ADDENDUM A 
Staff Report: Z-64-21-8 
August 3, 2022 
Camelback East Village Planning 
Committee Meeting Date 
June 7, 2022 
Planning Commission Hearing Date 
August 4, 2022 
Request From: 
A-2 (Industrial District) (17.82 acres)
Request To: 
PUD (Planned Unit Development) (17.82 
acres) 
Proposed Use 
Multifamily residential 
Location 
Southwest corner of 48th Street and 
Washington Street 
Owner 
Lincoln National Life Insurance Company 
Applicant 
Odyssey Group Holdings, LLC 
Representative 
Nick Wood, Esq., Snell & Wilmer, LLP 
Staff Recommendation 
Approval, subject to stipulations 
The purpose of this addendum is to revise the departmental comments in the staff 
report and revise the staff recommended stipulations regarding streetscape standards 
for the Banyan Residential PUD (Z-64-21-8).   
Stipulation No. 1.b. has been added to remove a reference to the Transit Gateway 
Character Area streetscape standards, as the streetscape standards for the project are 
already defined in the Development Standards Table on page 10 of the narrative.  
The Aviation Department clarified that the subject site is within close proximity to the 
noise contour area of Phoenix Sky Harbor International Airport, not within the contour 
area. Item No. 20 in the staff report has been updated accordingly.  
The Office of Environmental Programs clarified that the subject site is adjacent to the 
site for the former Olin Matheson Chemical Corporation and Arizona Agrochemical 
Corporation, the listed environmental remediation items are recommendations, not 
requirements, and that the applicant will follow all environmental requirements which 
includes, but is not limited to, those of the Arizona Department of Environmental Quality 
(ADEQ). Item No. 21 in the staff report has been updated accordingly. 
ATTACHMENT C

Addendum A to the Staff Report Z-64-21-8 
August 3, 2022 
Page 2 of 3 
 
 
Staff recommends approval subject to the following revised stipulations: 
 
Stipulations 
 
1. 
An updated Development Narrative for the Banyan Residential 48th Street & 
Washington PUD reflecting the changes approved through this request shall be 
submitted to the Planning and Development Department within 30 days of City 
Council approval of this request. The updated Development Narrative shall be 
consistent with the Development Narrative date stamped May 23, 2022, as 
modified by the following stipulations: 
 
 
 
a. 
Front cover: Revise the date information on the cover page to the 
following:  
 
City Council Adopted: [Add Adoption Date] 
 
 
 
 
b.  
PAGE 9, TABLE D, DEVELOPMENT STANDARDS TABLE: DELETE “D. 
CHARACTER AREAS, TRANSIT GATEWAY CHARACTER AREA 
(SECTION 1312 (A)))” 
 
 
 
2. 
The developer shall construct all streets within and adjacent to the development 
with paving, curb, gutter, sidewalk, curb ramps, streetlights, median islands, 
landscaping and other incidentals, as per plans approved by the Planning and 
Development Department. All improvements shall comply with all ADA 
accessibility standards. 
 
 
3. 
This parcel is in a Special Flood Hazard Area (SFHA) called Zone A, on panel 
2230 M of the Flood Insurance Rate Maps (FIRM) dated September 18, 2020. 
The following requirements shall apply, as approved by the Planning and 
Development Department: 
 
 
 
a.  The Architect/Engineer is required to show the floodplain boundary limits on 
the Grading and Drainage plan and ensure that impacts to the proposed 
facilities have been considered, following the National Flood Insurance 
Program (NFIP) Regulations (44 CFR Paragraph 60.3). This includes, but not 
limited to provisions in the latest versions of the Floodplain Ordinance of the 
Phoenix City Code. 
 
 
 
 
b. A copy of the Grading and Drainage Plan shall be submitted to the Floodplain 
Management section of Public Works Department for review and approval of 
Floodplain requirements. 
 
 
 
 
c. The developer shall provide a FEMA approved CLOMR-F or CLOMR prior to 
issuance of a Grading and Drainage permit. 
 
 
 
4. 
The property owner shall record documents that disclose the existence, and 
operational characteristics of Phoenix Sky Harbor Airport to future owners or

Addendum A to the Staff Report Z-64-21-8 
August 3, 2022 
Page 3 of 3 
 
 
tenants of the property. The form and content of such documents shall be 
according to the templates and instructions provided which have been reviewed 
and approved by the City Attorney. 
 
 
5. 
The developer shall provide a No Hazard Determination for the proposed 
development from the FAA pursuant to the FAA’s Form-7460 obstruction analysis 
review process, prior to construction permit approval, as per plans approved by 
the Planning and Development Department.   
 
 
6. 
The developer shall grant and record an avigation easement to the City of 
Phoenix for the site, per the content and form prescribed by the City Attorney prior 
to final site plan approval. 
 
 
7. 
In the event archaeological materials are encountered during construction, the 
developer shall immediately cease all ground-disturbing activities within a 33- foot 
radius of the discovery, notify the City Archaeologist, and allow time for the 
Archaeology Office to properly assess the materials. 
 
 
8. 
Prior to preliminary site plan approval, the landowner shall execute a Proposition 
207 waiver of claims form. The waiver shall be recorded with the Maricopa 
County Recorder's Office and delivered to the City to be included in the rezoning 
application file for record. 
 
Exhibits 
Revised Staff Report (33 pages)

*REVISED 
Staff Report: Z-64-21-8 
August 3, 2022 
 
Camelback East Village Planning 
Committee Meeting Date 
June 7, 2022 
Planning Commission Hearing Date 
August 4, 2022 
Request From: 
A-2 (Industrial District) (17.82 acres) 
Request To: 
PUD (Planned Unit Development) (17.82 acres) 
Proposed Use 
Multifamily residential 
Location 
Southwest corner of 48th Street and 
Washington Street 
Owner 
Lincoln National Life Insurance Company 
Applicant 
Odyssey Group Holdings, LLC 
Representative 
Nick Wood, Esq., Snell & Wilmer, LLP 
Staff Recommendation 
Approval, subject to stipulations 
 
General Plan Conformity 
General Plan Land Use Map Designation 
Current: Commerce/Business Park and 
Industrial 
 
Proposed (GPA-CE-2-21-8): Mixed Use 
Street Map 
Classification 
48th Street 
Collector 
33-foot west half street 
Washington Street 
Major Arterial 
with Light Rail 
Varies, 50 to 66.5-foot 
south half street 
CONNECT PEOPLE & PLACES CORE VALUE; TRANSIT ORIENTED 
DEVELOPMENT; LAND USE PRINCIPLE: Encourage high-density housing and high 
intensity employment uses to locate adjacent or close to transit stations per 
adopted transit district plans. 
 
The proposed development will provide multifamily residential uses near an existing light 
rail station. This will promote alternative transportation for future residents and guests of 
this development.

Staff Report: Z-64-21-8 
August 3, 2022 
Page 2 of 11 
 
 
CONNECT PEOPLE AND PLACES CORE VALUE; COMPLETE STREETS; DESIGN 
PRINCIPLE: Plan and design communities and neighborhoods to be pedestrian 
friendly and walkable. 
 
The proposed PUD incorporates numerous streetscape and frontage standards from the 
Walkable Urban (WU) Code, thus promoting a pedestrian friendly environment along 
adjacent street frontages.  
 
CONNECT PEOPLE AND PLACES CORE VALUE; BICYCLES; DESIGN PRINCIPLE: 
Development should include convenient bicycle parking. 
 
The subject site fronts a dedicated bicycle lane on Washington Street, and the proposed 
PUD narrative requires that secured bicycle parking spaces be provided for residents. The 
project will support tenants, employees and visitors who use all modes of transportation. 
 
BUILD THE SUSTAINABLE DESERT CITY CORE VALUE; TREES AND SHADE; 
DESIGN PRINCIPLE: Integrate trees and shade into the design of new development 
and redevelopment projects throughout Phoenix. 
 
The proposed development provides trees and shade on both street frontages which will 
reduce the urban heat island effect while also improving thermal comfort to site users and 
the surrounding neighborhood. 
 
 
Applicable Plan, Overlays, and Initiatives 
44th Street Corridor Specific Plan – See Background Item No. 9. 
 
Transit Oriented Development Strategic Policy Framework – See Background Item 
No. 10. 
 
Housing Phoenix Plan – See Background Item No. 11. 
 
Tree and Shade Master Plan – See Background Item No. 12. 
 
Complete Streets Guiding Principles – See Background Item No. 13. 
 
Comprehensive Bicycle Master Plan – See Background Item No. 14. 
 
Zero Waste PHX – See Background Item No. 15.

Staff Report: Z-64-21-8 
August 3, 2022 
Page 3 of 11 
 
 
Surrounding Land Uses/Zoning 
 
Land Use 
Zoning 
On Site 
Vacant 
A-2 
North (Across 
Washington Street) 
Office  
A-2 (Approved C-2 
M-R) 
South (across South 
Pacific Railroad) 
Warehousing and distribution 
A-2 
East (Across 48th 
Street) 
Various commercial uses and 
warehousing 
A-2 
West 
SR-143 freeway 
A-2 
 
Background/Issues/Analysis 
 
SUBJECT SITE 
1. 
This request is to rezone a 17.82-acre site located on the southwest corner of 48th 
Street and Washington Street from A-2 (Industrial District) to PUD (Planned Unit 
Development) to allow multifamily residential and other permitted uses as listed in 
the Walkable Urban Code Transect T5:5. The site is presently vacant and is located 
within a quarter mile of the 50th Street / Washington Street light rail station. 
Furthermore, the site is located adjacent to the SR-143 freeway. 
2. 
The General Plan Land Use Map 
designation for the subject site is 
Industrial, thus the proposal is not 
consistent with this General Plan Land 
Use Map designation. A companion 
General Plan Amendment request (GPA-
CE-2-21-8) proposes a Land Use Map 
designation of Mixed Use. The Mixed Use 
designation calls for multifamily 
residential and commercial land uses. If 
approved, the proposal would be 
consistent with the Mixed Use 
designation.   
 
The General Plan Land Use Map designation to the north and northwest, across 
Washington Street, is Mixed Use. South and east of the site, across the Union 
Pacific Railroad tracks and across 48th Street, is designated as Industrial. The 
designation along the SR-143 freeway is Transportation.  
General Plan Land Use Map 
Source: City of Phoenix Planning and 
Development Department

Staff Report: Z-64-21-8 
August 3, 2022 
Page 4 of 11 
 
 
EXISTING CONDITIONS & SURROUNDING ZONING 
3. 
The site is zoned A-2 (Industrial District) 
and is currently vacant. Properties to the 
north and northwest of the site, across 
Washington Street, are zoned A-2 and 
PUD (Planned Unit Development). Office 
and multifamily uses are located on those 
parcels. Properties to the south, east and 
west of the site are zoned A-2. Land uses 
include office, restaurants, warehousing 
and the SR-143 freeway. 
The proposal is consistent with the 
zoning in the surrounding area and with 
the scale of existing uses. Further, the 
proposed development standards in the 
PUD are consistent with the scale, 
character, and intensity of surrounding 
developments. 
 
PROPOSAL 
4. 
The proposal was developed utilizing the PUD zoning district. The Planned Unit 
Development (PUD) is intended to create a built environment that is superior to that 
produced by conventional zoning districts and design guidelines. Using a 
collaborative and comprehensive approach, an applicant authors and proposes 
standards and guidelines that are tailored to the context of a site on a case by case 
basis. Where the PUD Development Narrative is silent on a requirement, the 
applicable Zoning Ordinance provisions will be applied. 
5. 
Land Use 
The PUD proposes a multifamily residential development. The proposed 
development narrative lists all permitted uses in the T5:5 (Walkable Urban Code) 
transect district as permitted on the site. 
Zoning Map, Source: City of Phoenix  
Planning and Development Department

Staff Report: Z-64-21-8 
August 3, 2022 
Page 5 of 11 
 
 
6. 
Development Standards 
The PUD proposes development 
standards designed to accommodate 
multifamily residential buildings with a 
maximum building height of 56 with no 
density limit. However, the proposed 
building height is of 48 feet and 4 stories, 
with 515 dwelling units proposed. 
The project site has two street frontages 
along its northern and eastern 
perimeters. The PUD proposes 
pedestrian-friendly design with most of 
the residential buildings facing the 
adjacent streets and several pedestrian 
connections are provided to these. All 
resident and guest parking will be 
distributed throughout the site. 
Below is a summary of the key 
development standards set forth in the 
narrative. 
 
Conceptual Site Plan,  
Source: Todd + Associates 
Development Standards 
Standard 
Proposed 
Density 
No maximum 
Building Height 
56 feet  
Perimeter Building Setbacks 
  
Washington Street (Primary 
Frontage) 
Minimum: 20 feet 
Maximum: 30 feet 
  
48th Street (Secondary 
Frontage) 
Minimum: 20 feet 
Maximum: 30 feet 
 South 
0 feet 
 West 
5 feet 
 Interior Lot Lines 
0 feet 
Maximum Lot Coverage 
80 percent maximum 
Parking

Staff Report: Z-64-21-8 
August 3, 2022 
Page 6 of 11 
 
 
  
Residents (Reserved and 
Unreserved) 
901 spaces 
  
Bicycle 
Minimum 0.25 spaces per unit for a 
maximum of 50 spaces 
Perimeter Landscape Setbacks 
 
Washington Street (Primary 
Frontage) 
20 feet minimum 
 
48th Street (Secondary 
Frontage) 
20 feet minimum 
 South 
0 feet 
 West 
5 feet 
Open Space 
5 percent minimum 
7. 
Landscape Standards 
The PUD sets forth standards to activate two street frontages (48th Street and 
Washington Street) with pedestrian-oriented design and street-facing residential 
units. It also sets forth requirements to maximize the landscaping along these street 
frontages. Minimum 2-inch and 3-inch caliper trees will be required, planted 20 feet 
on center or in equivalent groupings along street frontages. Additionally, five shrubs 
per tree will be provided, and live groundcover to provide 75 percent groundcover at 
maturity. Furthermore, interior property lines not adjacent to public right-of-way shall 
be landscaped with minimum 1.5-inch caliper trees planted 25 feet on center or in 
equivalent groupings, in addition to five shrubs per tree and achieve 50 percent 
groundcover at maturity. 
8. 
Design Guidelines 
The PUD proposes a development design that prioritizes the pedestrian. 
Specifically, it sets forth requirements for frontage types that will active the street 
frontages in addition to providing pedestrian connections between residential 
buildings, street frontages and open space areas, which will have a various 
amenities.  
AREA PLANS, OVERLAY DISTRICTS, AND INITIATIVES 
9. 
44th Street Corridor Specific Plan 
The site is located within the boundaries of the 44th Street Corridor Specific Plan. 
Completed in 1991, the 44th Street Corridor Specific Plan established a framework 
to provide compatibility of new development along 44th Street from McDonald Drive 
to Sky Harbor International Airport. The Land Use Plan within the Specific Plan 
designates the subject property for commerce park, which is not consistent with the 
request. However, the standards proposed in the PUD narrative are compatible with 
the streetscape, landscaping, and design considerations listed in the plan.

Staff Report: Z-64-21-8 
August 3, 2022 
Page 7 of 11 
 
 
10. Transit Oriented Development Strategic Policy Framework 
The Transit Oriented Development Strategic Policy Framework, originally adopted 
in 2013, and later amended in 2016 and 2018, identifies policies and place types 
that are designed to shape walkable and mixed-use environments and focus 
redevelopment within a quarter mile of high capacity transit stations. The subject 
site is located less than quarter mile from the 50th Street / Washington Street light 
rail station, which is identified as a Minor Urban Center place type. A Minor Urban 
Center is a place type characterized by medium to low intensity uses, with building 
heights typically from two to five stories, with incentive heights of up to seven 
stories. Land uses may include entertainment, retail, mid-rise residences and low-
rise office developements. The proposed project, with a focus on pedestian-
oriented design, is consistent with the Minor Urban Center place type. Further, the 
utilization of the Walkable Urban Code for the framework for the PUD is consistent 
with the policies of the TOD Strategic Policy Framework. 
11. Housing Phoenix Plan 
In June 2020, the Phoenix City Council approved the Housing Phoenix Plan. This 
Plan contains policy initiatives for the development and preservation of housing with 
a vision of creating a stronger and more vibrant Phoenix through increased housing 
options for residents at all income levels and family sizes. Phoenix’s rapid 
population growth and housing underproduction has led to a need for over 163,000 
new housing units. Current shortages of housing supply relative to demand are a 
primary reason why housing costs are increasing. The proposed development 
supports the Plan’s goal of preserving or creating 50,000 housing units by 2030 by 
providing an opportunity for multifamily residential development. 
12. Tree and Shade Master Plan 
The Tree and Shade Master Plan has a goal of treating the urban forest as 
infrastructure to ensure that trees are an integral part of the city’s planning and 
development process. By investing in trees and the urban forest, the city can 
reduce its carbon footprint, decrease energy costs, reduce storm water runoff, 
increase biodiversity, address the urban heat island effect, clean the air, and 
increase property values. In addition, trees can help to create walkable streets and 
vibrant pedestrian places. The PUD includes standards for enhanced tree sizes 
along the street frontages, and a requirement for minimum 75 percent live 
groundcover will help reduce the urban heat island effect. 
13. Complete Streets Guiding Principles 
In 2014, the City of Phoenix City Council adopted the Complete Streets Guiding 
Principles. The principles are intended to promote improvements that provide an 
accessible, safe, connected transportation system to include all modes, such as 
bicycles, pedestrians, transit, and vehicles. The development will activate the street 
frontages, provide pedestrian connections to those frontages and provide enhanced 
landscaping and shade along the sidewalks.

Staff Report: Z-64-21-8 
August 3, 2022 
Page 8 of 11 
 
 
14. Comprehensive Bicycle Master Plan 
The City of Phoenix adopted the Comprehensive Bicycle Master Plan in 2014 to 
guide the development of its bikeway system and supportive infrastructure. The 
Comprehensive Bicycle Master Plan supports options for both short- and long-term 
bicycle parking as a means of promoting bicyclist traffic to a variety of destinations. 
The proposal incorporates requirements for bicycle parking to encourage multi-
modal transportation. 
15. Zero Waste PHX 
The City of Phoenix is committed to its waste diversion efforts and has set a goal to 
become a zero waste city, as part of the city’s overall 2050 Environmental 
Sustainability Goals. One of the ways Phoenix can achieve this is to improve and 
expand its recycling and other waste diversion programs. Section 716 of the 
Phoenix Zoning Ordinance establishes standards to encourage the provision of 
recycling containers for multifamily, commercial and mixed-use developments 
meeting certain criteria. The PUD narrative states that recycling containers will be 
provided on site. 
COMMUNITY INPUT SUMMARY 
16. At the time this staff report was written, staff did not receive any letters or 
correspondence regarding the project. 
INTERDEPARTMENTAL COMMENTS 
17. The Public Transit Department has requested that the developer provide maximum 
shade for sidewalks and pedestrian pathways. Furthermore, where pedestrian 
paths cross drive aisles, that they be constructed of materials that visually contrast 
with parking and drive aisle surfaces. These are addressed in the development 
narrative. 
18. The Street Transportation Department has required that all streets be constructed 
with all required improvements and comply with current ADA standards. This is 
addressed in Stipulation No. 2. 
19. The Floodplain Management division of the Public Works Department indicated that 
the site is in a Special Flood Hazard Area (SFHA) called Zone A, on panel 2230 M 
of the Flood Insurance Rate Maps (FIRM) dated September 18, 2020. Stipulation 
No. 3 addresses floodplain requirements. 
20.  This site is located within CLOSE PROXIMITY TO the noise contour area of 
Phoenix Sky Harbor International Airport (PHX). As such, staff is requesting that the 
developer provide notice to prospective purchasers or tenants regarding the 
existence and operational characteristics of this airport, that an aviation easement 
be granted and recorded for the City of Phoenix for the site, that noise mitigation is 
addressed through building construction, and that the developer provide a No 
Hazard determination from the FAA prior to construction permit approval.  These

Staff Report: Z-64-21-8 
August 3, 2022 
Page 9 of 11 
 
 
 
Findings 
 
1. 
The proposal will develop a vacant site and provide additional housing options 
within proximity to a light rail station and employment uses. The proposed 
requirements are addressed in the development narrative and Stipulation Nos. 4 
through 6. 
21. The Office of Environmental Programs commented that a construction and 
demolition landfill was once located on the site and ADJACENT TO the southern 
portion of the site was previously the location of the Olin Matheson Chemical 
Corporation and Arizona Agrochemical Corporation. The site was granted closure 
by the Arizona Department of Environmental Quality (ADEQ) based on a risk 
assessment of exposure to future construction workers and industrial employees, 
and that contaminated soil was reportedly removed from the site along with various 
other material including empty 55‐gallon drums, underground storage tanks, and 
pesticide contaminated liquids.  The Office of Environmental Programs commented 
RECOMMENDS CONSIDERATION that methane sampling should be completed in 
the area of any proposed buildings on this property, vapor barriers should be 
installed for any buildings on this property and if the existing wells are in the way of 
development, they should be abandoned following the proper Arizona Department 
of Water Resources regulations. The applicant will follow all EVIRONMENTAL 
requirements by ADEQ during the permitting and construction process. 
OTHER 
22. The site is located in an area identified as being archaeologically sensitive. In 
further review by the City of Phoenix Archaeology Office, it was determined that the 
Phase I testing conducted on the subject site by the applicant does not warrant 
additional archaeological testing. However, in the event archaeological materials 
are encountered during construction, all ground disturbing activities must cease 
within a 33-foot radius of the discovery and the City of Phoenix Archaeology Office 
must be notified immediately and allowed time to properly assess the materials. 
This is addressed in Stipulation No. 7. 
23. Staff has not received a completed form for the Waiver of Claims for Diminution in 
Value of Property under Proposition 207 (A.R.S. 12-1131 et seq.), as required by 
the rezoning application process. Therefore, a stipulation has been added to require 
the form be completed and submitted prior to preliminary site plan approval. This is 
addressed in Stipulation No. 8. 
24. Development and use of the site is subject to all applicable codes and ordinances. 
Zoning approval does not negate other ordinance requirements. Other formal 
actions such as, but not limited to, zoning adjustments and abandonments, may be 
required.

Staff Report: Z-64-21-8 
August 3, 2022 
Page 10 of 11 
 
 
development is also compatible in intensity, scale, and character with the 
surrounding area. 
2. 
The project site is appropriately located along an arterial street and within a quarter 
mile of a light rail station. 
3. 
The proposed PUD sets forth design and development standards that will facilitate 
pedestrian-oriented design and promote a safer walking environment. 
 
Stipulations 
 
1. 
An updated Development Narrative for the Banyan Residential 48th Street & 
Washington PUD reflecting the changes approved through this request shall be 
submitted to the Planning and Development Department within 30 days of City 
Council approval of this request. The updated Development Narrative shall be 
consistent with the Development Narrative date stamped May 23, 2022, as 
modified by the following stipulations: 
 
 
 
a. 
Front cover: Revise the date information on the cover page to the 
following:  
 
City Council Adopted: [Add Adoption Date] 
 
 
 
2. 
The developer shall construct all streets within and adjacent to the development 
with paving, curb, gutter, sidewalk, curb ramps, streetlights, median islands, 
landscaping and other incidentals, as per plans approved by the Planning and 
Development Department. All improvements shall comply with all ADA 
accessibility standards. 
 
 
3. 
This parcel is in a Special Flood Hazard Area (SFHA) called Zone A, on panel 
2230 M of the Flood Insurance Rate Maps (FIRM) dated September 18, 2020. 
The following requirements shall apply, as approved by the Planning and 
Development Department: 
 
 
 
a.  The Architect/Engineer is required to show the floodplain boundary limits on 
the Grading and Drainage plan and ensure that impacts to the proposed 
facilities have been considered, following the National Flood Insurance 
Program (NFIP) Regulations (44 CFR Paragraph 60.3). This includes, but not 
limited to provisions in the latest versions of the Floodplain Ordinance of the 
Phoenix City Code. 
 
 
 
 
b. A copy of the Grading and Drainage Plan shall be submitted to the Floodplain 
Management section of Public Works Department for review and approval of 
Floodplain requirements.

Staff Report: Z-64-21-8 
August 3, 2022 
Page 11 of 11 
 
 
 
c. The developer shall provide a FEMA approved CLOMR-F or CLOMR prior to 
issuance of a Grading and Drainage permit. 
 
 
 
4. 
The property owner shall record documents that disclose the existence, and 
operational characteristics of Phoenix Sky Harbor Airport to future owners or 
tenants of the property. The form and content of such documents shall be 
according to the templates and instructions provided which have been reviewed 
and approved by the City Attorney. 
 
 
5. 
The developer shall provide a No Hazard Determination for the proposed 
development from the FAA pursuant to the FAA’s Form-7460 obstruction analysis 
review process, prior to construction permit approval, as per plans approved by 
the Planning and Development Department.   
 
 
6. 
The developer shall grant and record an avigation easement to the City of 
Phoenix for the site, per the content and form prescribed by the City Attorney prior 
to final site plan approval. 
 
 
7. 
In the event archaeological materials are encountered during construction, the 
developer shall immediately cease all ground-disturbing activities within a 33- foot 
radius of the discovery, notify the City Archaeologist, and allow time for the 
Archaeology Office to properly assess the materials. 
 
 
8. 
Prior to preliminary site plan approval, the landowner shall execute a Proposition 
207 waiver of claims form. The waiver shall be recorded with the Maricopa 
County Recorder's Office and delivered to the City to be included in the rezoning 
application file for record. 
 
 
Writer 
Sarah Stockham 
August 3, 2022 
 
Team Leader 
Racelle Escolar 
 
Exhibits 
Sketch Map 
Aerial Map 
Conceptual Site Plan date stamped November 30, 2021 
Conceptual Elevations date stamped November 30, 2021 (18 pages) 
Banyan Residential PUD development narrative date stamped May 23, 2022

Z-110-03
Z-116-87
Z-SP-25-86
Z-110-03
Z-23-14
Z-110-03
Z-116-87
Z-17-16
Z-SP-12-86
Z-83-04
Z-6-07
Z-108-03
Z-119-03
*
*
*
*
*
C-2 M-R
Z-13-20
A-2 HP
A-1
A-2
HGT/WVR
DNS/WVR
A-2 HP
C-2
PUD
A-1
HP-L
A-2 
HP-L
A-2
 HP
A-2 
HP-L
A-2 
HP-L
M-R
A-2
A-2 HP
C-2 M-R *
Z-176-86
45TH ST
MADISON ST
50TH ST
DUPONT CIR
WASHINGTON ST
SR202 RMP
48TH ST
SR143 RMP
£
¤
143
7TH ST
24TH ST
40TH ST
32ND ST
16TH ST
BETHANY HOME RD
NORTHERN AVE
GLENDALE AVE
CAMELBACK RD
INDIAN SCHOOL RD
THOMAS RD
MC DOWELL RD
VAN BUREN ST
WASHINGTON ST
48TH ST
56TH ST
64TH ST
SR 51
CAMELBACK EAST VILLAGE
CITY COUNCIL DISTRICT: 8
I
APPLICANT'S NAME:
APPLICATION NO.
Z-64-21
GROSS AREA INCLUDING 1/2 STREET
AND ALLEY DEDICATION IS APPROX.
17.82 Acres
MULTIPLES PERMITTED
*   Maximum Units Allowed with P.R.D. Bonus
A-2
PUD
CONVENTIONAL OPTION
N/A
N/A
*   UNITS P.R.D. OPTION
N/A
583
Odyssey Group Holdings, LLC
DATE:
10/11/2021
REVISION DATES:
AERIAL PHOTO &
QUARTER SEC. NO.
QS 10-38
ZONING MAP
F-11
REQUESTED CHANGE:
FROM: A-2 ( 17.82 a.c.)
TO:
PUD ( 17.82 a.c.)
Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\2021\Z-64-21.mxd
Z-64-21
0.085
0
0.085
0.0425
Miles

Z-110-03
Z-116-87
Z-SP-25-86
Z-110-03
Z-23-14
Z-110-03
Z-116-87
Z-17-16
Z-SP-12-86
Z-83-04
Z-6-07
Z-108-03
Z-119-03
*
*
*
*
*
C-2 M-R
Z-13-20
A-2 HP
A-1
A-2
HGT/WVR
DNS/WVR
A-2 HP
C-2
PUD
A-1
HP-L
A-2 
HP-L
A-2
 HP
A-2 
HP-L
A-2 
HP-L
M-R
A-2
A-2 HP
C-2 M-R *
Z-176-86
45TH ST
MADISON ST
50TH ST
DUPONT CIR
WASHINGTON ST
SR202 RMP
48TH ST
SR143 RMP
£
¤
143
Maricopa County Assessor's Office
7TH ST
24TH ST
40TH ST
32ND ST
16TH ST
BETHANY HOME RD
NORTHERN AVE
GLENDALE AVE
CAMELBACK RD
INDIAN SCHOOL RD
THOMAS RD
MC DOWELL RD
VAN BUREN ST
WASHINGTON ST
48TH ST
56TH ST
64TH ST
SR 51
CAMELBACK EAST VILLAGE
CITY COUNCIL DISTRICT: 8
I
APPLICANT'S NAME:
APPLICATION NO.
Z-64-21
GROSS AREA INCLUDING 1/2 STREET
AND ALLEY DEDICATION IS APPROX.
17.82 Acres
MULTIPLES PERMITTED
*   Maximum Units Allowed with P.R.D. Bonus
A-2
PUD
CONVENTIONAL OPTION
N/A
N/A
*   UNITS P.R.D. OPTION
N/A
583
Odyssey Group Holdings, LLC
DATE:
10/11/2021
REVISION DATES:
AERIAL PHOTO &
QUARTER SEC. NO.
QS 10-38
ZONING MAP
F-11
REQUESTED CHANGE:
FROM: A-2 ( 17.82 a.c.)
TO:
PUD ( 17.82 a.c.)
Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\2021\Z-64-21.mxd
Z-64-21
0.085
0
0.085
0.0425
Miles

E. WASHINGTON  ST.
 S. 48TH ST.
WH
3
2
4
1
1
1
RECYCLE
COMPACTOR
PHASE 2
FIRE TURNING
GATES
GATES KEY PAD
MAINT.
RECYCLE
COMPACTOR
KEY PAD
26' DRIVE TYP.
(ASPHALT)
8.5'x18' TYP.
8.5'x18' TYP.
8.5'x18' TYP.
8.5'x18' TYP.
8.5'x18' TYP.
8.5'x18' TYP.
FDC
FDC
FDC
FDC
FDC
FDC
POOL
SPA
FIRE
PIT
TURF
CABANAS
CABANAS
POOL
FIRE
PIT
RAMADA
RAMADA
TURF
GATES
26' DRIVE TYP.
(ASPHALT)
26' DRIVE TYP.
(ASPHALT)
26' DRIVE TYP.
(ASPHALT)
26' DRIVE TYP.
(ASPHALT)
26' DRIVE TYP.
(ASPHALT)
26' DRIVE TYP.
(ASPHALT)
26' DRIVE TYP.
(ASPHALT)
0"
SETBACK
0" SETBACK
0"
SETBACK
20'-0" MIN.
SETBACK
20'-0" MIN.
SETBACK
20'-0" MIN.
SETBACK
PED.
GATE
8.5'x38'
BACK TO
BACK
8.5'x18' TYP.
CAR WASH
LEASING/
CLUBHOUSE
FITNESS
LEASING/
CLUBHOUSE
FITNESS
OPEN
SPACE
6'-0" VIEW FENCE
EXISTING POWER
POLE, TYP.
EXISTING POWER
POLE, TYP.
EXISTING POWER
POLE, TYP.
EXISTING POWER
POLE, TYP.
LOADING
LOADING
LOADING
8.5'x19' TYP.
12
8
7
8
6
12
12
12
11
12
6
6
9
9
9
9
10
9
11
12
11
11
7
4
13
6
7
2
7
5
7
4
10
10
12
12
11
11
12
9
7
7
10
10
4
5
9
8
7
7
9
7
6
6
11
3
10
10
5
5
5
5
EXIT ONLY
MAIN ENTRY
SECONDARY
ENTRY/ EXIT
EXISTING SIGN
SOUND WALL
EXISTING SIGN
COMMERCIAL
A-2 ZONING
COMMERCIAL
A-2 ZONING
HIGHWAY 143
PHASE LINE
PHASE
LINE
EXISTING FIRE
HYDRANT
EXISTING POWER
POLE, TYP.
EXISTING FIRE
HYDRANT
EXISTING FIRE
HYDRANT
EXISTING POWER
POLE, TYP.
EXISTING FIRE
HYDRANT
EXISTING POWER
POLE, TYP.
EXISTING POWER
POLES, TYP.
EXISTING POWER
POLE, TYP.
EXISTING POWER
POLE, TYP.
4
5
4
4
4
4
4
3
4
3
3
4
4
4
4
4
4
4
5
9
7
10
7
10
7
4
4
4
4
RIGHT TURN
ENTRY & RIGHT
TURN EXIT ONLY
FIRE TURNING
30'-0"
30'-0"
12
3
7
PARK
DOG PARK
BIKE STORAGE/REPAIR
7
7
7
8
TANDEM P.S.
3
10
3
3
10
10
10
TANDEM P.S.
GARAGES
8
8
PET WASH
4
11
11
OPEN
SPACE
TANDEM P.S.
TANDEM P.S.
GARAGES
GARAGES
OPEN
SPACE
8'-0" WIDE
SIDEWALK
8'-0" WIDE
SIDEWALK
GARAGES
TANDEM P.S.
8
8
8.5'x38'
BACK TO
BACK
8.5'x38'
BACK TO
BACK
3
3
6'-0" VIEW FENCE
15
3
10
5
10
10
3
4
7'-0"
LOADING
12
LOADING
30'-0"
PARKING
SETBACK
66'-11" PARKING
SETBACK
LOADING
30'-0"
PARKING
SETBACK
6" CURB
12' 5'
6" CURB
6" CURB
6" CURB
6" CURB
6" CURB
6" CURB
6" CURB
6" CURB
6" CURB
6" CURB
6" CURB
6" CURB
6" CURB
6" CURB
6" CURB
6" CURB
11' 5'11'
11'
5'
11'
8'-6"
8'-6"
8'-6"
8'-6"
2'-6"
15'-6"
2'-6"
15'-6"
19'-0" 19'-0"
26'-0" 15'-6" 2'-6"
2'-6" 15'-6"
2'-6" 15'-6"
2'-6" 15'-6"
2'-6" 15'-6"
2'-6" 15'-6"
2'-6" 15'-6"
2'-6"
15'-6"
2'-6"
15'-6"
26'-0"
8'-6"
12' 5'
26-0"
26'-0"
26'-0"
8'-0"
6'-6"
26'-0"
6'-6"15'-6" 26'-0"
19'-0" 19'-0"
26'-0" 15'-6" 8'-0"
15'-6" 2'-6"
9'-0"
8'-6"
8'-6"
8'-6"
8'-6"
11' 5'
38'-0"
38'-0"
8'-6"
8'-6"
15'-6"
2'-6"
2'-6"
15'-6"
15'-6"
2'-6"
15'-6"
2'-6"
5' 11'
9'-0"
9'-0"
9'-0"
8'-6"
18'-0"
18'-0"
5'
11'
26'-0"
26'-0"
26'-0"
5'-0"
8'-8"
5'-0"
6'-0"
5'-0"
12'-6"
7'-10"
13'-4"
5'-6"
4'-0"
5'-0"
8'-0"
5'-0"
5'-0"
7'-0"
6'-0"
6'-0"
6'-0"
11'
11'
5'
6'-0"
6'-0"
6'-0"
48'-0"
SCREEN WALL
6'-0"
8'-6"
GARAGES
PED.
GATE
PED.
GATE
PED.
GATE
54'-0"
30'-0" MAX.
SETBACK
30'-0" MIN.
SETBACK
30'-0" MAX.
SETBACK
20'-0" MIN.
SETBACK
30'-0" MAX.
SETBACK
+
TODD
ASSOCIATES
20-2025-00
Apartments @ SWC 48th St. & E. Washington St.
Phoenix, Arizona
PUD RE-ZONING
11-05-2021
BANYAN RESIDENTIAL
11-05-21
CONCEPTUAL SITE PLAN
A1.1
OWNER:  
BANYAN RESIDENTIAL
2411 THIRD STREET, UNIT E
SANTA MONICA, CA. 90405
CONTACT - MAX FRIEDMAN
240-620-6298
DESIGNER OF RECORD:
TODD & ASSOCIATES, INC.
4019 N. 44th STREET
PHOENIX, AZ.  85018
602-952-8280
ANTHONY JAURIGUE
A NEW 4-STORY FOR RENT MULTI-FAMILY RESIDENTIAL DEVELOPMENT WITH
CLUBHOUSE, FITNESS AND TUCKED UNDER GARAGES UNDER  ON THE FIRST
FLOORS OF THE BUILDINGS.  THE PROJECT WILL CONSIST OF STUDIO, ONE,
TWO AND THREE BEDROOM UNITS. THE AMENITIES TO INCLUDE FITNESS,
POOL, BBQ AREAS, COURTYARD, CABANAS AND PEDESTRIAN PATHWAYS.
BUILDING HEIGHT:
PROPOSED:................... 4 STORY MAXIMUM (48'-0" MAXIMUM)
PROJECT DESCRIPTION:
GENERAL ZONING ANALYSIS:
BUILDING SETBACKS:
PRIMARY FRONTAGE (WASHINGTON ST).............. 20' MIN. - 30' MAX.
ADJACENT TO PROPERTY LINE (48TH ST)............... 20' MIN. - 30' MAX
SIDE .......................................................................... 0'-0"
REAR ........................................................................ 0'-0"
LOADING AREA:
REQUIRED............. 4 - 10' x 30' LOADING AREA
PROVIDED............ 5 - 10' x 30' LOADING AREA
PARKING STANDARDS:
PARKING STALL ..............................................................
8'-6" X 18'-0"
   (or 15'-6" deep w/ 2'-6" overhang)
COMPACT PARKING STALL (10% MAX) .........................   8'-0" x 16'-0
ACCESSIBLE PARKING STALL ......................................... 11'-0" X 18'-0"
PARKING AISLE (FIRE LANE) ......................................................   26'-0"
STANDARD LANE .......................................................................   25'-0"
GENERAL BUILDING CODE ANALYSIS:
PROPOSED USE:.....................................
MULTI-FAMILY RESIDENTIAL
    OCCUPANCIES / CONSTRUCTION TYPE:
RESIDENTIAL UNITS ...................................... R-2:
TYPE VA
ATTACHED GARAGES ................................ S-2:
TYPE VA
OFFICE / LEASING ......................................
B: 
TYPE VB
FITNESS / CLUBHOUSE ................................
A-3:
TYPE VB
MAINTENANCE ........................................... S-2: 
TYPE VB
FIRE SPRINKLER SYSTEM:
RESIDENTIAL UNITS, ATTACHED GARAGES,
OFFICE, LEASING, FITNESS, CLUBHOUSE
AND MAINTENANCE BLDG ........................ NFPA 13
124-10-038, -017D, -021B, -023G
ACCESSOR'S PARCEL NUMBER:
LANDSCAPE SETBACKS:
PRIMARY FRONTAGE (WASHINGTON ST).............. 25'-0"
ADJACENT TO PROPERTY LINE (48TH ST)............... 25'-0"
SIDE .......................................................................... 0'-0"
REAR ........................................................................ 0'-0"
PARKING SETBACKS:
WASHINGTON STREET......................... 30'-0" MINIMUM
48th STREET.......................................... 30'-0" MINIMUM
BUILDING FRONTAGE:
WASHINGTON STREET......................... 71.1%
48th STREET.......................................... 57.0%
GLAZING % ALONG STREET FRONTAGE:
WASHINGTON STREET
GROUND FLOOR........................... 25%
SECOND FLOOR ........................... 27%
48th STREET
GROUND FLOOR .......................... 24%
SECOND FLOOR ........................... 25%
PARCEL A SITE AREA:
GROSS ACRES:................................  ± 17.84 ACRES (777,110.4 S.F.)
           PHASE I ................  ± 10.81 ACRES (470,883.6 S.F.)
           PHASE II ...............  ±   7.04 ACRES (306,662.4 S.F.)
NET ACRES:......................................  ± 15.98 ACRES (696,088.8 S.F.)
           PHASE I ................  ± 9.10 ACRES (409,465.0 S.F.)
           PHASE II ...............  ± 6.58 ACRES (286,624.8 S.F.)
ZONING:
EXISTING.........................  A-2
PROPOSED...................... PUD (T5:5)
DENSITY:
PROPOSED: ........................................ ±29.37
PHASE I ................  ±29.70 D.U./GROSS ACRE
PHASE II ...............  ±27.57 D.U./GROSS ACRE
UNIT MIX:
UNIT TYPE               PHASE I                  PHASE 2                 TOTAL
STUDIO                   59 D.U. (19%)        43 D.U. (23%)         102 D.U. (20%)
1 BEDROOM          119 D.U. (37%)       81 D.U. (41%)         200 D.U. (29%)
2 BEDROOM          134 D.U. (41%)       64 D.U. (33%)         198 D.U. (38%)
3 BEDROOM             9 D.U. (3% )           6 D.U. (3%)            15 D.U. (3%)
TOTAL                    321D.U. (100%)     194 D.U. (100%)     515 D.U. (100%)
OPEN SPACE CALCULATIONS:
REQUIRED OPEN SPACE:
5% OF ±17.84 ACRES = ±0.89 ACRES (±38,866 S.F.)
PROVIDED OPEN SPACE:
PRIVATE OPEN SPACE...............  ±145,498 S.F.          18.7%
PUBLIC OPEN SPACE                   ± 56,987 S.F.           7.3%
TOTAL                                            ±202,485 S.F.          26.0%
REQUIRED PARKING PHASE 2
      STUDIO -           1.3 P.S./D.U. x 43 D.U.=    56 P.S.
      1 BEDROOM -   1.5 P.S./D.U. x 81 D.U.=  121 P.S.
      2 BEDROOM -  1.5 P.S./D.U. x 64 D.U.=    99 P.S.
     3 BEDROOM -  2.0 P.S./D.U. x   6  D.U.=   12 P.S.
      TOTAL                                                        288 P.S. (1.48 P.S./ D.U.)
UNRESERVED PARKING REQUIRED
      0.5 P.S. x 188 D.U. =    94 P.S.
     1.0 P.S. x     6 D.U.=       6 P.S.
                                        100 P.S.
PROVIDED PARKING PHASE 2
    SURFACE UNCOVERED                            150 P.S.
          (INCLUDES 99 UNRESERVED P.S.)
   SURFACE CARPORT                                 175 P.S.
   ATTACHED GARAGE                                  8 P.S.
     SURFACE TANDEM                                   26 P.S.
      TOTAL                                                        359 P.S. (1.86 P.S. / D.U.)
(HANDICAP PARKING PROVIDED AT 2% =  8 P.S.)
   SURFACE PARKING              2 P.S.
   SURFACE VAN PARKING     1 P.S.
   CARPORT PARKING             2 P.S.
   CARPORT VAN PARKING    1 P.S.
  ATTACHED GARAGE           2 P.S.
 (UNRESERVED PARKING PROVIDED 99 P.S.)
 (RESERVED PARKING PROVIDED 260 P.S.)
TOTAL PARKING PROVIDED PHASE I & 2:
     SURFACE UNCOVERED                            341 P.S.
           (INCLUDES 267 UNRESERVED P.S.)
    SURFACE CARPORT                                 450 P.S.
    ATTACHED GARAGE                                 69 P.S.
     SURFACE TANDEM                                    41 P.S.
      TOTAL                                                        901 P.S. (1.86 P.S. / D.U.)
(HANDICAP PARKING PROVIDED AT 2% =  19 P.S.)
   SURFACE PARKING              5 P.S.
   SURFACE VAN PARKING     2 P.S.
   CARPORT PARKING             5 P.S.
   CARPORT VAN PARKING    2 P.S.
   ATTACHED GARAGE           5 P.S.
(UNRESERVED PARKING PROVIDED 267 P.S.)
(RESERVED PARKING PROVIDED 634 P.S.)
PARKING:
REQUIRED PARKING PHASE I
       
STUDIO - 1.3 P.S./D.U. x 59D.U.=               77 P.S.
      
1 BEDROOM - 1.5 P.S./D.U. x 119 D.U.=   178 P.S.
      
2 BEDROOM - 1.5 P.S./D.U. x 134 D.U.=  201 P.S.
      
3 BEDROOM - 2.0 P.S./D.U. x     9  D.U.=   18 P.S.
     
TOTAL                                                        474 P.S. (1.48 P.S./ D.U.)
 UNRESERVED PARKING REQUIRED
      0.5 P.S. x 312 D.U. =  156 P.S.
     1.0 P.S. x     9 D.U.=        9 P.S.
    165 P.S.
 PROVIDED PARKING PHASE I
SURFACE UNCOVERED                            191 P.S.
       
(INCLUDES 168 UNRESERVED P.S.)
    
SURFACE CARPORT                                 275 P.S.
   
ATTACHED GARAGE                               43 P.S.
     
SURFACE TANDEM                                   43 P.S.
    
TOTAL                                                        542 P.S. (1.70 P.S. / D.U.)
  (HANDICAP PARKING PROVIDED AT 2% = 11 P.S.)
SURFACE PARKING              3 P.S.
     
SURFACE VAN PARKING     1 P.S.
    
CARPORT PARKING             3 P.S.
   
CARPORT VAN PARKING    1 P.S.
    
ATTACHED GARAGE           3 P.S.
 (UNRESERVED PARKING PROVIDED 168 P.S.)
 (RESERVED PARKING PROVIDED 374 P.S.)
LOT COVERAGE:
PROVIDED :
PHASE I                  ±141,973 SF/ NET SITE AREA......34.0%
PHASE 2
± 83,444 SF/ NET SITE AREA ..... 29.1%
PHASE I AND 2 
± 225,417 SF/NET SITE AREA .... 32.4 %
BIKE PARKING PROVIDED:
BIKE STORAGE / REPAIR......................20
BIKE RACKS..........................................
SCALE:
0"
25'
50'
100'
1" = 50'-0"
MDEV/SDEV NO.  
2100187
PAPP NO.  
2102806
DSD KIVA NO.  
21-1644
VILLAGE 
CAMELBACK EAST
ZONING MAP 
F11
QUARTER SECTION NO.
10-38
PRE-APPLICATION MEETING
05-11-2021
1. DEVELOPMENT AND USE OF THIS SITE WILL CONFORM
TO ALL APPLICABLE CODES AND ORDINANCES.
2. ALL NEW OR RELOCATED UTILITIES WILL BE PLACED
UNDERGROUND.
3. ANY LIGHTING WILL BE PLACED SO AS TO DIRECT
LIGHT AWAY FROM ADJACENT RESIDENTIAL DISTRICTS
AND WILL NOT EXCEED ONE FOOT CANDLE AT THE
PROPERTY LINE. NO NOISE, ODOR, OR VIBRATION
WILL BE EMITTED AT ANY LEVEL EXCEEDING THE
GENERAL LEVEL OF NOISE, ODOR, OR VIBRATION
EMITTED BY USES IN THE AREA OUTSIDE OF THE SITE.
4. OWNERS OF THE PROPERTY ADJACENT TO PUBLIC
RIGHT-OF-WAY WILL HAVE RESPONSIBILITY FOR
MAINTAINING ALL LANDSCAPING LOCATED WITHIN
THE RIGHTS-OF-WAY, IN ACCORDANCE WITH
APPROVED PLANS.
5. ALL ROOFTOP EQUIPMENT AND SATELLITE DISHES
SHALL BE SCREENED TO THE HEIGHT OF THE TALLEST
EQUIPMENT.
6. ALL SERVICE AREAS SHALL BE SCREENED TO
CONCEAL TRASH CONTAINERS, LOADING DOCKS,
TRANSFORMERS, BACKFLOW PREVENTERS AND OTHER
MECHANICAL OR ELECTRICAL EQUIPMENT FROM EYE
LEVEL ADJACENT TO ALL PUBLIC STREETS.
7. ALL SIGNS REQUIRE SEPARATE PERMITS & APPROVALS.
I CONSENT TO THE REPRODUCTION OF THIS SITE PLAN FOR THE
FUTURE PURPOSE OF AMENDMENTS PROVIDED THAT IF
MODIFICATIONS ARE MADE, THE ARCHITECT THAT MAKES SUCH
CHANGES ASSUMES FULL RESPONSIBILITY AND LIABILITY FOR  THE
PLAN.
SIGNATURE OF COPYRIGHT OWNER
GARY TODD
PRINT NAME OF COPYRIGHT OWNER
PARKING CANOPY
PRIVATE ACCESSIBLE ROUTE WITH MIN. CLEAR
WIDTH OF 3'-0". MAX. SLOPE OF 5% AND MAX.
CROSS SLOPE OF 2%
PUBLIC ACCESSIBLE ROUTE WITH MIN. CLEAR WIDTH
OF 3'-0". MAX. SLOPE OF 5% AND MAX. CROSS SLOPE
OF 2% & TO INCLUDE TRUNCATED DOMES WHERE
TRANSVERSES DRIVE AISLE
+ + +
1
ACCESSIBLE PARKING SPACE
BUILDING SEQUENCE
BUILDING NUMBER
NUMBER OF STORIES
FINISH FLOOR ELEVATION - VERIFY WITH CIVIL
NEW FIRE HYDRANT
F.D.C. CONNECTION
KNOX BOX LOCATION PER PHOENIX FIRE DEPT.
REQUIREMENTS
K
+
FIRE TRUCK TURNING RADIUS INSIDE TURNING RADIUS
35'-0" MIN. OUTSIDE TURNING RADIUS 55'-0" MAX.
BUILDING ENTRANCE
TRANSFORMER
MP
METER PACK, REFER TO ELECTRICAL PLANS
T
CAR CHARGER 
BUILDING IBC GROSS SQUARE FOOTAGE:
RESIDENTIAL BUILDINGS:
BUILDING TYPE 1:
1st FLOOR (stair and elevator s.f.)..........
21,000 S.F.
2nd FLOOR ..............................................
20,543 S.F.
3rd FLOOR ...............................................
20,543 S.F.
4th FLOOR ...............................................
20,543 S.F.
SUB-TOTAL S.F.
 
82,629 S.F.
BUILDING TYPE 2:
1st FLOOR (stair and elevator s.f.)..........
21,243 S.F.
2nd FLOOR ..............................................
20,716 S.F.
3rd FLOOR ...............................................
20,709 S.F.
4th FLOOR ...............................................
20,709 S.F.
SUB- TOTAL S.F.
            
83,377 S.F.
BUILDING TYPE 3:
1st FLOOR (stair and elevator s.f.)..........
20,584 S.F.
2nd FLOOR ..............................................
20,066 S.F.
3rd FLOOR ...............................................
20,066 S.F.
4th FLOOR ...............................................
20,066 S.F.
SUB- TOTAL S.F.
            
80,782 S.F.
BUILDING TYPE 4:
1st FLOOR (stair and elevator s.f.)
RESIDENCE......................................... 25,195 S.F.
CLUBHOUSE.......................................     7,988 S.F.
2nd FLOOR
RESIDENCE......................................... 27,016 S.F.
CLUBHOUSE.......................................     2,677 S.F
3rd FLOOR ................................................ 32,619 S.F.
4th FLOOR ................................................ 32,619 S.F.
SUB- TOTAL S.F.
           
128,114 S.F.
SQUARE FOOTAGE DEFINITION:
GROSS BUILDING S.F. = THE BUILDING GROSS AREA IS
MEASURED FROM THE OUTSIDE FACE OF THE EXTERIOR STUD
OF THE BUILDING.  AREA INCLUDES BUILDING FRAME-OUTS,
PATIOS, BALCONIES, BREEZEWAYS & PATIO/BALCONY
STORAGE ROOMS.
BUILDING IBC GROSS SQUARE FOOTAGE CONT.:
BUILDING TYPE 5:
1st FLOOR (stair and elevator s.f.)
RESIDENCE......................................... 27,235 S.F.
CLUBHOUSE.......................................  7,722 S.F.
2nd FLOOR
RESIDENCE......................................... 28,981 S.F.
CLUBHOUSE.......................................    2,700 S.F.
3rd FLOOR ................................................ 34,026 S.F.
4th FLOOR ................................................ 34,026 S.F.
SUB- TOTAL S.F.
           
134,690 S.F.
BUILDING TYPE 6:
1st FLOOR (stair and elevator s.f.)..........
23,272 S.F.
2nd FLOOR ..............................................
22,726 S.F.
3rd FLOOR ...............................................
22,726 S.F.
4th FLOOR ...............................................
22,726 S.F.
SUB- TOTAL S.F.
            
91,450 S.F.
BUILDING GRAND TOTAL S.F.
601,042 S.F.
MAINTENANCE BUILDING:
1st FLOOR ...........................................    
   1,750 S.F.
SCALE: N.T.S.
WASHINGTON
VAN BUREN
202 FREEWAY
143 HIGHWAY
48th ST.
44th ST.
SKY HARBOR BLVD.
R.R. TRACKS
SITE

0'-0"
FINISH FLOOR
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0"
T.O. STAIR
STUCCO
A
CMU
D
STUCCO
B
SIDING
E
AWNING
C
STUCCO
B
RAILING
F
STUCCO
A
EYEBROW
C
STUCCO
B
STUCCO
A
SIDING
E
STUCCO
B
EYEBROW
C
RAILING
F
STUCCO
A
STUCCO
A
STUCCO
A
SIDING
E
STUCCO
B
CMU
D
EYEBROW
C
PAINT
B
STUCCO
B
AWNING
C
CMU
D
AWNING
C
AWNING
C
0'-0"
FINISH FLOOR
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0"
T.O. STAIR
STUCCO
A
SIDING
E
RAILING
F
CMU
B
STUCCO
D
STUCCO
E
SIDING
A
AWNING
C
0'-0"
FINISH FLOOR
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0"
T.O. STAIR
STUCCO
A
CMU
D
STUCCO
B
SIDING
E
STUCCO
A
RAILING
F
STUCCO
B
STUCCO
A
RAILING
F
STUCCO
B
STUCCO
A
STUCCO
B
STUCCO
A
STUCCO
B
RAILING
F
GARAGE
DOOR
B
GARAGE
DOOR
B
GARAGE
DOOR
B
GARAGE
DOOR
B
GARAGE
DOOR
B
GARAGE
DOOR
B
GARAGE
DOOR
B
CMU
D
AWNING
C
AWNING
C
0'-0"
FINISH FLOOR
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0"
T.O. STAIR
STUCCO
A
STUCCO
A
CMU
D
SIDING
E
1
SCALE: 1/16" = 1'-0"
3
SCALE: 1/16" = 1'-0"
2
SCALE: 1/16" = 1'-0"
4
SCALE: 1/16" = 1'-0"
+
TODD
ASSOCIATES
20-2025-00
Apartments @ SWC 48th St. & E. Washington St.
Phoenix, Arizona
PUD SUBMITTAL
06-23-2021
BANYAN RESIDENTIAL
06-23-21
BUILDING 1 -  EXTERIOR
ELEVATIONS
A4.1.1
A
B
F
LOCATION
MANUFACTURER
PAINT #1
METAL RAILING,
AWNINGS &
CANOPIES
PAINT #2
C
ACCENT PAINT
D
E
CMU
G
COLOR
SW 6005
"FOLKSTONE"
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SW 7757
"HIGH REFLECTIVE
WHITE"
SW 6005
"FOLKSTONE"
SW 9133 (ACCENT)
"JASPER STONE"
"BONE"
8x8x16
GROUND FACE
STOREFRONT
ARCADIA
DARK BRONZE
ALUMINUM
SUPERLITE
STACK BOND
SIDING
PAC-CLAD
7" FLUSH PANEL
CHERRYWOOD
OAK
3
2
4
1
MDEV/SDEV NO.  
2100187
PAPP NO.  
2102806
DSD KIVA NO.  
21-1644
VILLAGE 
CAMELBACK EAST
ZONING MAP 
F11
QUARTER SECTION NO.
10-38
PRE-APPLICATION MEETING
05-11-2021

0'-0"
FINISH FLOOR
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+41’-0”
T. O. PLATE
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+48'-0”
T.O.PARAPET 2
E
A
SIDING
STUCCO
C
B
EYEBROW
STUCCO
A
STUCCO
0'-0"
FINISH FLOOR
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+41’-0”
T. O. PLATE
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+48'-0”
T.O.PARAPET 2
STUCCO
B
STUCCO
B
STUCCO
A
CMU
D
EYEBROW
C
STUCCO
B
STUCCO
B
STUCCO
A
SIDING
E
STUCCO
B
EYEBROW
C
EYEBROW
C
STUCCO
A
RAILING
F
STUCCO
A
SIDING
E
CMU
D
0'-0"
FINISH FLOOR
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+41’-0”
T. O. PLATE
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+48'-0”
T.O.PARAPET 2
+54'-0"
T.O. STAIR
STUCCO
A
EYEBROW
C
E
SIDING
E
STUCCO
B
STUCCO
B
CMU
D
STUCCO
A
EYEBROW
C
STUCCO
B
C
EYEBROW
SIDING
CMU
D
AWNING
C
0'-0"
FINISH FLOOR
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+41’-0”
T. O. PLATE
+46'-0"
T.O. PARAPET 1
+48'-0”
T.O.PARAPET 2
STUCCO
STUCCO
A
F
RAILING
B
0'-0"
FINISH FLOOR
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+41’-0”
T. O. PLATE
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+48'-0”
T.O.PARAPET 2
+54'-0"
T.O. STAIR
STUCCO
A
E
SIDING
STUCCO
B
STUCCO
B
B
STUCCO
AWNING
C
CMU
D
2
SCALE: 1/16" = 1'-0"
1
SCALE: 1/16" = 1'-0"
3
SCALE: 1/16" = 1'-0"
5
SCALE: 1/16" = 1'-0"
4
SCALE: 1/16" = 1'-0"
+
TODD
ASSOCIATES
20-2025-00
Apartments @ SWC 48th St. & E. Washington St.
Phoenix, Arizona
PUD SUBMITTAL
06-23-2021
BANYAN RESIDENTIAL
06-23-21
BUILDING 2 -  EXTERIOR
ELEVATIONS
A4.2.1
+
TODD
ASSOCIATES
20-2025-00
Apartments @ SWC 48th St. & E. Washington St.
Phoenix, Arizona
PUD SUBMITTAL
06-23-2021
BANYAN RESIDENTIAL
06-23-21
A
B
F
LOCATION
MANUFACTURER
PAINT #1
METAL RAILING,
AWNINGS &
CANOPIES
PAINT #2
C
ACCENT PAINT
D
E
CMU
G
COLOR
SW 6005
"FOLKSTONE"
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SW 7757
"HIGH REFLECTIVE
WHITE"
SW 6005
"FOLKSTONE"
SW 9133 (ACCENT)
"JASPER STONE"
"BONE"
8x8x16
GROUND FACE
STOREFRONT
ARCADIA
DARK BRONZE
ALUMINUM
SUPERLITE
STACK BOND
SIDING
PAC-CLAD
7" FLUSH PANEL
CHERRYWOOD
OAK
3
4
5
2
1
MDEV/SDEV NO.  
2100187
PAPP NO.  
2102806
DSD KIVA NO.  
21-1644
VILLAGE 
CAMELBACK EAST
ZONING MAP 
F11
QUARTER SECTION NO.
10-38
PRE-APPLICATION MEETING
05-11-2021

0'-0"
FINISH FLOOR
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0"
T.O. STAIR
E
A
SIDING
STUCCO
STUCCO
A
STUCCO
B
0'-0"
FINISH FLOOR
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+41’-0”
T. O. PLATE
+46'-0"
T.O. PARAPET 1
+48'-0”
T.O.PARAPET 2
+54'-0"
T.O. STAIR
GARAGE
DOOR
B
GARAGE
DOOR
B
STUCCO
A
STUCCO
B
STUCCO
A
F
STUCCO
B
RAILING
D
CMU
GARAGE
DOOR
B
AWNING
C
GARAGE
DOOR
B
AWNING
C
STUCCO
A
B
STUCCO
0'-0"
FINISH FLOOR
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+41’-0”
T. O. PLATE
+48'-0”
T.O.PARAPET 2
STUCCO
B
F
RAILING
3
SCALE: 1/16" = 1'-0"
2
SCALE: 1/16" = 1'-0"
+
TODD
ASSOCIATES
20-2025-00
Apartments @ SWC 48th St. & E. Washington St.
Phoenix, Arizona
PUD SUBMITTAL
06-23-2021
BANYAN RESIDENTIAL
06-23-21
BUILDING 2 -  EXTERIOR
ELEVATIONS
A4.2.2
+
TODD
ASSOCIATES
20-2025-00
Apartments @ SWC 48th St. & E. Washington St.
Phoenix, Arizona
PUD SUBMITTAL
06-23-2021
BANYAN RESIDENTIAL
06-23-21
A
B
F
LOCATION
MANUFACTURER
PAINT #1
METAL RAILING,
AWNINGS &
CANOPIES
PAINT #2
C
ACCENT PAINT
D
E
CMU
G
COLOR
SW 6005
"FOLKSTONE"
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SW 7757
"HIGH REFLECTIVE
WHITE"
SW 6005
"FOLKSTONE"
SW 9133 (ACCENT)
"JASPER STONE"
"BONE"
8x8x16
GROUND FACE
STOREFRONT
ARCADIA
DARK BRONZE
ALUMINUM
SUPERLITE
STACK BOND
SIDING
PAC-CLAD
7" FLUSH PANEL
CHERRYWOOD
OAK
3
2
1
1
SCALE: 1/16" = 1'-0"
MDEV/SDEV NO.  
2100187
PAPP NO.  
2102806
DSD KIVA NO.  
21-1644
VILLAGE 
CAMELBACK EAST
ZONING MAP 
F11
QUARTER SECTION NO.
10-38
PRE-APPLICATION MEETING
05-11-2021

0'-0"
FINISH FLOOR
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0”
T.O.STAIR
STUCCO
C
A
E
SIDING
AWNING
CMU
D
B
STUCCO
0'-0"
FINISH FLOOR
+52'-0”
T.O.PARAPET 3
+46-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0”
T.O STAIR
STUCCO
A
CMU
D
STUCCO
STUCCO
B
A
F
RAILING
STUCCO
STUCCO
B
A
F
RAILING
C
STUCCO
B
CMU
D
AWNING
STUCCO
B
SIDING
E
C
EYEBROW
C
EYEBROW
STUCCO
A
STUCCO
B
G ALUMINUM
STOREFRONT
0'-0"
FINISH FLOOR
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+41’-0”
T. O. PLATE
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+48'-0”
T.O.PARAPET 2
STUCCO
A
RAILING
F
CMU
D
G ALUMINUM
STOREFRONT
STUCCO
B
0'-0"
FINISH FLOOR
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54-0”
T.O.STAIR
+52'-0”
T.O.PARAPET 3
STUCCO
SIDING
A
E
STUCCO
B
RAILING
F
CMU
D
AWNING
C
CMU
D
STUCCO
B
STUCCO
A
EYEBROW
C
STUCCO
B
0'-0"
FINISH FLOOR
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0”
T.O.STAIR
STUCCO
A
E
RAILING
F
CMU
D
SIDING
STUCCO
B
AWNING
C
0'-0"
FINISH FLOOR
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0”
T.O.STAIR
A
RAILING
F
CMU
D
STUCCO
A
B
STUCCO
STUCCO
EYEBROW
C
0'-0"
FINISH FLOOR
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
B
RAILING
F
CMU
D
STUCCO
0'-0"
FINISH FLOOR
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0"
T.O. STAIR
+52'-0”
T.O.PARAPET 3
+54-0”
T.O.STAIR
RAILING
F
GARAGE
DOOR
B
AWNING
C
STUCCO
A
STUCCO
B
GARAGE
DOOR
B
EYEBROW
C
1
SCALE: 1/16" = 1'-0"
2
SCALE: 1/16" = 1'-0"
3
SCALE: 1/16" = 1'-0"
4
SCALE: 1/16" = 1'-0"
5
SCALE: 1/16" = 1'-0"
6
SCALE: 1/16" = 1'-0"
8
SCALE: 1/16" = 1'-0"
+
TODD
ASSOCIATES
20-2025-00
Apartments @ SWC 48th St. & E. Washington St.
Phoenix, Arizona
PUD SUBMITTAL
06-23-2021
BANYAN RESIDENTIAL
BUILDING 3 -  EXTERIOR
ELEVATIONS
A4.3.1
7
SCALE: 1/16" = 1'-0"
A
B
F
LOCATION
MANUFACTURER
PAINT #1
METAL RAILING,
AWNINGS &
CANOPIES
PAINT #2
C
ACCENT PAINT
D
E
CMU
G
COLOR
SW 6005
"FOLKSTONE"
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SW 7757
"HIGH REFLECTIVE
WHITE"
SW 6005
"FOLKSTONE"
SW 9133 (ACCENT)
"JASPER STONE"
"BONE"
8x8x16
GROUND FACE
STOREFRONT
ARCADIA
DARK BRONZE
ALUMINUM
SUPERLITE
STACK BOND
SIDING
PAC-CLAD
7" FLUSH PANEL
CHERRYWOOD
OAK
4
2
5
1
7
6
3
8
MDEV/SDEV NO.  
2100187
PAPP NO.  
2102806
DSD KIVA NO.  
21-1644
VILLAGE 
CAMELBACK EAST
ZONING MAP 
F11
QUARTER SECTION NO.
10-38
PRE-APPLICATION MEETING
05-11-2021
06-23-21

0'-0"
FINISH FLOOR
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0”
T.O. STAIR
STUCCO
C
E
SIDING
AWNING
CMU
D
B
STUCCO
EYEBROW
C
F
RAILING
STUCCO
A
B
STUCCO
C
AWNING
C
AWNING
C
EYEBROW
CMU
D
STUCCO
A
STUCCO
B
A
A
STUCCO
B
STUCCO
CMU
D
STUCCO
A
B
STUCCO
STUCCO
B
0'-0"
FINISH FLOOR
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0”
T.O. STAIR
STUCCO
A
STUCCO
STUCCO
B
A
F
RAILING
CMU
D
SIDING
E
C
AWNING
STUCCO
B
F
RAILING
GARAGE
DOOR
B
GARAGE
DOOR
B
GARAGE
DOOR
B
0'-0"
FINISH FLOOR
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0”
T.O. STAIR
+54'-0"
T.O. STAIR
CMU
D
STUCCO
B
STUCCO
STUCCO
B
A
STUCCO
A
RAILING
F
STUCCO
A
E
STUCCO
STUCCO
A
B
EYEBROW
C
CMU
D
E
EYEBROW
C
RAILING
F
STUCCO
B
STUCCO
STUCCO
A
B
SIDING
SIDING
B
STUCCO
1
SCALE: 1/16" = 1'-0"
2
SCALE: 1/16" = 1'-0"
3
SCALE: 1/16" = 1'-0"
BUILDING 4 -  EXTERIOR
ELEVATIONS
A4.4.1
+
TODD
ASSOCIATES
20-2025-00
Apartments @ SWC 48th St. & E. Washington St.
Phoenix, Arizona
PUD SUBMITTAL
06-23-2021
BANYAN RESIDENTIAL
06-23-21
A
B
F
LOCATION
MANUFACTURER
PAINT #1
METAL RAILING,
AWNINGS &
CANOPIES
PAINT #2
C
ACCENT PAINT
D
E
CMU
G
COLOR
SW 6005
"FOLKSTONE"
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SW 7757
"HIGH REFLECTIVE
WHITE"
SW 6005
"FOLKSTONE"
SW 9133 (ACCENT)
"JASPER STONE"
"BONE"
8x8x16
GROUND FACE
STOREFRONT
ARCADIA
DARK BRONZE
ALUMINUM
SUPERLITE
STACK BOND
SIDING
PAC-CLAD
7" FLUSH PANEL
CHERRYWOOD
OAK
1
3
2
MDEV/SDEV NO.  
2100187
PAPP NO.  
2102806
DSD KIVA NO.  
21-1644
VILLAGE 
CAMELBACK EAST
ZONING MAP 
F11
QUARTER SECTION NO.
10-38
PRE-APPLICATION MEETING
05-11-2021

0'-0"
FINISH FLOOR
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+41’-0”
T. O. PLATE
0'-0"
FINISH FLOOR
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0”
T.O. STAIR
STUCCO
A
D
RAILING
F
STUCCO
A
STUCCO
B
EYEBROW
C
AWNING
C
EYEBROW
CMU
C
STUCCO
B
0'-0"
FINISH FLOOR
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0”
T.O. STAIR
A
RAILING
F
CMU
D
STUCCO
A
B
STUCCO
STUCCO
EYEBROW
C
F
SIDING
STUCCO
B
0'-0"
FINISH FLOOR
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
STUCCO
SIDING
A
E
STUCCO
A
RAILING
F
AWNING
C
CMU
D
STUCCO
A
EYEBROW
C
STUCCO
B
STUCCO
B
STUCCO
A
STUCCO
A
STUCCO
B
G ALUMINUM
STOREFRONT
SIDING
F
STUCCO
B
B
STUCCO
D
CMU
C
METAL
0'-0"
FINISH FLOOR
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
B
RAILING
F
CMU
D
STUCCO
0'-0"
FINISH FLOOR
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
B
RAILING
F
CMU
D
STUCCO
2
SCALE: 1/16" = 1'-0"
5
SCALE: 1/16" = 1'-0"
1
SCALE: 1/16" = 1'-0"
+
TODD
ASSOCIATES
20-2025-00
Apartments @ SWC 48th St. & E. Washington St.
Phoenix, Arizona
PUD SUBMITTAL
06-23-2021
BANYAN RESIDENTIAL
06-23-21
BUILDING 4 -  EXTERIOR
ELEVATIONS
A4.4.2
4
SCALE: 1/16" = 1'-0"
3
SCALE: 1/16" = 1'-0"
A
B
F
LOCATION
MANUFACTURER
PAINT #1
METAL RAILING,
AWNINGS &
CANOPIES
PAINT #2
C
ACCENT PAINT
D
E
CMU
G
COLOR
SW 6005
"FOLKSTONE"
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SW 7757
"HIGH REFLECTIVE
WHITE"
SW 6005
"FOLKSTONE"
SW 9133 (ACCENT)
"JASPER STONE"
"BONE"
8x8x16
GROUND FACE
STOREFRONT
ARCADIA
DARK BRONZE
ALUMINUM
SUPERLITE
STACK BOND
SIDING
PAC-CLAD
7" FLUSH PANEL
CHERRYWOOD
OAK
2
4
3
1
5
MDEV/SDEV NO.  
2100187
PAPP NO.  
2102806
DSD KIVA NO.  
21-1644
VILLAGE 
CAMELBACK EAST
ZONING MAP 
F11
QUARTER SECTION NO.
10-38
PRE-APPLICATION MEETING
05-11-2021

0'-0"
FINISH FLOOR
+52'-0”
T.O.PARAPET 3
+46-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0”
T.O.STAIR
+54'-0"
T.O. STAIR
+54'-0"
T.O. STAIR
STUCCO
B
STUCCO
STUCCO
B
A
F
RAILING
STUCCO
EYEBROW
C
A
B
STUCCO
C
CMU
D
AWNING
STUCCO
B
SIDING
E
C
EYEBROW
C
EYEBROW
STUCCO
STUCCO
B
A
C
AWNING
CMU
D
STUCCO
STUCCO
B
A
SIDING
E
0'-0"
FINISH FLOOR
+52'-0”
T.O.PARAPET 3
+46-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0”
T.O.STAIR
+54'-0"
T.O. STAIR
STUCCO
A
RAILING
F
CMU
D
G ALUMINUM
STOREFRONT
STUCCO
A
A
STUCCO
C
EYEBROW
C
EYEBROW
SIDING
E
CMU
D
B
STUCCO
A
RAILING
F
STUCCO
STUCCO
B
A
STUCCO
SIDING
E
STUCCO
B
C
METAL
B
STUCCO
+54'-0"
T.O. STAIR
0'-0"
FINISH FLOOR
+52'-0”
T.O.PARAPET 3
+46-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0"
T.O. STAIR
STUCCO
SIDING
A
E
STUCCO
B
RAILING
F
AWNING
C
CMU
D
STUCCO
A
EYEBROW
C
STUCCO
B
STUCCO
A
B
STUCCO
SIDING
STUCCO
E
A
EYEBROW
C
STUCCO
B
RAILING
F
STUCCO
A
STUCCO
B
CMU
D
STUCCO
B
A
STUCCO
EYEBROW
C
CMU
D
EYEBROW
C
STUCCO
B
STUCCO
B
1
SCALE: 1/16" = 1'-0"
2
SCALE: 1/16" = 1'-0"
3
SCALE: 1/16" = 1'-0"
+
TODD
ASSOCIATES
20-2025-00
Apartments @ SWC 48th St. & E. Washington St.
Phoenix, Arizona
PUD SUBMITTAL
06-23-2021
BANYAN RESIDENTIAL
06-23-21
BUILDING 5 -  EXTERIOR
ELEVATIONS
A4.5.1
A
B
F
LOCATION
MANUFACTURER
PAINT #1
METAL RAILING,
AWNINGS &
CANOPIES
PAINT #2
C
ACCENT PAINT
D
E
CMU
G
COLOR
SW 6005
"FOLKSTONE"
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SW 7757
"HIGH REFLECTIVE
WHITE"
SW 6005
"FOLKSTONE"
SW 9133 (ACCENT)
"JASPER STONE"
"BONE"
8x8x16
GROUND FACE
STOREFRONT
ARCADIA
DARK BRONZE
ALUMINUM
SUPERLITE
STACK BOND
SIDING
PAC-CLAD
7" FLUSH PANEL
CHERRYWOOD
OAK
2
1
3
MDEV/SDEV NO.  
2100187
PAPP NO.  
2102806
DSD KIVA NO.  
21-1644
VILLAGE 
CAMELBACK EAST
ZONING MAP 
F11
QUARTER SECTION NO.
10-38
PRE-APPLICATION MEETING
05-11-2021

0'-0"
FINISH FLOOR
+46-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0”
T.O.STAIR
CMU
D
STUCCO
B
STUCCO
B
EYEBROW
C
G ALUMINUM
STOREFRONT
A
STUCCO
A
RAILING
F
STUCCO
EYEBROW
C
0'-0"
FINISH FLOOR
+46-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
B
RAILING
F
CMU
D
STUCCO
0'-0"
FINISH FLOOR
+52'-0”
T.O.PARAPET 3
+46-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0”
T.O.STAIR
+54'-0"
T.O. STAIR
STUCCO
A
E
RAILING
F
SIDING
STUCCO
B
GARAGE
DOOR
B
AWNING
C
GARAGE
DOOR
B
STUCCO
A
E
RAILING
F
SIDING
CMU
D
STUCCO
B
0'-0"
FINISH FLOOR
+46-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
B
RAILING
F
CMU
D
STUCCO
0'-0"
FINISH FLOOR
+52'-0”
T.O.PARAPET 3
+46-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0”
T.O.STAIR
A
RAILING
F
CMU
D
STUCCO
A
B
STUCCO
STUCCO
AWNING
C
STUCCO
B
2
SCALE: 1/16" = 1'-0"
4
SCALE: 1/16" = 1'-0"
1
SCALE: 1/16" = 1'-0"
+
TODD
ASSOCIATES
20-2025-00
Apartments @ SWC 48th St. & E. Washington St.
Phoenix, Arizona
PUD SUBMITTAL
06-23-2021
BANYAN RESIDENTIAL
06-23-21
BUILDING 5 -  EXTERIOR
ELEVATIONS
A4.5.2
3
SCALE: 1/16" = 1'-0"
5
SCALE: 1/16" = 1'-0"
A
B
F
LOCATION
MANUFACTURER
PAINT #1
METAL RAILING,
AWNINGS &
CANOPIES
PAINT #2
C
ACCENT PAINT
D
E
CMU
G
COLOR
SW 6005
"FOLKSTONE"
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SW 7757
"HIGH REFLECTIVE
WHITE"
SW 6005
"FOLKSTONE"
SW 9133 (ACCENT)
"JASPER STONE"
"BONE"
8x8x16
GROUND FACE
STOREFRONT
ARCADIA
DARK BRONZE
ALUMINUM
SUPERLITE
STACK BOND
SIDING
PAC-CLAD
7" FLUSH PANEL
CHERRYWOOD
OAK
1
5
2
3
4
MDEV/SDEV NO.  
2100187
PAPP NO.  
2102806
DSD KIVA NO.  
21-1644
VILLAGE 
CAMELBACK EAST
ZONING MAP 
F11
QUARTER SECTION NO.
10-38
PRE-APPLICATION MEETING
05-11-2021

0'-0"
FINISH FLOOR
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0”
T.O.STAIR
+52'-0”
T.O.PARAPET 3
+54'-0"
T.O. STAIR
STUCCO
SIDING
E
A
STUCCO
STUCCO
A
B
F
RAILING
STUCCO
STUCCO
B
A
F
RAILING
SIDING
E
STUCCO
B
GARAGE
DOOR
B
GARAGE
DOOR
B
GARAGE
DOOR
B
GARAGE
DOOR
B
GARAGE
DOOR
B
GARAGE
DOOR
B
GARAGE
DOOR
B
STUCCO
A
C
AWNING
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+52'-0”
T.O.PARAPET 3
+54'-0”
T.O.STAIR
0'-0"
FINISH FLOOR
STUCCO
SIDING
A
E
STUCCO
B
EYEBROW
C
STUCCO
A
RAILING
F
RAILING
F
CMU
D
AWNING
C
STUCCO
A
C
AWNING
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0”
T.O.STAIR
+52'-0”
T.O.PARAPET 3
+54'-0"
T.O. STAIR
0'-0"
FINISH FLOOR
STUCCO
A
STUCCO
B
STUCCO
A
RAILING
F
RAILING
F
CMU
D
B
STUCCO
AWNING
C
CMU
D
CMU
D
SIDING
E
STUCCO
B
STUCCO
B
STUCCO
A
C
EYEBROW
E
SIDING
STUCCO
B
+52'-0”
T.O.PARAPET 3
+46'-0"
T.O. PARAPET 1
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
+54'-0"
T.O. STAIR
+54'-0”
T.O.STAIR
0'-0"
FINISH FLOOR
STUCCO
SIDING
A
E
GARAGE
DOOR
B
C
AWNING
E
SIDING
E
RAILING
F
CMU
D
GARAGE
DOOR
B
GARAGE
DOOR
A
SIDING
STUCCO
B
STUCCO
B
STUCCO
B
+'10-8"
2nd FLOOR
+21'-4"
3rd FLOOR
+32'-0"
4th FLOOR
+48'-0”
T.O.PARAPET 2
+41’-0”
T. O. PLATE
0'-0"
FINISH FLOOR
B
RAILING
F
CMU
D
STUCCO
1
SCALE: 1/16" = 1'-0"
2
SCALE: 1/16" = 1'-0"
3
SCALE: 1/16" = 1'-0"
4
SCALE: 1/16" = 1'-0"
5
SCALE: 1/16" = 1'-0"
BUILDING 6 -  EXTERIOR
ELEVATIONS
A4.6.1
+
TODD
ASSOCIATES
20-2025-00
Apartments @ SWC 48th St. & E. Washington St.
Phoenix, Arizona
PUD SUBMITTAL
06-23-2021
BANYAN RESIDENTIAL
A
B
F
LOCATION
MANUFACTURER
PAINT #1
METAL RAILING,
AWNINGS &
CANOPIES
PAINT #2
C
ACCENT PAINT
D
E
CMU
G
COLOR
SW 6005
"FOLKSTONE"
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SHERWIN
WILLIAMS
SW 7757
"HIGH REFLECTIVE
WHITE"
SW 6005
"FOLKSTONE"
SW 9133 (ACCENT)
"JASPER STONE"
"BONE"
8x8x16
GROUND FACE
STOREFRONT
ARCADIA
DARK BRONZE
ALUMINUM
SUPERLITE
STACK BOND
SIDING
PAC-CLAD
7" FLUSH PANEL
CHERRYWOOD
OAK
4
3
2
1
5
MDEV/SDEV NO.  
2100187
PAPP NO.  
2102806
DSD KIVA NO.  
21-1644
VILLAGE 
CAMELBACK EAST
ZONING MAP 
F11
QUARTER SECTION NO.
10-38
PRE-APPLICATION MEETING
05-11-2021
06-23-21