Attachment C - PHO Summary - PHO-3-21--Z-47-19-7.pdf

City of Phoenix — Formal (2021-12-15)

View PDF Meeting page

Extracted text (via pymupdf) 35057 characters
REPORT OF PLANNING HEARING OFFICER ACTION 
 Adam Stranieri, Planner III, Hearing Officer 
Bradley Wylam, Planner I, Assisting 
 
November 17, 2021 
 
ITEM NO: 5 
 
 
DISTRICT 7 
SUBJECT: 
 
 
 
Application #: 
PHO-3-21--Z-47-19-7 
Location: 
West of the intersection of 59th Avenue and South Mountain 
Avenue 
Zoning:  
R-4 
Acreage:  
23.27 
Request: 
1) Review of site plan, landscape plan, and elevations by the 
Planning Hearing Officer per Stipulation 33. 
2) Modification of Stipulation 35 regarding a minimum 25 
percent of surface parking areas shaded by trees. 
Applicant: 
Hawkins Companies 
Owner: 
 
Laveen Baseline LLC 
Representative: George Pasquel III,Withey Morris PLC 
 
ACTIONS: 
 
Planning Hearing Officer Recommendation: The Planning Hearing Officer 
recommended approval with additional stipulations. 
 
Village Planning Committee (VPC) Recommendation: The Laveen Village 
Planning Committee heard this request on November 8, 2021 and recommended 
denial as filed and approval with additional stipulations by a 10-1 vote. 
 
DISCUSSION: 
 
Jason Morris, representative with Withey Morris, stated that the applicant has 
withdrawn the request regarding the modification of Stipulation 35. He provided 
an overview of the original rezoning case and surrounding uses. He provided an 
overview of the proposed site plan, landscaping, open space, amenities, and 
building elevations, which were submitted for review by the Planning Hearing 
Officer per Stipulation 33. 
 
Adam Stranieri, Planning Hearing Officer, stated there has been no 
correspondence received from the public and provided a summary of the Laveen 
Village Planning Committee (VPC) recommendation. He stated that the 
additional stipulations recommended by the Laveen VPC regarding the 
requirement for a deceleration lane and additional emergency vehicle driveway 
Attachment C

Planning Hearing Officer Summary of November 17, 2021 
Application PHO-3-21--Z-47-19-7 
Page 2 
 
 
may be unnecessary. He noted that the Street Transportation Department 
recommended that a deceleration warrant analysis be completed to determine 
whether a deceleration lane is necessary. He also noted that he was not inclined 
to adopt the stipulation regarding an additional driveway and noted that an 
emergency vehicle access driveway was typically required due to a unit count or 
project size and this concern would be reviewed during the site plan review 
process.  He noted that the proposed conceptual site plan depicted the location 
and opportunity for such a driveway.  
 
Mr. Stranieri stated that the proposed site plan, landscape plan, and elevations 
would be reviewed per Stipulation 33. He stated that Stipulations 33.a and 33.b 
require pedestrian connections with the adjacent commercial development to the 
north which are impacted by the proposal in concurrent case PHO-2-21—Z-47-
19-7. He noted that there are connections through the sidewalk along the right-
of-way, but that the proposed site plan for PHO-2-21—Z-47-19-7 creates a 
barrier between the subject site and the commercial development north of both 
sites. He stated that Stipulation 33.c requires arcades and overhangs in all 
buildings to promote shade. He noted that overhangs are included in all 
buildings, but there are no arcades included in the design. He stated that the 
proposed building types do not support arcades, but the proposed architecture is 
consistent with goals in the Southwest Growth Study as intended by the 
stipulation. He stated that the proposed elevations include multiple building 
colors, multiple materials, vertical elements, varied window sizes, and many 
other relevant details required by Stipulation 33.d. He stated that Stipulation 33.e 
requires that the architectural style be consistent with prior phases of the project. 
He noted that the only phase that has progressed thus far is a portion of the 
commercial development to the north. He stated that the applicant is utilizing 
desert tones and stone accents, which is consistent with the proposal in PHO-2-
21—Z-47-19-7. He stated that the Public Transit Department identified a bus stop 
to be located on the site but there is an existing stipulation in place addressing 
this already. He stated that the Archaeology Department noted that the site was 
designated as archaeologically sensitive, but there are existing stipulations 
concerning the sensitive nature of the site. He stated that the Street 
Transportation Department recommended to include an additional stipulation 
regarding bicycle parking and described nearby pedestrian amenities. 
 
FINDINGS: 
 
1) The applicant submitted a site plan, landscape plan, and elevations in 
compliance with the requirements for Planning Hearing Officer review in 
Stipulation 33.  The plans are determined to appropriately reflect the 
criteria for review in Stipulations 33.a through 33.e as described below.  
Therefore, it is recommended that Stipulation 33 be deleted and replaced 
with standard language requiring general conformance to these plans and 
elevations.

Planning Hearing Officer Summary of November 17, 2021 
Application PHO-3-21--Z-47-19-7 
Page 3 
 
 
Stipulations 33.a and 33.b require pedestrian connections with the 
adjacent commercial development and three connections to the 
commercial development to the north.  The proposed site plan depicts a 
detached sidewalk along 59th Avenue that will connect the proposal to the 
commercial development to the north along the right-of-way.  However, 
due to the proposed development in PHO-2-21--Z-47-19-7 (also heard on 
this agenda) the property is not immediately adjacent to the proposed 
commercial development to the north.  Therefore, Stipulation 33.b is not 
relevant to this site.  Review PHO-2-21--Z-47-19-7 for further information 
on how this stipulation will be implemented. 
 
Stipulation 33.c requires arcades and overhangs in all buildings to 
promote shade.  All building elevations include overhangs which will 
promote shade.  Arcades are not included in the proposed elevations 
because the proposed building types do not support these.  However, the 
proposed building types and architectural design are consistent with goals 
in the Southwest Growth Study as intended by the stipulation. 
 
Stipulation 33.d requires architectural embellishments and detailing.  The 
proposed elevations include multiple building colors, multiple materials 
including stone, vertical elements, varied window sizes, roof overhangs, 
patios, varied rooflines, and other relevant details.  The proposed 
elevations are consistent with goals in the Southwest Growth Study as 
intended by the stipulation. 
 
Stipulation 33.e requires architectural style consistent with prior phases of 
the project.  The only phase that has progressed at this time is one portion 
of the commercial development to the north (movie theater).  The 
applicant noted that this project is also utilizing desert tones and stone 
accents.  It should also be noted that PHO-2-21--Z-47-19 is a concurrent 
application heard on this agenda that is also proposing a multifamily 
residential development.  This project is also utilizing desert tones and 
stone accents, albeit in a smaller scale design. 
 
2) The Street Transportation Department recommends an additional 
stipulation regarding bicycle parking to be provided per Section 1307.H for 
multifamily development. This stipulation is recommended for inclusion. 
The subject site is in proximity to multiple multi-use trails to the south, 
east, and west, established bike lanes, and is adjacent to the Laveen Area 
Conveyance Channel (LACC) to the north which provides a connection to 
the south bank of the Rio Salado. Bicycle infrastructure supports the 
established and future planned multi-modal network and promotes the 
goals of the City Council approved Complete Streets Policy.

Planning Hearing Officer Summary of November 17, 2021 
Application PHO-3-21--Z-47-19-7 
Page 4 
 
 
3) The Laveen Village Planning Committee recommended an additional 
stipulation requiring the developer to install a deceleration lane on 
southbound 59th Avenue into the primary entrance.  This stipulation is not 
recommended to be adopted.  Deceleration lanes can reduce the amount 
of potential streetscape landscaping and interfere with bike lanes.  These 
impacts would be contrary to the goals of many City policy plans including 
the Tree & Shade Master Plan, Bicycle Master Plan, and Complete 
Streets Program. 
 
Further, Street Transportation Department staff stated that they do not 
request deceleration lanes on a preference basis. A deceleration lane can 
be requested from the Street Transportation Department by providing an 
analysis to evaluate if a deceleration lane is warranted.  This typically 
includes analyzing the number of right-hand turns in a day or within a 
specific hour.   
 
Therefore, an alternative additional stipulation is recommended that 
requires the developer to submit a deceleration warrant analysis to the 
Street Transportation Department.  If this improvement is warranted, staff 
will have the opportunity to review and ensure consistency with the 
analysis. 
 
4) An additional stipulation is required to compel the applicant to execute a 
Proposition 207 Waiver of Claims prior to preliminary site plan approval as 
this was not submitted to staff in advance of the Planning Hearing Officer 
hearing.  This stipulation is recommended to be placed as the New 
Stipulation 13, under the heading ‘Overall Site’ so that this applies to any 
land use or any potential future configuration of property and not solely to 
a multifamily development project (as proposed in this request). 
 
STIPULATIONS: 
 
Overall Site 
 
1. 
The development shall be in General Conformance to the Conceptual 
Master Site Plan date stamped October 23, 2019 with specific regard to the 
site locations, as approved by the Planning and Development Department. 
 
 
2. 
All parking areas adjacent to public streets, excluding the freeway, shall be 
screened by a combination of decorative screen walls and a minimum 3-
foot high landscaped mound/berm along the perimeter streets, as approved 
by the Planning and Development Department. 
 
 
3. 
All sidewalks adjacent to public streets shall be detached with a minimum 
5-foot wide continuous landscape area located between the sidewalk and

Planning Hearing Officer Summary of November 17, 2021 
Application PHO-3-21--Z-47-19-7 
Page 5 
 
 
back of curb; and shall include minimum 3-inch caliper, large canopy 
single-trunk shade trees (limbed-up a minimum of 10-feet clear from finish 
grade), planted 25 feet on center or in equivalent groupings; and minimum 
5-gallon shrubs with a maximum mature height of 2 feet providing 75 
percent live cover, as approved by the Planning and Development 
Department. If there is limited right-of-way along the Baseline Road 
frontage requiring a modified cross section, an attached sidewalk design 
may be considered, as approved by the Planning and Development 
Department. 
 
 
4. 
The developer shall provide clearly defined, accessible pathways at 
vehicular crossings, constructed of decorative pavement that visually 
contrasts with the adjacent parking and drive aisle surfaces for internal 
drive aisles and accessways, as approved by the Planning and 
Development Department. 
 
 
5. 
The applicant shall submit a Traffic Impact Study (TIS) to the City for this 
development for review and approval by the Street Transportation 
Department (except for the Site A, Harkins) prior to the submittal of 
preliminary site plans. Additional right-of-way and street improvements may 
be required following TIS review. Phasing of off-site improvements must be 
consistent with the TIS recommendations. Phased street improvements will 
require the installation of pavement transition tapers, as approved by the 
Street Transportation Department. 
 
 
6. 
The developer shall construct all streets within and adjacent to the 
development required for each phase with paving, curb, gutter, minimum 5-
foot wide sidewalk, curb ramps, streetlights, landscaping and other 
incidentals, as per plans approved by the Planning and Development 
Department. All improvements shall comply with the current ADA 
Guidelines. 
 
 
7. 
Open irrigation facilities are to be piped outside of right-of-way and shown 
on the preliminary site plan, as approved by the Planning and Development 
Department. 
 
 
8. 
All multi-use trails and shared use paths shall be shaded a minimum of 50 
percent with 2-inch minimum caliper, large canopy shade trees, located 5 
to 8 feet from the edge of the trail, as approved by the Planning and 
Development Department. 
 
 
9. 
The right-of-way shall be dedicated, if required, and a bus pad (detail 
P1260 or P1262) constructed at the following locations, unless otherwise 
modified by the Planning and Development Department and Public Transit 
Department:

Planning Hearing Officer Summary of November 17, 2021 
Application PHO-3-21--Z-47-19-7 
Page 6 
 
 
 
 
 
a. 
Eastbound Baseline Road east of 63rd Avenue. Pad shall be spaced 
from the intersection of 63rd Avenue and Baseline Road according to 
City of Phoenix Standard Detail P1258. 
 
 
 
 
b. 
Three bus stop pads shall be located along southbound 59th Avenue. 
 
 
 
10. If determined necessary by the Phoenix Archaeology Office, the applicant 
shall conduct Phase I data testing and submit an archaeological survey 
report of the development area for review and approval by the City 
Archaeologist prior to clearing and grubbing, landscape salvage, and/or 
grading approval. 
 
 
11. If Phase I data testing is required, and if, upon review of the results from 
the Phase I data testing, the City Archaeologist, in consultation with a 
qualified archaeologist, determines such data recovery excavations are 
necessary, the applicant shall conduct Phase II archaeological data 
recovery excavations. 
 
 
12. In the event archaeological materials are encountered during construction, 
the developer shall immediately cease all ground-disturbing activities within 
a 33-foot radius of the discovery, notify the City Archaeologist, and allow 
time for the Archaeology Office to properly assess the materials. 
 
 
13. PRIOR TO PRELIMINARY SITE PLAN APPROVAL, THE LANDOWNER 
SHALL EXECUTE A PROPOSITION 207 WAIVER OF CLAIMS 
FORM. THE WAIVER SHALL BE RECORDED WITH THE MARICOPA 
COUNTY RECORDER'S OFFICE AND DELIVERED TO THE CITY TO BE 
INCLUDED IN THE REZONING APPLICATION FILE FOR RECORD. 
 
 
Site A 
 
14. 
13. 
The development shall be in general conformance with the site plan and 
elevations date stamped October 23, 2019, as modified by the following 
stipulations and approved by the Planning and Development Department. 
 
 
15. 
14. 
The maximum building height shall be limited to 56 feet. 
 
 
16. 
15. 
There shall be a 150-foot stepback provided from 59th Avenue to buildings 
over 30 feet in height. 
 
 
17. 
16. 
A minimum of one clearly defined pedestrian connection shall be provided 
from Site A to connect with the trail along the Laveen Area Conveyance

Planning Hearing Officer Summary of November 17, 2021 
Application PHO-3-21--Z-47-19-7 
Page 7 
 
 
Channel with one pedestrian scale amenity (benches, tables, etc.) provided 
within close proximity of the trail, as approved by the Planning and 
Development Department. 
 
 
18. 
17. 
A minimum of two pedestrian pathways that are a minimum 6 feet wide 
shall be provided from the west side of Site B through Site A to the 
proposed buildings. The parking lot shall be designed to have minimal 
vehicular drive crossings through these pathways. These pathways shall 
have a minimum 50 percent shade provided by 2-inch minimum caliper 
trees located in minimum 5-foot wide landscape areas and/or an 
architectural shading element, as approved by the Planning and 
Development Department. 
 
 
19. 
18. 
A minimum of two inverted-U bicycle racks (4 spaces) shall be provided for 
each building on site, located near building entries, and installed per the 
requirements of Section 1307.H. of the Phoenix Zoning Ordinance, as 
approved by the Planning and Development Department. 
 
 
20. 
19. 
The developer shall construct the west half street of 59th Avenue, as 
consistent with the Street Classification Map, including the landscaped 
median between the Laveen Area Conveyance Channel and the Southern 
boundary of Site A, as approved by the Planning and Development 
Department. Asphalt pavement transition tapers are required between 
ultimate and interim street conditions, as approved by the Street 
Transportation Department. 
 
 
21. 
20. 
The developer shall construct a 10-foot-wide Shared Use Path (SUP) along 
the west side of 59th Avenue in lieu of the required sidewalk, consistent 
with the improvements on 59th Avenue north of the Laveen Area 
Conveyance Channel, as approved by the Planning and Development 
Department. 
 
 
22. 
21. 
The developer shall construct a 10-foot-wide Multi-Use Trail (MUT) along 
the south side of the Laveen Area Conveyance Channel, as approved by 
the Planning and Development Department. 
 
 
Site B (Retail/Restaurant) 
 
23. 
22. 
The maximum building height shall be limited to 30 feet within 150 feet of 
59th Avenue and 45 feet for the remainder of Site B. 
 
 
24. 
23. 
There shall be a 150-foot stepback provided from 59th Avenue for building 
over 30 feet in height.

Planning Hearing Officer Summary of November 17, 2021 
Application PHO-3-21--Z-47-19-7 
Page 8 
 
 
25. 
24. 
The site plan, landscape plan showing pedestrian circulation and 
elevations, shall be reviewed and approved by the Planning Hearing Officer 
through the public hearing process prior to preliminary site plan approval 
for conceptual review of the applicable provisions of the goals and policies 
of the Southwest Growth Study which shall include the following: 
 
 
 
a. 
Promoting the overall pedestrian circulation within the commercial 
corner through wide sidewalks, detached sidewalks and overall 
connectivity including: 
 
 
 
 
 
(i) 
A minimum of two pedestrian pathways that are a minimum of 6 
feet wide shall be provided from 59th Avenue through the site to 
connect to buildings and the pedestrian pathways at Site A. The 
parking lot shall be designed to have minimal vehicular drive 
crossings through these pathways. These pathways shall have 
a minimum 50 percent shade provided by 2-inch minimum 
caliper trees located in minimum 5-foot wide landscape areas 
and/or an architectural shading element. 
 
 
 
 
 
 
(ii) 
A minimum of two clearly defined pedestrian connections shall 
be provided to connect with the trail along the Laveen Area 
Conveyance Channel with two pedestrian scale amenities (open 
space, benches, tables, etc.) provided within close proximity of 
the trail. 
 
 
 
 
 
b. 
Arcades and overhangs shall be incorporated into the buildings to 
promote shade. 
 
 
 
 
c. 
All building facades shall contain architectural embellishments and 
detailing such as textural changes, pilasters, offsets, recesses, 
window fenestration, shadow boxes and overhead/canopies at least 
every 50 linear feet. 
 
 
 
 
d. 
Accent building materials such as: native stone, burnt adobe, textured 
brick, wood (when shaded by overhangs or deep recesses), slump 
block, ceramic tile (matte finish), stucco and/or exposed aggregate 
concrete shall be used on buildings or otherwise demonstrate that the 
architectural style is consistent with prior phases of the project and 
development in the area. 
 
 
 
26. 
25. 
Drive-through restaurant pick-up windows shall be architecturally integrated 
in proportion, color, material and texture to the building it serves by 
providing awnings or architecturally integrated structures for weather 
protection, as approved by the Planning and Development Department.

Planning Hearing Officer Summary of November 17, 2021 
Application PHO-3-21--Z-47-19-7 
Page 9 
 
 
27. 
26. 
Drive-through restaurant facilities shall provide a minimum of 250 square 
feet of outdoor seating areas, as approved by the Planning and 
Development Department. 
 
 
28. 
27. 
A minimum of 25 percent of the surface parking areas shall be shaded by 
2-inch minimum caliper, large canopy single-trunk shade trees, located 
within minimum 5-foot wide landscape areas, as approved by the Planning 
and Development Department. 
 
 
29. 
28. 
A minimum of two inverted-U bicycle racks (4 spaces) shall be provided for 
each building on site, located near building entries, and installed per the 
requirements of Section 1307.H. of the Phoenix Zoning Ordinance, as 
approved by the Planning and Development Department. 
 
 
30. 
29. 
A minimum of 30 percent of the linear frontage of the buildings, that has 
main public entries oriented towards parking areas, shall be provided with 
planting. Planting areas shall be sized to provide adequate area for 
planting materials to thrive. Trees and shrubs shall be sized to provide 30 
percent shading of area at maturity, as approved by the Planning and 
Development Department. 
 
 
31. 
30. 
The developer shall construct the west half street of 59th Avenue, as 
consistent with the Street Classification Map, including landscaped median 
between the Laveen Area Conveyance Channel and the southern 
boundary of Site B, as approved by the Planning and Development 
Department. Asphalt pavement transition tapers are required between 
ultimate and interim street conditions, as approved by the Street 
Transportation Department. 
 
 
32. 
31. 
The developer shall construct a 10-foot Shared Use Path (SUP) on 59th 
Avenue in lieu of the required sidewalk, consistent with the improvements 
on 59th Avenue north of the Laveen Area Conveyance Channel. 
 
 
33. 
32. 
The developer shall construct a 10-foot-wide Multi-Use Trail (MUT) along 
the south side of the Laveen Area Conveyance Channel, as approved by 
the Planning and Development Department. 
 
 
Site C (Multifamily) 
 
34. 
33. 
The site plan, landscape plan showing pedestrian circulation, and 
elevations shall be reviewed and approved by the Planning Hearing Officer 
through the public hearing process prior to preliminary site plan approval 
for conceptual review of the applicable provisions of the goals and policies 
of the Southwest Growth Study which shall include the following:

Planning Hearing Officer Summary of November 17, 2021 
Application PHO-3-21--Z-47-19-7 
Page 10 
 
 
THE DEVELOPMENT SHALL BE IN GENERAL CONFORMANCE WITH 
THE SITE PLAN, LANDSCAPE PLAN, AND ELEVATIONS DATE 
STAMPED OCTOBER 1, 2021, AS MODIFIED BY THE FOLLOWING 
STIPULATIONS AND APPROVED BY THE PLANNING AND 
DEVELOPMENT DEPARTMENT. 
 
 
 
a. 
Promoting pedestrian connections with the adjacent commercial 
development through sidewalks, detached sidewalks and overall 
connectivity including: 
 
 
 
 
b. 
A minimum of three evenly dispersed pedestrian connection points to 
the commercial development to the north. This pedestrian connection 
shall be clearly defined and minimize vehicular conflicts. 
 
 
 
 
c. 
Arcades and overhangs shall be incorporated into the buildings to 
promote shade. 
 
 
 
 
d. 
All building facades shall contain architectural embellishments and 
detailing such as textural changes, pilasters, offsets, recesses, 
window fenestration, shadow boxes and overhead/canopies at least 
every 50 linear feet, as approved by the Planning and Development 
Department. 
 
 
 
 
e. 
Ensuring architectural style is consistent with prior phases of the 
project and development in the area. 
 
 
 
35. THE DEVELOPER SHALL PROVIDE SECURED BICYCLE PARKING AS 
REQUIRED IN CHAPTER 13, SECTION 1307.H FOR MULTI-FAMILY 
DEVELOPMENT, AS APPROVED BY THE PLANNING AND 
DEVELOPMENT DEPARTMENT. 
 
 
36. 
34. 
There shall be a minimum of 10 percent common area open space 
provided onsite, as approved by the Planning and Development 
Department. 
 
 
37. 
35. 
A minimum of 25 percent of the surface parking areas shall be shaded by a 
minimum 2-inch caliper, large canopy single-trunk shade trees, located 
within minimum 5-foot wide landscape areas, as approved by the Planning 
and Development Department. 
 
 
38. THE DEVELOPER SHALL SUBMIT A DECELERATION WARRANT 
ANALYSIS TO THE STREET TRANSPORTATION DEPARTMENT. 
IMPROVEMENTS SHALL BE CONSISTENT WITH THE APPROVED 
ANALYSIS, AS APPROVED BY THE STREET TRANSPORTATION 
DEPARTMENT.

Planning Hearing Officer Summary of November 17, 2021 
Application PHO-3-21--Z-47-19-7 
Page 11 
 
 
 
 
39. 
36. 
The developer shall construct the west half street of 59th Avenue, as 
consistent with the Street Classification Map, including the landscaped 
median for the full extent of Site C, as approved by the Planning and 
Development Department. Asphalt pavement transition tapers are required 
between ultimate and interim street conditions, as approved by the Street 
Transportation Department. 
 
 
40. 
37. 
The developer shall construct a 10-foot wide Shared Use Path (SUP) on 
59th Avenue in lieu of the required sidewalk, consistent with the 
improvements on 59th Avenue north of the Laveen Area Conveyance 
Channel. 
 
 
41. 
38. 
The developer shall provide conduit plan and junction boxes at 59th 
Avenue and South Mountain Avenue on project site for future traffic signal 
equipment and all work related to the construction or reconstruction of the 
conduit runs and junction box installation shall be the responsibility of the 
Developer, as approved by the Planning and Development Department. 
 
 
Site D (Commerce Park/General Commerce Park North of the LACC) 
 
42. 
39. 
The site plan, landscape plan showing pedestrian circulation and 
elevations shall be reviewed and approved by the Planning Hearing Officer 
through the public hearing process prior to preliminary site plan approval 
for conceptual review of the applicable provisions of the goals and policies 
of the Southwest Growth Study which shall include the following: 
 
 
 
a. 
Promoting the overall pedestrian circulation within the development 
through wide sidewalks, detached sidewalks and overall connectivity 
including: 
 
 
 
 
 
(i) 
A minimum of two pedestrian connections to the Laveen Area 
Conveyance Channel. 
 
 
 
 
 
 
(ii) 
There shall be an employee open space area provided adjacent 
to the Laveen Area Conveyance Channel. The open space 
areas shall provide a minimum of one amenity (tables, benches, 
yard games, etc.) each. 
 
 
 
 
 
b. 
Arcades and overhangs shall be incorporated into the buildings to 
promote shade. 
 
 
 
 
c. 
All building facades shall contain architectural embellishments and 
detailing such as textural changes, pilasters, offsets, recesses,

Planning Hearing Officer Summary of November 17, 2021 
Application PHO-3-21--Z-47-19-7 
Page 12 
 
 
window fenestration, shadow boxes and overhead/canopies at least 
every 50 linear feet. 
 
 
 
 
d. 
Ensuring architectural style is consistent with prior phases of the 
project and development in the area. 
 
 
 
43. 
40. 
There shall be a minimum of one exterior employee balcony provided on 
each four-story building that is a minimum of 12 feet in depth and a 
minimum of 200 square feet in size, as approved by the Planning and 
Development Department. 
 
 
44. 
41. 
The glazing on all building windows shall have a maximum reflectivity of 20 
percent, as approved by the Planning and Development Department. 
 
 
45. 
42. 
A minimum of 25 percent of the surface parking areas shall be shaded by 
minimum 2-inch caliper, large canopy single-trunk shade trees, located 
within minimum 5-foot wide landscape areas, as approved by the Planning 
and Development Department. 
 
 
46. 
43. 
A minimum of six inverted-U bicycle racks (12 spaces) shall be provided for 
each building on site, located near building entries, and installed per the 
requirements of Section 1307.H. of the Phoenix Zoning Ordinance, as 
approved by the Planning and Development Department. 
 
 
 
47. 
44. 
A minimum of 30 percent of building linear frontage, that has main public 
entries oriented towards parking areas, shall be provided with planting. 
Planting areas shall be sized to provide adequate area for planting 
materials to thrive. Trees and shrubs shall be sized to provide 30 percent 
shading of area at maturity, as approved by the Planning and Development 
Department. 
 
 
48. 
45. 
The developer shall protect in place the shared-use path and 20-foot wide 
public trail/sidewalk easement along the north side of the Laveen Area 
Conveyance Channel, as approved by the Planning and Development 
Department. 
 
 
49. 
46. 
The developer shall dedicate a 30-foot-wide public trail/sidewalk easement 
along the west side of the 202 Loop or adjacent to 63rd Avenue, whichever 
provides greater connectivity, at the time of preliminary site plan approval. 
Developer shall construct a 10-foot-wide shared-use path (SUP) within the 
easement as indicated in section 429 of the City of Phoenix MAG 
Supplement, as approved by the Planning and Development Department. 
 
 
50. 
47. 
A minimum 10-foot public multi-use trail shall be constructed within a 30-
foot easement in accordance with MAG supplemental detail 429 along the

Planning Hearing Officer Summary of November 17, 2021 
Application PHO-3-21--Z-47-19-7 
Page 13 
 
 
south side of Baseline Road to connect to the trails to the east and west, as 
approved by the Parks and Recreation Department. 
 
 
51. 
48. 
The developer shall dedicate 60 feet of right-of-way for the full parcel limits 
for the south half of Baseline Road, as approved by the Planning and 
Development Department. 
 
 
52. 
49. 
The developer shall dedicate a minimum of 40 feet of right-of-way for the 
full parcel limits for the east half of 63rd Avenue. Additional right-of-way 
dedications and improvements as required by the TIS, as approved by the 
Street Transportation Department. 
 
 
53. 
50. 
The developer shall dedicate 40 feet of right-of-way for the full parcel limits 
for the east half of 63rd Avenue and improvements as required by the TIS, 
as approved by the Planning and Development. Asphalt pavement 
transition tapers are required between ultimate and interim street 
conditions, as approved by the Street Transportation Department. 
 
 
54. 
51. 
The developer shall dedicate a 25-foot by 25-foot right-of-way triangle at 
the southeast corner of Baseline Road and 63rd Avenue, as approved the 
Planning and Development Department. 
 
 
Site E (Commerce Park/General Commerce Park South of the LACC) 
 
55. 
52. 
The site plan, landscape plan showing pedestrian circulation and 
elevations shall be reviewed and approved by the Planning Hearing Officer 
through the public hearing process prior to preliminary site plan approval 
for conceptual review of the applicable provisions of the goals and policies 
of the Southwest Growth Study which shall include the following: 
 
 
 
a. 
Promoting the overall pedestrian circulation within the development 
through wide sidewalks, detached sidewalks and overall connectivity 
including: 
 
 
 
 
 
(i) 
A minimum of two pedestrian connections to the Laveen Area 
Conveyance Channel. 
 
 
 
 
 
 
(ii) 
There shall be an employee open space area provided adjacent 
to the Laveen Area Conveyance Channel. The open space 
areas shall provide a minimum of one amenity (tables, benches, 
yard games, etc.)  each. 
 
 
 
 
 
b. 
Arcades and overhangs shall be incorporated into the buildings to 
promote shade.

Planning Hearing Officer Summary of November 17, 2021 
Application PHO-3-21--Z-47-19-7 
Page 14 
 
 
 
 
 
 
c. 
All building facades shall contain architectural embellishments and 
detailing such as textural changes, pilasters, offsets, recesses, 
window fenestration, shadow boxes and overhead/canopies at least 
every 50 linear feet. 
 
 
 
 
d. 
Ensuring architectural style is consistent with prior phases of the 
project and development in the area. 
 
 
 
56. 
53. 
There shall be a minimum of one exterior employee balcony provided on 
each four-story building that is a minimum of 12 feet in depth and a 
minimum of 200  square feet in size, as approved by the Planning and 
Development Department. 
 
 
57. 
54. 
The glazing on all building windows shall have a maximum reflectivity of 20 
percent, as approved by the Planning and Development Department. 
 
 
58. 
55. 
A minimum of 25 percent of the surface parking areas shall be shaded by 
minimum 2-inch caliper, large canopy single-trunk shade trees, located 
within minimum 5-foot wide landscape areas, as approved by the Planning 
and Development Department. 
 
 
59. 
56. 
A minimum of six inverted-U bicycle racks (12 spaces) shall be provided for 
each building on site, located near building entries, and installed per the 
requirements of Section 1307.H. of the Phoenix Zoning Ordinance, as 
approved by the Planning and Development Department. 
 
 
60. 
57. 
A minimum of 30 percent of building linear frontage, that has main public 
entries oriented towards parking areas, shall be provided with planting. 
Planting areas shall be sized to provide adequate area for planting 
materials to thrive. Trees and shrubs shall be sized to provide 30 percent 
shading of area at maturity, as approved by the Planning and Development 
Department. 
 
 
61. 
58. 
The developer shall dedicate a 30-foot-wide public trail/sidewalk easement 
along the west side of the 202 Loop Freeway or adjacent to 63rd Avenue, 
whichever provides greater connectivity, at the time of preliminary site plan 
approval. Developer shall construct a 10-foot wide shared-use path (SUP) 
within the easement per Section 429 of the City of Phoenix MAG 
Supplement, as approved by the Planning and Development Department. 
 
 
62. 
59. 
The developer shall construct a 10-foot-wide Multi-Use Trail (MUT) along 
the south side of the Laveen Area Conveyance Channel, as approved by 
the Planning and Development Department.

Planning Hearing Officer Summary of November 17, 2021 
Application PHO-3-21--Z-47-19-7 
Page 15 
 
 
63. 
60. 
The developer shall dedicate a minimum of 40 feet of right-of-way for the 
full parcel limits for the east half of 63rd Avenue. Additional right-of-way 
dedications and improvements as required by the TIS, and as approved by 
the Street Transportation Department. Asphalt pavement transition tapers 
are required between ultimate and interim street conditions, excepting the 
frontage of APN 300-020-017C, as approved by the Street Transportation 
Department. 
 
 
 
Upon request, this publication will be made available within a reasonable length of time 
through appropriate auxiliary aids or services to accommodate an individual with a 
disability. This publication may be made available through the following auxiliary aids or 
services: large print, Braille, audiotape or computer diskette. Please contact the Planning 
and Development Department, Angie Holdsworth, at voice number 602-495-5622 or TTY 
use 7-1-1.