WATER RESOURCES GOAL AND POLICY CONSIDERATIONS 
COMP PLAN ELEMENT 
(GOALS/POLICIES) 
CPA CONSISTENCY/JUSTIFICATION 
Water Resources Goal #4:  Increase 
water conservation. 
The switch in land use from agriculture to solar will significantly 
increase water conservation in the county. The Project will utilize 
photovoltaic (PV) modules to generate electricity. PV technology is 
the most water-efficient solar generation technology available. The 
Applicant recognizes that the proposed site receives a high degree 
of solar radiation and that water supplies in the vicinity are limited. 
The Project will implement water conservation measures while 
utilizing water-efficient technology. Solar uses roughly 835 gallons of 
water per acre per year where agriculture uses roughly 3,340 gallons 
of water per acre per year. Solar plants use approximately 25 percent 
of water required for a similar parcel of land growing alfalfa or other 
agricultural uses. Construction Peak Water Usage and Operations & 
Maintenance Water Usage would be significantly less than an 
agricultural use. 
Water 
Resources 
Policy 
#2: 
Maricopa County supports water 
conservation 
techniques 
in 
the 
planning 
and 
design 
of 
new 
development. 
The Project will include a comprehensive Water Conservation Plan 
with established BMPs for water conservation. The Project’s water-
conscious design and implementation is consistent with the 
applicable water goals and policies of the Comprehensive Plan. 
Water 
Resources 
Policy 
#4: 
Maricopa 
County 
supports 
compliance with its Drinking Water 
and 
Water 
and 
Wastewater 
Treatment Programs. 
Drinking water will be delivered by truck. If a local well is required for 
water use, such well will comply with local and state permitting, 
operations, monitoring, and recharge requirements. 
The Project will maintain compliance with Maricopa County’s 
wastewater treatment programs during the construction activity 
period. The Project as proposed will not have wastewater demands 
or discharge. A septic system will be used if an O&M building is 
required. Alternatively, portable restroom facilities will be provided 
for employee use during the implementation and operational phases.
Water 
Resources 
Policy 
#5: 
Maricopa County supports low water 
use 
solar 
electric 
generating 
technologies.   
Harquahala Sun II will require very little water except for 
maintenance for cleaning the solar panels and equipment. This water 
will either be hauled to the site during construction and operation or 
obtained from existing wells on-site or new wells permitted through 
the Arizona Department of Water Resources (ADWR), as needed. 
Water hauled to the site would be from permitted sources. 
Water 
Resources 
Policy 
#7: 
Maricopa County supports low water 
use and drought tolerant landscaping.  
If landscape treatments are required to provide visual buffering, they 
will be selected from drought tolerant xeric species which will require 
low water use to establish and maintain.

Page 19 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
 
ENERGY GOAL AND POLICY CONSIDERATIONS 
COMP PLAN ELEMENT 
(GOALS/POLICIES) 
CPA CONSISTENCY/JUSTIFICATION 
Energy Goal #1: 
Provide 
leadership 
to 
promote 
regional environmental quality.  
 
Harquahala Sun II will have a long-term environmental impact of 
improving air quality by reducing emissions associated with 
conventional electric energy generation. The county has adopted 
environmental performance standards intended to preserve and 
sustain biologic, cultural, and environmental resources of the region 
which are evidence of the county’s regional leadership role in the 
promotion of environmental quality.  
Energy Goal #2: 
Make Maricopa County a leader in 
alternative 
energy 
research 
and 
development. 
 
Harquahala Sun II provides the opportunity to implement, test, and 
evaluate the efficiencies of the most current PV solar generation 
equipment and battery energy storage systems. Evaluation of their 
operational performance is key to the research and development of 
more efficient equipment and related processes. An operational 
facility provides opportunities to implement advances in the 
associated technologies over the life of the Project. Approval of the 
facility provides opportunities to test storage systems in response to 
increasing demands for the use of stored energy.  
Energy Policy #6: 
Maricopa County supports being a 
responsible leader in alternative 
energy research and development. 
Harquahala Sun II will be reflective of the Maricopa County Board of 
Supervisor’s regional and statewide leadership in the attraction, 
promotion, and delivery of renewable energy resources and 
infrastructure.  
 
COST OF DEVELOPMENT GOAL AND POLICY CONSIDERATIONS 
COMP PLAN ELEMENT 
(GOALS/POLICIES) 
CPA CONSISTENCY/JUSTIFICATION 
Cost of Development Goal #2: New 
development pays its proper and 
reasonable share of the costs of new 
infrastructure, services and other 
public improvements. 
 
All Project costs, including, but not limited to, on-site improvements, 
gen-tie line infrastructure and connections, collection lines, off-site 
road improvements, and water and wastewater treatment service, 
shall be borne solely by the Developer. 
Cost of Development Policy #2: 
Maricopa County supports recouping 
the costs of its products and services 
without unfairly burdening those most 
in need of its products and services. 
All development costs will be borne solely by the developer, 
including, but not limited to, applicable fees for service, impact fees, 
performance bonds and sureties, and property taxes.

Page 20 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
 
OPEN SPACE GOAL AND POLICY CONSIDERATIONS 
COMP PLAN ELEMENT 
(GOALS/POLICIES) 
CPA CONSISTENCY/JUSTIFICATION 
Open Space Goal #1:  Provide 
regional 
leadership 
to 
promote 
environmental quality, including the 
preservation of open, natural park 
and recreation lands. 
Despite the Project being mostly disturbed for agricultural purposes, 
Harquahala Sun II encourages the preservation of natural open 
space in the form of drainage corridors and wildlife linkages. The 
Project, which is adjacent to the Centennial Wash, will conduct onsite 
investigations and implement appropriate protective measures as 
needed for biological and historical/archaeological resources to 
either avoid or mitigate impacts to the natural environment, in 
coordination with the Arizona State Historic Preservation Office 
(SHPO) and Arizona Game and Fish Department (AZGFD). This 
project will be developed to avoid, minimize, or mitigate potential 
impacts to wildlife and recreational access during development and 
operation of the facilities. This coordination will continue in a more 
detailed fashion with the subsequent zone change and plan of 
development to minimize any potential impacts to the surrounding 
wildlife including proper treatment or preservation of drainage ways 
and wildlife corridors. 
 
 
 
 
 
 
(The remainder of this page is left intentionally blank)

Page 21 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
F. COMPREHENSIVE PLAN AMENDMENT MAP EXHIBIT

Page 22 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
G. COMPREHENSIVE PLAN AMENDMENT LEGAL DESCRIPTIONS EXHIBITS 
 
(Legal descriptions for the 10 parcels are available in a separate deed attachment.)

Page 23 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
APPENDIX - A ‘Site Parcels’  
Ten (10) parcels or portions thereof that constitute the +/-327.65-acre CPA area. 
 
 
        Harquahala Sun II - Parcels/Acreage – Part of CPA 
# 
Assessor 
Parcel No. 
(APN) 
Owner 
Partial
Parcel CPA Area (±SF)
CPA 
Acreage 
(±AC) 
Township 
& Range 
Sectio
n 
Deed 
1 
506-28-023C
CV HARQUAHALA LLC 
Y 
4,767,317 
109.44 
1N 8W 
30 
20100327801 
2 
506-28-028E 
CV HARQUAHALA LLC 
Y 
4,199,420 
96.40 
1N 9W 
24 
20170629452 
3 
506-28-031C
CV HARQUAHALA LLC 
Y 
1,253,345 
28.77 
1N 9W 
25 
20100327801 
4 
506-28-031D
CV HARQUAHALA LLC 
Y 
1,253,296 
28.77 
1N 9W 
25 
20100327801 
5 
506-29-015B 
WPI HD3 FARM AZ LLC 
Y 
58,000 
1.33 
1N 9W 
11 
20160336165 
6 
506-29-027D
WPI II-HARQ FARM AZ LLC 
N 
1,746,159 
40.09 
1N 9W 
12 
20210451125 
7 
506-29-027G
WPI II-HARQ FARM AZ LLC 
N 
872,842 
20.04 
1N 9W 
12 
20210451125 
8 
506-29-031E 
WPI II-HARQ FARM AZ LLC 
N 
23,134 
0.53 
1N 9W 
13 
20170629444 
9 
506-29-031G
WPI II-HARQ FARM AZ LLC 
N 
11,922 
0.27 
1N 9W 
13 
20170629444 
10 
506-29-012A 
WPI II-HARQ FARM AZ LLC 
N 
87,318 
2.00 
1N 9W 
13 
20170629444 
PARCEL TOTALS 
 
14,272,752 
327.65
 
* Note: The CPA covers the entirety of each parcel with exception of APN’s 506-29-015B, 506-28-023C, 506-28-028E, 506-
28-031C and 506-28-031D. 
                    Harquahala Sun II – Ownership Data 
Total # Parcels 
Owner 
Square 
Feet 
Acres 
4 
CV HARQUAHALA LLC 
11,473,377
263.39 
1 
WPI HD3 FARM AZ LLC 
58,000 
1.33 
5 
WPI II-HARQ FARM AZ LLC 
2,741,375 
62.93 
10 
CPA TOTAL 
14,272,752
327.65

Page 24 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666

kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
General Location: The proposed Project is located west of Saddle Mountain, east of Granite Mountain, and 
north and east of the Eagle Tail Mountains in Township 1 North, Range 8 West, and Township 1 North, Range 
9 West. The site is approximately 15 miles west of Tonopah, Arizona in unincorporated Maricopa County, 
Arizona with parcels lying south and west of the intersection of 499th Avenue and Courthouse Road. The Project 
area is irregularly shaped and is generally located between the alignments of Courthouse Road on the north, 
Southern Avenue on the south, Harquahala Valley Road on the west line and 491st Avenue on the east. 
HARQUAHALA SUN II 
CASE #: Z2022214                                                              
REQUEST: Zone Change with Overlay from RU-43 & C-2 to IND-2 
IUPD On Approximately 2,717.76 Net Acres 
NARRATIVE REPORT FOR 
03/03/2023

Page 2 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
 
TABLE OF CONTENTS 
1. 
PURPOSE OF REQUEST .......................................................................................................................... 3 
2. 
DESCRIPTION OF PROPOSAL ................................................................................................................ 3 
2.1 Site Summary Information: ...................................................................................................................... 3 
2.2 Proposed Uses Summary: ....................................................................................................................... 3 
Number of Employees: ............................................................................................................................... 3 
Description/Location of Buildings: ............................................................................................................... 4 
Color Palette: .............................................................................................................................................. 4 
Sign Details: ................................................................................................................................................ 4 
Screening Wall/Fence Details and Location: .............................................................................................. 4 
Security Lighting ....................................................................................................................................... 5 
3. 
RELATIONSHIP TO SURROUNDING PROPERTIES .............................................................................. 5 
Surrounding Adjacent General Land Descriptions ..................................................................................... 5 
Existing Surrounding Solar (Utility) Land Use Approvals ........................................................................... 6 
Surrounding Adjacent Parcel Descriptions (Zoning and Land Use) ........................................................... 6 
4. 
LOCATION AND ACCESSIBILITY ............................................................................................................ 8 
Location: ..................................................................................................................................................... 8 
Access: ....................................................................................................................................................... 8 
5. 
CIRCULATION SYSTEM ........................................................................................................................... 9 
Off-site Circulation (Access) ....................................................................................................................... 9 
On-site Circulation ...................................................................................................................................... 9 
Parking and Loading ................................................................................................................................... 9 
6. 
DEVELOPMENT SCHEDULE .................................................................................................................... 9 
7. 
COMMUNITY FACILITIES AND SERVICES ........................................................................................... 10 
8. 
PUBLIC UTILITIES AND SERVICES ...................................................................................................... 10 
Tables 
1. Industrial Unit Plan of Development ………………………………………………………………...…....….11

Page 3 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
1. PURPOSE OF REQUEST 
HV Sunrise, LLC, (“Applicant”) on behalf of the six (6) property owners, CV Harquahala LLC, WPI-HD1 Farm 
AZ LLC, WPI-HD2 Farm AZ LLC, WPI HD3 Farm AZ LLC, WPI-HD4 Farm AZ LLC, WPI II-Harq Farm AZ LLC, 
requests approvals of a Zone Change with Overlay (rezone) from RU-43 & C-2 to IND-2 IUPD Zone for the 
Harquahala Sun II Photovoltaic Solar Energy Generation and Storage Project on approximately ±2,717.76 net 
acres. The Project will construct and operate a 350-MWac hybrid solar photovoltaic (PV) plant, battery energy 
storage system (BESS) and associated infrastructure. 
2. DESCRIPTION OF PROPOSAL 
2.1 Site Summary Information: 
The ±2,342.84 net acres included are inclusive of the following thirty-two (32) underlying parcels: 506-28-022, 
506-28-023C, 506-28-024A, 506-28-024B, 506-28-028B, 506-28-028E, 506-28-031C, 506-28-031D, 506-29-
011A, 506-29-012A, 506-29-013A, 506-29-013G, 506-29-015A, 506-29-015B, 506-29-015C, 506-29-015D, 
506-29-016A, 506-29-016K, 506-29-016L, 506-29-017, 506-29-018B, 506-29-018E, 506-29-024A, 506-29-
025A, 506-29-026A, 506-29-027D, 506-29-027E, 506-29-027F, 506-29-027G, 506-29-031D, 506-29-031E & 
506-29-031G.  The Project will include approximately +/-1,050,000 solar modules mounted on single axis 
trackers, inverters to convert direct current into alternating current, transformers to increase the voltage of the 
electricity generated, a 500 kV utility substation, BESS, and one or more small buildings to house 
telecommunication equipment. The Project will interconnect to the transmission grid at the Arizona Public 
Service (APS) Delaney Substation. On-site overhead electrical structures will have a 140-foot maximum height.  
Off-site supporting improvements, infrastructure, and/or uses include a gen-tie route corridor that extends 
through a combination of private land, land owned by Flood Control District of Maricopa County (FCDMC), 
Maricopa County Department of Transportation (MCDOT), Arizona State Land Department (ASLD), and land 
administered by the Bureau of Land Management (BLM). Offsite improvements will be approved via separate 
applications with supporting site plan exhibits through MCDOT, FCDMC, ASLD, and BLM. 
2.2 Proposed Uses Summary: 
Hours/Days of Operation:  
The site will be in operation and/or production 24 hours a day, seven (7) days per week. Solar generation 
activities would be limited to daytime (daylight) hours which will vary seasonally but would generally range from 
around 5:00 AM to 9:00 PM during summer months when daylight hours are longest. Energy storge activities 
and operations will be continuous and energy transmission into the power grid will occur on demand as needed 
throughout the daytime and nighttime hours. 
Number of Employees: 
The Project is anticipated to be developed in multiple phases and will generate approximately 250-400 jobs in 
the construction, contracting, administrative, and project management fields during the construction and 
implementation of each Project phase.

Page 4 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
Operation of the site will employ zero full-time employees daily. Routine maintenance activities will require up 
to 15 part-time or seasonal employees and up to 20 employees for equipment repair and replacement as 
needed per phase. In addition to providing in state construction jobs and long-term technical careers, local 
projects like Harquahala Sun II will help contribute to the regional economy by providing tax revenue and by 
using local engineering and development contractors in Maricopa County.  
Description/Location of Buildings: 
Electrical and telecommunication equipment may be contained within housing units or cabinets that are a 
manufactured protective outer covering for the internal equipment. No permanent habitable buildings are 
proposed which will be occupied by employees. Self-enclosed units include small telecommunications 
equipment cabinets and BESS equipment cabinets/shelters. BESS components will be housed in prefabricated 
steel containers located within the BESS area or adjacent to inverters. All BESS areas will be setback 150’ from 
the project edge and if BESS are collocated in an area greater than 5 acres, BESS will be setback 100’ from 
solar PV facilities to provide adequate access around the BESS. The project will also work with the local fire 
marshal to develop an emergency/fire response plan prior to facility operation and BESS setbacks may be 
reduced if approved by the fire marshal. Smaller communication and electrical equipment is located among the 
PV array fields as depicted on the Plan of Development (POD). 
Color Palette: 
All materials coatings, finishes, and colors, where practicable, will be selected to blend facility components to 
the natural setting. Selection of color palettes for electrical cabinets and PV solar equipment will be selected 
from factory specifications and options provided by the respective manufacturers. Color palette selection will 
conform to generally accepted and adopted industry standards for PV solar equipment and support structures. 
Final color selections will seek to minimize heat absorption and glare and blend with surrounding natural 
environment so far as is practicable. 
Sign Details:  
Signage will be limited to site identification signs, OSHA approved safety signage, and security signage in 
accordance with Chapter 14 of the Maricopa County Zoning Ordinance. 
Screening Wall/Fence Details and Location: 
As discussed below, the property is surrounded mostly by vacant and agricultural lands along with a few 
structures located to the west. To ensure proper site security, related to these surrounding uses, the site 
perimeter will be enclosed with chain link fence (6 feet in height) with gates where needed along the perimeter 
of the project. Fencing section elevation details have been provided on the POD which depict typical fencing 
types and proposed opaque screening. One (1) foot of barbed wire strands will be incorporated atop 6-foot 
fencing for additional security.  
Enhanced screening will be provided adjacent to existing residential properties. Unless otherwise coordinated, 
screening against these boundaries will include opaque screening in the form of vinyl slats to create visual 
opacity to screen the internal facility components and operations from public roadways and adjacent residential 
views. Any reduction in proposed fencing requirements as shown in the site plan shall be reviewed and 
approved by the Maricopa County Planning and Development Department or Zoning Administrator. Where 
necessary, proposed opaque fencing may be combined with berming to enhance mitigation of visual impacts.

Page 5 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
Enhanced screening will be provided around the BESS and Substation to mitigate visual impacts to surrounding 
views. 
Security Lighting 
Security lighting will be limited to motion activated lighting associated with the BESS and Substation and other 
security sensitive areas such as entry gates, and parking areas, as shown on the Plan of Development. All 
lighting installed will be directed downward and into the site, in compliance with Maricopa County Zoning 
Ordinance Article 1112, to ensure lighting will not be cast onto neighboring properties. Lighting required for 
safety operations during nighttime operational or maintenance activities will be provided by the associated 
staff/employee personnel.  
3. RELATIONSHIP TO SURROUNDING PROPERTIES 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Surrounding Adjacent General Land Descriptions 
Direction
Zoning 
Land Use Designation 
Current Use  
North 
RU-43 
Utilities/Rural Development Areas 
Agricultural/Residential/Vacant 
East 
IND-2 IUPD/RU-43 
Utilities/Rural Development Areas 
Agricultural/Vacant 
South 
RU-43 
Utilities/Rural Development Areas 
Agricultural/Commercial/Vacant 
West 
C-2/RU-43 
Utilities/Rural Development Areas 
Agricultural/Commercial/Residential

Page 6 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
Harquahala Sun II looks to expand upon the upcoming improvements to be constructed as a part of the recently 
approved Harquahala Sun CPA (CPA2021007) and Zone Change with a Plan of Development (Z2021111). 
Many of the surrounding parcels around Harquahala Sun II have been subject to previous CPA approvals, by 
the Board of Supervisors, including the Maricopa Solar & Storage Project (CPA2020002), which makes up 88% 
of the Project area. The remaining 12% of the property which was not originally included in this approval is 
going through a concurrent Comprehensive Plan Amendment from Rural Development Area to the consistent 
Utilities land use designation. Additionally, the proposed solar use is compatible with other similar approved 
and implemented solar Projects within the general area. Associated facilities within this area include approved 
CPA’s for Utility (solar) land uses, PV solar generation facilities, utility corridors, transmission lines and a utility 
substation. Other nearby projects are as follows: 
Existing Surrounding Solar (Utility) Land Use Approvals 
Project 
Location (Township/Range) 
Maricopa Solar and Storage Project  
T1N R8W; T1N R9W; T2N R8W; T2N R9W 
Harquahala Sun 
T1N R9W 
Saddle Mountain Solar 
T1N R9W 
Eagletail Solar Farm 
T1S R9W 
Almeria Solar 
T2N R8W 
Sun Valley North 
T2N R8W 
Sun Valley South 
T2N R8W 
Areva Solar AZ II 
T2N R7W 
Papago Solar 
T2N R8W 
Tonopah Photovoltaic 
T2N R8W 
The surrounding area has a few sparsely distributed residential land uses including residential owners & vacant 
lots interior to site. Existing access to these properties will be preserved and nearby development will take into 
consideration the required setbacks and screening. The rest of the surrounding area is characterized by active 
and passive agricultural land uses, Bureau of Land Management (BLM) and Arizona State Land Department 
(ASLD) owned and managed lands, natural gas-powered electric generation facilities, solar powered electric 
generation facilities, and native desert lands. The predominant surrounding private land uses within the area is 
Utilities as designated by approved Comprehensive Plan Amendments which have changed the underlying 
future land uses from Rural Development Area to Utilities. Given the sites remote location the area is known as 
a potential route for training flights from Luke Air Force Base. Consistent with previous approvals, as a 
consideration, the project team will coordinate with the DOD Siting Clearinghouse for informal review.  
 
The proposed Zone Change with Overlay and Plan of Development is consistent with similar approved and 
implemented solar projects within an approximately 4-mile radius of the Project site. Associated facilities within 
this radius include approved CPA’s for Utility (solar) land uses, PV solar generation facilities, utility corridors, 
transmission lines and a utility substation. The specific adjacent land uses are described below. 
Surrounding Adjacent Parcel Descriptions (Zoning and Land Use) 
Location 
Parcel # 
Land Use 
Owner 
Zoning 
North 
506-30-017E 
Agricultural 
New Harquahala Generating Co. LLC 
RU-43 
North 
506-29-068 
Agricultural 
ODB Farms LLC 
RU-43 
North 
506-23-037A 
Agricultural 
WPI-HD2 Farm AZ LLC 
RU-43

Page 7 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
North 
506-23-038A 
Agricultural 
WPI-HD2 Farm AZ LLC 
RU-43 
North 
506-29-026B 
Vacant 
WPI-HD2 Farm AZ LLC 
RU-43 
East 
506-28-035C 
Vacant 
Chester J Sikon Trust 
RU-43 
East 
506-28-034B 
Vacant 
CV Harquahala LLC 
RU-43 
East 
506-29-004 
Vacant 
CV Harquahala LLC 
IND-2 IUPD 
East 
506-29-005 
Vacant 
CV Harquahala LLC 
RU-43 
East 
506-29-029 
Vacant 
CV Harquahala LLC 
RU-43 
East 
506-29-006B 
Agricultural 
CV Harquahala LLC 
RU-43 
East 
506-29-024B 
Agricultural 
CV Harquahala LLC 
RU-43 
East 
506-29-019 
Agricultural 
CV Harquahala LLC 
RU-43 
East 
506-29-032 
Vacant 
CV Harquahala LLC 
RU-43 
East 
506-29-033 
Vacant 
CV Harquahala LLC 
RU-43 
East 
506-28-044 
Vacant 
CV Harquahala LLC LEASE #01-2325 
RU-43 
East 
506-28-041 
Vacant 
Flood Control District of Maricopa County 
RU-43 
East 
506-29-025B 
Agricultural 
WPI-HD1 Farm AZ LLC 
RU-43 
East 
506-29-027A 
Vacant 
WPI-HD2 Farm AZ LLC 
RU-43 
South 
506-28-031A 
Agricultural/Vacant 
CV Harquahala LLC 
RU-43 
South 
506-28-031B 
Agricultural/Vacant 
CV Harquahala LLC 
RU-43 
South 
506-28-027B 
Vacant 
FNA DZ LLC 
RU-43 
South 
506-28-007A 
Vacant 
PSC-94 Site LLC 
RU-43 
South 
506-28-045 
Vacant 
Torrey Pines Dev LLC/ETAL Ls. #01-1826 
RU-43 
West 
506-59-006 
Vacant 
Airth Properties LP 
RU-43 
West 
506-59-007 
Vacant 
Airth Properties LP 
RU-43 
West 
506-29-009E 
Agricultural/Vacant 
Arizona Hay Press LLC 
RU-43 
West 
506-32-002 
Vacant 
Bautista Elias 
C-2 
West 
506-32-001 
Vacant 
Bautista Salvador 
C-2 
West 
506-28-011 
Vacant 
CV Harquahala LLC 
RU-43 
West 
506-28-032B 
Agricultural 
CV Harquahala LLC 
RU-43 
West 
506-29-050 
Vacant 
Degiorgi Bruno 
RU-43 
West 
506-28-038 
Agricultural/Vacant 
El Paso Natural Gas Co 
RU-43 
West 
506-29-073 
Vacant 
Glenrock Farms LLC 
RU-43 
West 
506-29-074 
Vacant 
Glenrock Farms LLC 
RU-43 
West 
506-29-081 
Vacant 
Glenrock Farms LLC 
RU-43 
West 
506-29-082 
Vacant 
Glenrock Farms LLC 
RU-43 
West 
506-29-020 
Agricultural 
Harquhala Gin LLC 
RU-43 
West 
506-29-021A 
Agricultural 
Harquhala Gin LLC 
RU-43 
West 
506-29-021B 
Agricultural 
Harquhala Gin LLC 
C-2 
West 
506-22-039 
Vacant 
Khan Anthony H 
RU-43 
West 
506-29-009F 
Vacant 
NEC HV/Tonto St 118 LLC 
RU-43 
West 
506-59-008 
Vacant 
Rev. Trust of Yoon Choi and Anthony Choi 
RU-43 
West 
506-59-009 
Vacant 
Rev. Trust of Yoon Choi and Anthony Choi 
RU-43 
West 
506-59-016 
Vacant 
Rev. Trust of Yoon Choi and Anthony Choi 
RU-43 
West 
506-59-004A 
Residential 
Reyna Leonardo C 
RU-43 
West 
506-29-049 
Residential 
Schickedanz Jason/Amber 
RU-43 
West 
506-32-003 
Vacant 
Scout Real Estate LLC 
C-2 
West 
506-32-004 
Vacant 
Scout Real Estate LLC 
C-2

Page 8 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
4. LOCATION AND ACCESSIBILITY 
Location: 
The proposed Project is located west of Saddle Mountain, east of Granite Mountain, and north and east of the 
Eagle Tail Mountains in Township 1 North, Range 8 West, and Township 1 North, Range 9 West. The site is 
approximately 15 miles west of Tonopah, Arizona in unincorporated Maricopa County, Arizona with parcels 
lying south and west of the intersection of 499th Avenue and Courthouse Road. The Project area is irregularly 
shaped and is generally located between the alignments of Courthouse Road on the north, Southern Avenue 
on the south, Harquahala Valley Road on the west line and 491st Avenue on the east. 
Access: 
 The Project is located south of Interstate 10 (I-10), approximately 30 miles west of the State Route 85 (SR 
85) connection to I-10.  
 Regional access to the site will be from I-10 to Harquahala Valley Road. Alternatively, Salome Highway 
southeasterly from I-10 to Courthouse Road westerly to the site. Access to 499th and 507th Avenue may be 
achieved from Courthouse Road easterly from Harquahala Valley Road or westerly from the intersection of 
Courthouse Road and Salome Highway. 
 Access to the site will be established by a variety of full-access driveways shown in the illustration below.  
 Maricopa County Department of Transportation (MCDOT) requires that driveways be spaced a minimum of 
250 feet from adjacent intersections on major collector roadways.

Page 9 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
5. CIRCULATION SYSTEM 
Off-site Circulation (Access) 
The roadway network serving the proposed Project from the I-10 corridor includes the I-10/Salome Highway 
interchange that connects to Harquahala Valley Road. The site can also be accessed from the east from the 
Salome Highway which provides access to 499th and 507th Avenues and Harquahala Valley Road via 
Courthouse Rd. There are several smaller, existing roads, both named and unnamed, that traverse the Project 
site, which are anticipated to be used and improved for construction and ongoing operations of the Project. Site 
access will be identified with the Plan of Development. Final access locations will be determined in accordance 
with access management policies and permitting requirements of Maricopa County. 
 
As requested by MCDOT, Harquahala Sun II will dedicate 65’ half street right-of-way for Harquahala Valley 
Road and a minimum of 40’ half street(s) right-of-way dedication for Buckeye Road. Where reasonable, the 
Project will dedicate section and mid-section alignments, and per Maricopa County Zoning Ordinance Section 
1105, and will provide the necessary setbacks starting from the future half street rights-of-way of 55’ and 40’ 
respectively. Offsite improvements and any additional right-of-way needed will be determined by MCDOT Traffic 
Design and MCDOT Permits based on the submittal of a TIA/TIS. Final dedication, preservation, alignments, 
terminations, and vacations of unneeded ROW will be determined in negotiation with MCDOT. 
On-site Circulation  
Internal circulation is planned via a network of private maintenance and service drive aisles to provide vehicular 
access to the solar arrays, associated equipment, and BESS and substation facilities. All driveway aprons (as 
specified by MCDOT), shall be paved with a minimum asphalt milling bound with a liquid binding emulsifier, or 
comparable, with the remainder of the typical 20’ internal drives being compacted decomposed granite (DG), 
or similar road base material to minimize imperviousness and stormwater runoff, as proposed with an approved 
dust control permit from Maricopa County Air Quality Control. Construction and maintenance of the drives will 
conform to applicable requirements of the Maricopa County Air Quality Control Department  
Parking and Loading 
With no occupied buildings or full-time employees on-site, there is no proposed formal parking spaces or ada 
spaces. During operations maintenance parking, loading, and temporary maintenance staging will occur within 
designated area within the substation/BESS Yard area. Loading during maintenance activities in the solar field 
will occur on private 20-foot (typical) all weather surfaced roads among the solar arrays and BESS Yard as 
shown on the Plan of Development. 
6. DEVELOPMENT SCHEDULE 
A power purchase agreement (PPA) is expected with an Arizona corporate entity for energy from Harquahala 
Sun. The Project is scheduled to deliver energy in 2024. The Applicant has a Facility Study with APS to 
interconnect the Generation Facility to APS’s 500-kV Delaney Switchyard and is working on the final execution 
of the Generator Interconnection Agreement. Construction is anticipated to begin in Q4 2023.

Page 10 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
7. COMMUNITY FACILITIES AND SERVICES 
The Project is located within the community service district boundaries: 
 
Western Maricopa Education Center (MEC) Technical School District (District Ward No. 2) 
 
Buckeye Union High School District No. 1 
 
Arlington School District No. 47 
 
The Project is not anticipated to generate any adverse impacts to the listed school districts. 
8. PUBLIC UTILITIES AND SERVICES 
Utility service(s) to the site will be provided by the following providers. No water or wastewater service is 
planned. Water for construction purposes will be transported to the site. Drinking water for employees will be 
individually provided. No permanent restrooms will be provided. Temporary facilities will be provided for 
maintenance activities as needed.  
UTILITY/SERVICE 
AGENCY/PROVIDER 
Water 
(N/A) Hauled/well 
Sewer 
(N/A) Sanitary sewer provided via accessible portable 
restroom facility as needed for maintenance activities. In 
the event that a future O&M building is built and/or 
permanent employees are present on the site sewer to 
be septic. 
Electric Service  
Arizona Public Service 
Fire Protection (including EMS and Ambulatory 
Services) 
Harquahala Valley Fire District 
Police Protection 
Maricopa County Sheriff Office 
Refuse (Waste Management) 
Republic Services 
Telephone 
American Telephone and Telegraph (AT&T) Co 
 
 
 
(The remainder of this page is left intentionally blank)

Page 11 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
Table 1: Industrial Unit Plan of Development 
HARQUAHALA SUN - IUPD MODIFICATIONS TO IND-2 DEVELOPMENT STANDARDS 
STANDARD 
CATAGORY 
IND-2 ZONING 
DISTRICT 
STANDARD 
PROPOSED IND-2 
IUPD ZONING 
DISTRICT STANDARD 
JUSTIFICATION 
MAX. HEIGHT 
40' 
40' 
  
MIN. FRONT 
YARD
10'-25' 
10'-25' 
  
LANDSCAPING 
ARTICLE 901.4.1: 
ALL PROPERTIES 
ABUTTING A 
PUBLIC STREET 
SHALL HAVE AN 
OPEN SETBACK 
AREA WHICH 
SHALL BE 
LANDSCAPED 
EXTENDING FOR 
THE FULL WIDTH 
OF THE 
PROPERTY 
NO LANDSCAPE 
STRIP REQUIRED 
INSTALLING A LANDSCAPING STRIP 
ON THE SITE ALONG ALL ROAD 
FRONTAGES WOULD BE COST 
PROHIBITIVE, IMPACT THE 
EFFECTIVNESS OF SOLAR PANEL 
OPERATION, THE EXISTING NATURAL 
VEGETATION IS NEARLY NON-
EXISTENT SO THE ADDITIONAL 
LANDSCAPE WOULD LOOK OUT OF 
PLACE, AND WOULD LOWER THE 
OVERALL ENERGY GENERATING 
CAPACITY OF THE SITE. 
MIN. SIDE YARD 
3'-10' 
3'-10’ 
  
MIN. REAR YARD 25' 
25' 
  
MIN. LOT AREA 
6,000 SQ. FT. 
6,000 SQ. FT. 
  
MIN. LOT WIDTH 60' 
60' 
  
MAX. LOT 
COVERAGE
60% MAXIMUM 
60% MAXIMUM 
 
PARKING 
REGULATIONS 
ARTICLE 
1102.1.5: 600 
SQ.FT. OF 
FLOOR AREA; 5% 
OF PARKING 
SPACES SHALL 
BE 
HANDICAPPED 
PARKING 
SPACES 
NONE REQUIRED  
THE APPLICANT PLANS NO 
PERMANENT PARKING SPACES.  NO 
OCCUPIED BUILDINGS WILL BE 
CONSTRUCTED NOR WILL THERE BE 
ANY FULL-TIME EMPLOYEES ON-SITE. 
WORKERS, WHEN ON-SITE, WILL BE IN 
THE SOLAR FIELD WITH PARKING 
AREAS ON THE 20-FT ALL WEATHER 
(PRIVATE) ACCESS ROADS OR AT THE 
DESIGNATED PARKING AREA AT THE 
SUBSTATION AND BESS YARD. 
PARKING IS NOT REQUIRED DURING 
OPERATION. THE FACITLITY WILL BE 
UNMANNED DURING OPERATIONS 
EXCEPT FOR TEMPORARY SYSTEM 
OR FACILITY MAINTENANCE. IF ANY 
FACILITIES ARE PROVIDED IN THE 
FUTURE, ADA SPACES WOULD BE 
PROVIDED PER ARTICLE 1102.1.5.

Page 12 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
PAVEMENT 
NONE REQUIRED
PAVEMENT NOT 
REQUIRED FOR 
PARKING SPACES 
WITH AN APPROVED 
DUST CONTROL 
PLAN BY MARICOPA 
COUNTY AIR 
QUALITY CONTROL 
THE APPLICANT PLANS NO 
PERMANENT PARKING SPACES.  NO 
OCCUPIED BUILDINGS WILL BE 
CONSTRUCTED NOR WILL THERE BE 
ANY FULL-TIME EMPLOYEES ON-SITE. 
WORKERS, WHEN ON-SITE, WILL BE IN 
THE SOLAR FIELD WITH PARKING 
AREAS ON THE 20-FT ALL WEATHER 
(PRIVATE) ACCESS ROADS OR AT THE 
DESIGNATED PARKING AREA AT THE 
SUBSTATION AND BESS YARD. 
LOADING & 
UNLOADING 
ARTICLE 1103.2 
ONE LOADING 
AND UNLOADING 
SPACE FOR 
EACH 10,000 
SQ.FT. OF 
FLOOR AREA, OR 
FRACTION 
THEREOF, 
DEVOTED TO 
SUCH USE IN 
THE BUILDING 
NONE REQUIRED 
LOADING AND UNLOADING SPACES 
WILL NOT BE REQUIRED FOR THE 
SITE AS NO OCCUPIED STRUCTURES 
ARE ANTICIPATED AT THE FACILITY, 
NO FULL-TIME EMPLOYEES OR 
MANNED PROJECT BUILDINGS 
WOULD BE LOCATED ON SITE OR ON 
PUBLIC ROADS, AND THERE WOULD 
BE NO ROUTINE DELIVERIES OR 
SHIPMENTS. A ±1.98 ACRE PARKING 
AND LOADING AREA IS DESIGNATED 
AT THE SUBSTATION AND BESS YARD.
SIGHT VISIBILITY 
TRIANGLES 
NO 
OBSTRUCTIONS 
OVER 2' IN 
HEIGHT WITHIN 
25'X25' SVTS 
NO SVT'S REQUIRED 
AT PROJECT SITE 
ENTRY/EXIT POINTS, 
SECTION LINE, AND 
MID-SECTION LINE 
INTERSECTING 
ALIGNMENTS 
FENCING AT INTERSECTIONS WILL BE 
OPEN CHAIN-LINKNED, EXCEPT 
WHERE ADJACENT TO RESIDENTIAL 
ZONES AND USES WHERE THERE IS 
NO PROPOSED ACCESS, AND 
THEREFORE VISIBILITY WILL BE 
MAINTAINED. ADDITIONALLY, HAVING 
NO SVT REQUIREMENT WOULD BE 
THE MOST EFFICIENT USE OF SITE 
AREA AND MAXIMIZE ENERGY 
GENERATION 
ARTICLE 902.91 
ALL USES 
EXCEPT FOR 
PARKING, 
LOADING, 
UNLOADING OR 
STORAGE SHALL 
BE CONDUCTED 
WITHIN A 
COMPLETELY 
ENCLOSED 
BUILDING 
ALL UTILITY USES 
PERMITTED 
OUTDOORS 
THE OPERATING USES OF THE SITE 
INCLUDE ENERGY GENERATION AND 
STORAGE, THROUGH THE USE OF 
SOLAR PV PANELS. THE USE CANNOT 
BE ACHIEVED WITHIN ENCLOSED 
STRUCTURES; THEREFORE, ARRAYS 
WILL BE LOCATED OUTSIDE OF 
ENCLOSED BUILDINGS,

Page 13 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
SITE 
ENCLOSURE 
AND SCREENING
6' CMU WALL 
ADJACENT TO 
RURAL AND 
RESIDENTIAL 
ZONING 
BOUNDARIES 
AND FOR 
OUTDOOR USE 
OF AN 
INDUSTRIAL 
NATURE 
CHAIN-LINK FENCING 
AND GATES SHALL 
BE ALLOWED ON THE 
PERIMETER OF THE 
PROJECT.    
AS REQUIRED TO ENSURE PUBLIC 
SAFETY REQUIRED BY APPLICABLE 
ELECTRICAL SAFETY REGULATIONS 
AND PROVIDE FOR THE SECURITY OF 
THIS INFRASTRUCTURE PROJECT, 
THE APPLICANT WILL INSTALL CHAIN-
LINK FENCING (WITH GATES WHERE 
NEEDED ALONG THE PERIMETER OF 
THE PROJECT). THE APPLICANT 
PROPOSES TO USE CHAIN LINK FOR 
THE GATES ALSO, WHICH WOULD BE 
CONSISTENT WITH OTHER ADJACENT 
AND NEARBY ENERGY GENERATION 
PROJECTS.  
MAX ELECTRIC 
TRANSMISSION 
LINE HEIGHT 
120' 
140’ 
A NEW GEN-TIE ROUTE IS REQUIRED 
FOR THIS PROJECT AND WHILE THE 
MAJORITY OF IT IS OUTSIDE THIS 
ZONING BOUNDARY THERE IS STILL 
IMPACT TO THE PROJECT SITE WITH 
THE CONNECTION TO THE 
SUBSTATION. UTILITY POLE HEIGHTS 
UP TO 140 FEET ARE REQUESTED 
BECAUSE UTILITY STRUCTURES 120 
FEET OR LESS IN HEIGHT MAY BE 
INFEASIBLE DUE TO FINAL 
ELECTRICAL DESIGN 
CONSIDERATIONS AND MAY IMPACT 
THE SUBJECT ROW/PROPERTIES 
MORE, REQUIRING LESS SPACING 
AND MORE POLES. THE APPLICANT’S 
CURRENT PRELIMINARY, 
CONCEPTUAL DESIGNS INDICATE 
THAT HIGHVOLTAGE DEAD-END 
STRUCTURES UP TO 140 FEET IN 
HEIGHT MAY BE REQUIRED AND 
COULD RESULT IN LESS IMPACT. THE 
APPLICANT REQUESTS THE 
FLEXIBILITY TO MAKE THE 
NECESSARY ADJUSTMENTS, AS 
NEEDED, FOR FUTURE FINAL 
DESIGNS. ADDITIONALLY, UNDER THE
DOD CLEARINGHOUSE PROCESS, 
ENERGY PROJECTS GREATER THAN 
199’ ABOVE GROUND LEVEL ARE 
REQUIRED TO GO THROUGH A 
FORMAL REVIEW, WHICH HAS 
PROACTIVELY BEEN SUBMITTED 
UNDER THE INFORMAL REVIEW DOD 
CLEARINGHOUSE PROCESS.