Attachment C - PC Summary - PHO-1-23--Z-73-01-6(8).pdf

City of Phoenix — Formal (2024-03-06)

View PDF Meeting page

Extracted text (via pymupdf) 16115 characters
REPORT OF PLANNING COMMISSION ACTION 
February 1, 2024 
ITEM NO: 7 
DISTRICT NO.: 8
SUBJECT:
Application #: 
PHO-1-23--Z-73-01-6(8) 
Existing Zoning: 
MUA BAOD 
Location: 
Southwest corner of 32nd Street and Baseline Road 
Request: 
1)
Request to modify Stipulation 1.a regarding general conformance
with the site plan dated August 27, 2001.
2)
Request to delete Stipulation 1.b regarding landscape strips.
3)
Request to delete Stipulation 1.d regarding creation of a
Homeowners Association.
4)
Request to delete Stipulation 1.e regarding Planning Hearing
Officer review of gated entry design.
5)
Request to delete Stipulation 1.g regarding alternative paving
materials for parking stalls.
Acreage:  
3.64 
Applicant: 
Tim Rasnake, Archicon LC 
Owner: 
Zanbour, LLC 
Representative: 
Tim Rasnake, Archicon LC 
ACTIONS: 
Village Planning Committee (VPC) Recommendation: 
South Mountain 8/8/2023 Continued, with direction. Vote: 9-1.  
South Mountain 11/14/2023 Approval, with modifications and additional stipulations. Vote: 14-0.  
Planning Hearing Officer (PHO) Recommendation: On November 15, 2023, the Planning Hearing 
Officer recommended a continuance to the December 20, 2023 PHO Hearing. The Planning Hearing 
Officer heard the request on December 20, 2023 and recommended approval with a modification and 
additional stipulations. 
Staff Recommendation: Approval, with a modification and additional stipulations, per the PHO 
recommendation.  
Planning Commission Recommendation: Approval, per the PHO recommendation, with a deleted 
stipulation and additional stipulations. 
Motion Discussion: N/A 
ATTACHMENT C

Motion details: Vice-Chairperson Busching made a MOTION to approve PHO-1-23--Z-73-01-6(8), per 
the Planning Hearing Officer recommendation with the changes as set forth and presented (per 
appellant request). 
 
 
Maker: Vice-Chairperson Busching 
 
Second: Gorraiz 
 
 
Vote: 8-0 
 
 
 
Absent: None   
 
Opposition Present: Yes  
 
Findings:  
 
1. 
The request for modification of Stipulation 1.A regarding general conformance to a 
conceptual site plan is recommended to be approved.  The request for review and 
approval of conceptual site plan per Stipulation 1 has been complied with and text was 
eliminated that pertained to the previously approved plan.  The recommendation is 
therefore to approve the plan and modify the existing Stipulation 1 to replace the 
existing language with a standard language general conformance stipulation to the site 
plan.    
 
Furthermore, pedestrian connection and site walkability will be ensured through the 
Site Plan approval process.  The proposed stipulated plan shows the provision of open 
space, with a sidewalk between the buildings. 
 
2. 
The request to delete the language in Stipulation 1.B is approved. This stipulation is 
not pertinent to the new design as there is no residential development proposed. 
 
3. 
The request to delete Stipulation 1.d regarding creation of a Homeowners Association 
is approved. There is not residential development. 
 
4. 
The request to delete Stipulation 1.e regarding Planning Hearing Officer review of 
gated entry design is approved. This is not a residential development and there will be 
no gated entry. 
 
5. 
The request to delete Stipulation 1.g regarding alternative paving materials for parking 
stall is approved as it was written. The original stipulation will be replaced with the 
stipulation regarding alternative materials that was recommended by the South 
Mountain Village Planning Committee. 
 
Village Recommended Stipulations: 
 
1. 
The South Mountain VPC recommended 17 stipulations at the November 15th hearing.  
7 of the stipulations were recommended to be added at this hearing. The ones that 
were omitted were either part of the existing Zoning Ordinance requirements for the 
MUA zoning district or were not candidates for stipulation based on the passive nature 
of the language therein. In addition, the vague nature of the design-based stipulations 
made them contradictory to the existing language in the Zoning Ordinance. The 
findings for the recommended stipulations are below.

2. 
The request for a minimum of 10% of the required parking spaces shall be level 2 or 
greater EV ready is approved. This request is clear and does not contradict other 
stipulations or the Zoning Ordinance. 
 
3. 
The request for a minimum five bicycle spaces is approved. The following details are 
clear and do not contradict other stipulations or the Zoning Ordinance. 
 
4. 
The request for the surface of parking stalls shall be composed of an alternative to 
asphalt or concrete has been implemented by modifying the existing Stipulation 1.g. 
 
5. 
The request that the landscaping shall be limited to the Sonoran Plant List with the 
addition of Cercidium Hybrid (Desert Museum Palo Verde), Quercus Virginiana (Live 
Oak), and Pistacia X 'Red-Push (Red Push Pistache) has been approved. 
 
6. 
The request for pedestrian access to be provided to the development to the south is 
approved. The developer has agreed to work with the residential developer to the 
south to provide access. 
 
Additional Stipulations: 
 
7. 
The site is identified as archaeologically sensitive and three additional stipulations are 
recommended to be included to address requirements for archaeological survey and 
testing. 
 
8. 
The applicant did not submit a Proposition 207 waiver of claims prior to the Planning 
Hearing Officer hearing. Submittal of this form is an application requirement. An 
additional stipulation is recommended to require the applicant to record this form and 
deliver it to the City to be included in the rezoning application file for record. 
 
Stipulations:  
 
1. 
Site Planning: 
 
 
 
a. 
That The development shall be in general conformance with the site plan dated 
STAMPED OCTOBER 6, 2023 August 27, 2001, AS APPROVED OR MODIFIED 
BY THE FOLLOWING STIPULATIONS AND APPROVED BY THE PLANNING 
AND DEVELOPMENT DEPARTMENT. with specific regard to areas to be 
counted towards approximation of the 50% open space requirements in the MUA 
as may be approved by DSD, and represented by: 
 
 
 
 
 
x A circular open space tract in the residential area. 
 
 
 
 
 
 
x Linear pedestrian tracts in the east and south connecting to adjacent 
properties. 
 
 
 
 
 
 
x A pedestrian link from the residential to the commercial areas in the north 
and crossing 32nd Street. 
 
 
 
 
b. 
Landscaped-tree lined strips that run along both sides of all local streets in the 
residential area. This landscaped strip shall include a meandering sidewalk as 
shown on the site plan.

c. 
b. 
That the height for commercial buildings be limited to one story along Baseline 
Road, as specified on the site plan. 
 
 
 
 
d. 
That a Homeowners Association (HOA) be created to maintain all areas 
specified in 1.a. 
 
 
 
 
e. 
That a design for the gated entry for the residential area shall be provided to the 
PHO for review prior to Preliminary Site Plan approval. 
 
 
 
 
f. 
c. 
That solid walls be allowed on the interior perimeter walls (east and south) not 
the walls along 32nd Street or Baseline Road. These solid walls must incorporate 
controlled gates where they intersect the linear pedestrian tracts in the east and 
south that connect to adjacent properties so pedestrian connections with future 
adjacent developments is allowed. 
 
 
 
 
g. 
d. 
 
THE SURFACE OF PARKING STALLS SHALL BE COMPOSED OF AN 
ALTERNATIVE TO ASPHALT OR CONCRETE, AS APPROVED BY THE 
PLANNING AND DEVELOPMENT DEPARTMENT. That 81 parking stalls 
between the residential and commercial use shall be built with an alternative 
paving material. 
 
 
 
 
e. 
A MINIMUM OF 10% OF THE REQUIRED PARKING SPACES SHALL BE 
LEVEL 2 OR GREATER EV READY. 
 
 
 
 
f. 
A MINIMUM FIVE BICYCLE SPACES SHALL BE PROVIDED CONSISTING OF 
INVERTED U AND/OR ARTISTIC RACKS LOCATED NEAR THE BUILDING 
ENTRANCES OR IN A SECURE LOCATION INSIDE THE BUILDING AND 
INSTALLED PER THE REQUIREMENTS OF SECTION 1307.H., AS 
APPROVED BY THE PLANNING AND DEVELOPMENT DEPARTMENT. 
 
 
 
 
g. 
THE LANDSCAPING SHALL BE LIMITED TO THE SONORAN PLANT LIST 
WITH THE ADDITION OF CERCIDIUM HYBRID (DESERT MUSEUM PALO 
VERDE), QUERCUS VIRGINIANA (LIVE OAK), AND PISTACIA X 'RED-PUSH 
(RED PUSH PISTACHE). 
 
 
 
 
h. 
ACCESS TO THE PROJECT TO THE SOUTH SHALL BE REQUIRED 
SUBJECT TO ADA STANDARDS. 
 
 
 
2. 
Building Design: 
 
 
 
2.1 Commercial Buildings 
 
 
 
a. 
That the applicant shall submit detailed elevations of the commercial buildings 
detailing the open areas between the buildings. These connections shall be 
made through “transparent” type of architectural elements working as shading 
devices. These elements may include arcades, ramadas, isolated-decorative 
walls, columns, and other elements that help define and support a shaded 
pedestrian environment but allow the flow of vistas. This information shall be 
submitted for review to the Planning Hearing Officer at the time of Preliminary 
Site Plan approval.

b. 
THE BUILDING ELEVATIONS SHALL BE IN GENERAL CONFORMANCE 
WITH ELEVATIONS DATE STAMPED JANUARY 31, 2024, AS APPROVED 
BY THE PLANNING AND DEVELOPMENT DEPARTMENT. 
 
 
  
 
c. 
ANY BUILDING NOT REFLECTED IN THE ABOVE REFERENCED 
ELEVATIONS SHALL BE PRESENTED FOR REVIEW AND COMMENT TO 
THE SOUTH MOUNTAIN VILLAGE PLANNING COMMITTEE PRIOR TO 
PRELIMINARY SITE PLAN APPROVAL.  
 
 
  
 
d 
ALL BUILDING ELEVATIONS SHALL INCLUDE SIMILAR BUILDING 
MATERIALS AND HAVE A SIMILAR OR COMPATIBLE DESIGN AS THE 
ELEVATIONS DATE STAMPED JANUARY 31, 2024, AS APPROVED BY THE 
PLANNING AND DEVELOPMENT DEPARTMENT. 
 
 
 
 
2.2 Residential Buildings 
 
 
 
a. 
That only one-story houses shall be built on the south property line and 30% of 
overall units shall be at one story. 
 
 
 
 
b. 
The floor plans shall be consistent with the elevations that reflect a rural design 
based on the “Tuscan Architecture” style illustrated by the applicant. 
 
 
 
3. 
Streets and rights-of-way: 
 
 
 
a. 
That a right-of-way totaling 60 feet shall be dedicated for the south half of 
Baseline Road. 
 
 
 
 
b. 
That right-of-way for 32nd Street realignment shall be dedicated as per plans 
approved by the City of Phoenix. The future intersection for 32nd Street at 
Baseline Road shall be flared to the minimum extent necessary and tapered in 
the shortest reasonable distance to function with the existing improvements on 
the north side of Baseline and with the future 40 foot of pavement within the 60 
foot of right-of-way planned for 32nd Street on the south side of Baseline Road. 
Additional improvements may be required to accommodate left turn access to the 
proposed driveways. 
 
 
 
 
c. 
That a 21 foot by 21 foot right-of-way triangle shall be dedicated at the southeast 
and southwest corners of 32nd Street and Baseline Road. 
 
 
 
 
d. 
That sufficient right-of-way shall be dedicated to accommodate a bus bay (Detail 
P-1256) on Baseline Road east of 32nd Street (new alignment). 
 
 
 
 
e. 
That rights-of-way dedications and street alignments for local streets within the 
subdivision will be determined by DSD at the time of Preliminary Subdivision Plat 
Review. 
 
 
 
 
f. 
That the developer shall construct all streets within and adjacent to the 
development with paving, curb, gutter, sidewalk, curb ramps, streetlights, median 
islands, landscaping, and other incidentals as per plans approved by the city. All 
improvements shall comply with all ADA accessibility standards.

g. 
The applicant shall complete and submit the Developer Project Information form 
for the MAG Transportation Improvement Program to the Street Transportation 
Department (602-262-6193). This form is a requirement of the EPA to meet clean 
air quality requirements. 
 
 
 
 
h. 
That sufficient right-of-way must be provided for an underground tunnel crossing 
Baseline Road running on the west side of the 32nd Street (realignment) as may 
be approved by the Parks, Recreation and Library Department and Street 
Transportation Department. This right-of-way should be approximately 100 feet 
by 50 feet from the right-of-way of Baseline Road at the southwest corner of 
Baseline Road and 32nd Street realignment. 
 
 
 
4. 
ARCHAEOLOGY: 
 
 
 
a. 
IF DETERMINED NECESSARY BY THE PHOENIX ARCHAEOLOGY OFFICE, 
THE APPLICANT SHALL CONDUCT PHASE I DATA TESTING AND SUBMIT 
AN ARCHAEOLOGICAL SURVEY REPORT OF THE DEVELOPMENT AREA 
FOR REVIEW AND APPROVAL BY THE CITY ARCHAEOLOGIST PRIOR TO 
CLEARING AND GRUBBING, LANDSCAPE SALVAGE, AND/OR GRADING 
APPROVAL. 
 
 
 
 
b. 
IF PHASE I DATA TESTING IS REQUIRED, AND IF, UPON REVIEW OF THE 
RESULTS FROM THE PHASE I DATA TESTING, THE CITY 
ARCHAEOLOGIST, IN CONSULTATION WITH A QUALIFIED 
ARCHAEOLOGIST, DETERMINES SUCH DATA RECOVERY EXCAVATIONS 
ARE NECESSARY, THE APPLICANT SHALL CONDUCT PHASE II 
ARCHAEOLOGICAL DATA RECOVERY EXCAVATIONS. 
 
 
 
 
c. 
IN THE EVENT ARCHAEOLOGICAL MATERIALS ARE ENCOUNTERED 
DURING CONSTRUCTION, THE DEVELOPER SHALL IMMEDIATELY CEASE 
ALL GROUND-DISTURBING ACTIVITIES WITHIN A 33-FOOT RADIUS OF 
THE DISCOVERY, NOTIFY THE CITY ARCHAEOLOGIST, AND ALLOW TIME 
FOR THE ARCHAEOLOGY OFFICE TO PROPERLY ASSESS THE 
MATERIALS. 
 
 
 
4. 
5. 
Trails: 
 
 
 
 
a. 
A 30-FOOT-WIDE MULTI-USE TRAIL EASEMENT (MUTE) SHALL BE 
DEDICATED ALONG THE SOUTH SIDE OF BASELINE ROAD AND THE 
WEST SIDE OF 32ND STREET AND A MINIMUM 10-FOOT-WIDE MULTI-USE 
TRAIL (MUT) SHALL BE CONSTRUCTED WITHIN THE EASEMENT IN 
ACCORDANCE WITH THE MAG SUPPLEMENTAL DETAIL AND AS 
APPROVED OR MODIFIED BY THE PLANNING AND DEVELOPMENT 
DEPARTMENT. 
That a 25 foot easement shall be provided on the west side of 32nd Street and 
along Baseline Road to incorporate a multi-use trail as indicated on the South 
Mountain Village/Laveen Village Trail System map. Plans must be submitted to 
the Parks, Recreation and Library Department for final approval.

b. 
That the developer shall provide an alternative paving material where the 
entrance driveway crosses the equestrian trail. The alternative paving material 
shall be as wide as the equestrian trail and must be used across the entire width 
of the street or driveway. The alternate paving material and the material used at 
the street/trail interface shall be acceptable to the Parks, Recreation and Library 
Department and Street Transportation Department. 
 
 
 
5. 
6. 
Other issues: 
 
 
 
a. 
That upon approval of this request by City Council, the South Mountain Village 
Planning Committee will be notified of any subsequent modifications and/or 
deletions of stipulations and/or variances. 
 
 
 
 
b. 
PRIOR TO PRELIMINARY SITE PLAN APPROVAL, THE LANDOWNER SHALL 
EXECUTE A PROPOSITION 207 WAIVER OF CLAIMS IN A FORM 
APPROVED BY THE CITY ATTORNEY'S OFFICE.  THE WAIVER SHALL BE 
RECORDED WITH THE MARICOPA COUNTY RECORDER'S OFFICE AND 
DELIVERED TO THE CITY TO BE INCLUDED IN THE REZONING 
APPLICATION FILE FOR RECORD. 
 
 
 
 
b. 
c. 
That the development shall commence construction within 24 months of the 
rezoning request approval by City Council. 
 
 
 
 
d. 
PEDESTRIAN ACCESS SHALL BE PROVIDED TO THE DEVELOPMENT TO 
THE SOUTH, SUBJECT TO ADA STANDARDS AND AS APPROVED BY THE 
PLANNING AND DEVELOPMENT DEPARTMENT.  
 
 
 
 
e. 
THE AMOUNT OF CUT AND FILL SHALL BE THE MINUIMUM AMOUNT 
NECESSARY TO ACCOMMODATE SITE INFRASTRUCTURE AND THE 
ACCESSIBLE PEDESTRIAN PATHWAY CONNECTING TO THE 
DEVELOPMENT TO THE SOUTH, AS APPROVED BY THE PLANNING AND 
DEVELOPMENT DEPARTMENT. 
 
 
 
 
f. 
ON-SITE LIGHTING SHALL BE ACCOMPLISHED WITH LOW LEVEL, 
UNIFORM LIGHTING FIXTURES DISPERSED THROUGHOUT THE SITE 
WITH A LUMEN RATING OF 3,000 OR LESS. 
 
 
 
 
g. 
THE LANDSCAPING FOR THE PROJECT SHALL BE EQUAL TO OR 
BETTER THAN THE LANDSCAPE DESIGN SHOWN ON THE LANDSCAPE 
PLAN PRESENTED TO THE SOUTH MOUNTAIN VILLAGE PLANNING 
COMMITTEE BY THE APPLICANT ON NOVEMBER 14, 2023, OR AS 
REQUIRED BY OTHER CITY CODE, WHICH EVER IS GREATER.  
 
This publication can be made available in alternate format upon request. Please contact Teleia  
Galaviz at 602-291-2559, teleia.galaviz@phoenix.gov, TTY: Use 7-1-1.