Attachment D - Applicant Packet - PHO-2-21--Z-47-19-7.pdf

City of Phoenix — Formal (2021-12-15)

View PDF Meeting page

Extracted text (via pymupdf) 116605 characters
PLEASE RESPOND ELECTRONICALLY TO BRAD WYLAM 2ND FLOOR, 602-256-3322 
To: 
Departments Concerned 
Date: September 21, 2021 
From: 
Alan Stephenson 
Planning & Development Department Director 
Subject:   P.H.O. APPLICATION NO. PHO-2-21--Z-47-19-7 – Notice of Pending Actions  
 by the Planning Hearing Officer 
1.
Your attention is called to the fact that the Planning Hearing Officer will
consider the following case at a public hearing on October 20, 2021.
2.
Information about this case is available for review at the Zoning Counter in
the Planning and Development Department on the 2nd Floor of Phoenix City
Hall, telephone 602-262-7131, Option 6.
3.
Staff, please indicate your comments and respond electronically to
pdd.pho@phoenix.gov or you may provide hard copies at the Zoning Counter
in the Planning and Development Department on the second floor of Phoenix
City Hall by September 28, 2021.
DISTRIBUTION
Mayor’s Office (Lisa Fernandez), 11th Floor 
City Council (Sina Matthes, Tony Motola ), 11th Floor 
Aviation (Sheldon Daisley)
CED (Michelle Pierson), 20th Floor 
Fire Prevention (Aaron Conway), 2nd Floor
Light Rail (Joel Carrasco/Special TOD Only)   
Neighborhood Services (Gregory Gonzales, Lisa Huggins), 4th Floor 
Parks & Recreation (Natasha Hughes), 16th Floor 
Public Transit (Kathryn Boris)
Public Works (Ray Dovalina, Kristina Jensen, Elise Moore, Rudy Rangel), 5th Floor 
Street Transportation Department (Maja Brkovic, Alan Hilty, Chris Kowalsky), 5th Floor 
Street Transportation - Ped. Safety Coordinator (Mailen Pankiewicz), 5th Floor 
Water Services (Don Reynolds, Victor Romo), 8th Floor
Planning and Development (Alan Stephenson, Joshua Bednarek), 3rd Floor 
Planning and Development/Information Services (Ben Ernyei, Andrew Wickhorst), 4th 
Floor
Planning and Development/Historic Preservation Office (Kevin Weight), 3rd Floor 
Planning Hearing Officer (Tricia Gomes, Adam Stranieri, Brad Wylam), 2nd Floor 
Village Planner (Sofia Mastikhina, Laveen Village) 
Village Planning Committee Chair (Tonya Glass, Laveen Village)
Attachment D

200 W Washington Street, 2nd Floor * Phoenix, Arizona 85003 * Tel: (602) 262-7131 * Fax: (602) 495-3793
APPLICATION FOR PLANNING HEARING OFFICER ACTION
APPLICATION NO: PHO-2-21--Z-47-19
Council District: 7       
   
Request For: 
Stipulation Modification
    Reason for Request:   Modification of Stipulation 1 regarding general conformance to the Conceptual Master Site Plan date
stamped October 23, 2019.   Review of site plan, landscape plan, and elevations by the Planning Hearing Officer per Stipulation
33.   Modification of Stipulation 34 regarding a minimum 10 percent common area open space.  
   
Owner
Applicant
Representative
Laveen Baseline, LLC
Michael Trueman
Tanya Aksamentova
1707 East Highland Avenue, Suite 100
20410 North 19th Avenue
20410 North 19th Avenue
Phoenix AZ 85016
Phoenix AZ 85027
Phoenix AZ 85027
(602) 631-6101
(480) 217-4727
P: (480) 798-9444  F: 
banderson@kitchell.com                  
mjtrueman@drhorton.com                  
mjtrueman@drhorton.com                  
     Property Location: Approximately 650 feet north of the intersection of 59th Avenue and South Mountain Avenue
                                                                                                                                           
  
Zoning Map: D-5
Quarter Section: 01-14
APN: 300-02-927B
Acreage: 10.74
  
Village: Laveen  
Last Hearing: CC HEARING
Previous Opposition: 
Date of Original City Council Action: 01/08/2020 230 PM
Previous PHO Actions: 
Zoning Vested: C-2 HGT/WVR         
Supplemental Map No.: 
Planning Staff: 071773    
      An applicant may receive a clarification from the city of its interpretation or application of a statute, ordinance, code or authorized
substantive policy statement. To request clarification or to obtain further information on the application process and applicable
review time frames, please call 602-262-7131 (option 6), email zoning.mailbox@phoenix.gov or visit our website at
http://phoenix.gov/pdd/licensetimes.html.
   A Filing Fee had been paid to the City Treasurer to cover the cost of processing this application. The fee will be retained to cover
the cost whether or not the request is granted
   
Fee 
Fee Waived
Fee Date
Receipt
Purpose
$1,725.00
$0.00
09/02/2021
21-0084023
Original Filing Fee
   
Signature of Applicant: _____________________________________________________         DATE: ___________________
   
Hearing Results
   
Planning Hearing Officer
Planning Commission
City Council
Date: 10/20/2021 1000 AM
Date:
Date:
Appealed?:
Appealed?:
Action:
Action:
Action:

BERRY RIDDELL LLC 
September 16, 2021 
Page 1 
 
6750 E. Camelback Rd., #100 
Scottsdale, AZ 85251 
Office: 480-385-2727 
www.berryriddell.com 
 
wr@berryriddell.com 
Direct: 480-682-3902 
 
 
September 16, 2021 
 
Via Hand-delivery to: 
 
City of Phoenix 
Attn: Planning Hearing Officer 
200 W Washington Street, 2nd Floor 
Phoenix, Arizona 85003 
 
Re: 
Request for Planning Hearing Officer Approval / Z-47-19 
 
Dear Planning Hearing Officer: 
 
The purpose of this correspondence is to seek approval of several stipulation modifications and 
approval of a site plan, landscape plan, and elevations pursuant to Z-47-19 to allow for a 130-unit 
DR Horton multi-family development called Ascend at South Mountain. The  property is located 
north of the northwest corner of 59th Avenue and South Mountain Avenue (the “Site”). The Site 
is located within the Laveen Village.

BERRY RIDDELL LLC 
September 16, 2021 
Page 2 
 
 
 
 
In 2019, the site outlined below in yellow was rezoned from S-1 (approved CP/GCP and/or C-2) to 
28.64 acres of C-2, 23.27 acres of R-4, and 76.7 acres of CP/GCP to refine the former “cafeteria 
zoning” and create a path forward for the development of a master plan. The first phase of the 
plan is for the Harkins theatre, with subsequent phases to follow as users for the various sites 
were found. A Conceptual Master Site Plan was developed and presented through the Public 
Hearing Process to divide the site into five distinct districts and account for the remaining 
phases that currently had no specific users. Zoning Case Z-47-19 is subject to 60 stipulations, 12 
of which apply to the overall rezoning area, including general conformance to the site locations 
shown on the Conceptual Master Site Plan, and six apply only to Site C. Part of the stipulation 
modification request will to be incorporate approximately 10.38 gross acres of the “Site A” and 
“Site B” into “Site C”; thus, requiring compliance with “Site C” stipulations. 
 
Conceptual Master Site Plan as approved per Z-47-19

BERRY RIDDELL LLC 
September 16, 2021 
Page 3 
 
 
The Proposal 
The Site is proposed as 130-unit agrarian style single-family style rental community that functions like a 
grouping of attached single-family dwelling units akin to a compact single-family subdivision which 
encourages compatibility with the surrounding context. The development features its own centralized 
amenities including an open space community area, clubhouse, dog park, and resort-style pool. Buildings 
are grouped to create courtyards, with inviting landscaping to support healthy neighborhood 
interactions. It will fill a need in the market for those renters who want a backyard and the privacy offered 
by a single-family layout, but don’t want the financial and maintenance responsibilities associated with 
owning a traditional single-family home. 
 
 
 
 
Stipulation Modifications 
 
Overall Site Stipulations   
 
The stipulations from the original zoning case were broken into five different site areas, in addition 
to overall site stipulations. The overall zoning case was broken into smaller pieces to allow for 
appropriate stipulations to be placed with specific zoning districts and development types.  
 
#1 
The development shall be in General Conformance to the Conceptual Master Site Plan 
date stamped October 23, 2019 SEPTEMBER 02, 2021, with specific regard to the site 
locations, as approved by the Planning and Development Department. 
 
Response: To best address the proposed multi-family development, the expansion of “Site C” to 
the north to encompass this Site is proposed. As part of the original zoning case, it was envisioned 
to have multi-family adjacent to the commercial development with pedestrian connectivity. By 
extending the “Site C” area to the north, the original intent will be maintained while allowing for 
compliance with all original stipulations for “Site C”.

BERRY RIDDELL LLC 
September 16, 2021 
Page 4 
 
 
 
 
 
Stipulations – Site C (Multifamily) 
 
One of the six stipulations that apply to “Site C” requires approval of a site plan, landscape plan, 
and elevations by the Planning Hearing Officer (“PHO”) through the public hearing process to 
show compliance with applicable goals and policies of the Southwest Growth Study. The 
Southwest Growth Study was created to guide development in Laveen after the area was annexed 
into the City of Phoenix is 1995, and to preserve the community’s agrarian character. The policy 
document provides design policies and standards, with regard to architectural style, pedestrian 
connectivity, and shade. The plans have been designed to be in compliance with those policies 
and standards, particularly those included in Stipulation 33 of the zoning case, as outlined below. 
 
33. 
The site plan, landscape plan showing pedestrian circulation and elevations shall 
be reviewed and approved by the Planning Hearing Officer through the public hearing process 
prior to preliminary site plan approval for conceptual review of the applicable provisions of 
the goals and policies of the Southwest Growth Study which shall include the following: 
 
a. 
Promoting pedestrian connections with the adjacent commercial development 
through sidewalks, detached sidewalks, and overall connectivity including:

BERRY RIDDELL LLC 
September 16, 2021 
Page 5 
 
 
b. 
A minimum of three evenly disperse pedestrian connection points to the 
commercial development to the north. This pedestrian connection shall be clearly 
defined and minimize vehicular conflicts. 
 
Response: As proposed, Ascend at South Mountain includes three evenly spaced pedestrian 
connections to the future commercial development to the north. The shaded pathways feature 
self-closing, ADA compliant pedestrian gates. An interconnected network of pathways traverse 
the Site so that residents can safely and comfortably travel to and from the commercial 
development, encouraging synergy between the land uses. Additionally, a separated sidewalk is 
located along 59th Avenue connected to internal pathways so that residents can easily leave the 
Site to access the adjacent bus stop, bike or walk or surrounding properties, etc. 
 
c. 
Arcades and overhangs shall be incorporated into the buildings to promote shade. 
 
Response: The proposed building designs features architectural integral overhangs that provide 
amble shade while also promoting agrarian theming. The roof line varies on each proposed 
product type, but each building style provides a minimum of one gable style overhang.  
 
 It is important to note that the use of “arcades” is more in line with traditional apartment styles 
that have interconnected buildings with multiple levels. The product type proposed on site 
mimics the styling of single-family homes and provides architecturally integrated overhangs, 
which meets the intent of this review criteria.  
 
d. 
All building facades shall contain architectural embellishments and detailing such 
as textural changes, pilasters, offsets, recesses, window fenestration, shadow 
boxes and overhead/canopies at least every 50 linear feet, as approved by the 
Planning and Development Department. 
 
 
Response: Building façades feature frequent color and material changes, vertical and horizontal 
elements, architectural integral overhangs, and pop-outs to create visual interest and encourage 
shade within the development. This articulation happens more frequently than 50 linear feet.

BERRY RIDDELL LLC 
September 16, 2021 
Page 6 
 
e. 
Ensuring architectural style is consistent with prior phases of the project and 
development in the area. 
 
Response: Ascend at South Mountain is the second phase within Z-47-19 to proceed with the 
preliminary site plan approval stage, with Harkins being the first. Ascend at South Mountain has 
been designed to be consistent with the architectural details found within the Harkins design 
and other surrounding developments. Common elements include desert-toned stucco, stone 
work, etc.  By utilizing high-quality design and materials, Ascend at South Mountain sets a 
precedent for the remainder of the rezoning boundary, ensuring superior architectural style and 
materials throughout Laveen Park Place. 
 
 
#34 
 There shall be a minimum of 10 percent common area open space provided on site. THIS OPEN 
SPACE SHALL BE A COMBINATION OF COMMON AREA OPEN SPACE AND PRIVATE OPEN SPACE, 
as approved by the Planning and Development Department.  
 
Response: Ascend at South Mountain is a unique community as the units are designed in clusters to 
mimic a single-family subdivision, which includes each unit having the luxury of their own private open 
space area. As proposed, each unit will have a private backyard space totaling a minimum of 200 square 
feet each. In addition to the private open space, the community will have a luxury style clubhouse for 
use by the residents, a pool, a cabana, barbeques, and additional communal gathering spaces. Given the 
unique nature of the design of the private open space within the units, the residents of the community 
will have ample open space to enjoy both in combination of private and public spaces. The cumulative 
open space providing, including both public and private, totals a minimum of 15% of the gross site area. 
A graphic depicting the breakdown of open space can be found as an exhibit to this application.

BERRY RIDDELL LLC 
September 16, 2021 
Page 7 
 
 
 
It is also important to note that this development site will be including three pedestrian access points to 
the commercial development to the north. Through the commercial development to the north there is 
direct access to the Laveen Area Conveyance Channel (“LACC”). The LACC is a drainage channel that 
spans from 59th Avenue to the 79th Avenue alignment and provides recreational opportunities, including 
a multi- use trail.  
 
Your attention to this matter is greatly appreciated. Please feel free to reach out to 
me directly with questions. 
 
Wendy Riddell 
Very truly yours,

follows: 
Official Records of Maricopa County Recorder 
ADRIAN FONTES 
ORDINANCE G-6659 
20200043095 01/16/2020 03:30 
ELECTRONIC RECORDING 
G6659-17-1-1-
AN ORDINANCE AMENDING THE ZONING DISTRICT MAP 
ADOPTED PURSUANT TO SECTION 601 OF THE CITY OF 
PHOENIX ORDINANCE BY CHANGING THE ZONING DISTRICT 
CLASSIFICATION FOR THE PARCEL DESCRIBED HEREIN 
(CASE Z-47-19-7) FROM S-1, APPROVED CP/GCP AND/OR C-2 
(RANCH OR FARM RESIDENCE DISTRICT, APPROVED 
COMMERCE PARK/GENERAL COMMERCE PARK DISTRICT 
AND/OR INTERMEDIATE COMMERCIAL DISTRICT) TO CP/GCP 
(COMMERCE PARK/GENERAL COMMERCE PARK DISTRICT), 
C-2 HGTNVVR (INTERMEDIATE COMMERCIAL, HEIGHT
WAIVER), AND R-4 (MULTIFAMILY RESIDENCE DISTRICT).
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF PHOENIX, as 
SECTION 1. The zoning of a 128.61 acre site located at the southeast 
corner of 63rd Avenue and Baseline Road in a portion of Sections 5 and 6, Township 1 
South, Range 2 East, as described more specifically in Exhibit "A," is hereby changed 
from "S-1, Approved CP/GCP and/or C-2" (Ranch or Farm Residence District, Approved 
Commerce Park/General Commerce Park District and/or Intermediate Commercial 
District) to 76.70 acres of "CP/GCP" (Commerce Park/General Commerce Park 
District), 28.64 acres of "C-2 HGTNVVR" (Intermediate Commercial, Height Waiver), 
and 23.27 acres of "R-4" (Multifamily Residence District) to allow commerce park

development, commercial development with a height waiver for up to 56 feet and 
multifamily residential. 
SECTION 2. The Planning and Development Director is instructed to 
modify the Zoning Map of the City of Phoenix to reflect this use district classification 
change as shown in Exhibit "B." 
SECTION 3. Due to the site's specific physical conditions and the use 
district applied for by the applicant, this rezoning is subject to the following stipulations, 
violation of which shall be treated in the same manner as a violation of the City of 
Phoenix Zoning Ordinance: 
Overall Site 
1.
The development shall be in General Conformance to the Conceptual Master
Site Plan date stamped October 23, 2019, with specific regard to the site
locations, as approved by the Planning and Development Department.
2.
All parking areas adjacent to public streets, excluding the freeway, shall be
screened by a combination of decorative screen walls and a minimum 3-foot high
landscaped mound/berm along the perimeter streets, as approved by the
Planning and Development Department.
3.
All sidewalks adjacent to public streets shall be detached with a minimum 5-foot
wide continuous landscape area located between the sidewalk and back of curb;
and shall include minimum 3-inch caliper, large canopy single-trunk shade trees
(limbed-up a minimum of 10-feet clear from finish grade), planted 25 feet on center
or in equivalent groupings; and minimum 5-gallon shrubs with a maximum mature
height of 2 feet providing 75 percent live cover, as approved by the Planning and
Development Department. If there is limited right-of-way along the Baseline Road
frontage requiring a modified cross section, an attached sidewalk design may be
considered, as approved by the Planning and Development Department.
4.
The developer shall provide clearly defined, accessible pathways at vehicular
crossings, constructed of decorative pavement that visually contrasts with the
adjacent parking and drive aisle surfaces for internal drive aisles and
accessways, as approved by the Planning and Development Department.
2 
Ordinance G-6659

5.
The applicant shall submit a Traffic Impact Study (TIS) to the City for this
development for review and approval by the Street Transportation Department
(except for the Site A, Harkins) prior to the submittal of preliminary site plans.
Additional right-of-way and street improvements may be required following TIS
review. Phasing of off-site improvements must be consistent with the TIS
recommendations. Phased street improvements will require the installation of
pavement transition tapers, as approved by the Street Transportation
Department.
6.
The developer shall construct all streets within and adjacent to the development
required for each phase with paving, curb, gutter, minimum 5-foot wide sidewalk,
curb ramps, streetlights, landscaping and other incidentals, as per plans approved
by the Planning and Development Department. All improvements shall comply with
the current ADA Guidelines.
7.
Open irrigation facilities are to be piped outside of right-of-way and shown on the
preliminary site plan, as approved by the Planning and Development
Department.
8.
All multi-use trails and shared use paths shall be shaded a minimum of 50
percent with 2-inch minimum caliper, large canopy shade trees, located 5 to 8
feet from the edge of the trail, as approved by the Planning and Development
Department.
9.
The right-of-way shall be dedicated, if required, and a bus pad (detail P1260 or
P1262) constructed at the following locations, unless otherwise modified by the
Planning and Development Department and Public Transit Department:
a.
Eastbound Baseline Road east of 63rd Avenue. Pad shall be spaced from
the intersection of 63rd Avenue and Baseline Road according to City of
Phoenix Standard Detail P1258.
b.
Three bus stop pads shall be located along Southbound 59th Avenue.
10.
If determined necessary by the Phoenix Archaeology Office, the applicant
shall conduct Phase I data testing and submit an archaeological survey report
of the development area for review and approval by the City Archaeologist
prior to clearing and grubbing, landscape salvage, and/or grading approval.
11.
If Phase I data testing is required, and if, upon review of the results from the
Phase I data testing, the City Archaeologist, in consultation with a qualified
archaeologist, determines such data recovery excavations are necessary, the
applicant shall conduct Phase II archaeological data recovery excavations.
12.
In the event archaeological materials are encountered during construction, the
3 
Ordinance G-6659

developer shall immediately cease all ground-disturbing activities within a 33-foot 
radius of the discovery, notify the City Archaeologist, and allow time for 
the Archaeology Office to properly assess the materials. 
Site A 
13.
The development shall be in general conformance with the site plan and
elevations date stamped October 23, 2019, as modified by the following
stipulations and approved by the Planning and Development Department.
14.
The maximum building height shall be limited to 56 feet.
15.
There shall be a 150-foot stepback provided from 59th Avenue for buildings
over 30 feet in height.
16.
A minimum of one clearly defined pedestrian connection shall be provided from
Site A to connect with the trail along the Laveen Area Conveyance Channel with
one pedestrian scale amenity (benches, tables, etc.) provided within close
proximity of the trail, as approved by the Planning and Development
Department.
17.
A minimum of two pedestrian pathways that are a minimum 6 feet wide shall be
provided from the west side of Site B through Site A to the proposed buildings.
The parking lot shall be designed to have minimal vehicular drive crossings
through these pathways. These pathways shall have a minimum 50 percent
shade provided by 2-inch minimum caliper trees located in minimum 5-foot wide
landscape areas and/or an architectural shading element, as approved by the
Planning and Development Department.
18.
A minimum of two inverted-U bicycle racks (4 spaces) shall be provided for
each building on site, located near building entries, and installed per the
requirements of Section 1307.H. of the Phoenix Zoning Ordinance, as approved
by the Planning and Development Department.
19.
The developer shall construct the west half street of 59th Avenue, as consistent
with the Street Classification Map, including the landscaped median between
the Laveen Area Conveyance Channel and the southern boundary of Site A, as
approved by the Planning and Development Department. Asphalt pavement
transition tapers are required between ultimate and interim street conditions, as
approved by the Street Transportation Department.
4 
Ordinance G-6659

20.
The developer shall construct a 10-foot-wide Shared Use Path (SUP) along the
west side of 59th Avenue in lieu of the required sidewalk, consistent with the
improvements on 59th Avenue north of the Laveen Area Conveyance Channel,
as approved by the Planning and Development Department.
21.
The developer shall construct a 10-foot-wide Multi-Use Trail (MUT) along the
south side of the Laveen Area Conveyance Channel, as approved by the
Planning and Development Department.
Site B (Retail/Restaurant) 
22.
The maximum building height shall be limited to 30 feet within 150 feet of 59th
Avenue and 45 feet for the remainder of Site B.
23.
There shall be a 150-foot stepback provided from 59th Avenue for building over
30 feet in height.
24.
The site plan, landscape plan showing pedestrian circulation and elevations,
shall be reviewed and approved by the Planning Hearing Officer through the
public hearing process prior to preliminary site plan approval for conceptual
review of the applicable provisions of the goals and policies of the Southwest
Growth Study which shall include the following:
a.
Promoting the overall pedestrian circulation within the commercial corner
through wide sidewalks, detached sidewalks and overall connectivity
including:
(i)
A minimum of two pedestrian pathways that are a minimum of 6 feet
wide shall be provided from 59th Avenue through the site to connect
to buildings and the pedestrian pathways at Site A. The parking lot
shall be designed to have minimal vehicular drive crossings through
these pathways. These pathways shall have a minimum 50 percent
shade provided by 2-inch minimum caliper trees located in minimum
5-foot wide landscape areas and/or an architectural shading element.
(ii)
A minimum of two clearly defined pedestrian connections shall be
provided to connect with the trail along the Laveen Area Conveyance
Channel with two pedestrian scale amenities (open space, benches,
tables, etc.) provided within close proximity of the trail.
b.
Arcades and overhangs shall be incorporated into the buildings to promote
shade.
5 
Ordinance G-6659

c.
All building facades shall contain architectural embellishments and detailing
such as textural changes, pilasters, offsets, recesses, window fenestration,
shadow boxes and overhead/canopies at least every 50 linear feet.
d.
Accent building materials such as: native stone, burnt adobe, textured brick,
wood (when shaded by overhangs or deep recesses), slump block, ceramic
tile (matte finish), stucco and/or exposed aggregate concrete shall be used
on buildings or otherwise demonstrate that the architectural style is
consistent with prior phases of the project and development in the area.
25.
Drive-through restaurant pick-up windows shall be architecturally integrated in
proportion, color, material and texture to the building it serves by providing
awnings or architecturally integrated structures for weather protection, as
approved by the Planning and Development Department.
26.
Drive-through restaurant facilities shall provide a minimum of 250 square feet of
outdoor seating areas, as approved by the Planning and Development
Department.
27.
A minimum of 25 percent of the surface parking areas shall be shaded by 2-inch
minimum caliper, large canopy single-trunk shade trees, located within minimum 5-
foot wide landscape areas, as approved by the Planning and Development
Department.
28.
A minimum of two inverted-LI bicycle racks (4 spaces) shall be provided for each
building on site, located near building entries, and installed per the requirements of
Section 1307.H. of the Phoenix Zoning Ordinance, as approved by the Planning
and Development Department.
29.
A minimum of 30 percent of the linear frontage of the buildings, that has main
public entries oriented towards parking areas, shall be provided with planting.
Planting areas shall be sized to provide adequate area for planting materials to
thrive. Trees and shrubs shall be sized to provide 30 percent shading of area at
maturity, as approved by the Planning and Development Department.
30.
The developer shall construct the west half street of 59th Avenue, as consistent
with the Street Classification Map, including landscaped median between the
Laveen Area Conveyance Channel and the southern boundary of Site B, as
approved by the Planning and Development Department. Asphalt pavement
transition tapers are required between ultimate and interim street conditions, as
approved by the Street Transportation Department.
31.
The developer shall construct a 10-foot Shared Use Path (SUP) on 59th Avenue in
lieu of the required sidewalk, consistent with the improvements on 59th Avenue
north of the Laveen Area Conveyance Channel.
6 
Ordinance G-6659

32.
The developer shall construct a 10-foot-wide Multi-Use Trail (MUT) along the
southside of the Laveen Area Conveyance Channel, as approved by the
Planning and Development Department.
Site C (Multifamily) 
33.
The site plan, landscape plan showing pedestrian circulation and elevations shall
be reviewed and approved by the Planning Hearing Officer through the public
hearing process prior to preliminary site plan approval for conceptual review of the
applicable provisions of the goals and policies of the Southwest Growth Study
which shall include the following:
a.
Promoting pedestrian connections with the adjacent commercial
development through sidewalks, detached sidewalks and overall connectivity
including:
b.
A minimum of three evenly dispersed pedestrian connection points to the
commercial development to the north. This pedestrian connection shall be
clearly defined and minimize vehicular conflicts.
c.
Arcades and overhangs shall be incorporated into the buildings to promote
shade.
d.
All building facades shall contain architectural embellishments and detailing
such as textural changes, pilasters, offsets, recesses, window fenestration,
shadow boxes and overhead/canopies at least every 50 linear feet, as
approved by the Planning and Development Department.
e.
Ensuring architectural style is consistent with prior phases of the project and
development in the area.
34.
There shall be a minimum of 10 percent common area open space provided
onsite, as approved by the Planning and Development Department.
35.
A minimum of 25 percent of the surface parking areas shall be shaded by a
minimum 2-inch caliper, large canopy single-trunk shade trees, located within
minimum 5-foot wide landscape areas, as approved by the Planning and
Development Department.
36.
The developer shall construct the west half street of 59th Avenue, as consistent
with the Street Classification Map, including the landscaped median for the full
extent of Site C, as approved by the Planning and Development Department.
Asphalt pavement transition tapers are required between ultimate and interim
street conditions, as approved by the Street Transportation Department.
7 
Ordinance G-6659

37.
The developer shall construct a 10-foot wide Shared Use Path (SUP) on 59th
Avenue in lieu of the required sidewalk, consistent with the improvements on
59th Avenue north of the Laveen Area Conveyance Channel.
38.
The developer shall provide conduit plan and junction boxes at 59th Avenue
and South Mountain Avenue on project site for future traffic signal equipment
and all work related to the construction or reconstruction of the conduit runs and
junction box installation shall be the responsibility of the Developer, as approved by
the Planning and Development Department.
Site D (Commerce Park/General Commerce Park North of the LACC) 
39.
The site plan, landscape plan showing pedestrian circulation and elevations shall
be reviewed and approved by the Planning Hearing Officer through the public
hearing process prior to preliminary site plan approval for conceptual review of the
applicable provisions of the goals and policies of the Southwest Growth Study
which shall include the following:
a.
Promoting the overall pedestrian circulation within the development through
wide sidewalks, detached sidewalks and overall connectivity including:
(i)
A minimum of two pedestrian connections to the Laveen Area
Conveyance Channel.
(ii)
There shall be an employee open space area provided adjacent to the
Laveen Area Conveyance Channel. The open space areas shall
provide a minimum of one amenity (tables, benches, yard games, etc.)
each.
b.
Arcades and overhangs shall be incorporated into the buildings to promote
shade.
c.
All building facades shall contain architectural embellishments and detailing
such as textural changes, pilasters, offsets, recesses, window fenestration,
shadow boxes and overhead/canopies at least every 50 linear feet.
d.
Ensuring architectural style is consistent with prior phases of the project and
development in the area.
40.
There shall be a minimum of one exterior employee balcony provided on each
four-story building that is a minimum of 12 feet in depth and a minimum of 200
square feet in size, as approved by the Planning and Development
Department.
41.
The glazing on all building windows shall have a maximum reflectivity of 20
percent, as approved by the Planning and Development Department.
8 
Ordinance G-6659

42.
A minimum of 25 percent of the surface parking areas shall be shaded by
minimum 2-inch caliper, large canopy single-trunk shade trees, located within
minimum 5-foot wide landscape areas, as approved by the Planning and
Development Department.
43.
A minimum of six inverted-LI bicycle racks (12 spaces) shall be provided for
each building on site, located near building entries, and installed per the
requirements of Section 1307.H. of the Phoenix Zoning Ordinance, as
approved by the Planning and Development Department.
44.
A minimum of 30 percent of building linear frontage, that has main public
entries oriented towards parking areas, shall be provided with planting.
Planting areas shall be sized to provide adequate area for planting materials
to thrive. Trees and shrubs shall be sized to provide 30 percent shading of
area at maturity, as approved by the Planning and Development Department.
45.
The developer shall protect in place the shared-use path and 20-foot wide
public trail/sidewalk easement along the north side of the Laveen Area
Conveyance Channel, as approved by the Planning and Development
Department.
46.
The developer shall dedicate a 30-foot-wide public trail/sidewalk easement
along the west side of the 202 Loop or adjacent to 63rd Avenue, whichever
provides greater connectivity, at the time of preliminary site plan approval.
Developer shall construct a 10-foot-wide shared-use path (SUP) within the
easement as indicated in section 429 of the City of Phoenix MAG Supplement,
as approved by the Planning and Development Department.
47.
A minimum 10-foot public multi-use trail shall be constructed within a 30-foot
easement in accordance with MAG supplemental detail 429 along the south
side of Baseline Road to connect to the trails to the east and west, as
approved by the Parks and Recreation Department.
48.
The developer shall dedicate 60 feet of right-of-way for the full parcel limits for
the south half of Baseline Road, as approved by the Planning and Development
Department.
49.
The developer shall dedicate a minimum of 40 feet of right-of-way for the full
parcel limits for the east half of 63rd Avenue. Additional right-of-way
dedications and improvements as required by the TIS, as approved by the
Street Transportation Department.
9 
Ordinance G-6659

50.
The developer shall dedicate 40 feet of right-of-way for the full parcel limits for
the east half of 63rd Avenue and improvements as required by the TIS, as
approved by the Planning and Development. Asphalt pavement transition
tapers are required between ultimate and interim street conditions, as approved
by the Street Transportation Department.
51.
The developer shall dedicate a 25-foot by 25-foot right-of-way triangle at the
southeast corner of Baseline Road and 63rd Avenue, as approved the Planning
and Development Department.
Site E (Commerce Park/General Commerce Park South of the LACC) 
52.
The site plan, landscape plan showing pedestrian circulation and elevations shall
be reviewed and approved by the Planning Hearing Officer through the public
hearing process prior to preliminary site plan approval for conceptual review of the
applicable provisions of the goals and policies of the Southwest Growth Study
which shall include the following:
a.
Promoting the overall pedestrian circulation within the development through
wide sidewalks, detached sidewalks and overall connectivity including:
(i)
A minimum of two pedestrian connections to the Laveen Area
Conveyance Channel.
(ii)
There shall be an employee open space area provided adjacent to the
Laveen Area Conveyance Channel. The open space areas shall
provide a minimum of one amenity (tables, benches, yard games, etc.)
each.
b.
Arcades and overhangs shall be incorporated into the buildings to promote
shade.
c.
All building facades shall contain architectural embellishments and detailing
such as textural changes, pilasters, offsets, recesses, window fenestration,
shadow boxes and overhead/canopies at least every 50 linear feet.
d.
Ensuring architectural style is consistent with prior phases of the project and
development in the area.
53.
There shall be a minimum of one exterior employee balcony provided on each
four-story building that is a minimum of 12 feet in depth and a minimum of 200
square feet in size, as approved by the Planning and Development
Department.
54.
The glazing on all building windows shall have a maximum reflectivity of 20
percent, as approved by the Planning and Development Department.
10 
Ordinance G-6659

55.
A minimum of 25 percent of the surface parking areas shall be shaded by
minimum 2-inch caliper, large canopy single-trunk shade trees, located within
minimum 5-foot wide landscape areas, as approved by the Planning and
Development Department.
56.
A minimum of six inverted-LI bicycle racks (12 spaces) shall be provided for
each building on site, located near building entries, and installed per the
requirements of Section 1307.H. of the Phoenix Zoning Ordinance, as
approved by the Planning and Development Department.
57.
A minimum of 30 percent of building linear frontage, that has main public
entries oriented towards parking areas, shall be provided with planting.
Planting areas shall be sized to provide adequate area for planting materials
to thrive. Trees and shrubs shall be sized to provide 30 percent shading of
area at maturity, as approved by the Planning and Development Department.
58.
The developer shall dedicate a 30-foot-wide public trail/sidewalk easement
along the west side of the 202 Loop Freeway or adjacent to 63rd Avenue,
whichever provides greater connectivity, at the time of preliminary site plan
approval. Developer shall construct a 10-foot wide shared-use path (SUP) within
the easement per Section 429 of the City of Phoenix MAG Supplement, as
approved by the Planning and Development Department.
59.
The developer shall construct a 10-foot-wide Multi-Use Trail (MUT) along the
southside of the Laveen Area Conveyance Channel, as approved by the
Planning and Development Department.
60.
The developer shall dedicate a minimum of 40 feet of right-of-way for the full
parcel limits for the east half of 63rd Avenue. Additional right-of-way dedications
and improvements as required by the TIS, and as approved by the Street
Transportation Department. Asphalt pavement transition tapers are required
between ultimate and interim street conditions, excepting the frontage of APN
300-020-017C, as approved by the Street Transportation Department.
SECTION 4. If any section, subsection, sentence, clause, phrase or 
portion of this ordinance is for any reason held to be invalid or unconstitutional by the 
decision of any court of competent jurisdiction, such decision shall not affect the validity 
of the remaining portions hereof. 
11 
Ordinance G-6659

PASSED by the Council of the City of Phoenix this 8th day of January 
2020. 
ATTEST: 
1: ft,t.- 
City Clerk
	tJ1,11-ZaZitJ 
APPROVED AS TO FORM: 
'• 
; . 
· .. · 
.. 
,,,
' . . 
y 
. 
.. 
--Qi-._1 
...... 4 ...... i' -t'"'-A'-""¥--=----
---'Acting City Attorney pm I
REVIEWED BY: 
Exhibits: 
A - Legal Description (4 Pages) 
B - Ordinance Location Map (1 Page) 
12 
Ordinance G-6659

Z-100-02
ANX 273
ANX 273
Z-40-07
Z-39-02
ANX 175
Z-39-02
ANX 175
Z-39-02
ANX 273
Z-39-02
ANX 175
ANX 271
ANX 175
Z-7-19
ANX 175
Z-115-99
Z-39-02
Z-62-02
Z-151-02
ANX 175
ANX 273
ANX 272
ANX 175
Z-107-02
ANX 175
Z-14-16
Z-25-00
Z-26-00
ANX 175
*
MARICOPA COUNTY
*
MARICOPA
COUNTY
*
*
*
*
*
*
*
S-1
C-1
R-3A
R1-8 PRD
R-2 PRD
S-1
R-3
C-2
HGT/WVR
R-2 PRD PCD
C-2 HGT/WVR
R-3A
R1-8
S-1
S-1
C-1
GC
S-1
BASELINE RD
SOUTH MOUNTAIN AVE
56TH DR
57TH AVE
63RD DR
57TH DR
64TH LN
56TH LN
DESERT DR
ARDMORE RD
COLES RD
PARK ST
64TH AVE
61ST DR
59TH DR
63RD AVE
Future Loop 202
59TH AVE
R1-6 *
Z-52-99
R1-8 PCD *
Z-180-04
C-2/CP-GCP
Z-79-01
CP/GCP and/or C-2 *
Z-126-00
R-2 *
Z-126-00
R-3 *
Z-126-00
C-2 *
Z-151-05
75TH AVE
67TH AVE
59TH AVE
51ST AVE
43RD AVE
35TH AVE
27TH AVE
BROADWAY RD
BASELINE RD
SOUTHERN AVE
DOBBINS RD
ELLIOT RD
ESTRELLA DR
LAVEEN VILLAGE
CITY COUNCIL DISTRICT: 7
I
APPLICANT'S NAME:
APPLICATION NO.
Z-47-19
GROSS AREA INCLUDING 1/2 STREET
AND ALLEY DEDICATION IS APPROX.
128.61 Acres
MULTIPLES PERMITTED
*
Maximum Units Allowed with P.R.D. Bonus
S-1 (Approved CP/GCP and/or C-2)
CP/GCP, C-2 HGT/WVR, R-4
CONVENTIONAL OPTION
128 (N/A, 1,865)
N/A, 415, 675
*
UNITS P.R.D. OPTION
N/A (N/A, 2,238)
N/A, 498, 810
Wendy Riddell/Berry Riddell LLC
DATE:
10/3/2019
REVISION DATES:
AERIAL PHOTO &
QUARTER SEC. NO.
QS 01-14
ZONING MAP
D-5
REQUESTED CHANGE:
FROM:
S-1 (Approved CP/GCP and/or C-2) (128.61 a.c.)
TO:
CP/GCP ( 76.70 a.c.)
C-2 HGT/WVR ( 28.64 a.c.)
R-4 ( 23.27 a.c.)
Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\2019\Z-47-19.mxd
Z-47-19
0.1
0
0.1
0.05
Miles
10/11/2019 10/17/2019

S 56TH LN
W SOUTH MOUNTAIN AVE
S 59TH AVE
Maricopa County Assessor's Office
Planning & Development Department
PHO-2-21--Z-47-19-7
Property Location: Approximately 650 feet north of the intersection of 
59th Avenue and South Mountain Avenue
0
320
640
160
Feet ´

S 56TH LN
W SOUTH MOUNTAIN AVE
S 59TH AVE
R1-8*
R-3*
S-1
CP/GCP*
S-1
S-1
R-4*
C-2 HGT/WVR*
Maricopa County Assessor's Office
Planning & Development Department
PHO-2-21--Z-47-19-7
Property Location: Approximately 650 feet north of the intersection of 
59th Avenue and South Mountain Avenue
0
320
640
160
Feet ´

archite cture 
'LJ LJ 
ZO.N 
G :C,.1 
ZONING 
SITEA 
PROJECT SITE 
SITEC 
 
 
- -'-----,
 . ,/ 
2-47-19-7 MASTER PLAN
Source: Butler Design Group 
ASCEND at SOUTH MOUNTAIN 
PARCEL MAP 
9-2-21 NOT TO SCALE
PHO-2-21--Z-47-19-7
Proposed Master Site Plan
Hearing Date: 10/20/21

i
<D 
a 
w
n 
n 
w w 
0::: 
a 
LL 
a 
N
a 
U1 
C)
N 
_L_ 
I 
L_J 
6 
7 
I 
I 
I 
I 
1 
I,
I'
ri 
SYMBOL SCHEDULE 
I 2 I 
BUILDING NUMBER 
-BUILDING TYPE
;;
35' INSIDE TURNING RADIUS 
2 I 
\ \1f55' OUTSIDE TURNING RADIUS 
\ 
' 
IN ACCORDANCE WITH 
'' '-
PHOENIX FIRE DEPT 
', __ 
STANDARDS 
-
- -
[
2'-6" OVERHANG 
SPACE 
# OF SPACES IN ROW 
1GIN I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
ESMT 
TYPICAL SINGLE STORY 
DUPLEX BUILDING 
 j 
! 
I 27 I
1 
I 191 2 1 
sgo·oo·oo"E 
11 
---
r 
--··1
[28[GAR[ .l 
I 29 I 2 I 
. -------------
 "' 
PROJECT DESCRIPTION 
ASCEND AT SOUTH MOUNTAIN IS A PROPOSED GATED 130 DUPLEX UNIT COMMUNITY 
ON +/-10.38 GROSS ACRES ON THE WEST SIDE OF SOUTH 59TH AVENUE, SOUTH OF 
WEST BASELINE ROAD. 
THE SITE IS ADJACENT TO FUTURE RETAIL DEVLEOPMENT TO 
THE NORTH, FUTURE MULTI-FAMILY RESIDENTIAL TO THE SOUTH, AND THE 202 
FREEWAY TO THE WEST. 
THE COMMUNITY'S PRIMARY VEHICULAR INGRESS/EGRESS IS 
FROM SOUTH 59TH AVENUE, WHICH ALIGNS WITH THE ENTRY TO BETTY H. FAIRFAX 
HIGH SCHOOL. A SECONDARY GATED ACCESS IS PROPOSED FROM THE RETAIL 
DEVELOPMENT TO THE NORTH. PEDESTRIAN ACCESS LINKS THE SITE TO SOUTH 59TH 
AVENUE, WHILE THREE PEDESTRIAN GATES WILL CONNECT ASCEND AT SOUTH 
MOUNTAIN TO THE FUTURE RETAIL TO THE NORTH. 
THE DUPLEXES ARE COMPRISED OF THREE DIFFERENT BUILDING TYPES, WITH 1-, 2-
AND 3-BEDROOM PLANS. 
WITH A COMBINATION OF SINGLE- AND TWO-STORY 
BUILDINGS, THE SITE DESIGN ASSURES NO TWO IDENTICAL BUILDINGS WILL BE PLACED 
SIDE-BY-SIDE, AND THREE DIFFERENT EXTERIOR COLOR PALETTES ASSURE ADDITIONAL 
VARIATION OF THE STREETSCAPE. 
EACH DWELLING UNIT IS PR0\1DED WITH 270 
SQUARE FEET OF ENCLOSED PRIVATE GROUND LEVEL OPEN SPACE., WITH A PATIO, 
LANDSCAPE AREA AND A GATE ALLOWING ACCESS DIRECTLY TO THE COMMON AREA. 
THE ARCHITECTURAL CHARACTER IS TRADITIONAL AND APPROPRIATE TO LAVEEN 
VILLAGE, '111TH VARYIING ROOF LINES AND PORCH ELEMENTS. THE PROPOSED COLOR 
PALETTES ARE WARM, NEUTRAL AND COMPLEMENTARY, WHILE STONE VENEER, BOARD 
& BATTEN DETAILING AND WINDOW SHUTTERS TO ADD VISUAL INTEREST. 
COMMUNITY AMENITIES INCLUDE A POOL, CABANA WITH A COVERED PATIO FOR 
SOCIALIZING AND A DOG PARK. 
THE CLUBHOUSE ACCOMMODATES THE LEASING 
FACIITIES AND AN EXPANSIVE FITNESS FACILITY THAT OVERLOOKS THE POOL. ASCEND 
AT SOUTH MOUNTAIN IS PART OF THE LAVEEN PARK PLACE DEVELOPMENT, WITH AN 
ABUNDANCE OF STORES AND A SCHOOL \\1THIN WALKING DISTANCE, AND EASY 
ACCESS TO THE 202-FREEWAY. 
 
I 36 I 1 
I 
<D 
1151 3 I 
I 14 I 1
" 
I 37 I 2 
FIRE LANE 
--; 
I 13 I 
I 
2 I 
39 
2 
NO'OO'oo"E 
16.00' 
.- - -----.. - - ,--u 
N00"14'00"E 
17.58' 
N9o·oo·oo"w 705.44' 
FUTURE MUL Tl-FAMILY 
NOT A PART OF 
VICINITY MAP 
l::::;::::;;;;;;;;;;;;,;;;;;;;.;,;,._w Baseline
.,._ ·sproutslfiarmers Market 
PROJ 
LOCATIO 
[42 I 
Groce sto
N90"00'00"W 187.53' 
re .. 
SCALE: 
N.T.S. 
D 
cJ 
11 
 
PROJECT DATA 
OVERALL SITE DATA: 
TOTAL SITE GROSS AREA: 
TOTAL SITE NET AREA: 
APN NO.: 
PROPOSED USE: 
ZONING: 
MAXIMUM HEIGHT: 
PROVIDED HEIGHT: 
PROPOSED DENSITY: 
COMMON OPEN SPACE: 
PROVIDED OPEN SPACE: 
±10.38 GROSS ACRES/452,152.8 S.F. 
±10.01 NET ACRES/436,035.6 S.F. 
300-02-927B
MULTI FAMILY RESIDENTIAL 
C-2/R-3
2-STORIES / 30'-0" MAXIMUM
2-STORIES / 24'-8" MAXIMUM
12.52 DU/GROSS AC 
45,215.28 SF/ 10% REQUIRED 
39,843.42 SF COMMON AREA 
28,080.00 SF PRIVATE AREA 
PARKING: 
REQUIRED: 
!
66) 1-BED X 1.5
54) 2-BED X 1.5
10) 3-BED X 2
TOTAL REQUIRED: 
99 P.S. 
81 P.S. 
20 P.S. 
200 P.S. 
INCLUDING 70 UNRESERVED GUEST SPACES 
PROVIDED: 
PRIVATE GARAGE PARKING (RESERVED) 
CARPORT PARKING (RESERVED) 
UNCOVERED PARKING (UNRESERVED) 
TOTAL PROVIDED: 
20 P.S. 
110 P.S. 
104 P.S. 
234 P.S, 
1.8 P.S. PER DWELLING UNIT 
TOTAL: 
66,923.42 SF /15% PROVIDED 
TOTAL UNIT MIX: 
ONE BEDROOM UNITS: 
TWO BEDROOM UNITS: 
THREE BEDROOM UNITS: 
TOTAL: 
UNIT TYPE 
DUPLEX UNIT A 
DUPLEX UNIT B 
DUPLEX UNIT C 
TOTAL: 
1,001 AVERAGE S.F. 
□ 
□ 
□ 
□ 
1 BED/1 BA 
2 BED/2 BA 
3 BED/2 BA 
LIVABLE 
AREA 
770 S.F. 
1,203 S.F. 
1,441 S.F. 
66 (50.8%) 
54 (41.5%) 
10 
(7.7%) 
130 D.U. 
UNITS 
66 
54 
10 
130 D.U. 
(i__'(l.()' 
 \ 
\ 
L=228.1 0' 
\ 
=895.00' 
I 
5·20·0 .. 
Cf) 
0 
\ 
I 
I 
::::=:::::< :::::-::::: 	
 
I
I 
I 
\ 
I 
I 
1-1--
1 
I 
:c. 
- --- --CJ1
,.....,....,.. 
 
:c. 
-
·, --4
' 
___ J_ 
I 
I 
I 
I 
L=204'-2" 
R=536.77' 
t,=33·12'00" 
- ... 
KNOX BOX/ 
KEY PAD 
I 
,_\, 
I 
I 
I 
I 
20•-o" 
SRP 
E';,SEMEĆT
\ 
I
'1 
I 
', 
I 
8'-o" 
I SIDEWALK/ 
I 
PUE 
I 
 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I' 
I' 
I' 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I I 
FlJ 
I 
0 
25' 
50' 
FIRE HYDRANT 
NORTH 
C 
rn 
SITE PLAN 
E
a; 
'-
1,,,. 
::i 
...., 
0 
u 
'-+-
a; ...., 
..c 
u 
'-
ra 
biltform architecture 
g r o u p , 
LLC 
11460 north cave creek road . suite 11 
phoenix . arizona 8 5 0 2 0 
Phone 602.285.9200 
Fax 602.285.9229 
z
0 
 
<( 
C: 
I-z 
=> 
0 
 
-
I 
IZ< 
C 
=> t5
•
1-i ;, 
=>>< 
Or5
o(_) i-l
_J  
en =
z (.) 
•= 
I • l!J 
ro o::: 
0 
z 
w 
(.) 

0
Q) 0
en 
-
(0
- .,._ 
(.) "' 
C: 
	 
<( 
.g Q)
0 I-
:i:::c
 .s 
;;i; g, 
...... ·;:: 
REVISIONS: 
JOB NO: 
21-037
DATE: 
SEPTEMBER 2ND, 2021 
SCALE: 
SHEET NO: 
A1 
PHO SUBMITTAL 9-03-21 
© BILTFORM ARCHITECTURE GROUP, INC.
PHO-2-21--Z-47-19-7
Proposed Site Plan
Hearing Date: 10/20/21

I 
I 
I 
I 
I 
I 
I 
1-
cb 
I 
1-
1 
1 :3.5 SEATS 
SITE AREA: 
382,866 S.F. (8.79 AC.) 
----------
PLANT LEGEND 
TREES 
0 Quercus virginiana
Southern Live Oak 
(1'\ 
Prosopis chilensis"Hybrid"
'<Y, 
Thomless Chilean Mesquite 
¥ 
Chilopsis linearis 
Desert Willow 
Ulmus parvifolia
9 
Chinese Elm 
I \Pistacia chinensis 
1,,, ◊ 'f Chinese Pistache 
• 
, 
k 6 ./ Cercidium hybrid
• 
• 
"Desert Museum" Hybrid 
'--11,./ * 
X Butiagrus nabonnandii
Mule Palm 
¦ 
Phoenix daclylifera
T 
Date Palm 
0 Cersis mexicana 
a Mexican Redbud 
Pinus eldarica 
Mandel Pine 
y::-'\ Olea europaea
U "Swan Hill" Olive 
a Lagerstroemia indica 
"White" Crape Myrtle 
0 Sophora secundiflora
Texas Mountain Laurel 
ffi 
Bauhinia blakeana 
W 
White Hong Kong Orchid Tree
 --------"=' 
8 
' = ' 
' ' = 
01 1 1 1 011111 1 01 1111110 
w>
a 
011111111110111111111101111111110 
O11111111110111111111101111111 ll:J 
SPECIFICATION 
24" Box 
Double Stake
24" Box 
Double Stake
24" Box 
Double Stake
24" Box 
Double Stake
36" Box 
Standard
36" Box 
Multi Trunk
24" Box
18' Trunk Height
Diamond Cut Trunk
24" Box
Double Stake
24" Box 
Double Stake
36" Box 
Multi- Trunk
36" Box 
Multi- Trunk
24" Box 
Multi- Trunk
24" Box 
Double Stake
	
 
.
. . .,: 
(\'; 
-; c<; 
0. .•. 
·y;·
.- ' . 
:· 
·.:-_· •. 
. . 
EB':
_
:
_
s:; 
. 
. 
. C)(.) •. 
·
· 
-iw. 
.
0.·'· .. ··.:
·. '
/:0,
·: 
·.)_..;r 
. _w<\
0 
,\_,_.·:* 
UC' 
SHRUBS 
SIZE 
Carissa grandiflora 
5 Gallon
Natal Plum 
Tecoma hybrid 
5 Gallon
Orange Jubilee 
Phoenix roebelenii
5 Gallon
Pigmy Date Palm 
Leucophyllum candida 
5 Gallon
"Thundercloud " Sage
Dodonea viscosa 
5 Gallon
Hopseed Bush 
Tecomaria capensis 
5 Gallon
Cape Honeysuckle 
Agave bracteosa 
5 Gallon
Spider Agave 
Hibiscus rosa- sinensis 
5 Gallon
Chinese Hibiscus 
Hesperaloe parvifolia 
5 Gallon
Red Yucca 
Lagerstroemia indica "Dynamite" 5 Gallon
Crape Myrtle 
Pittosporum tobira
5 Gallon
Mock Orange
SHRUBS 
Caesalpinia pulcherrima 
Red Bird of Paradise
Senna phyllodenia 
Silver- Leaf Senna 
Nerium oleander
Petite Pink Dwarf Oleander
Ruellia peninsularis 
Desert Ruellia 
Raphiolepis lndica
Indian Hawthorn 
Xylosma congesta
Shiny Xylosma 
Sophora secundiflora 
Texas Mountain Laurel 
Muhlenbergia capillaris
"Regal Mist" Deer Grass
SIZE 
5 Gallon
5 Gallon
5 Gallon
5 Gallon
5 Gallon
5 Gallon
5 Gallon
5 Gallon
5 Gallon
ANCHOR 
55,000 S.F. 
GROUNDCOVERS 
{f: Lantana montevidensis
Convolvulus cneorum 
Bush Morning Glory 
Rosemarinus officinalis
0 
Prostrate Rosemary
. 
. i
Wedelia trilobata 
. •.: Yellow Dots 
Ruellia brittoniana
: y; 
;t1::;:i§
e
¨:olacea 
\:J · : ;(.'. Society Garlic 
.u-J 
Seasonal annuals 
Synthetic turf
Easyturf
Cynodon dactylon 
Midiron Hybrid
""'"' VINES 
(0l"'m Bignonia capreolata
'4..i{,J) Tangerine Beauty Crossv1ne
(b J} · Ficus pumila 
C 
· 
· 
Creeping Fig Vine
SIZE 
1 Gallon
1 Gallon
1 Gallon
1 Gallon
1 Gallon
1 Gallon
4" Pots
@6"0.C. 
Nutmeg Lush
Sod
SIZE 
5 Gallon W/
4'x 4' Trellis
1 Gallon
\ 
LANDSCAPE MATERIALS 
(Contractor to submit sample for approval)
\ 
' \
\ \ 
\ \ 
\ 
\ 
' 
 
\ 
Decomposed granite 
112' Screened
Desert Brown 
2" Depth
Concrete header 
n 
Extruded
4"x6" 
 
DOBBINS ROAD 
VICINITY MAP 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
I 
\
\ 
\ 
-
BASELINE ROAD 
N.T.S.
NORTH
0 
25' 
50' 
100' 
LANDSCAPE PLAN 
E 
cu....
cu 
Ii-
c.. ::::i
+-'
n:I 
0
u
u cu
• 
rJl 
+-' 
""'O 
c:: ..c:: 
n:I u.... 
n:I
biltform landscape 
a r c h i t e ct u r e g r o u p,
in C .
1 1 4 6 0 North Cave Creek Rd. suite 6 
phoenix . arizona 8 5 0 2 0 
Phone 602.285.9200 
Fax 602.285.9229 
email: dave@billform.com 
• 
REVISIONS: 
JOB NO: 
DATE: 
a, 
C: 
0 
.c: 
c:, 
a, c:, 
-
<O 
 ,..._ 
0 (/) 
C: 
 
0 
a, 
"C'. l­
o 
:i::: 
C: 
 .9 
...-
Cl 
(Y) 
C: 
._ ·;:: 
21-036L
Xxxxx XX, XXXX 
SCALE: 
1" = 50'-0" 
SHEET NO: 
PL 1. 1 
XofX 
© BIL TFORM ARCHITECTURE GROUP, INC. 
PHO-2-21--Z-47-19-7
Proposed Landscape Plan
Hearing Date: 10/20/21

ASCEND AT SOUTH MOUNTAIN   OPEN SPACE EXHIBIT   8-18-21 N.T.S.
Total Required Common Open Space:  
45,215.28 S.F. / 10% of gross site area
Common Open Space Provided:  
39,843.42 S.F. 
Private Open Space Provided:   
28,080.00 S.F. 
Total Provided Open Space:  
66,923.42 S.F. / 15% of gross site area
Every unit is provided with 270 SF of private ground level open space.  
Site Area  +/- 10.38 gross acres / 452,152.8 S.F.
59TH AVENUE
PHO-2-21--Z-47-19-7
Proposed Open Space Exhibit
Hearing Date: 10/20/21

ESMT 
PLANT LEGEND 
TREES 
Quercus virginiana 
Southern Live Oak 
Prosopis chilensis "Hybrid" 
Thomless Chilean Mesquite 
Chilopsis linearis 
Desert Willow 
Ulmus parvifolia 
Chinese Elm 
Pistacia chinensis 
Chinese Pistache 
Cercidium hybrid 
"Desert Museum" Hybrid 
X Butiagrus nabonnandii 
Mule Palm 
Phoenix daclylifera 
Date Palm 
Cersis mexicana 
Mexican Redbud 
Pinus eldarica 
Mendel Pine 
Olea europaea 
"Swan Hill" Olive 
, 
Lagerstroemia indica
"White" Crape Myrtle 
Sophora secundiflora 
Texas Mountain Laurel 
J 
Bauhinia blakeana 
White Hong Kong Orchid Tree 
SPECIFICATION 
24" Box 
Double Stake 
24" Box 
Double Stake 
24" Box 
Double Stake 
24" Box 
Double Stake 
36" Box 
Standard 
36" Box 
Multi Trunk 
24" Box 
18' Trunk Height 
Diamond Cut Trunk 
24" Box 
Double Stake 
24" Box 
Double Stake 
36" Box 
Multi- Trunk 
36" Box 
Multi- Trunk 
24" Box 
Multi- Trunk 
24" Box 
Double Stake 
SHRUBS 
SIZE 
Carissa grandiflora 
5 Gallon 
Natal Plum 
Tecoma hybrid 
5 Gallon 
Orange Jubilee 
Phoenix roebelenii 
5 Gallon 
Pigmy Date Palm 
Leucophyllum candida 
5 Gallon 
"Thundercloud " Sage 
Dodonea viscosa 
5 Gallon 
Hopseed Bush 
Tecomaria capensis 
5 Gallon 
Cape Honeysuckle 
Agave bracteosa 
5 Gallon 
Spider Agave 
Hibiscus rosa- sinensis 
5 Gallon 
Chinese Hibiscus 
Hesperaloe parvifolia 
5 Gallon 
Red Yucca 
Lagerstroemia indica "Dynamite" 5 Gallon 
Crape Myrtle 
Pittosporum tobira 
5 Gallon 
Mock Orange 
l I I
SHRUBS 
Caesalpinia pulcherrima 
Red Bird of Paradise 
Senna phyllodenia 
Silver- Leaf Senna 
Nerium oleander 
Petite Pink Dwarf Oleander 
Ruellia peninsularis 
Desert Ruellia 
Raphiolepis lndica 
Indian Hawthorn 
Xylosma congesta 
Shiny Xylosma 
Sophora secundiflora 
Texas Mountain Laurel 
Muhlenbergia capillaris 
"Regal Mist" Deer Grass 
SIZE 
5 Gallon 
5 Gallon 
5 Gallon 
5 Gallon 
5 Gallon 
5 Gallon 
5 Gallon 
5 Gallon 
5 Gallon 0 • 
GROUNDCOVERS 
Lantana montevidensis 
Gold Mound Lantana 
Convolvulus cneorum 
Bush Morning Glory 
Rosemarinus officinalis 
Prostrate Rosemary 
Wedelia trilobata 
Yellow Dots 
Ruellia brittoniana 
"Katie" Ruellia 
Tulbaghia violacea 
Society Garlic 
Seasonal annuals 
Synthetic turf
Easyturf 
Cynodon dactylon 
Midiron Hybrid 
VINES 
Bignonia capreolata 
Tangerine Beauty Crossvine 
Ficus pumila 
Creeping Fig Vine 
SIZE 
1 Gallon 
1 Gallon 
1 Gallon 
1 Gallon 
1 Gallon 
1 Gallon 
4" Pots 
@6"0.C. 
Nutmeg Lush 
Sod 
SIZE 
5 Gallon W/ 
4'x 4' Trellis 
1 Gallon 
LANDSCAPE MATERIALS 
(Contractor to submit sample for approval) 
Decomposed granite 
112' Screened 
Desert Brown 
2" Depth 
Concrete header 
a 
Extruded 
4"x6" 
-
b I 
10 
a r C 
1 1 4 5 
BASELINE ROAD 
DOBBINS ROAD 
VICINITY MAP 
N.T.S. 
NORTH 
0 
25' 
50' 
100' 
PRELIMINARY LANDSCAPE PLAN 
E
cu 
cu .... 
Ii-
c.. ::::i 
+-' 
0 
n:I u 
u cu 
• 
rJl 
+-' 
""O 
c:: ..c:: 
n:I u .... 
n:I 
biltform landscape 
a r c h i t e ct u r e g r o u p, 
in C .
1 1 4 6 0 North Cave Creek Rd. suite 6 
phoenix . arizona 8 5 0 2 0 
Phone 602.285.9200 
Fax 602.285.9229 
email: dave@billform.com 
• 
REVISIONS: 

& 

& 
&. 
JOB NO: 
DATE: 
SCALE: 
SHEET NO: 
PL 1 
XofX 
■ 
a,
C: 
0 
.c: 
c:, 
a, c:,
- <O
 ,.__ 
0 (/) 
r:: 
0 a,
t l­
o 
:i::: r:: 
 .9 
...-
Cl 
(Y) r:: 
._ ·;::
21-036L
Xxxxx XX, XXXX 
1" = 50'-0" 
1 
© BIL TFORM ARCHITECTURE GROUP, INC. 
PHO-2-21--Z-47-19-7
Proposed Landscape Plan
Hearing Date:10/20/21

I 
I 
I 
I 
I 
I 
I 
I 
I . 
I 
I 
I 
I 
I 
I 
I 
I 
\ 
',	-------------------------
pedestrian circulation 
I I 
I if 
1 IL------,--------------
1 L  - 	 - - - - - - - - 
 - - - - - - - - -  - - - - 
---------------------------
1 
-	-------------------------
1 
I 
I 
I 
I 
I 
a 
PHO-2-21--Z-47-19-7
Proposed Pedestrian Circulation Plan
Hearing Date: 10/20/21

0 
& 
w 
n 
n
w 
w
0:::: 
0 
LL 
0 
N 
C) 
N 
---
7
I 
I 
SYMBOL SCHEDULE 
# OF SPACES IN ROW 
J 
PROJECT DESCRIPTION 
ASCEND AT SOUTH MOUNTAIN IS A PROPOSED GATED 130 DUPLEX UNIT COMMUNITY 
ON +/-10.38 GROSS ACRES ON THE WEST SIDE OF SOUTH 59TH AVENUE, SOUTH OF 
WEST BASELINE ROAD. 
THE SITE IS ADJACENT TO FUTURE RETAIL DEVLEOPMENT TO
THE NORTH, FUTURE MULTI-FAMILY RESIDENTIAL TO THE SOUTH, AND THE 202 
FREEWAY TO THE WEST. 
THE COMMUNITY'S PRIMARY VEHICULAR INGRESS/EGRESS IS 
FROM SOUTH 59TH AVENUE, WHICH ALIGNS WITH THE ENTRY TO BETTY H. FAIRFAX 
HIGH SCHOOL. A SECONDARY GATED ACCESS IS PROPOSED FROM THE RETAIL 
DEVELOPMENT TO THE NORTH. PEDESTRIAN ACCESS LINKS THE SITE TO SOUTH 59TH 
AVENUE, WHILE THREE PEDESTRIAN GATES WILL CONNECT ASCEND AT SOUTH 
MOUNTAIN TO THE FUTURE RETAIL TO THE NORTH. 
THE DUPLEXES ARE COMPRISED OF THREE DIFFERENT BUILDING TYPES, WITH 1-, 2-
AND 3-BEDROOM PLANS. 
WITH A COMBINATION OF SINGLE- AND TWO-STORY 
BUILDINGS, THE SITE DESIGN ASSURES NO TWO IDENTICAL BUILDINGS WILL BE PLACED 
SIDE-BY-SIDE, AND THREE DIFFERENT EXTERIOR COLOR PALETTES ASSURE ADDITIONAL 
VARIATION OF THE STREETSCAPE. 
EACH DWELLING UNIT IS PROVIDED WITH 270 
SQUARE FEET OF ENCLOSED PRIVATE GROUND LEVEL OPEN SPACE., WITH A PATIO, 
LANDSCAPE AREA AND A GATE ALLOWING ACCESS DIRECTLY TO THE COMMON AREA. 
THE ARCHITECTURAL CHARACTER IS TRADITIONAL AND APPROPRIATE TO LAVEEN 
VILLAGE, WITH VARYIING ROOF LINES AND PORCH ELEMENTS. THE PROPOSED COLOR 
PALETTES ARE WARM, NEUTRAL AND COMPLEMENTARY, WHILE STONE VENEER, BOARD 
& BATTEN DETAILING AND WINDOW SHUTTERS TO ADD VISUAL INTEREST.
COMMUNITY AMENITIES INCLUDE A POOL, CABANA WITH A COVERED PATIO FOR 
SOCIALIZING AND A DOG PARK. 
THE CLUBHOUSE ACCOMMODATES THE LEASING 
FACIITIES AND AN EXPANSIVE FITNESS FACILITY THAT OVERLOOKS THE POOL. ASCEND 
AT SOUTH MOUNTAIN IS PART OF THE LAVEEN PARK PLACE DEVELOPMENT, WITH AN 
ABUNDANCE OF STORES AND A SCHOOL WITHIN WALKING DISTANCE, AND EASY 
ACCESS TO THE 202-FREEWAY. 
[J 1
n
 
1111111 
FUTURE RETAIL 
NOT A PART OF 
 :< \'--J1-l-ll-l-l--1L -,-,-------,-,---
ESMT 
----
-·--------------------------,i!!'.I	Cl I 
lu 1 
1[lllllli2J 
TYPICAL SINGLE STORY
DUPLEX BUILDING 
sgo·oo·oo"E 5s90·00·00" I!3lA0 I I I I I I 
685.51' 
N90'00'00"W 705.44' 
FUTURE MULTI-FAMILY 
NOT A PART OF 
VICINITY MAP 
1,
202 
:r. ·sprouts\f,armers Market 
Grocery st	re 
, 
X 
,, 
H. h School
->-
e·o 
SCALE: 
N. T.S. 
PROJECT DATA 
OVERALL SITE DATA: 
TOTAL SITE GROSS AREA: 
TOTAL SITE NET AREA: 
APN NO.: 
PROPOSED USE: 
ZONING: 
PARKING: 
REQUIRED: 
1
66
} 
I-BED X 1.5
54 2-BED X 1.5 
10 3-BED X 2 
TOTAL REQUIRED: 
99 P.S. 
81 P.S. 
20 P.S. 
200 P.S. 
MAXIMUM HEIGHT: 
±10.38 GROSS ACRES/452,152.8 S.F. 
±10.01 NET ACRES/436,035.6 S.F. 
300-02-927B
MUL Tl FAMILY RESIDENTIAL 
C-2/R-3
2-STORIES / 30'-0" MAXIMUM
2-STORIES / 24'-8" MAXIMUM
INCLUDING 70 UNRESERVED GUEST SPACES 
PROVIDED HEIGHT: 
PROPOSED DENSITY: 
COMMON OPEN SPACE: 
PROVIDED OPEN SPACE: 
TOTAL UNIT MIX: 
ONE BEDROOM UNITS: 
TWO BEDROOM UNITS: 
THREE BEDROOM UNITS: 
TOTAL: 
UNIT TYPE 
DUPLEX UNIT A 
DUPLEX UNIT B 
DUPLEX UNIT C 
TOTAL: 
1,001 AVERAGE S.F. 
12.52 DU/GROSS AC 
45,215.28 SF/ I 0% REQUIRED 
39,843.42 SF COMMON AREA 
28,080.00 SF PRIVATE AREA 
PROVIDED: 
PRIVATE GARAGE PARKING (RESERVED) 
CARPORT PARKING (RESERVED) 
UNCOVERED PARKING (UNRESERVED) 
TOTAL PROVIDED: 
TOTAL: 
66,923.42 SF /15% PROVIDED 
LIVABLE 
AREA 
I BED/I BA 
770 S.F. 
2 BED/2 BA 
1,203 S.F. 
3 BED/2 BA 
1,441 S.F. 
66 (50.8%) 
54 (41.5%) 
10 
(7.7%) 
130 D.U. 
UNITS 
66 
54 
10 
130 D.U. 
L=204'-2" 
R=536.77' 
l\=33'12'00" 
KNOX BOX/ 
KEY PAD 
II 
II 
20'-0" 
SRP 
Ei;,,SEME T \
I 
' 
' 
I 
I, 
I s•-o" 
SIDEWALK/ 
PUE 
+-,l'-
1 
20 P.S. 
110 P.S. 
104 P.S. 
234 P.S. 
1.8 P.S. PER DWELLING UNIT 
FIRE HYDRANT 
pedestrian circulation 
automotive circulation 
FU 
0 
25' 
50' 
NORTH 
SITE PLAN 
E
a; 
I... 
% 
:::i 
..... 
0
u 
'-+-
a; ..... 
..c 
u 
,._ 
c-s 
bi I tform architecture 
g r o u p , 
LLC 
11460 north cave creek road 
suite 11 
phoenix . arizona 8 5 O 2 O 
Phone 602.285.9200 
Fax 602.285.9229 
z 
<( 
1-z 
=> 
0 
'( 
:r: z <(
=> 5
N 
1-
	
><­
__,o r5
0 0
_J 
rn <(  
v.1l--
zu 
I ■W 
ro o::: 
0 
z 
w 
(_) 
en 
<( 
REVISIONS: 
ffi 
ffi 
JOB NO: 
DATE: 
SCALE: 
SHEET NO: 
) 
0 
"' 0 
- co
 l'­
u (/)
C 
0, 
0 
X 
t:'. 
QJ 
0 1-­
:r: C:
 .8 
..,. 
0, 
MC 
) ·;::
<(
21-037
SEPTEMBER 2ND, 2021 
1"=50'-0" 
A1 
PHO SUBMITTAL 9-03-21 
© BILTFORM ARCHITECTURE GROUP. INC. 
PHO-2-21--Z-47-19-7
Proposed Circulation Plan
Hearing Date: 10/20/21

G)LEFT ELEVATION
+17'-W
X 
T.O. RIDGE 
 
... 
:,, 
I 
b 
+o· -o"__.,I,,_
ŒisH FLOOR'r
,-.:,:
+9'-o"__.,I,,_
i.J ---f.o. PLATEY
:,: 
z 
+e·-o:........_ 
w -ZDOW HEA[ 
,. 
g 
+o'-o"__.,I,,_
FINISH FLOOR'r 
G)LEFT ELEVATION
+11·-
a
g--- -T.O. RioGE 
 
1§ 
,-.:,:
:,: 
g 
w 5! 
!'§ 
 ... 
l'l 
I 
b -
+8'-0"__.,I,,_
T.O. PLATE\ 
0REAR ELEVATION
0REAR ELEVATION
z
0:: 
+ 17 -f'__,,,j.,_
--- -T.O. RioGE'l"'
, 
+0'-0"__.,I,,_
- ŒISH FLOOR'r
-
G)RIGHT ELEVATION
l'l 
I 
b -
+17'-2" 
r5-- -T.O. Rio^ 
51 
 
+0'-0 ..
h!"'l.ŒISH FLOO 
... 
0FRONT ELEVATION
G)RIGHT ELEVATION
GjRONT ELEVATION
b 
g 
w 5! 
!'§ 
g 
5! 
!'§ 
+17'-2" ._
--- -T.O. RioGf'I"' 
+9'-0
'" 
-f.o. PLATE_
+8'-0"__.,I,,_
7i1N66w'HEA[
+11·-2· ._
--- -T.O. RiDGf'I"' 
+9'-0" 
-f.o. PLATE]
+8'-0"__.,I,,_
ZDOWHEA[
+o'-o"__.,I,,_
FINISH FLOOR'r
KEYED NOTES: 0 
1. 
CONCRETE ROOF TILE 
2.
EXTERIOR STUCCO FINISH SYSTEM
3.
STUCCO CONTROL JOINT
4.
FOAM SURROUND w/ STUCCO FINISH
5.
PAINTED COMPOSITE SHUTTER
6.
STONE VENEER
7.
VINYL \\1NDOW - WHITE FRAME 
8.
PAINTED COMPOSITE SHUTTER
9.
FIBERGLASS DOOR 
10. EXTERIOR WALL LIGHT
11. CORBEL
12. VERTICAL FOAM PROFILE w/ STUCCO FINISH
13. FRAMED COLUMN w/ STUCCO FINISH
14. METAL RAILING 
15. PAINTED METAL 
16. FASCIA w/ STUCCO FINISH
17. AWMINUM STOREFRONT - WHITE FRAME 
EXTERIOR COLOR SCHEME 1: 
@BoDY COLOR 
BENJAMIN MOORE 
CSP-75 CASTILE GA TE
® ACCENT COLOR 1 
DUNN EDWARDS
DEW379 IGLOO 
©TRIM COLOR 
DUNN EDWARDS
DEW379 IGLOO 
® ACCENT COLOR 2 
BENJAMIN MOORE 
2134-20 MIDSUMMER NIGHT
© STONE VENEER 
ENVIRONMENTAL STONE WORKS
BROOMFIELD SOUTHERN 
LEDGESTONE 
©ROOF TILE 
EAGLE 
PONDEROSA FLINTRIDGE GRAY
5511 
@DECORATIVE METAL 
DUNN EDWARDS
DEA187 BLACK 
EXTERIOR COLOR SCHEME 2: 
0BOOY COLOR 
BENJAMIN MOORE
861 SHALE 
® ACCENT COLOR 1 
BENJAMIN MOORE
AF-705 CINDER 
©TRIM COLOR 
DUNN EDWARDS
DEW379 IGLOO 
® ACCENT COLOR 2 
BENJAMIN MOORE 
2112-30 STONE BROWN
© STONE VENEER 
ENVIRONMENTAL STONE WORKS
BROOMFIELD SOUTHERN 
LEDGESTONE 
©ROOF TILE 
EAGLE 
PONDEROSA ARCADIA CANYON
BROWN 5502 
© DECORATIVE METAL 
DUNN EDWARDS
DEA187 BLACK 
EXTERIOR COLOR SCHEME 3: 
@BODY COLOR 
SHER\\1N \\1LLIAMS
6171 CHA TROOM 
® ACCENT COLOR 1 
BENJAMIN MOORE 
AF-670 NIGHTINGALE
©TRIM COLOR 
DUNN EDWARDS
DEW379 IGLOO 
® ACCENT COLOR 2 
DUNN EDWARDS
232 MOLASSES 
© STONE VENEER 
ENVIRONMENTAL STONE WORKS
BROOMFIELD SOUTHERN 
LEDGESTONE 
©ROOF TILE 
EAGLE 
PONDEROSA CANYON GRAY
5552 
© DECORATIVE METAL 
DUNN EDWARDS
DEA187 BLACK 
PROPOSED ELEVATIONS 
BLDG TYPE 1 & GARAGE 
E
Q.l 
'-
,._ 
::::l -
0
u 
'-+-
Q.l -
..c 
u 
'-
C'O 
biltform architecture 
g r o u p , 
LLC 
11460 north cave creek road . suite 11
phoenix . arizona 8 5 0 2 0 
Phone 602.285.9200 
Fax 602.285.9229 
z
0 
 
<:( 
e. 
I-z 
=> 
0 
	
 
Iz
C • 
=>2 
1-
=>>< 
0
'II,,
o(_) i-
__J LL
C/)i:: 
zu
I 
• l!J 
ro o::: 
0 
z 
w 
(.) 

0
Q) 0 
C/) 
- "'
-	 t-
(.) "'
C: 
 
<:( 
.g Q) 
0 1--
:r: c:-
 .s
;;i; g,
...... ·;:: 
REVISIONS: 
JOB NO: 
21-031
DATE: 
SEPTEMBER 2ND, 2021 
SCALE: 
3/16" = 1 ·-0· 
SHEET NO: 
A2.1 
PHO SUBMITTAL 9-3-21 
© BILTFORM ARCHITECTURE GROUP, INC. 
PHO-2-21--Z-47-19-7
Proposed Elevations
Hearing Date: 10/20/21

+19'-6" 
0 
-----♦ 
0 
T.O. PLATE 
"' "' 
...J 
< 
>--i'i 
w
:,: 
<"' 
+10'-6"♦
-------
2ND FLOOR 
+9'-o" 
-----;.+ 
T.O. PLATE 
+e'-o" 
m 
z 
----..WN5ow HEAD? 
0:: • "' 
I "' 
@EFT ELEVATION
>--
:,: 
'-' w 
• "' 
,.,."'
+28'-2" .,_ 
-------< 
T.O. RIDGE 
+19'-6" 
---T:0. PL.Ai£♦ 
+18'-6" 
----..WN5ow HEA=
+10'-6"♦
-------
2ND FLOOR 
+9'-0
>
-------
T.O. PLAlE 
+8'-0
#
WINDOW HEAD 
+o·-o·
-AisH FLooir+ 
0REAR ELEVATION
"' 
 
< 
:,: 
'-' w 
:,: 
< 
"' 
"' 
+28'-2" .,_
T.O. RID
 
+19'-6" 
---T:0. PL.Ai£♦ 
+10'-6"♦
-------
2ND FLOOR 
+9'-0
> 
-------
T.O. PLAlE 
+8'-0
#
WINDOW HEAD 
G)RIGHT ELEVATION
+19'-6"♦
T.O. PLAlE 
+18'-6
#
WINDOW HEAD 
>--i'i 
w
:,: 
+10·-s·♦
-------
2ND FLOOR 
"' 
+s·-o· 
-----;.+ 
T.O. PLAlE 
+s·-o·
----..WN5ow HEA@
"' 
I ,.,."'
+o·-o·
==t- AisH FLOOir+
0FRONT ELEVATION
KEYED NOTES: © 
1.
CONCRETE ROOF TILE
2.
EXTERIOR STUCCO FINISH SYSTEM
3.
STUCCO CONTROL JOINT 
4. FOAM SURROUND w/ STUCCO FINISH
5.
PAINTED COMPOSITE SHUTTER
6.
STONE VENEER
7.
VINYL WINDOW - WHITE FRAME 
8.
PAINTED COMPOSITE SHUTTER
9.
FIBERGLASS DOOR 
10. EXTERIOR WALl_ LIGHT
11. CORBEL
12. VERTICAL FOAM PROFILE w/ STUCCO FINISH
13. FRAMED COLUMN w/ STUCCO FINISH
14. METAL RAILING
15. PAINTED METAL
16. FASCIA w/ STUCCO FINISH
17. ALUMINUM STOREFRONT - WHITE FRAME 
EXTERIOR COLOR SCHEME 1: 
@BODY COLOR 
BENJAMIN MOORE 
CSP-75 CASTLE GATE 
® ACCENT COLOR 1 
DUNN EDWARDS 
DEW379 IGLOO 
©TRIM COLOR 
DUNN EDWARDS 
DEW379 IGLOO 
® ACCENT COLOR 2 
BENJAMIN MOORE 
2134-20 MIDSUMMER NIGHT 
© STONE VENEER 
ENVIRONMENTAL STONE WORKS 
BROOMFIELD SOUTHERN 
LEDGESTONE 
©ROOF TILE 
EAGLE 
PONDEROSA FLINTRIDGE GRAY 
5511 
© DECORATIVE METAL 
DUNN EDWARDS 
DEA 187 BLACK 
EXTERIOR COLOR SCHEME 2: 
@BODY COLOR 
BENJAMIN MOORE 
861 SHALE 
® ACCENT COLOR 1 
BENJAMIN MOORE 
AF-705 CINDER 
©TRIM COLOR 
DUNN EDWARDS 
DEW379 IGLOO 
® ACCENT COLOR 2 
BENJAMIN MOORE 
2112-30 STONE BROWN 
© STONE VENEER 
ENVIRONMENTAL STONE WORKS 
BROOMFIELD SOUTHERN 
LEDGESTONE 
©ROOF TILE 
EAGLE 
PONDEROSA ARCADIA CANYON 
BROWN 5502 
© DECORATIVE METAL 
DUNN EDWARDS 
DEA187 BLACK 
EXTERIOR COLOR SCHEME 3: 
@BODY COLOR 
SHERWIN Wlll_lAMS 
6171 CHA TROOM 
® ACCENT COLOR 1 
BENJAMIN MOORE 
AF-670 NIGHllNGALE 
©TRIM COLOR 
DUNN EDWARDS 
DEW379 IGLOO 
® ACCENT COLOR 2 
DUNN EDWARDS 
232 MOLASSES 
© STONE VENEER 
ENVIRONMENTAL STONE WORKS 
BROOMFIELD SOUTHERN 
LEDGESTONE 
©ROOF TILE 
EAGLE 
PONDEROSA CANYON GRAY 
5552 
© DECORAllVE METAL 
DUNN EDWARDS 
DEA187 BLACK 
PROPOSED ELEVATIONS 
BLDG TYPE 2 
E 
I].).... 
:i.... 
::::l 
+-' 
0
u 
'-+-
I].) 
+-' 
..c 
u.... 
ro 
bi I tform arch i tee tu re 
g r o u p , 
LLC 
11460 north cave creek ,oad . suite 11 
phoenix . arizona 8 5 0 2 0 
Phone 602.285.9200 
Fax 602.285.9229 
z
0 
;:::-
 
 
e 
I-z 
 
0 
	 
-
I 
IZ< 
C 
=:,5
• 
N 
Z! 
1- i1 

>< 
0 ifi
o(_)
_J 
 =· 
en<( =
I- -
zu 
• = 
I • l!J 
ro 
0 
z 
w 
(.) 

0
Cl) 0 
en 
-
(0 
-
 I'--
u "'
C: 
 
 
.g Q) 
0 I-
:i:::c: 
 .9 
,:;I; g, 
....... ·;:: 
REVISIONS 
JOB NO: 
21-031
DATE: 
SEPTEMBER 2ND, 2021 
SCALE: 
3116" = 1'-0" 
SHEET NO: 
A2.2 
PHO SUBMITTAL 9-3-21 
© BILTFORM ARCHITECTURE GROUP, INC. 
PHO-2-21--Z-47-19-7
Proposed Elevations
Hearing Date: 10/20/21

m 
... 
0 
l,J 
--'
< ",-r" 
iij 
r 
z<
 
• co 
;, 
+28'-S
T.0. RIDT
+19'-6" 
--T.O. PLATT:♦
--2N;:♦ 
+9'-oN 
-f.o. PLATEX
+a'-o"
IViNiiow HEADU
@EFT ELEVATION
,-r 
r 
• coI ;,"'
+28'-2" ._ 
T.O. RIDT
+19'-6" 
- --T:0. PLAT£♦ 
+18'-6" 
-\ViNiiow HEADU
+10'-6"
♦
-------
2ND FLOOR 
+9'-0 .. 
-----	
T.0. PLAlE 
+8'-o:;.+
W1ND0W HEAD 
0REAR ELEVATION
	 
... 
0 
0:: 
 
< " 
r"
r 
z<
l,J 
 
, 
l,J 
<
0:: 
,. z;;:• coI ;,"'
+28'-K......b_
T.O. RIDT
+19'-6" 
- --T.0. PL.Ai£♦ 
+10'-6"
♦
-------
2ND FLOOR 
+9'-o;,+
-------
T.O. PLAlE 
+8'-oV
W1NDOW HEAD 
G)RIGHT ELEVATION
r" 
iij 
r 
• coI 
;,"'
+2B'-£A
T.O. RIDT
+19'-6" 
--T.O. PLATT:♦
+18'-6" 
\ViNiiow HEAW
--2N;:♦ 
+s'-o"
-f.o. PLATEY
+e·-o· 
\W.liiow HEAW
+o·-o·
f'iNisH FLOOZ
0FRONT ELEVATION
KEYED NOTES: © 
1. 
CONCRETE ROOF TILE
2.
EXTERIOR srucco FINISH SYSTEM
3.
srucco CONTROL JOINT
4. 
FOAM SURROUND w/ srucco FINISH
5.
PAINTED COMPOSITE SHUTTER
6.
STONE VENEER
7.
VINYL W1NDOW - WHITE FRAME
8.
PAINTED COMPOSITE SHUTTER
9.
FlBERGLASS DOOR 
10. EXTERIOR WALL LIGHT 
11. CORBEL 
12. VERTICAL FOAM PROFlLE w/ srucco FlNISH
13. FRAMED COLUMN w/ srucco FlNISH
14. METAL RAILING
15. PAINTED METAL
16. FASCIA w/ srucco FINISH
17. ALUMINUM STOREFRONT - WHITE FRAME
EXTERIOR COLOR SCHEME 1: 
@BODY COLOR 
BENJAMIN MOORE 
CSP-75 CASTLE GA TE 
® ACCENT COLOR 1 
DUNN EDWARDS 
DEW379 IGLOO 
©TRIM COLOR 
DUNN EDWARDS 
DEW379 IGLOO 
0 ACCENT COLOR 2 
BENJAMIN MOORE 
2134-20 MIDSUMMER NIGHT 
© STONE VENEER 
ENv1RONMENTAL STONE WORKS 
BROOMFIELD SOUTHERN 
LEDGESTONE 
0ROOF TILE 
EAGLE 
PONDEROSA FLINTRIDGE GRAY 
5511 
© DECORATIVE METAL 
DUNN EDWARDS 
DEA187 BLACK 
EXTERIOR COLOR SCHEME 2: 
@soDY COLOR 
BENJAMIN MOORE 
861 SHALE 
® ACCENT COLOR 1 
BENJAMIN MOORE 
AF-705 CINDER 
©TRIM COLOR 
DUNN EDWARDS 
DEW379 IGLOO 
0 ACCENT COLOR 2 
BENJAMIN MOORE 
2112-30 STONE BROWN 
© STONE VENEER 
ENv1RONMENTAL STONE WORKS 
BROOMFIELD SOUTHERN 
LEDGESTONE 
0ROOF TILE 
EAGLE 
PONDEROSA ARCADIA CANYON 
BROWN 5502 
© DECORATIVE METAL 
DUNN EDWARDS 
DEA187 BLACK 
EXTERIOR COLOR SCHEME 3: 
@BODY COLOR 
SHERW1N W1LLIAMS 
6171 CHATROOM 
® ACCENT COLOR 1 
BENJAMIN MOORE 
AF-670 NIGHTINGALE 
©TRIM COLOR 
DUNN EDWARDS 
DEW379 IGLOO 
0 ACCENT COLOR 2 
DUNN EDWARDS 
232 MOLASSES 
© STONE VENEER 
ENVIRONMENTAL STONE WORKS 
BROOMFIELD SOUTHERN 
LEDGESTONE 
0ROOF TILE 
EAGLE 
PONDEROSA CANYON GRAY 
5552 
© DECORATIVE METAL 
DUNN EDWARDS 
DEA187 BLACK 
PROPOSED ELEVATIONS 
BLDG TYPE 3 
E
a, .... 
}.... 
:::::l 
...., 
0
u 
'-+-
a, ...., 
..c 
u .... 
ro 
biltform architecture 
g r o u p , 
LLC 
11460 north cave creek road . suite 11 
phoenix . arizona 8 5 0 2 0 
Phone 602.285.9200 
Fax 602.285.9229 
z
0 
;:::-

 
 
e. 
0 
I-z 
=> 
0 

 
-
I 
Iz<( 
C 
=> 5 •
N
 
1- i1 
=>>< 
0 if] 
o(_)§? 
_J  =· 
en =
z (.) 
I 
• l!J 
coo:: 
0 
z 
w 
(.) 

0 
Q) 0 
en 
- co
_g .,._
(.) u, 
C: 
	 
 
.g <I) 
01-
:i:::c 
 .9 
 g, 
...... ·;:: 
REVISIONS: 
JOB NO: 
21-031
DATE: 
SEPTEMBER 2ND, 2021 
SCALE: 
3/16" = 1 '-Qw 
SHEET NO: 
A2.3 
PHO SUBMITTAL 9-3-21 
© BIL TFORM ARCHITECTURE GROUP, INC. 
PHO-2-21--Z-47-19-7
Proposed Elevations
Hearing Date: 10/20/21

0REAR ELEVATION
©LEFT ELEVATION
... 
0 
0 "' 
 
[D <" 
w 
C<"' 
z 
0:: 
+2s•-s·♦
-------
T.O. RIDGE 
+10·-o
T.O. PLAlE 
+e·-o· 
V.,NDOWHEAir+
+o·-o·
FlNISH FLOORÎ
+25'-B"
-T.O. RIDa
8 "' 
+10'-0"___.,j,,_
T.O. PLATE----.;;:p,-
+B'-0"___.,j,,_
,.'f' DOW HEAÏ
C "'"
z 
EXTERIOR COLOR SCHEME 2:
@BODY COLOR
BENJAMIN MOORE
861 SHALE 
® ACCENT COLOR 1
BENJAMIN MOORE
AF-705 CINDER 
©TRIM COLOR
DUNN EDWARDS
DEW379 IGLOO 
® ACCENT COLOR 2
BENJAMIN MOORE 
2112-30 STONE BROWN
© STONE VENEER
ENVIRONMENTAL STONE WORKS
BROOMFIELD SOUTHERN 
LEDGESTONE 
©ROOF TILE
EAGLE 
PONDEROSA ARCADIA CANYON
BROWN 5502
© DECORATIVE METAL
DUNN EDWARDS
DEA 187 BLACK 
I 
KEYED NOTES: © 
1. 
CONCRETE ROOF TILE
2.
EXTERIOR STUCCO FINISH SYSTEM
3.
STUCCO CONTROL JOINT
4.
FOAM SURROUND w/ STUCCO FINISH
5.
PAINTED COMPOSITE SHUTTER
6.
STONE VENEER
7.
VINYL V.,NDOW - WHITE FRAME
8.
PAINTED COMPOSITE SHUTTER
9.
FIBERGLASS DOOR 
1 O. EXTERIOR WALL LIGHT
11. CORBEL
12. VERTICAL FOAM PROFILE w/ STUCCO FINISH
13. FRAMED COWMN w/ STUCCO FINISH
14. METAL RAILING
15. PAINTED METAL
16. FASCIA w/ STUCCO FINISH
17. ALUMINUM STOREFRONT - WHITE FRAME
+2s·-s
· 
-------
0 
0 "' 
 
[D <" 
z 
0:: 
GjlGHT ELEVATION
0FRONT ELEVATION
T.O. RIDGE 
+10'-0"
--f.o. PLATEÍ
+8'-0"
7\fNBow HEAir+
8 "' 
+25'-B"
- --T.O. RIDGE♦
+8'-0"
WINDOW HEAir+-
PROPOSED ELEVATIONS 
CLUBHOUSE 
E
ilJ 
'-
:i.... 
::::; 
....., 
0
u 
'-+-
ilJ ....., 
..c: 
u 
'-
ctl 
bi I tform arch i tee tu re 
g r o u p , 
LLC 
11460 north cave creek road . suite 11
phoenix . anzona 8 5 0 2 0
Phone 602.285.9200
Fax 602.285.9229
REVISIONS:
JOB NO: 
DATE: 
SCALE:
SHEET NO: 
• 
 
c:, 
Q) c:, 
E:'! Ð
0 (/)
C: I!!
.g a,
CI­
I c: 
Ñ .9 
.... a,
(') C: 
 
21--031
SEPTEMBER 2ND, 2021
3/16" = 1'-0"
A2.4 
PHO SUBMITTAL 9-3-21 
© BILTFORM ARCHITECTURE GROUP, INC.
PHO-2-21--Z-47-19-7
Proposed Elevations
Hearing Date: 10/20/21

+17'-8"
+17'-8"
RIDGE
RIDGE
IL 
IL 
0 
0 
0
0
"' 
"' 
+10·-1 1 8"
ls 
+10·-1 1 8"
ls 
T.O. PLATE
f-
T.O. PLATE
f-
z f-
z f-
0 :,: 
0 :,: 
0.. 
C, 
0.. 
C, 
Cl iiJ
Cl iiJ 
:is :,: 
:is :,:
g 
C, 
g 
C, 
z 
z 
"' 9 
"' 9 
Cl ::,
Cl ::,
< 
< 
 
ID
 
ID
...J 
...J 
 
 
0 g 
0 g 
ID 
ID 
< 
< 
• 
• 
"' 
"' 
I --H
+o'-o"
+o·-o·
TOP OF STEM 
TOP OF STEM 
ORIGHT SIDE ELEVATION
OREAR ELEVATION
+17'-8"
+17
1-8
11 
RIDGE 
RIDGE 
IL 
IL 
0 
0 
0 
"'
"'
IL 
IL 
+10·-1 1 8"
0 
+10'-1 1 8"
0 
T.0. PLATE
f-
T.0. PLATE
z f-
z f-
0 :,: 
0 :,: 
; 
0.. 
C, 
Cl 
:,: 
·.J. .. ,_ 
 !ii
g 
C, 

"' 9
Cl 
ii! 
<
::, 
"' 
C, 
...J 
• 

I 
	
 
0 
ID 
g 
< 
• 
• 
"'
"'
I 
I 
-
-:., 
-:., 
 ;:c:. 
-
-
;:,-"! 
-H
-H
+o·-o·
+o·-o·
OP OF STEM 
TOP OF STEM 
OLEFT SIDE ELEVATION
OFRONT ELEVATION
KEYED NOTES: © 
1.
CONCRETE ROOF TILE
2.
EXTERIOR STUCCO FINISH SYSTEM
3.
STUCCO CONTROL JOINT
4.
FOAM SURROUND w/ STUCCO FINISH
5.
PAINTED COMPOSITE SHUTTER
6.
STONE VENEER
7.
VINYL V.,NDOW - WHITE FRAME
8.
PAINTED COMPOSITE SHUTTER
9.
FIBERGLASS DOOR 
1 O. EXTERIOR WALL LIGHT 
11. CORBEL
12. VERTICAL FOAM PROFILE w/ STUCCO FINISH
13. FRAMED COWMN w/ STUCCO FINISH
14. METAL RAILING
15. PAINTED METAL
16. FASCIA w/ STUCCO FINISH
17. ALUMINUM STOREFRONT - WHITE FRAME
EXTERIOR COLOR SCHEME 1: 
@BODY COLOR 
BENJAMIN MOORE 
CSP-75 CASTLE GATE 
® ACCENT COLOR 1 
DUNN EDWARDS 
DEW379 IGLOO 
©TRIM COLOR 
DUNN EDWARDS 
DEW379 IGLOO 
® ACCENT COLOR 2 
BENJAMIN MOORE 
2134-20 MIDSUMMER NIGHT 
© STONE VENEER 
ENVIRONMENTAL STONE WORKS 
BROOMFIELD SOUTHERN 
LEDGESTONE 
©ROOF TILE 
EAGLE 
PONDEROSA FLINTRIDGE GRAY 
5511 
@DECORATIVE METAL 
DUNN EDWARDS 
DEA187 BLACK 
PROPOSED ELEVATIONS 
CABANA 
E
ilJ ... 
:i.... 
::::; 
....., 
0
u 
'-+-
ilJ ....., 
..c: 
u ... 
ctl 
bi I tform arch i tee tu re 
g r o u p , 
LLC 
11460 north cave creek road . suite 11 
phoenix . anzona 8 5 0 2 0 
Phone 602.285.9200 
Fax 602.285.9229 
REVISIONS: 
JOB NO: 
DATE: 
SCALE: 
SHEET NO: 
• 

 
c:, 
Q) c:, 
E:'!  
0 (/) 
C: I!! 
.g a, 
0
1-
:r: C: 
 .9 
.... a, 
(') C: 

 
21-031
SEPTEMBER 2ND, 2021
1/4"=1'-0
 
A2.5 
PHO SUBMITTAL 9-3-21 
© BILTFORM ARCHITECTURE GROUP, INC. 
PHO-2-21--Z-47-19-7
Proposed Elevations
Hearing Date: 10/20/21

9'-0" 
PAINTED 12" 
METAL FASCIA 
----,. 
D 
15 
TYPICAL CARPORT ELEVATION 
A 
2 
C 
12 
TRASH ENCLOSURE-LEFT ELEVATION 
COMPACTOR-LEFT ELEVATION 
COMPACTOR-FRONT ELEVATION 
+7'-o" $ 
T.O. WALL 
TRASH ENCLOSURE-RIGHT ELEVATION 
+7'-0" $
T.O. WALL 
TRASH ENCLOSURE- FRONT ELEVATION 
G 
12 
C 
12 
A 
2 
COMPACTOR-REAR ELEVATION 
COMPACTOR-RIGHT ELEVATION 
+9'-0" $
T.O. WALL 
+7'-0" $
T.O. WALL 
KEYED NOTES: (j) 
1.
CONCRETE ROOF TILE
2. 
EXTERIOR STUCCO FINISH SYSTEM
3. 
STUCCO CONTROL JOINT
4. 
FOAM SURROUND w/ STUCCO FINISH
5. PAINTED COMPOSITE SHUTTER
6.
STONE VENEER
7. VINYL WINDOW - WHITE FRAME
8. 
PAINTED COMPOSITE SHUTTER
9. 
FIBERGLASS DOOR 
10. EXTERIOR WALL UGHT
11. CORBEL
12. VERTICAL FOAM PROFILE w/ STUCCO FINISH
13. FRAMED COLUMN w/ STUCCO FINISH
14. METAL RAILING
15. PAINTED METAL
16. FASCIA w/ STUCCO FINISH
17. ALUMINUM STOREFRONT - WHITE FRAME
EXTERIOR COLOR SCHEME 2:
@eoDY COLOR 
BENJAMIN MOORE 
861 SHALE 
® ACCENT COLOR 1 
BENJAMIN MOORE 
AF-705 CINDER 
© TRIM COLOR 
DUNN EDWARDS 
DEW379 IGLOO 
® ACCENT COLOR 2 
BENJAMIN MOORE 
2112-30 STONE BROWIN 
© STONE VENEER 
ENVIRONMENTAL STONE WORKS 
BROOMFIEUD SOUTHERN 
LEDGESTONE 
©ROOF TILE 
EAGLE 
PONDEROSA ARCADIA CANYON 
BROWIN 5502 
© DECORATIVE METAL 
DUNN EDWARDS 
DEA 187 BLACK 
PROPOSED ELEVATIONS 
TRASH ENCL & CARPORT 
E
ilJ 
'-
:i.... 
::::; 
u 
'-+-
ilJ ...., 
..c: 
u 
'-
ctl 
bi I tform arch i tee tu re 
g r o u p , 
LLC 
11460 north cave creek road . suite 11 
phoenix . anzona 8 5 0 2 0 
Phone 602.285.9200 
Fax 602.285.9229 
REVISIONS: 
JOB NO: 
DATE: 
SCALE; 
SHEET NO: 
 
c:, 
Q) c:, 
E:'! ˜
i:3 (/)
C: I!!
.g a,
0 1-
:r: C:
™ .9 
.... a,
(') r::: 
 
21-031
SEPTEMBER 2ND, 2021 
1/4" = 1·-0· 
A2.6 
PHO SUBMITTAL 9-3-21 
© BILTFORM ARCHITECTURE GROUP, INC. 
PHO-2-21--Z-47-19-7
Proposed Elevations
Hearing Date: 10/20/21

ZONING RU--43 
ZONING C-2/CP-GCP 
B i :◄ , ,_, : i i ! ! 
DEVELOPMENT 
ZONING C-2 
ZONING R-3A 
ZONING C.1 
t 
 
I 
01t·•.,. :,: 
Jr, l; 
.JJ J°-. -. : 
 
fr 
1---==1::t::4::-c:,...= =	
::1Fr: 
SITEC 
ZONt4G C.2/CP-OCP 
Laveen Park Place 
CONCEPTUAL MASTER SITE PLAN 
Laveen, Arizona 
BASELINE ROAD 
ZONING C.2 
CITY OF PHOENIX
OCT 2 3 2019 
Planning & Development
Department
10-11-19 
MSP 
PHO-2-21--Z-47-19-7
Stipulated Conceptual Master Site Plan
Hearing Date: 10/20/21

174406 
City Council Formal Meeting 
Minutes 
January 8, 2020 
because: 
"I come from a family that owns several gas stations and a restaurant. I 
understand the responsibilities that come along with the liquor license. I 
have grown up seening my family members running these businesses 
successfully and safely. I also have a Bachelor's degree in Computer 
Science from Arizona State University. I have the capability of 
understanding and following the rules to ensure safety of everyone." 
The public convenience requires and the best interest of the community 
will be substantially served by the issuance of the liquor license because: 
"The restaurant is loacted on a very busy intersection, and in a very 
densely populated region of the city. Our customers will be able to enjoy 
great Mexican food, and cocktails without having to travel too far." 
Staff Recommendation 
Staff recommends approval of this application. 
Attachments 
Liquor License Data - Taco Boys 
Liquor License Map - Taco Boys 
This item was recommended for approval. 
ORDINANCES, RESOLUTIONS, AND NEW BUSINESS 
Mayor Gallego requested a motion on the remaining agenda items. A motion 
was made, as appears below. 
Note: Comment cards were submitted in favor of Item 71 by the following 
individuals, but did not wish to speak. 
Michael Mooney 
Chris Robertson 
Deana Garner 
J.D. Loudabarger
Dan Klocke
Devney Preuss
A motion was made by Vice Mayor Guardado, seconded by Councilwoman 
Williams, that Items 32-115 be approved or adopted except for Items 33, 36, 
City of Phoenix 
Page49

174406 
City Council Formal Meeting 
Minutes 
January 8, 2020 
43, 45, 50, 62, 74, 77, 79, 87, and 107-112; and continuing Item 70 to the Jan. 
29, 2020 City Council Formal Meeting and Item 103 to the March 4, 2020 City 
Council Formal Meeting. The motion carried by the following vote: 
Yes: 
No: 
9 -
Councilman DiCiccio, Councilmember Garcia, 
Councilman Nowakowski, Councilwoman Pastor, 
Councilwoman Stark, Councilman Waring, 
Councilwoman Williams, Vice Mayor Guardado and 
Mayor Gallego 
0 
Items 32, 34-35, 37-42, 44, and 46-49, Ordinance S-46263 was a request to 
authorize the City Controller to disburse funds up to amounts indicated for the 
purpose of paying vendors, contractors, claimants and others, and providing 
additional payment authority under certain existing city contracts. This section 
also requested continuing payment authority, up to amounts indicated below, for 
the following contracts, contract extensions and/or bids awarded. As indicated 
below, some items below require payment pursuant to Phoenix City Code 
section 42-13. 
32 
North American Region of the Airports Council International, doing 
business as Airports Council International - North America 
For $128,061.00 in payment authority for 2020 Airports Council 
International - North America (ACI-NA) membership dues for the Aviation 
Department. ACI-NA is an organization that represents state, local, and 
regional governing bodies that own and operate commercial airports in 
North America and the world, with a focus on industry issues such as 
finance, safety, operations, business, and regulatory issues, as well as 
the Federal Aviation Administration, Department of Homeland Security 
and Customs and Border Protection. This item was approved by the 
Transportation, Infrastructure and Innovation Subcommittee on Dec. 4, 
2019. 
This item was adopted. 
34 
Trace Analytics, LLC. 
For $45,000.00 in payment authority for a new Contract, entered on or 
about Jan. 15, 2020, for a term of five years, for respiratory air testing 
and analysis services for the Fire Department. These services are vital to 
City of Phoenix 
Page SO

174406 
City Council Formal Meeting 
Minutes 
January 8, 2020 
Zoning Map of the City of Phoenix, by adopting Rezoning Application 
Z-29-19-6 and rezone the site from R1-6 to P-1 to allow parking to serve
adjacent businesses.
Summary
Current Zoning: R1-6
Proposed Zoning: P-1
Acreage: 0.78
Proposed Use: Parking to serve adjacent businesses
Owner: James Aaron Klusman 
Applicant: Ed Bull, Burch & Cracchiolo, PA 
Representative: Ed Bull, Burch & Cracchiolo, PA 
Staff Recommendation: Approval subject to stipulations. 
VPC Action: The Camelback East Village Planning Committee heard this 
case on Aug. 6, 2019, and recommended approval per the staff 
recommendation by a 15-0 vote. 
PC Action: The Planning Commission heard this case on Dec. 5, 2019, 
and recommended approval per the Camelback East Village Planning 
Committee recommendation by a 9-0 vote. 
Location 
Approximately 235 feet east of the northeast corner of 32nd Street and 
Campbell Avenue 
Council District: 6 
Parcel Addresses: 3216 and 3220 E. Minnezona Circle 
This item was continued to the March 4, 2020 City Council Formal 
Meeting. 
104 
Amend City Code - Ordinance Adoption - Rezoning Application 
Z-47-19-7- Southeast Corner of 63rd Avenue and Baseline Road
(Ordinance G-6659)
Request to amend the Phoenix Zoning Ordinance, Section 601, the 
Zoning Map of the City of Phoenix, by adopting Rezoning Application 
Z-47-19-7 and rezone the site from S-1 (approved CP/GCP and/or C-2)
to CP/GCP, C-2 HGT/WVR and R-4 to allow commerce park
development, commercial development with a height waiver for up to 56
feet, and multifamily residential.
City of Phoenix 
Page 106

174406 
City Council Formal Meeting 
Minutes 
Summary 
Current Zoning: S-1 (approved CP/GCP and/or C-2) 
Proposed Zoning: CP/GCP, C-2 HGT/WVR and R-4 
Acreage: 128.61 
January 8, 2020 
Proposed Use: Commerce park development, commercial development 
with a height waiver for up to 56 feet and multifamily residential 
Owner: Laveen Baseline, LLC 
Applicant: Wendy Riddell, Berry Riddell, LLC 
Representative: Wendy Riddell, Berry Riddell, LLC 
Staff Recommendation: Approval, subject to stipulations. 
VPC Action: The Laveen Village Planning Committee heard this case on 
Nov. 4, 2019, and recommended approval per the staff recommendation 
with a modified stipulation by an 8-0 vote. 
PC Action: The Planning Commission heard this case on Dec. 5, 2019, 
and recommended approval per the Laveen Village Planning Committee 
recommendation by a 9-0 vote. 
Location 
Southeast corner of 63rd Avenue and Baseline Road 
Council District: 7 
Parcel Addresses: 8388 S. 59th Drive 
This item was adopted. 
105 
Amend City Code - Ordinance Adoption - Rezoning Application 
Z-23-19-8 - Approximately 165 Feet East of the Southeast Corner of
the 35th Street Alignment and Van Buren Street (Ordinance
G-6655)
Request to amend the Phoenix Zoning Ordinance, Section 601, the 
Zoning Map of the City of Phoenix, by adopting Rezoning Application 
Z-23-19-8 and rezone the site from C-3 to WU Code T5:3 GW to allow
multifamily and mixed use.
Summary
Current Zoning: C-3
Proposed Zoning: WU Code T5:3 GW
Acreage: 3.21
Proposed Use: Multifamily residential and mixed use
City of Phoenix 
Page 107

Planning Commission Minutes for December 5, 2019 
Item#: 
Application #: 
From: 
To: 
Acreage: 
Location: 
Proposal: 
Applicant: 
Owner: 
Representative: 
11 
Z-47-19-7
S-1 (Approved CP/GCP and/or C-2)
CP/GCP, C-2 HGT/WVR and R-4
128.61
Southeast corner of 63rd Avenue and Baseline Road
Commerce park development, commercial development with a
height waiver for up to 56 feet, and multifamily residential
Wendy Riddell, Berry Riddell, LLC
Laveen Baseline, LLC
Wendy Riddell, Berry Riddell, LLC
Ms. Racelle Escolar stated that Item No. 11 is Z-47-19-7, a request to rezone 128.61 
acres located at the southeast corner of 63rd Avenue and Baseline Road from S-1 
(Ranch or Farm Residence District), approved CP/GCP (Commerce Park/General 
Commerce Park option) and/or C-2 (Intermediate Commercial District). The requested 
zoning is CP/GCP, C-2 with a height waiver for up to 56 feet, and R-4 (Multifamily 
Residence District) to allow commerce park development, commercial development 
with the height waiver up to 56 feet, and multifamily residential. 
The Laveen Village Planning Committee recommended approval with a modified 
stipulation by an 8-0 vote. 
Stipulation No. 22 was modified to limit the building height to 30 feet within 150 feet of 
59th Avenue, and to reduce the height from 56 feet to 45 feet for the remainder of Site 
B, the northeast portion of the site. 
Staff recommends approval per the Laveen Village Planning Committee 
recommendation. 
Commissioner Johnson stated that he received one speaker card from Mr. Robert 
Branscomb, wishing to speak in favor; but received no cards in opposition. He asked 
Mr. Branscomb if he still wanted to speak. 
Mr. Robert Branscomb stated no. 
Commissioner Shank made a MOTION to approve Z-47-19-7, per the Laveen 
Village Planning Committee recommendation. 
Commissioner Montalvo SECONDED. 
There being no further discussion, Chairman Johnson called for a vote and the 
MOTION PASSED 9-0. 
58

Planning Commission Minutes for December 5, 2019 
Stipulations: 
Overall Site 
1.
The development shall be in General Conformance to the Conceptual Master
Site Plan date stamped October 23, 2019, with specific regard to the site
locations, as approved by the Planning and Development Department.
2.
All parking areas adjacent to public streets, excluding the freeway, shall be
screened by a combination of decorative screen walls and a minimum 3-foot high
landscaped mound/berm along the perimeter streets, as approved by the
Planning and Development Department.
3.
All sidewalks adjacent to public streets shall be detached with a minimum 5-foot
wide continuous landscape area located between the sidewalk and back of curb;
and shall include minimum 3-inch caliper, large canopy single-trunk shade trees
(limbed-up a minimum of 10-feet clear from finish grade), planted 25 feet on
center or in equivalent groupings; and minimum 5-gallon shrubs with a maximum
mature height of 2 feet providing 75 percent live cover, as approved by the
Planning and Development Department. If there is limited right-of-way along the
Baseline Road frontage requiring a modified cross section, an attached sidewalk
design may be considered, as approved by the Planning and Development
Department.
4.
The developer shall provide clearly defined, accessible pathways at vehicular
crossings, constructed of decorative pavement that visually contrasts with the
adjacent parking and drive aisle surfaces for internal drive aisles and
accessways, as approved by the Planning and Development Department.
5.
The applicant shall submit a Traffic Impact Study (TIS) to the City for this
development for review and approval by the Street Transportation Department
(except for the Site A, Harkins) prior to the submittal of preliminary site plans.
Additional right-of-way and street improvements may be required following TIS
review. Phasing of off-site improvements must be consistent with the TIS
recommendations. Phased street improvements will require the installation of
pavement transition tapers, as approved by the Street Transportation
Department.
6.
The developer shall construct all streets within and adjacent to the development
required for each phase with paving, curb, gutter, minimum 5-foot wide sidewalk,
curb ramps, streetlights, landscaping and other incidentals, as per plans
approved by the Planning and Development Department. All improvements shall
comply with the current ADA Guidelines.
7.
Open irrigation facilities are to be piped outside of right-of-way and shown on the
preliminary site plan, as approved by the Planning and Development
Department.
8.
All multi-use trails and shared use paths shall be shaded a minimum of 50
59

Planning Commission Minutes for December 5, 2019 
percent with 2-inch minimum caliper, large canopy shade trees, located 5 to 8 
feet from the edge of the trail, as approved by the Planning and Development 
Department. 
9.
The right-of-way shall be dedicated, if required, and a bus pad (detail P1260 or
P1262) constructed at the following locations, unless otherwise modified by the
Planning and Development Department and Public Transit Department:
a) Eastbound Baseline Road east of 63rd Avenue. Pad shall be spaced from
the intersection of 63rd Avenue and Baseline Road according to City of
Phoenix Standard Detail P1258.
b) Three bus stop pads shall be located along Southbound 59th Avenue.
10.
If determined necessary by the Phoenix Archaeology Office, the applicant
shall conduct Phase I data testing and submit an archaeological survey report
of the development area for review and approval by the City Archaeologist
prior to clearing and grubbing, landscape salvage, and/or grading approval.
11.
If Phase I data testing is required, and if, upon review of the results from the
Phase I data testing, the City Archaeologist, in consultation with a qualified
archaeologist, determines such data recovery excavations are necessary, the
applicant shall conduct Phase II archaeological data recovery excavations.
12.
In the event archaeological materials are encountered during construction, the
developer shall immediately cease all ground-disturbing activities within a 33-foot
radius of the discovery, notify the City Archaeologist, and allow time for
the Archaeology Office to properly assess the materials.
Site A
13.
The development shall be in general conformance with the site plan and
elevations date stamped October 23, 2019, as modified by the following
stipulations and approved by the Planning and Development Department.
14.
The maximum building height shall be limited to 56 feet.
15.
There shall be a 150-foot setback provided from 59th Avenue for buildings
over 30 feet in height.
16.
A minimum of one clearly defined pedestrian connection shall be provided from
Site A to connect with the trail along the Laveen Area Conveyance Channel with
one pedestrian scale amenity (benches, tables, etc.) provided within close
proximity of the trail, as approved by the Planning and Development
Department.
17.
A minimum of two pedestrian pathways that are a minimum 6 feet wide shall be
provided from the west side of Site B through Site A to the proposed buildings.
The parking lot shall be designed to have minimal vehicular drive crossings
60

Planning Commission Minutes for December 5, 2019 
through these pathways. These pathways shall have a minimum 50 percent 
shade provided by 2-inch minimum caliper trees located in minimum 5-foot wide 
landscape areas and/or an architectural shading element, as approved by the 
Planning and Development Department. 
18.
A minimum of two inverted-Li bicycle racks (4 spaces) shall be provided for
each building on site, located near building entries, and installed per the
requirements of Section 1307.H. of the Phoenix Zoning Ordinance, as approved
by the Planning and Development Department.
19.
The developer shall construct the west half street of 59th Avenue, as consistent
with the Street Classification Map, including the landscaped median between
the Laveen Area Conveyance Channel and the southern boundary of Site A, as
approved by the Planning and Development Department. Asphalt pavement
transition tapers are required between ultimate and interim street conditions, as
approved by the Street Transportation Department.
20.
The developer shall construct a 10-foot-wide Shared Use Path (SUP) along the
west side of 59th Avenue in lieu of the required sidewalk, consistent with the
improvements on 59th Avenue north of the Laveen Area Conveyance Channel,
as approved by the Planning and Development Department.
21.
The developer shall construct a 10-foot-wide Multi-Use Trail (MUT) along the
south side of the Laveen Area Conveyance Channel, as approved by the
Planning and Development Department.
Site B (Retail/Restaurant)
22.
The maximum building height shall be limited to 30 FEET WITHIN 150 FEET OF
59TH AVENUE AND 45 W feet FOR THE REMAINDER OF SITE B.
23.
There shall be a 150-foot step back provided from 59th Avenue for building over
30 feet in height.
24.
The site plan, landscape plan showing pedestrian circulation and elevations,
shall be reviewed and approved by the Planning Hearing Officer through the
public hearing process prior to preliminary site plan approval for conceptual
review of the applicable provisions of the goals and policies of the Southwest
Growth Study which shall include the following:
a. Promoting the overall pedestrian circulation within the commercial corner
through wide sidewalks, detached sidewalks and overall connectivity
including:
(i) A minimum of two pedestrian pathways that are a minimum of 6
feet wide shall be provided from 59th Avenue through the site to
connect to buildings and the pedestrian pathways at Site A. The
parking lot shall be designed to have minimal vehicular drive
crossings through these pathways. These pathways shall have a
61

Planning Commission Minutes for December 5, 2019 
minimum 50 percent shade provided by 2-inch minimum caliper 
trees located in minimum 5-foot wide landscape areas and/or an 
architectural shading element. 
(ii) A minimum of two clearly defined pedestrian connections shall be
provided to connect with the trail along the Laveen Area
Conveyance Channel with two pedestrian scale amenities (open
space, benches, tables, etc.) provided within close proximity of the
tra i I.
b. Arcades and overhangs shall be incorporated into the buildings to
promote shade.
c. All building facades shall contain architectural embellishments and
detailing such as textural changes, pilasters, offsets, recesses, window
fenestration, shadow boxes and overhead/canopies at least every 50
linear feet.
d. Accent building materials such as: native stone, burnt adobe, textured
brick, wood (when shaded by overhangs or deep recesses), slump block,
ceramic tile (matte finish), stucco and/or exposed aggregate concrete
shall be used on buildings or otherwise demonstrate that the architectural
style is consistent with prior phases of the project and development in the
area.
25.
Drive-through restaurant pick-up windows shall be architecturally integrated in
proportion, color, material and texture to the building it serves by providing
awnings or architecturally integrated structures for weather protection, as
approved by the Planning and Development Department.
26.
Drive-through restaurant facilities shall provide a minimum of 250 square feet of
outdoor seating areas, as approved by the Planning and Development
Department.
27.
A minimum of 25 percent of the surface parking areas shall be shaded by 2-inch
minimum caliper, large canopy single-trunk shade trees, located within minimum
5-foot wide landscape areas, as approved by the Planning and Development
Department.
28.
A minimum of two inverted-U bicycle racks (4 spaces) shall be provided for each
building on site, located near building entries, and installed per the requirements
of Section 1307.H. of the Phoenix Zoning Ordinance, as approved by the
Planning and Development Department.
29.
A minimum of 30 percent of the linear frontage of the buildings, that has main
public entries oriented towards parking areas, shall be provided with planting.
Planting areas shall be sized to provide adequate area for planting materials to
thrive. Trees and shrubs shall be sized to provide 30 percent shading of area at
maturity, as approved by the Planning and Development Department.
62

Planning Commission Minutes for December 5, 2019 
30.
The developer shall construct the west half street of 59th Avenue, as consistent
with the Street Classification Map, including landscaped median between the
Laveen Area Conveyance Channel and the southern boundary of Site B, as
approved by the Planning and Development Department. Asphalt pavement
transition tapers are required between ultimate and interim street conditions, as
approved by the Street Transportation Department.
31.
The developer shall construct a 10-foot Shared Use Path (SUP) on 59th Avenue
in lieu of the required sidewalk, consistent with the improvements on 59th
Avenue north of the Laveen Area Conveyance Channel.
32.
The developer shall construct a 10-foot-wide Multi-Use Trail (MUT) along the
southside of the Laveen Area Conveyance Channel, as approved by the
Planning and Development Department.
Site C (Multifamily)
33.
The site plan, landscape plan showing pedestrian circulation and elevations shall
be reviewed and approved by the Planning Hearing Officer through the public
hearing process prior to preliminary site plan approval for conceptual review of
the applicable provisions of the goals and policies of the Southwest Growth
Study which shall include the following:
a.
Promoting pedestrian connections with the adjacent commercial
development through sidewalks, detached sidewalks and overall
connectivity including:
b. A minimum of three evenly dispersed pedestrian connection points to the
commercial development to the north. This pedestrian connection shall be
clearly defined and minimize vehicular conflicts.
c. Arcades and overhangs shall be incorporated into the buildings to
promote shade.
d. All building facades shall contain architectural embellishments and
detailing such as textural changes, pilasters, offsets, recesses, window
fenestration, shadow boxes and overhead/canopies at least every 50
linear feet, as approved by the Planning and Development Department.
e.
Ensuring architectural style is consistent with prior phases of the project
and development in the area.
34.
There shall be a minimum of 10 percent common area open space provided
onsite, as approved by the Planning and Development Department.
35.
A minimum of 25 percent of the surface parking areas shall be shaded by a
minimum 2-inch caliper, large canopy single-trunk shade trees, located within
minimum 5-foot wide landscape areas, as approved by the Planning and
63

Planning Commission Minutes for December 5, 2019 
Development Department. 
36.
The developer shall construct the west half street of 59th Avenue, as consistent
with the Street Classification Map, including the landscaped median for the full
extent of Site C, as approved by the Planning and Development Department.
Asphalt pavement transition tapers are required between ultimate and interim
street conditions, as approved by the Street Transportation Department.
37.
The developer shall construct a 10-foot wide Shared Use Path (SUP) on 59th
Avenue in lieu of the required sidewalk, consistent with the improvements on
59th Avenue north of the Laveen Area Conveyance Channel.
38.
The developer shall provide conduit plan and junction boxes at 59th Avenue
and South Mountain Avenue on project site for future traffic signal equipment
and all work related to the construction or reconstruction of the conduit runs and
junction box installation shall be the responsibility of the Developer, as approved
by the Planning and Development Department.
Site D (Commerce Park/General Commerce Park North of the LACC)
39.
The site plan, landscape plan showing pedestrian circulation and elevations shall
be reviewed and approved by the Planning Hearing Officer through the public
hearing process prior to preliminary site plan approval for conceptual review of
the applicable provisions of the goals and policies of the Southwest Growth
Study which shall include the following:
a. Promoting the overall pedestrian circulation within the development
through wide sidewalks, detached sidewalks and overall connectivity
including:
(i) A minimum of two pedestrian connections to the Laveen Area
Conveyance Channel.
(ii) There shall be an employee open space area provided adjacent to
the Laveen Area Conveyance Channel. The open space areas
shall provide a minimum of one amenity (tables, benches, yard
games, etc.) each.
b. Arcades and overhangs shall be incorporated into the buildings to
promote shade.
c.
All building facades shall contain architectural embellishments and
detailing such as textural changes, pilasters, offsets, recesses, window
fenestration, shadow boxes and overhead/canopies at least every 50
linear feet.
d.
Ensuring architectural style is consistent with prior phases of the project
and development in the area.
64

Planning Commission Minutes for December 5, 2019 
40.
There shall be a minimum of one exterior employee balcony provided on each
four-story building that is a minimum of 12 feet in depth and a minimum of 200
square feet in size, as approved by the Planning and Development
Department.
41.
The glazing on all building windows shall have a maximum reflectivity of 20
percent, as approved by the Planning and Development Department.
42.
A minimum of 25 percent of the surface parking areas shall be shaded by
minimum 2-inch caliper, large canopy single-trunk shade trees, located within
minimum 5-foot wide landscape areas, as approved by the Planning and
Development Department.
43.
A minimum of six inverted-U bicycle racks (12 spaces) shall be provided for
each building on site, located near building entries, and installed per the
requirements of Section 1307.H. of the Phoenix Zoning Ordinance, as
approved by the Planning and Development Department.
44.
A minimum of 30 percent of building linear frontage, that has main public
entries oriented towards parking areas, shall be provided with planting.
Planting areas shall be sized to provide adequate area for planting materials
to thrive. Trees and shrubs shall be sized to provide 30 percent shading of
area at maturity, as approved by the Planning and Development Department.
45.
The developer shall protect in place the shared-use path and 20-foot wide
public trail/sidewalk easement along the north side of the Laveen Area
Conveyance Channel, as approved by the Planning and Development
Department.
46.
The developer shall dedicate a 30-foot-wide public trail/sidewalk easement
along the west side of the 202 Loop or adjacent to 63rd Avenue, whichever
provides greater connectivity, at the time of preliminary site plan approval.
Developer shall construct a 10-foot-wide shared-use path (SUP) within the
easement as indicated in section 429 of the City of Phoenix MAG Supplement,
as approved by the Planning and Development Department.
47.
A minimum 10-foot public multi-use trail shall be constructed within a 30-foot
easement in accordance with MAG supplemental detail 429 along the south
side of Baseline Road to connect to the trails to the east and west, as
approved by the Parks and Recreation Department.
48.
The developer shall dedicate 60 feet of right-of-way for the full parcel limits for
the south half of Baseline Road, as approved by the Planning and Development
Department.
49.
The developer shall dedicate a minimum of 40 feet of right-of-way for the full
parcel limits for the east half of 63rd Avenue. Additional right-of-way
dedications and improvements as required by the TIS, as approved by the
Street Transportation Department.
65

Planning Commission Minutes for December 5, 2019 
50.
The developer shall dedicate 40 feet of right-of-way for the full parcel limits for
the east half of 63rd Avenue and improvements as required by the TIS, as
approved by the Planning and Development. Asphalt pavement transition
tapers are required between ultimate and interim street conditions, as approved
by the Street Transportation Department.
51.
The developer shall dedicate a 25-foot by 25-foot right-of-way triangle at the
southeast corner of Baseline Road and 63rd Avenue, as approved the Planning
and Development Department.
Site E (Commerce Park/General Commerce Park South of the LACC)
52.
The site plan, landscape plan showing pedestrian circulation and elevations shall
be reviewed and approved by the Planning Hearing Officer through the public
hearing process prior to preliminary site plan approval for conceptual review of
the applicable provisions of the goals and policies of the Southwest Growth
Study which shall include the following:
a. Promoting the overall pedestrian circulation within the development
through wide sidewalks, detached sidewalks and overall connectivity
including:
(i) A minimum of two pedestrian connections to the Laveen Area
Conveyance Channel.
(ii) There shall be an employee open space area provided adjacent to
the Laveen Area Conveyance Channel. The open space areas
shall provide a minimum of one amenity (tables, benches, yard
games, etc.) each.
b. Arcades and overhangs shall be incorporated into the buildings to
promote shade.
c. All building facades shall contain architectural embellishments and
detailing such as textural changes, pilasters, offsets, recesses, window
fenestration, shadow boxes and overhead/canopies at least every 50
linear feet.
d. Ensuring architectural style is consistent with prior phases of the project
and development in the area.
53.
There shall be a minimum of one exterior employee balcony provided on each
four-story building that is a minimum of 12 feet in depth and a minimum of 200
square feet in size, as approved by the Planning and Development
Department.
54.
The glazing on all building windows shall have a maximum reflectivity of 20
percent, as approved by the Planning and Development Department.
66

Planning Commission Minutes for December 5, 2019 
55.
A minimum of 25 percent of the surface parking areas shall be shaded by
minimum 2-inch caliper, large canopy single-trunk shade trees, located within
minimum 5-foot wide landscape areas, as approved by the Planning and
Development Department.
56.
A minimum of six inverted-U bicycle racks (12 spaces) shall be provided for
each building on site, located near building entries, and installed per the
requirements of Section 1307.H. of the Phoenix Zoning Ordinance, as
approved by the Planning and Development Department.
57.
A minimum of 30 percent of building linear frontage, that has main public
entries oriented towards parking areas, shall be provided with planting.
Planting areas shall be sized to provide adequate area for planting materials
to thrive. Trees and shrubs shall be sized to provide 30 percent shading of
area at maturity, as approved by the Planning and Development Department.
58.
The developer shall dedicate a 30-foot-wide public trail/sidewalk easement
along the west side of the 202 Loop Freeway or adjacent to 63rd Avenue,
whichever provides greater connectivity, at the time of preliminary site plan
approval. Developer shall construct a 10-foot wide shared-use path (SUP) within
the easement per Section 429 of the City of Phoenix MAG Supplement, as
approved by the Planning and Development Department.
59.
The developer shall construct a 10-foot-wide Multi-Use Trail (MUT) along the
southside of the Laveen Area Conveyance Channel, as approved by the
Planning and Development Department.
60.
The developer shall dedicate a minimum of 40 feet of right-of-way for the full
parcel limits for the east half of 63rd Avenue. Additional right-of-way dedications
and improvements as required by the TIS, and as approved by the Street
Transportation Department. Asphalt pavement transition tapers are required
between ultimate and interim street conditions, excepting the frontage of APN
300-020-017C, as approved by the Street Transportation Department.
*** 
67

173542 
LAVEEN VILLAGE PLANNING COMMITTEE 
Meeting Minutes 
Monday, November 4, 2019 
Laveen Elementary School District Office #59 
Laveen Education Center, Building B, Room #101 
5001 West Dobbins Road, Laveen, Arizona. 
Members Present 
Robert Branscomb, Chair 
Tonya Glass, Vice Chair 
Cinthia Estela 
Gary Flunoy 
Stephanie Hurd 
John Mockus 
Carlos Ortega 
Jennifer Rouse 
Members Excused 
Linda Abegg 
Wendy Ensminger 
Rochelle Harlin 
Staff Present 
Samantha Keating 
1.
Call to order. introductions and announcements by Chair.
Chairman Robert Branscomb called the meeting to order at 6:30 p.m. There was a
quorum with 8 members present.
2.
Review and approval of the October 14, 2019, meeting minutes.
MOTION 
Mr. John Mockus moved to approve the minutes as presented. Ms. Stephanie Hurd 
seconded the motion. 
> 
8-0, Motion to approve, with Committee Members Branscomb, Estela, Flunoy, Glass,
Hurd, Mockus, Ortega and Rouse in favor.
3.
Public comment concerning items not on the agenda.
None.
4. Z-47-19-7: Presentation, discussion, and possible recommendation regarding a request
to rezone 128.61 acres located at the southeast corner of 63rd Avenue and Baseline
Road from S-1 (Approved CP/GPC and/or C-2) to CP/GCP, C-2 HGT/WVR and R-4 to
allow commerce park development, commercial development with a height waiver for
up to 56 feet and multifamily residential.
Ms. Samantha Keating provided an overview of the request, noting the location and
proximity to the Loop 202 freeway. Ms. Keating explained that the site was broken up
into subareas in terms of staff's recommended stipulations.

Mr. Carlos Ortega explained that he was concerned about not having a bus pull out. 
Mr. John Mockus asked if the height waiver was being requested for both Sites A and 
B. Ms. Keating confirmed that the height waiver was for both portions of the
development site and noted they were treated differently in the stipulations because
Site A has a conceptual site plan that requires general conformance.
Ms. Stephanie Hurd asked why a path was being asked for in Site B. Ms. Keating 
relayed that the stipulation called for a wider sidewalk that could also be used as a 
pathway. 
Vice Chair Tonya Glass commented that she understood why the height was needed 
for Site A because of the height of the movie screens, but was unsure why it was 
needed for Site B. 
Ms. Wendy Riddell of Berry Riddell LLC, the applicant explained she was representing 
Kitchell, the property owner. Ms. Riddell explained that the certainty of the Harkins 
theater will help ensure the needs of the community are met. The project looks to 
reduce the number of overall dwelling units currently permitted. They are hoping to 
attract other entertainment-type uses next to the planned Harkings theater. The 
planned multifamily will make the retail more successful. The proposal is really a 
refinement of the existing entitlements on the site. 
Chairman Robert Branscomb asked for clarification on the size of the units. Ms. 
Riddell stated they would be a mix of one to three bedrooms. 
Ms. Hurd commented that she liked the elevated design and plan for trails. She 
explained that commercial land is important in the area and does not want to see too 
much of it turn residential. She also commented that although palm trees do not 
provide shade, she thinks they add a nice aesthetic. 
Ms. Hurd also commented that she would like to see ground floor retail with units 
above. She suggested fun bike racks. 
Ms. Jennifer Rouse commented that the development should be dog friendly and that 
she understands certain retail uses will follow a theater. Multifamily can be beautiful but 
it needs to be better than just stucco. The mountain views need to be maintained. 
Mr. Mockus explained he was excited to have the project move forward but wants to 
see the project done right. 
Mr. Ortega commented that everyone talks about mountain views and he suggest 
oriented the multifamily project toward the mountains. 
Mr. Gary Flunoy asked what the planned height was for Site B and the multifamily 
area. Ms. Riddell responded that the use for Site B was hopefully an entertainment­
type use and they were looking for flexibility on the height. No height waiver is being 
requested for the multifamily area. 
Nine public comment cards were submitted for this item. Two cards were submitted by 
Tracie Riggs and Joe Jannuzzi in opposition to the request, but not wishing to speak. 
Two cards were submitted indicating they were in favor of the request and wishing to 
speak. Two cards were submitted indicating they were in opposition to the item and 
wishing to speak. Three cards were submitted wishing to speak, not indicating in favor

or opposed. 
Mr. Jon Kimoto indicated he liked the uses proposed and the early meetings the 
applicant held, but felt there was no compelling argument for the height variance. The 
apartments were to be built on a higher piece of land and maintaining mountain views 
would be critical. The scale should not dominate the environment. It is important to 
maintain the guidelines in the Southwest Growth Study and other formative documents. 
Ms. Jae Storm president of Mir' Ra Image explained she was before the committee 
representing youth. She indicated she would like to see the builders and developers be 
involved with the youth. She felt that there should be stipulations for more 
neighborhood meetings. 
Ms. Lynette Lee explained to the committee she had questions regarding the proposed 
theater and asked if the theater was planning to have reclining seats. She also asked 
how much the apartments were planned to rent for and how they will be maintained. 
Ms. Riddell responded that only newer, luxury theaters with reclining seats are being 
built now. The developer will ensure the multifamily is maintained as they have a 
financial interest and want to keep a good reputation. 
Ms. Riddell also responded to some of the preceding comments and explained that 
they were not seeking a height variance, but a height waiver and were not required to 
demonstrate a hardship. The development team is also sympathetic to youth and the 
commercial uses planned will help address concerns with youth. 
Mr. Sandy Hamilton explained he was on the LCRD and agrees with the additional 
height for the movie theater site only. He indicated he tried contacting Kitchell the 
previous week but was unsuccessful. 
Mr. Dan Penton explained that the community worked on a Central Laveen 
Commercial Area Plan in 2003 which stated that there were to be a maximum of four 
stories to keep views of the mountains. He also commented that art features should be 
southwest in nature and the multifamily should provide a view corridor and look into 
providing commercial space on the bottom floor. He indicated support of the request, 
but had some concerns with the western side of the request and the amount of parking 
shown on the conceptual plans. 
Mr. Phil Hertel explained he had no problem with the height waiver for the theater site, 
but was not in favor of the additional height for Site B without seeing a plan. He wants 
the site to planned carefully and planned well and would like to be on a notification list 
for future cases. 
Ms. Claudine Reifschneider commented that this was a crucial time and the 
community needed to put their best foot forward and work to elevate standards. This, in 
turn, will increase home values and impact fees. The committee should think about the 
community vision when making their decision. This project will set the tone for others. 
Vice Chair Glass asked if the apartments and theater were a packaged deal and if the 
theater and height for Site B were a packaged deal. Ms. Riddell indicated that they 
were and that she believed they all were after the same thing, which is why the 
developer is agreeing to return to review plans with the committee. 
Ms. Riddell also explained that limiting the height on Site B would limit who would look

at the site for future development. The team also reached out to Mr. Hamilton. 
Chairman Branscomb commented that since the committee cannot restrict uses, they 
need to be ensure it is done right. 
Mr. Ortega and Mr. Mockus commented that they want something great, but 
understand it is Catch 22 regarding the height and attracting entertainment uses on Site 
B. 
Ms. Rouse commented that the multifamily needs to be beautiful and wants to see 
stone work and heightened standards. 
Ms. Hurd commented that views should be looked at. 
Ms. Riddell indicated that these would all be taken into consideration. 
Vice Chair Glass asked if the applicant was willing to consider less height on Site B. 
Ms. Riddell indicated she conferred with her client and project architect and they were 
willing to agree to the following heights on Site A and B: 
•
56 feet for Site A
•
45 feet for Site B
•
30 feet within 150 feet of 59th Avenue
Ms. Cinthia Estela asked if solar panels were planned for covered parking. Ms. 
Riddell responded they would look into this. 
MOTION 
Mr. John Mockus moved to approve the proposal as recommended by staff with a 
modification to the height stipulation for Site B as proposed by the applicant. 
Ms. Jennifer Rouse seconded the motion. 
Vote 
8-0, Motion to approve, with Committee Members Branscomb, Estela, Flunoy, Glass,
Hurd, Mockus, Ortega and Rouse in favor.
5. INFORMATION ONLY: Presentation and discussion regarding General Plan Land Use
Map Designations in the Laveen Village.
Ms. Samantha Keating provided an overview of the intent of the item and explained
that as a follow up to last month's conversation she had a presentation regarding the
history of General Plan Land Use designations in the Laveen area.
Ms. Stephanie Hurd explained that she had a concern that the Laveen core needed to
be protected and she does not want to see it all turn into multifamily development.
Anything south of Dobbins Road that has not been designated should be protected.
Mr. Carlos Ortega commented he wanted to protect S-1 zoning.
Vice Chair Tonya Glass asked about zoning reversions. Ms. Keating explained