Attachment A - Stipulations - PHO-2-22--Z-206-86-8(7).pdf
Extracted text (via pymupdf)
5763 characters
Attachment A- Stipulations - PHO-2-22--Z-206-86-8(7) Location: Approximately 340 feet north of the northwest corner of Jesse Owens Parkway and Baseline Road Stipulations: 1. THE DEVELOPMENT SHALL BE IN GENERAL CONFORMANCE WITH THE SITE PLAN DATE STAMPED JUNE 1, 2022, AS MODIFIED BY THE FOLLOWING STIPULATIONS AND APPROVED BY THE PLANNING AND DEVELOPMENT DEPARTMENT. 2. 1. That Within 90 days of final City Council approval of this zoning change, a rezoning application SHALL be filed to adjust zoning district boundaries to conform to alignment of the loop road, and to include the existing C-2 zoned property fronting Central Avenue. 2. That development be in general conformance to the site plan submitted, with the understanding that rezoning is required to adjust district boundaries. 3. That The entire development proposal SHALL be subject to the Development Coordination Office PLANNING AND DEVELOPMENT DEPARTMENT site plan review and approval in accordance with Section 511 of the Zoning Ordinance. 4. That Approval SHALL be conditioned upon development of the commercial districts within 24 months and the residential districts within 36 months of City Council zoning approval in accordance with Section 108-M of the Zoning Ordinance. 5. That An average landscaped setback of 51 feet for any building and parking area will be provided along Baseline Road and average landscaped setback of 25 feet will be provided along Central Avenue measured from the property line. 6. That Two rows of 24-inch box-sized citrus trees and/or date palms and large areas of flowers will be planted along Baseline Road, 20 feet on center or equivalent groupings as approved by the PLANNING AND Development DEPARTMENT Coordination Office. 7. That There shall be mature landscaping along Central Avenue to include 24-inch box trees spaced a maximum of 25 feet on center or placed in equivalent groupings. 8. That All parking along Baseline Road and Central Avenue shall be screened with landscaped berms, a three-foot wall, or combination thereof, as approved by the PLANNING AND Development DEPARTMENT Coordination Office. 9. That Five percent or more of interior parking shall be landscaped with reasonable distribution throughout the parking area and along the face of the buildings. 10. That No drive-through facility on the site will have its drive-through land facing any public right-of-way with the exception of the new road. 11. That A pedestrian and bike trail SHALL be provided and maintained along Baseline Road and the loop roadway, the location, width, coloration, and design of which is to be determined by the PLANNING AND Development DEPARTMENT Coordination Office review. That The improvements (sidewalk, etc.) made through the Improvement District SHALL remain and accommodate the intent of this stipulation. 12. That All rooftop mechanical units shall be screened by parapet walls, building walls or enclosed in a mechanical equipment penthouse that shall BE architecturally integrated with the buildings. 13. That Apartment buildings along the north portion of the site shall be limited to two-stories in height. 14. That Signage will be in conformance with the guidelines (recommendations) adopted by the South Mountain Village Planning Committee (the “Committee”) for the Baseline Scenic Parkway, provided: a. Those guidelines are adopted by the time the applicant is ready to install signage; b. The applicant has the opportunity to provide input to the Committee concerning the appropriate dimensions and appearance of the signage; c. The guidelines specifically address signage for commercial shopping centers. 15. That The intersection of Central Avenue with Jesse Owens Parkway is to align with Fremont Drive (one quarter mile point) to the west of Central Avenue or offset no more than a half street width to the south of that alignment. (This is imperative in order to coordinate the traffic signals and minimize delay for traffic on Central AVENUE). 16. That Future signalization of Jesse Owens Parkway and Central Avenue and Baseline Road will be at the expense of the developer. Traffic signals will not be installed until the warrants are met or a need is supported by a traffic study submitted and reviewed by the Streets and Traffic STREET TRANSPORTATION Department. 17. That Right lanes will be required on Baseline Road at Jesse Owens Parkway and on Central Avenue at Jesse Owens Parkway. 18. That Construction of an internal loop road and bridge over the Western Canal SHALL be provided by the applicant/property owner with cooperation and support by the City of Phoenix in the first phase of development. 19. That the site be developed in general conformance to the site plan presented to the Planning Hearing Officer on July 26, 1989, which is for the property east of the Jesse Owens Parkway and is for a K-Mart development. 19. 20. That Walls or fencing along the north side of the Western Canal shall be offset to reduce scale and bulk and to maximize the safety and security for pedestrians and other persons using the trail along the canal, as approved by the PLANNING AND Development DEPARTMENT Coordination Office. If masonry walls are used along the north side of the canal, they shall be attractively landscaped and maintained and shall be colored to blend in with the surrounding landscaping. 20. THE DEVELOPER SHALL PROVIDE $15,000.00 IN AN ESCROW ACCOUNT TO THE STREET TRANSPORTATION DEPARTMENT FOR A HAWK INSTALLATION AT JESSE OWENS PARKWAY AND THE WESTERN CANAL, PRIOR TO PRELIMINARY SITE PLAN APPROVAL.