Attachment A - DVT Land Use Plan Executive Summary.pdf
City of Phoenix — Transportation, Infrastructure, and Planning Subcommittee (2023-06-21)
Extracted text (via pymupdf)
12937 characters
D E V E L O P M E N T O P P O R T U N I T Y D E V E L O P M E N T O P P O R T U N I T Y D E V E L O P M E N T O P P O R T U N I T Y STRATEGIC LOCATION NEIGHBORING TENANTS AND DEVELOPERS ECONOMIC FACTORS AIRPORT GROWTH FACTORS PROPERTY OVERVIEW PARCEL ONE PARCEL TWO PARCEL THREE PARCEL FOUR ............................3 ........................4 .............................5 .................6 ............................7 ..........................................8 ........................................10 ......................................12 .......................................14 OVERVIEW AVAILABLE PROPERTY T A B L E . O F C O N T E N T S 2 S T R A T E G I C L O C A T I O N Phoenix Deer Valley Airport (DVT) is at the core of North Phoenix’s burgeoning economy. Owned and operated by the City of Phoenix Aviation Department, DVT is located 15 miles north of downtown Phoenix along the I-17 corridor which connects Phoenix to Flagstaff, AZ. It is also within close access to I-10, connecting Phoenix to the major destinations of Tucson, AZ, and Los Angeles, CA. In addition, the Taiwan Semiconductor Manufacturing Company (TSMC)’s new fabrication plant is being constructed 6 miles north of DVT. Situated within easy access to major transportation routes of I-17 and Arizona State Route 101. Only 6 miles from TSMC’s $40B semiconductor plant. 101 17 DOWNTOWN DOWNTOWN PHOENIX PHOENIX 17 10 10 303 74 60 51 101 202 15 MILES 15 MILES AWAY AWAY 6 MILES 6 MILES AWAY AWAY GLENDALE GLENDALE SCOTTSDALE SCOTTSDALE SDL SDL AIRPORT AIRPORT PHX PHX AIRPORT AIRPORT DEER VALLEY DEER VALLEY PEORIA PEORIA 3 Northwest Industrial Airpark NEIGHBORING TENANTS AND D E V E L O P E R S The entire community of Deer Valley is experiencing an economic boom as it evolves into a sought-after commercial, advanced manufacturing, technology and distribution hub. The area has strong growth projections, with an estimated new demand of 7.4 million sq ft in logistics warehouses, flex industrial, and flex office area by 2028. New development occurring around DVT includes the TSMC fabrication plant, MACK industrial park with warehouse space, Sunbelt Investment Holdings, Inc (SIHI) business park, and Hopewell’s redevelopment of an industrial campus. EXISTING BUSINESS CURRENT DEVELOPMENT 4 4TH LARGEST EXPORTER OF SEMICONDUCTORS A R I Z O N A P H O E N I X 4TH LARGEST AEROSPACE & DEFENSE MANUFACTURER POPULATION GROWTH OF 89,000 PER YEAR 72.5% OF THE STATE’S ECONOMY 5TH LARGEST U.S. CITY BY POPULATION METRO IN THE U.S. WITH 6TH YOUNGEST POPULATION Deer Valley is one of the 15 Phoenix urban villages and is one of the fastest growing. As Deer Valley’s population and opportunities expand, so does the available workforce and the community. The arrival of TSMC’s semiconductor fabrication plant further propels the North Phoenix region as a leading semiconductor manufacturing and technology hub. Arizona is the fourth largest aerospace and defense manufacturer and Phoenix alone accounts for the majority of the state’s economy. E C O N O M I C F A C T O R S 5 10% ANNUAL JET AIRCRAFT GROWTH 11 CORPORATE AIRCRAFT HANGARS UNDER CONSTRUCTION 36 JET AIRCRAFT WAIT LIST FOR HANGAR SPACE With the 8,196-foot-long southern Runway 7R-25L, DVT is ready to handle an increase in corporate aviation aircraft size and capabilities. Additionally, the northern Runway 7L-25R is planned to be extended 800 feet to the east beyond its current length of 4,500 feet to 5,300 feet, per the 2015 Master Plan. The airport plans to upgrade the airfield to meet FAA’s Airplane Design Group (ADG) III design standards. D-III Gulfstream G650 C-II Cessna Citation X+ As of 2022, the Airport has 1,200+ based aircraft, spread across a multitude of Fixed-Base Operator (FBO), corporate hangars, and T-hangars. The number of based aircraft is forecast to double in the next 20 years. With the rapid economic growth in the region, there will continue to be unprecedented demand for aircraft storage. A I R P O R T G R O W T H F O R E C A S T 6 E X I S T I N G A I R F I E L D RWY 7L-25R 4,500’ RWY 7L-25R 4,500’ x 75’ 75’ RWY 7R-25L 8,196’ RWY 7R-25L 8,196’ x 100’ 100’ N 23RD AVE N 23RD AVE N 7TH ST N 7TH ST N 7TH AVE N 7TH AVE W HAPPY VALLEY RD W HAPPY VALLEY RD PARCEL FOUR 14 ACRES PARCEL ONE 77 ACRES PARCEL TWO 75 ACRES PARCEL THREE 20 ACRES W DEER VALLEY RD W DEER VALLEY RD N 19TH AVE N 19TH AVE N 7TH AVE N 7TH AVE W PINNACLE PEAK RD W PINNACLE PEAK RD W ROSE GARDEN LN W ROSE GARDEN LN 101 2 Aircraft and Parts Manufacturing 12 3 1 The parcel sizes displayed on this map represent the total available area and may not match with the acreage shown on the following individual parcel maps due to reserved airside access and other site infrastructure. 2 Future taxilane connection from Taxiway A can be provided by extending Taxilane R9 if airside access is needed for Parcel 4. 3 Aircraft Manufacturing or R&D must be associated with the final assembly of an aircraft, aircraft preflight or validation activities. Aviation-related Support Foreign Trade Zone (FTZ), Aviation-related Research & Development (R&D) Aviation Innovation Park Support facilities for rotary wing and electric vertical takeoff and landing (eVTOL) Aircraft Maintenance, Repairs, and Overhaul (MRO) General Aviation T Hangars Corporate Aviation Aircraft Hangars, Fixed Base Operator (FBO), U.S. Customs and Border Protection (CBP) services for air travelers A I R P O R T L A N D U S E P R O P E R T Y O V E R V I E W Phoenix Deer Valley Airport offers four sites available for development. These parcels provide highly desirable land with airside access. 1 7 3 Any development on these sites must include supporting services and facilities related to the operation of aircraft and should require access to airport ramps and the movement areas. Representative uses include: 3 RECOMMENDED USES RENDERING OF RECOMMENDED PARCEL USAGE 77 ACRES 2 TAXIWAY A ACCESS N 19TH AVE N 19TH AVE N 15TH AVE N 15TH AVE E AIRPORT DR E AIRPORT DR W PINNACLE PEAK RD W PINNACLE PEAK RD W DEER VALLEY RD W DEER VALLEY RD 3 4 Existing Utilities 1 • 8” sewer line located along southern boundary of parcel. • 8” water line located along southern boundary of parcel. • Storm drain located at southeast corner of parcel. Existing Roadway Access • N 15th Ave is located west of parcel. Infrastructure Upgrades by Airport • Portions of Taxiways A and B3 will be widened conforming to the Airplane Design Group (ADG) III standards. Infrastructure Upgrades by Developer • A paved apron connector from Taxiway A to the proposed development is required. • Improvements to the perimeter landside roadway on the northern boundary of parcel is required to provide vehicle access. • All utilities shall be brought from the main utility location to the development site. Developer may need to establish new service with the corresponding utility provider. 1 All information were gathered from past utility master reference drawings. Additional verification on sizing, condition, and location of utility line(s) will be required on behalf of the developers. D E V E L O P M E N T C O N S I D E R A T I O N S 8 P A R C E L Aircraft and Parts Manufacturing Corporate Aviation O N E PARCEL ONE RECOMMENDED LAND USE PLAN TAXIWAY A TAXIWAY A POTENTIAL SUBDIVISION OF PARCEL FOR DEVELOPMENT 21 ACRES 21 ACRES TOTAL: TOTAL: 56 ACRES 56 ACRES N 15TH AVE N 15TH AVE 6 ACRES 6 ACRES 22.5 ACRES 22.5 ACRES 22.5 ACRES 22.5 ACRES DEVELOPABLE SITE BOUNDARY CORPORATE AVIATION AIRCRAFT AND PARTS MANUFACTURING 3.5 ACRES 3.5 ACRES 1.5 ACRES 1.5 ACRES ATCT ATCT P A R C E L Aircraft Maintenance, Repairs, & Overhaul Corporate Aviation T W O General Aviation T Hangars Aviation-Related Support RECOMMENDED USES 75 ACRES TAXIWAY A ACCESS N 19TH AVE N 19TH AVE E AIRPORT DR E AIRPORT DR W PINNACLE PEAK RD W PINNACLE PEAK RD W DEER VALLEY RD W DEER VALLEY RD N 7TH ST N 7TH ST NORTH T-HANGAR ACCESS 1 3 4 Existing Utilities 1 • 12” water line located along northern boundary of parcel. • Storm drain located along northern boundary of parcel. Existing Roadway Access • E Airport Dr. is located north of parcel. Infrastructure Upgrades by Airport • Taxiway A will be extended to the east. • Portions of Taxiways A and C13 will be widened conforming to the Airplane Design Group (ADG) III standards. Infrastructure Upgrades by Developer • A paved apron connector from Taxiway A to the proposed development is required. • Widening of the perimeter landside roadway on the northern boundary of parcel is recommended to accommodate traffic growth.. • All utilities shall be brought from the main utility location to the development site. Developer may need to establish new service with the corresponding utility provider. 1 All information were gathered from past utility master reference drawings. Additional verification on sizing, condition, and location of utility line(s) will be required on behalf of the developers. 10 D E V E L O P M E N T C O N S I D E R A T I O N S RENDERING OF RECOMMENDED PARCEL USAGE DEVELOPABLE SITE BOUNDARY NEW TAXIWAY PAVEMENT CORPORATE AVIATION AVIATION RELATED SUPPORT GENERAL AVIATION T HANGARS AIRCRAFT MAINTENANCE, REPAIRS, AND OVERHAUL PARCEL TWO RECOMMENDED LAND USE PLAN ADG III TAXIWAY ADG III TAXIWAY TAXIWAY C13 TAXIWAY C13 TAXIWAY A TAXIWAY A 23 ACRES 23 ACRES 22 ACRES 22 ACRES 24 ACRES 24 ACRES 6 ACRES 6 ACRES N 7TH ST N 7TH ST E AIRPORT DR E AIRPORT DR 1 3 4 TAXIWAY D ACCESS E AIRPORT DR E AIRPORT DR W PINNACLE PEAK RD W PINNACLE PEAK RD W DEER VALLEY RD W DEER VALLEY RD N 7TH ST N 7TH ST N 19TH AVE N 19TH AVE 20 20 ACRES ACRES 1 4 2 Existing Utilities 1 • 6” sanitary connection located along western boundary of parcel. • Water line located along western, southern and eastern boundaries of parcel. • Electrical conduit located along western and southern boundaries of parcel. • Storm drain located along western boundary of parcel Existing Roadway Access • W Deer Valley Rd is located south of parcel. Infrastructure Upgrades by Airport • Portions of Taxiways C13 and D will be widened conforming to the Airplane Design Group (ADG) III standards. Infrastructure Upgrades by Developer • A paved apron connector from Taxiway D to the proposed development is required. • All utilities shall be brought from the main utility location to the development site. Developer may need to establish new service with the corresponding utility provider. 1 All information were gathered from past utility master reference drawings. Additional verification on sizing, condition, and location of utility line(s) will be required on behalf of the developers. 12 D E V E L O P M E N T C O N S I D E R A T I O N S P A R C E L Corporate Aviation T H R E E RECOMMENDED USES RENDERING OF RECOMMENDED PARCEL USAGE DEVELOPABLE SITE BOUNDARY NEW TAXIWAY PAVEMENT CORPORATE AVIATION PARCEL THREE RECOMMENDED LAND USE PLAN W DEER VALLEY RD W DEER VALLEY RD N 7TH ST N 7TH ST 20 ACRES 20 ACRES ADG III TAXIWAY ADG III TAXIWAY N 19TH AVE N 19TH AVE E AIRPORT DR E AIRPORT DR W PINNACLE PEAK RD W PINNACLE PEAK RD W DEER VALLEY RD W DEER VALLEY RD N 7TH ST N 7TH ST 14 14 ACRES ACRES 1 3 2 Existing Utilities 1 • 8” sewer line located along southern boundary of parcel. • 8” water line located along southern boundary of the western- half of parcel. • 12” water line located along southern boundary of the eastern- half of parcel. • Electrical conduit located along southern boundary of the eastern-half of parcel. • Communications line located along southern boundary of the eastern-half of parcel. • 24” storm drain located near the southeast corner of parcel. Infrastructure Upgrades by Developer • A paved apron connector from Taxilane R9 to the proposed development is required. • New landside roadways on the northern and western boundaries of parcel are recommended to accommodate traffic growth. • All utilities shall be brought from the main utility location to the development site. Developer may need to establish new service with the corresponding utility provider. 1 All information were gathered from past utility master reference drawings. Additional verification on sizing, condition, and location of utility line(s) will be required on behalf of the developers. D E V E L O P M E N T C O N S I D E R A T I O N S P A R C E L Aviation Innovation Park F O U R 14 RECOMMENDED USES RENDERING OF RECOMMENDED PARCEL USAGE PARCEL FOUR RECOMMENDED LAND USE PLAN FUTURE ROAD (TO BE CONSTRUCTED BY OTHERS) DEVELOPABLE SITE BOUNDARY NEW TAXIWAY PAVEMENT NEW ROADWAY PAVEMENT AVIATION INNOVATION PARK EXTEND TAXILANE R9 FUTURE TRAFFIC SIGNAL (INSTALLED BY OTHERS) TAXILANE R9 TAXILANE R9 N 7TH AVE N 7TH AVE PINNACLE PEAK RD PINNACLE PEAK RD E AIRPORT DR E AIRPORT DR 14 ACRES 14 ACRES