Attachment A - Task Force Analysis.pdf

City of Phoenix — Formal (2021-09-15)

View PDF Meeting page

Extracted text (via pymupdf) 6238 characters
CITY COUNCIL REPORT 
TO: 
Ginger Spencer 
Deputy City Manager 
FROM: 
Alan Stephenson 
Planning Director 
SUBJECT:  Request for Task Force Analysis: 35th Avenue and Carter Road Annexation 
This report recommends the approval of the proposed annexation of 4.93 acres located at the 35th 
Avenue and Carter Road, Parcel # 105-89-013L 
THE REQUEST: 
The applicant is requesting annexation to access city services and to annex and rezone the parcels to 
develop a  multi-family rental complex. 
OTHER INFORMATION: 
Planning Village: 
Laveen 
General Plan Designation: 10 to 15 dwelling units per acre – Higher density attached townhouses, 
condor, or apartments. 
Current Zoning District: 
RU-43 
Equivalent Zoning District: S-1 
Current Conditions 
   Current Land-Use: 
Vacant 
   To the North: 
Single-family dwelling and ranch properties, zoned RU-43, Maricopa 
County jurisdiction 
   To the South: 
Single-family dwelling and ranch properties, zoned RU-43, Maricopa 
County jurisdiction 
   To the West: 
Single-family dwelling and ranch properties, zoned RU-43, Maricopa 
County jurisdiction 
   To the East: 
Single-family subdivision, zoned R1-10, City of Phoenix jurisdiction 
Non-Conformities Present?  NONE PRESENT 
PARCEL(S) HISTORY: None 
ATTACHMENT A

ALTERNATIVES: 
 
 
 Option A - Annex the land as requested: 
 
The city of Phoenix will control rezoning requests in this area to ensure conformance with the General 
Plan Land Use Map. The city of Phoenix will capture property tax, utility tax, state shared revenue, and 
impact fees. 
 Option B - Deny the request for annexation: 
 
If annexed later, this site would have been developed under County zoning and development 
standards that may not be consistent with the General Plan, Land Use Map, zoning, and development 
standards.  
 
RECOMMENDATION: 
Located adjacent to City of Phoenix lands, this annexation is supported by the 2015 General Plan, 
particularly the Land Use goal for land uses and development standards for unincorporated land, under 
Policies 1 and 2. This annexation is recommended for approval. 
Approval of annexation does not constitute recommendation for future rezoning actions. 
 
SUPPORTING INFORMATION: 
 
I.  
Water and Sewer Service 
Q.S.#: 1-20 
Water Pressure Zone Area: 1 
The Water Services Department (WSD) has reviewed the above parcel and does not have any 
concerns with the annexation request. The proposed parcel can likely be served by the City of 
Phoenix water and sewer system in the area, pending capacity review and approval. Water and/or 
sewer system stipulations/requirements are determined at time of Site Plan approval after 
annexation. Design and construction of any infrastructure will be the responsibility of the developer. 
City map shows the closest water/sewer infrastructure is within S 35th Avenue: 12-inch DIP, 
pressure zone 1 water main within S 35th Avenue 15-inch VCP, sewer main within S 35th Avenue 
 
II.  Fire Protection 
 
Servicing Station: Phoenix Fire Station 39, 2276 W Southern Avenue 
 
Station Capacity Level, Current: Unknown 
 
 
Station Capacity Level, After Annexation: Unknown 
 
 
Current Response Time: 3 Min. 45 Sec. 
 
City Average Response Time: 5 Min. 2 Sec. 
 
Difference from Typical Response Time: 1 Min. 17 Sec. 
 
Number of Service Calls Expected: 15 
 
Average Cost Per Service Call: 
$466 
 
 
Estimated Total Annual Fire Service Costs: 
$6,911

III.  Police Protection 
 
Servicing Station: Estrella Mountain, Police Beat 334 
 
Number Of New Officers Required: 0.15 
 
 
Number Of New Patrol Cars Required: 0.07  
 
Estimated Total Annual Police Service Costs: 
$20,229 
 
 
IV.  Refuse Collection 
 
Number of New Containers Required: 0 
Note:  Public refuse container costs not applicable for apartments and non-residential l uses as 
these require private refuse services or contractual agreements with the City that are not 
determined at this time. 
Cost for Refuse Containers, Each: 
$43.05  
Cost for Recycling Containers, Each: 
$45.70  
Total Start-Up Costs For Refuse Collection: 
$0 
 
 
V.  Street Maintenance 
 
Average Cost Per Acre For Street Maintenance: 
$85 
 
 
Estimated Total Annual Street Maintenance Costs: 
$421 
 
 
VI.  Public Transit 
 
Servicing Routes: Local routes 35 (35th Avenue), 77 (Baseline), and 251 (51st Avenue). Bus stops 
are located approximately 1/2 mile from the parcel. 
 
VII.  Parks and Recreation 
 
Neighborhood Park Demand In Acres: 0.58  
 
Community Park Demand In Acres: 0.31 
 
 
District Park Demand In Acres: 0.31  
 
Total Park Demand In Acres: 1.19 
 
 
Cost Per Acre, Annual Maintenance: 
$11,00  
 
Total Annual Parks and Recreation Costs: 
$13,129 
 
 
 
VIII.  Schools 
 
Elementary School District: Bernard Black Elementary 
 
High School District: Cesar Chavez High School 
 
Total Expected Elementary School Students: 39 
 
 
Total Expected High School Students: 22 
 
 
Total Expected New Students: 62

IX. Revenues 
 
Residential Impact Fees: This project is in the Laveen West Impact Fee area.  
 
Expected Total Impact Fees at Buildout: 
$442,018 
 
 
 
Tax Income, Year One 
 
 
Property Tax Income: 
$483 
 
 
Utility Fee Income: 
$7,001  
 
State Shared Revenue: 
$44,614 
 
 
Solid Waste: 
$22,716 
 
 
Sales Tax Generated: 
$0 
 
 
Total Tax Related Income, Annually: 
$74,814 
 
 
 
Tax Income, Year Two and Beyond 
 
 
Property Tax Income: 
$483 
 
 
Utility Fee Income: 
$7,001  
 
State Shared Revenue: 
$44,614 
 
Solid Waste: 
$22,716 
 
Sales Tax Generated: 
$0 
 
 
Total Tax Related Income, Annually: 
$74,814 
 
X. 
Total Costs  
 
Revenue, First Year Only: 
$516,832 
 
Revenue, Year Two and Beyond: 
$74,814 
 
 
 
Expenses, First Year Only: 
$40,689 
 
Expenses, Year Two and Beyond: 
$40,689 
 
XI. Total Annual Revenue 
 
 
 
 
 
Total Annual Revenue, First Year Only: 
$476,143 
 
Total Annual Revenue, Year Two and Beyond: 
$34,125 
 
The above referenced Property Tax Income figures are based on vacant parcels only, it does not refer 
to future development which will vary depending on number of lots and individual square footage.  
Total Tax Related Income and Total Annual Revenues will vary depending on project scope and size, 
the timing of permit issuance and build-out.