Attachment C - Routing - PHO-2-22--Z-206-86-8(7).pdf

City of Phoenix — Formal (2022-10-26)

View PDF Meeting page

Extracted text (via pymupdf) 59584 characters
PLEASE RESPOND ELECTRONICALLY TO BRAD WYLAM 2ND FLOOR, 602-256-3322 
To: 
Departments Concerned 
Date: June 14, 2022
From: 
Alan Stephenson 
Planning & Development Department Director 
Subject:   P.H.O. APPLICATION NO. PHO-2-22--Z-206-86-8(7) – Notice of Pending Actions
 by the Planning Hearing Officer 
1.
Your attention is called to the fact that the Planning Hearing Officer will
consider the following case at a public hearing on July 20, 2022.
2.
Information about this case is available for review at the Zoning Counter in
the Planning and Development Department on the 2nd Floor of Phoenix City
Hall, telephone 602-262-7131, Option 6.
3.
Staff, please indicate your comments and respond electronically to
pdd.pho@phoenix.gov or you may provide hard copies at the Zoning Counter
in the Planning and Development Department on the second floor of Phoenix
City Hall by June 21, 2022.
DISTRIBUTION
Mayor’s Office (Lisa Fernandez), 11th Floor
City Council (Sina Matthes, Tony Motola ), 11th Floor
Aviation (Sheldon Daisley)
CED (Michelle Pierson), 20th Floor
Fire Prevention (Aaron Conway), 2nd Floor
Light Rail (Joel Carrasco/Special TOD Only)  
Neighborhood Services (Gregory Gonzales, Lisa Huggins), 4th Floor
Parks & Recreation (Natasha Hughes), 16th Floor
Public Transit (Michael Pierce)
Public Works (Ray Dovalina, Kristina Jensen, Elise Moore, Rudy Rangel), 5th Floor 
Street Transportation Department (Maja Brkovic, Alan Hilty, Chris Kowalsky), 5th Floor 
Street Transportation - Ped. Safety Coordinator (Mailen Pankiewicz), 5th Floor 
Water Services (Don Reynolds, Victor Romo), 8th Floor
Planning and Development (Alan Stephenson, Joshua Bednarek), 3rd Floor 
Planning and Development/Information Services (Ben Ernyei, Andrew Wickhorst), 4th
Floor
Planning and Development/Historic Preservation Office (Kevin Weight), 3rd Floor 
Planning Hearing Officer (Tricia Gomes, Adam Stranieri, Brad Wylam), 2nd Floor 
Village Planner (Elias Valencia, South Mountain Village) 
Village Planning Committee Chair (Tamala Daniels, South Mountain Village)
Attachment C

200 W Washington Street, 2nd Floor * Phoenix, Arizona 85003 * Tel: (602) 262-7131 * Fax: (602) 495-3793
APPLICATION FOR PLANNING HEARING OFFICER ACTION
APPLICATION NO: PHO-2-22--Z-206-86-8
Council District: 8   7 
   
Request For: 
Stipulation Modification
    Reason for Request:   Deletion of Stipulation 2 regarding general conformance to the site plan submitted.   Modification of
Stipulation 19 regarding general conformance to the site plan presented to the Planning Hearing Officer on July 26, 1989. 
Technical corrections to Stipulations 3, 6, 8, 11, 16, and 20.  
   
Owner
Applicant
Representative
Herbert and Patricia Dreiseszun Trust
Andrew Biskind, TBBG Acquisitions LLC
Benjamin Tate, Withey Morris PLC
PO Box 10775
2390 East Camelback Road #130
2525 East Arizona Biltmore Circle, A-
212
Phoenix AZ 85064
Phoenix AZ 85016
Phoenix AZ 85016
(602) 346-4610
(602) 369-6673
P: (602) 346-4610  F: 
ben@witheymorris.com                    
biskind@tbbginvestments.com             
ben@witheymorris.com                    
     Property Location: Approximately 340 feet north of the northwest corner of Jesse Owens Parkway and Baseline Road
                                                                                                                                                
  
Zoning Map: D-8
Quarter Section: 1-28
APN: 114-16-016
Acreage: 1.93
  
Village: South Mountain  
Last Hearing: CC HEARING
Previous Opposition: No
Date of Original City Council Action: 08/30/1989 
Previous PHO Actions: 
Zoning Vested: C-2 BAOD            
Supplemental Map No.: 770
Planning Staff: 071773    
      An applicant may receive a clarification from the city of its interpretation or application of a statute, ordinance, code or authorized
substantive policy statement. To request clarification or to obtain further information on the application process and applicable
review time frames, please call 602-262-7131 (option 6), email zoning.mailbox@phoenix.gov or visit our website at
http://phoenix.gov/pdd/licensetimes.html.
   A Filing Fee had been paid to the City Treasurer to cover the cost of processing this application. The fee will be retained to cover
the cost whether or not the request is granted
   
Fee 
Fee Waived
Fee Date
Receipt
Purpose
$1,080.00
$0.00
06/01/2022
22-0053582
Original Filing Fee
   
Signature of Applicant: _____________________________________________________         DATE: ___________________
   
Hearing Results
   
Planning Hearing Officer
Planning Commission
City Council
Date: 07/20/2022 1000 AM
Date:
Date:
Appealed?:
Appealed?:
Action:
Action:
Action:

0 
 
 
 
 
 
Arise at Baseline  
 
SWC Western Canal & Jesse Owens Parkway 
PHO-2-22—Z-206-86

1 | A r i s e a t B a s e l i n e  
Development Team  
 
 
 
 
 
 
 
 
 
 
Developer 
TBBG Investments 
2390 E. Camelback Road 
Suite 130 
Phoenix, AZ 85016 
 
 
 
 
     Attorneys/Representative  
                                 
Architect 
 
 
     Withey Morris, PLC 
 
 
                     
Tomecak Design 
 
 
     2525 E. Arizona Biltmore Cir. 
 
                    
4368 N Civic Center Plaza 
 
 
    Suite A-212 
 
 
 
 
         
Suite 201 
 
 
     Phoenix, AZ 85016 
 
   
                     
Scottsdale, AZ 85251  
 
 
 
 
 
 
Engineer 
6370 E. Thomas Rd. 
Suite # 200  
Scottsdale, AZ 85251

2 | A r i s e a t B a s e l i n e  
Introduction 
This firm represents TBBG Investments in its request to develop a small community of attached 
townhomes on approximately 1.7 gross acres located at the southwest corner of the Western Canal and 
Jesse Owens Parkway as shown on the Aerial Map attached at Tab 1 (the “Property”).  The Property is 
currently zoned C-2 as shown in the Zoning Map attached at Tab 2. Despite being rezoned to C-2 in 1987 
for the expansion of an existing shopping center, the Property has remained vacant and undeveloped for 
the last 36 years.  In order for TBBG to properly develop the site, modifications to the stipulations in the 
underlying zoning case (Z-206-86) are necessary. 
 
Existing property conditions 
As noted above, the Property is a 1.7-gross-acre parcel at the southwest corner of the Western Canal 
and Jesse Owens Parkway in Phoenix, Arizona. The Property is vacant, unimproved land. 
 
Surrounding Land Uses 
North 
Western Canal and a senior living facility zoned R-4A 
East 
Commercial shopping center zoned C-2 SP 
South 
Fast food restaurant zoned C-2 
West 
Commercial shopping center zoned C-2 
 
Zoning Case History 
On February 3, 1987, the Phoenix City Council approved rezoning of the Property from R-4 and R-3A to 
C-2 for the expansion of an existing commercial and retail shopping center known as “Southgate Center”.  
See Rezoning Approval Letter at Tab 3. The conceptual development plan for the original project showed 
the Property as “Offices”.  See Z-206-86 Site Plan at Tab 4. The rezoning was ultimately approved subject 
to twenty (20) stipulations, including general conformance to the submitted site plan. A Planning Hearing 
Officer application was later approved in August 1989 for a six-month time extension of the conditional 
zoning time stipulation and modification of stipulations related to landscape setbacks along Central 
Avenue and the site plan for the proposed K-Mart on the east side of Jesse Owens Parkway. See 1989 
PHO Approval Letter at Tab 5. The Property is the only remaining undeveloped land in the commercial 
shopping center south of the Western Canal that was the subject of this zoning case. 
 
Project Overview 
The proposed project will utilize the approved C-2 zoning for the development of an intimate residential 
community of sixteen (16) modern two-story townhomes utilizing the R-3 development standards 
permitted in the C-2 zoning district. See Site Plan at Tab 6. The residences will be configured around a

3 | A r i s e a t B a s e l i n e  
U-shaped private drive with opposing duplexes on each side of the private drive, slightly offset from one 
another to avoid a monotonous or uniform building layout. 
 
The building layout is central to overall design of the site and remaining faithful to the Baseline Area 
Overlay District’s (BAOD) prioritization of view corridors looking toward South Mountain. As illustrated by 
the attached View Corridor Exhibit at Tab 7, the buildings are deliberately pushed to the eastern portion 
of the site to maintain the view corridor looking south from Jesse Owens Parkway. The townhomes will 
be entirely tucked behind the two-story element of the senior living facility on the north side of the Western 
Canal. Additionally, the townhomes are broken up into duplexes to avoid long expanses of horizontal 
building planes and allow visual permeability looking both north/south and east/west. 
 
The community will be generously landscaped both internally and externally with a lush, drought-tolerant 
landscape palette as illustrated by the Landscape Plan attached at Tab 8.  Large, landscaped open space 
areas are provided on the northern and southern ends of the community, with network of pedestrian paths 
offering convenient access to neighboring properties and the Western Canal to the north. A total of 7,334 
SF of open space is provided on the Property – more than twice the required open space in the R-3 
development standards. 
 
The proposed development is an ideal use for an infill site that has been overlooked for development 
since it was originally zoned in the mid-1980s. This stipulation modification request aligns with several 
General Plan goals and policies, including the encouragement of a mix of housing types in neighborhoods 
where transit or transportation alternatives exist and promotion of development in compact cores, centers, 
and corridors connected by roads and transit. With the adoption of the South Central TOD Plan and the 
planned extension of the Valley Metro Light Rail, the Property is perfectly located and suited for new high-
quality multi-family development with convenient access to public transit. 
 
Stipulation Deletion/Modification Request 
 
2. That development be in general conformance to the site plan submitted, with the understanding 
that rezoning is required to adjust district boundaries. 
 
Rationale: This stipulation is somewhat redundant with Stipulation 19 and makes no reference to 
a dated site plan. Moreover, the zoning boundary-related portion of the stipulation is no longer 
relevant based on the available zoning records. 
 
19. That the site be developed in general conformance to the site plan presented to the Planning 
Hearing Officer on July 26, 1989, which is for the property east of the Jesse Owens Parkway and 
is for a K-Mart development. The development shall be in general conformance with the site plan 
date stamped June 1, 2022 as approved by the Planning and Development Department. 
 
Rationale: This modification will allow TBBG to move forward with the development of a small, 
contextually appropriate townhome community on a site that has remained vacant since it was 
rezoned over 35 years ago. The proposed development will provide well-designed housing in an

4 | A r i s e a t B a s e l i n e  
area of Phoenix in need of new, high-quality housing inventory in close proximity to a future 
planned Valley Metro Light Rail station at Central Avenue and Baseline Road. 
 
Conclusion 
Approval of the requested stipulation modifications will allow the applicant to construct a high-quality 
multi-family townhome development on a site that has been vacant for over three and a half decades. 
The proposed development is a direct response to the City’s recently adopted Housing Phoenix plan, 
which aims to add 50,000 new housing units to the City of Phoenix by 2030. Coupled with the recent 
adoption of the South Central TOD Plan, the area surrounding the Baseline Road and Central Avenue 
light rail station is poised to become a re-invigorated hub of activity for South Mountain Community. 
Convenient, attainable, and high-quality housing options are going to be critical to the success of the 
South Mountain TOD Plan’s vision, and the proposed project is a small but important step toward that 
goal.

TAB 1

North of NWC Baseline Road & Jesse Owens Parkway - Phoenix, AZ
N
Aerial Map
N
SITE

TAB 2

North of NWC Baseline Road & Jesse Owens Parkway – Phoenix, AZ
N
Zoning Map

TAB 3

TAB 4

TAB 5

TAB 6

TAB 7

North of NWC Baseline Road & Jesse Owens Parkway - Phoenix, AZ
N
Aerial Map
N
SITE
Two Story
One Story

TAB 8

To: 
Adam Stranieri 
Planning Hearing Officer 
Date: June 9, 2022 
 
 
 
From: 
Bradley Wylam 
Planner I 
 
 
Subject: PHO-2-22--Z-206-86-8 – CURRENT STIPULATIONS OF APPROVAL 
 
The purpose of this memo is to discuss the current, base stipulations relevant to the 
modification requests in Rezoning Case No. PHO-2-22—Z-206-86-8.  After a review of 
Rezoning Case No. PHO-1-89--Z-206-86-8, it was noted that there was no approval 
letter issued that contained a complete list of stipulations resulting from the City Council 
approval of this case.   
 
PHO-1-89--Z-206-86-8 was heard by the Planning Hearing Officer (PHO) in two parts: 
requests regarding Stipulations 5 and 19 were heard on July 26, 1989 (Attachment A); 
requests regarding Stipulations 11 and 16 were heard on August 2, 1989 (Attachment 
B).  Both parts were heard by the City Council on August 30, 1989 (Attachment C).  Two 
separate approval letters were issued (Attachments D and E).   
 
The complete stipulations of PHO-1-89--Z-206-86-8, which are the current, base 
stipulations applicable to the subject property of PHO-2-22—Z-206-86-8, are those from 
the original approval letter of Rezoning Case No. Z-206-86-8 (Attachment F) as 
modified by the City Council actions reflected in the two approval letters issued for 
PHO-1-89--Z-206-86-8. 
 
Additionally, note that PHO-1-89--Z-206-86-8 was filed concurrently as PHO-1-89--Z-
207-86-8 and PHO-1-89--Z-208-86-8.   The current stipulations described in this memo 
are also relevant to the subject property of Rezoning Case No. Z-207-86-8 and a copy 
of this memo is being placed in that case file.  However, based on the PHO summaries, 
City Council minutes, and approval letters, the PHO request was not ultimately heard or 
approved for Rezoning Case No. Z-208-86-8 and is not relevant to that case. 
 
Complete Stipulations of PHO-1-89--Z-206-86-8 
 
• Written in legislative edit format, depicting the approved modifications of 
Stipulations 5, 11, 16, and 19. 
 
1. 
That within 90 days of final City Council approval of this zoning change, a 
rezoning application be filed to adjust zoning district boundaries to conform 
to alignment of the loop road, and to include the existing C-2 zoned 
property fronting Central Avenue. 
 
 
2. 
That development be in general conformance to the site plan submitted,

Memo for Z-58-86-4 and Z-SP-20-86-4 
Page 2 of 2 
with the understanding that rezoning is required to adjust district 
boundaries. 
3. 
That the entire development proposal be subject to the Development 
Coordination Office site plan review and approval in accordance with 
Section 511 of the Zoning Ordinance. 
4. 
That approval be conditioned upon development of the commercial 
districts within 24 months and the residential districts within 36 months of 
City Council zoning approval in accordance with Section 108-M of the 
Zoning Ordinance. 
5. 
That an average landscaped setback of 55 51 feet for any building and 
parking area will be provided along Baseline Road and average 
landscaped setback of 25 feet will be provided along Central Avenue 
measured from the property lines LINE. 
6. 
That two rows of 24-inch box-sized citrus trees and/or date palms and 
large areas of flowers will be planted along Baseline Road, 20 feet on 
center or equivalent groupings as approved by the Development 
Coordination Office. 
7. 
That there shall be mature landscaping along Central Avenue to include 
24-inch box trees spaced a maximum of 25 feet on center or placed in
equivalent groupings.
8. 
That all parking along Baseline Road and Central Avenue shall be 
screened with landscaped berms, a three-foot wall, or combination thereof, 
as approved by the Development Coordination Office. 
9. 
That five percent or more of interior parking shall be landscaped with 
reasonable distribution throughout the parking area and along the face of 
the buildings. 
10. 
That no drive-through facility on the site will have its drive-through land 
facing any public right-of-way with the exception of the new road. 
11. 
That a pedestrian and bike trail be provided and maintained along 
Baseline Road and the loop roadway, the location, width, coloration, and 
design of which is to be determined by the Development Coordination 
OFFICE review. 
THAT THE IMPROVEMENTS (SIDEWALK, ETC.) MADE THROUGH THE 
IMPROVEMENT DISTRICT REMAIN AND ACCOMMODATE THE 
INTENT OF THIS STIPULATION. 
12. 
That all rooftop mechanical units shall be screened by parapet walls,

Memo for Z-58-86-4 and Z-SP-20-86-4 
Page 2 of 2 
 
 
building walls or enclosed in a mechanical equipment penthouse that shall 
architecturally integrated with the buildings. 
 
 
13. 
That apartment buildings along the north portion of the site shall be limited 
to two-stories in height. 
 
 
14. 
That signage will be in conformance with the guidelines 
(recommendations) adopted by the South Mountain Village Planning 
Committee (the “Committee”) for the Baseline Scenic Parkway, provided: 
 
 
 
a. 
Those guidelines are adopted by the time the applicant is ready to 
install signage; 
 
 
 
 
b. 
The applicant has the opportunity to provide input to the Committee 
concerning the appropriate dimensions and appearance of the 
signage; 
 
 
 
 
c. 
The guidelines specifically address signage for commercial shopping 
centers. 
 
 
 
15. 
That the intersection of Central Avenue with Jesse Owens Parkway is to 
align with Fremont Drive (one quarter mile point) to the west of Central 
Avenue or offset no more than a half street width to the south of that 
alignment. (This is imperative in order to coordinate the traffic signals and 
minimize delay for traffic on Central). 
 
 
16. 
That future signalization of Jesse Owens Parkway AND with Central 
Avenue and Baseline Road will be at the expense of the developer. Traffic 
signals will not be installed until the warrants are met. OR A NEED IS 
SUPPORTED BY A TRAFFIC STUDY SUBMITTED AND REVIEWED BY 
THE STREETS AND TRAFFIC DEPARTMENT. 
 
 
17. 
That right lanes will be required on Baseline Road at Jesse Owens 
Parkway and on Central Avenue at Jesse Owens Parkway. 
 
 
18. 
That construction of an internal loop road and bridge over the Western 
Canal be provided by the applicant/property owner with cooperation and 
support by the City of Phoenix in the first phase of development. 
 
 
19. 
That the site be developed in general conformance to the site plans 
submitted December 8, 1986, including the public amenities enumerated 
on the site plans PLAN PRESENTED TO THE PLANNING HEARING 
OFFICER ON JULY 26, 1989, WHICH IS FOR THE PROPERTY EAST 
OF THE JESSE OWENS PARKWAY AND IS FOR A K-MART 
DEVELOPMENT. 
 
 
20. 
That wall or fencing along the north side of the Western Canal shall be

Memo for Z-58-86-4 and Z-SP-20-86-4 
Page 2 of 2 
offset to reduce scale and bulk and to maximize the safety and security for 
pedestrians and other persons using the trail along the canal, as approved 
by the Development Coordination Office. If masonry walls are used along 
the north side of the canal, they shall be attractively landscaped and 
maintained and shall be colored to blend in with the surrounding 
landscaping. 
Complete Stipulations of PHO-1-89--Z-206-86-8 
•
Shown with legislative edit applied.
1. 
That within 90 days of final City Council approval of this zoning change, a 
rezoning application be filed to adjust zoning district boundaries to conform 
to alignment of the loop road, and to include the existing C-2 zoned 
property fronting Central Avenue. 
2. 
That development be in general conformance to the site plan submitted, 
with the understanding that rezoning is required to adjust district 
boundaries. 
3. 
That the entire development proposal be subject to the Development 
Coordination Office site plan review and approval in accordance with 
Section 511 of the Zoning Ordinance. 
4. 
That approval be conditioned upon development of the commercial 
districts within 24 months and the residential districts within 36 months of 
City Council zoning approval in accordance with Section 108-M of the 
Zoning Ordinance. 
5. 
That an average landscaped setback of 51 feet for any building and 
parking area will be provided along Baseline Road and average 
landscaped setback of 25 feet will be provided along Central Avenue 
measured from the property line. 
6. 
That two rows of 24-inch box-sized citrus trees and/or date palms and 
large areas of flowers will be planted along Baseline Road, 20 feet on 
center or equivalent groupings as approved by the Development 
Coordination Office. 
7. 
That there shall be mature landscaping along Central Avenue to include 
24-inch box trees spaced a maximum of 25 feet on center or placed in
equivalent groupings.
8. 
That all parking along Baseline Road and Central Avenue shall be 
screened with landscaped berms, a three-foot wall, or combination thereof, 
as approved by the Development Coordination Office. 
TC
TC
TC

Memo for Z-58-86-4 and Z-SP-20-86-4 
Page 2 of 2 
9. 
That five percent or more of interior parking shall be landscaped with 
reasonable distribution throughout the parking area and along the face of 
the buildings. 
10. 
That no drive-through facility on the site will have its drive-through land 
facing any public right-of-way with the exception of the new road. 
11. 
That a pedestrian and bike trail be provided and maintained along 
Baseline Road and the loop roadway, the location, width, coloration, and 
design of which is to be determined by the Development Coordination 
Office review. 
That the improvements (sidewalk, etc.) made through the Improvement 
District remain and accommodate the intent of this stipulation. 
12. 
That all rooftop mechanical units shall be screened by parapet walls, 
building walls or enclosed in a mechanical equipment penthouse that shall 
architecturally integrated with the buildings. 
13. 
That apartment buildings along the north portion of the site shall be limited 
to two-stories in height. 
14. 
That signage will be in conformance with the guidelines 
(recommendations) adopted by the South Mountain Village Planning 
Committee (the “Committee”) for the Baseline Scenic Parkway, provided: 
a. 
Those guidelines are adopted by the time the applicant is ready to 
install signage; 
b. 
The applicant has the opportunity to provide input to the Committee 
concerning the appropriate dimensions and appearance of the 
signage; 
c. 
The guidelines specifically address signage for commercial shopping 
centers. 
15. 
That the intersection of Central Avenue with Jesse Owens Parkway is to 
align with Fremont Drive (one quarter mile point) to the west of Central 
Avenue or offset no more than a half street width to the south of that 
alignment. (This is imperative in order to coordinate the traffic signals and 
minimize delay for traffic on Central). 
16. 
That future signalization of Jesse Owens Parkway and Central Avenue 
and Baseline Road will be at the expense of the developer. Traffic signals 
will not be installed until the warrants are met or a need is supported by a 
traffic study submitted and reviewed by the Streets and Traffic 
TC
TC

Memo for Z-58-86-4 and Z-SP-20-86-4 
Page 2 of 2 
Department. 
17. 
That right lanes will be required on Baseline Road at Jesse Owens 
Parkway and on Central Avenue at Jesse Owens Parkway. 
18. 
That construction of an internal loop road and bridge over the Western 
Canal be provided by the applicant/property owner with cooperation and 
support by the City of Phoenix in the first phase of development. 
19. 
That the site be developed in general conformance to the site plan 
presented to the Planning Hearing Officer on July 26, 1989, which is for 
the property east of the Jesse Owens Parkway and is for a K-Mart 
development. 
20. 
That wall or fencing along the north side of the Western Canal shall be 
offset to reduce scale and bulk and to maximize the safety and security for 
pedestrians and other persons using the trail along the canal, as approved 
by the Development Coordination Office. If masonry walls are used along 
the north side of the canal, they shall be attractively landscaped and 
maintained and shall be colored to blend in with the surrounding 
landscaping. 
Attachments: 
A – Planning Hearing Officer Summary of Action dated July 26, 1989 (2 pages) 
B – Planning Hearing Officer Summary of Action dated August 2, 1989 (2 pages) 
C – City Council Minutes dated August 30, 1989 (5 pages) 
D – Approval letter for PHO-2-22—Z-206-86-8 (Stipulations 5 and 19) dated September 
1, 1989 (1 page) 
E - Approval letter for PHO-2-22—Z-206-86-8 (Stipulations 11 and 16) dated September 
1, 1989 (1 page) 
F – Approval letter for Z-206-86-8 dated February 3, 1987 (3 pages) 
TC

[TY OF PHOENIX, ARIZONA 
PLANNING DEPARTMENT 
SUMMARY OF ACTION ON __ XX 
__ ModificaU.on of Stipulation 
XX 
Time Extension 
----
Rezoning App. No. 206-86 & 207-86 
DCO File No. 
Planning Hrg Officer Date: 
07/26/89 
Applicant: 
Representative: 
Southern Gem Associates 
William Brownlee 
DISTRICT NO. 
8 
Location: 
(North 
side 
of 
Baseline 
Road 
between Central Avenue and 7th 
Street) 
Planning Hearing Officer's Recommendation: 
Approval 
---
xx 
Approval with Stipulations for a portion of the request pertaining only 
to 206-86. 
Denial 
---
___ Denial as filed but Approval of 
XX 
Continuance for a portion of _the request to August 2, 1989, - No Fee. 
Withdrawn 
Findings (Summary): 
Mr. William Brownlee presented the 
request 
zoning 
time 
stipulation; 
modĄfication 
of 
stated that 
they 
expect 
to 
pull 
building 
described the following modifications: 
for 
deletion 
of 
site 
plan 
and 
permits within 
the 
conditional 
stipulations. 
He 
30-60 
days 
and
1.
Eliminate 
the 
conditional 
zoning 
time sU.pulation 
since the zoning has
vested.
2.
Reduce average landscaped set back along Baseline Road from 55 to 51 
feet
the 
change 
is 
necessary to meet the parking requirements for the proposed
K-Mart and McDonalds
3.
Provide 
a 
pedestrian 
and 
bike trail 
along 
Baseline 
Road
consistent with the adjacent developments.
which 
is 
4.
That 
the 
traffic 
signals 
will 
be 
installed 
within two weeks 
of the
developer receiving the certificate of occupancy 
for 
the 
retail 
centers.
Now stipulated to not being installed until the warrants are met.
5.
Modify 
the 
site 
for the property at the northeast corner of Baseline Road
and the Jesse Owens Parkway. 
The proposed use is for a K-Mart Center.
CONTINUED 
Opposition Present: NO 
Attachment A

PHO SUMMARY 
July 26, 1989 
Special Permit No. 8-88 
Page 2 
The Planning Hearing Officer explained that 
a 
conditional 
zoning stipulation 
is 
met 
when construction begins and not when the zoning is vested. 
It appears 
that the project is moving forward and construction is anticipated 
within 
the 
next 
few 
months. 
He 
noted that the landscaped setback standard as suggested 
by the South Mountain Village Planning 
Committee 
is 
50 
feet 
along 
Baseline 
Road. 
He 
had concerns about 
modifying stipulations no. 11 and 16 which pertain to 
the pedestrian and bike 
trail 
being 
provided 
along Baseline 
Road 
and 
the 
timing 
of 
the 
installation 
of 
the 
traffic 
signals. 
He 
suggested 
that 
additional time would be necessary to contact the appropriate 
city 
departments 
and get their recommendations on these matters. 
He 
questioned 
the applicant about what pedestrian amenities are being provided 
on the site and if there would be 
pedestrian 
connections 
between 
the 
shops. 
The 
applicant 
stated 
that 
with 
tne reduction in the number of buildings and 
pads there is no longer the need 
for 
pedestrian 
connections. 
He 
questioned 
the applicant about the building's design and architectural style. 
The 
Planning Hearing 
Officer recommended approval of a six month extension of 
the 
conditional 
zoning 
time 
stipulation 
and 
approval 
of 
the 
following 
stipulation modifications: 
No. 5: 
No. 19: 
That an average 
landscaped setback 
of 51 feet for any building and 
parking 
area 
will 
be 
provided 
along 
Baseline 
Road and 
average 
landscaped 
setback 
of 
25 
feet will be provided along Central Avenue 
measured from the property line. 
That the site be developed in general 
conformance 
to 
the 
site 
plan 
presented 
to 
the 
Planning Hearing Officer on July 26, 1989, which is 
for the property east of the Jesse Owens Parkway and is 
for 
a 
K-Mart 
development. 
The 
Planning Hearing 
Officer recommended a continuance to August 2, 1989 to 
consider modification to stipulations nos. 11 and 16. 
PHOSUM:072689:SD/ab

CJ.TY OF PHOENIX, ARIZONA 
PLANNING DEPARTMENT 
SUMMARY OF ACTION ON __ =XXª_Modification of Stipulation 
--=XXª_Time Extension 
Rezoning App. Nos@207-86 
DCO File No. ___ _ 
Planning Hearing Officer Date: 08/02/89 
Applicant: 
Representati"'{e: 
Southern Gem Associates 
William Brownlee 
DISTRICT N0._8_ 
Location:· 
(North 
side 
of 
Baseline 
Road 
between 
Central 
Avenue and 7th 
Street) 
Planning Hearing Officer's Recommendation: 
___ Approval 
XX 
Approval with Stipulations 
Denial 
---
___ Denial as filed but Approval of 
___ Continuance to 
___ Withdrawn 
Findings (Summary): 
Mr. William Brownlee presented the request 
for 
modification 
of stipulations. 
He noted 
that 
portions 
of 
the 
request 
were approved at the July 26, 1989 
hearing. 
This hearing is 
to 
consider 
the modifications pertaining to the 
pedestrian 
and 
bike 
trail to be 
provided along Baseline Road and with the 
future signalization of Jesse Ownens Parkway with Central Avenue 
and Baseline 
Road. 
He 
stated 
that they were requesting to provide the pedestrian and bike 
trail in a similar manner as the adjacent developments. 
He noted that improvements were made to the site (sidewalks, etc.) 
as part of 
the Jesse 
Owens Parkway/Baseline Road Improvement District. 
He requested that 
these improvements be retained when this stipulation is considered 
and 
there 
be no requirement to 
remove these improvements. 
He stated that due to 
increasing traffic and traffic concerns, K-Mart would request 
that instead of 
the 
traffic 
signals 
not 
being installed until the warrants are met that they 
would be installed within two weeks of the developer receiving 
the 
certificate 
of occupancy for the retail centers. 
The Planning 
Hearing 
Officer stated that he contacted the Streets and Traffic 
Department about the signalization modification. 
They were not 
in 
favor 
of 
the modification 
because of liability concerns but would consider installation 
of the traffic signals based upon a traffic study 
submitted by the applicant 
supporting the need for signalization at these locations. 
He 
noted 
that 
the 
existing 
improvements 
along 
Baseline 
(sidewalks and 
landscaping) should be retained when the applicant is providing the 
pedestrian 
and bike 
trail. 
These 
should be consistent with the trail improvements made 
by the development to the east. 
He questioned the applicant about his meetings with the various 
committees in 
this village and their support of the request. 
CONTINUED 
Opposition Present? 
Jill_ 
Attachment B

PHO SUMMARY
• August 2, 1989
Rezoning Application Noi. 206/207-86
Page 2
The 
Planning 
Hearing 
Officer 
recommended 
approval to 
modify the following 
stipulations: 
No. 11. 
That a pedestrian and bike 
trail 
be 
provided 
and 
maintained 
along 
Baseline Road and the 
loop roadway, the location, width, coloration 
and 
design 
of 
which 
is to be 
determined 
by 
the 
Development 
Coordination review. 
That 
the 
improvements 
(sidewalk, 
etc.) made through the Improvement 
District remain and accommodate· the intent of this stipulation. 
No. 16. 
That future signalization of Jesse Owens Parkway with 
Central Avenue 
and 
Baseline 
Road will 
be at the expense of the developer. 
Traffic 
signals will not be installed until the warrants are met or a 
need is 
supported by a 
traffic 
study 
submitted and reviewed by the Streets 
and Traffic Department. 
PHOSUM6:080289:SD/ab

-280-
August 30, 1989 
ITEM 31 
Karen F. George, Agent 
Cactus Jacks Bar & Grill 
4747 Elliott Road 
Suite 3-5 
ITEM 32 
Salvatore S. Benigno, 
Agent 
Sammy B's Pizza 
4825 East Warner Road 
Suite Dl-D2 
District 8, Series 12 -
Original license. 
District 8, Series 7 -
Ownership & location 
transfer of a business 
from Scottsdale. 
Use permit for Item 32 to be subject to the following 
stipulations: 
1.
A use permit be approved for one year only;
2.
That alcoholic beverage sales not exceed 25% of gross
revenue;
3.
That there be no package liquor sales, and
4.
That only beer and wine be sold.
ITEM 26 
Amira Z. Mansour 
Campbell Food Mart 
4410 North 40 Street 
District 6, Series 10 - Original 
license. 
A convenience market 
that does not sell gas and meets 
convenience market guidelines. 
MOTION was made by Mrs. Wilcox, SECONDED by Mr. Adams, 
that Item 26 be recommended for approval. 
MOTION CARRIED 
UNANIMOUSLY. 
PETITIONS, COMMUNICATIONS, AND PUBLIC HEARINGS 
MOTION was made by Mr. Adams, SECONDED by Mr. Nelson, 
to approve Items 33 through 37, except 36A, 36B and 37A. 
For the record, Mayor Goddard stated that he would be 
supportive, understanding that Items 35A and B were consis­
tent with previous Council discussion and neighbors to the 
north 
still 
supported 
the 
compromise. 
Also, 
Item 37K 
(another concern) clarified a previous Counci 1 approval. 
Mr. Goode stated that Items 36A and B had not been called 
to his attention, so he would go ahead with them. 
MOTION 
CARRIED UNANIMOUSLY. 
Attachment C

-287-
August 30, 1989 
DISTRICT 8 
SOUTHERN GEM ASSOCIATES 
H.
Rezoning Applications 206-86 and 207-86-8, request of 
Southern 
Gem 
Associates, 
represented 
by 
William
Brownlee, for deletion of the conditional zoning time
stipulation, 
modification of site plan and stipula­
tions. 
Located at the north side of Baseline Road
between Central Avenue and 7th Street.
The Planning Hearing Officer 
six-month extension of the 
stipulation and approval of 
modifications: 
recommended approval of a 
conditional 
zoning time 
the following stipulation 
5. That an average landscaped setback of 51 feet for
.. ·.J 
-- :
any building and parking area will be provided
-Ü
along Baseline Road and average landscaped setback
of 25 feet will be provided along Central Avenue
measured from the property line.
19. That the site be developed in general conformance
to the site plan presented to the Planning Hearing
Officer on July 26, 1989, which is for the property
east of the Jesse Owens Parkway and is for a K-Mart
development.
The Planning Hearing Officer recommended a continuance 
to August 2, 1989, to consider modification to Stipu­
lations 11 and 16. 
DISTRICT 1 -
DR. ANTHONY PANNOZZO 
I.
Rezoning Application 297-83-1 - Request of Dr. Anthony
Pannozzo, for extension of the conditional zoning time
stipulation. 
Located at the southeast corner of 36th
Street and Bell Road.
The Planning Hearing Officer recommended approval of
an 18-month extension of the conditional zoning time
stipulation.
DISTRICT 1 - DR. JAMES RUSHER 
J.
County Rezoning Application 85-182-1 - Request of Dr.
James Rusher, represented by Louis Jekel, for extension
of the conditional zoning time stipulation. 
Located
at the west side of 28th Street 
beginning 600 feet
north of Bell Road.

-288-
August 30, 1989 
K. 
The Planning Hearing Officer recommended approval of a 
two-year 
extension 
of 
the 
conditional 
zoning 
time 
stipulation. 
DISTRICT 2 - PHOENIX 
ASSOCIATES LAND VENTURE 
Rezoning Application 228-85-2 
Request of 
Associates 
Land 
Venture, 
represented 
by 
Widener, for modification of site plan and 
tions. 
Located north of the northeast corner 
Canyon Freeway and Peoria Avenue. 
Phoenix 
Michael 
stipula­
of Black 
The Planning Hearing Officer recommended approval to 
modify the following stipulations: 
1. That the floor area ratio not exceed .830.
2. That maximum building heights for structures shown
on the stipulated site plan shall not exceed the
fol lowing heights: 
a) one building of l4 stories,
190 feet; b) one building of 10 stories, 140 feet;
c) one building of 8 stories, 120 feet.
3. That a minimum 35,000 square feet be devoted to
retail/service 
activities 
for 
the 
area 
between
Peoria Avenue, 
Challa Street, east of 
the I-17
Frontage Road and west of Cave Creek Wash owned by
the 
applicant or by partnerships in 
which 
the
applicant is a partner.
9. That 
the 
property 
be 
developed , in 
general
conformance to the 
site 
plan 
presented at 
the
Planning 
Hearing 
Officer 
hearing 
of 
August 
2,
1989. 
That no building within the C-1 mid-rise
district boundary be closer than 35 feet to the
freeway 
frontage, 
provided 
that 
any 
building
within 75 feet of the freeway frontage shall be no
more than one story in height except as shown on
the approved site plan.
12. That the applicant shall coordinate efforts with
Gannett to construct a shelter in 
keeping with
Phoenix 
Transit 
standards on the north side of
Peoria Avenue in proximity to 25th Avenue.

-289-
August 30, 1989 
16.
That the applicant shall place funds in escrow at·
a rate approximating $.05 per square foot of rent­
able 
building 
area 
as its 
contribution to the
development of the Hatcher Parkway proposed between
Metro Core and Cave Creek Road. 
The funds shall
be placed in escrow consistent with the phasing of
the buildings on the site. 
If no plan for the
Hatcher Parkway has been submitted for considera­
tion to the Phoenix City Council by June 30, 1989,
the escrowed funds shall be released to the appli­
cant. 
That 
following 
the 
plan 
submittal 
or 
approval 
by 
City 
Counci 1, 
the 
applicant 
and 
Development Coordination Off ice wi 11 negotiate a 
reasonable time to hold the funds. 
DISTRICT 4 - THOMAS GATE LTD. 
L.
Rezoning Application 43-88-4 -
Request bf Thomas Gate
Ltd., represented by Ed Hoepker, for modification of
site plan to allow a gas service station at corner and
modify restriction to PSC signage, requesting C-2 sign
ordinance 
regulations. 
Located 
at 
the 
northwest
corner of 83rd Avenue and Thomas Road.
The Planning Hearing Officer recommended approval of
the request subject to the following stipulations:
1. That development be in general conformance with the
site plan presented to the Planning Hearing Officer
on AuguÖt 2, 1989, which modifies the approved site
plan to allow a service station at the intersection
corner.
2.
Deletion of Stipulation 9 which limited signage to
PSC zoning sign ordinance regulations.
3.
That signage for the service station site at the
intersection corner be in general conformance with
the 
sign 
elevations 
presented 
to 
the 
Planning
Hearing Officer on August 2, 1989.
4.
That the balance of the stipulations pertaining to
Rezoning Application 43-88 remain intact.
DISTRICT 8 -
SOUTHERN GEM ASSOCIATES 
M.
Rezoning 
Applications 
206/207-86-8 
Request 
of 
Southern 
Gem 
Associates, 
represented 
by 
William 
Brownlee, 
for modification of 
stipulations. 
Located 
at 
the north side of 
Baseline 
Road between Central 
Avenue and 7th Street. 
' ··· 
, ·.

August 30, i._...s9 
The Planning Hearing Officer recommended approval to 
modify the following stipulations: 
11. That a pedestrian and bike trail be provided and
maintained along Baseline Road and the loop road­
way, the location, width, coloration and design of
which 
is 
to 
be 
determined 
by 
the 
Development
Coordination Office review.
16. 
That 
the 
improvements 
(sidewalk, 
etc.) 
made 
through the Improvement District remain and accom­
modate the intent of this stipulation. 
That future 
and Central 
the 
expense 
will not be 
or a need is 
and reviewed 
signalization of Jesse Owens Parkway 
Avenue and Baseline Road will be at 
of 
the 
developer. 
Traffic 
signals 
installed until the warrants are met 
supported by a traffic study submitted 
by the Streets and Traffic Department. 
MOTION was made by Mr. 
Adams, SECONDED by Dr. Parks, 
to approve Items 36A, 368 and 37A. 
Mr. Nelson withdrew 
from the voting body for possible conflicts of interest. 
MOTION CARRIED UNANIMOUSLY. 
ITEM 36 
DISTRICTS 1, 7 AND 8 - ZONING 
CASES SCHEDULED FOR RATIFI­
CATION OF PC ACTION - F-2700 
The Counci 1 
heard 
request to approve recommendations 
made on the following zoning matters which were heard by 
the Planning Commission on August 9, 1989. 
DISTRICT 8 - UDC/FOOTHILLS 
LIMITED PARTNERSHIP 
A.
Application 
289-C-84-8: 
Request 
of 
UDC/Foothills
Limited 
Partnership 
for 
a 
major 
amendment 
to 
the
Foothills PCD on a parcel located between 19th Avenue
and 
3rd 
Avenue, 
Ray 
Road 
and 
Pecos 
Road 
(approxi­
mately 1,447.4 
acres) 
from 
Rl-8 
(59,6 
acres), 
Rl-6
(321.3 acres), R-2 
(771.8 acres), R-4A (107.0 acres),
RE-35 (160.0 acres), Ind. Pk. (50.0 acres), C-0 
(18.5
acres) 
and C-2 
(27.4 
acres) 
to 
Rl-8 
(460.0 acres),
Rl-6 
(551.7 
acres), 
R-2 
(86.7 
acres), 
R-3A 
(46.9 
acres), 
R-4 
(42.8 
acres), RE-35 S.P. 
(160.0 acres), 
GCP (35.9 acres) and C-2 (63.5 acres). 
In the alter­
native, staff recommended an additional 19. 5 acres of 
CP/BP rather than proposed C-2 zoning. 
L:£ .. ·-··

City of Phoenix 
PLANNING DEPARTMENT 
September 1, 1989 
Mr. William Brownlee, Representative 
Southern Gem Associates, Owner 
The M-3 Companies 
1308 West Camelback Road 
Phoenix, Arizona 
85013 
Re: Rezoning 
Application 
Nos. 
206-86 and 207-86-8 - Located at the north side 
of Baseline Road between Central Avenue 
and 
7th 
Street. 
Heard at City 
Council on August 30, 1989. 
Dear Mr. Brownlee 
Please 
be 
advised 
that 
the 
Phoenix 
City 
Councii, 
in 
accordÂnce with the 
provisions of 
Section 
108-M 
of 
the 
Zoning 
Ordinance, 
concurred 
witn the 
recommendation 
of 
the 
Planning 
Hearing 
Officer 
for approval of a six month 
extension of the 
cond:i.tional · zoning 
time 
stipulation 
and approval 
of 
the 
following stipulation modifications: 
No. 5: 
No. 19: 
That 
an 
average 
landscaped 
setback of 51 feet for any building 
and 
parking 
area 
will 
be 
provided 
along 
Baseline Road 
and 
average iandscaped setback of 
25 
feet 
will 
be provided along 
Central Avenue measured from the property line. 
That 
the 
site 
be developed 
in general conformance to the site 
plan presented to the Planning Hearing Officer on July 
26, 
1989, 
which 
is 
for the property east of the Jesse Owens Parkway and is 
for a K-Mart development. 
The Planning Hearing Officer recommended a continuance 
to August 
2, 
1989 
to consider modification to stipulations nos. 11 and 16. 
Sincerely, 
1:&,.fs l<W-vt 
David E. Richert 
Zoning Administrator 
DER:ab 
cc: City Clerk 
J. Beall ( 2)
P. Hazlett
S. Muenker
J. Neville
File/Book
125 East Washington Street. Phoen,x. Arizcna <350(J,;.2342 602·262·6655 
Attachment D

\ \ 
\ 
City of Phoenix 
September l, 1989 
Mr. William Brownlee, Representative 
Southern Gem Associates, Owner 
The M-3 Companies 
1308 West Camelback Road 
Phoenix, Arizona 85013 
PLANNING DEPARH.'ENT 
125 East V✓osh1'lgtC': ::,; 
Phoenix. Arizona 
85004 2 34 2 
602-262 6655 
Re: Rezoning Application Nos. 206/207-86-8 
Baseline 
Road between 
Central Avenue 
Council on August 30, 1989. 
Located at 
the 
and 
7th Street. 
north 
Heard 
side 
of 
at City 
Dear Mr. Brownlee: 
Please be advised 
that 
the 
Phoenix 
City 
Council, 
in 
accordance 
With 
the 
provisions 
of 
Section 
108-M 
of tne 
Zoning 
Ordinance, 
concurred 
witn the 
recomrnendaU.on of the Planning Hearing 
Officer for approval to modHy the 
following stipulations: 
No. 11. 
That 
a 
pedestrian 
and bike 
trail 
be 
along Baseline Road and the loop 
roadway, 
coloration and design 
of which 
is 
to 
Development Coordination Office review. 
provided and maintained 
the 
location, 
width, 
be determined 
by the 
No. 16. 
That the improvements 
Improvement 
District 
stipulation. 
(sidewalk, 
remain 
and 
That future signal.i. za tion 
of 
Jesse 
Avenue 
and 
Baseline 
Road 
will 
developer. 
Traffic signals 
will 
warrants 
are 
met 
or 
a 
need is 
etc.) 
made 
through 
the 
accommodate the intent of this 
Owens 
Parkway and Central 
be 
at 
the 
expense of tne 
not 
be 
installed until 
the 
supported 
by a traffic study 
submitted and reviewed by the Streets and Traffic Department. 
Sincerely, 
hJ1cS 
David E. Richert 
Zoning Administrator 
DER:ab 
cc: City Clerk 
J. Beall(2)
P. Hazlett
S. Muenker
J. Neville
File/Book
Attachment E

February 3, 1987 
Slavin, Kane and Paterson 
2198 E. Camelback Road 
Phoenix, AZ 85016 
c;,i" of Photni, 
Planning Deportment 
Re: 
Rezoning Application No. 206-86 
Dear Sir: 
Please be advised that the Phoenix City Council, in accordance with the 
provisions of Section 108-J of the Zoning Ordinance, as amended, has on 
January 14, 1987, concurred in the recommendation of the Planning Commission 
and approved Rezoning Application No. 206-86 for C-2 zoning on a parcel 
located on the north side of Baseline Road beginning approximately 1057 feet 
east of Central Avenue, (approximately 14.87 acres), subject to staff's 
stipulations as modified by Hr. Kane's submittal: 
STIPULATIONS 
1.
That within 90 days of final City Council approval of this zoning change,
a rezoning application be filed to adjust zoning district boundaries to
conform to alignment of the loop road, and to include the existing C-2
zoned property fronting Central Avenue.
2.
That development be in general conformance to the site plan submitted,
with the understanding that rezoning is required to adjust district
boundaries.
3.
That the entire development proposal be subject to the Development
Coordination Office site plan review and approval in accordance with
Section 511 of the Zoning Ordinance.
4.
That approval be conditioned upon development of the commercial districts̈
ithin 24 months and the residential districts within 36 months of City
· · •' .. , '-Counci t·-z:on-i trg ··ap"f'TI1V8 i.-·in-accOTitance -vi. th -S-ect ỉ n .JOS-:-:H .. of .·.the Zoning
Ordinance. 
125 Eosl _Washington Street, Phoenix, Arizona 85004 602 26256655 
Attachment F

Slavin, Kane and Paterson 
February 3, 1987 
Page Two 
5. 
6. 
7. 
8. 
That an averaϣe landscaped setback of 55 feet for anv building and parking 
area will be provided alonϤ Baseline Road snd averaϥe landscaped setback 
of 25 feet Ϧill be providϧd alonϨ Central Avenue measured from the 
property lines. 
That tϩo roϪs of 24 inch box-sized citrus trees and/or date palms and 
large areas of flowers will be planted along Baseline Road, 20 feet on 
center or equivalent groupings as approved by the Development Coordination 
Office. 
That there shall be mature landscaping alonϫ Central Avenue to include 24 
inch bnx trees spaced a maximum 25 feet on center or placed in equivalent 
groupings. 
That all parking along Baseline Road and Central Avenue shall be screened 
with landscaped berms, a three-foot wall, or combination thereof, as 
approved by the Development Coordination Office. 
9.
That five percent or more of interior parking shall be landscaped with
reasonable distribution throughout the parking area and along the face of
the buildings.
10. That no drive-through facility on the site will have its drive-through
land facing any public right-of-way with the exception of the new road.
11. That a pedestrian and bike trail be provided and maintained along Baseline
Road and the loop roadway, the location, Ϭidth, coloration and design of
which is to be determined by the Development Coordination review.
12. That all rooftop mechanical units shall be screened by parapet walls,
building walls or enclosed in a mechanical equipment penthouse that shall
architecturally integrated with the buildings.
13. That apartment buildings along lhe north portion of the site shall be
limited to two-stories in height..
14. That signage will be in conformance with the guidelines (recommendations)
·adopted by the South Mountain Village Planning Coϭittee (the "Committee")
._ .... for. the .Baseline Scenic .Pa rkw_ay, provided: 
. . . .. 
·a.
Those guidellnes are adopted by the time the _applicant is ready to 
install signage; 
,/ 
b.
The applicant has the opportunity to provide input to the Committee
concerning the appropriate dimensions and appearance of the signage;
c.
The ·guidelines specifically address s1gnage for Ϯommercial shopping
centers.
.-

Slavin, Kane and 
February 3, 1987 
Page Three 
15. That the intersection of Central Avenue with Jesse Owens Parkway is to
align with Fremont Drive (one quarter mile point) to the west oi Central
Avenue or offset no more than a half street width to the south of that
alignment. 
(This is imperative in order to coordinate the traffic signals
and minimize delay for traffic on Central.)
16. That future signalization of Jesse Owens Parkway with Central Avenue and
Baseline Road will be at the expense of the developer. 
Traffic signals
will not be installed until the warrants are met.
17. That right lanes will be required on Baseline Road at Jesse Owens Parkwav
and on Central Avenue at Jesse Owens Parkway.
18. That construction of an internal loop road and bridge over the Western
Canal be provided by the applicant/property owner with cooperation and
support by the City of Phoenix in the first phase of development.
19. That the site be developed in general conformance to the site plans
submitted December 8, 1986, including the public amenities enumerated on
the site plans.
20. That wall or fencing along the north side of the Western Canal shall be
offset to reduce scale and bulk and to maximize the safety and security
for pedestrians and other persons using the trail along the canal, as
approved by the Development Coordination Office. 
If masonry walls are
used along the north side of the canal, they shall be attractively
landscaped and maintained and shall be colored to blend in with the
surrounding landscaping.
Sincerely, 
Deputy Planning Director 
DER: d fr /20686 
cc: 
City Clerk 
Jay Neville 
Tom Slade 
--. 
· · l.oni ng "[nfoTcement
f!il]£V

W BASELINE RD
S CENTRAL AVE
E BASELINE RD
WESTERN CAN
AL
PRIVATE
ALLEY
W FREMONT RD
S MARDIAN WAY
E JESSE OWENS P
KWY
E VALENCIA DR
PRIVATE RD
S JESSE OWENS PKWY
S 7TH ST
R-5
C-2*
R1-10
R1-10
R1-10
R1-10
R1-10 HP
C-2*
R1-10
HP
R-4A*
R-4*
R1-10
HP
R1-6
R-5
R-5
PUD*
C-2
C-2
C-2
P-1
C-3*
C-2*
C-2
HGT/WVR*
C-2*
C-2*
C-2 SP*
C-2*
C-1*
C-2
C-2*
C-2*
R1-10
R-3
R1-6
Maricopa County Assessor's Office
Planning & Development Department
PHO-2-22--Z-206-86-8(7) Property Location: Approximately 340 feet north of the northwest corner of 
Jesse Owens Parkway and Baseline Road
0
280
560
140
Feet ´

W BASELINE RD
S CENTRAL AVE
E BASELINE RD
WESTERN CAN
AL
PRIVATE
ALLEY
W FREMONT RD
S MARDIAN WAY
E JESSE OWENS P
KWY
E VALENCIA DR
PRIVATE RD
S JESSE OWENS PK
W
Y
S 7TH ST
Maricopa County Assessor's Office
Planning & Development Department
PHO-2-22--Z-206-86-8(7) Property Location: Approximately 340 feet north of the northwest corner of 
Jesse Owens Parkway and Baseline Road
0
280
560
140
Feet ´

• 
OHE------------
90'ELECTRIC EASEMENT 
PER DOCKET 10681, 
PAGE 603, M.C.R. -
ACCESS TO CANAL -
. 
TURF AMEN !TY AREA ---ll-l---1----if---l. 
15' BUILDING -
SETBACK 
. 
RAMADA/BBQ -----!Jfl----+---i--tt-1 
APPROXIMATE ZONE 
BOUNDARY LIN
Ŋ 
5'LANDSCAPE 
SETBACK 
ZONE "A" 
• • •
mn
r-- "' 
crlai
mm
"' "'
ZONE "X" SHADED 
AP .N.114-16-005C 
MfTRI H SHAMI & Sf!./JD SHAMI 
TRUST /SHAMI SHILOH UC 
1998-0430535 M.C.R. 
;,: 3:
••
r-- m
OLO 
q-	
oo
• • 
oo 
oo 
zz 
OH£--......_,__ 
TRASH/REFUSE ------.. 
ENCLOSURE 
--..._ 
OHE---......_,__ 
II 
II 
0 
N 
II 
II 
• • 
• • 
'/ 
I 
L/ 
, 
•
I 
a, 
"'? 
,q­m 
N 
I 
I 
0 
0 
 "r------
"=__J_---==" 
11 ___ 12_5'--i:_./'/u' /:_.' //I "--
r--- ASPHALT PARKING
II 
t-S/W 
15.5' 
TYP. 
[Fō-==\l"_Jlbesl.=J..I .....JI"Ŏŏ=,
"r--s;w 
TYP. 
E1=
' 
v= 
 ....... ------11r-----. 
!1
0 
0 
" 
I 
" 
II 
oHE 
II 
f'1 ..... 
(/) 
LL.I LL.I 
Qt, 
LON
co·a> 
,q- ,q-
);., 
00 
1"' 
I 
ŋFIRE 
I 
\I 
'ňr---FD. CITY IJ, - PʼnEONIX
1\ 
► 
3" BRASS \GtP FLUSH
------
---
 
 
35' 
R/W 
tJ 
... "' 
I ,i
N N-"-+--OHE---l--\1----__Jl-----
.. 1---llt ··--
I 
WV
"' ;,: 
q -
 
ll) 
,q-
N 
m 
,q-• "' 
0 
z 
I 
35' 
R/W 
-UGFO-
---1-lrt"i". •·
0 
N 
HYDRANT 
', ·, 
<TYP .) ..i.
l -i-lŌl
l+
S'
:,\-1--j. • • 
-1--1--· .. -
1 
.. . 
... ---;===;---·.. 
\ ....
" 
II 
' -	 :,. m, [ '"'°'"
,,---
3"BRASS 1AP FLUSH 
II 
 
0 
\I 
" 
0 
0 
0 
I 
II 
I 
" 
0 
L__J 
0 
L/ 
,,.,,--CATCH 
),....-
BASIN 
II 
0 
N 
" 
1 WV 
CLIENT: 
TBBG ACQUISITIONS, LLC 
CONTACT: ANDREW BISKIND 
PHONE: (602) 369-6673 
APN NUMBERS: 
114-16-016
ADDRESS: 
LL.I 
::::, 
z 
LL.I 
 
SOUTHERN 
LL.I 
::::, 
z 
LL.I 
 
AVENUE 
a:
f­
V)
ENGINEER: 
3 ENGINEERING 
PHOENIX, ARIZONA, 85042 
VINEY ARD 
ROAD 
6370 E. THOMAS ROAD, SUITE # 
SCOTTSDALE, ARIZONA 85251 
CONT ACT: DANIEL G. MANN, P .E. 
PHONE: (602)334-4387 
EMAIL: DAN@3ENGINEERING.COM 
NOTE: 
200 
BUILDINGS SHALL BE SPRINKLERED 
WITH NFPA 13R SPRINKLER SYSTEM 
PROJECT SCOPE: 
THIS PROJECT IS A NEW MUL TI-FAMILY 
RESIDENTIAL DEVELOPMENT WHICH CONSISTS OF 
16-UNITS WITH ASSOCIATED PARKING, DRIVE
AISLES, AND OPEN SPACE. 
LEGAL DESCRIPTION: 
THAT PORTION OF THE SOUTHEAST ONE-QUARTER OF SECTION 
32, TOWNSHIP 1 NORTH, RANGE 3 EAST OF THE GILA AND 
SALT RIVER BASE AND MERIDIAN, MARICOPA COUNTY, ARIZONA, 
DESCRIBED AS FOLLOWS: 
COMMENCING AT THE SOUTH ONE-QUARTER CORNER OF SAID 
SECTION 32; 
THENCE NORTH 90" 00' 00" EAST ALONG THE SOUTH LINE OF 
SAID SECTION 32, A DISTANCE OF 1057.32 FEET; 
THENCE LEAVING SAID SOUTH LINE NORTH 00" 04' 07" WEST, 
55.00 FEET TO THE TRUE POINT OF BEGINNING; 
THENCE CONTINUING NORTH oo· 04' 07" WEST, 644.79 FEET 
TO A POINT ON THE SOUTHERLY RIGHT OF WAY OF THE 
WESTERN CANAL; 
THENCE ALONG SAID RIGHT OF WAY NORTH 84' 07' 20" EAST, 
198.98 FEET TO A POINT ON THE WEST RIGHT OF WAY OF 
JESSE OWENS PARKWAY AS CONVEYED TO THE CITY OF 
PHOENIX IN RECORDERS NO. 88-297420, MARICOPA COUNTY 
RECORDER; 
THENCE ALONG SAID RIGHT OF WAY SOUTH 03' 48' 50" EAST, 
139.81 FEET TO THE BEGINNING OF A TANGENT CURVE 
CONCAVE TO THE WEST, HAVING A RADIUS OF 785.00 FEET; 
THENCE SOUTHERLY ALONG THE ARC OF SAID CURVE, THROUGH 
A CENTRAL ANGLE OF 1 T 48' 50" AN ARC DISTANCE OF 
244.07 FEET; 
THENCE SOUTH 14' 00' 00" WEST, 282.21 FEET; 
THENCE SOUTH 51' 58' 56" WEST, 1 5.76 FEET TO A POINT 
55.00 FEET NORTH OF THE SOUTH LINE OF SAID SECTION 32; 
THENCE SOUTH 90" 00' 00" WEST, 104.19 FEET TO THE TRUE 
POINT OF BEGINNING. 
EXCEPT THE SOUTHERLY 325 FEET; AND 
EXCEPT THE SOUTHERLY 25 FEET. 
--+-------32 --------+-
:c 
f­
r--
BASELINE 
J 
ROAD 
:c 
f­
r--
VICINITY MAP 
N.T.S. 
SITE PLAN NOTES: (CITY OF PHOENIX) 
1. DEVELOPMENT AND USE OF THIS SITE WILL CONFORM WITH ALL APPLICABLE
CODES AND ORDINANCES
2. ALL NEW OR RELOCATED UTILITIES WILL BE PLACED UNDERGROUND
3. STRUCTURES AND LANDSCAPING WITHIN A TRIANGLE MEASURED BACK 10'
FROM THE PROPERTY LINE AND 20' ALONG THE PROPERTY LINE ON EACH
SIDE OF THE DRIVEWAY ENTRANCES WILL BE MAINTAINED AT A MAXIMUM
HEIGHT OF 3'
4. ANY LIGHTING WILL BE PLACED SO AS TO DIRECT THE LIGHT AWAY FROM
ADJACENT RESIDENTIAL DISTRICTS AND WILL NOT EXCEED ONE FOOT CANDLE
AT THE PROPERTY LINE. NO NOISE, ODOR OR VIBRATION WILL BE EMITTED AT
ANY LEVEL EXCEEDING THE GENERAL NOISE, ODOR OR VIBRATION EMITTED BY
USES IN THE AREA OUTSIDE THE SITE
5. OWNERS OF PROPERTY ADJACENT TO PUBLIC RIGHT-OF-WAY WILL HAVE
RESPONSIBILITY FOR MAINTAIN ALL LANDSCAPING LOCATED WITHIN THE
RIGHTS-OF-WAY, IN ACCORDANCE WITH APPROVED PLANS
6. AFTER FINAL APPROVAL THE PROJECT WILL BE INSPECTED FOR ZONING
COMPLIANCE DURING CONSTRUCTION AND PRIOR TO OCCUPANCY. THE 
APPLICANT IS TO NOTIFY D.S.D. PRIOR TO OCCUPANCY TO ARRANGE FOR 
INSPECTIONS. CALL 602-262-6981 AND REQUEST A DESIGN REVIEW INSPECTION 
7. ALL ROOFTOP EQUIPMENT AND SATELLITE DISHES SHALL BE SCREENED TO
THE HEIGHT OF THE TALLEST EQUIPMENT
8. ALL SERVICE AREAS SHALL BE SCREENED TO CONCEAL TRASH CONTAINERS,
LOADING DOCKS, TRANSFORMERS, BACK-FLOW PREVENTERS AND OTHER 
MECHANICAL OR ELECTRICAL EQUIPMENT FROM EYE LEVEL ADJACENT TO ALL 
PUBLIC STREETS 
9. BARED, RAZOR OR CONCERTINA WIRE (OR SIMILAR) OR CHAIN LINK SHALL NOT
BE USED ON THIS SITE WHERE VISIBLE FROM PUBLIC STREETS OR ADJACENT 
RESIDENTIAL AREAS 
10. SMOKE, GAS, AND ODOR EMISSIONS SHALL COMPLY WITH REGULATION Ill OF
THE MARICOPA COUNTY AIR POLLUTION RULES AND REGULATIONS. 
11. THE DISPOSAL OF ALL WASTE MATERIALS SHALL COMPLY WITH TITLE 9,
CHAPTER 9, ARTICLES 18 AND 4 OF THE HAZARDOUS WASTE REGULATIONS AS 
ADOPTED BY THE ARIZONA HEAL TH DEPARTMENT 
12. ALL SIGNAGE REQUIRES SEPARATE APPROVALS AND PERMITS
I CONSENT TO THE REPRODUCTION OF THIS SITE PLAN PROVIDED THAT IF 
MODIFICATIONS ARE MADE, THE ARCHITECTS WHO MAKE SUCH CHANGES ASSUME 
FULL RESPONSIBILITY AND LIABILITY FOR THE MODIFIED PORTION OF THE 
PLAN. 
13. THIS PROJECT IS LOCATED IN THE CITY OF PHOENIX WATER SERVICE AREA
AND HAS BEEN DESIGNATED AS HAVING AN ASSURED WATER SUPPLY.
< 2 
SIGNATURE OF COPYRIGHT OWNER 
DANIEL G. MANN 
PRINTED NAME OF COPYRIGHT OWNER 
3 1B 22 
DATE 
EXISTING/PROPOSED ZONING ........ C-2 - R-3 USE, BASELINE AREA OVERLAY DISTRICT 
GROSS AREA ............................................................ 1.689 ACRES ...................................... 73,598 SF 
NET AREA················--······························ 1.434 ACRES ...................................... 62,475 SF 
OPEN SPACE 
51/. OF GROSS 
3,680 SF REQ./ 
7,334 SF PROV. 
PROPOSED DENSITY. 
.. 
. 
. ...... 9.47 UNITS/ACRE 
ALLOWED DENSITY .......................................... 14.5 UNITS/ ACRE 
LOT COVERAGE ................................................... 31.871/. OF NET AREA .............. 19,912 SF /62,475 SF 
19,912 SF BUILDINGS 
PARKING CALCULATIONS 
REQUIRED .............. ....... ....... ....... .................. .... 16 X 2 = 32 
16 X 1 = 16 
TOT AL REQUIRED ............................................ 48 SPACES 
................................... 3 + BEDROOM UNIT 
__ ................... 1 GUEST /3 + BD UNIT 
PROVIDED ... -- ......................... __ 17 UNCOVERED NON-ADA 
32 GARAGE SPACES 
1 UNCOVERED ADA 
TOT AL PROVIDED .............................................. 50 SPACES (INCLUDING 1 ADA) 
APPROVALS 
Coni.ct Arlz,;,na 811 d 11:nt twg lull 
'IIOlti'lg IIIJS belonl yau begin ucavation 
Call 811 or cllck Artzona811.com 
SNOISl/\311 
N
I I I -..::t
:z 
_ _.I<( 
I I I Z 
V')O 
<(
 
co<C 
o<S 
UJ 
C/)Q 
:z :r:
I I I°: 
3: 
0 
I I I 
C/)o6 
V')v, 
I I I z
UJ 
> 3;:
uo 
3: 
:z 
I I U 
0 
:zoz 
z 
<( 
_J 
a... 
w
I--
U)>­
Ck::: 
<( z 
 
_Jw 
Ck::: 
a... 
u:::l
z
"' 
w 
w z 
6 
iii "" 
 
ci 
I 
'---------' .!.. 
3 ENGINEERING, llC 
6370 E. TI,OMAS ROAD 
SUlfE # 20D 
SCOTTSDALE, ARIZONA 85251 
PHONE: (602) 334-4387 
FAX: (602) 490-3230 
WWW.3ENGINEERING.COM 
DATE: 03/18/22 
PROJECT NO. 
PHO-2-22--Z-206-86-8(7)
Proposed Site Plan
Hearing Date: July 20, 2022

PHO-2-22--Z-206-86-8(7)
Site Plan Sourced from Original Rezoning Case (Z-206-86)
Note: No site plan was identified with the July 26, 1989 date as referenced in Stipulation 19  
Hearing Date: July  20, 2022