August 3, 2022 
Historic Preservation 
City of Phoenix 
To whom it may concern, 
John and Meg Smeck, owners of 302 E. Pasadena Ave. 85012, request extinguishment of the remaining 
one year of the 2008 easement attached to our home by a prior owner who installed a roof with HP 
grant funds.  
There are two home improvement projects to our home, one an emergency and the other to achieve 
energy efficiency, that we would like to complete ASAP without the time constraints and process burden 
that the easement presents: 
1. Emergency Project: The wood shingle roof covered by this easement failed in a recent monsoon
storm which caused interior ceiling plaster damage in the kitchen.  The licensed roofer who did an
emergency patch/cover of the area found at least 20 other weak/loose areas on the roof that risk
further interior water damage in other rooms of our home.  With the age, type of roofing material, and
low-quality installation of the roof, the roofer said "repairs cannot be guaranteed and are not advisable
with the condition of this roof." The roof has 5" exposure which is typically a lower cost/lower quality
install, which likely explains why what could normally be expected to last up to 30 years has failed at
year 14. We need to move ahead with a roof replacement immediately to prevent further damage to the
interior and contents of our home.
Included are photos to show the roof patches and covering over the kitchen bay window and an interior 
ceiling photo to show the plaster damage where the water came through the ceiling. To date, we have 
incurred $600 for the emergency temporary patch to the roof and are currently getting estimates for 
the interior plaster ceiling repair and roof replacement.  
2. Energy Efficiency Project:  We plan to do a full window replacement with high-end Sierra Pacific wood
casement windows with clear glass to preserve the more historic non-tinted look of the windows.
Beyond the immediate energy efficiency and cost savings of having airtight windows, we have already
encountered a 10% cost increase due to the delay in working through the historic easement/guidelines
and are exposed to the risk of further cost increases with every further delay.
We understand that Section 6 calls for a $1250 penalty to extinguish the easement in its final year. And 
while we would like the City to consider waiving this out clause because we will be improving the home 
with materials that are within the historic preservation guidelines, we ask for an expedited response to 
address the emergency roof replacement required and to help us achieve the cost savings that will 
accrue with more efficient windows. 
Respectfully submitted, 
Meg and John Smeck 
602-617-5914 (Meg Cell)
meg.smeck@quarles.com
Attachment C

Photo 1.  302 E. Pasadena Ave., front view.  Note patch over shingles to address roof leak.

Photo 2.  302 E. Pasadena Ave., interior view.  Note evidence of leak in ceiling.