SRP - CO8 GILBERT ROAD BRIDGE 6-12-2023.PDF

Maricopa County — Formal (2023-06-28)

View PDF Item 104 Meeting page

Extracted text (via ocr_local) 7605 characters
FDR

hdrinc.com

May 25, 2023

Farzana Yasmin

Maricopa County Department of Transportation
2901 West Durango Street

Phoenix, AZ 85009

Dear Ms. Yasmin,

We are pleased to submit this scope and fee proposal for additional post design services on the Gilbert Road
Bridge at Salt River Project. This change order (#08) reflects additional post design services that were not
included with Change Order # 06, dated 4/21/2020.

Please find attached the scope and fee proposal for the additional work.

Thank you for considering the associated changes to help us to work toward completion of this important
project. Please don’t hesitate to contact Ravi Sripada (602-385-1622, ravi.sripada@hdrinc.com) should you
have any questions or concerns.

Sincerely,
HDR Engineering

CBee ae as

Aaron Meilleur, P.E. Ravi Sripada, P.E.
Senior Vice President Senior Transportation Project Manager

Area Manager

20 E Thomas Road
Suite 2500
Phoenix, AZ 85012

Scope of Services — Gilbert
Road Bridge at the Salt River

Post Design Services
Change Order # 08

Gilbert Road Bridge at the Salt River

Consultant: HDR Engineering
Project No: TT0339
Contract No.: 2015-039

Maricopa County
Department of Transportation
2901 W. Durango Street
Phoenix, AZ 85009

May 2023

Scope of Services
Post Design Services
Change Order # 08

SCOPE OF SERVICES — POST DESIGN (CHANGE ORDER # 08)

HDR will provide post design services during the construction of Gilbert Road Bridge at the Salt River
with anticipated construction duration of 24 months. The scope of services as outlined below reflects
additional post design services that were not included with Change Order (CO) # 06, dated 4/21/2020
for this project.

1100.1.3 Request for Information (RFIs)

HDR will provide official response to the RFIs issued throughout construction. Considering the
complex nature of the project coupled with 24-month construction duration, CO # 08 includes a total of
one hundred (100) RFIs in addition to the 22 RFIs that were included with CO # 06.

1100.1.4 Shop Drawing Submittals

HDR will review the following Structure and the Geotechnical shop drawings. The following shop
drawings are in addition to the shop drawings listed on CO #06. Hours included with this CO do not
include hours for shop drawings that have already been reviewed by HDR and by our subconsultants.

Structure Shop Drawings:

e Abutment foundation/shaft reinforcement

e Deck pour schedule/sequence

e Miscellaneous Metals-Expansion Joints etc

e Survey of top of girder elevations

e Girder bracing plan

e Additional miscellaneous structure submittals and resubmittals (max 6)

Geotechnical Shop Drawings:

e Drilled shaft integrity testing results (22 shafts)

e ADOT inspector reports and concrete placement logs

e CSA placement plan and mix design

e Additional miscellaneous geotechnical submittals (max 4)

1100.1.5 General Project Management

This task includes hours for project management and contract administration throughout the 24-month
duration for construction. CO # 08 includes an additional 60 hours for the PM and an additional 24
hours for project administration and coordination. CO # 06 included 12 hours for the PM and 24 hours
for project administration.

1100.1.6 Record Drawings

It is anticipated that MCDOT Survey team will prepare the Record Drawings once construction is
complete. HDR has not included any hours for the preparation of Record Drawings. Hours are included
for the coordination with MCDOT survey team.

Project No.: TT0339 Contract No.: 2015-039
Change Order # 08 Page 2 of 3

Scope of Services
Post Design Services
Change Order # 08

1100.1.7 Design Modifications (MCDOT Requested)

The HDR team will address up to four (4) design modifications during construction. This work will only
be completed with a written request from MCDOT. HDR anticipates development of two (2) plan sheets
at 40 scale (half-size) for each design modification. Hours have been included for the development of
the design modification and plan sheets including QC and coordination with MCDOT.

Project No.: TT0339 Contract No.: 2015-039
Change Order # 08 Page 3 of 3

FEE PROPOSAL - TABLE A

CONSULTANT
COST PROPOSAL SUMMARY
CHANGE ORDER # 08
CONSULTANT: HDR Engineering CONTRACT NO.: 2015-039
PROJECT NAME: Gilbert Road Bridge at the Salt River
DIRECT LABOR
Classifications Man-Hours Hourly Rates Labor Costs
Principal 0.0 106.50 $0.00
Project Manager 184.0 83.25 $15,318.00
Senior Project Engineer 216.0 86.75 $18,738.00
Project Engineer 612.0 67.50 $41,310.00
Senior Engineer 0.0 $6.25 $0.00
Engineer 168.0 42.75 $7,182.00
Designer 0.0 36.75 $0.00
Technician 0.0 51.00 $0.00
Project Administrator 24.0 40.75 $978.00
Secretary/Clerical 0.0 32.75 $0.00
Consultant's Subtotal Direct Labor $83,526.00
Consultant's Overhead @ 155.49% of Direct Labor $129,874.58
Consultant's Profit @ 10% of Direct Labor + Overhead $21,340.06
Consultant's Total Direct Labor $234,740.64
DIRECT AND OUTSIDE EXPENSES
Description Expense Amount

Miscellaneous

Consultant's Total Direct and Outside Expenses

$0.00

SUBCONSULTANT(s)
Name of Subconsultant DBE Task ‘Total Cost

JE Fuller Additional Scour Analysis $0.00
J2 x Onsite Drainage, Hydraulic Analysis $0.00
Lee Engineering Traffic, ITS $0.00
Terracon Additional Geotechnical Borings $0.00
Total Subconsultant(s) $0.00

Consultant's Total Direct Labor $234,740.64

Consultant's Total Direct and Outside Expenses $0.00

Total: $234,740.64
Consultant's Totals of Direct Labor and Direct and Outside Expenses $234,740.64
TOTAL PROPOSED FEE $234,740.64

(Inclusive of Consultant and Subconsultant[{s] total proposed fee.)

HDR Engineering
Firm

Sr Vice President, Area Manager
Title

May 30, 2023

Date

uopopodsues. 30 wowyndeg Aung odeauey

doge’| ONCE UPL MUPY Bg - 9 a[qeLSMUIdUD sURUED
£40 €99Va
oo'szs’es $ - S}ooszs S$] - $s] - Soot, Ss] - S| ovore’ty $|oosec'st $|ogatest S| -
O'pOe'T : Ove : : o89T 7 orztg orotz ost -
‘S1eIO4 Walord
ljao'ses‘ess jao'os loo'sz6$ oorag 00's eo'zer'zs —_[O0'os oo'otEe’trs —_fao'sec‘st$ —_[oo’ate’st$ fooros
o'poz'T ~ vz . - O'soT : ozrg o'9tz over > SuNOH-URI {2203GNS
oorpo'ors — [o'zer lo'eet o'ay et 8 (p Xein) (parsanbay LOGI) suoREDyIpoW UEisoq LT OTT
eo'gve'TS ove oT o's. SBujmeiq P1OrY 9"TOOTT
loc'eze’ss loves ove oros uoneu|p007 g UonPASIERUpY 199[o1g
uoUNaBeUueY y0l0s [EIDUAD STOTT
loorsso’es jor oraz o'oz {29/544 OT © v xew) sjenluigns-o1/sjenmuiqns y99j0a8 asw) |eUORIPPY
OO"PEz'TS O'S oe 0°8. 4SISOP XILU pue UEC Judluared Ys>
OSLIZZ$ —|O'OE oroz loot 380] JusWane|d By0/9U09 pue stiodal 201edsul LOGY
oszoz‘ors —_a'ost oroet oor {syeus @z) Synses Sunsoy AynaBaqs ayeUs pallud
(yeaioag) sjennugns duymeig doys
oszzo'rs foros o0E OE {28/534 OT © 9 ew) SpenuUgns-a4/s/eRHUgns Sungan.AS ISIU (EUORIPPY
los'es6s Ort o'er ore uejg 3uDe1g FpAD
ootzs'ts —_|ovez ogt os oe SuOREAapp 19pi1a Jo doz 50 Abang
las‘p9$ O°OT ov ov ore saujof uojsuedxe/sjexoul 951A)
los-ezss oe log oz aouanbas/ainpayss nod y29q
}00°668°7S oer oO oraz o's MEWaDOJUIEs YeYs/uoRepuNgy JuaUNngY
(eanzonaas} sjeuugns Suymesg doys oT OTT
ooosz’zes[oroos o'00e loo0r 0°0OT Gaza/siy s © 5144 0OT) (Sidu} YO!EUNOJU] 10g Wanbox E'T‘OOTT
‘SODIAIDS USISOG ISOd LOOTE ASBL|
‘SUNOH SLTES $L00$ ‘On'tss SC9ES slurs St'95$ os'29$ $988 STERS os'sors | sus
sony sNvA | uap/sos | uupy-fod | uepsuyay | seulsoq | so0ussug sau ‘as siua‘fo | -Suarhaus | wGwefoag | yedouug | jo-on a6vHd/iSv2 LaVaLNOD
WL, W101 *

BEC STO? ON JesUOD

YOAV LIAMIG ONY SYNOH-NYW GALYWILSS
ANVLTASNODENS/LNVLINSNOD

OaTavL

8207 ‘sz Ae tava
FONY TCS SH TE Tapa PEON VOGLD ‘SINWN L93f0Ud
Suyaaus3u9 YOH <aIWN LNVLINSNOIENS/INVLINSNOD