Attachment A- Stipulations- PHO-6-21--Z-100-89-1(2) 
 
Location:  Approximately 410 feet west of the southwest corner of Tatum Boulevard 
and Bell Road 
 
Stipulations: 
 
1. 
That The site plan SHALL be subject to Planning and Development 
Department review as per Section 507 of the Zoning Ordinance. 
 
 
2. 
That THE development, ON ALL BUT THE 0.60 ACRES DEPICTED ON THE 
AUTOZONE SITE PLAN DATE STAMPED SEPTEMBER 14, 2021, SHALL 
be in substantial conformance to the site plan dated December 9, 2012, and 
elevations presented, and that THE development SHALL be limited to no 
more than four freestanding pads, as shown on the site plan, as may be 
modified by the following stipulations AND APPROVED BY THE PLANNING 
AND DEVELOPMENT DEPARTMENT. 
 
 
 
a. 
That Building 3 SHALL be modified (to Buildings 3A and 3B) as shown 
on the site plan dated November 29, 1993. 
 
 
 
 
b. 
That There SHALL be no drive-thru lanes permitted for Buildings 3A or 
3B. 
 
 
 
 
c. 
That BuildingS 3A, 3B and 4 shall be tied together with plazas as 
generally depicted on the site plan dated November 29, 1993. 
 
 
 
 
d. 
That Building 3A and 3B be architecturally integrated and constructed in 
a single phase. 
 
 
 
 
E. 
THE DEVELOPMENT OF THE 0.60 ACRE AUTOZONE PROPERTY 
SHALL BE IN GENERAL CONFORMANCE WITH THE SITE PLAN 
AND ELEVATIONS DATE STAMPED SEPTEMBER 14, 2021, AS 
MODIFIED BY THE FOLLOWING STIPULATIONS AND APPROVED 
BY THE PLANNING AND DEVELOPMENT DEPARTMENT. 
 
 
 
3. 
That A 40-foot landscaped setback SHALL be provided along Bell Road. 
Landscaping shall include mature 2-1/2 inch caliper shade trees to be planted 
20 feet on center or in equivalent groupings as approved by the Planning and 
Development Department. 
 
 
4. 
That Building heights SHALL be limited to 30 feet except for architectural 
embellishments which shall not exceed 40 feet in height. 
 
 
5. 
That Any commercial center signage SHALL be identified and approved 
through the use permit procedure for a Comprehensive Sign Package, with 
the PSC zoning district being applicable.

6. 
That All structures SHALL be integrated with similar or harmonious materials, 
surface textures, and color as approved by the Planning and Development 
Department. 
 
 
7. 
That The wall treatment, including texture, coloration, and building materials 
shall be consistent around each entire structure exclusive of architecturally 
embellished parapets. 
 
 
8. 
That No truck unloading shall occur within 50 feet of the adjacent R1-10 
zoned properties. 
 
 
9. 
The developer will be responsible for 100 percent of the cost of a traffic signal 
on Bell Road at the main driveway, when warranted, as determined by the 
Street Transportation Department. 
 
 
10. 
The following right-of-way is to be provided within 30 days of final City Council 
approval for the improvements to be installed with the Bell Road Major Street 
Project (P-874289): 
 
 
 
a. 
The developer is to dedicate right-of-way for both Bell Road and Tatum 
Boulevard as per Street Improvement Project P-874289. 
 
 
 
 
b. 
Paving plans for P-874289 show a bus bay on Tatum Boulevard, just 
south of Bell Road. The bus bay is to be extended to provide a 
continuous 10-foot-wide right-turn lane to the main driveway on Tatum 
Boulevard. Right-of-way for the bus bay/right-turn lane is to be 
dedicated by the developer. 
 
 
 
 
c. 
The developer shall dedicate right-of-way for a 100-foot-long 10-foot-
wide right-turn lane with a 120-foot transition on Bell Road at the future 
signalized driveway. The 40-foot landscaped setback described in 
Stipulation No. 3 above shall be measured from the existing Bell Road 
right-of-way and shall include all necessary dedications required by 
Planning and Development Department or other applicable City 
departments. 
 
 
 
 
d. 
The developer is to dedicate right-of-way for a bus bay (Detail P-1257) 
on Bell Road just east of the future signalized driveway. The 40-foot 
landscaped setback described in Stipulation No. 3 above shall be 
measured from the existing Bell Road right-of-way and shall include all 
necessary dedications required by Planning and Development 
Department or other applicable City departments. 
 
 
 
11. 
The developer is to provide funds in escrow prior to final Planning and 
Development Department site plan approval for all adjacent curb, gutter and 
sidewalk improvements, including bus bay modifications and right turn lanes 
as indicated above.

12. 
That Shade protected walkways connecting transit facilities, detached pads, 
and the principal structure, and shade trees adjacent to transit waiting areas 
SHALL be provided as approved by the Planning and Development 
Department. 
 
 
13. 
The 20-foot landscaped buffer within the 50-foot rear and side yard setbacks 
shall be planted with mature shade trees 12 to 14 feet in height and 20 feet 
on center or in equivalent groupings. The details of the landscaping plan shall 
be approved through Planning and Development Department with the direct 
involvement of the property owners abutting the site along the south and west 
property lines. 
 
 
14. 
The dumpster for the grocery store shall be an enclosed compactor system 
with a misting component to prevent odors and pests. 
 
 
15. 
Speed bumps shall be placed along all driveways located at the rear of the 
buildings. 
 
 
16. 
All rear yard security lighting shall be placed in the landscaped buffer and 
shall be directed away from any residential area. 
 
 
17. 
Developer shall apply for a variance to permit an eight-foot decorative block 
or stucco wall to be placed along the west and south property lines. 
Developer shall construct the decorative boundary wall prior to 
commencement of construction and shall be responsible for the removal and 
disposal of existing fencing separating the site from the properties of adjacent 
property owners. 
 
 
18. 
Truck deliveries to the shopping center shall be prohibited between the hours 
of 11:00 p.m. and 6:00 a.m. 
 
 
19. 
No trash compactors servicing the shopping center shall be operated 
between the hours of 11:00 p.m. and 6:00 a.m. 
 
 
20. 
The shopping center shall be regularly monitored by a security patrol 
engaged by the developer or the shopping center tenants. 
 
 
21. 
All entrances to the shopping center shall be paved with red bomanite. 
 
 
22. 
All pads shall be landscaped simultaneously with the landscaping of the 
shopping center. 
 
 
23. 
All HVAC units installed in the shopping center shall have vertical exhaust 
features. 
 
 
24. 
Deterrent type plant material shall be placed on the side of the decorative 
block fence which faces the shopping center for security purposes. 
 
 
25. 
That A three-foot berm or wall SHALL be provided along Bell Road.

26. 
That Development SHALL commence within 24 months of final City Council 