Staff Report Z-6-22-2 
April 29, 2022 
Desert View Village Planning Committee 
Meeting Date: 
May 3, 2022 
Planning Commission Hearing Date: 
June 2, 2022 
Request From: 
S-1 (Ranch or Farm Residence District)
(417.33 acres)
Request To: 
R1-10 (Single-Family Residence District) 
(388.10 acres), R-2 (Multifamily Residence 
District) (14.19 acres), and R-3A 
(Multifamily Residence District) (15.04 
acres) 
Proposed Use: 
Single-family and multifamily residential 
Location: 
Approximately 2,400 feet southwest of the 
southwest corner of Cave Creek Road and 
Jomax Road 
Owner: 
Arizona State Land Department 
Applicant: 
DR Horton, Inc. 
Representative: 
Jason Morris, Withey Morris, PLC 
Staff Recommendation: 
Approval, subject to stipulations 
General Plan Conformity 
General Plan Land Use Map Designation 
Current 
Residential 2 to 5 dwelling units per acre 
Parks/Open Space - Publicly Owned 
Preserves/2 to 3.5 or 3.5 to 5 dwelling units 
per acre 
Future Parks/Open Space or 1 dwelling unit 
per acre 
Proposed (GPA-1-DSTV-22-2) for 29.48 
acres 
Residential 10 to 15 dwelling units per acre 
Residential 15+ dwelling units per acre 
Attachment B

Staff Report: Z-6-22-2 
April 29, 2022 
Page 2 of 24 
 
 
 
 
General Plan Conformity 
Street Map Classification 
Cave Creek 
Road 
Major Arterial 
(Scenic Drive) 
Width varies from 33-
foot to 73.15-foot west 
half street 
Desert Peak 
Parkway 
Major Arterial 
70-foot east half street 
 
CELEBRATE OUR DIVERSE COMMUNITIES & NEIGHBORHOODS CORE VALUE; 
CERTAINTY & CHARACTER; DESIGN PRINCIPLES: Promote neighborhood identity 
through planning that reinforces the existing landscaping and character of the area. 
Each new development should contribute to the character identified for the village; 
Integrate into the development design natural features such as washes, canals, 
significant topography and existing vegetation, which are important in providing 
character to new subdivisions. 
 
As stipulated, the proposed development will reinforce the character of the area by 
dedicating land to the City for the Sonoran Preserve, providing a public trail network with 
access points to the desert park/mountain preserve area, and by maintaining the existing 
wash and hillside areas within the subdivision as natural features. These design elements 
enhance the desert character of the Village and incorporate natural features that promote 
the identity of the Village. 
 
 
CONNECT PEOPLE AND PLACES CORE VALUE; OPPORTUNITY SITES; LAND USE 
PRINCIPLE: Support reasonable levels of increased intensity, respectful of local 
conditions and surrounding neighborhoods. 
 
The requested R1-10, R-2, and R-3A zoning districts would allow development of a new 
residential community that is compatible with surrounding neighborhoods and respectful of 
local conditions. The overall proposed density of the site is similar to densities in the 
surrounding neighborhood and as stipulated, the proposal incorporates large setbacks, 
landscaping, and density limits that prevent the development from having a negative 
impact on the surrounding area.

Staff Report: Z-6-22-2 
April 29, 2022 
Page 3 of 24 
 
 
 
 
General Plan Conformity 
 
BUILD THE SUSTAINABLE DESERT CITY CORE VALUE; TREES AND SHADE; 
DESIGN PRINCIPLE: Integrate trees and shade into the design of new development 
and redevelopment projects throughout Phoenix. 
 
The proposal will be required to provide shade along the adjacent public sidewalks and 
trails, in addition to the internal pedestrian pathways. This will help to provide shade for 
pedestrians and bicyclists in and around the community and to mitigate the urban heat 
island effect by covering hard surfaces, thus cooling the micro-climate around the vicinity. 
 
 
Applicable Plans, Overlays, and Initiatives 
 
North Land Use Plan: See Background Item No. 7. 
 
Tree and Shade Master Plan: See Background Item No. 8. 
 
Complete Streets Guiding Principles: See Background Item No. 9. 
 
Comprehensive Bicycle Master Plan: See Background Item No. 10. 
 
Zero Waste PHX: See Background Item No. 11. 
 
Housing Phoenix: See Background Item No. 12. 
 
 
Surrounding Land Uses and Zoning 
 
Land Use 
Zoning 
On Site 
Vacant 
S-1 
North 
Vacant and recreation area 
S-1 
South 
Single-family residential 
S-1 (Approved R1-8), R1-8 
East (across Cave Creek 
Road) 
Vacant 
S-1 (Approved R1-6, C-2) 
West (including across 
Desert Peak Parkway) 
Single-family residential and 
vacant 
R1-18, R1-6, PUD

Staff Report: Z-6-22-2 
April 29, 2022 
Page 4 of 24 
 
 
 
 
 
R1-10 – Single-Family Residence District 
(Planned Residential Development Option) 
 
Standards 
R1-10 Requirements 
Provisions on the 
proposed site plan 
Gross Acreage 
- 
388.10 acres 
Total Maximum Number of 
Units 
1,358 units, up to 1,746 with 
bonus 
1,145 units (Met) 
Maximum Density 
3.5 dwelling units per acre, up 
to 4.5 with bonus 
2.95 dwelling units per acre 
(Met) 
Minimum Lot Width 
45 feet 
45 feet (Met) 
Minimum Lot Depth 
None, except 110 feet 
adjacent to freeway or arterial 
100 to 130 feet (Met) 
Maximum Building Height 
2 stories and 30 feet 
2 stories and less than 29 
feet (Met) 
Maximum Lot Coverage 
40 percent, up to 50 percent 
including attached shade 
structures 
Not specified 
 
 
 
Minimum Parking 
2 spaces per dwelling unit 
 
2,290 spaces required 
Not specified 
 
MINIMUM PERIMETER BUILDING SETBACKS 
Perimeter Streets 
15 feet (in addition to 
landscape setback) 
Not specified 
 
Perimeter Property Lines  
(Side and Rear) 
Rear: 15 feet (1-story),  
20 feet (2-story) 
 
Side: 10 feet (1-story), 15 feet 
(2-story) 
 
Not specified 
 
MINIMUM LANDSCAPE SETBACKS AND STANDARDS 
Common landscaped 
setback adjacent to 
perimeter streets 
 
15 feet average, 10 feet 
minimum 
Cave Creek Road: 140 feet 
(Met) 
 
Desert Peak Parkway: 15 
feet (Met) 
Minimum Common Area 
5 percent of gross site area 
15.76 percent (Met)

Staff Report: Z-6-22-2 
April 29, 2022 
Page 5 of 24 
 
 
 
 
R-2 - Multifamily Residence District 
(Planned Residential Development Option) 
 
Standards 
Requirements 
Provisions on the 
Proposed site Plan 
Gross Acreage 
- 
14.19 acres 
Total Maximum Number of 
Units 
149 units, up to 170 with 
bonus 
140 units 
Maximum Density 
10.5 dwelling units per 
acre, up to 12 with bonus 
9.87 dwelling units per 
acre (Met) 
Maximum Lot Coverage 
45 percent 
Not specified 
Building Height/Stories 
2 stories and 30 feet for 
first 150 feet; 1 foot 
increase in height for 5 
feet of additional building 
setback, up to 48 feet 
and 4 stories 
2 stories and less than 
28 feet (Met) 
Minimum Perimeter Setbacks 
Adjacent to public street 
20 feet 
Not specified 
Adjacent to property line 
10 feet 
Not specified 
Minimum Interior Building Setbacks 
Front 
10 feet 
Not specified 
Minimum Perimeter Landscape Setbacks 
Adjacent to public street 
20 feet 
Not specified 
Adjacent to property line 
5 feet 
Not specified 
Minimum Open space 
5 percent 
Not specified 
Minimum parking 
1.3 spaces per efficiency 
unit; 1.5 spaces per 1 or 
2 bedroom unit; 2 spaces 
per 3 or more bedroom 
unit; 1.0 spaces per unit 
of less than 600 square 
feet 
Not specified

Staff Report: Z-6-22-2 
April 29, 2022 
Page 6 of 24 
 
 
 
 
R-3A - Multifamily Residence District 
(Planned Residential Development Option) 
 
Standards 
Requirements 
Provisions on the 
Proposed site Plan 
Gross Acreage 
- 
15.04 acres 
Total Maximum Number of 
Units 
347 units, up to 397 with 
bonus 
260 units 
Maximum Density 
23.1 dwelling units per 
acre, up to 26.4 with 
bonus 
17.29 dwelling units per 
acre (Met) 
Maximum Lot Coverage 
45 percent 
Not specified 
Maximum Building Height 
3 stories and 40 feet for 
150 feet; 1 foot increase 
in height for 5 feet of 
additional building 
setback, up to 48 feet 
and 4 stories 
3 stories and 33 feet 
(Met) 
Minimum Perimeter Setbacks 
Adjacent to public street 
20 feet 
Not specified 
Adjacent to property line 
15 feet 
Not specified 
Minimum Interior Building Setbacks 
Front 
10 feet 
Not specified 
Minimum Perimeter Landscape Setbacks 
Adjacent to public street 
20 feet 
Not specified 
Adjacent to property line 
5 feet 
Not specified 
Minimum Open space 
5 percent 
Not specified 
Minimum Parking 
1.3 spaces per efficiency 
unit; 1.5 spaces per 1 or 
2 bedroom unit; 2 spaces 
per 3 or more bedroom 
unit; 1.0 spaces per unit 
of less than 600 square 
feet 
Not specified 
 
Background/Issues/Analysis 
 
SUBJECT SITE 
1. 
This request is to rezone 417.33 acres located approximately 2,400 feet southwest 
of the southwest corner of Cave Creek Road and Jomax Road from S-1 (Ranch or

Staff Report: Z-6-22-2 
April 29, 2022 
Page 7 of 24 
 
 
 
 
Farm Residence District) to R-10 (Single-Family Residence District), R-2 
(Multifamily Residence District), and R-3A (Multifamily Residence District) for a 
detached single-family residential and two multifamily residential communities. The 
site is undeveloped vacant land, owned by the Arizona State Land Department, 
which was recently auctioned. Ownership is in transition to the applicant, DR Horton 
Inc. 
 
 
GENERAL PLAN LAND USE MAP DESIGNATIONS 
2. 
The majority of the subject site is 
designated as Residential 2 to 5 dwelling 
units per acre on the General Plan Land 
Use Map. Additionally, the northwest 
portion of the site is designated as Future 
Parks/Open Space or 1 dwelling unit per 
acre, and Preserves / 2 to 3.5 or 3.5 to 5 
dwelling units per acre. Finally, the 
northern portion of the site contains a 
narrow portion of land designated as 
Parks/Open Space – Publicly Owned. 
 
General Plan Land Use Map, Source: Planning 
and Development Department 
 
 
The applicant is proposing a minor General Plan Amendment (GPA-DSTV-1-22-2), 
which would change portions of the northeast corner of the subject site from 
Residential 2 to 5 dwelling units per acre and Parks/Open Space - Publicly Owned 
to Residential 10 to 15 dwelling units per acre and Residential 15+ dwelling units per 
acre. These designations would be coterminous with the proposed R-2 and R-3A 
zoning districts, respectively. The proposed zoning districts are consistent with the 
proposed General Plan Land Use Map designation. 
 
PROPOSAL 
3. 
Site Plan 
The applicant proposes to develop a new residential community, which would 
include a 1,145-lot detached single-family residential community. The development 
also proposes two multifamily portions, described as Casitas and Garden on the 
conceptual site plan, with a total of 400 multifamily units. The overall density would 
be approximately 3.7 dwelling units per acre. The conceptual site plan depicts a 
range of lot sizes within the single-family residential portion, from 4,500 square feet 
to 8,450 square feet.

Staff Report: Z-6-22-2 
April 29, 2022 
Page 8 of 24 
 
 
 
 
 
 
Conceptual Site Plan, Source: ABLA Studio 
 
 
Staff does not recommend general conformance to the site plan, as this is a large 
development, and the specific layout of lots and streets could change during the 
subdivision and site plan review process. Staff is recommending several stipulations 
that require certain aspects of the site plan to be maintained, as described below. 
 
The conceptual site plan includes a 74.82-acre hillside area in the northwest portion 
of the site, which is intended to be conveyed to the City of Phoenix Parks and 
Recreation Department for development of a future park or mountain preserve. This 
conveyance is consistent with the General Plan Land Use designation of Future 
Parks/Open Space or 1 dwelling unit per acre for the northwest hillside area. The 
developer also intends to provide public access to the preserve area through two 
access points within the subdivision, including a trail network and the possibility of a

Staff Report: Z-6-22-2 
April 29, 2022 
Page 9 of 24 
 
 
 
 
public parking area to ensure the public has access to the preserve. These aspects 
of the plan are incorporated in Stipulation Nos. 1 and 2.  
 
Staff recommends the following site plan elements to be incorporated: 
• A minimum 140-foot landscape setback along Cave Creek Road, consistent 
with the designation as a scenic corridor (Stipulation No. 3); 
• Enhanced landscaping with 70 percent two-inch and 30 percent three-inch 
caliper trees, planted 20 feet on center and five, five-gallon shrubs per tree 
within landscape setbacks along Cave Creek Road, Desert Peak Parkway 
and the perimeter setbacks of the R-2 and R-3A zoned areas (Stipulation No. 
4); 
• Minimum 15 percent open space (after the dedication of the hillside area) 
provided within the R1-10 zoned area (Stipulation No. 25); 
• Minimum 10 percent open space provided within each of the R-2 and R-3A 
zoned areas (Stipulation Nos. 28 and 32); 
• A minimum of two active and three passive open space areas provided within 
the R1-10 zoned area (Stipulation No. 26); 
• A minimum of five amenities provided within the open space areas for the R-
2 and R-3A zoned areas (Stipulation Nos. 29 and 33). 
 
4. 
Overall Trails Exhibit 
The applicant has submitted an Overall Trails Exhibit, which depicts the location of a 
proposed trail network within and surrounding the site. It includes multi-use trails 
along the entire frontages of Cave Creek Road and Desert Peak Parkway and a 
combination of multi-use trails, community trails, and detached sidewalks through 
the site connecting the two frontages along three separate paths. The development 
does not intend to be closed to pedestrians. Public access easements will be 
required to meet the public access requirement for the access points to the 
preserve. It is expected that the internal multi-use trails will contain easements 
sufficient to fulfill this requirement, but the plan for access will be finalized at a later 
date in consultation with the Parks and Recreation Department, per Stipulation No. 
2.

Staff Report: Z-6-22-2 
April 29, 2022 
Page 10 of 24 
 
 
 
 
 
 
Overall Trails Exhibit, Source: ABLA Studio 
 
 
Staff recommends the following elements of the Overall Trails Exhibit to be 
incorporated into the development: 
• A 10-foot-wide multi-use trail (MUT) and 30-foot-wide multi-use trail 
easement (MUTE) shall be provided along both perimeter frontages 
(Stipulation No. 6); 
• Ten-foot-wide community trails and multi-use trails shall be provided within 
the development, where indicated on the plan (Stipulation No. 7); 
• A detached sidewalk shall be provided along the primary roadway through 
the development, as indicated on the plan, including two-inch caliper shade 
trees planted 25 feet on center planted between the sidewalk and the back of 
the curb (Stipulation No. 10).

Staff Report: Z-6-22-2 
April 29, 2022 
Page 11 of 24 
 
 
 
 
5. 
Single-Family Elevations 
The conceptual building elevations for the single-family homes depict one- and two-
story homes with a variety of architectural styles and variation in colors, textures, 
and facades. Staff recommends enhancing the four-sided architectural component 
by requiring architectural detailing to the windows on all sides of the buildings 
(Stipulation No. 24). 
 
 
Conceptual Single-Family Building Elevations, Source: DR Horton

Staff Report: Z-6-22-2 
April 29, 2022 
Page 12 of 24 
 
 
 
 
 
Conceptual Single-Family Building Elevations, Source: DR Horton 
 
6. 
Multifamily Elevations 
Staff recommends general conformance to the multifamily building elevations within 
both the R-2 zoned areas, labeled “Casitas” on the site plan and elevations, and the 
R-3A zoned areas, labeled “Garden” on the site plan and “Tuck-Under Multifamily” 
and “Carriage Multifamily” on the elevations. The elevations depict multifamily 
buildings with a variety of architectural styles and variation in colors, textures, and 
facades, as well as four-sided architecture. The Casitas building elevations depict 
one- and two-story buildings with a maximum height of less than 28 feet. The 
Garden building elevations depict two- and three-story buildings with a maximum 
height of 33 feet. These are addressed in Stipulation Nos. 27 and 31.

Staff Report: Z-6-22-2 
April 29, 2022 
Page 13 of 24 
 
 
 
 
 
 
 
 
Conceptual Building Elevations (Casitas), Source: DHI Communities

Staff Report: Z-6-22-2 
April 29, 2022 
Page 14 of 24 
 
 
 
 
 
 
 
 
Conceptual Building Elevations (Garden), Source: DHI Communities

Staff Report: Z-6-22-2 
April 29, 2022 
Page 15 of 24 
 
 
 
 
STUDIES AND POLICIES 
7. 
North Land Use Plan 
In 1996, the Phoenix City Council adopted the North Land Use Plan, which 
established recommendations for land use and future development for the area 
generally bounded by Cave Creek Wash to the west, Scottsdale Road to the east, 
Carefree Highway to the north, and Pinnacle Peak Road to the south. The plan 
shifted residential density designations from the previous General Plan Land Use 
Map with the goals of protecting the desert character, recognizing washes as a 
development constraint, and maximizing infrastructure efficiency. The subject site is 
designated as Residential 2 to 5 dwelling units per acre in the plan. Figure 22 in the 
plan also denotes the site as an area containing extra infrastructure capacity, noting 
that density should be move toward areas of extra capacity to increase 
infrastructure efficiency. 
 
 
 
 
 
The proposed development includes a range of densities and a large area to be set-
aside for a desert preserve or mountain park. The overall site is proposed at a 
density of 3.7 dwelling units per acre, which is consistent with the designation in the 
North Land Use Plan. The site plan shifts density away from the hillside preserve 
area to the west and closer to the major arterial of Cave Creek Road. While this 
creates areas within the development that exceeds 5 dwelling units per acre, the 
overall average density is consistent with the recommendations in the North Land 
Use Plan, in addition to the preservation of sensitive areas to the west and 
incorporation of washes as preserved resources within the community.

Staff Report: Z-6-22-2 
April 29, 2022 
Page 16 of 24 
 
 
 
 
8. 
Tree and Shade Master Plan 
The Tree and Shade Master Plan encourages treating the urban forest as 
infrastructure to ensure the trees are an integral part of the City’s planning and 
development process. Sidewalks on the street frontages should be detached from 
the curbs to allow trees to be planted on both sides of the sidewalk to provide 
thermal comfort for pedestrians and to reduce the urban heat island effect. Staff is 
recommending the following stipulations designed to provide trees and enhance 
shade within the development. 
• Seventy percent two-inch caliper and 30 percent three-inch caliper trees 
within the required landscape setbacks (Stipulation No. 4); 
• Shaded pedestrian paths, multi-use trails, and sidewalks to provide a 
minimum of 75 percent shade (Stipulation No. 5); 
• The sidewalks along Cave Creek Road and the internal primary roadway 
through the development shall be detached with landscaped areas between 
the sidewalk and the back of the curb (Stipulation Nos. 9 and 10). 
 
 
9. 
Complete Streets Guiding Principles 
In 2014, the City of Phoenix City Council adopted the Complete Streets Guiding 
Principles. The principles are intended to promote improvements that provide an 
accessible, safe, connected transportation system to include all modes, such as 
bicycles, pedestrians, transit, and vehicles. To promote safety and connectivity for 
pedestrians, bicyclists, and transit users, staff is recommending detached sidewalks 
along Cave Creek Road and the internal primary roadway, multi-use trails and 
pedestrian paths on the perimeter streets and within the development, construction 
and dedication of a new bus stop pad on Cave Creek Road, and bicycle parking in 
the multifamily portions of the development. These are addressed in Stipulation 
Nos. 6 through 10, 30, and 34. 
 
 
10. 
Comprehensive Bicycle Master Plan 
The City of Phoenix adopted the Comprehensive Bicycle Master Plan in 2014 to 
guide the development of its Bikeway System and supportive infrastructure. The 
Comprehensive Bicycle Master Plan supports options for both short- and long-term 
bicycle parking as a means of promoting bicyclist traffic to a variety of destinations. 
As stipulated, the project will provide bicycle parking spaces within the multifamily 
portions of the development, installed per the requirements of the Walkable Urban 
(WU) Code. This is addressed in Stipulation Nos. 30 and 34. 
 
 
11. 
Zero Waste PHX 
The City of Phoenix is committed to its waste diversion efforts and has set a goal to 
become a zero-waste city, as part of the city’s overall 2050 Environmental 
Sustainability Goals. One of the ways Phoenix can achieve this is to improve and 
expand its recycling and other waste diversion programs. The City of Phoenix offers

Staff Report: Z-6-22-2 
April 29, 2022 
Page 17 of 24 
 
 
 
 
recycling services for single-family residential properties. 
 
 
12. 
Housing Phoenix 
In June 2020, the Phoenix City Council approved the Housing Phoenix Plan. This 
Plan contains policy initiatives for the development and preservation of housing with 
a vision of creating a stronger and more vibrant Phoenix through increased housing 
options for residents at all income levels and family sizes. Phoenix’s rapid 
population growth and housing underproduction has led to a need for over 163,000 
new housing units. Current shortages of housing supply relative to demand are a 
primary reason why housing costs are increasing. The proposed development 
supports the Plan’s goal of preserving or creating 50,000 housing units by 2030 by 
contributing to a variety housing types that will address the supply shortage at a 
more rapid pace while using vacant land in a more sustainable fashion. 
 
 
COMMUNITY INPUT SUMMARY 
13. 
As of the writing of this report, staff received eight letters in opposition to this 
request. The letters cited issues with the proposed density and character of the 
area, increased traffic, impacts to wildlife, and a lack of nearby retail and open 
space. 
 
 
INTERDEPARTMENTAL COMMENTS 
 
 
14. 
The Parks and Recreation Department requires the dedication of a multi-use trail 
easement and construction of a multi-use trail along Cave Creek Road and Desert 
Peak Parkway adjacent to this development. These comments are addressed in 
Stipulation No. 6. 
 
 
15. 
The Street Transportation Department commented that the developer shall provide 
detached sidewalks along Cave Creek Road, construct a 24-foot landscaped 
median island along Desert Peak Parkway, align the primary roadway through the 
subdivision with the intersection of Desert Peak Parkway and Hillstone Way, and 
connect to the existing stub streets of Rustling Oaks Lane, 27th Place, and 29th 
Way. Other comments provided pertained to adjacent right-of-way dedication and 
street construction, traffic impact study requirement, and other general street 
improvement requirements. These comments are addressed in Stipulation Nos. 9 
and 11 through 16. 
 
 
16. 
The Public Transit Department commented that the developer shall dedicate right-
of-way and construct one bus stop pad along southbound Cave Creek Road, 
meeting the requirements of the City of Phoenix. This comment is addressed in 
Stipulation No. 8.

Staff Report: Z-6-22-2 
April 29, 2022 
Page 18 of 24 
 
 
 
 
17. 
The Water Services Departments commented that a water and sewer main 
extension will be required and a water and sewer master plan will need to be 
submitted during the development review process. However, no stipulations are 
required for the rezoning case. Furthermore, capacity is a dynamic condition that 
can change over time due to a variety of factors. The City intends to provide water 
and sewer service, requirements and assurances for which are determined during 
the site plan review process. For any given property, water and sewer requirements 
may vary over time to be less or more restrictive depending on the status of the 
City’s water and sewer infrastructure. 
 
 
18. 
The Aviation Department requires that the property owner record a Notice to 
Prospective Purchasers of Proximity to Airport in order to disclose the existence, 
and operational characteristics of Deer Valley Airport to future owners or tenants of 
the property. Furthermore, that an avigation easement is dedicated to the City of 
Phoenix as this property is within the Deer Valley Airport traffic pattern airspace and 
seeking noise sensitive land uses. Lastly, that a No Hazard Determination for the 
proposed development be provided from the FAA pursuant to the FAA’s Form-7460 
obstruction analysis review process. These are addressed in Stipulation Nos. 17 
through 19. 
 
 
19. 
The site is located in a larger area identified as being archaeologically sensitive. If 
further review by the City of Phoenix Archaeology Office determines the site and 
immediate area to be archaeologically sensitive, and if no previous archaeological 
projects have been conducted within this project area, it is recommended that 
archaeological Phase I data testing of this area be conducted. Phase II 
archaeological data recovery excavations may be necessary based upon the results 
of the testing. A qualified archaeologist must make this determination in consultation 
with the City of Phoenix Archaeologist. In the event archaeological materials are 
encountered during construction, all ground disturbing activities must cease within a 
33-foot radius of the discovery and the City of Phoenix Archaeology Office must be 
notified immediately and allowed time to properly assess the materials. This is 
addressed in Stipulation Nos. 20 through 22. 
 
 
20. 
The Floodplain Management division of the Public Works Department did not have 
any comments on this case. 
 
 
21. 
The Fire Department commented that there were no anticipated problems with the 
referenced case and that the water supply will be required to meet fire flow 
standards in the fire code. 
 
 
OTHER 
22. 
Staff has not received a completed form for the Waiver of Claims for Diminution in

Staff Report: Z-6-22-2 
April 29, 2022 
Page 19 of 24 
 
 
 
 
Value of Property under Proposition 207 (A.R.S. 12-1131 et seq.), as required by 
the rezoning application process. Therefore, a stipulation has been added to require 
the form be completed and submitted prior to preliminary site plan approval. This is 
addressed in Stipulation No. 23. 
 
 
23. 
Development and use of the site is subject to all applicable codes and ordinances. 
Zoning approval does not negate other ordinance requirements such as obtaining a 
use permit to conduct the proposed outdoor use in this zoning district. Other formal 
actions such as, but not limited to, zoning adjustments and abandonments, may be 
required. 
 
Findings 
 
1. 
The requested R1-10, R-2, and R-3A zoning districts produce an overall density and 
development pattern that is consistent with the character of the surrounding area. 
 
 
2. 
As stipulated, the proposed development appropriately shifts density away from 
sensitive natural resources and closer to the major arterial of Cave Creek Road and 
provides design elements that protect the surrounding natural and built environment. 
 
 
3. 
As stipulated, the proposed development enhances connectivity in the immediate 
vicinity, including multi-modal transportation options with shade elements, and 
improves public access to the adjacent natural resources. 
 
Stipulations 
 
OVERALL SITE 
 
1. 
Prior to the issuance of Final Site Plan approval, the landowner shall convey 
approximately 74 acres (or an area mutually agreed upon by the city and the 
owner) of hillside land selected by the City of Phoenix and located in the area 
depicted as “Hillside Area” on the site plan date stamped February 4, 2022, to 
the City of Phoenix for the use as a City of Phoenix desert park and/or mountain 
preserve, as modified and approved by the Planning and Development 
Department and the Parks and Recreation Department. 
 
 
2. 
The developer shall work with the City of Phoenix Parks and Recreation 
Department to determine a maximum of two access points to the desert park or 
mountain preserve area prior to issuance of preliminary site plan approval. The 
access points shall be made accessible to the public through a trail network, 
within and/or bounding the site, as approved or modified by the Planning and 
Development Department. In conjunction with the electric utility provider, the

Staff Report: Z-6-22-2 
April 29, 2022 
Page 20 of 24 
 
 
 
 
developer shall also explore the possibility of providing a public access parking 
lot in the utility easement area with access to the preserve trail network. 
 
 
3. 
A minimum landscaped setback of 140 feet shall be provided along the Cave 
Creek Road frontage. 
 
 
4. 
The required landscape setbacks along Cave Creek Road, Desert Peak 
Parkway, and the perimeter setbacks for the R-2 and R-3A zoned portions of the 
site where adjacent to single-family residential zoning shall be planted with a 
minimum of 70 percent 2-inch caliper and 30 percent 3-inch caliper large canopy 
drought-tolerant trees, 20 feet on center or in equivalent groupings, with five 5-
gallon shrubs per tree, as approved or modified by the Planning and 
Development Department. 
 
 
5. 
Within the development and along Cave Creek Road and Desert Peak Parkway, 
all pedestrian paths, multi-use trails, and sidewalks, excluding sidewalks along 
internal streets, shall be shaded by a structure, landscaping at maturity, or a 
combination of the two to provide a minimum of 75 percent shade, as approved 
or modified by the Planning and Development Department. 
 
 
6. 
The developer shall dedicate 30-foot-wide multi-use trail easements (MUTE) 
along the east side of Desert Peak Parkway and the west side of Cave Creek 
Road and construct a minimum 10-foot-wide multi-use trail (MUT) within the 
easements in accordance with the MAG supplemental detail and as approved by 
the Planning and Development Department. Where conflicts or restrictions exist, 
the developer shall work with the Site Planning Section on an alternative design 
through the technical appeal process. 
 
 
7. 
The developer shall construct minimum 10-foot-wide community trails and multi-
use trails, as generally depicted on the Overall Trails Exhibit, date stamped April 
15, 2022, as approved or modified by the Planning and Development 
Department. Where conflicts or restrictions exist, the developer shall work with 
the Site Planning Section on an alternative design through the technical appeal 
process. 
 
 
8. 
The developer shall dedicate right-of-way and construct one bus stop pad along 
southbound Cave Creek Road. The bus stop pad shall be constructed according 
to the City of Phoenix Standard Detail P1260 with a minimum depth of 10 feet 
and be located from the intersection of the main access point on Cave Creek 
Road according to City of Phoenix Standard Detail P1258, as approved or 
modified by the Planning and Development Department or the Public Transit 
Department.

Staff Report: Z-6-22-2 
April 29, 2022 
Page 21 of 24 
 
 
 
 
 
 
9. 
The developer shall construct a minimum 5-foot-wide detached sidewalk and a 
minimum 11-foot-wide landscape area between the back of curb and sidewalk 
along Cave Creek Road, planted to the following standards and as approved or 
modified by the Planning and Development Department or Street Transportation 
Department. 
 
 
a. 
Minimum 2-inch caliper shade trees planted 20 feet on center or in 
equivalent groupings. 
 
 
 
 
b. 
Drought tolerant vegetation to achieve 75 percent live coverage at 
maturity. 
 
 
 
Where utility conflicts arise, the developer shall work with the Planning and 
Development Department on an alternative design solution consistent with a 
pedestrian environment. 
 
 
10. 
The developer shall construct minimum 5-foot-wide detached sidewalks with 
minimum 5-foot-wide landscape areas between the back of curb and sidewalks 
along the primary roadway through the subdivision, as generally depicted on the 
Overall Trails Exhibit, date stamped April 15, 2022, planted with minimum 2-inch 
caliper shade trees, 25 feet on center or in equivalent groupings, as approved or 
modified by the Planning and Development Department. Where utility conflicts 
arise, the developer shall work with the Planning and Development Department 
on an alternative design solution consistent with a pedestrian environment. 
 
 
11. 
The developer shall dedicate 65 feet of right-of-way along Cave Creek Road, as 
approved by the Planning and Development Department. 
 
 
12. 
The developer shall construct a 24-foot-wide landscaped median island along 
Desert Peak Parkway from Hillstone Way to 23rd Street, as approved or 
modified by the Planning and Development Department. 
 
 
13. 
The developer shall align the primary roadway through the subdivision with the 
intersection of Desert Peak Parkway and Hillstone Way and shall be responsible 
for any modifications to the existing drainage facility and access ramp, as 
approved or modified by the Planning and Development Department. 
 
 
14. 
The developer shall connect to the existing stub streets of Rustling Oaks Lane, 
27th Place, and 29th Way, as depicted on the site plan date stamped February 
4, 2022 and as approved or modified by the Planning and Development 
Department.

Staff Report: Z-6-22-2 
April 29, 2022 
Page 22 of 24 
 
 
 
 
 
 
15. 
The developer shall submit a Traffic Impact Study, including a Cave Creek Road 
Traffic Corridor Analysis from Sonoran Desert Drive south to the 101 Freeway to 
evaluate the overall level of service and corridor conditions with impacts 
associated with the proposed 1,545 dwelling units. The developer shall be 
responsible for regional mitigation identified through the analysis. No preliminary 
approval of plans shall be granted until the study is reviewed and approved by 
the Street Transportation Department. 
 
 
16. 
The developer shall construct all streets within and adjacent to the development 
with paving, curb, gutter, sidewalk, curb ramps, streetlights, median islands, 
landscaping and other incidentals, as per plans approved by the Planning and 
Development Department. All improvements shall comply with all ADA 
accessibility standards. 
 
 
17. 
The developer shall grant and record an avigation easement to the City of 
Phoenix for the site, per the content and form prescribed by the City Attorney 
prior to final site plan approval. 
 
 
18. 
The developer shall provide a No Hazard Determination for the proposed 
development from the FAA pursuant to the FAA’s Form-7460 obstruction 
analysis review process, prior to construction permit approval, as per plans 
approved by the Planning and Development Department.  
 
 
19. 
The property owner shall record documents that disclose the existence, and 
operational characteristics of Deer Valley Airport to future owners or tenants of 
the property. The form and content of such documents shall be according to the 
templates and instructions provided which have been reviewed and approved by 
the City Attorney. 
 
 
20. 
If determined necessary by the Phoenix Archeology Office, the applicant shall 
conduct Phase I data testing and submit an archaeological survey report of the 
development area for review and approval by the City Archeologist prior to 
clearing and grubbing, landscape salvage, and/or grading approval. 
 
 
21. 
If Phase I data testing is required, and if, upon review of the results from Phase I 
data testing, the City Archeologist, in consultation with a qualified archeologist, 
determines such data recovery excavations are necessary, the applicant shall 
conduct Phase II archeological data recovery excavations. 
 
 
22. 
In the event archeological materials are encountered during construction, the 
developer shall immediately cease all ground-disturbing activities within a 33-foot

Staff Report: Z-6-22-2 
April 29, 2022 
Page 23 of 24 
 
 
 
 
radius of the discovery, notify the City Archeologist, and allow time for the 
Archeology Office to properly assess the materials. 
 
 
23. 
Prior to preliminary site plan approval, the landowner shall execute a Proposition 
207 waiver of claims form. The waiver shall be recorded with the Maricopa 
County Recorder's Office and delivered to the City to be included in the rezoning 
application file for record. 
 
 
R1-10 ZONED AREA 
 
24. 
Building elevations shall depict architectural detailing applied to windows on all 
sides of the homes, as approved by the Planning and Development Department.  
 
 
25. 
A minimum of 15 percent of the gross site area for the R1-10 zoned portion of 
the site, after dedication of the hillside area to the city, shall be retained as open 
space, including washes and internal hillside areas, as approved by the Planning 
and Development Department. This requirement shall not be applied to individual 
phases of the overall development. 
 
 
26. 
A minimum of two distinct active open space areas and a minimum of three 
passive open space areas shall be provided within the overall R1-10 zoned area, 
as approved by the Planning and Development Department. 
 
 
R-2 ZONED AREA 
 
27. 
The development shall be in general conformance with the building elevations 
date stamped February 4, 2022, as approved by the Planning and Development 
Department. 
 
 
28. 
A minimum of 10 percent of the gross site area shall be retained as open space, 
including washes, as approved by the Planning and Development Department. 
 
 
29. 
There shall be a minimum of 5 amenities within the open space areas, such as 
but not limited to benches, picnic tables, ramadas, and/or playground equipment, 
as approved by the Planning and Development Department. 
 
 
30. 
The developer shall provide secured bicycle parking per Section 1307 of the City 
of Phoenix Zoning Ordinance. In addition, inverted U- and/or artistic bicycle racks 
shall be provided for guests, with a minimum of 0.05 spaces per unit, located 
near the clubhouse or distributed throughout the site and installed per the 
requirements of Section 1307.H of the Zoning Ordinance, as approved by the 
Planning and Development Department.

Staff Report: Z-6-22-2 
April 29, 2022 
Page 24 of 24 
 
 
 
 
 
 
R-3A ZONED AREA 
 
31. 
The development shall be in general conformance with the building elevations 
date stamped February 4, 2022, as approved by the Planning and Development 
Department. 
 
 
32. 
A minimum of 10 percent of the gross site area shall be retained as open space, 
including washes, as approved by the Planning and Development Department. 
 
 
33. 
There shall be a minimum of 5 amenities within the open space areas, such as 
but not limited to benches, picnic tables, ramadas, and/or playground equipment, 
as approved by the Planning and Development Department. 
 
 
34. 
The developer shall provide secured bicycle parking per Section 1307 of the City 
of Phoenix Zoning Ordinance. In addition, inverted U- and/or artistic bicycle racks 
shall be provided for guests, with a minimum of 0.05 spaces per unit, located 
near the clubhouse or distributed throughout the site and installed per the 
requirements of Section 1307.H of the Zoning Ordinance, as approved by the 
Planning and Development Department. 
 
Writer 
Anthony Grande 
April 29, 2022 
 
Team Leader 
Racelle Escolar 
 
Exhibits 
Zoning sketch map 
Aerial sketch map 
Conceptual Site Plan date stamped February 4, 2022 (1 page) 
Conceptual Overall Trails Exhibit date stamped April 15, 2022 (1 page) 
Conceptual Building Elevations and renderings date stamped February 4, 2022 (35 
pages; note: not all elevations submitted are included herein but are available to view as 
part of the rezoning case file) 
Community Correspondence (8 pages)

Z-8-04
Z-43-02
Z-43-02
ANX 254
Z-8-04
Z-46-19
Z-8-04
Z-14-04
ANX 254
ANX 254
ANX 254
Z-65-97
Z-43-02
Z-43-02
Z-43-02
ANX 187
ANX 254
*
*
*
*
*
*
*
HAPPY VALLEY ROAD ALIGNMENT
*
R1-8
PRD
R-2 PRD
R1-6
R1-8
PUD
S-1
R1-6
R1-18
R1-8 PRD
R1-8
S-1
C-2 *
Z-61-06
R1-6 *
Z-61-06
R1-8 PRD *
Z-8-04
C-2 *
Z-61-06
R1-6 *
Z-61-06
R1-8 *
Z-61-06
DESERT PEAK PKWY
21ST ST
21ST PL
ROBB LN
2
3
R
D
S
T
2
2
ND WAY
LEI
B
ER
PL
2
5TH ST
27TH ST
28TH ST
S
HADY
SPRING TR
L
24TH WAY
27TH PL
29TH ST
F
A
LLE
N
LE
A
F LN
MISTY WILLO
W
LN
L
IEBE
R P
L
2
5
TH PL
PARK
VIEW L
N
MIN
E CR
EEK RD
RIDG
E
C
R
EEK
RD
S
A
G
U
A
R
O PA
R
K LN
ALAMEDA RD
HI
L
LST
O
NE W
A
Y
Q
UIET HOLL
O
W
L
N
JOMAX RD
CAVE CREEK RD
Desert Maintenance
Character B
Overlay District
DOVE VALLEY RD
LONE MOUNTAIN RD
DYNAMITE BLVD
JOMAX RD
HAPPY VALLEY RD
PINNACLE PEAK RD
DEER VALLEY DR
MAYO BLVD
CAVE CREEK RD
BLACK MTN PKY
TATUM BLVD
56TH ST
64TH ST
SCOTTSDALE RD
CAREFREE HWY
SR-101
DESERT VIEW VILLAGE
CITY COUNCIL DISTRICT: 2
I
APPLICANT'S NAME:
APPLICATION NO.
Z-6-22
GROSS AREA INCLUDING 1/2 STREET
AND ALLEY DEDICATION IS APPROX.
417.33 Acres
MULTIPLES PERMITTED
*   Maximum Units Allowed with P.R.D. Bonus
S-1
R1-10, R-3A, R-2
CONVENTIONAL OPTION
417
1358, 331, 142
*   UNITS P.R.D. OPTION
N/A
1746, 397, 170
DR Horton, Inc.
DATE:
4/14/2022
REVISION DATES:
AERIAL PHOTO &
QUARTER SEC. NO.
QS 46-33, 46-34, 47-33,
47-34, 48-33
ZONING MAP
O-10, O-9, P-9
REQUESTED CHANGE:
FROM: S-1 ( 417.33 a.c.)
TO:
R1-10 ( 388.10 a.c.)
R-3A ( 15.04 a.c.)
R-2 ( 14.19 a.c.)
Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\2022\Z-6-22.mxd
Z-6-22
0.2
0
0.2
0.1
Miles

Z-8-04
Z-43-02
Z-43-02
ANX 254
Z-8-04
Z-46-19
Z-8-04
Z-14-04
ANX 254
ANX 254
ANX 254
Z-65-97
Z-43-02
Z-43-02
Z-43-02
ANX 187
ANX 254
*
*
*
*
*
*
*
HAPPY VALLEY ROAD ALIGNMENT
*
R1-8
PRD
R-2 PRD
R1-6
R1-8
PUD
S-1
R1-6
R1-18
R1-8 PRD
R1-8
S-1
C-2 *
Z-61-06
R1-6 *
Z-61-06
R1-8 PRD *
Z-8-04
C-2 *
Z-61-06
R1-6 *
Z-61-06
R1-8 *
Z-61-06
DESERT PEAK PKWY
21ST ST
21ST PL
ROBB LN
2
3
R
D
S
T
2
2
ND WAY
LEI
B
ER
PL
2
5TH ST
27TH ST
28TH ST
S
HADY
SPRING TR
L
24TH WAY
27TH PL
29TH ST
F
A
LLE
N
LE
A
F LN
MISTY WILLO
W
LN
L
IEBE
R P
L
2
5
TH PL
PARK
VIEW L
N
MIN
E CR
EEK RD
RIDG
E
C
R
EEK
RD
S
A
G
U
A
R
O PA
R
K LN
ALAMEDA RD
HI
L
LST
O
NE W
A
Y
Q
UIET HOLL
O
W
L
N
JOMAX RD
CAVE CREEK RD
Desert Maintenance
Character B
Overlay District
DOVE VALLEY RD
LONE MOUNTAIN RD
DYNAMITE BLVD
JOMAX RD
HAPPY VALLEY RD
PINNACLE PEAK RD
DEER VALLEY DR
MAYO BLVD
CAVE CREEK RD
BLACK MTN PKY
TATUM BLVD
56TH ST
64TH ST
SCOTTSDALE RD
CAREFREE HWY
SR-101
DESERT VIEW VILLAGE
CITY COUNCIL DISTRICT: 2
I
APPLICANT'S NAME:
APPLICATION NO.
Z-6-22
GROSS AREA INCLUDING 1/2 STREET
AND ALLEY DEDICATION IS APPROX.
417.33 Acres
MULTIPLES PERMITTED
*   Maximum Units Allowed with P.R.D. Bonus
S-1
R1-10, R-3A, R-2
CONVENTIONAL OPTION
417
1358, 331, 142
*   UNITS P.R.D. OPTION
N/A
1746, 397, 170
DR Horton, Inc.
DATE:
4/14/2022
REVISION DATES:
AERIAL PHOTO &
QUARTER SEC. NO.
QS 46-33, 46-34, 47-33,
47-34, 48-33
ZONING MAP
O-10, O-9, P-9
REQUESTED CHANGE:
FROM: S-1 ( 417.33 a.c.)
TO:
R1-10 ( 388.10 a.c.)
R-3A ( 15.04 a.c.)
R-2 ( 14.19 a.c.)
Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\2022\Z-6-22.mxd
Z-6-22
0.2
0
0.2
0.1
Miles

  
,)*#H
-$##H
)HH





,)*#H
.$##H


,)+#H
-$##H


,)*#H .$##H
'H H
	



	




	
	
;$+; 
(/;





,)*#H -$##H
)HH






	
;!;
	
;";

(/;

;)&);

;%,;

	


%

/
'!'/
'"'/








;$+;

(.;


;!;


;!;

(/;
;$+;

;*'*;



%

/
 #H
 #'; )'1;# - )
  #'; )'1;# - )
8 -;((;);#  )# ;)#
0() ;$';

'((;# 1;);#  )# 
)#;0() ;$'
	
; ;'1;';#';$';
			
9; :;$'#$#(;/;
0() ;/;

			
	

	


!H

H3H?7=H@/9/2=H>/?8D/FH
A3;>3H/?7G=</H	H
> 

1=<A/1AH/93EH47@6
	

(H=?A=<
	H<HA6H/C3<B3H@B7A3H
>6=3<7EH/?7G=</H	
 

 		
1=<A/1AH2/<H0=<=D


/22?3@@H
9=1/A32H<=?A6H/<2H@=BA6H
=4HA63H6/>>FHC/993FH
/975<;3<AH/<2HD3@AH=4H
1/C3H1?338H?=/2H7<H
>6=3<7EH/?7G=</H
/>>971/<AH
"H
1=<A/1AH
/93EH47@6H
3E7@A7<5HG=<7<5H 
H
>?=>=@32HG=<7<5H(:H&(%H(
H&(%H
(	H&(%
5?=@@H/1?3/53H 	H/1H
		
,/&(#/$/






#/+-/$/


		
./
	/
	/

	/
	
	
	
	
$526;(3254;	; 274	


	;
%)* /




,.9;
-*0;-;
; ;3;8;
)1;-;
	;	;
5.;-;

;

 %%.!;-;
;;


2-).' 0 *);.()1;
;


.)!;*-- *-;

;
;
*,);.,;-;
;;
;
1*1%;*,);.,;
;;


3)"1;
*3)1!1"7;
' 6;
-);

	3	;


. 1.;

;4;

	
:

;%*1;
3;
;

:

;%*2;
4;

:;%*2;

3	;



:;%*2;
3;
;
:
;%*2;
3;
;
,.;;,-%;2*1%;
;3;
,.;;
-*0;-;
;


)1;-;
;;
5.;-;
	
;

.)!;*-- *-;
;;
;
*,);.,;-;
;
;
1*1%;*,);.,;
;;
	;
3) 1;
*3)1!1$7;
' 6;
:

;%*2;
	3	;


:

;%*2;

;4;
	

:;%*2;
3;
;

:;%*2;
4;

,.;;,-%;1*2%;
;	3;
,.;;
-*..;-;

;; ;38;
)1;-;
/+
5.;-;
;

	
"%%.!;-;
;

*,);.,;-;
;;

;
1*1%;*,);.,;
;;
		
3) 1;
*3)1 1 7;
' 6;
:

;%*2;

;4;
;
	



:;%*2;
;4;


:;%*2;

;4;
;
:
;%*1;
4;

,.;;,-%;1*2%;
;3;
1*1%;
-*0;-;
;; 
;38;
)1;-;
	
;	;
5.;-;

;;
	;
 %%.#;-;
;;

	

2-).' 0 *);.()1;
;
;

	
		
*,);.,;-;
;

1*1%;*,);.,;
;;
;
3) 1;
*3)1!1$7;
' 6;

4;
;
.!1.;

;3;

:

;%*1;
;4;



:

;%*1;
;4;
;
:;%*1;
;4;



:;%*1;
;4;
	;




;4;

,-&;1*2%;
;3;


 
  

	


	
 	




 
 

	
 		


EË
AË




BË
>IË AFË

	 



MË
BË
BË


MË
D

BË
QË
?>Ë
SË







	
 


CË
EË



	 

DP=Ë


 
	
š š š ™ Ë
DD‰Ë |µqË
“9€.Ë ‹€€aË WZ¶Ë
   ! D="FË O·

”.€0Ë …tT’[Ë
 ASEË>¸
€ƒË €`Ë –k~¹
A>"E>¸
 
?RÀ
¼Ë
‘:€6Ë ‡tT“^˜Ë
 >P"PË J·
€ƒË €`Ë –k~	
>="PË J·
 	

S
?Ë >;PË
‘5€2Ë ‡vT½

PË
”€„Ë €aË —l

`k~lhË at€€Œ


DP $¯
”3€-Ë ƒT‹T„°Ë
 ± !
DD"‰Ë |ÇË
-€6Ë ‹€€aË W[Vs
² œD§FË


 	
{Ë @R"E>¸Ë
€…Ë €`Ë –k~X€–Ë
³ œ@>EË
Dª¡Ë ct€€ŠË
?SSË
‘.€/Ë ˆuT½Ë
>PPË H;PË
“€‡Ë €bË –k~¹Ë
³ œ>=PË Ê;PË
@¤¡Ë cu€´Ë
™
™›Ë S"?o·Ë
”.<-Ë „uT½Ë
N=
eTŠTf^Ë 

bk~lgË ct€€ŠË
DP=Ë
‘1€2Ë ˆTŠTˆ°Ë
 º 
! DD	=Ë }µ£
‘.<3Ë Œ€€`Ë Y\»

 œD¨"EË
6€4Ë †wT”]•Ë
›AS
FË
”€„Ë €aË —lY¹Ë
¾
 ›A?"FË
D©¢Ë `w<¿#
Ë>SÀ
“6€6Ë ˆwT‘_«Ë
?P"PË K·
”€„Ë €aË —lX¹Ë
Á œ?=®"¬Ë ·Ë
A¥¢Ë bw€€‹«Ë
S>Ë ?;PË
“6€5Ë ˆwT½
P$Ã
”€„Ë €aË —lXÄ%
‚$Ã
alkŽiË `w€¿Ë
	 	





	 


DP$ÃË
& ' ' ' ' '
,'Ŕ Æ-<Æ 6џT ‹T„°Ë
p
("+( DD"=Ë }Ç
”4€7Ë Œ€€`Ë X]UrË
m)** D=GË NË;PË

nË
“6€6Ë ˆwT½Ë
yzœË @S"FË ?¸Ë
‘€ˆË €cË —lX€—Ë
œ@?F˞;@Ë
Dª¢Ë bw€ÈË
>SÉ­
“8€8 „xT½
?PPË L;PË
‘€ˆË €cË —lY¹Ë
œ?=PË Ê;PË
@¦¢Ë dx€ÈË
S"> ?·
6€.Ë „wT½
P=Ë
‘€ˆË €cË —lY¹Ë
==Ë
clkjË bw€ÈË
	




 
 

	
	

	
7


,0‚
 

	 	



 



 


	
	
	

-1hqi‚6kj
cX!‚ [A]A[|
*78‚
c ( ‚ ZRBz
87‚ 4x
.pm‚ IOUPaL‚ IRXy
7*‚+'7‚
f X ‚ YRBz
r)6kj
;<@
GC‚ ITXX^{



 
 

	
	 

	




	







/3}
f$X ‚ [B_B[Df‚g
 *7~
c#( ‚ \TBz
:7‚ 5x
/pm‚ IOUPbL‚ ITX
uw*+x
c X ‚ ZRBcE€
))‚
=>?l

KQWnv aNHC‚ KRXX`‚{
 
 
 
 		 
s


 
 

	
	

	

t

	
	
	
	




	







.2‚
c!X"‚ \A^A[|
*79‚
d X ‚ ZSBz
87‚ 4x
.om‚ IPUOaM‚ JSXy
7	*‚+'7‚
e X ‚ YSBz

	
 	
 
/3	)‚
f$X%‚ [B_BY|
+7~
c#( ‚ \TBz
:
7‚ 5x
/pm‚ JOVPbL‚ ITX
7*+x
c&X ‚ ZRBdF‚

 
	






	


	


 

	



	
				



		


    


 
	


	






	
	


.*9 +%29








	




	(9 !'**-


6








/*9 +&/ 9




 	











	 $ !

	

	
	
	
.*9 +%19
	

	 "5




	


	


  		





.*9 +&. 


	








9
			*9 ,$
	

	
	
	
.*9 +%09






	


	

	(9 !%**-



.*9 +&0 



 	





	


9
		*9 ,$


	
	
	
.*9 +%09
	
	








	


	(9 !%**-


$


 	
4
7
8)*39 # 9








 	 "$ #

	
		


Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 4091 B
Stucco System
Concrete Roof Tile
Decorative Gable Pipes
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
4
12
TYP
0’-0”
10’-1 1/8”
20’-7”
25’-4 3/4”
Decorative Wraught Iron Detail

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 4091 F
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
6
12
TYP
0’-0”
10’-1 1/8”
20’-7”
26’-4 1/8”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 4091 C
Stucco System
Concrete Roof Tile
Standard Ledgestone Shown
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
4
12
TYP
0’-0”
10’-1 1/8”
20’-7”
25’-4 3/4”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3534 A
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
9’-1”
17’-0”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3534 B
0’-0”
9’-1”
17’-0”
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
Decorative Gable 
Pipe Detail

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3534 C
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
Standard Ledgestone Shown
5
12
TYP
0’-0”
9’-1”
17’-0”
12’- 10 1/8”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3534 F
0’-0”
9’-1 1/8”
17’-0”
12’-1”
Board and Batton System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
5
12
TYP
Standard Ledgestone Shown

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3534 N
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
 n
w
o
h
S e
n
o
t
s
e
g
d
e
L d
r
a
d
n
a
t
S
5
12
TYP
0’-0”
9’-1 1/8”
17’-0”
10’-1”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 4093 B
Stucco System
Concrete Roof Tile
Decorative Gable Pipes
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
4
12
TYP
0’-0”
10’-1 1/8”
20’-7”
25’-6”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 4093 F
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
6
12
TYP
0’-0”
10’-1 1/8”
20’-7”
27’-8”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 4093 C
Stucco System
Concrete Roof Tile
Standard Ledgestone Shown
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
4
12
TYP
0’-0”
10’-1 1/8”
20’-7”
25’-6”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Front Elevation
0’-0”
10’-1 1/8”
20’-7”
27’-3 1/4”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 4097 F
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
Front Elevation
5
12
TYP
0’-0”
10’-1 1/8”
20’-7”
28’-9 1/2”
Decorative Wooden Shutters
Standard Ledgestone Shown

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 4097 C
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
Standard Ledgestone Shown
Front Elevation
4
12
TYP
0’-0”
10’-1 1/8”
20’-7”
27’-3 1/4”
Decorative Wooden Shutters

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 4095 B
Front Elevation
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Decorative Gable Pipe Detail
Accent Paint w/
Special Stucco Finish
4
12
TYP
0’-0”
10’-1 1/8”
20’-7”
26’-0 1/2”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 4095 F
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
Front Elevation
6
12
TYP
0’-0”
10’-1 1/8”
20’-7”
28’-3 3/4”
Standard Ledgestone Shown

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 4095 C
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
Standard Ledgestone Shown
Front Elevation
4
12
TYP
0’-0”
10’-1 1/8”
20’-7”
25’-10 3/8”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3507 A
Stucco System
Decorati e Wrought Iron Detail
Concrete Roof Tile
Decorative Wooden Shutters
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
9’-1 1/8”
11’-1 1/8”
16’-11 3/4”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3507 B
0’-0”
Stucco System
Decorative Gable Pipe
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
9’-1 1/8”
11’-1 1/8”
16’-11 3/4”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3507 C
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
Optional Ledgestone Available
5
12
TYP
0’-0”
9’-1 1/8”
11’-1 1/8”
16’-11 3/4”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3507 F
0’-0”
9’-1 1/8”
12’-1 1/8”
17’-0”
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Decorative Wooden 
Shutters
Standard Ledgestone Shown
5
12
TYP

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3507 N
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
Optional Ledgestone Available
4
12
TYP
0’-0”
9’-1 1/8”
11’-1 1/8”
15’-5 1/8”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3524 A
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
9’-1 1/8”
16’-11 1/2”
13’-1 1/8”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3524 B
0’-0”
9’-1 1/8”
16’-11 1/2”
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
Decorative Gable Pipe Detail
13’-1 1/8”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3524 C
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
Standard Ledgestone Shown
5
12
TYP
0’-0”
9’-1 1/8”
16’-11 1/2”
Decorative Wrought Iron Detail
13’-1 1/8”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3524 F
0’-0”
9’-1 1/8”
16’-11 1/2”
Board and Batton System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
5
12
TYP
Standard Ledgestone Shown
12’-1 1/8”

Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3524 N
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
Standard Ledgestone Shown
5
12
TYP
0’-0”
9’-1 1/8”
15’-6”
12’-1 1/8”

From:
Natalie Heylen
To:
Julianna Pierre
Subject:
Raining for stone butte east
Date:
Monday, February 28, 2022 3:54:34 PM
What is the case number for this? I see lots of numbers everywhere. 
Application number z-6-22
Dsd#21-5799
I want to make my feelings known I am not ok with this rezoning. What will happen to all the
hiking trails around here?

From:
Lauren Prole
To:
Julianna Pierre
Subject:
Stone Butte East - Concerns
Date:
Wednesday, March 2, 2022 2:13:54 PM
Good afternoon Julianna, 
I am a concerned resident of Desert Peak, just south of the proposed Stone Butte East project.
I wanted to reach out to you to find out how community concerns can be heard. We had a
neighborhood meeting with the developers of the project yesterday, but they did not provide
any specific responses to questions that were asked and many responses included pointed
towards the City of Phoenix. 
One of my biggest issues is traffic, since the current infrastructure barely handles the traffic of
the residents that live here, adding 1,500 homes is concerning. Here are a couple examples: 
-Cave Creek between Pinnacle and 51 freeway is congested almost all hours of the day. 
-Excessive speed on Cave Creek as well as Desert Peak Parkway - I'm extremely concerned
for the children crossing Desert Peak Parkway with no clear pedestrian crosswalks. 
-On Pinnacle/Desert Peak Parkway as traffic is heading west at the intersection of Cave Creek
Rd and Pinnacle there is already a huge problem with traffic backing up with no turn lane. 
Are any of these issues going to be addressed with the planning of Stone Butte East? I
appreciate your time and look forward to your response. 
Thank you,
Lauren Prole

1
Anthony M Grande
From:
Anthony M Grande
Sent:
Wednesday, April 13, 2022 6:04 PM
To:
Anthony M Grande
Subject:
FW: Stone Butte East
From:M.J.Westfall<mjwestfall@gmail.com>
Sent:Tuesday,April5,20221:13PM
To:JuliannaPierre<julianna.pierre@phoenix.gov>;PDDNorthGatewayVPC<northgatewayvpc@phoenix.gov>
Cc:ben@witheymorris.com
Subject:StoneButteEast

IamcontactingyoutorespectfullyrequestthatyoureconsidertherezoningrequestsforZͲ6Ͳ22Ͳ2,theproposedproject
ofStoneButteEast.

Outofconsiderationfortheexistingresidentsinthearea,Iamaskingthatyoupleaseconsidersignificantlyincreasing
theproposed40'landscapebufferbetweentheSheaneighborhood,NorthviewatStoneButte,andthewestsideof
phase1.Theresidentswhopurchasedhomesinthisare0qadidsofortheopenspaceandthesurroundingnatural
desert.Increasingthedistancebetweentheseresidentialcomplexeswillhelptomaintaintheopen,naturalfeelofthe
areaandhelptoprotecttheexistinghabitatsofthelocalwildlife.Ifeelthattheexistingplandoesnotproperly
accomodateforpreservingthenaturalaspectofthearea,theverythingthatmakesthislocationdesirabletoyour
futurepotentialbuyers.

Additionally,Iamrequestingthatyoupleasereconsidertherequestedzoningchangesforthemultifamilyresidential
units.TheareaisalreadygrosslyoverͲcongestedandcrammingmorepeopleintothisareaisirresponsibleconsidering
thatwedonothavetheroads,stores,etc.tosupportthegrowth.Furthermore,themultifamilyunitsbringan
undesirableelementthatwilllikelyimpacthomevalueswithboththenewbuildhomesandtheexistinghomes.

I'dbehappytodiscussfurtherandsincerlyhopethattheconcernsoftheexistingresidentswillbeconsidered.

BestRegards,
MelissaWestfall
619Ͳ518Ͳ5973

1
Anthony M Grande
From:
Niranjan Dravid <n_dravid@yahoo.com>
Sent:
Sunday, April 24, 2022 12:28 PM
To:
Anthony M Grande
Subject:
Desert View Village Planning committee meeting - Stone butte East
HELLO Anthony,  
 
We were told by some of our residents to contact you in order to get our objections for the public 
meeting notice that is going to be help on May 3 (Village planning ) & June 2 (Planning rezoning) .  
 
We want to strongly OBJECT to the proposal due to the below reasons 
 
1. This will simply destroy the ecosystem of the animals living in this area & will put them in danger .  
2. This proposal will put a direct impact on our home prices. The high density of homes is 6 times 
more denser than the existing homes that are built in Stone butte.  
3. The whole area will become a concrete jungle without any parks. There are no parks near Stone 
butte at all, why can't the City consider to use and redevelop this land and built parks for the families 
so that the kids and adults can enjoy walks, pickle ball, tennis, baseball . We strongly feel that 
building so many homes is profitable for the builder and they will mint a lot of money, but what about 
the general public who needs parks and recreations near this area ? Is anyone thinking about them ?  
 
We also do not have grocery stores, Gym etc near by, use this land to develop that instead and not 
allow using such a dense population of homes which will have a negative impacts on eco system, 
prices & the existing families. 
 
We OBJECT to this proposal and would appreciate if you can take our vote for objection, 
 
Shea Homes resident

1
Anthony M Grande
From:
Smitha Kundur <smithakundur@gmail.com>
Sent:
Monday, April 25, 2022 2:49 PM
To:
Anthony M Grande
Subject:
Reference to Stone Butte East, Case Nos Z-6--22 & GPS-DSTV-1-22
Attachments:
Stone Butte.jpg
Hello Anthony, 
 
I am a resident of the Desert Peak neighborhood located on the northwest corner of Pinnacle Peak Road and Cave Creek 
Road. 
 
I understand there is a zoning conversion hearing for Stone Butte East development as referenced above.  We obtained 
a proposed site plan (see attached) that shows 3 connections to the existing Desert Peak community.  I am a resident 
that lives adjacent to one of these connections and I am very concerned with the amount of traffic the new 
development will add to our neighborhood.  The way their site plan is laid out, most of the traffic from the houses 
located along the southern property limits of Stone Butte will most likely access the existing Desert Peak community 
adding a lot of traffic burden on our roadways. 
 
I would also like to request any traffic study/circulation study the developer submitted as part of the zoning conversion 
documents.  I am a traffic engineer by profession and would like to see the amount of traffic the proposed community is 
generating as a whole and how much of it will be accessing our neighborhood. 
 
Thank you for your time. I can be reached at 479‐871‐4110 or via email if you have any questions. 
 
Thanks, 
Smitha.

1
Anthony M Grande
From:
Maruth Kumar Mulakala <maruthkumar@gmail.com>
Sent:
Thursday, April 28, 2022 11:25 AM
To:
Anthony M Grande
Subject:
Ref Stone Butte East Case nos: Z-6-22 & GPA-DSTV-1-22
Hello Anthony, 
 
I am a resident of the Desert Peak neighborhood located on the northwest corner of Pinnacle Peak Road and Cave Creek 
Road. 
 
I understand there is a zoning conversion hearing for Stone Butte East development as referenced above.  We obtained 
a proposed site plan (see attached) that shows 3 connections to the existing Desert Peak community.  I am a resident 
that lives adjacent to one of these connections and I am very concerned with the amount of traffic the new 
development will add to our neighborhood.  The way their site plan is laid out, most of the traffic from the houses 
located along the southern property limits of Stone Butte will most likely access the existing Desert Peak community 
adding a lot of traffic burden on our roadways.  
 
Thank you for your time. I can be reached at 480 677 0026 or via email if you have any questions. 
 
Please let me know if there is anything we can do to avoid such an intrusive plan. 
 
Thanks 
Maruth Mulakala

1
Anthony M Grande
From:
Anunori <anunori@yahoo.com>
Sent:
Thursday, April 28, 2022 12:51 PM
To:
Anthony M Grande
Subject:
Stone Butte East - Cases No Z-6-22 & GPA-DSTV-1-22
Hello Anthony, 
 
I am a resident of the Desert Peak neighborhood located on the northwest corner of Pinnacle Peak Road and Cave Creek 
Road. 
 
I understand there is a zoning conversion hearing for Stone Butte East development as referenced above.  We obtained 
a proposed site plan that shows 3 connections to the existing Desert Peak community.  I am a resident that lives 
adjacent to one of these connections and I am very concerned with the amount of traffic the new development will add 
to our neighborhood.  The way their site plan is laid out, most of the traffic from the houses located along the southern 
property limits of Stone Butte will most likely access the existing Desert Peak community adding a lot of traffic burden 
on our roadways.  
This is a concern for us. 
 
Thank you for your time and listening to us. 
 
Regards, 
Anuradha

1
Anthony M Grande
From:
Lalitha K <lalitha.kagithapu@gmail.com>
Sent:
Thursday, April 28, 2022 1:41 PM
To:
Anthony M Grande
Subject:
Regarding zoning for Desert View village
Attachments:
2c7ca7fa-031c-4515-89b0-96e09fee80a4.jpg
Hello Anthony, 
 
I am a resident of the Desert Peak neighborhood located on the northwest corner of Desert Peak Road and Cave Creek 
Road. 
 
I understand there is a zoning conversion hearing for Stone Butte East development as referenced above.  We obtained 
a proposed site plan (see attached) that shows 3 connections to the existing Desert Peak community.  I am a resident 
that lives adjacent to one of these connections and I am very concerned with the amount of traffic the new 
development will add to our neighborhood.  The way their site plan is laid out, most of the traffic from the houses 
located along the southern property limits of Stone Butte will most southern property limits of Stone Butte will most 
likely access the existing Desert Peak community adding a lot of traffic burden on our roadways.  
   
We are already impacted by Stone Butt west and North View Shea construction and with hazardous traffic conditions. 
 
Thank you for your time. I can be reached at 305 798 2625 or via email if you have any questions. 
 
Thanks, 
Lalitha