FY 2021-22 CM REVISED Budget Attachment B.pdf
Extracted text (via pymupdf)
11470 characters
Department/Program 2021-22 Total Water Services 1. Water Resource Management and Development Planning $724,000 *NEW* Water Conservation: Add staff and equipment to implement Phase II of the water conservation plan approved by City Council. The positions are being requested based on the Water Conservation Ad Hoc Committee recommendation to expand conservation outreach within the City. Council also adopted the water conservation metric to reduce the total gallons-per-capita-per-day (GPCD) from 169 to 155 by 2030. 5.0 Total Water Services $724,000 5.0 TOTAL CLIMATE CHANGE AND HEAT READINESS $724,000 5.0 Public Works 1. Education and Enforcement $0 Human Services Campus Cleanup: Add funding to support the coordination and expansion of the Human Services Campus Clean-Up service. The request includes adding one Supervisor and two Solid Waste Equipment Operator positions, one Rear Loader, one Articulator Loader, and one Trailer positions. Positions will be in the Solid Waste Division of Public Works. 3.0 Total Public Works $0 3.0 TOTAL AFFORDABLE HOUSING AND HOMELESSNESS $0 3.0 ATTACHMENT B 2021-22 PROPOSED SUPPLEMENTALS NON-GENERAL FUND View the Inventory of Programs published online for program details. AFFORDABLE HOUSING AND HOMELESSNESS CLIMATE CHANGE AND HEAT READINESS Department/Program 2021-22 Total Planning and Development 1. Residential Plan Review & Inspections $284,000 Add two Construction Permit Specialist II positions and a Plan Review Coordinator position to the Residential Plan Review section which has seen a 49% increase in Single Family Residence plot plan submittals compared to last fiscal year along with a 90% increase in photovoltaic submittals. Additional staffing resources are needed to reduce the turnaround times for these reviews and maintain turnaround times in the future. 3.0 2. Commercial Plan Review & Inspections $325,000 Add a Structural Plans Engineer position, a Mechanical Plans Engineer position and a Principal Engineering Technician position in the Commercial Plan Review section due to several large development projects, including the semiconductor plant project, which is expected to meet strict deadlines to keep the project on track. 3.0 3. Administration $78,000 Add an Accountant I position to support the data reconciliation, analysis and reporting of financial data for accounts receivable, accounts payable and budget/cost recovery. Additional financial analysis support is needed primarily due to new duties anticipated with the KIVA/SHAPE PHX permitting system conversion. This position will provide technical/financial expertise and support in the new SHAPE PHX system to over 50 cash handling staff across various payment counters and sections within the department. 1.0 4. Residential Plan Review & Inspections $116,000 Add a General Inspector II position for the Remote Inspections program. This position will be dedicated to the Remote Inspections program but will also be able to assist with other inspections as needed. 1.0 5. Administration $96,000 Add a User Technology Specialist position. IT staff provide day-to-day support for more than 500 computer workstations and associated software. This position will help ensure any service or technical issues are being proactively resolved in order to minimize customer impact. 1.0 6. Administration $60,000 Add a Records Clerk II position to support the scanning of planning, zoning and historic preservation files. Increased activity and resulting workloads of planners supports the need for this position. PDD averages 750 to 1,000 zoning cases annually. Each of these Zoning adjustment, rezoning and special permit case files need to be scanned into SIRE database system after the cases are completed. 1.0 Total Planning and Development $959,000 10.0 BUILDING COMMUNITY AND RESPONDING TO GROWTH Department/Program 2021-22 Total Public Works 1. Contained Residential Collection $2,012,000 Add funding to support the refuse and recycle collection service growth needed to efficiently maintain existing and future service levels. The request is consistent with the 2019 Solid Waste Rate Advisory Committee and financial plan approved by Mayor and City Council. Includes adding four Solid Waste Equipment Operator and four Automated Side Loader positions. 4.0 2. Open Landfill $72,000 Add one Equipment Operator IV position to support the citywide growth in solid waste tonnage at the SR85 Landfill. This position is needed to reduce overtime, employee fatigue and operational efficiency. 1.0 Total Public Works $2,084,000 5.0 Street Transportation 1. Street Maintenance $0 Add a Senior GIS Technician position in the Geographic Technology Services Section to oversee quality control, training, and data research for the GIS land base information and ensure recorded documents are correctly prepared and documented for GIS Technicians to map. Position will replace consulting services resulting in a net zero add. 1.0 2. Administration $94,000 Add a Senior GIS Technician position in the Technical Services Section to meet the needs of Pavement Management program’s GIS editing and analyses, and the demand for GIS maps, tools, and services. 1.0 3. Various $262,000 Restore two Street Maintenance Foreman III positions and add funding for two vehicles. Positions are assigned to the Preventive Maintenance and Street Cleaning Sections. Six Foreman III positions were eliminated during the recession, four positions were restored, these are the last two positions. Positions handle day- to-day operations, provide training on procedures and safe operation of equipment, and handle administrative responsibilities related to emergency and storm response. 2.0 4. Street Maintenance $77,000 Add an Administrative Aide position in the Field Operations Administration section, dispatch function to assist with phone service requests, email, and other communications from the public, City staff, and other agencies regarding emergency, non-emergency street maintenance, and non-street related concerns. 1.0 Total Street Transportation $433,000 5.0 Department/Program 2021-22 Total TOTAL BUILDING COMMUNITY AND RESPONDING TO GROWTH $3,476,000 20.0 Public Works 1. Administration $94,000 Add one Senior Human Resources Analyst position to provide support to the Solid Waste divisions. This position is located in the General Fund but will be funded by the Solid Waste fund and is needed to increase response time, provide supervisor support, process corrective actions and recruitments. 0.0 Total Public Works $94,000 0.0 TOTAL ADMINISTRATIVE ACCOUNTABILITY $94,000 0.0 Law 1. Criminal Division - Victim Services Unit $0 Conversion of eleven existing temporary positions to ongoing positions within the Law Department's Criminal Division - Victim Services Unit funded by Victims of Crimes Act (VOCA) Advocacy Services Grant, VOCA Advocate for Victims 50 & Over Grant and Arizona Governor's Office of Highway Safety (GOHS) Grant. These positions are of a long-term nature as grants have been awarded consistently over the past fifteen years. 0.0 Total Law $0 0.0 Neighborhood Services 1. Administration $0 Convert a temporary Special Project Administrator position (Grants Compliance Administrator) to ongoing status. A continued long term need is due to increased complexity and reporting requirements per the U.S. Department of Housing and Urban Development and to perform critical financial and programmatic analysis and oversight to identify strategic opportunities to maximize CDBG funds. This addition will provide the City with a dedicated position to perform specialized CDBG compliance and programmatic research and provide recommendations to City management and Council on initiatives and projects to best meet the diverse needs of Phoenix neighborhoods. 0.0 ADMINISTRATIVE ACCOUNTABILITY POSITION CONVERSIONS TO MAINTAIN EXISTING SERVICES Department/Program 2021-22 Total 2. Targeted Neighborhood Revitalization Programs $0 Convert a temporary Project Manager position and an Accountant II position to ongoing status. These positions were originally funded with Neighborhood Stabilization Program grant funds and support programs to purchase foreclosed or abandoned homes and multi-family properties at a discount to rehabilitate, resell, or redevelop these properties in order to stabilize neighborhoods within the City of Phoenix. The programs are now funded with program income expected from outstanding 15-30 year loans which must also comply with the HUD federal funding regulations including regular grant reporting and program administration for reuse of available funds. 0.0 3. Housing Rehab Programs $0 Convert a temporary Housing Rehabilitation Specialist position and a Project Manager position to ongoing status. These positions support weatherization grant programs that provide energy efficient improvements for low-income residents. The City has continuously received level or increased funding to assist Phoenix residents and there is no indication of the City not being a continued recipient of these grant funds. 0.0 Total Neighborhood Services $0 0.0 Public Transit 1. Light Rail $0 Convert a temporary Management Assistant II position (Business Assistance Coordinator) to ongoing status. This position is responsible for the creation and implementation of the Small Business Financial Assistance Program Pilot in conjunction with Valley Metro and the program administrator. This position is essential for developing programs that support the business communities that might be impacted by light rail construction and for working with Valley Metro, business owners and other stakeholders to assure the quality and standards for the City of Phoenix and Light Rail Business Assistance program are maintained. 0.0 2. Light Rail $0 Convert a temporary Economic Development Program Manager position to ongoing status. The position is in the construction oversight and coordination section of the Light Rail Transit Division and is responsible for the implementation of a quality assurance program, and serves as a liaison for other internal City departments as it relates to Light Rail operations and construction. The position is also responsible for making sound engineering determinations to forward the progress of light rail projects. 0.0 Total Public Transit $0 0.0 Department/Program 2021-22 Total Street Transportation 1. Administration $0 Convert a temporary Special Projects Administrator position in the Horizontal Project Management (HPM) section to ongoing status to manage the design and construction staff and the Materials Testing Lab and Survey sections and oversee the work of design consultants and construction contractors. 0.0 2. Transportation and Drainage Design and Construction $70,000 Convert a temporary Chief Construction Inspector and Senior Construction Inspector to ongoing status, and add funding for vehicles. Inspectors are responsible for project management of multiple projects, project and public safety, adhering and monitoring Americans with Disabilities Act (ADA) Federal compliance, and addressing citizen concerns and efficient resolution of citizen complaints related to projects. 0.0 Total Street Transportation $70,000 0.0 TOTAL POSITION CONVERSIONS TO MAINTAIN EXISTING SERVICES $70,000 0.0 TOTAL PROPOSED NON-GENERAL FUND ADDITIONS $4,364,000 28.0