Attachment A - Draft Ordinance - PHO-2-21_Z-12-11-2.pdf

City of Phoenix — Formal (2021-08-25)

View PDF Meeting page

Extracted text (via pymupdf) 11968 characters
ATTACHMENT A 
 
THIS IS A DRAFT COPY ONLY AND IS NOT AN OFFICIAL COPY OF THE 
FINAL, ADOPTED ORDINANCE 
 
 
 
 
 
ORDINANCE G- 
 
AN ORDINANCE AMENDING THE STIPULATIONS APPLICABLE TO 
REZONING APPLICATION Z-12-11-2 PREVIOUSLY APPROVED BY 
ORDINANCE G-5664. 
 
____________ 
 
 
 
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF PHOENIX, as 
follows: 
SECTION 1. The zoning stipulations applicable located approximately 
1,320 feet south of the southeast corner of North Valley Parkway and Sonoran 
Desert Drive in a portion of Section 24, Township 5 North, Range 2 East, as 
described more specifically in Attachment “A”, are hereby modified to read as set 
forth below.  
STIPULATIONS: 
SITE PLAN AND ELEVATIONS 
 
 
1. 
THE DEVELOPMENT SHALL BE IN GENERAL CONFORMANCE WITH 
THE SITE PLAN AND ELEVATIONS DATE STAMPED JUNE 3, 2021, AS 
MODIFIED BY THE FOLLOWING STIPULATIONS AND APPROVED BY 
THE PLANNING AND DEVELOPMENT DEPARTMENT. 
 
Conceptual site plan(s) and elevations shall be reviewed and approved by the 
Planning Hearing Officer through the public hearing process for stipulation 
modification prior to preliminary site plan approval as each parcel is to be 
developed. This is a legislative review for conceptual purposes only. Specific 
development standards and requirements may be determined by the 
Planning Hearing Officer and the Planning and Development Department.

a. For development of parcel 204-13-003T the following shall be notified: 
 
 Sonoran Foothills Homeowners Association 
c/o Capital Consultants Management Company 
Attn: Board President 
8360 East Via De Ventura 
Scottsdale, AZ 85258 
 
 Property owners within one mile. 
 
 
TRAILS AND OPEN SPACE 
 
 
2. 
A 10-foot public multi-use trail shall be constructed within a 30-foot easement 
in accordance with City of Phoenix MAG Supplemental detail P1130 & P1131 
and Section 429 of the Supplemental Specifications along Sonoran Desert 
Drive as approved by the Parks and Recreation Department and Planning 
and Development Department. 
 
 
3. 
A 10-foot shared use path shall be constructed within a 20-foot public 
sidewalk easement on the east side of North Valley Parkway as approved by 
the Parks and Recreation Department and Planning and Development 
Department. 
 
 
4. 
Property owners shall dedicate all rights-of-way and required easements (for 
streets, utilities, trail systems, and other open space where required). A 
multi-use trail easement shall be dedicated along the Skunk Creek Wash and 
Sonoran Wash as approved by the Parks and Recreation Department and the 
Planning and Development Department to provide connectivity through the 
site to adjacent open space and trail connections. 
 
 
STREET TRANSPORTATION 
 
 
5. 
The developer shall dedicate right-of-way totaling 70 feet for the south half of  
Sonoran Desert Drive as approved by the Planning and Development 
Department. 
 
 
6. 
The developer shall dedicate right-of-way totaling 70 feet for the west and 
east halves of North Valley Parkway as approved by the Planning and 
Development Department. 
 
 
7. 
A 25-foot by 25-foot right-of-way triangle shall be dedicated at all corners of 
arterial/arterial and arterial/collector intersections as approved by the 
Planning and Development Department.

8. 
The developer shall construct all streets within and adjacent to the 
development  with paving, curb, gutter, sidewalk, curb ramps, streetlights, 
median islands, landscaping and other incidentals as per plans approved or 
modified by the Planning and Development Department. All improvements 
shall comply with ADA accessibility requirements. 
 
 
9. 
The applicant shall submit a Traffic Impact Study to the Street Transportation 
Department and the Planning and Development Department prior to 
preliminary site plan review. The applicant shall be responsible for any 
dedications and required improvements as recommended by the approved 
Traffic Impact Study and as approved or modified by the Planning and 
Development Department and the Street Transportation Department. 
 
 
10. 
Sufficient right-of-way shall be dedicated to accommodate bus-bays at all 
arterial/arterial intersections as approved by the Planning and Development 
Department. 
 
 
11. 
The developer shall complete and submit the Developer Project Information 
Form for the MAG Transportation Improvement Program to the Street 
Transportation Department at (602) 262-6193. This form is a requirement of 
the EPA to meet clean air quality requirements. 
 
 
12. 
REQUIRED RIGHT-OF-WAY, DRAINAGE EASEMENT, ACCESS 
CONTROL DEDICATIONS AND FLOOD PLAIN ENCROACHMENTS 
ALONG NORTH VALLEY PARKWAY SHALL BE IN CONFORMANCE WITH 
THE CITY OF PHOENIX SONORAN WASH BRIDGE ASSESSMENT 
REPORT DATED JUNE 30, 2021 AND AS APPROVED BY THE STREET 
TRANSPORTATION DEPARTMENT.  
 
 
SPECIAL PERMIT FOR THE DRIVEWAY ACCESS, MINE MAINTENANCE 
BUILDING, SCALE HOUSE (NOVAK GRANITE MINE) 
 
 
13. 
12. 
The scale house and mine maintenance building shall be buffered from view 
of adjacent parcels, wash locations, proposed Sonoran Preserve and North 
Valley  Parkway through the use of indigenous, drought tolerant trees a 
minimum of 2-inch caliper size and shrubs. The landscape shall be installed 
as recommended in the North Black Canyon Corridor Design Guidelines, and 
as approved by the Planning and Development Department. 
 
 
14. 
13. 
The approval of the Special Permit shall be removed through the legislative 
process and the use of the driveway access, scale house and the mine 
maintenance building shall be demolished and removed once the current 
non-conforming use (rock quarrying operation/granite mine) is terminated. 
 
 
OTHER 
 
 
15. 
14. 
The developer shall show the planned 69kV underground power lines on the 
site, landscape, and grading and drainage plans. All utilities and other

construction shall be coordinated with the City and APS so as to not conflict 
with the planned power lines. 
 
 
16. 
15. 
The applicant shall submit an archaeological survey report of the 
development area for review and approval by the City Archaeologist prior to 
clearing and grubbing, landscape salvage, and/or grading. Further 
archaeological monitoring  and/or testing (trenching) may be necessary 
based on the results of the survey. 
 
 
17. 
IF DETERMINED NECESSARY BY THE PHOENIX ARCHAEOLOGY 
OFFICE, THE APPLICANT SHALL CONDUCT PHASE I DATA TESTING 
AND SUBMIT AN ARCHAEOLOGICAL SURVEY REPORT OF THE 
DEVELOPMENT AREA FOR REVIEW AND APPROVAL BY THE CITY 
ARCHAEOLOGIST PRIOR TO CLEARING AND GRUBBING, LANDSCAPE 
SALVAGE, AND/OR GRADING APPROVAL. 
 
 
18. 
IF PHASE I DATA TESTING IS REQUIRED, AND IF, UPON REVIEW OF 
THE RESULTS FROM THE PHASE I DATA TESTING, THE CITY 
ARCHAEOLOGIST, IN CONSULTATION WITH A QUALIFIED 
ARCHAEOLOGIST, DETERMINES SUCH DATA RECOVERY 
EXCAVATIONS ARE NECESSARY, THE APPLICANT SHALL CONDUCT 
PHASE II ARCHAEOLOGICAL DATA RECOVERY EXCAVATIONS. 
 
 
19. 
IN THE EVENT ARCHAEOLOGICAL MATERIALS ARE ENCOUNTERED 
DURING CONSTRUCTION, THE DEVELOPER SHALL IMMEDIATELY 
CEASE ALL GROUND-DISTURBING ACTIVITIES WITHIN A 33- FOOT 
RADIUS OF THE DISCOVERY, NOTIFY THE CITY ARCHAEOLOGIST, 
AND ALLOW TIME FOR THE ARCHAEOLOGY OFFICE TO PROPERLY 
ASSESS THE MATERIALS. 
 
 
20. 
16. 
Prior to final site plan approval, the property owner shall record documents 
that disclose to purchasers of the property within the development the 
existence and operational characteristics of the mining operation near the 
development, that it is an active mine, has the potential to be active seven 
days a week, 24 hours a day, and is anticipated to continue until the rock 
resources are exhausted, which could be for 20 or more years. The form and 
content of such documents shall be reviewed and approved by the Law 
Department. 
 
 
21. 
17. 
Access for the Novak mine operation shall be directed west through the City 
of Phoenix Transfer Station site to the Interstate 17 frontage road per a 
development agreement between all affected parties. 
 
 
18. 
Conceptual site plan(s) and elevations shall be reviewed by the North 
Gateway Village Planning Committee for recommendation prior to review and 
approval by the Planning Hearing Officer.

SECTION 2. Due to the site’s specific physical conditions and the use 
district granted pursuant to Ordinance G-5664, this portion of the rezoning is now 
subject to the stipulations approved pursuant to Ordinance G-5664 and as modified 
in Section 1 of this Ordinance. Any violation of the stipulation is a violation of the City 
of Phoenix Zoning Ordinance. Building permits shall not be issued for the subject 
site until all the stipulations have been met. 
SECTION 3. If any section, subsection, sentence, clause, phrase or 
portion of this ordinance is for any reason held to be invalid or unconstitutional by 
the decision of any court of competent jurisdiction, such decision shall not affect the 
validity of the remaining portions hereof. 
PASSED by the Council of the City of Phoenix this 25th day of August, 
2021. 
 
 
 
 
________________________________ 
MAYOR  
 
 
 
ATTEST: 
 
 
____________________________City Clerk 
 
 
APPROVED AS TO FORM: 
 
____________________________City Attorney 
 
 
 
REVIEWED BY:  
 
____________________________City Manager 
 
Exhibits:

A - Legal Description (2 Pages) 
B - Ordinance Location Map (1 Page)

EXHIBIT A 
 
LEGAL DESCRIPTION FOR PHO-2-21-- Z-12-11-2 
 
A portion of land being situated within the Southeast quarter of the Northwest Quarter 
of Section 24, Township 5 North, Range 2 East of the Gila and Salt River Meridian, 
Maricopa County, Arizona, being more particularly described as follows:  
 
COMMENCING at a found Iron pipe with cap stamped RLS 17288 accepted as the 
Northeast corner of the Southeast quarter of the Northwest quarter of said Section 24 
from which a found 3” City of Phoenix brass cap flush accepted as the North quarter 
corner of said Section 24 bears North 00°26'51" West, 1327.13 feet; 
 
Thence South 89°49'59" West, 110.45 feet along the north line of said Southeast 
quarter to the POINT OF BEGINNING; 
 
Thence leaving said north line, South 15°55'34" West, 45.04 feet; 
 
Thence South 15°58'20" West, 22.73 feet; 
 
Thence South 18°55'37" West, 100.64 feet; 
 
Thence South 17°26'37" West, 54.45 feet; 
 
Thence South 17°30'51" West, 16.18 feet to a non-tangent curve, concave 
southeasterly, having a radius of 1568.80 feet, the center of which bears 
South 50°53'18" East; 
 
Thence southwesterly along said curve, through a central angle of 12°36'33", an arc 
length of 345.25 feet to a non-tangent line; 
 
Thence South 23°51'24" West, 28.69 feet; 
 
Thence North 90°00'00" West, 66.70 feet; 
 
Thence South 23°51'24" West, 55.03 feet; 
 
Thence South 12°12'44" West, 100.72 feet; 
 
Thence South 10°12'08" West, 81.54 feet; 
 
Thence South 14°05'59" West, 85.15 feet; 
 
Thence South 13°34'35" West, 81.25 feet; 
 
Thence South 18°47'12" West, 60.19 feet; 
 
Thence South 19°31'12" West, 47.69 feet;

Thence South 18°28'44" West, 89.39 feet; 
 
Thence South 21°58'44" West, 80.53 feet; 
 
Thence South 28°18'49" West, 54.75 feet; 
 
Thence South 24°30'42" West, 70.00 feet to the centerline of North Valley Parkway 
per Book 580, Page 16, Maricopa County records; 
 
Thence along said centerline the following 3 courses: 
 
Thence North 65°29'18" West, 75.43 feet to the beginning of a tangent curve concave 
northeasterly having a radius of 955.00 feet; 
 
Thence northwesterly along said curve, through a central angle of 65°01'09", an arc 
length of 1083.73 feet to a tangent line; 
 
Thence North 00°28'09" West, 411.15 feet along the west line of the Southeast 
quarter of said Northwest quarter to the Northwest corner of Southeast quarter of the 
Northwest Quarter of Section 24; 
 
Thence leaving aid centerline and along the north line of the Southeast quarter of the 
said Northwest quarter, North 89°49'59" East, 1214.82 feet to the POINT OF 
BEGINNING.