Item 57 - Continuance Memo.pdf

City of Phoenix โ€” Formal (2022-07-01)

View PDF Meeting page

Extracted text (via ocr_local) 4054 characters
ยข
City > al

PLANNING & DEVELOPMENT DEPARTMENT

To: Alan Stephenson Date: May 27, 2022
Deputy City Manager
Planning and Development Director

From: Joshua Bednarek
Planning and Development Deputy Director

Subject: CONTINUANCE OF ITEMS 57-60 ON THE JUNE 1, 2022 FORMAL AGENDA: Z-
62-18-2, Z-TA-5-18-2, GPA-DSTV-1-18-2, Z-75-18-2

Items 57 through 60 are companion cases associated with a proposal for a single-family
subdivision in Council District 2.

Item 57, Rezoning Application Z-62-18-2 (Verdin PUD) is a request to rezone 488.63 acres
located at the southwest corner of the 24th Street alignment and Sonoran Desert Drive from S-1
DCOD, S-1, RE-35 DCOD to PUD to allow single-family residential (Ordinance G-6991).

Item 58, Text Amendment Z-TA-5-18-2 is a request to amend Section 653 of the Zoning
Ordinance to modify the boundaries of the Desert Character Overlay District (Ordinance G-
6993).

Item 59, General Plan Amendment GPA-DSTV-1-18-2 is a request to modify the General Plan
Land Use Map for 474.37 acres near the southwest corner of the 24th Street alignment and
Sonoran Desert Drive from Preserves/Residential 0 to 1/Residential 1 to 2 dwelling units per
acre, Preserves/Residential 2 to 3.5/Residential 3.5 to 5 dwelling units per acre, and
Preserves/Floodplain; and Infrastructure Phasing Overlay to Residential 2 to 3.5 dwelling units
per acre and Preserves/Floodplain, and Infrastructure Phasing Overlay removal (Resolution
22030)

Item 60, Rezoning Application Z-75-18-2 is a request to rezone approximately 155.06 acres
located south of Sonoran Desert Drive between the 16th and 32nd Street alignments from RE-
35 DCOD-A, S-1 DCOD-A to RE-35 and S-1 to modify the boundary of Desert Character
Overlay District (Ordinance G-6992).

The North Gateway Village Planning Committee heard all of the requests on March 10, 2022,
and recommended the following:

Item No. Recommendation Vote
57 Approval, per the staff recommendation with a modification. 4-1
58 Approval, per the staff recommendation. 4-4
59 Approval. 4-1
60 Approval, per the staff recommendation. 4-1

The Desert View Village Planning Committee heard all of the requests on April 5, 2022, and
recommended the following:

Item No. Recommendation Vote

57 Approval, per the staff recommendation with modifications 10-1
and additional stipulations.

58 Approval, per the staff recommendation. 7-4

59 Denial as filed, approval with modifications. 10-1

60 Denial as filed, approval per the staff recommendation. 7-4

The Planning Commission heard all of the requests on May 5, 2022, and recommended the
following:

Item No. Recommendation Vote
57 Approval, per the staff memo dated May 5, 2022. 7-1
58 Approval, per the Addendum A Staff Report. 7-1
59 Approval, per Addendum A of the Staff Analysis Report. 7-1
60 Approval, per the Addendum A Staff Report. 7-1

The Planning Commission recommendation for Item 57 (Z-62-18-2) included additional and
modified stipulations (per the staff memo). One of the stipulations requires the execution of a
development agreement between the city and the developer within 24 months of City Council
approval of this change of zone and prior to final site plan approval and issuance of any grading
and drainage permits. The development agreement will outline the requirements for initial
improvements to Sonoran Desert Drive, as well as financial contributions for the ultimate
buildout of Sonoran Desert Drive.

Staff recommends a continuance of all of the items to the July 1, 2022 City Council Formal
meeting to allow additional time to finalize the site specific development agreement and to
finalize the north area Sonoran Desert Drive Funding Policy for the City Council to adopt
concurrently with the site specific planning and zoning items. These items need to happen
concurrently as both are necessary to address the impacts to Sonoran Desert Drive as this
property and all the other vacant land develops in this northern area of Phoenix.

Approved: Az Legli
Alan Stephenson

Deputy City Manager/Planning and Development Director