Staff Report: Z-40-23-2
September 1, 2023
Paradise Valley Village Planning
Committee Meeting Date:
September 11, 2023
Planning Commission Hearing Date:
October 5, 2023
Request From:
C-O/G-O HGT/WVR (Commercial Office
General Office District, Height Waiver) (1.59
acres)
Request To:
R-2 (Multifamily Residence District) (1.59
acres)
Proposal:
Multifamily residential
Location:
Approximately 430 feet east of the southeast
corner of 32nd Street and Paradise Lane
Owner:
Brandon Nunn’s for Nunn’s Construction
Applicant/Representative:
Shaine T. Alleman, Tiffany & Bosco, P.A.
Staff Recommendation:
Approval, subject to stipulations
General Plan Conformity
General Plan Land Use Designation
Residential 3.5 to 5 dwelling units per acre
Street Map Classification
Paradise
Lane
Minor Collector
30-foot south half street
CONNECT PEOPLE & PLACES CORE VALUE; OPPORTUNITY SITES; LAND USE
PRINCIPLE: Support reasonable levels of increased intensity, respectful of local
conditions and surrounding neighborhoods.
The proposed density is 10.06 dwelling units per gross acre, which is a reasonable level
of increased intensity that is compatible with the existing density of the adjacent mobile
home parks. The proposal also includes only one-story buildings which is respectful of
local conditions and surrounding neighborhoods.
CONNECT PEOPLE & PLACES CORE VALUE; BICYCLES; DESIGN PRINCIPLE:
Development should include convenient bicycle parking.
The proposal, as stipulated, will provide secured bicycle parking near open space
areas. This bicycle parking will provide residents and guests with an alternative mode of
transportation to the site nearby 32nd Street, which is designated as a bikeway.
ATTACHMENT B
Staff Report: Z-40-23-2
September 1, 2023
Page 2 of 14
BUILD THE SUSTAINABLE DESERT CITY; TREES AND SHADE; DESIGN
PRINCIPLE: Integrate trees and shade into the design of new development and
redevelopment projects throughout Phoenix.
The proposal, as stipulated, will provide pedestrian walkways shaded to a minimum of
75 percent, a detached tree-shaded sidewalk along Paradise Lane, and uncovered
surface parking shaded by drought-tolerant shade trees to a minimum of 25 percent.
Applicable Plan, Overlays, and Initiatives
Piestewa Peak Freeway Specific Plan: See Background Item No. 7.
Housing Phoenix Plan: See Background Item No. 8.
Tree and Shade Master Plan: See Background Item No. 9.
Complete Streets Guidelines: See Background Item No. 10.
Comprehensive Bicycle Master Plan: See Background Item No. 11.
Zero Waste PHX: See Background Item No. 12.
Transportation Electrification Action Plan: See Background Item No. 13.
Phoenix Climate Action Plan: See Background Item No. 14.
Surrounding Land Uses/Zoning
Land Use
Zoning
On Site
Vacant
C-O/G-O HGT/WVR
North (across Paradise Lane)
Mobile home park
R1-8
South
Mobile home park
R1-14
East
Mobile home park
R1-14
West
Church
C-O/G-O HGT/WVR
Staff Report: Z-40-23-2
September 1, 2023
Page 3 of 14
R-2 – Multifamily Residence District
(Planned Residential Development Option)
Standards
Requirements
Proposed
Gross Acreage
-
1.59 acres
Maximum Number of Units
16; 19 with bonus
16 (Met)
Maximum Density
(dwelling units/acre)
10.50 dwelling units per
acre; 12.00 with bonus
density points
10.06 dwelling units per acre
(Met)
Maximum Lot Coverage
45%
23% (Met)
Maximum Building Height
2 stories or 30 feet for first
150 feet; 1-foot increase in
height per 5-foot increase
in setback to a maximum
of 48 feet high and 4-story
1-story and 15 feet, 11 inches
high (Met)
Minimum Building Setbacks
Adjacent to Public Street
20 feet
Paradise Lane (North): 31
feet, 7 inches (Met)
Adjacent to Property Line
10 feet
East: Approx. 68 feet (Met)
South: 11 feet, 6 inches (Met)
West: 11 feet, 9 inches – 22
feet, 5 inches (Met)
Minimum Landscape Setbacks
Adjacent to Public Street
20 feet
Paradise Lane (North): 20
feet (Met)
Adjacent to Property Line
5 feet
East: 10 feet (Met)
South: 11 feet, 6 inches (Met)
West: 10 feet (Met)
Minimum Parking
24 spaces required
1.5 spaces per 1- or 2-
bedroom unit
16 units proposed all 1- or
2-bedroom
27 spaces provided (Met)
Background/Issues/Analysis
SUBJECT SITE
1.
This request is to rezone 1.59 acres located approximately 430 feet east of the
southeast corner of 32nd Street and Paradise Lane from C-O/G-O HGT/WVR
(Commercial Office/General Office District, Height Waiver) to R-2 (Multifamily
Residence District) for a 16-unit, 1-story multifamily development.
Staff Report: Z-40-23-2
September 1, 2023
Page 4 of 14
GENERAL PLAN LAND USE MAP DESIGNATION
2.
The General Plan Land Use Map designation for the subject site is Residential
3.5 to 5 dwelling units per acre. This land use category falls under the traditional
lot housing type, which allows land use categories with densities from 2 to 3.5
dwelling units per acre, 3.5 to 5 dwelling units per acre, 5 to 10 dwelling units per
acre, or anything falling within those categories. Zoning districts R1-10, R1-8, R1-
6 and R-2 are consistent with this housing type. While the proposal for R-2 is not
consistent with the General Plan Land Use Map designation of Residential 3.5 to
5 dwelling units per acre, it is consistent with the allowable zoning districts within
the traditional lot housing type in the General Plan.
The General Plan Land Use Map designations surrounding the site to the north,
east, south, and west are also Residential 3.5 to 5 dwelling units per acre.
SURROUNDING LAND USES AND ZONING
3.
The subject site is vacant and is currently zoned C-O/G-O HGT/WVR
(Commercial Office/General Office District, Height Waiver).
To the north of the subject site, across Paradise Lane, is a mobile home park
zoned R1-8 (Single-Family Residence District).
General Plan Land Use Map
Source: Planning and Development Department
Staff Report: Z-40-23-2
September 1, 2023
Page 5 of 14
To the east and south of the subject site is another mobile home park zoned R1-
14 (One-Family Residence).
To the west of the subject site is a church zoned C-O/G-O HGT/WVR
(Commercial Office/General Office District, Height Waver).
PROPOSAL
4.
Site Plan
The site plan, attached as an exhibit, proposes a new 16-unit multifamily
residential development with a total building footprint of 14,548 square feet.
Vehicular access is proposed along the northeast portion of the site to Paradise
Lane. The proposal includes 27 parking spaces, two of which are reserved for
accessible parking spaces. Additionally, a driveway connection to the existing
driveway for the site to the east is proposed in the southeast portion of the
subject site for emergency vehicle turnaround access only. Refuse bins are
proposed to be located on the southeast portion of the site, adjacent to the
proposed driveway. Two units are proposed to have a frontage along Paradise
Zoning Sketch Map
Source: Planning and Development Department
Staff Report: Z-40-23-2
September 1, 2023
Page 6 of 14
Lane and pedestrian walkways connecting to the public sidewalk are proposed
across the site to connect to each unit. Two common open space areas are
proposed with a total area of 3,353 square feet.
The site meets maximum lot coverage, minimum building setback, minimum
landscape setback, and minimum parking requirements and has units with a
frontage along the public street. Therefore, staff recommends general
conformance to the site plan date stamped August 18, 2023. This is addressed in
Stipulation No. 1.
To enhance the perimeter landscaping and provide a buffer between the single-
family zoning surrounding the site, staff recommends the landscape setbacks be
planted with minimum two-inch caliper, large canopy, drought-tolerant shade
trees planted 20 feet on center or in equivalent groupings, and drought-tolerant
shrubs, accents, and vegetative groundcovers to achieve a minimum of 75
percent live coverage at maturity. This is addressed in Stipulation No. 3.
To enhanced pedestrian comfort, visibility, and safety, staff recommends the
following:
• All pedestrian walkways, including sidewalks, be shaded by a structure,
landscaping at maturity, or a combination of the two to achieve a minimum
of 75 percent shade.
• The sidewalk adjacent to Paradise Lane be detached and include
minimum two-inch caliper, single-trunk, large canopy, drought tolerant
shade trees planted 20 feet on center or in equivalent groupings within the
landscape strip located between the back of curb and sidewalk.
• Where pedestrian walkways cross a vehicular path, the pathway be
constructed of alternative materials or pavement treatments that visually
contrasts the parking and drive aisle surfaces.
• Fencing adjacent to Paradise Lane be full view fencing.
• Private rear yards adjacent to common open space areas incorporate a
combination of view walls/fencing and partial view walls/fencing.
These are addressed in Stipulation Nos. 4, 5, 9, 10 and 15.
To visually improve the entry to the site and to reduce vehicular speeds at the
entry and exit of the site, staff recommends the entry and exit driveway
incorporate decorative pavers, stamped or colored concrete, or a similar
alternative material. This is addressed in Stipulation No. 6.
To increase shade in uncovered surface parking lot areas and reduce the
amount of pavement in the direct sunlight, staff recommends that all uncovered
surface parking lot areas be landscaped with minimum two-inch caliper drought-
Staff Report: Z-40-23-2
September 1, 2023
Page 7 of 14
tolerant shade trees dispersed throughout the parking lot area to achieve a
minimum of 25 percent shade at maturity. This is addressed in Stipulation No. 7.
To enhance pedestrian connectivity and frontage along Paradise Lane, staff
recommends that the units adjacent to Paradise Lane each have individual
pedestrian entrances oriented towards the street connected with a direct
sidewalk and include a porch or patio to accentuate the street-facing unit
entrance. This is addressed in Stipulation No. 8.
To promote bicycling as an alternative mode of transportation nearby 32nd
Street, which is a designated bikeway, staff recommends the project include
bicycle parking per the requirements of Section 1307.H of the Phoenix Zoning
Ordinance and a bicycle repair station. To enhanced bicyclist comfort, staff also
recommends the bicycle parking spaces and bicycle repair station to be shade a
minimum of 75 percent. These are addressed in Stipulation Nos. 11 and 12.
5.
Landscape Plan
The conceptual landscape plan, attached as an exhibit, proposes trees and live
coverage along the street frontage, perimeter and throughout the site to provide
shade and enhance the built environment.
6.
Elevations
The building elevations, attached as an exhibit, propose a variation of colors and
materials, masonry and architectural embellishments. Staff recommends general
conformance to the elevations date stamped June 20, 2023. This is addressed in
Stipulation No. 2.
PLANS, OVERLAYS, AND INITATIVES
7.
Piestewa Peak Freeway Specific Plan
The subject site is located within the Piestewa Peak Freeway Specific Plan
corridor, Segment 7. This segment contains a variety of land uses including
commercial development, churches, scattered multifamily residential housing,
vacant land, single-family residential housing, small office development, mobile
home parks, and other public/quasi-public uses. No circulation mitigation
measures were proposed for Segment 7. Paradise Lane was identified as a
bikeable street for Segment 7. No landscape enhancement measures were
proposed for the subject site. No noise walls or berms were proposed for the
subject site. The Public Art Element identified opportunities for the development
of public art projects along the Piestewa Peak Freeway and actions to implement
public art along the freeway.
8.
Housing Phoenix Plan
In June 2020, the Phoenix City Council approved the Housing Phoenix Plan. This
Plan contains policy initiatives for the development and preservation of housing
with a vision of creating a stronger and more vibrant Phoenix through increased
Staff Report: Z-40-23-2
September 1, 2023
Page 8 of 14
housing options for residents at all income levels and family sizes. Phoenix’s
rapid population growth and housing underproduction has led to a need for over
163,000 new housing units. Current shortages of housing supply relative to
demand are a primary reason why housing costs are increasing. The proposal
supports the Plan’s goal of preserving or creating 50,000 housing units by 2030
by contributing to a variety housing types that will address the supply shortage at
a more rapid pace while using vacant land in a more sustainable fashion.
9.
Tree and Shade Master Plan
The Tree and Shade Master Plan has a goal of treating the urban forest as
infrastructure to ensure that trees are an integral part of the city’s planning and
development process. By investing in trees and the urban forest, the city can
reduce its carbon footprint, decrease energy costs, reduce storm water runoff,
increase biodiversity, address the urban heat island effect, clean the air, and
increase property values. In addition, trees can help to create walkable streets
and vibrant pedestrian places. Staff is recommending robust tree planting
standards, including planting minimum two-inch caliper trees 20 feet on center or
in equivalent groupings within the landscape strip adjacent to Paradise Lane and
within the landscape setbacks, and dispersed throughout uncovered surface
parking lot areas to achieve 25 percent shade at maturity. Staff is also
recommending that all pedestrian walkways and bicycle infrastructure be shaded
a minimum of 75 percent. This is addressed in Stipulation Nos. 3, 4, 7, 12, and
15.
10.
Complete Streets Guidelines
In 2014, the City of Phoenix City Council adopted the Complete Streets Guiding
Principles. The principles are intended to promote improvements that provide an
accessible, safe, connected transportation system to include all modes, such as
bicycles, pedestrians, transit, and vehicles. Staff is recommending the sidewalk
adjacent to Paradise Lane be detached and separated by a landscape strip
planted with drought-tolerant shade trees. This is addressed in Stipulation No.
15.
11.
Comprehensive Bicycle Master Plan
The City of Phoenix adopted the Comprehensive Bicycle Master Plan in 2014 to
guide the development of its Bikeway System and supportive infrastructure. The
Comprehensive Bicycle Master Plan supports options for both short- and long-
term bicycle parking as a means of promoting bicyclist traffic to a variety of
destinations. As stipulated, the project will provide a bicycle parking spaces per
the requirements of Section 1307.H of the Phoenix Zoning Ordinance within
common open space areas and a bicycle repair station. This is addressed in
Stipulation No. 11.
12.
Zero Waste PHX
The City of Phoenix is committed to its waste diversion efforts and has set a goal
Staff Report: Z-40-23-2
September 1, 2023
Page 9 of 14
to become a zero-waste city, as part of the City’s overall 2050 Environmental
Sustainability Goals. One of the ways Phoenix can achieve this is to improve and
expand its recycling and other waste diversion programs. Section 716 of the
Phoenix Zoning Ordinance establishes standards to encourage the provision of
recycling containers for multifamily, commercial, and mixed-use developments
meeting certain criteria. The applicant’s submittal materials indicate that the
proposal will encourage the use of recycling services to all residents.
13.
Transportation Electrification Action Plan
In June 2022, the Phoenix City Council approved the Transportation
Electrification Action Plan. The current market desire for the electrification of
transportation is both a national and global phenomenon, fueled by a desire for
better air quality, a reduction in carbon emissions, and a reduction in vehicle
operating and maintenance costs. Businesses, governments and the public are
signaling strong future demand for electric vehicles (EVs), and many automobile
manufacturers have declared plans for a transition to fully electric offerings within
the coming decade. This Plan contains policy initiatives to prepare the City for a
future filled with more EVs, charging infrastructure and e-mobility equity, and
outlines a roadmap for a five-step plan to prepare for the EV infrastructure needs
of 280,000 EVs in Phoenix by 2030. One goal of the Plan to accelerate public
adoption of electric vehicles through workplace, business, and multifamily
charging infrastructure recommends a standard stipulation for rezoning cases to
provide EV charging infrastructure. This goal is addressed in Stipulation Nos.
11.c and 13, which requires a minimum of 10 percent of required bicycle parking
to include standard electrical receptacles for electric bicycle charging capabilities
and a minimum of 10 percent of the required parking spaces to include EV
Installed infrastructure.
14.
Phoenix Climate Action Plan
In October 2021, the Phoenix City Council approved the Climate Action Plan.
The Climate Action Plan will serve as a long-term plan to achieve greenhouse
gas emissions reductions and resiliency goals from local operations and
community activities as well as prepare for the impacts of climate change. This
plan contains policy and initiatives regarding stationary energy, transportation,
waste management, air quality, local food systems, heat, and water. Goal W2
(Water), Action W2.4, pertains to the implementation of the Greater Phoenix
Metro Green Infrastructure (GI) and Low Impact Development Details for
Alternative Stormwater Management to benefit the environment, promote water
conservation, reduce urban heat, improve the public health, and create additional
green spaces. This goal is addressed in Stipulation No. 14, which requires a
minimum of two GI techniques for stormwater management to be implemented in
this development.
COMMUNITY INPUT SUMMARY
15.
At the time this staff report was written, staff received one letter of support.
Staff Report: Z-40-23-2
September 1, 2023
Page 10 of 14
Findings
1.
As stipulated, the proposal is providing enhanced shading and trees.
2.
As stipulated, the proposal is compatible with the adjacent land uses and zoning.
3.
As stipulated, the proposal supports efforts from various plans, such as the Tree
and Shade Master Plan, the Comprehensive Bicycle Master Plan, the
Transportation Electrification Action Plan, and the Phoenix Climate Action Plan.
INTERDEPARTMENTAL COMMENTS
16.
Water Services Department
The City of Phoenix Water Services Department has noted the property has
existing water and sewer mains that can potentially serve the proposed
development; however, water capacity is a dynamic condition that can change
over time due to a variety of factors.
17.
Street Transportation Department
The Street Transportation Department requested that a minimum five-foot-wide
detached sidewalk separated by a minimum eight-foot-wide landscape strip
located between the back of curb and sidewalk along the south side of Paradise
Lane be constructed, that a minimum of 40 feet of right-of-way be dedicated for
the south side of Paradise Lane adjacent to the development, and that all streets
be constructed with all required elements and to ADA requirements. These are
addressed in Stipulation Nos. 15 through 17.
18.
Aviation Department
The Aviation Department requested that the property owner record documents
that disclose the existence and operational characteristics of the Deer Valley
Airport to future owners or tenants of the property. This is addressed in
Stipulation No. 18.
OTHER
19.
The site has not been identified as being archaeologically sensitive. However, in
the event archaeological materials are encountered during construction, all
ground disturbing activities must cease within 33-feet of the discovery and the
City of Phoenix Archaeology Office must be notified immediately and allowed
time to properly assess the materials. This is addressed in Stipulation No. 19.
20.
Development and use of the site is subject to all applicable codes and
ordinances. Zoning approval does not negate other ordinance requirements.
Other formal actions such as, but not limited to, zoning adjustments and
abandonments, may be required.
Staff Report: Z-40-23-2
September 1, 2023
Page 11 of 14
Stipulations
1.
The development shall be in general conformance with the site plan date
stamped August 18, 2023, as modified by the following stipulations and as
approved by the Planning and Development Department.
2.
The development shall be in general conformance with the elevations date
stamped June 20, 2023, as approved by the Planning and Development
Department.
3.
The required landscape setbacks shall be planted with minimum 2-inch caliper,
large canopy, drought-tolerant shade trees planted 20 feet on center or in
equivalent groupings, as approved by the Planning and Development
Department.
4.
All pedestrian walkways, including sidewalks, shall be shaded by a structure,
landscaping at maturity, or a combination of the two to provide minimum 75%
shade, as approved by the Planning and Development Department.
5.
Where pedestrian walkways cross a vehicular path, the pathway shall be
constructed of decorative pavers, stamped or colored concrete, or other
pavement treatments that visually contrasts parking and drive aisle surfaces, as
approved by the Planning and Development Department.
6.
The primary entry/exit drive shall incorporate decorative pavers, stamped or
colored concrete, or similar alternative material, as approved by the Planning
and Development Department.
7.
All uncovered surface parking lot areas shall be landscaped with minimum 2-
inch caliper drought-tolerant shade trees. Landscaping shall be dispersed
throughout the parking area and achieve 25% shade at maturity, as approved by
Planning and Development Department.
8.
All units adjacent to Paradise Lane, as depicted on the site plan date stamped
August 18, 2023, shall have individual pedestrian entrances oriented to the
nearest public street and be connected by a direct sidewalk. These units shall
include a porch or patio to accentuate the street-facing unit entrance, as
described below and as approved by the Planning and Development
Department.
a. Patio frontages shall have a minimum depth of 8 feet and a minimum
area of 64 square feet.
Staff Report: Z-40-23-2
September 1, 2023
Page 12 of 14
b. Porch frontages shall have a minimum depth of 6 feet, a minimum width
of 50% of the unit façade, and a minimum shade coverage of 75% of
the porch area.
9.
If fencing is provided adjacent to Paradise Lane, it shall be limited to full view
fencing, as approved by the Planning and Development Department.
10.
A combination of view walls/fencing and partial view walls/fencing shall be
incorporated for private rear yards adjacent to open space areas, as approved
by the Planning and Development Department.
11.
Bicycle infrastructure shall be provided as described below, as approved by the
Planning and Development Department.
a. Bicycle parking spaces per the requirements of Section 1307.H. of the
Phoenix Zoning Ordinance shall be provided through Inverted U and/or
artistic racks located near improved open space areas. Artistic racks
shall adhere to the City of Phoenix Preferred Designs in Appendix K of
the Comprehensive Bicycle Master Plan.
b. A bicycle repair station (“fix it station”) shall be provided and maintained
on site within an open space area The bicycle repair station (“fix it
station”) shall be provided in an area of high visibility and separated
from vehicular maneuvering areas, where applicable. The repair station
shall include, but not be limited to, standard repair tools affixed to the
station, a tire gauge and pump affixed to the base of the station or the
ground, and a bicycle repair stand which allows pedals and wheels to
spin freely while making adjustments to the bike.
c. A minimum of 10% of the required bicycle parking spaces shall include
standard electrical receptacles for electric bicycle charging capabilities.
12.
Bicycle infrastructure shall be shaded by a structure, landscaping at maturity, or
a combination of the two to provide minimum 75% shade, as approved by the
Planning and Development Department.
13.
A minimum of 10% of the required parking spaces shall include Electric Vehicle
(EV) Installed infrastructure, as approved by the Planning and Development
Department.
14.
A minimum of two green infrastructure (GI) techniques for stormwater
management shall be implemented per the Greater Phoenix Metro Green
Infrastructure and Low Impact Development Details for Alternative Stormwater
Management, as approved or modified by the Planning and Development
Department.
Staff Report: Z-40-23-2
September 1, 2023
Page 13 of 14
15.
A minimum 5-foot-wide detached sidewalk separated by a minimum 8-foot-wide
landscape strip located between the back of curb and sidewalk along the south
side of Paradise Lane shall be constructed and planted to the following
standards, as approved by the Planning and Development Department.
a. Minimum 2-inch caliper single-trunk, large canopy, drought-tolerant
shade trees planted 20 feet on center or in equivalent groupings.
b. Drought-tolerant shrubs, accents and vegetative groundcovers to
achieve a minimum of 75% live coverage at maturity.
Where utility conflicts exist, the developer shall work with the Planning and
Development Department on an alternative design solution consistent with a
pedestrian environment.
16.
A minimum of 40 feet of right-of-way shall be dedicated for the south side of
Paradise Lane adjacent to the development, as approved by the Planning and
Development Department.
17.
All streets within and adjacent to the development shall be constructed with
paving, curb, gutter, sidewalk, curb ramps, streetlights, median islands,
landscaping and other incidentals, as per plans approved by the Planning and
Development Department. All improvements shall comply with all ADA
accessibility standards.
18.
The property owner shall record documents that disclose the existence, and
operational characteristics of the Deer Valley Airport to future owners or tenants
of the property. The form and content of such documents shall be according to
the templates and instructions provided which have been reviewed and
approved by the City Attorney.
19.
In the event archaeological materials are encountered during construction, the
developer shall immediately cease all ground-disturbing activities within a 33-
foot radius of the discovery, notify the City Archaeologist, and allow time for the
Archaeology Office to properly assess the materials.
Writer
Adrian Zambrano
September 1, 2023
Team Leader
Racelle Escolar
Staff Report: Z-40-23-2
September 1, 2023
Page 14 of 14
Exhibits
Zoning Sketch Map
Aerial Sketch Map
Site Plan date stamped August 18, 2023
Landscape Plan date stamped August 18, 2023
Elevations date stamped June 20, 2023 (4 pages)
Correspondence (2 pages)
Z-SP-35-86
Z-SP-6-78
Z-SP-3-20
Z-36-20
Z-48-20
Z-6-86
*
*
*
*
PAD
C-O/G-O
HGT/WVR
C-2 SP
HGT/WVR
C-2
R1-14
R1-14
R1-6
C-2 SP
R1-8
R1-6
C-2 SP *
Z-SP-16-05
BEVERLY LN
32ND ST
34TH ST
33RD PL
32ND PL
33RD WAY
PARADISE LN
MARCONI AVE
DEER VALLEY DR
SR 101
UNION HILLS DR
BELL RD
GREENWAY RD
THUNDERBIRD RD
CACTUS RD
SHEA BLVD
S
Q
U
A
W PEAK PKWY (SR 51)
16TH ST
24TH ST
32ND ST
40TH ST
TATUM BLVD
56TH ST
64TH ST
SCOTTSDALE RD
PARADISE VALLEY VILLAGE
CITY COUNCIL DISTRICT: 2
I
APPLICANT'S NAME:
APPLICATION NO.
Z-40-23
GROSS AREA INCLUDING 1/2 STREET
AND ALLEY DEDICATION IS APPROX.
1.59 Acres
MULTIPLES PERMITTED
* Maximum Units Allowed with P.R.D. Bonus
C-O/G-O HGT/WVR
R-2
CONVENTIONAL OPTION
16
N/A
* UNITS P.R.D. OPTION
N/A
19
Shaine T. Alleman
DATE:
6/20/2023
REVISION DATES:
AERIAL PHOTO &
QUARTER SEC. NO.
QS 35-35
ZONING MAP
L10
REQUESTED CHANGE:
FROM: C-O/G-O HGT/WVR ( 1.59 a.c.)
TO:
R-2 ( 1.59 a.c.)
Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\2023\Z-40-23.mxd
Z-40-23
0.04
0
0.04
0.02
Miles
9/01/2023
Z-SP-35-86
Z-SP-6-78
Z-SP-3-20
Z-36-20
Z-48-20
Z-6-86
*
*
*
*
PAD
C-O/G-O
HGT/WVR
C-2 SP
HGT/WVR
C-2
R1-14
R1-14
R1-6
C-2 SP
R1-8
R1-6
C-2 SP *
Z-SP-16-05
BEVERLY LN
32ND ST
34TH ST
33RD PL
32ND PL
33RD WAY
PARADISE LN
MARCONI AVE
DEER VALLEY DR
SR 101
UNION HILLS DR
BELL RD
GREENWAY RD
THUNDERBIRD RD
CACTUS RD
SHEA BLVD
S
Q
U
A
W PEAK PKWY (SR 51)
16TH ST
24TH ST
32ND ST
40TH ST
TATUM BLVD
56TH ST
64TH ST
SCOTTSDALE RD
PARADISE VALLEY VILLAGE
CITY COUNCIL DISTRICT: 2
I
APPLICANT'S NAME:
APPLICATION NO.
Z-40-23
GROSS AREA INCLUDING 1/2 STREET
AND ALLEY DEDICATION IS APPROX.
1.59 Acres
MULTIPLES PERMITTED
* Maximum Units Allowed with P.R.D. Bonus
C-O/G-O HGT/WVR
R-2
CONVENTIONAL OPTION
16
N/A
* UNITS P.R.D. OPTION
N/A
19
Shaine T. Alleman
DATE:
6/20/2023
REVISION DATES:
AERIAL PHOTO &
QUARTER SEC. NO.
QS 35-35
ZONING MAP
L10
REQUESTED CHANGE:
FROM: C-O/G-O HGT/WVR ( 1.59 a.c.)
TO:
R-2 ( 1.59 a.c.)
Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\2023\Z-40-23.mxd
Z-40-23
0.04
0
0.04
0.02
Miles
9/01/2023
23(1
63$&(
23(1
63$&(
%('5220
6725<
%('5220
6725<
%('5220
6725<
%('5220
6725<
%('5220
6725<
%('5220
6725<
%('5220
6725<
%('5220
6725<
%('5220
6725<
%('5220
6725<
%('5220
6725<
%('5220
6725<
%('5220
6725<
%('5220
6725<
%('5220
6725<
%('5220
6725<
(9
(9
(9
(0 (5* (1&<
( ;,72 1/<
3$5$',6(/$1(
)
)
0$,1(175<
1
:
6
(
6
(
1
:
1
:
6
(
$31%
13+;3$5$',6(9$//(<$66(7//&
=21,1*&2*2+*7:95
$31
%5(,73$5$',6(9$//(<0+&//&
=21,1*5
$31
%5(,73$5',6(9$//(<0+&//&
=21,1*5
)
)
&
$
)
%
&
7<3
35,9$7(5($5
<$5'6$7($&+
81,77<3
$
6(7%$&.
6(7%$&.
6(7%$&.
%
6(7%$&.
6(7%$&.
52:
6(7%$&.
($6(0(17
6,'(:$/.
38(
'
'
$
&
'
'
'
(
)
)
'
6,'(:$/.
&2175$67,1*&21&5(7(
3$9(0(17$7&5266,1*
/(*$/'(6&5,37,21
6,7(,1)250$7,21
352-(&7
352-(&72:1(5
'(9(/23(5
352-(&7$5&+,7(&7
352-(&71$55$7,9(
=21,1*
$31
6,7($5($
'(16,7<
%8,/',1*&29(5$*(
23(163$&(
3$5$',6(/$1(%75
(3$5$',6(/$1(
3+2(1,;$=
18116&216758&7,21
(02+$:./168,7(
3+2(1,;$=
&217$&775$9,61811
75$9,6#18116&216758&7,21&20
WUL$5&$5&+,7(&785( '(6,*1
(&$0(/%$&.5'68,7(
3+2(1,;$=
&217$&7-$&48(/,1(520$1
-$&48(/,1(#75,$5&'(6,*1&20
1(:%8,/')255(1708/,7)$0,/<352-(&76725<
%('5220'83/(;$1'%('5220'83/(;
12/276$/(6
(;,67,1*&2*2+*7:953,(67(:$29(5/$<=21(
352326('535'
&
*5266$&6)
1(7$&6)
'8$&0$;$//2:('
'8$&352326('81,76$&*5266
0$;
352326('6)
!2)727$/23(163$&(3529,'('
$0(1,7,(67%'
%8,/',1*,1)250$7,21
%8,/',1*+(,*+7
$//2:('
6725,(6$1'
)25),567
,1
,1&5($6(72
+,*+ 6725<0$;,080
3529,'('
6725<
2&&83$1&<
5
&216758&7,217<3(
1215$7('7<3(9%:22')5$0(
),5(635,1./(56
$3$570(1761)3$5
':(//,1*81,70,;
%('5220
%('5220
727$/81,76
9(+,&/(3$5.,1*5(48,5('
%('522081,76;36 63$&(6
%('522081,76;36 63$&(6
727$/ 63$&(6815(6(59('
$&&(66,%/(2)727$/ ,1&/8'(',1727$/
3$5.,1*3529,'('
685)$&(23(1
63$&(6
$&&(66,%/(3529,'(',1&/8'(',1727$/$%29(
%8,/',1*6(7%$&.6
5(48,5('
)5217
6,'(
5($5
38%/,&675((7
3529,'('
7+(/$1'5()(55('72+(5(,1%(/2:,66,78$7(',17+(&2817<2)0$5,&23$
67$7(2)$5,=21$'(6&5,%('$6)2//2:6
3$5&(/0,125/$1'',9,6,216859(<5(&25'(',1%22.2)0$363$*(
5(&25'2)0$5,&23$&2817<$5,=21$'(6&5,%('$6)2//2:6
7+$73$572)7+(1257++$/)2)7+(1257+:(6748$57(52)7+(1257+:(67
48$57(52)7+(6287+:(6748$57(52)6(&7,2172:16+,31257+5$1*(
($672)7+(*,/$6$/75,9(5%$6($1'0(5,',$10$5,&23$&2817<$5,=21$
'(6&5,%('$6)2//2:6
&200(1&,1*$77+(:(6748$57(5&251(52)6$,'6(&7,2102180(17:,7+$
%5$66&$3,1+$1'+2/(:+,&+%($561257+'(*5((60,187(66(&21'6
:(67$',67$1&(2))((7)5207+(6287+:(67&251(52)6$,'6(&7,21
02180(17:,7+$%5$66&$3,1+$1'+2/(
7+(1&($/21*7+(1257+/,1(2)7+(6287+:(6748$57(52)6$,'6(&7,21
6287+'(*5((60,187(66(&21'6($67$',67$1&(2))((7727+(
1257+($67&251(52)7+(1257++$/)2)7+(1257+:(6748$57(52)7+(
1257+:(67+$/)2)7+(1257+:(6748$57(52)7+(1257+:(6748$57(52)
7+(6287+:(6748$57(52)6$,'6(&7,21
7+(1&($/21*7+(($67/,1(2)7+(1257++$/)2)7+(1257+:(6748$57(52)
7+(1257+:(6748$57(52)7+(6287+(6748$57(52)6$,'6(&7,216287+
'(*5((60,187(66(&21'6($67$',67$1&(2))((772$32,172)$
/,1()((76287+2)$1'3$5$//(/:,7+6$,'1257+/,1(6$,'32,17%(,1*7+(
32,17%(*,11,1*
7+(1&(&217,18,1*$/21*6,'(($67/,1(6287+'(*5((60,187(6
6(&21'6($67$',67$1&(2))((7727+(6287+($67&251(52)7+(
1257++$/)2)7+(1257+:(6748$57(52)7+(6287+:(6748$57(52)6$,'
6(&7,21
7+(1&($/21*7+(6287+/,1(2)7+(48$57(52)6$,'6(&7,211257+
'(*5((60,187(66(&21'6:(67$',67$1&(2))((772$32,1721$
/,1()((7($672)7+(3$5$//(/:,7+/,1(2)7+(6287+:(6748$57(52)
6$,'6(&7,21
7+(1&($/21*6$,'3$5$//(//,1(1257+'(*5((60,187(66(&21'6
:(67$',67$1&())((772$32,1721$/,1()((76287+2)
3$5$//(/:,7+7+(1257+/,1(2)7+(6287+:(6748$57(52)6$,'6(&7,21
7+(1&($/21*6$,'3$5$//(//,1(1257+'(*5((60,187(66(&21'6
($67$',67$1&(2))((772$32,1721$/,1()((7($672)$1'
3$5$//(/:,7+7+(:(67/,1(2)7+(6287+:(6748$57(52)6(&7,21
7+(1&($/21*6$,'3$5$//(//,1(1257+'(*5((60,187(66(&21'6
:(67$',67$1&(2))((772$32,1721$/,1()((76287+2)$1'
3$5$//(/:,7+7+(1257+/,1(2)7+(6287+:(6748$57(52)6$,'6(&7,21
7+(1&(6287+'(*5((60,187(66(&21'6($67$',67$1&(2))((7
727+(2)%(*,11,1*
&217$,1,1*$&5(6>6)@025(25/(66
352-(&7'$7$
9,&,1,7<0$3
3$5$',6(/$1(
7+675((7
*5((1:$<52$'
1'675((7
6,7(
176
3,(67(:$):<
6287+:(67
48$57(5
6(&
7215(
1)&
127)25&216758&7,21
127)25&216758&7,21
352-(&7180%(5
,668('$7(
6+((77,7/(
6+((7180%(5
(DVW&DPHOEDFN5G
6XLWH
3KRHQL[$=
3
7KLVGUDZLQJLVWKHSURSHUW\RIWUL$5&$UFKLWHFWXUH GHVLJQ//&(DVW&DPHOEDFN5G6XLWH3KRHQL[$=7KLVGUDZLQJLVOLPLWHGWRWKHRULJLQDOXVHIRUZKLFKLWZDVSUHSDUHG&KDQJHVUHSURGXFWLRQVRUDVVLJQLQJWR DQ\WKLUGSDUW\RIWKLVGUDZLQJIRUDQ\RWKHUXVHLVQRWSHUPLWWHGZLWKRXWZULWWHQFRQVHQWRIWUL$5&$UFKLWHFWXUH 'HVLJQ//&&
$0
??WULDUF?*HQHUDO?352-(&76?3DUDGLVH/DQH%753KRHQL[$=?':*?3DUDGLVH/DQHUYW
3$5$',6(/$1(%75
(3$5$',6(/$1(
3+2(1,;$=
&21&(378$/
3/$1
$
(3$5$',6(/$1(
3+2(1,;$=
(3$5$',6(/$1(
3+2(1,;$=
(3$5$',6(/$1(3+2(1,;$=
6,7(3/$1
.(<('127(6
$
7<33$5.,1*63$&(
[
&
7<3$&&(66,%/(3$5.,1*63$&(
[
:,7+
:,'($&&(66$,6/(
%
(0(5*(1&<(;,721/<9(+,&8/$5*$7(
&
6,'(:$/.7<3
)
$'-$&(173523(57</,1(3(5,0(7(567$1'$5'7<3
'
;
3$7,2
$
%,&<&/(3$5.,1*5$&.)25%,&<&/(6
&
%,&<&/(5(3$,567$7,21:32:(5)25&+$5*,1*(%,.(6
'
(99(+,&/(3$5.,1*:&+$5*,1*67$7,216
$
(;,67,1*),5(+<'5$17725(0$,1
%
1(:),5(+<'5$17
'
9,(:)(1&,1*:$&&(66*$7(6
(
3$57,$/9,(:)(1&($'-$&(177223(163$&(
)
$0(1,7,(6)2523(163$&(7%'
5(9
'$7(
'(6&5,37,21
$33529$/67$03
.,9$352-(&7
6'(9
3$33)$&7
23(1
63$&(
23(1
63$&(
(0 (5* (1&<
( ;,72 1/<
(0 (5* (1&<
( ;,72 1/<
3$5$',6(/$1(
)
)
0$,1(175<
1
:
6
(
6
(
1
:
1
:
6
(
$31%
13+;3$5$',6(9$//(<$66(7//&
=21,1*&2*2+*7:95
$31
%5(,73$5$',6(9$//(<0+&//&
=21,1*5
$31
%5(,73$5',6(9$//(<0+&//&
=21,1*5
)
)
)
%
&
35,9$7(5($5
<$5'6$7($&+
81,77<3
$
%
'
'
$
&
(
)
)
'
&2175$67,1*&21&5(7(
3$9(0(17$7&5266,1*
*
*
*
*
1)&
127)25&216758&7,21
127)25&216758&7,21
352-(&7180%(5
,668('$7(
6+((77,7/(
6+((7180%(5
(DVW&DPHOEDFN5G
6XLWH
3KRHQL[$=
3
7KLVGUDZLQJLVWKHSURSHUW\RIWUL$5&$UFKLWHFWXUH GHVLJQ//&(DVW&DPHOEDFN5G6XLWH3KRHQL[$=7KLVGUDZLQJLVOLPLWHGWRWKHRULJLQDOXVHIRUZKLFKLWZDVSUHSDUHG&KDQJHVUHSURGXFWLRQVRUDVVLJQLQJWR DQ\WKLUGSDUW\RIWKLVGUDZLQJIRUDQ\RWKHUXVHLVQRWSHUPLWWHGZLWKRXWZULWWHQFRQVHQWRIWUL$5&$UFKLWHFWXUH 'HVLJQ//&&
$0
??WULDUF?*HQHUDO? 352-(&76? 3DUDGLVH /DQH %75 3KRHQL[ $=? ':*? 3DUDGLVH /DQHUYW
3$5$',6(/$1(%75
(3$5$',6(/$1(
3+2(1,;$=
&21&(378$/
/$1'6&$3(
3/$1
$
18116&216758&7,21
18116&216758&7,21
(3$5$',6(/$1(
3+2(1,;$=
(3$5$',6(/$1(
3+2(1,;$=
(3$5$',6(/$1(3+2(1,;$=
(3$5$',6(/$1(3+2(1,;$=
(3$5$',6(/$1(3+2(1,;$=
(3$5$',6(/$1(3+2(1,;$=
5(9
'$7(
'(6&5,37,21
&21&(378$//$1'6&$3(3/$1
.(<('127(6
%
(0(5*(1&<(;,721/<9(+,&8/$5*$7(
&
6,'(:$/.7<3
)
$'-$&(173523(57</,1(3(5,0(7(567$1'$5'7<3
'
;
3$7,2
$
%,&<&/(3$5.,1*5$&.)25%,&<&/(6
&
%,&<&/(5(3$,567$7,21:32:(5)25&+$5*,1*(%,.(6
$
(;,67,1*),5(+<'5$17725(0$,1
%
1(:),5(+<'5$17
'
9,(:)(1&,1*:$&&(66*$7(6
(
3$57,$/9,(:)(1&($'-$&(177223(163$&(
)
$0(1,7,(6)2523(163$&(7%'
*
/$1'6&$3(75((6$1'*5281'&29(5,1*3(5&,7<25',1$1&(
$33529$/67$03
.,9$352-(&7
6'(9
3$33)$&7
CITY OF PHOENIX
Planning & Development
Department
AUG 18 2023
(;7(5,25),1,6+/(*(1'
37%
37$
678&&2%2'<25$&&(17
'811(':$5'6
'(6$1''81(
678&&2%2'<25$&&(17
'811(':$5'6
'(:&22/'(&(0%(5
5)
63$1,6+7,/(&21&5(7(
%25$/7,/(
9,//$7(55$&277$)/$6+('
37&
3$,17'2256 6+877(56
'811(':$5'6
'(6($/383
37'
3$,17$&&(17
'811(':$5'6
'(7&2&2$32:'(5
*/
:,1'2:6 */$66'2256
9,1</'8$/3$1(/2:(
)5$0(&2/25:+,7(
0$6
%5,&.9(1((5
&2521$'26721(
$'2%(%5,&.6,(11$
),567)/225
7232)522)
7232)3/$7(
37%
37&
*/
37$
37%
5)
37%
37%
37&
37%
0$6
0$6
37'
37'
),567)/225
7232)522)
7232)3/$7(
37%
5)
37%
37$
*/
37%
37'
0$6
37$
),567)/225
7232)522)
7232)3/$7(
37%
*/
5)
37$
37%
),567)/225
7232)522)
7232)3/$7(
37%
5)
37$
*/
37%
37%
0$6
37'
37$
1)&
127)25&216758&7,21
127)25&216758&7,21
352-(&7180%(5
,668('$7(
6+((77,7/(
6+((7180%(5
(DVW&DPHOEDFN5G
6XLWH
3KRHQL[$=
3
7KLVGUDZLQJLVWKHSURSHUW\RIWUL$5&$UFKLWHFWXUH GHVLJQ//&(DVW&DPHOEDFN5G6XLWH3KRHQL[$=7KLVGUDZLQJLVOLPLWHGWRWKHRULJLQDOXVHIRUZKLFKLWZDVSUHSDUHG&KDQJHVUHSURGXFWLRQVRUDVVLJQLQJWR DQ\WKLUGSDUW\RIWKLVGUDZLQJIRUDQ\RWKHUXVHLVQRWSHUPLWWHGZLWKRXWZULWWHQFRQVHQWRIWUL$5&$UFKLWHFWXUH 'HVLJQ//&&
30
&?8VHUV?QLNL?'RFXPHQWV? 3DUDGLVH /DQHBQLNLWULDUFUYW
3$5$',6(/$1(%75
%('5220
81,7
(/(9$7,216
$
18116&216758&7,21
(3$5$',6(/$1(3+2(1,;$=
%('522081,7)5217(/(9$7,21
%('522081,7/()7(/(9$7,21
%('522081,75($5(/(9$7,21
%('522081,75,*+7(/(9$7,21
5(9
'$7(
'(6&5,37,21
%521=(
1)&
127)25&216758&7,21
127)25&216758&7,21
(DVW&DPHOEDFN5G
6XLWH
3KRHQL[$=
3
3$5$',6( /$1( %75
( 3$5$',6( /$1(
3+2(1,; $=
18116 &216758&7,21
18116 &216758&7,21
( 3$5$',6( /$1(
3+2(1,; $=
( 3$5$',6( /$1(
3+2(1,; $=
( 3$5$',6(/$1(3+2(1,; $=
( 3$5$',6(/$1(3+2(1,; $=
( 3$5$',6(/$1(3+2(1,; $=
( 3$5$',6(/$1(3+2(1,; $=
5(9
'$7(
'(6&5,37,21
*/
:,1'2:6 */$66'2256
9,1</'8$/3$1(/2:(
)5$0(&2/25%521=(
From:
nickvoss@earthlink.net
To:
Adrian G Zambrano
Subject:
FW: REZONE Z-40-23/PARCEL 214-35-004C
Date:
Thursday, July 27, 2023 8:36:07 PM
Attachments:
image001.png
From: nickvoss@earthlink.net <nickvoss@earthlink.net>
Sent: Thursday, July 27, 2023 8:32 PM
To: 'sta@tblaw.com, adrian.zambrano@phoenix.com' <sta@tblaw.com, adrian.zambrano@phoenix.com>
Cc: Gloria Pinkerton <gloriapink12@gmail.com>; Diane Phariss <dphariss456@gmail.com>; Colleen Miller (Summer Breeze)
<colsmiles@cox.net>; 'Council District 2 PCC' <council.district.2@phoenix.gov>
Subject: RE: REZONE Z-40-23/PARCEL 214-35-004C
Adrian,
We had the informal community meeting tonight.
Belcanto Block Watch, which was not originally in support of this project, but now is.
At the PV hearing we intend to bring other neighbors block watch groups to support it. We hope to achieve a
unanimous official okey-dokey to allow this project to progress. Even the nearby Baptist church is in support. I spoke to
the pastor after the event and he and his admin were clearly keen on it. Everyone present is counting on this project
goes through without any holdups.
We need this project to go through swiftly. There is an urgent need for this kind of housing.
We met Travis, the developer, and all feel he is a good and decent man. He lives and works in this neighborhood. Our
best chance of having someone develop this land to our benefit is Travis.
Travis answered all our questions, but I feel he dodge an important one: does he have the financing to pull this off? We
had a situation not long ago where the construction dragged on. To be fair, this occurred during the pandemic and so
their were supply chain issues.
Please find out if he is sufficiently funded – we do not want half-built structures where transients nest nor
temptations of arson like nearby Chicanos Por La Causa (and several others), which we also supported, mysteriously
burnt down (never rebuilt) or stop for insufficient funding during construction.
***
Adrian,
Please record that the award-winning Saint John Alliance block watch group is in full support of this rezone application!
We need additional housing in this area and the preliminary design sketch indicates the motif will fit nicely in the
neighborhood.
This parcel of land has been a haunt of transient/drug activity for decades.
Please move forward! This appears to be a sound project.