Staff Report Z-19-21-8
July 1, 2022
Central City Village Planning
Committee Hearing Date
July 11, 2022
Planning Commission Hearing Date
August 4, 2022
Request From:
C-2 (Intermediate Commercial District) (7.40
acres)
C-2 (Approved C-2 SP) (Intermediate
Commercial District, Approved Intermediate
Commercial District, Special Permit) (2.08
acres)
C-2 SP (Intermediate Commercial District,
Special Permit) (0.27 acres)
R1-6 (Single-Family Residence District)
(1.06 acres)
R1-6 (Approved PAD-13) (Single-Family
Residence District, Approved Planned Area
Development) (0.65 acres)
Request To:
WU Code T4:3 GW (Walkable Urban Code,
Transect 4:3 District, Transit Gateway
Character Area) (11.46 acres)
Proposed Use:
Multifamily residential
Location:
Southwest corner of 24th Street and the
Loop 202 Freeway
Owner:
Waheguru Properties, LLC
Applicant:
LLC Central PHX, LLC
Representative:
Wendy Riddell, Berry Riddell, LLC
Staff Recommendation:
Approval, subject to stipulations
General Plan Conformity
General Plan Land Use Map Designation
Commercial and Residential 10 to
15 dwelling units per acre
Street Map Classification
24th Street
Major
Arterial
40-foot+ west half street
Portland Street
Local
Street
25-foot north half street
Attachment B
Staff Report: Z-19-21-8
July 1, 2022
Page 2 of 15
General Plan Conformity
Street Map Classification
22nd Street
Local
Street
30-foot west half street
21st Street
Local
Street
50-foot-wide street end
CONNECT PEOPLE AND PLACES CORE VALUE; TRANSIT ORIENTED
DEVELOPMENT; LAND USE PRINCIPLE: Encourage high-density housing and
high intensity employment uses to locate adjacent or close to transit stations
per adopted transit district plans.
The site is located within the Gateway Transit Oriented Development (TOD) District
and is within one mile of the 24th Street and Washington Street and 24th Street and
Jefferson Street light rail transit stations. The proposed multifamily development with
pedestrian-friendly design elements of the Walkable Urban Code is appropriate at this
location given that the site is within the Gateway TOD Policy Plan area.
CONNECT PEOPLE AND PLACES CORE VALUE; INFILL DEVELOPMENT; LAND
USE PRINCIPLE: Promote and encourage compatible infill development with a
mix of housing types in neighborhoods close to employment centers,
commercial areas, and where transit or transportation alternatives exist.
The proposed development is located within the Gateway Transit Oriented
Development (TOD) District and is within one mile of two light rail stations. The
Gateway TOD Policy Plan identified the site as an area for mixed use residential
development. The proposal for multifamily residential development is consistent with
the vision identified in the Gateway TOD Policy Plan and will be a compatible addition
to the surrounding area.
CELEBRATE OUR DIVERSE COMMUNITIES AND NEIGHBORHOODS CORE
VALUE; DIVERSE NEIGHBORHOODS; LAND USE PRINCIPLE: Include a mix of
housing types and densities where appropriate within each village that support
a broad range of lifestyles.
The proposed development will provide new higher-density multifamily housing
opportunities to a transit-oriented neighborhood in close proximity to the major
employment centers of Downtown Phoenix and Sky Harbor Airport. The proposal will
broaden the range of housing types and densities available in this high opportunity
neighborhood.
Staff Report: Z-19-21-8
July 1, 2022
Page 3 of 15
General Plan Conformity
BUILD THE SUSTAINABLE DESERT CITY CORE VALUE; TREES AND SHADE;
DESIGN PRINCIPLE: Integrate trees and shade into the design of new
development and redevelopment projects throughout Phoenix.
The proposed development provides trees and shade on 24th Street which will reduce
the urban heat island effect while also improving thermal comfort to site users and the
surrounding neighborhood.
Applicable Plans, Overlays and Initiatives
Transit Oriented Development Strategic Policy Framework – See Background
Item No. 3.
Gateway Transit Oriented Development Policy Plan – See Background Item No. 4.
Housing Phoenix Plan – See Background Item No. 9.
Comprehensive Bicycle Master Plan – See Background Item No. 10.
Complete Streets Guiding Principles – See Background Item No. 11.
Tree and Shade Master Plan – See Background Item No. 12.
Zero Waste PHX – See Background Item No. 13.
Surrounding Land Uses/Zoning
Land Use
Zoning
On Site
Vacant
R1-6, R1-6 (Approved
PAD-13), C-2, C-2 SP,
and C-2 (Approved C-2
SP)
North
Loop 202 Freeway
R1-6, C-2, C-2 SP, and
C-O
South
Single-family residential
R1-6 and R-3 RI
South (across Portland
Street)
Vacant building
C-1
East (across 24th Street)
Gas station and vacant
land
C-2 and C-2 (Approved C-
2 SP)
West
Freeway Interchange
R1-6
Staff Report: Z-19-21-8
July 1, 2022
Page 4 of 15
Walkable Urban Code
T4:3 GW
*variance required or
design alternative
Standards
Requirements
Provisions on the
Proposed Site Plan
Gross Acreage
N/A
11.46
Total Number of Units
No Maximum
274
Density
No Maximum
23.91 dwelling units
per acre
Maximum Building Height
40 feet
33 feet (Met)
Min. Parking – Per Section
702
• 10% reduction when
greater than 1,320
feet of a light rail stop
362 spaces
447 spaces (Met)
Bicycle Parking – Per
Section 1307.H.6.d
• Minimum 0.25 per
residential unit, with a
maximum of 50
required spaces
50 spaces
Not specified
Streetscape Standards (Section 1312.A)
Arterial Street (24th Street)
6-foot sidewalk (minimum)
5-foot landscape (minimum)
Not specified
Local Street (Portland
Street, 22nd Street, and
21st Place)
5-foot sidewalk (minimum)
5-foot landscape (minimum)
Not specified
Main Building Setbacks
24th Street (Primary
Frontage)
20-foot maximum
20 feet, 2 inches (Not
Met)*
Portland Street, 22nd Street,
and 21st Place (Secondary
Frontage)
8-foot maximum
Not specified
Side (North and South)
Per Section 1303.A.2
10-foot minimum building
setback when adjacent to
single-family residential
districts, otherwise 0-foot
minimum
Not specified
Parking Setbacks
24th Street (Primary
Frontage)
30-foot minimum or behind
building
Not specified
Staff Report: Z-19-21-8
July 1, 2022
Page 5 of 15
Walkable Urban Code
T4:3 GW
*variance required or
design alternative
Standards
Requirements
Provisions on the
Proposed Site Plan
Portland Street, 22nd Street,
and 21st Place (Secondary
Frontage)
8-foot minimum or behind
building
Not specified
Side (North and South)
Per Section 1307.F.2.a
Adjacent to single-family
zoning: 10-foot minimum,
otherwise 0-foot minimum
Not specified
Lot Requirements
Lot Coverage
70 percent maximum
28 percent (Met)
Primary Building Frontage
(24th Street)
60 percent minimum
Not specified
Secondary Building
Frontage (Portland Street,
22nd Street, and 21st Place)
None
None (Met)
Open Space
5 percent minimum
Not specified
Frontage Types Allowed
Primary Building Frontage
(24th Street)
Porch, patio, stoop, forecourt,
or alternative frontages per
Section 1305.B.1.c
Not specified
Secondary Building
Frontage (Portland Street,
22nd Street, and 21st Place)
Porch, patio, stoop, forecourt,
or alternative frontages per
Section 1305.B.1.c
Not specified
Background/Issues/Analysis
SUBJECT SITE
1.
This request is to rezone an 11.46-acre site located at the southwest corner of
24th Street and the Loop-202 Freeway from C-2 (Intermediate Commercial
District) (7.40 acres), C-2 (Approved C-2 SP) (Intermediate Commercial District,
Approved Intermediate Commercial District, Special Permit) (2.08 acres), C-2 SP
(Intermediate Commercial District, Special Permit) (0.27 acres), R1-6 (Single-
Family Residence District) (1.06 acres), and R1-6 (Approved PAD-13) (Single-
Family Residence District, Approved Planned Area Development) (0.65 acres) to
WU Code T4:3 GW (Walkable Urban Code, Transect 4:3, Gateway Character
Area) to allow multifamily residential development. The subject site is located
within the Gateway TOD Policy Plan area and within one mile of the 24th Street /
Jefferson Street and 24th Street / Washington Street light rail stations.
Staff Report: Z-19-21-8
July 1, 2022
Page 6 of 15
2.
The General Plan Land Use Map designation for most of this site is Commercial
in the eastern portion and Residential 10 to 15 dwelling units per acre in the
western portion. The Commercial designation accommodates office, retail,
service, and multifamily development. The Residential 10 to 15 dwelling units per
acre designation accommodates multifamily development with densities in the
range of 10 to 15 dwelling units per acre. The proposed zoning is consistent with
the Commercial designation because it allows for a mix of commercial and
residential uses but is not consistent with the Residential 10 to 15 dwelling units
per acre designation. However, because the area of inconsistency is less than
10 acres, a General Plan Amendment is not required.
General Plan Land Use Map, Source: Planning and Development Department
Staff Report: Z-19-21-8
July 1, 2022
Page 7 of 15
3.
Transit Oriented Development Strategic Policy Framework
The Transit Oriented Development
(TOD) Strategic Policy Framework is
part of the city’s General Plan which
identified planning typologies to
describe urban environments. The
subject site is within one mile of the
24th Street / Washington Street and
24th Street / Jefferson Street light
rail stations. The identified
environment for the station is Minor
Urban Center. Minor Urban Center
is a place type characterized by
medium to low intensity with building
heights typically from two to five
stories with incentive heights of up
to seven stories. Land uses may
include supportive retail, mid-rise
living and low-rise office
employment. The proposed three-
story residential development is
consistent with the Minor Urban
Center placetype.
TOD Strategic Policy Framework Placetypes,
Source: Planning and Development Department
4.
Gateway Transit Oriented Development District Policy Plan
The site is located within the Gateway TOD District, the boundaries for which are
State Route 143 or the Hohokam Expressway to the east, Interstate 10 to the
west, the Loop 202 to the north, and Air Lane to the south. The policy plan
adopted for the Gateway TOD District provides a blueprint for fully achieving the
transformative potential of light rail in a sustainable manner. Changes advocated
in the plan can lower transportation costs for residents, create new business
opportunities, encourage active, healthy lifestyles, ensure Phoenix increases its
competitive advantage in the global marketplace, and improve prosperity by
growing the economy in locations with existing infrastructure and public services.
In order to realize the implementation of the Vision and Master Plan for the
Gateway TOD District, one key recommendation is the implementation of a form-
based zoning code. The proposal to Walkable Urban Code furthers that vision.
While the plan does not identify a specific transect for the subject site, the
proposed T4:3 transect is consistent with lower-intensity transects generally
located farther from the light rail stations.
Staff Report: Z-19-21-8
July 1, 2022
Page 8 of 15
The Gateway TOD policy plan
identifies the subject site with the
“stabilize” and “maintained housing”
labels on the land use and housing
element maps, highlighting the need
for contextual development that is
sensitive the surrounding
neighborhoods. The proposal for
three-story multifamily buildings in
the WU Code T4:3 transect is
consistent with these designations.
The site also fronts on 24th Street,
which is identified for a bike lane
opportunity in the mobility element.
While the proposed development
would not create a new bike lane, it
would include bicycle parking and a
pedestrian friendly frontage that
meets the vision of alternative
transportation options at this
location.
Gateway TOD Policy Plan, Source: Planning and
Development Department
Staff Report: Z-19-21-8
July 1, 2022
Page 9 of 15
The Gateway TOD policy plan
identifies the subject site in the master
plan as a development opportunity with
a future conceptual mixed-use
development, while noting that the WU
Code would not prescribe specific
uses, but would allow a more flexible
mix based on market conditions. The
plan also identifies 24th Street as a
complete streets priority street. In the
public transit map of the master plan,
Roosevelt Street is identified as a
transit route priority, highlighting that
future transit improvements should be
made along the corridor, which is one
block south of the subject site.
Gateway TOD Policy Plan, Source: Planning
and Development Department
EXISTING CONDITIONS AND SURROUNDING ZONING
5.
The subject site is an 11.46-gross-acre vacant lot, adjacent to the freeway
interchange, with mostly commercial zoning on the site, as shown on the sketch
map attached as an exhibit. In the western portion of the site, there is a 1.71-
acre portion zoned for single-family residential uses, including R1-6 and R1-6
(Approved PAD-13). The surrounding area contains a mix of uses and zoning.
Properties along 24th Street are zoned commercial (C-1 and C-2) and contain a
gas station, retail, and a vacant building formerly used as a house of worship.
Directly south of the subject site, properties along Portland Street and 22nd
Street, including lots with rear lot lines abutting the subject site, are zoned for
residential uses, (R1-6 and R-3) and contain single-family residential uses.
Directly north and west of the subject site are the Loop 202 and I-10 freeways.
PROPOSAL
6.
The proposed WU Code T4:3 District is described as a low-intensity urban
residential fabric characterized by single-family homes, duplexes, single-family
attached, and small multifamily developments. As shown on the conceptual site
plan attached as an exhibit, the proposed development consists of ten two- and
three-story residential buildings with a maximum height of 33 feet. The proposal
includes a building with frontage on 24th Street and a leasing office at the corner
Staff Report: Z-19-21-8
July 1, 2022
Page 10 of 15
of 24th Street and Portland Street. The 24th Street frontage would be required to
have a minimum of 60 percent building frontage, and the frontage must meet the
frontage type requirements outlined in Chapter 13 of the Zoning Ordinance.
Additionally, detached sidewalks will be required along the street frontage with a
5-foot-wide landscape area between the sidewalk and back of curb. The site
plan depicts vehicular access through a driveway on 24th Street, leading to drive
aisles and parking lots throughout the site and an exit-only gate to 22nd Street
near the western edge of the property.
The development will be required to provide bicycle parking for residents
pursuant to Section 1307.H of the Zoning Ordinance, which requires bicycle
parking at a rate 0.25 spaces per unit in multifamily residential development with
a maximum of 50 spaces. In addition, the development would be required to
provide 0.05 spaces of guest bicycle parking per unit and a bicycle repair station
(Stipulation No. 1).
7.
Because the site is over five acres, it will be considered a large-scale
development, according to Section 1304.G of the Zoning Ordinance, which may
require revisions to the conceptual site plan attached as an exhibit. Five percent
of the lot area shall be provided as a public open space, and the plan shall
include improvements to thoroughfares and pedestrian access. These revisions
will be addressed during the development review process.
8.
Section 1304.C. of the Zoning Ordinance requires that all sides of a building
exhibit design continuity and multiple exterior accent materials. The provided
conceptual elevations attached as an exhibit show multiple exterior accent
colors, materials, and design continuity throughout all sides of the building.
AREA PLANS, OVERLAY DISTRICTS, AND INITIATIVES
9.
Housing Phoenix Plan
In June 2020, the Phoenix City Council approved the Housing Phoenix Plan.
This Plan contains policy initiatives for the development and preservation of
housing with a vision of creating a stronger and more vibrant Phoenix through
increased housing options for residents at all income levels and family sizes.
Phoenix’s rapid population growth and housing underproduction has led to a
need for over 163,000 new housing units. Current shortages of housing supply
relative to demand are a primary reason why housing costs are increasing. The
proposed development supports the Plan’s goal of preserving or creating 50,000
housing units by 2030 by providing contributing to a variety housing types that
will address the supply shortage at a more rapid pace while using vacant land in
a more sustainable fashion. The proposed multifamily development supports the
goal of providing more housing units by 2030.
Staff Report: Z-19-21-8
July 1, 2022
Page 11 of 15
10. Comprehensive Bicycle Master Plan
The City of Phoenix adopted the Comprehensive Bicycle Master Plan in 2014 to
guide the development of its Bikeway System and supportive infrastructure. The
Comprehensive Bicycle Master Plan supports options for both short- and long-
term bicycle parking as a means of promoting bicyclist traffic to a variety of
destinations. Per Section 1307.H of the Zoning Ordinance and as stipulated, the
development would provide bicycle parking for residents and guests, in addition
to providing a bicycle repair station, encouraging the use of biking as an
alternative mode of transportation. This is addressed in Stipulation No. 1.
11. Complete Streets Guiding Principles
In 2014, the City of Phoenix City Council adopted the Complete Streets Guiding
Principles. The principles are intended to promote improvements that provide an
accessible, safe, connected transportation system to include all modes, such as
bicycles, pedestrians, transit, and vehicles. The proposal includes shaded,
detached sidewalks which will increase the thermal comfort for those walking to
and from nearby transit and those patronizing local businesses. The proposal
also includes several bicycle parking spaces for visitors and residents, in
addition to a bicycle repair station as required in Stipulation No. 1.
12. Tree and Shade Master Plan
The Tree and Shade Master Plan encourages treating the urban forest as
infrastructure to ensure the trees are an integral part of the City’s planning and
development process. Sidewalks on the street frontages should be detached
from the curbs to allow trees to be planted on both sides of the sidewalk to
provide thermal comfort for pedestrians and to reduce the urban heat island
effect. The Walkable Urban Code requires detached sidewalks along street
frontages and a 75 percent minimum shade requirement for public sidewalks and
internal pedestrian pathways.
13. Zero Waste PHX
The City of Phoenix is committed to its waste diversion efforts and has set a goal
to become a zero-waste city, as part of the city’s overall 2050 Environmental
Sustainability Goals. One of the ways Phoenix can achieve this is to improve and
expand its recycling and other waste diversion programs. Section 716 of the
Phoenix Zoning Ordinance establishes standards to encourage the provision of
recycling containers for multifamily, commercial and mixed-use developments
meeting certain criteria. The proposed conceptual site plan and application
materials did not reference recycling containers.
COMMUNITY INPUT SUMMARY
14. At the time this staff report was written, staff had not received any public
correspondence regarding the request.
Staff Report: Z-19-21-8
July 1, 2022
Page 12 of 15
INTERDEPARTMENTAL COMMENTS
15. The Street Transportation Department requested a minimum 10-foot-wide
sidewalk easement on the west side of 24th Street, dedication of right-of-way
along 24th Street for a right turn deceleration lane, improvements constructed
per the approved traffic impact statement, and that all street improvements be
constructed with all required elements to ADA accessibility standards. These are
addressed in Stipulation Nos. 2 through 5.
16. The City of Phoenix Water Services Department has noted that all public streets
bounding and within a proposed development must have public water mains
within them, and if none exists, the developer must install. However, water
capacity is a dynamic condition that can change over time due to a variety of
factors.
17. The Aviation Department requires that the property owner record a Notice to
Prospective Purchasers of Proximity to Airport in order to disclose the existence,
and operational characteristics of City of Phoenix Sky Harbor International
Airport (PHX) to future owners or tenants of the property. The Aviation
Department also requires that the project receive a No Hazard Determination
from the FAA and that the property owner grant and record an avigation
easement. These are addressed in Stipulation Nos. 6 through 8.
18. The Fire Department commented that the buildings shall comply with the
Phoenix Fire Code, including apparatus access road turning radius requirements
and fire flow standards.
OTHER
19. The site is located in a larger area identified as being archaeologically sensitive.
If further review by the City of Phoenix Archaeology Office determines the site
and immediate area to be archaeologically sensitive, and if no previous
archaeological projects have been conducted within this project area, it is
recommended that archaeological Phase I data testing of this area be
conducted. Phase II archaeological data recovery excavations may be
necessary based upon the results of the testing. A qualified archaeologist must
make this determination in consultation with the City of Phoenix Archaeologist. In
the event archaeological materials are encountered during construction, all
ground disturbing activities must cease within a 33-foot radius of the discovery
and the City of Phoenix Archaeology Office must be notified immediately and
allowed time to properly assess the materials. This is addressed in Stipulation
Nos. 9 through 11.
20. Staff has not received a completed form for the Waiver of Claims for Diminution
in Value of Property under Proposition 207 (A.R.S. 12-1131 et seq.), as required
by the rezoning application process. Therefore, a stipulation has been added to
Staff Report: Z-19-21-8
July 1, 2022
Page 13 of 15
require the form be completed and submitted prior to preliminary site plan
approval. This is addressed in Stipulation No. 12.
21. Development and use of the site is subject to all applicable codes and
ordinances. Zoning approval does not negate other ordinance requirements.
Zoning adjustments, abandonments or other formal actions may also be
required.
Findings
1.
The proposal will redevelop a vacant property and provide multifamily
residential development that is consistent with the Gateway TOD Policy Plan
vision for the site.
2.
The proposal provides a new multifamily housing option to contribute to the mix
of housing types in the area and will help alleviate the housing shortage in
Phoenix.
3.
As stipulated, the proposal provides enhanced pedestrian, bicycle, and shade
amenities consistent with the Gateway TOD Policy Plan, Comprehensive
Bicycle Master Plan, Tree and Shade Master Plan, and the Complete Streets
Guiding Principles.
Stipulations
1.
In addition to the bicycle parking requirements per Section 1307.H.6 of the
Phoenix Zoning Ordinance, the developer shall provide and maintain the
following bicycle infrastructure, as described below and as approved by the
Planning and Development Department.
a. Guest bicycle parking for multifamily residential use shall be provided at a
minimum of 0.05 spaces per unit with a maximum of 50 spaces near
entrances of buildings and installed per the requirements of Section
1307.H. of the Phoenix Zoning Ordinance.
b. A bicycle repair station (“fix it station”) shall be provided on the site. The
station shall include but not limited to: standard repair tools affixed to the
station; a tire gauge and pump; and a bicycle repair stand which allows
pedals and wheels to spin freely while making adjustments to the bike, as
approved by the Planning and Development Department.
2.
The developer shall dedicate a minimum 10-foot-wide sidewalk easement
along the west side of 24th Street, as approved by the Planning and
Development Department. The required streetscape area shall be
encompassed by the sidewalk easement.
Staff Report: Z-19-21-8
July 1, 2022
Page 14 of 15
3.
The developer shall dedicate fee title right-of-way along the west side of 24th
Street to accommodate the required right-turn deceleration lane, as approved
by the Planning and Development Department.
4.
The developer shall construct improvements per the approved Traffic Impact
Analysis.
5.
The developer shall construct all streets within and adjacent to the
development with paving, curb, gutter, sidewalk, curb ramps, streetlights,
median islands, landscaping and other incidentals, as per plans approved by
the Planning and Development Department. All improvements shall comply
with all ADA accessibility standards.
6.
The developer shall provide a No Hazard Determination for the proposed
development from the FAA pursuant to the FAA’s Form-7460 obstruction
analysis review process, prior to construction permit approval, as per plans
approved by the Planning and Development Department.
7.
The property owner shall record documents that disclose the existence, and
operational characteristics of Phoenix Sky Harbor Airport to future owners or
tenants of the property. The form and content of such documents shall be
according to the templates and instructions provided which have been
reviewed and approved by the City Attorney.
8.
The developer shall grant and record an avigation easement to the City of
Phoenix for the site, per the content and form prescribed by the City Attorney
prior to final site plan approval.
9.
If determined necessary by the Phoenix Archaeology Office, the applicant shall
conduct Phase I data testing and submit an archaeological survey report of the
development area for review and approval by the City Archaeologist prior to
clearing and grubbing, landscape salvage, and/or grading approval.
10. If Phase I data testing is required, and if, upon review of the results from the
Phase I data testing, the City Archaeologist, in consultation with a qualified
archaeologist, determines such data recovery excavations are necessary, the
applicant shall conduct Phase II archaeological data recovery excavations.
11. In the event archaeological materials are encountered during construction, the
developer shall immediately cease all ground-disturbing activities within a 33-
foot radius of the discovery, notify the City Archaeologist, and allow time for
the Archaeology Office to properly assess the materials.
Staff Report: Z-19-21-8
July 1, 2022
Page 15 of 15
12. Prior to preliminary site plan approval, the landowner shall execute a
Proposition 207 waiver of claims form. The waiver shall be recorded with the
Maricopa County Recorder's Office and delivered to the City to be included in
the rezoning application file for record.
Writer
Anthony Grande
July 1, 2022
Team Leader
Racelle Escolar
Exhibits
Sketch Map
Aerial Map
Conceptual Site Plan Date Stamped March 21, 2022
Conceptual Elevations Date Stamped March 21, 2022 (2 pages)
Z-148-96
Z-42-98
Z-294-85
Z-85-89
Z-59-93
Z-36-91
Z-SP-10-08
Z-38-96
Z-SP-148-96
Z-131-98
Z-61-99
*
*
*
*
*
*
*
*
SP
C-2 SP
C-1
C-2
RI
R-5
RI
C-2
C-1
R-5
I
RI
R1-6
C-O
C-1
C-1
P-1
R-3
C-1
C 2
P-1
R-5
C-2
R-3
R-3
C-2
R-5
RI
RI
R-4A
R-5
P-1
P-1 *
Z-159-83
C-2 SP
Z-SP-54-76
C-2 SP
Z-SP-10-94
P-1 *
Z-119-95
PAD-13
Z-116-80
SR51 RMP
I10 RMP
ROOSEVELT ST
WILLETTA ST
22ND ST
24TH ST
21ST PL
22ND PL
MORELAND ST
24TH PL
25TH ST
SR202 RMP
CULVER ST
PORTLAND ST
£
¤
51
§¨¦
10
v
w
202
VAN BUREN ST
MC DOWELL RD
JEFFERSON ST
BUCKEYE RD
LOWER BUCKEYE RD
19TH AVE
7TH AVE
CENTRAL AVE
7TH ST
16TH ST
24TH ST
32ND ST
40TH ST
I - 10
I - 17
CENTRAL CITY VILLAGE
CITY COUNCIL DISTRICT: 8
I
APPLICANT'S NAME:
APPLICATION NO.
Z-19-21
GROSS AREA INCLUDING 1/2 STREET
AND ALLEY DEDICATION IS APPROX.
11.46 Acres
MULTIPLES PERMITTED
* Maximum Units Allowed with P.R.D. Bonus
C-2, C-2 (Approved C-2 SP), C-2 SP,
R1-6, R1-6 (Approved PAD-13)
WU T4:3 GW
CONVENTIONAL OPTION
107, 30 ( 30), 4, 5, 3 (N/A)
No Maximum
* UNITS P.R.D. OPTION
129, 36 ( 36), 4, 7, 4 (N/A)
N/A
Lyfe Living Communities c/o Bert Kempfer
DATE:
4/26/21
REVISION DATES:
AERIAL PHOTO &
QUARTER SEC. NO.
QS 12-32
ZONING MAP
G-9
REQUESTED CHANGE:
FROM: C-2 ( 7.40 a.c.)
C-2 (Approved C-2 SP) ( 2.08 a.c.)
C-2 SP ( 0.27 a.c.)
R1-6 ( 1.06 a.c.)
R1-6 (Approved PAD-13) ( 0.65 a.c.)
TO:
WU T4:3 GW ( 11.46 a.c.)
Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\2021\Z-19-21.mxd
Z-19-21
0.07
0
0.07
0.035
Miles
4/26/22
Z-148-96
Z-42-98
Z-294-85
Z-85-89
Z-59-93
Z-36-91
Z-SP-10-08
Z-38-96
Z-SP-148-96
Z-131-98
Z-61-99
*
*
*
*
*
*
*
*
SP
C-2 SP
C-1
C-2
RI
R-5
RI
C-2
C-1
R-5
I
RI
R1-6
C-O
C-1
C-1
P-1
R-3
C-1
C 2
P-1
R-5
C-2
R-3
R-3
C-2
R-5
RI
RI
R-4A
R-5
P-1
P-1 *
Z-159-83
C-2 SP
Z-SP-54-76
C-2 SP
Z-SP-10-94
P-1 *
Z-119-95
PAD-13
Z-116-80
SR51 RMP
I10 RMP
ROOSEVELT ST
WILLETTA ST
22ND ST
24TH ST
21ST PL
22ND PL
MORELAND ST
24TH PL
25TH ST
SR202 RMP
CULVER ST
PORTLAND ST
£
¤
51
§¨¦
10
v
w
202
VAN BUREN ST
MC DOWELL RD
JEFFERSON ST
BUCKEYE RD
LOWER BUCKEYE RD
19TH AVE
7TH AVE
CENTRAL AVE
7TH ST
16TH ST
24TH ST
32ND ST
40TH ST
I - 10
I - 17
CENTRAL CITY VILLAGE
CITY COUNCIL DISTRICT: 8
I
APPLICANT'S NAME:
APPLICATION NO.
Z-19-21
GROSS AREA INCLUDING 1/2 STREET
AND ALLEY DEDICATION IS APPROX.
11.46 Acres
MULTIPLES PERMITTED
* Maximum Units Allowed with P.R.D. Bonus
C-2, C-2 (Approved C-2 SP), C-2 SP,
R1-6, R1-6 (Approved PAD-13)
WU T4:3 GW
CONVENTIONAL OPTION
107, 30 ( 30), 4, 5, 3 (N/A)
No Maximum
* UNITS P.R.D. OPTION
129, 36 ( 36), 4, 7, 4 (N/A)
N/A
Lyfe Living Communities c/o Bert Kempfer
DATE:
4/26/21
REVISION DATES:
AERIAL PHOTO &
QUARTER SEC. NO.
QS 12-32
ZONING MAP
G-9
REQUESTED CHANGE:
FROM: C-2 ( 7.40 a.c.)
C-2 (Approved C-2 SP) ( 2.08 a.c.)
C-2 SP ( 0.27 a.c.)
R1-6 ( 1.06 a.c.)
R1-6 (Approved PAD-13) ( 0.65 a.c.)
TO:
WU T4:3 GW ( 11.46 a.c.)
Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\2021\Z-19-21.mxd
Z-19-21
0.07
0
0.07
0.035
Miles
4/26/22
\
]
]
\
\
\
\
;´
]
;´
]
]
]
X´
U´
X´
X´
#´ $´
´
049"
#:$
%;
16<=>?&@AB'C(DEEE)FG2*5H8I<J@@AB'(D+KL!M< NO,P>?&@AB'7(DEQ-RS..TO,P>?&@AB'C/3U
¦°¥¬°®¡´
.'''¯£´
V´
V´
W´
typ^IC
´m=jI7´
typtpIE´I
´
Pyp´XI´=yI=8´
mI´XI´=yI=7´
CyyIm´pmXmP9´
typtpIE´pmYmP7´
BXaEXmP´QIXPQ
´=bcpIE7´
ap´CpIy=PI´=bapIE7´
BXaEXmP´Lpp
uyYm9´
ap´CpIy=PI´uypXEIE7´
p=d´mY
´
mX´XI:´
yIYEImY=a´BXaEXmP´=yI=7´
aKAXmP´pLMXCI8´
CaBQpI´=yI=9´
t=y`XmP´yIxYyIE7´
t=y`XmP´uypXEIE8´
CA=´EIa´yK´
mC´,0Q´yII´=mE´
upy
a=mE´yII´
jcYL=jXd´yIXEImX=a´
´
)(0/´=CyI´
´ ¢´08/´
´E%=C
0((´/´pyXI
1(
,,*34,´L´
,5(5
,30´mX
´
00´«EXp´)2* ´
)*(´)BIEyppj´0(* ´
),(´,BIEyppj´±0/5
´
EXp7´
115´L´
)BIEyppj´CImIy9´22,´M
)BIEyppj´CpymIy7´3/5´M
,BIEyppj´CIm
Iy´62/´M
,BIEyppj´CpymIy8´§´(*6´L
,,(,00´L´
/1((´L´
/(((´L´
0(,´u=CI´
00´EXp´
/<13´
¨©(¨Byj ¨"1)21´
),(´,Byj ´)"1¨B(´
004´u=CI´)2/´´mY´
EkbpujIm
´pM´=´jaªN=lXa´yIYEIm
Y=b´typ^IC
´pm´
=´=C=m
´t=yCIb´epC=IE´=´QI´mpTI´CpymIy´pO´
,0R´ yII
´=mE´upz
[=mE´yII´ Xm´ tQpImY´=yXpm=´
SI´typupIE´u{q^IC´Yba´Cpm=Ym´,25´P=yEIm´bI´
=u=yjIm
´ mY
´ Ym´ Iu={=I´ ¤p´ =mE´
SyII´ py´
BXaEXmP´ =mE´ BI´ t=y`IE´ =
´ =ttypYj=
Ia´ *3´ u=CI´
uIy´ mX´Ym´ Bp
S´CpIyIE´ =mE´ mpmCpIyIE´yM=CI´
u=y`YmP´u=CI´
SI´Y
I´X´P=yEP=I´ICyIE´=mE´Y´
ug=mmIE´p´Cpm
=Ym´jc
YuaI´pEppy´=lImY´=yI= ´
)"
yIMI´ImCapyI
,´
pEppy´=lImY´=yI= ´
/´
2´ICyX
´=da´
0´
IX´pma´P=I´
1´
Imy&IY
´P=yE´P=
I´
frrv-'-´
²³³²³³³²´
BIy´yXEEIaa´abC´
231(´I´C=jIaB=C`´yp=E´
Y
I´Z´((´
Cp
F=aI´=´51,1)´
ImE´yXEEIab´
"
E=Y´
/(//´m!´CImy=a´>I´
Y
I´Bss´
uSpImY =´51(*,´
05(2/5*´*((
wr|hnG´´
bb´CImy=a´tQ´baC´
26,6´m´T@EIm´yp=E´
X
I´C0,1,´
CpE=bI´=´51,1(´
Bpj=m´
)2((´m ´EIIy´EyYI´
XI´,)(´
jY`I´IE=yE
! "
IjtI´=´51,5*´
ByCI´g=~pm´
"
?´+''´ YJ´win´?oG´w}r_JD´H??´
oࢼ1;o=!b]_|vثƏƍƏƏ ("ĸ$" ""!$*&"(!!$+
("ĸ&"!!! &$"!$$ )$&$$*!"")!$$!""
("ĸ
CASA DEL REY
SOUTH ELEVATION
BREEZEWAY SECTION
EAST / WEST ELEVATION
44’-6”
44’-6”
STANDING SEAM METAL
CLADDING @ MAIN BALCONY
AWNINGS (TYP.)
E.I.F.S. (TYP.)
MECHANICAL ON ROOF (TYP.)
PAINTED METAL ENTRY
DOOR FEATURE W/ SIGNAGE
& LIGHTING (TYP.)
STEEL STAIR W/ STEEL PLATE
GUARDRAILS, HANDRAILS (TYP.)
PAINTED METAL PLATE
BALCONY FASCIA W/ METAL
PICKET RAILING (TYP.)
FIBER-REINFORCED CONCRETE
(FRC) OR COMPOSITE PLANK
CLADDING (TYP.)
37’-10”
ROOF AWNING
37’-10”
ROOF AWNING
35’-6”
PARAPET
35’-6”
PARAPET
33’-0”
ROOF
33’-0”
ROOF
22’-0”
3RD FLOOR
22’-0”
3RD FLOOR
11’-0”
2ND FLOOR
11’-0”
2ND FLOOR
0’-0”
1ST FLOOR
0’-0”
1ST FLOOR
BUILDING A
EXTERIOR ELEVATIONS
21172A.000 - 02/14/2022
0’
5’
10’
20’
40’
35’-6”
PARAPET
22’-0”
3RD FLOOR
33’-0”
ROOF
11’-0”
2ND FLOOR
0’-0”
1ST FLOOR
STANDING SEAM METAL CLADDING
@ MAIN BALCONY AWNINGS (TYP.)
PICKET-STYLE METAL
RAILINGS (TYP.)
PAINTED METAL @ UNDERSIDE
OF STEEL STAIR (TYP.)
16” DEEP METAL SUN SHADE
(OPTIONAL @ SOUTH ELEVATION)
oࢼ1;o=!b]_|vثƏƍƏƏ ("ĸ$" ""!$*&"(!!$+
("ĸ&"!!! &$"!$$ )$&$$*!"")!$$!""
("ĸ
0’
1’
2’
5’
10’
ENLARGED SOUTH ELEVATION
BUILDING SECTION A
44’-6”
CL
22’-0”
3RD FLOOR
2’-0”
2’-6”
2’-0”
2’-0”
2’-0”
9’-0”
9’-0”
9’-0”
11’-0”
2ND FLOOR
0’-0”
1ST FLOOR
33’-0”
ROOF
35’-6”
PARAPET
STANDARD 8’-0” TALL
SLIDING DOOR
2’-0” CLERESTORY
WINDOW
STANDARD 8’-0” TALL
SLIDING DOOR
STANDARD 8’-0” TALL
SLIDING DOOR
E.I.F.S. (TYP.)
FIXED WINDOW
(TYP.)
OPERABLE WINDOW
(TYP.)
PAINTED METAL
PLANTER BOX
ATTACHED
TO BALCONY
FASCIA (TYP.)
PAINTED METAL
PLATE BALCONY
FASCIA W/ PICKET-
STYLE METAL
RAILING (TYP.)
STEEL PLATE PRIVACY
RAILING @ 1ST FLOOR
BALCONIES (TYP.)
METAL FASCIA
TRIM (TYP.)
FRC OR COMPOSITE
PLANK CLADDING (TYP.)
BUILDING A
ENLARGED ELEVATION + SECTION
21172A.000 - 02/14/2022
CASA DEL REY
A
A