS wiring diagrams. Must
include the means to disconnect this service and
lock-off in the “open” position (NFPA 70 article
620.22 and 620.53 or CEC article 38.22 and
38.53).
If KONE Access 500: if Mobile Device feature is
provided, the customer provides the site-specific
configuration  cards and two valid mobile
credentials for testing to KONE during
installation. Consult with your sales rep or bid
letter
Turnstile Integration for KONE Destination 
(if  provided) 
4. Provide one (1) dedicated GFCI protected 20
amp 120 VAC (15 amp in Canada) duplex
outlet for People Flow Servers per the wiring
diagrams.
5. KONE recommends a minimum 100 Mbit/s
Ethernet for each of the following applications:
Security Integrated Touchscreen/Keypad
Destination Operating Panels, Monitoring
System, Multimedia Equipment, and Card
Readers.
6. Provide IP addresses per KONE LAN schedule.
IP  addresses are required for, but not limited to,
KONE Group Controllers (KGC), KONE Interface
Controllers (KIC), LAN Destination Operating
Panels (DOP), LAN Destination Guidance
Displays (DGD), and LAN InfoScreen.
7. Provide and install the required number and
size conduit runs from elevator hoistways to
turnstile 
banks. 
See 
turnstile 
integration
specifications for  site specific requirements.
3rd Party Access Integration/Security (if provided) 
8. Our proposal includes KONE logic and
provisions for the specified Touchscreen(s),
Keypad Destination Operating Panel(s),
Monitoring System(s), and Multimedia
Equipment.
9. Card Readers and/or any additional required
hardware & software for proper functionality
of access control/security system(s) shall be
furnished and installed by others.
10. A designated 15 amp 120 VAC circuit is
required at each of the remote monitoring
stations.
11. Any required interface software to ensure proper
communication between KONE control system(s)
and building system(s) shall be the responsibility
of others.
12. KONE recommends a minimum 100 Mbit/s
Ethernet for each of the following applications:
Security Integrated Touchscreen/Keypad
Destination Operating Panels, Monitoring System,
Multimedia Equipment, and Card Readers.
KONE Destination Dispatching (if provided) 
General: when KONE Destination (Destination
Dispatch) is used, provide one (1) dedicated 15
amp 120 VAC fused service with ground (supplied
through automatic emergency lighting supply if
available in building) connected to each elevator
signal control cabinet for shaft power. Must include
the means to disconnect this service and lock-off in
the “open” position (NFPA 70 article 620.22 and
620.53 or CEC article 38.22 and 38.53).
Provide IP addresses per KONE LAN schedule. IP
addresses are required, but not limited to, KONE
Group Controllers (KCEGC), KONE Interface
Controllers (KIC), LAN Destination Operating
Panels (DOP), LAN Destination Guidance Displays
(DGD), and LAN InfoScreen.
Provide a VLAN with a minimum 100 MBit/s dual
ethernet connections with dual RJ45 jack in each
machine room/control room/control space. Consult
with your sales rep or bid letter
If KONE Destination 820: provide a minimum 100
MBit/s dual ethernet connections with
dual RJ45 jacks between elevator groups
and across hallways where machine
rooms/control rooms/control spaces form the same
group (minimum CAT6 up to 100m,
fiber Optics if greater than 100m).
If KONE Destination 1020: provide one (1)
additional dedicated 15 amp 120 VAC fused
service with ground (supplied through
automatic emergency lighting supply if
available in building) connected to each
elevator signal control cabinet that has a
LAN riser to power Core and Shaft LAN Switches.
Must include the means to
disconnect this service and lock-off in the
"open" position (NFPA 70 article 620.22 and
620.53 or CEC article 38.22 and 38.53).
If KONE Destination 1020: provide one (1)
additional dedicated 15 amp 120 VAC fused
service with ground (supplied through
automatic emergency lighting supply if
available in building) to power the Site

Advanced People Flow (APF) Attachment to Bid “B”
Work by Others 
CONSTR-07-0666 (2021-1 -2 ) Advanced People Flow (APF)
2
Controller and Edge Router modules. 
Must include the means to disconnect this 
service and lock-off in the "open" position 
(NFPA 70 article 620.22 and 620.53 or 
CEC article 38.22 and 38.53). 
19. If KONE Destination 1020: provide a
dedicated OM3 optical fiber link with SC
connectors and terminated into a patch
panel to integrate machine rooms.
20. If KONE Destination 1020: if Elevator
Guide (EG) display is provided; provide a
Full HD TV with HDMI v1.4 interface and
a minimum size of 24". Provide a 120
VAC power outlet at the location of the
EG display to provide power to the TV
and proper HDMI cables to connect the
HDMI output provided by KONE into the
HDMI input of the provided TV. If the EG
display is located 30 ft (10 m) or farther
from the elevator shaft, proper HDMI
signal extension means shall be provided.
E-Link (if provided)
21. A designated 15 amp 120 VAC circuit
is required at each of the remote
 monitoring  stations.
22. KONE recommends a minimum 100 Mbit/s
Ethernet for each of the following applications:
Security Integrated Touchscreen/Keypad
Destination Operating Panels, Monitoring
System,  Multimedia Equipment, and Card
Readers.
23. Provide IP addresses per KONE LAN schedule.
IP  addresses are required, but not limited to,
KONE Group Controllers (KGC), KONE Interface
Controllers (KIC), LAN Destination Operating
Panels (DOP), LAN Destination Guidance Displays
(DGD), and LAN InfoScreen.
24. BACnet additional requirements (if provided):
a.
Provide all E-Link features required.
b.
Provide BACnet Device IDs for Devices.
c.
Provide BACnet Revision Level
requested for the site (PR-18 supported
or not).
KONE Remote Call (if provided) 
25. Provide one (1) dedicated CFCI protected 20 amp
120 VAC - amp duplex (15 amp in Canada) outlet
per the Remote Call wiring diagrams.
26. KONE recommends a minimum 100 Mbit/s
Ethernet for each of the following applications:
Security Integrated Touchscreen/Keypad
Destination Operating Panels, Monitoring System,
Multimedia Equipment, and Card Readers.
27. Provide one (1) public IP v4 address that can be
accessed via the Internet.
28. Provide IP addresses per KONE LAN schedule.
IP addresses are required, but not limited to,
KONE Group Controllers (KGC), KONE Interface 
Controllers (KIC), LAN Destination Operating 
Panels (DOP), LAN. 
InfoScreen (if provided) 
29. If InfoScreen is offline, none of the below is
applicable.
Provide one (1) RJ45 CAT6 jack and network
switch in each elevator machine room/control space
that has an InfoScreen server. This jack is  wired to
a building LAN network with internet access. In the
machine room/control space, pipe  and wire CAT6
cable from the switch to the InfoScreen Server Box.
30. Provide one (1) IP address for each InfoScreen
server.
31. Provide another RJ45 CAT6 jack and VLAN
configuration to the next elevator machine
room/control space that has elevators with
InfoScreens. This is to connect two Group
Connection Boxes from two elevator machine
rooms/control space.
32. Provide a dedicated 15 amp 115 VAC fused
disconnect with ground PE per machine
room/control space piped and wired to the first
InfoScreen Group Connection Box
33. If InfoScreen TV Streaming Video is to be used, the
equipment and converters will be located in a
building IT room as shown in the wiring diagram.
Provide another RJ45 CAT6 jack and VLAN
configuration in InfoScreen IP network range for
Video Encoder Board in the machine room/control
space that has the last Group Connection Box.
Provide a Cable TV Box as needed, or other device
that will stream composite video output.
Elevator Variable Message Display (If provided) 
34. An outlet marked as, “elevator equipment only”
must be provided at each display location. The
outlets may be powered by a separate breaker but
must share the same power source as the
elevator. Amperage requirements for the outlets
shall be calculated based on the requirements of
the monitors provided by others.

1
Site Safety Requirements / Work by Others (Bid Attachment “B”) 
CONSTR-007-0664 (2022-06-13) KONE MonoSpace 500 
 
 
 
Site Safety Requirements / Work by Others 
KONE MonoSpace 500 Bid Attachment “B” 
Purchaser to provide the following in accordance with code requirements. NOTE: All site preparation required to be in 
place prior to KONE’s start must be ready two (2) weeks prior to the start of installation. 
 
 
General 
1. Provide sufficient on-site refuse containers for the 
disposal of the elevator packing material. Should 
sufficient containers not be provided, the removal of the 
elevator packing material shall become the responsibility 
of others. 
2. Provide forklift for KONE’s exclusive use during the 
unloading of the elevator at time of delivery. 
3. Provide any cutouts to accommodate the elevator 
equipment (see notes below). 
4. Provide and install finished elevator cab flooring prior to 
balancing 
cabs 
(coordinate 
with 
KONE). 
Cab 
flooring/weight allowance shall be in accordance with 
KONE’s approved layouts. Owner must provide 
certification (to the elevator inspector at time of 
inspection) that flooring meets flame spread and smoke 
density requirements. (ASME A17.1/CSA B44 sec 
2.14.2.1). 
5. Provide permanent elevator lobby lighting, ceiling and 
flooring prior to inspection date. 
6. Owner must provide certification (to the elevator 
inspector at time of inspection) that owner-supplied 
elevator interior finishes meet flame spread and smoke 
density requirements (ASME A17.1/CSA B44 sec. 
2.14.2.1). In the case of using glass, transparent or 
translucent plastic panels for car interiors, they shall 
meet the requirements of ASME A17.1/CSA B44 sec. 
2.14.1.8, ANSI Z97.1/ CGSB 12.1 in Canada. 
7. Provide cutting/ coring of all openings and penetrations 
required to install hall push buttons, signal fixtures, 
wiring duct and piping, and sleeves. Sleeves will be 
required in the hoistway wall for EACH elevator. 
8. Provide any repairs such as grouting, patching and 
painting made necessary by such cutting/ coring. 
Provide fire caulking around all fixtures and as needed 
to satisfy NFPA 70 article 300.21, or any applicable 
local code. 
9. Please note that none of the elevator components are 
weather- proof and that the elevator entrances do not 
seal the hoistway from inclement weather. The entire 
elevator, hoistway, and controls must remain protected 
from inclement weather prior to and throughout the 
installation. 
10. If KONE 24/7 Emergency Video Communications: For 
units with travel greater or equal to 60 ft (18 m), or if 
located in a seismic zone and the code year is 2016 or 
later (regardless the travel):  Customer will provide a 
dedicated Windows-based PC or laptop with Chrome 
browser and 24-hour/day Internet access.  This 
computer must be accessible by emergency personnel 
to communicate through voice and text with people in 
the elevator and to have a video display of the cab 
interior. 
 
 
 
 
 
Safety 
11. Provide adequate, rollable access with a minimum 
opening of 8’ x 8’ (2.5 m x 2.5 m) into the building. 
Clean, safe, secure, dry space is required adjacent to 
the hoistway at grade level, minimum of 21’ x 56’ [6.4m 
x 17m] per elevator for storage of materials. 
12. Provide free-standing, removable, OSHA-compliant 
barricades capable of withstanding 200lb (890N) of 
force in all directions around all hoistway openings per 
OSHA 29 CFR 1926.502, and/or any applicable local 
code. 
13. Provide and install full-covering entry protection as per 
local requirements and manufacturer’s requirements. 
Protection to be made of nylon mesh or reinforced 
plastic, at all hoistway openings to prevent materials or 
tooling from falling into the elevator shaft during 
installation per Federal OSHA requirements listed in 29 
CFR 1926.502(j). In Canada, where required by 
Provincial regulation, enclose the front of the hoistway 
with removable hoarding or screening to prevent 
material from entering the hoistway. Design and install 
entrance protection in such a way as to allow quick 
accessibility in and out of the hoistway. 
14. Provide two (2) lifeline attachments at the top, front of 
the hoistway. Each must be capable of withstanding a 
5000 lb [2250 Kg] load per OSHA 29 CFR 1926.502, or 
any applicable local code. For machine-room-less 
applications, provide attachments as described above, 
or install KONE- provided 5” x 5” x 3/8” (127mm x 
127mm x 9.6mm) tube steel lifeline beam in the 
elevator hoistway overhead 10 inches (254 mm) from 
front of hoistway to center line, with bottom of lifeline 
beam at same elevation as bottom of hoisting I-beam. 
Lifeline tube steel supplied by KONE by request at no 
additional cost. Engineering details, attachment details 
and/or modifications, or any beam(s) alterations in the 
field for installation is by others. 
15. Provide proper lighting in all work areas and stairways, 
including access to all floors and machine rooms per 
OSHA 29.CFR1926.1052 or any applicable local code. 
16. Provide and maintain 6-foot (1800 mm) clear work area 
in 
front 
of 
all 
entrance 
openings 
per 
OSHA 
29.CFR1926.502 or any applicable local code. 
Hoistway 
17. Provide a clear and plumb hoistway of size shown on 
approved KONE final layout drawings. Any variations 
from the detailed dimensions may not exceed 2” [50 
mm] greater and may not be less than the clear 
dimensions detailed. (Tolerance: -0” + 2” [-0 mm +50 
mm]).

2
Site Safety Requirements / Work by Others (Bid Attachment “B”) 
CONSTR-007-0664 (2022-06-13) KONE MonoSpace 500 
 
 
 
 
 
 
 
18. Provide hoistway ventilation per local building code 
requirements as applicable. For proper equipment 
operation, the machine space in machine room or at 
the top of the hoistway must maintain a temperature 
between 41° F [5° C] and 104° F [40° C]. Maximum 
allowed humidity is 95% non-condensing. 
19. Provide any partitions between common hoistways if 
applicable. 
20. Install hoist beam(s) in overhead(s) per KONE final 
layout drawings. Beam supplied by KONE unless 
otherwise 
noted 
on 
layouts. 
Engineering 
and 
attachment details or field modifications of the beam 
is by others. 
NOTE: KONE requires a written explanation and 
photographic evidence of installation method for 
each connection point of the beam(s). 
21. In cases where multiple elevators are in a common 
hoistway, and the counterweights are 
located 
between elevators, the entire length of counterweight 
runway must be guarded. The guard shall extend at 
least 6 inches (150mm) horizontally beyond each 
counterweight rail. The guard shall be made from 
wire-mesh material equal to or stronger than 0.048-
inch diameter wire with openings not exceeding 1/2 
inch (13 mm), securely fastened to keep the guard 
taut and plumb. (ASME A17.1 – 2019 / B44 – 19: 
General Requirements.) 
22. On applications where working platforms are required, 
working platforms provided shall comply with the 
requirements of the current ASME A17.1 / CSA-B44 
code edition in effect at the time of installation and /or 
any applicable local code. 
23. Provide adequate support for guide rail brackets from 
pit floor to the top of the hoistway. Locate rail backing 
per KONE final approved layout drawings. When 
maximum bracket span is exceeded, additional 
support shall be provided at purchaser’s expense. 
Any bracket mounting surface that is not in line with 
the clear hoistway dimension detailed on the 
approved KONE final layout drawings may need to be 
corrected 
to 
meet 
the 
proper 
dimension 
at 
purchaser’s expense. 
24. If guide rail brackets are to attach to steel, ensure all 
brackets are installed prior to applying fireproofing to 
the steel. Otherwise, removal and reapplication of 
fireproofing will be at purchaser’s expense. 
25. All offsets, ledges or projections within the hoistway 
shall be addressed in accordance with applicable 
local code. All offsets, ledges or projections within the 
hoistway greater than 4 inches (100mm) must be 
tapered to not less than 75 degrees (ASME 
A17.1/CSA B44 sec 2.1.6.2). Maximum ledge or 
projection is 2 inches (50mm) in Massachusetts, 
California and District of Columbia. 
 
 
 
 
 
 
 
 
 
 
 
26. If concrete block wall construction, refer to the 
approved KONE final approved layout drawings for 
proper installation of rail bracket attachments. Inserts 
provided by KONE unless otherwise noted on the 
approved KONE final approved layout drawings. 
Insert type must be approved by KONE. Concrete 
masonry units, mortar and grout, shall conform to IBC 
2000 or any applicable local code. Concrete masonry 
units shall have a minimum compressive strength of 
1500 PSI (10.5 MPa). Mortar and grout shall have a 
minimum compressive strength of 2000 PSI (13.8 
MPa). 
27. KONE entrance jambs are non-ferrous and material 
may not be attached to them (i.e. fire doors/curtains). 
28. Arrange for entrance walls to be constructed at the 
time doorframes and sills are installed to facilitate 
timely installation of hall fixture faceplates. Entire front 
wall must be left open at top and bottom landings until 
elevator equipment is installed. Intermediate landings 
must have rough openings of the size and location 
shown on KONE final approved layout drawings to 
allow installation of entrances. All entrance openings 
must be aligned vertically. Adequate support for 
entrance attachment points shall be provided at all 
landings. Any marble, stone or similar wall material 
must be prepared after the entrance frames are 
installed. Provide corridor lines for any marble or 
“special finish” walls.  
NOTE: If concrete block wall construction- to prevent 
overloading entrance frames, top of entrances should 
not receive more than one row of block. A lintel 
must be installed to support additional rows of block. 
29. Provide elevator landings suitably prepared to accept 
entrance sill installation per KONE final layout 
drawings. Grouting to be done by purchaser after sills 
are installed.  
NOTE: Traditional angle or concrete sill support is not 
required. 
30. Provide finished-floor height marks visible from 
hoistway openings at all landings minimum one week 
prior to beginning entrance installation. Placing floor 
height mark on hoistway wall is desirable. Complete 
“Contractor Verification Form of Sill to Sill Heights and 
Remote Machine Piping,” CONSTR-07-0675. 
31. Provide suitable, permanent lighting for control space 
with light switch located within 18” [457 mm] of strike 
jamb side of control space door where practical. 
32. Electric lighting shall have a minimum lighting 
intensity of 200 lx (19 fc) at the floor level. When 
permitted by state and local code the light switch 
should also control the machine space lighting if 
control space is adjacent to the hoistway at the top 
landing.

3
Site Safety Requirements / Work by Others (Bid Attachment “B”) 
CONSTR-007-0664 (2022-06-13) KONE MonoSpace 500 
 
 
 
 
 
 
33. If the control space is located remote from the 
elevator hoistway top landing the following may apply:  
a. If applicable, provide machine space access door 
of the size and in the location shown on the KONE 
final layout drawings. The access door shall be 
secured against unauthorized access. It shall be 
self-closing, self-locking and operable from the 
inside without a key. 
b. Provide suitable lighting in or above the machine 
space access with light switch located within 18” 
[457 mm] of strike jamb side of access space door 
where practical. 
c. When permitted by state and local code the light 
switch should also control the machine space 
lighting. 
d. In cases where a battery lowering device is 
provided, control closet may not be adequate. 
Please consult KONE representative. 
34. Provide and install GFCI-type receptacle located at 
machine in the top of the hoistway or in machine room 
as applicable (NFPA 70 article 620.85 or CEC article 
38.85 whichever is applicable). 
35. Provide and install light switch located at manual 
brake release location: may also be required in 
control space per local jurisdiction. 
36.Where a single elevator is installed in a hoistway and 
a portion of the travel extends higher that 11m (36 ft.) 
between 
entrances 
(single 
blind 
hoistway), 
emergency door(s) must be provided. Emergency 
doors and their electrical contacts shall comply with 
the current ASME A17.1/CSA-B44 code edition in 
effect at the time of installation and/or any applicable 
local code. ASME A17.1-2019/B44-19 requirement 
Section 2.11.1.2 covers “Emergency Doors in Blind 
Hoistways” and Section 
2.26.2 covers “Electrical Protective Devices”. Each 
emergency door must be provided with an electrical 
contact with minimum UL/CSA NEMA A300 rating 
suitable for use in a 3-amp 230VAC circuit. Consult 
KONE representative if there are any questions 
concerning the code requirements. 
37. In 
jurisdictions 
enforcing 
the 
NBCC 
and 
in 
jurisdictions enforcing NFPA 72, the means for 
testing and maintenance of fire alarm initiating 
devices without having to enter the hoistway shall be 
permitted. When this means is provided it must 
comply with ASME A17.1-2019/B44 requirement 
2.8.2.4 and the location of equipment inside the 
elevator hoistway must be coordinated with KONE 
sales and/or operations representative.  
Pit 
38. Provide a legal, dry and clean pit with level pit floor, 
built per KONE final layout drawings. Pit shall be 
reinforced to sustain vertical forces detailed on KONE 
final layout drawings (vertical forces detailed are two 
times the static loads). 
 
 
 
 
 
 
 
 
 
 
39. Sumps and/or sump pumps (where permitted) located 
within the pit may not interfere with the elevator 
equipment. Sumps to be covered with flush mounted, 
non-combustible cover capable of withstanding 150 
lbs. per square foot (7 kPa). The sump pump/drain 
must, at minimum, remove 3,000 gal/h (11.4 m3/h): 
a. ASME 
A17.1-2016/B44-16 
and 
earlier, 
per 
elevator. 
b. ASME A17.1-2019/B44-19 and later, per single 
hoistway or multiple car hoistway. 
40. Provide a pit light fixture with switch and guards with 
an illumination level equal to or greater than that 
required by 
ASME 
A17.1/CSA 
B44 2000, 
or 
applicable 
version. 
Recommended 
to 
provide 
minimum 4-foot double tube fluorescent fixture, with 
suitable guard and mounted to rear wall of pit per 
KONE installation representative’s direction. 
41. Provide a dedicated pit circuit with GFCI-protected 15 
or 20-amp 120VAC duplex outlet. Location to be 
coordinated with the KONE project team using the 
KONE final approve layout drawings (NFPA 70 article 
620.85; CEC article 38.85 whichever is applicable). 
42. Provide non-GFCI-protected single receptacle for 
sump pumps (NFPA 70 article 620.85, NFPA 70 
article 620.85 or CEC article 38.85 whichever is 
applicable). 
43. Pit ladder to be constructed of non-combustible 
material extending from pit floor to 48” [1200 mm] 
above the sill of the access landing. Pit ladder is 
supplied by KONE; provided by purchaser on other 
KONE products unless otherwise noted on the layout 
drawing. Locate per KONE final layout drawings. 
Coordinate ladder sizing and location with KONE 
representative to assure proper fit in hoistway. 
44. When a separate pit access door is provided, it must 
conform to ASME A17.1, requirement 2.2.4.5.  When 
an electric contact is required, it shall comply with 
ASME A17.1, requirement 2.2.4.5 (b) (1). 
 
Electrical 
45. US Applications - Purchaser provides in accordance 
with National Electrical Code, NFPA 70 (NEC) Article 
620 or any applicable local code. 
46. Canadian Applications - Purchaser provides in 
accordance with Canadian Electrical Code, C22.1 
Section 38 or any applicable local code. 
47. Provide dedicated GFCI-protected 20-amp 120VAC 
duplex (15 amp in Canada) outlet next to each control 
cabinet. 
48. Provide for all electrical branch circuits/disconnects to 
be labeled (NFPA 70 article 620.54 / 620.53 / 
620.51d, CEC articles 38.54/ 38.53/ 36.51d). 
49. Provide 480/208VAC (USA) or 575/208VAC (Canada) 
three-phase permanent power, including piping, 
wiring and fused disconnect, to controller location to 
facilitate elevator installation prior to start of project. 
WARNING: An Open Delta transformer is not 
acceptable to supply the main power to elevators with 
regenerative 
drives, 
either 
for 
temporary 
or 
permanent power.  Doing so can permanently 
damage the drive.

4
Site Safety Requirements / Work by Others (Bid Attachment “B”) 
CONSTR-007-0664 (2022-06-13) KONE MonoSpace 500 
 
 
 
 
 
 
50. Provide 220VAC single-phase temp. power and 
115VAC single-phase temp. power, of permanent 
characteristics at each elevator landing for lighting 
and installation method tools. Locate connection 
points at elevator hoistway. 
NOTE: For installation purposes related to items 
49 
and 
50, 
please 
consult 
your 
KONE 
representative to confirm disconnect location(s) 
and type of temporary power. 
51. When 
generator 
is used 
to 
provide 
3-phase 
480/208VAC (USA) or 575/208VAC (Canada) power 
for installation, purchaser to accept change notice for 
additional costs, estimated locally by installing office, 
to cover inefficiencies and any damages resulting 
from installing without permanent power present. 
NOTE: 
Our 
elevator 
controllers 
require 
Wye 
configuration transformers. It is also the responsibility 
of the purchaser to provide consistent three- phase 
voltages balanced within +/- 10% when measured 
phase-to-phase and +/-10% when measured phase-
to- ground. 
52. Provide a dedicated 20-amp 115VAC circuit in the fire 
command room piped and wired to the lobby panel 
where applicable. 
53. Provide a dedicated 15-amp, 115VAC fused service 
with ground (supplied through automatic emergency 
lighting supply if available in building) connected to 
each elevator signal control cabinet for car lighting. 
Must include the means to disconnect this service and 
lock-off in the “open” position (NFPA 70 article 620.22 
and 620.53 or CEC article 38.22 and 38.53). 
54. Provide a separate 15-amp, 115 VAC fused service 
with ground (powered by building emergency power 
system, when available) for each elevator with KONE 
24/7 
Emergency 
Video 
Communications, when 
specified. Must include the means to disconnect each 
service and lock-off in the “open” position (NFPA 70 
article 620.22 and 620.53 or CEC article 38.22 and 
38.53).” 
 
Control Space/ Integrated Controls Solution (ICS) 
55. Provide a legal control space/ machine room with 
access as indicated on the KONE final layout 
drawings. To include a temporary or permanent door 
that can be locked from outside. Permanent door 
must be self-closing, self- locking, and require a key to 
open from outside. Must have adequate temporary or 
permanent lighting for installation purposes. For 
proper equipment operation, the temperature in the 
control space must maintain between 41° F [5° C] and 
104° F [40° C]. Maximum allowed humidity is 95% 
non-condensing. 
56. Provide safe and convenient access to control 
space/machine 
room 
including 
provisions 
for 
necessary lighting for access path (ASME A17.1/CSA 
B44 sec 2.8.1, ASME A17.1 / CSA B44 sec 2.7.3). 
 
 
 
 
 
 
 
 
 
 
57. Provide a clean and dry elevator control room. 
58. Provide suitable lighting for control space with light 
switch located within 18” [457 mm] of strike jamb side 
of control space door where practical. When 
permitted by state and local code the light switch 
should also control the machine space lighting if 
control space is adjacent to the hoistway at the top 
landing.   
59. Provide dedicated GFCI-protected 120VAC 20- amp 
duplex (15 amp in Canada) outlet in the shaft, located 
above and centered to the entrance opening at the 
controller landing. Consult KONE installation team for 
precise location. 
60. Provide 
a 
single 
means 
of 
disconnecting 
all 
ungrounded main power conductors for each elevator 
by an enclosed, externally operable, fused motor 
circuit switch with UL/CSA Class RK1 fuses. Must be 
lockable in the open position. This disconnecting 
means shall disconnect the normal power service as 
well as emergency power service, when provided. 
NOTE 1: If a battery-powered rescue device is required, 
the above-mentioned disconnect must have an 
auxiliary contact monitored by elevator controller that 
is positively opened mechanically and is normally 
closed (NC) when the main power is in the ON position 
and is normally open (NO) when power is in the OFF 
position. 
NOTE 2: If a battery-powered rescue device is 
required and a separate shunt trip breaker which is 
subject to either the hoistway or control space sprinkler 
system is provided, the shunt trip breaker must have 
an auxiliary contact that is positively opened 
mechanically and is NC when the main power is in the 
ON position. 
NOTE 3: Shunt trip not allowed in Canada and some 
US jurisdictions. 
61. Provide a Direct-in-dial (DID) analog phone line, 
activated at least one week prior to inspection, 
terminated at the appropriate phone jacks in the 
elevator control room. GC/ Owner may elect to have a 
separate analog line installed (one per elevator), or 
GC/ Owner may elect to provide DID lines from an 
Analog Station Card in the building’s PBX system. If 
GC/Owner provides a Direct-in-Dial analog phone line 
or lines off an existing PBX phone system, a backup 
power source must also be provided. All phone and 
associated equipment provided by GC/ Owner shall 
be in compliance with the requirements of ASME 
A17.1/ CSA B44, local codes and applicable law, as 
amended. 
62. Provide all fire alarm initiating signals as required by 
all national, state and local codes for termination at 
the primary elevator signal control cabinet in each 
group.

5
Site Safety Requirements / Work by Others (Bid Attachment “B”) 
CONSTR-007-0664 (2022-06-13) KONE MonoSpace 500 
 
 
 
 
 
 
63. With emergency power service provide emergency 
power transfer switch and power change pending 
signals as required; 2 normally open dry contacts 
from transfer switch to controller (2 pairs plus ground 
wire). One contact closes to signal emergency power 
is present, the other contact closes to give 30 second 
pre-signal prior to transfer switch change. Termination 
of these wires is at the primary elevator signal control 
cabinet in each group (2 pairs plus ground wire). 
64. Furnish and install smoke detectors and fire operation 
per ASME A17.1/CSA B44 sec 2.27.3.2, NFPA 72; 
one for lobby detector, machine room detector, 
hoistway detector (hoistway detector requirement 
determined by local code), and one for all grouped 
non-lobby detectors are required. Provide normally-
closed dry contacts, with wiring, to controller for each 
group listed above. 
65. Provide and install smoke detector in hoistway as 
required per local codes, and in all elevator lobbies, 
machine room and controller space. 
66. Provide heat detectors and "shunt-trip operation ( US 
Only)" when sprinklers are required in machine room, 
machinery space, control room, control space or 
hoistway, (ASME A17.1 sec 2.8.3.3.2, NFPA 13 & 
NFPA 72). 
67. If Fire Status Panel or Security panels are required, 
all remote conduit runs from elevator equipment 
room/machine space to these panels shall be by 
others. 
68. Non-elevator 
related 
piping 
and 
equipment 
is 
prohibited in machine room or hoistway (ASME 
A17.1/CSA B44 sec 2.8.1, ASME A17.1/CSA B44 sec 
2.8.2). 
69. Provide and mount at minimum a 10-pound, ABC-type 
fire extinguisher in control space (ASME A17.1 sec 
8.6.1.6.5). (Not required in Canada). 
 
Applicable for Integrated Control Solution (ICS) 
70. Provide a completely open front wall at top landing 
with access as indicated on the KONE Final Approved 
Layout Drawings. Must have adequate temporary or 
permanent lighting for installation purposes. NOTE: 
The lobby side of the ICS control cabinet must be 
faced with 2 layers of dry wall to comply with UL 
certification, regardless of front type. See KONE Final 
Approved Layout Drawings for details and wall type 
and minimum dimensions. 
71. Provide environment for proper equipment operation 
during 
installation 
and 
after 
acceptance, 
the 
temperature at the top floor elevator lobby must 
maintain between 41° F [5° C] and 104° F [40° C]. 
Maximum allowed humidity is 95% non-condensing. 
72. Provide safe and convenient roll-able access to top 
floor elevator lobby area. (ASME A17.1/CSA B44 sec 
2.8.1, ASME A17.1/CSA B44 sec 2.7.3). 
 
 
 
 
 
 
 
 
 
 
 
 
73. Provide 
480/208VAC 
(USA) 
or 
575/208VAC 
(Canada), three-phase permanent power, including 
piping, and wiring from fused disconnect, to junction 
box located in hoistway at top landing to facilitate 
elevator installation. 
WARNING: A Wye configuration transformer is 
required.  An Open Delta transformer is not 
acceptable to supply the main power to elevators with 
regenerative 
drives, 
either 
for 
temporary 
or 
permanent power.  Doing so can permanently 
damage the drive. 
74. FIRE ALARM INITIATING DEVICE (FAID). FAID is a 
requirement of ASME A17.1/B44, rules 2.27.3.2.1 (b) 
and 
2.27.3.2.2 (b). 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1. Since ICS control enclosure is vented into the 
hoistway, a fire alarm initiating device (FAID) is 
required in this portion of the control space. 
2. A fire alarm initiation device (FAID) is required 
in the lobby area to protect the control space 
when ICS is open. 
 
 
 
 
 
 
 
 
 
 
USA 
CANADA 
COMMENT 
W 
30"
1m 
NEC2014, CEC2020 
D
36"
1m 
NEC2014, CEC2020 
C 
Min 
36" 
Min 
914mm 
Minimum recommended.
Consult ADA 
requirements for exact 
building clearance

6
Site Safety Requirements / Work by Others (Bid Attachment “B”) 
CONSTR-007-0664 (2022-06-13) KONE MonoSpace 500 
 
 
 
  
 
 
Fire Service Access and Occupant evacuation 
Operation IBC 2018 or Designated Fire Fighter’s 
Elevator per the NBCC 
75. Fire service access elevators per code requirements 
(IBC 403.6) shall be provided with hoistway lighting 
per code requirements (IBC 3007). The hoistway 
lighting shall illuminate the entire height of the 
hoistway and shall be located such that it does not 
interfere with the operation of the elevator or reduce 
any clearances below applicable code requirements. 
Additionally, provide an enclosed 24 vdc relay (Omron 
G2R-1-S-DC24, or equivalent) local to the controller 
for interfacing hoistway lighting with elevator system 
(applicable only in jurisdictions enforcing the IBC, 
International 
Building 
Code). 
Consult 
KONE 
representative to assure required clearances are 
provided. 
76. Conductors and cables located outside of the elevator 
hoistway, machine space and control space, that 
provide normal or standby power, car lighting power, 
car ventilation power, car heating power, car air 
conditioning power, control signals, communication 
with the car and fire/heat-detecting systems control 
signals 
to 
Fire 
Service 
Access 
Elevators 
or 
designated Firefighter’s Elevator, shall be protected 
by construction having a fire-resistance rating of not 
less 
than 
2 
hours. 
(APPLICABLE 
ONLY 
IN 
JURISDICTIONS ENFORCING THE IBC BUILDING 
CODE OR THE NBCC OR ANY APPLICABLE 
LOCAL CODES. 
77. Fire Service Access elevators shall be provided with 
hoistway lighting. 
78. Prevent water from the operation of an automatic 
sprinkler system outside the enclosed lobby from 
infiltrating the hoistway enclosure in accordance with 
an approved method per rule 3008. 
79. Means for elevator shutdown in accordance with 
Section 3005 shall not be installed on elevator 
systems used for Fire Service Access and/or 
Occupant Evacuation Elevators per rule 3008. 
80. Occupant Evacuation elevators shall be continuously 
monitored at the fire command center or a central 
control point approved by the fire department and 
arranged to display all of the following information per 
rule 3008. 
a. Floor location of each elevator car. 
b. Direction of travel of each elevator car. 
c. Status of each elevator car with respect to whether 
it is Occupied. 
d. Status of normal power to the elevator equipment, 
elevator 
machinery 
and 
electrical 
apparatus 
cooling 
equipment 
where 
provided, 
elevator 
machine room, control room and control space 
ventilation and cooling equipment. 
e. Status of standby or emergency power system that 
provides backup power to the elevator equipment, 
elevator 
machinery 
and 
electrical 
cooling 
equipment where provided, elevator machine 
room, control room and control space ventilation 
and cooling equipment. 
 
 
 
 
 
 
f.
Activation of any fire alarm initiating device in any 
elevator lobby, elevator machine room, machine 
space containing a motor controller or electric 
driving machine, control space, control room or 
elevator hoistway. 
g. Provide a minimum of one Elevator Guide monitor 
per landing for each OEO elevator group. 
81. Each Fire Service and /or Occupant Evacuation 
elevator shall be supplied by both normal power and 
Type 60/Class 2/Level 1 standby power per rule 3008.  
a. Elevator equipment. 
b. Ventilation and cooling equipment for elevator 
machine rooms, control rooms, machinery spaces 
and control spaces. 
c. Elevator car lighting. 
82. Standby power loads shall be based on the 
determination of the number of occupant evacuation 
elevators in Sections 3008.1.1 and 3008.8.1. 
83. Wires or cables that are located outside of the 
elevator hoistway, machine room, control room and 
control space and that provide normal or standby 
power, control signals, communication with the car, 
lighting, heating, air conditioning, ventilation and fire-
detecting systems to occupant evacuation elevators 
shall be protected using one of the following methods 
3008. 
a. Cables used for survivability of required critical 
circuits shall be listed in accordance with UL 2196 
and shall have a fire-resistance rating of not less 
than 2 hours. 
b. 2. Electrical circuit protective systems shall have a 
fire-resistance rating of not less than 2 hours. 
Electrical circuit protective systems shall be 
installed 
in 
accordance 
with 
their 
listing 
requirements. 
c. Construction having a fire-resistance rating of not 
less than 2 hours. 
Exception: Wiring and cables to control signals 
are not required to be protected provided that 
wiring and cables do not serve Phase II 
emergency in-car operation.