ATTACHMENT A
PUBLIC
TRANSPORTATION
AGENCY SAFETY PLAN
City of Phoenix Public
Transit Department
December 2022
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
i
The City of Phoenix Public Transit Department (PTD) has prepared the Public Transportation Agency
Safety Plan (PTASP, or Plan) to comply with the Federal Transportation Administration’s (FTA) PTASP
final rule 49 Code of Federal Regulations (CFR) Part 673, published on July 19, 2018. The rule requires
public transportation system operators receiving federal Section 5307 funds to develop safety plans with
processes and procedures that implement safety management systems (SMS) principles and methods.
The SMS includes the PTASP’s Safety Management Policy Statement, Safety Risk Management, Safety
Assurance and Safety Promotion policies and procedures that encompass a top-down and data-driven
approach to safety risk management and ensuring the effectiveness of safety risk mitigation. This Plan
serves as the overarching PTD PTASP and is supported by the three separate contract operator Safety
Plans, available as separate documents affixed to this Plan.
Phoenix Transit Operations
PTD operates fixed local bus service, neighborhood bus circulators, commuter bus service, and
paratransit services in an area of approximately 518 square miles, with a population of nearly 1.8 million.
Transit services are operated in partnership with three contractors (Contractors): First Transit Inc.,
Transdev Services Inc., and MV Transportation Inc. Day-to-day bus operations and maintenance
originate with each contractor, and PTD works with each contractor individually to ensure an effective
safety program for the entire Phoenix-operated transit system.
Developed a system-specific
safety plan for motor bus system.
Developed a system-specific
safety plan for motor bus
system.
Developed a system-specific
safety plan for demand
response system.
City of Phoenix
Public Transportation Agency Safety Plan
Executive Summary
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
ii
Safety Plan Regulatory Background
On July 19, 2019, the FTA PTASP Final Rule (49 CFR Part 673.11(a)(3)) became effective. FTA
established the PTASP compliance date to be July 20, 2020 and extended it to December 31, 2020. PTD
finalized and approved the initial PTASP in
PTASP Elements
Safety Management
Policy
A documented commitment
to safety that defines safety
objectives, as well as the
accountabilities and
responsibilities of employees
in regard to safety.
Safety Assurance
A federally mandated process
for safety performance
monitoring and
measurement. As a large
transit provider, it is required
to develop processes that
address management of
change and promote
continuous improvement.
Safety Risk Management
An established and documented
process for identifying, analyzing,
assessing, and mitigating safety
risks and hazards.
Safety Promotion
A process for safety training and
communication.
Key Performance
Indicators
Established safety performance
targets, including the process
and timeline for conducting an
annual review and update.
Regional Relationships
PTD is responsible for overseeing the city's transit program and, at the same time, serves as the
designated recipient for federal funding under FTA's Section 5307, 5309, 5310, 5316, 5317, 5337, and
5339 programs in the Phoenix-Mesa Urbanized Area. This includes the cities of Phoenix, Tempe, Mesa,
Scottsdale, Glendale, Avondale, Fountain Hills, Peoria, Paradise Valley, Goodyear, Litchfield Park,
Surprise, Tolleson, Youngtown and areas of Maricopa County.
In addition to managing FTA grant subrecipients, PTD is responsible for ensuring compliance with federal
rules and guidelines for itself and the region’s subrecipients. Each subrecipient enters into a Grant Pass-
Through Agreement with PTD for the receipt of FTA funds.
PTD provides FTA funding for two transit agencies as subrecipients: the Regional Public Transportation
Authority (RPTA) and Valley Metro Rail, Inc. (VMR). RPTA is a public agency, duly organized under the
laws of the State of Arizona to operate regional bus service and is overseen by a board of its members’
elected officials. Membership is open to all municipalities in Maricopa County and to the county
government. VMR is a non-profit, public corporation that is responsible for the design, construction and
operation of the 26-mile light rail system and future extensions. In addition, Scottsdale, Peoria, and
Glendale provide local transit service within their jurisdictions, all as small transit agencies as defined in
the PTASP final rule.
The Arizona Department of Transportation (ADOT) serves as the State Safety Oversight Agency for PTD
and the Maricopa Association of Governments (MAG) serves the metropolitan Phoenix area as the
regional Metropolitan Planning Organization for the agencies within Maricopa County.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
iii
Plan Development
PTD requires transit system Contractors to develop and implement safety plans unique to each
contractor’s system and scope of operation. In addition, PTD coordinated with MAG to develop regional
transit system performance targets, by contractor and mode, in the PTASP, included in section 6.
Following the completion of the annual draft, the PTD Safety Committee reviewed the draft for
concurrence, per 49 United States Code (USC) 5329(d)(1)(A).
Certification and Implementation
Prior to finalizing the PTASP was assessed by the PTD Safety Committee, which comprises an equal
number of frontline and management staff at PTD. The Phoenix City Council adopted and certified the
PTASP along with final signature by the Accountable Executive. The PTASP was shared with ADOT and
MAG and implemented by PTD and Contractors.
Roles Defined in the PTASP
Accountable Executive
An individual who has signing authority for the Plan. Examples
of an accountable executive may include a city manager or
department director.
Board of Directors
A board that must approve the Plan. In Phoenix, the City Council
is the equivalent authority to the board of directors.
Chief Safety Officer
An individual who is responsible for safety within the transit
agency and usually reports directly to the agency’s chief
executive officer or the equivalent position.
Safety Committee
The Safety Committee is a group responsible for reviewing
safety concerns and hazards and review of the Plan ahead of
signature by the Accountable Executive and the approval by the
Board of Directors.
The PTASP followed the timeline as detailed below in Figure 1, starting with the FTA final rule and
initial PTASP draft completed by PTD.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
iv
FTA Final Rule: July
19, 2019
Initial draft of PTASP
Accountable
Executive Signature
& Board Approval
(by December 1)
Develop safety
performance
targets with MAG
Begin annual
update
Safety Committee
review
Figure 1 PTASP Draft Process
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
v
Table 1: PTASP Revision Log
Version Number
Section/Pages
Affected
Reason for Change
Date Issued
Initial Revision
All
December 2020
Revision 1
All
Annual Review
Bipartisan
Infrastructure Law
changes in 49 USC
5329
December 2022
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
vi
Table of Contents
1.
Plan Adoption and Certification ..................................................................................................... 1-1
1.1
Plan Adoption ......................................................................................................................... 1-1
1.1
Certification of Compliance ..................................................................................................... 1-1
2.
Introduction ...................................................................................................................................... 2-1
3.
Safety Plan Regulatory Background .............................................................................................. 3-1
3.1
Plan Development .................................................................................................................. 3-1
3.2
Certification and Implementation ............................................... Error! Bookmark not defined.
4.
Transit Agency Information ............................................................................................................ 4-1
4.1
General Information ................................................................................................................ 4-1
4.2
Agency Description ................................................................................................................. 4-2
5.
Safety Plan Development and Maintenance .................................................................................. 5-1
5.1
PTASP Development .............................................................................................................. 5-1
5.2
Annual Internal Review and Update Process ......................................................................... 5-1
5.2.1
PTD ............................................................................................................................ 5-1
5.2.2
Contractors ................................................................................................................ 5-1
5.3
PTASP Audit Process ............................................................................................................. 5-1
5.4
PTASP Documentation and Recordkeeping .......................................................................... 5-2
5.4.1
PTD ............................................................................................................................ 5-2
5.4.2
Contractors ................................................................................................................ 5-2
6.
Safety Performance Targets ........................................................................................................... 6-1
7.
Safety Management Systems.......................................................................................................... 7-1
7.1
Safety Management Policy ..................................................................................................... 7-1
7.1.1
PTD ............................................................................................................................ 7-1
7.2
State and Metropolitan Planning Organization Coordination ................................................. 7-2
7.3
Safety Goals ........................................................................................................................... 7-3
7.4
Safety Management Policy Communication .............................. Error! Bookmark not defined.
7.4.1
PTD ............................................................................... Error! Bookmark not defined.
7.4.2
Contractors ................................................................... Error! Bookmark not defined.
7.5
Authorities, Roles and Responsibilities .................................................................................. 7-3
7.5.1
PTD ............................................................................................................................ 7-3
7.5.2
Contractors ................................................................................................................ 7-8
7.6
Employee Safety Reporting Program ..................................................................................... 7-8
7.6.1
PTD ............................................................................................................................ 7-8
7.6.2
Contractors ................................................................................................................ 7-9
7.7
Administrative Regulation Reporting Policy ........................................................................... 7-9
7.7.1
PTD ............................................................................................................................ 7-9
7.7.2
Contractors .............................................................................................................. 7-10
7.8
Safety Risk Management ..................................................................................................... 7-10
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
vii
7.8.1
Safety Hazard Identification..................................................................................... 7-10
7.8.2
Safety Risk Assessment .......................................................................................... 7-14
7.8.3
Safety Risk Mitigation .............................................................................................. 7-16
7.9
Safety Assurance ................................................................................................................. 7-19
7.9.1
Safety Performance Monitoring and Measurement ................................................. 7-19
7.9.2
Management of Change .......................................................................................... 7-22
7.9.3
Continuous Improvement ........................................................................................ 7-22
7.10
Safety Promotion .................................................................................................................. 7-23
7.10.1 Safety Communication ............................................................................................ 7-23
7.10.2 Safety Training ........................................................................................................ 7-24
List of Appendices
Appendix A. City Council Minutes or Resolution
Appendix B. First Transit Abbreviated Safety Plan
Appendix C. Transdev Abbreviated Safety Plan
Appendix D. MV Transportation Abbreviated Safety Plan
Appendix E. PTASP Activity Log
Appendix F. PTASP Performance Target Log
1.
PTASP Performance Target Log
2.
PTASP Baseline Performance Log
Appendix G. PTASP Supporting Documents
1.
NTD Monthly Reports
2.
PTD’s Critical & Emergency Incident Communication Map
3.
Employee Critical Incident Training
4.
City of Phoenix Administrative Regulations
5.
Public Transit Department Facility Inspection Report
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
viii
List of Tables
Table 1. Bus Service Safety Performance Baseline and Targets .............................................................. 6-1
Table 2. Paratransit Service Safety Performance Baseline and Targets ..... Error! Bookmark not defined.
Table 3. Safety Roles and Responsibilities ................................................................................................ 7-5
Table 4. Safety Hazard Type Identification (Step 2) ................................................................................ 7-12
Table 5. Safety Hazard Risk Probability (Step 3) .................................................................................... 7-13
Table 6. Safety Hazard Risk Severity Categories (Step 4) ...................................................................... 7-13
Table 7. Safety Hazard Risk Assessment Matrix (Step 5) ....................................................................... 7-14
Table 8. Safety Hazard Risk Index Matrix (Step 6) .................................................................................. 7-15
Table 9. Hazard Identification and Risk Assessment Log (Step 7).......................................................... 7-16
Table 10. Hazard Mitigation Actions (Step 8) ............................................... Error! Bookmark not defined.
List of Figures
Figure 1 PTASP Draft Process .................................................................................................................... iv
Figure 2. Public Transit Department Regional Chart ................................................................................. 2-2
Figure 3. City of Phoenix Public Transit Department Safety Organizational Chart ................................... 7-4
Figure 4. Safety Risk Management Eight Step Process .......................................................................... 7-10
Figure 5. Hazard Identification and Documentation (Step 1) ................................................................... 7-11
Figure 6. Safety Risk Management Scenario .......................................................................................... 7-18
Figure 7. PTD and Contractor Monthly Communication .......................................................................... 7-20
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
ix
Glossary of Terms
49 CFR Part 673: The final rule for the Public Transportation Agency Safety Plan as authorized by the
Moving Ahead for Progress in the 21st Century Act (MAP-21). This final rule requires states and certain
operators of public transportation systems that receive federal financial assistance under 49 U.S.C.
Chapter 53 to develop Public Transportation Agency Safety Plans.
Accident: An event that involves a loss of life, a serious injury to a person, a collision of transit vehicles,
an evacuation for life safety reasons or any derailment of a transit vehicle, at any location, at any time,
whatever the cause.
Accountable Executive: Typically, the highest executive in the agency. A single, identifiable person who
has ultimate responsibility for carrying out the safety management system of a public transportation
agency, and control or direction over the human and capital resources needed to develop and maintain
the agency’s Public Transportation Agency Safety Plan, in accordance with 49 U.S.C. 5329(d), and the
agency’s Transit Asset Management Plan in accordance with 49 U.S.C. 5326.
Bipartisan Infrastructure Law: Law enacted in 2021 intended to expand investment in national
infrastructure. Transit safety requirements are further expanded in 49 U.S.C. 5329 to require the transit
providers to develop a safety committee, expand upon safety risk reduction programs, increases in
frontline safety training, and align internal programs with local and federal infectious disease prevention
requirements.
Chief Safety Officer: An adequately trained individual who has responsibility for safety and reports
directly to a transit department’s chief executive officer, general manager, president, or equivalent officer.
A Chief Safety Officer may not serve in other operational or maintenance capacity, unless employed by a
department that is either a small public transportation provider, or a public transportation provider that
does not operate a rail fixed guideway public transportation system.
Critical Incident: An occurrence, natural or human-caused, that requires a response to protect life or
property. Incidents can, for example, include major disasters, emergencies, terrorist attacks, terrorist
threats, civil unrest, wildland and urban fires, floods, hazardous materials spills, nuclear accidents, aircraft
accidents, earthquakes, hurricanes, tornadoes, tropical storms, tsunamis, war-related disasters, public
health and medical emergencies, and other occurrences requiring an emergency response.
Departmental Leadership and Executive Management: Members of an agency who have authorities or
responsibilities for day-to-day implementation and operation of an agency’s safety management system.
Designated Recipient: An entity that has been designated by the state governor or his/her designee to
receive and/or sub-allocate FTA funding.
Equivalent Authority: An entity that carries out duties similar to that of a Board of Directors, for a
recipient or subrecipient of FTA funds under 49 U.S.C. Chapter 53, with sufficient authority to review and
approve a recipient or subrecipient’s Public Transportation Agency Safety Plan.
Event: An accident, incident, or occurrence.
Grant Pass-Through Agreement: A non-federal entity that provides a subaward to a subrecipient to
carry out part of a federal program.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
x
Hazard: Any real or potential condition that can cause injury, illness, or death; damage to or loss of the
facilities, equipment, rolling stock or infrastructure of a public transportation system; or harm to the
environment.
Incident: An event that involves personal injury that is not a serious injury; one or more injuries requiring
medical transport; or damage to facilities, equipment, rolling stock or infrastructure that disrupts the
operations of a transit agency.
Investigation: Process of determining the causal and contributing factors of an accident, incident or
hazard for the purpose of preventing recurrence and mitigating risk.
Key Staff: A group of staff and their direct reporting personnel that support the Accountable Executive,
Chief Safety Officer or Safety Management System Executive in developing, implementing, and operating
the department’s safety management system.
Major Mechanical Failure: Failure caused by vehicle malfunction or subpar vehicle condition that
requires that the vehicle be pulled out of service.
National Public Transportation Safety Plan: A plan to improve the safety of all public transportation
systems that receive federal financial assistance under 49 U.S.C. Chapter 53.
Occurrence: An event without any personal injury in which damage to facilities, equipment, rolling stock
or infrastructure does not disrupt the operations of a transit agency/department.
Operator: Provider of public transportation as defined under 49 U.S.C. 5302(14).
Passenger: A person, other than an operator, who is boarding onto, riding on, or alighting from a vehicle
on a public transportation system for the purpose of travel.
Performance Measure: An expression based on a quantifiable indicator of performance or condition that
is used to establish targets and to assess progress toward meeting the established targets.
Performance Target: A quantifiable level of performance or condition, expressed as a value for the
measure, to be achieved within a time period required by FTA.
Potential Hazard: Any possible future condition that may cause injury, illness, or death; damage to or
loss of the facilities, equipment, rolling stock or infrastructure of a public transportation system; or harm to
the environment.
Preventive Maintenance: Regular, scheduled and/or recurring maintenance of assets (equipment and
facilities) as required by the manufacturer’s or vendor’s requirements, typically for the purpose of
maintaining assets in satisfactory operating condition. Preventive maintenance is conducted by providing
systematic inspection, detection, and correction of anticipated failures either before they occur or before
they develop into major defects. Preventive maintenance is maintenance, including tests, measurements,
adjustments, and parts replacement, performed specifically to prevent faults from occurring. The primary
goal of preventive maintenance is to avoid or mitigate the consequences of equipment failure.
Public Transportation Agency Safety Plan: The documented comprehensive agency safety plan for a
transit agency that is required by 49 U.S.C. 5329 and 49 CFR Part 673.
Rail Fixed Guideway Public Transportation System: Any fixed guideway system that uses rail,
operates for public transportation, and serves within the jurisdiction of a state (and is not subject to the
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
xi
jurisdiction of the Federal Railroad Administration), or any such system undergoing engineering or
construction. Rail fixed guideway public transportation systems include rapid rail; heavy rail; light rail;
monorail; trolley; and inclined plane, funicular, and automated guideway.
Reportable Event: A safety or security event occurring on transit right-of-way or infrastructure, at a transit
revenue facility, at a maintenance facility or rail yard, during a transit related maintenance activity or
involving a transit revenue vehicle. The following types of events are excluded from reporting
requirements: events that occur off transit property where affected persons, vehicles, or objects come to
rest on transit property after the event; OSHA events in administrative buildings; deaths that are a result
of illness or other natural causes; other events occurring at bus stops or shelters that are not on transit-
controlled property; collisions that occur while travelling to or from a transit-related maintenance activity;
and collisions involving a supervisor car or other transit service vehicle operating on public roads.
Risk: The composite of predicted severity and likelihood of the potential consequences of hazards.
Risk Mitigation: A method or methods to eliminate or reduce the effects of hazards.
Root Cause Analysis: A systematic process for identifying root causes of safety events and an approach
for responding to them.
Safety Assurance: The process within a transit agency’s Safety Management System that functions to
ensure the implementation and effectiveness of safety risk mitigation and the satisfaction of safety
objectives through the collection, analysis, and assessment of information.
Safety Management Policy: A transit agency’s documented commitment to safety, which defines the
transit agency’s safety objectives and the transit agency employees’ accountabilities and responsibilities
in regard to safety.
Safety Management System: The formal, top-down, data-driven, organization-wide approach to
managing safety risk and ensuring the effectiveness of a transit agency’s safety risk mitigation. Safety
management system includes systematic procedures, practices, and policies for managing risks and
hazards.
Safety Objective: A general goal or desired outcome related to safety.
Safety Performance: An organization’s safety effectiveness and efficiency, as defined by safety
performance indicators and targets, measured against the organization's safety objectives.
Safety Performance Indicator: A data-driven, quantifiable parameter used for monitoring and assessing
safety performance.
Safety Performance Measure: An expression based on a quantifiable indicator or condition of
performance that is used to establish targets and to assess progress toward meeting the established
targets.
Safety Performance Monitoring: Activities aimed at the quantification of an organization’s safety
effectiveness and efficiency during service delivery operations, through a combination of safety
performance indicators and safety performance targets.
Safety Performance Target: A quantifiable level or condition of performance, expressed as a value for a
given performance measure, achieved over a specified timeframe related to safety management
activities.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
xii
Safety Promotion: A combination of training and communication of safety information to support safety
management system as applied to the transit agency’s public transportation system.
Safety Risk: Assessed probability and severity of the potential consequence(s) of a hazard, using as
reference the worst foreseeable, but credible, outcome.
Safety Risk Assessment: Formal activity whereby a transit agency determines safety risk management
priorities by establishing the significance or value of the safety risks.
Safety Risk Management: A process within a transit agency’s safety plan for identifying hazards,
assessing the hazards, and mitigating safety risk.
Safety Risk Mitigation: Activities whereby a public transportation agency controls the probability or
severity of the potential consequences of hazards.
Safety Hazard Risk Probability: Likelihood that a consequence might occur, taking as reference the
worst foreseeable, but credible, condition.
Safety Hazard Risk Severity: Anticipated effects of a consequence, should hazards materialize, taking
as reference the worst foreseeable, but credible, condition.
Serious Injury: Any injury that:
•
Requires hospitalization for more than 48 hours, commencing within 7 days from the date the injury
was received
•
Results in a fracture of any bone (except simple fractures of fingers, toes or nose)
•
Causes severe hemorrhages, or nerve, muscle, or tendon damage
•
Involves any internal organ
•
Involves second- or third-degree burns, or any burns affecting more than 5% of the body surface
State: A state of the United States, the District of Columbia or the Territories of Puerto Rico, the Northern
Mariana Islands, Guam, American Samoa, and the Virgin Islands.
State of Good Repair: Condition in which a capital asset can operate at a full level of performance.
State Safety Oversight Agency: An agency established by a state that meets the requirements and
performs the functions specified by 49 U.S.C. 5329(e) and the regulations set forth in 49 CFR Part 674.
Transit Agency: An operator of a public transportation system.
Transit Asset Management Plan: Strategic and systematic practice of procuring, operating, inspecting,
maintaining, rehabilitating and replacing transit capital assets to manage their performance, risks and
costs over their life cycles for the purpose of providing safe, cost-effective and reliable public
transportation, as required by 49 U.S.C. 5326 and 49 CFR 625.
Vehicle Revenue Mile: The miles that vehicles are scheduled to or travel while in revenue service.
Vehicle revenue miles include layover/recovery time and exclude deadhead, operator training, vehicle
maintenance testing and school bus and charter services.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
xiii
Acronyms
ADOT Arizona Department of Transportation
CFR
Code of Federal Regulations
CSO
Chief Safety Officer
DASH Downtown Area Shuttle
FTA
Federal Transit Administration
MAG
Maricopa Association of Governments
NSP
National Safety Plan
NTD
National Transit Database
PTASP Public Transportation Agency Safety Plan
PTD
Public Transit Department
RPTA Regional Public Transportation Authority
SMS
Safety Management Systems
TI&I
Transportation, Infrastructure and Innovation Subcommittee
U.S.C. United States Code
VMR
Valley Metro Rail
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
1-1
1.
Plan Adoption and Certification
1.1
Plan Adoption
This Public Transportation Agency Safety Plan (PTASP) is approved by the Phoenix City Council and is
hereby adopted, certified as compliant and signed by the Accountable Executive and the Chief Safety
Officer:
Jesus Sapien
Accountable Executive
Date
Lars Jacoby
Chief Safety Officer
Date
1.1
Certification of Compliance
The city of Phoenix certified on INSERT DATE POST COUNCIL APPROVAL, that this PTASP is in full
compliance with 49 Code of Federal Regulations (CFR) Part 673, as required by 49 U.S.C. 5329, and is
adopted and implemented by the city of Phoenix as evidenced by the Plan adoption signature and
necessary Phoenix City Council approvals in Appendix A of this Plan.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
2-1
2.
Introduction
The City of Phoenix Public Transit Department (PTD) originally prepared a Public Transportation Agency
Safety Plan (PTASP) in 2020 to comply with the Federal Transportation Administration’s (FTA) PTASP
final rule 49 CFR Part 673. The rule requires public transportation system operators receiving federal
Section 5307 funds to develop safety plans with processes and procedures that implement safety
management system (SMS) principles and methods. The SMS includes the PTASP’s Safety Management
Policy Statement (SMP), Safety Risk Management (SRM), Safety Assurance (SA), and Safety Promotion
(SP) policies and procedures that encompass a top-down and data-driven approach to safety risk
management and ensuring the effectiveness of safety risk mitigation.
The 2022 PTASP revision is in response to new requirements that are part of the Building Infrastructure
Law implemented in early 2022. The new requirements include the creation of a safety committee
comprised equally of front-line and management employees, a standardized formula for determining
annual safety performance targets, a new risk reduction program and the identification of ongoing training
opportunities.
PTD operates fixed local bus service, neighborhood bus circulators, commuter bus service, and
paratransit services in partnership with three Contractors: First Transit, Transdev and MV Transportation,
which are all responsible for the day-to-day operations and maintenance, although PTD works individually
with each contractor to ensure an effective safety program for the city’s transit system.1
PTD is also part of an overall regional transit system in partnership with the Regional Public
Transportation Authority (RPTA) and Valley Metro Rail (VMR). The City of Phoenix is the designated
recipient of FTA funding for the Phoenix-Mesa Urbanized Area, and distributes funds to subrecipients
including RPTA, VMR, Tempe, Mesa, Scottsdale, Glendale, Avondale, Fountain Hills, Peoria, Paradise
Valley, Goodyear, Litchfield Park, Surprise, Tolleson, Youngtown, and unincorporated areas of Maricopa
County. In addition, Glendale, Peoria, and Scottsdale operate bus transit service in their jurisdictions, and
PTASP regulations also apply to those transit agencies. This complex regional relationship is illustrated
on Figure 2.
1 This PTASP represents an overarching safety program for PTD’s relationship with its bus transit service contractors and includes
safety management as it also relates to PTD employees, particularly those employees in safety-sensitive positions. As such, the
preponderance of PTD transit budget is contracted service (89% of PTD’s budget is contracted services). No city employees are bus
operators; the city does not provide maintenance, fueling or direct management of the contracted bus service. Where applicable,
each section of this Plan includes the safety management processes and procedures of PTD and/or the safety management
processes and procedures of the contractors. Contractors’ abbreviated safety plans are included in Appendices B through D. Their
full safety plans are referenced in each abbreviated plan and are available upon request.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
2-2
Figure 2. Public Transit Department Regional Chart
*Note that the Valley Metro Rail and RPTA PTASPs are separate from this Plan. This Plan covers the
PTD bus operations supported by First Transit, Transdev, and MV. The small transportation providers of
Scottsdale, Glendale, and Peoria are all separate PTASPs.
City of Phoenix
FTA Designated Recipient of Federal
Funds
(5307, 5309, 5310, 5337, 5339, CMAQ, STP)
Phoenix Public Transit Department
Operates bus & paratransit
60% of region’s bus ridership
Governance
•
TIP Subcommittee
•
Phoenix City Council
Valley Metro Rail*
Operates 26 miles of light rail
Governance
•
RTAG
•
RMC
•
VMR Board
•
Phoenix*
•
Tempe*
•
Mesa*
•
Chandler
* Current light rail service
RPTA*
Regional Public Transportation
Authority
Operates Bus & Paratransit
Governance
•
RTAG
•
TMC
•
RPTA Board
*19 board members
40% of region’s bus ridership
57 current
5310
Subrecipients
•
Avondale
•
Buckeye
•
Chandler
•
El Mirage
•
Gilbert
•
Goodyear
•
Maricopa
County
•
Mesa
•
Queen
Creek
5307
City of Phoenix
•
TIP – Transportation, Infrastructure
and Planning Subcommittee
Valley Metro
•
VMR – Valley Metro Rail
•
RMC – Rail Management Committee
•
RTAG – Regional Transit Advisory Group
•
TMC – Transit Management Committee
Federal
•
CMAQ – Congestion Mitigation and Air Quality
•
FTA – Federal Transit Administration
•
STP – Surface Transportation Program
Acronyms & Abbreviations
Subrecipients
•
Surprise
•
Tempe
•
Tolleson
Operates Service
•
Glendale
•
Scottsdale
•
Phoenix
•
Peoria
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
3-1
3.
Safety Plan Regulatory Background
The FTA PTASP Final Rule (49 CFR Part 673.11(a)(3)) became effective July 19, 2019. The rule requires
public transportation system operators receiving federal Section 5307 funds to develop safety plans with
processes and procedures for implementing the SMS. The PTASP contains the following four SMS
elements:
•
Safety Management Policy: A documented commitment to safety that defines PTD’s objectives, as
well as the accountabilities and responsibilities of its employees in regard to safety.
•
Safety Risk Management: An established and documented process for identifying, analyzing,
assessing, and mitigating safety risks and hazards.
•
Safety Assurance: A federally mandated process for safety performance monitoring and
measurement. PTD is a large transit provider and therefore required to develop management of
change and continuous improvement processes.
•
Safety Promotion: A process for safety training and communication.
The PTASP also contains established safety performance targets for contracted service operators,
including the process and timeline for conducting an annual PTASP review and update. Since the initial
release of the PTASP, the Bipartisan Infrastructure Law (BIL), introduced further safety requirements,
described in 49 U.S.C. 5329, elaborated upon within this document.
3.1
Initial Certification and Implementation
In accordance with 49 CFR Part 673.13, PTD’s Accountable Executive and the Phoenix City Council
certified initial compliance with the PTASP requirements in 2020, which was then shared with the Arizona
Department of Transportation (ADOT) and implemented by PTD staff and Contractors. PTD conducts
annual certification of the implementation of the PTASP in compliance with 673.13(b)
3.2
Plan Development and Annual Review
PTD requires Contractors to develop, annually update, and implement safety plans unique to each
Contractor’s system and scope of operation. The PTASP rule is also applicable to the PTD Contractors.
PTD is required to form a joint safety committee composed of the frontline and management staff, in
equal parts. Following the annual revision of the PTASP, the Plan was then brought to the PTD Safety
Committee for review and input prior to approval by the Phoenix City Council and signature by the
Accountable Executive (defined below).
PTD coordinated with the Maricopa Association of Governments (MAG) as the MPO to collaborate on
regional transit system performance targets in the PTASP.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
4-1
4.
Transit Agency Information
4.1
General Information
General Agency Information
City of Phoenix
Public Transit Department
302 North 1st Avenue, Suite 900
Phoenix, Arizona 85003
Number of Employees: 115
Contractor Information (as of this writing)
Transdev
Number of Employees: 952
Buses (40 and 60 foot): 330
Circulator Cutaways: 10
PTD Fiscal Year Revenue Miles:
2018 - 14,924,290
2019 - 15,191,569
2020 - 13,878,353
First Transit
Number of Employees: 510
Buses (40 and 60 feet): 159
Circulator Cutaways: 6
PTD Fiscal Year Revenue Miles:
2018 - 6,453,377
2019 - 6,274,901
2020 - 6,810,813
MV Transportation
Number of Employees: 249
Dial-A-Ride Cutaways: 123
PTD Fiscal Year Revenue Miles:
2018 - 322,914
2019 - 331,731
2020 - 288,763
Note: PTD’s fiscal year is July 1 through June 30, each year.
Accountable Executive
Jesús Sapien
Public Transit Director
Chief Safety Officer
Lars Jacoby
Management Assistant II, Director’s Office
Mode Applicability
Operated: Bus and Paratransit
Plan Applicability: Bus and Paratransit
Types of Funding
Section 5307
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
4-2
4.2
PTD Agency Description
The city of Phoenix purchased the Phoenix Transit System from a private company in 1971, and since
then is responsible for overseeing the city's transit programs and serves as the designated recipient for
federal funding under FTA's Section 5307, 5309, 5310, 5316, 5317, 5337 and 5339 programs in the
Phoenix-Mesa Urbanized Area. PTD's service area is 518 square miles, consisting of a population of
approximately 1.7 million people. PTD contracts the operation of the city’s transit network of:
-
38 local fixed routes (First Transit [11 routes] and Transdev [27 routes])
-
Four circulator routes (First Transit [1 route] and Transdev [3 routes])
-
Six RAPID (commuter bus) routes (Transdev)
-
Phoenix Dial-A-Ride paratransit service (MV Transportation).
In addition to managing FTA grants subrecipients, PTD is responsible for ensuring compliance with
federal rules and guidelines for itself and the region’s subrecipients. Each subrecipient signs a Grant
Pass Through Agreement with PTD for the receipt of FTA funds to support its operations. Per 49 U.S.C.
5329(d)(4)(B), PTD and its subrecipients are required to utilize .75% of 5307 for risk reduction programs.
CITY OF PHOENIX CONTRACTORS
First Transit operates 11 local and one circulator routes from the city’s West Transit Facility. For
additional information, see the First Transit Abbreviated Safety Plan (Appendix B).
Transdev operates 27 local, six RAPID, and three circulator routes. Transdev operates from the city’s
North and South Transit Facilities. For additional information on Transdev, see the Transdev Abbreviated
Safety Plan (Appendix C).
MV Transportation operates the Phoenix Dial-A-Ride paratransit service for persons with disabilities
certified under the Americans with Disabilities Act of 1990 guidelines. The company operates from an
operator-leased facility.
To supplement Dial-A-Ride, PTD’s Alternative Transportation Programs are also provided by MV
Transportation for transportation assistance via taxi vouchers and to operate a shuttle service for seniors
and persons with disabilities or are receiving dialysis treatment. For additional information on MV
Transportation, see the MV Transportation Abbreviated Safety Plan (Appendix D).
OTHER AGENCIES of PTD
PTD provides FTA funding for two transit agencies and three small transit agencies as subrecipients:
RPTA, VMR, city of Scottsdale, city of Glendale, and city of Peoria respectively (see Figure 2). Each
transit agency maintains a standalone PTASP for their respective programs.
RPTA is overseen by a board of elected officials from member agencies, including Avondale, Buckeye,
Chandler, El Mirage, Gilbert, Glendale, Goodyear, Maricopa County, Mesa, Peoria, Phoenix, Scottsdale,
Surprise, Tempe, Tolleson and Wickenburg. RPTA is responsible for transit marketing and financial
management of the transit component of the Maricopa County regional transportation program. RPTA
also contracts for the operation of the local and commuter bus and paratransit services it operates outside
of Phoenix.
VMR is a non-profit, public corporation that is responsible for the design, construction and operation of
the 26-mile light rail system and future extensions. The board includes representatives from the member
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
4-3
cities of Chandler, Mesa, Phoenix and Tempe. The light rail system currently serves Phoenix, Tempe, and
Mesa.
ADOT is the state’s agency responsible for planning, building and operating the highway system, as well
as building and maintaining bridges and the operation of the Grand Canyon Airport. ADOT serves as the
State Safety Oversight Agency for VMR within PTD.
MAG serves the metropolitan Phoenix area as the regional Metropolitan Planning Organization (MPO) for
Maricopa County and its 27 member cities and agencies. As the MPO, it is responsible for coordinating
with each public transportation provider in the development and review of their safety performance targets
(SPT) for planning purposes.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
5-1
5.
Safety Plan Development and Maintenance
5.1
PTASP Development
The PTASP was written and reviewed by PTD subject matter experts and a third-party consultant to
ensure it meets current safety industry standards and follows 49 CFR Part 673 and 49 U.S.C. 5329.
Through its written agreements with multiple service providers, PTD requires Contractors to develop and
implement safety plans unique to their respective scope of operations, while providing oversight and input
to ensure compliance. Throughout each process, each Contractor develops and implements safety plans
that address safety needs.
The PTASP goes through a formal approval process:
1. Internal transit agency safety committee review and concurrence.
2. Transportation, Infrastructure and Planning (TIP) Subcommittee – a four-member subcommittee
of the Phoenix City Council that provides policy guidance on a range of issues, including transit.
3. Phoenix City Council – Comprised of nine members (the Mayor and eight Council members), who
provide approval and direction on policies and initiatives citywide.
5.2
Annual Internal Review and Update Process
5.2.1
PTD
PTD management and staff will review the PTASP on an annual basis prior to December 31 of each year
and make updates to the plan as necessary. Review of the PTASP along with any subsequent updates,
addendums, adoption, and distribution activities will be documented in the PTASP Activity Log (Appendix
E) and tracked through the date and version provided in the header on the individual pages. Approval of
each updated Plan will be completed by the Accountable Executive, the Chief Safety Officer (CSO) and
the Phoenix City Council; and self-certification will be completed annually by the Accountable Executive
and CSO in compliance with 49 CFR Part 673.13.
5.2.2
Contractors
At a minimum, Contractors are required to update their plans annually. Each Contractor has developed
their own review process and will submit updates to PTD.
For more details on each contractor’s safety plan review and update process, see:
•
First Transit – Appendix B.2 (Plan Development, Approvals, and Updates)
•
Transdev – Appendix C.5.1.3 (Agency Safety Plan Review Process)
•
MV Transportation – Appendix D.2 (Plan Development, Approvals, and Updates)
5.3
PTASP Audit Process
Following PTD’s annual review and update process, PTD will consult with third-party subject matter
experts for independent auditing of the PTD PTASP. Reviews of its three service contractors will occur on
a biennial basis. The auditor will ensure the plan’s compliance with 49 CFR Part 673 and any
accompanying mandates.
In addition, the VMR and RPTA PTASPs will be independently audited annually, while the Glendale,
Scottsdale, and Peoria PTASPs will be audited triennially.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
5-2
5.4
PTASP Documentation and Recordkeeping
5.4.1
PTD
PTD will maintain the documents set forth in the PTASP, including those documents related to
implementation of the SMS (in tandem with operations contractors) and results from SMS processes and
activities.
PTD will also maintain documents that are included in whole, or by reference, that describe the programs,
policies, and procedures that PTD uses to carry out the PTASP and all iterations of those documents.
These documents will be made available upon request to FTA or other federal entity, or ADOT. PTD will,
at a minimum, retain these documents as outlined in the federal and local records retention policies and
schedules or for three years, as required in 49 CFR Part 673.31. Such materials may include:
•
Safety Committee meeting agendas and notes;
•
Proficiency and rules compliance checks;
•
Employment records;
•
Safety bulletins;
•
Preventive and corrective maintenance records;
•
Training records; and
•
Event investigations
Accident and incident investigations
5.4.2
Contractors
Each Contractor maintains individual policies on safety-related documentation and recordkeeping for no
less than three years. All Contractors are committed to maintaining documents and records related to
their plans, including the safety plan itself and other associated safety records and documentation. For
more information about each Contractor’s policy on documentation and recordkeeping, see:
•
First Transit – Appendix B.3 (Annual Review and Update of the Public Transportation Safety
Plan)
•
Transdev – Appendix C.2 - Transdev (Safety Plan Documentation and Recordkeeping)
•
MV Transportation – Appendix D.3 (Annual Review and Update of the Public Transportation
Safety Plan)
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
6-1
6.
Safety Performance Targets
The PTASP Final Rule requires public transportation providers to develop a PTASP that includes safety
performance targets based on the seven safety performance measures established under the FTA’s
National Public Transportation Safety Plan (NSP). The safety performance measures outlined in the NSP,
which are based on data currently being submitted to the National Transit Database (NTD), are
developed to ensure applicability to all modes of public transportation and are based on data submitted
using the NTD and are each listed as categories in Table 1 and Table 2. The SPTs are developed based
on a three-year rolling average. The NTD is maintained by FTA and serves as a reporting system for
public transit information tracking, such as agency funding sources, inventories of assets, safety reports
and measures of transit service. The safety performance measures included in the NSP are fatalities,
injuries, safety events and system reliability.
Given that PTD does not directly operate the Phoenix transit system or other operations in the region, the
safety performance baselines and targets presented in the PTASP are established and directly monitored
by Contractors across the region.
Each Contractor baseline was established as the actual safety performance value recorded at the end of
the federal fiscal year 2019, except for ‘System ‘Reliability, which is a contractual performance target. All
safety performance metrics use the federal fiscal calendar, which begins October 1 and ends on
September 30.
A record of prior safety performance baselines and targets are found in the PTASP Performance Target
Log (Appendix F).
Table 1 and Table 2 present the safety performance baselines and targets for bus service and paratransit
service, respectively.
Table 1. Bus Service Safety Performance Baseline and Targets
MB (per 100,000 VRM)
Mode -
MB
Fatalities
Rate* of
Fatalities
Injuries
Rate* of
Injuries
Safety
Events
Rate* of
Safety
Events
Mean Distance
Between Mechanical
Failure
2019
Actual
0
0.00
39
0.18
71
0.32
19,810
2020
Actual
0
0.00
35
0.17
105
0.51
15,241
2021
Actual
5
0.02
51
0.25
157
0.78
18,365
Average
1.67
0.01
42
0.20
111
0.54
17,805
2023
SPT
(MB)
1.67
0.01
42
0.20
111.00
0.54
17,805
Table 2. Paratransit Service Safety Performance Baseline and Targets
DR (per 100,000 VRM)
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
6-2
Mode -
DR
Fatalities
Rate* of
Fatalities
Injuries
Rate* of
Injuries
Safety
Events
Rate* of
Safety Events
System
Reliability
2019
Actual
0
0.00
1
0.03
1
0.03
18,989
2020
Actual
0
0.00
0
0.00
2
0.07
22,554
2021
Actual
0
0.00
1
0.03
2
0.06
19,036
Average
0
0
0.67
0.02
1.67
0.06
20,193
2023 SPT
(DR)
0
0
0.67
0.02
1.67
0.06
20,193
*rate = total number for the year/total revenue vehicle miles traveled
Tables 1 and 2 definitions:
•
Fatality: A death or suicide confirmed within 30 days of a reported event. Does not include deaths in
or on transit property that are a result of illness or other natural causes.
•
Injury: Any damage or harm to persons as a result of an event that requires immediate medical
attention away from the scene.
•
Safety Event: A collision, derailment, fire, hazardous material spill, act of nature (Act of God),
evacuation or OSONOC (other safety occurrence not otherwise classified) occurring on transit right-
of-way, in a transit revenue facility, in a transit maintenance facility, or involving a transit revenue
vehicle that meets the established NTD reportable thresholds.
•
System Reliability: The rate of vehicle failures in service, defined as mean distance between major
mechanical failures.
6.1
Accident and Assault Reduction Strategies
These SPTs are set to works towards a reduction of vehicular and pedestrian accidents involving buses.
In order to reduce such events, PTD and its contractors will utilize the SRM process, spelled out in
section 7.7. Mitigations that may be taken to reduce events may include measures to reduce visibility
impairments for bus operators that contribute to accidents, including retrofits to buses in revenue service
and specifications for future procurements that reduce visibility impairments. Additionally, per 49 U.S.C.
5329(d)(1)(I)(ii), PTD has and will continue to take measures to mitigate assaults on transit workers,
including the deployment of assault mitigation infrastructure and technology on buses. Barriers to restrict
the unwanted entry of individuals and objects into the workstations of bus operators have already been
installed regionally. To conduct this review, the PTD Safety Committees will conduct risk analyses to
determine if such physical mitigations are necessary to reduce assaults and injuries to transit workers.
See further details on the overall risk assessment and mitigation process in sections 7.7 and 7.8.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
7-1
7.
Safety Management Systems
7.1
Safety Management Policy – 673.23(a)
7.1.1
PTD
The city of Phoenix is committed to safety management as a systematic, comprehensive, and ongoing
approach to identifying hazards and risks associated with transit system operations, facilities and related
preventive maintenance activities. The PTD Safety Management Policy (SMP) is the first layer of its
commitment to the SMS framework.
PTD adopted an SMS framework as an element of its responsibility by establishing:
•
A safety management policy
•
Identifying hazards and controlling risks
•
Goal setting, planning, and measuring performance.
PTD recognizes that the management of safety is a core value. PTD is committed to providing safe and
reliable transportation to the communities it serves. The management team of PTD will embrace the SMS
and is committed to developing, implementing, maintaining, and constantly improving processes to
ensure safety. As SMS is a top-down method for instituting safety practices throughout the agency, all
levels of management and frontline employees are committed to safety and understand that safety is the
primary responsibility of all employees. As necessary, PTD will plan to develop plans, procedures,
structures, and resources to support the implementation of SMS within the agency. PTD is committed to
performing the following activities to implement SMS and this PTASP:
•
Communicate the purpose and benefits of the SMS to all staff, managers, supervisors, and
employees through Safety Promotion activities. This communication will specifically define the
duties and responsibilities of each employee throughout the organization and all employees will
receive appropriate information and SMS training.
•
Provide appropriate management involvement and the necessary resources to establish an
effective employee safety reporting system that will encourage employees to communicate and
report any unsafe work conditions, hazards, or at-risk behavior to the management team.
•
Identify hazardous and unsafe work conditions and analyzing data from the employee reporting
system. After thoroughly analyzing provided data, the transit operations division will develop
processes and procedures to mitigate safety risk to an acceptable level.
•
Ensure that no action will be taken against employees who disclose safety concerns through the
reporting system, unless disclosure indicates an illegal act, gross negligence, or deliberate or
willful disregard of regulations or procedures.
•
Establish Safety Performance Targets (SPTs) that are realistic, measurable, and data driven.
•
Continual improvement of safety performance through management processes that ensure
appropriate safety management action is taken and is effective.
•
Ensure the SMP is signed by highest executive in the agency to convey that SMS is important to
the highest level of the organization.
•
Provide resources for managing safety during service delivery.
•
Convey to employees and agency stakeholders that receiving safety information is critical to the
operation and success of the SMS.
•
Ensure that the PTD’s strategies and guidelines to address infectious disease planning and
response is consistent with the Centers for Disease Control and Prevention and the Arizona and
local health authorities in order to minimize exposure to infectious diseases in accordance with 49
USC section 5329 (d)(1)(D).
PTD also follows safety management policies as directed in the city of Phoenix’s safety program outlined
in Administrative Regulation 2.31 (AR 2.31). See the City of Phoenix Administrative Regulations
(Appendix G).
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
7-2
7.1.1.1
Communicating the Policy Throughout the Agency
PTD
PTD is committed to ensuring the safety of our passengers, personnel, and operations. Part of that
commitment is developing an SMS and agencywide safety culture that reduces agency risk to the lowest
level possible. The first step in developing a full SMS and agencywide safety culture is communicating the
SMP throughout the agency and to the Contractors. The SMP and safety objectives are at the forefront of
all communications within the Department. This communication strategy will include posting the policy in
prominent work locations for existing employees and adding the policy statement to the on-boarding
material for all new employees The signed PTASP serves as the Accountable Executive’s endorsement
of the SMP and the Council’s adoption of the Plan and SMP.
Methods used to communicate the safety management policy include the following:
•
Safety presentations at PTD staff meetings.
•
Annual safety training with key PTD staff.
•
PTASP and safety training information uploaded to PTD’s employee-accessible SharePoint site.
Additionally, PTD oversees the contracted transit providers to ensure that they are providing adequate
information on not only their respective SMPs, but also PTD’s overarching PTD to ensure it aligns with the
Department’s SMS values.
7.1.2
Contractors
Each Contractor has adopted their own SMPs that are compliant with 49 CFR Part 673 and are
complementary to PTD’s policy.
For specific details regarding each contractor’s safety management policy, see:
•
First Transit – Appendix B.5 (Safety Management Policy)
•
Transdev – Appendix C.4 (Safety Policy Statement)
•
MV Transportation – Appendix D.4 (Safety Management Policy)
Contractors
PTD Contractors have included a SMP Communication section in their safety plans regarding their
communications to their staff. The Contractors plan to communicate safety information to their employees
by creating accessible safety reports, implementing training programs, posting information on general
bulletin boards, and sending safety emails.
For more information on each Contractor’s individual policies related to safety communication, see:
•
First Transit – Appendix B.5 (Safety Management Policy Communication)
•
Transdev – Appendix C.4 (Communication)
•
MV Transportation – Appendix D.4 (Safety Management Policy Communication)
7.2
State and Metropolitan Planning Organization Coordination
The city of Phoenix makes its SPTs available to ADOT and the MPO, Maricopa Association of
Governments (MAG), to aid in those agencies’ respective regional and long-range planning processes.
To the maximum extent practicable, PTD coordinates with ADOT and MAG in the selection of the SPTs.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
City of Phoenix - Public Transportation Agency Safety Plan, 2022
7-3
Each year during the FTA Certifications and Assurances reporting process, PTD will transmit any updates
to its SPTs to both the MAG and ADOT (unless those agencies specify another time in writing).
7.3
Safety Goals
To address the ongoing oversight and review required to ensure the proper implementation of this plan,
the following safety goals are set:
•
Establish a safety and training committee with key frontline and management representatives
from PTD to review policies and procedures related to the PTASP, per 49 U.S.C. 5329(d)(1)(A).
•
Encourage and improve safety communication strategies and awareness with both internal and
external stakeholders.
•
Identify roles and responsibilities for the transit system’s safety program and develop a training
curriculum.
•
Strive for continuous improvement in all SMS-related activities across PTD.
7.4
Authorities, Roles and Responsibilities
7.4.1
PTD
The key to a successful safety plan is fostering a culture focused on safety. With this philosophy in mind,
all PTD employees are responsible for implementing the safety practices and being safe every day.
Figure 3 illustrates the organizational structure for PTD’s SMS. Table 3 defines the specific
responsibilities and accountabilities each role has in achieving safety targets, program oversight, and
implementation.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
Placeholder
City of Phoenix - Public Transportation Agency Safety Plan, 2022
7-4
Figure 3. City of Phoenix Public Transit Department Safety Organizational Chart
Roberto
Valentin
Transit
Superintendent
Management
Key Staff
Contractors
Lars Jacoby
Management Assistant II
Jesús Sapien
Public Transit Department Director
Ken Kessler
Assistant Director
First Transit
TransDev
MV
Transportation
Barbara Paez
Administrative
Assistant II
Herb Muñoz
Transit
Superintendent
Facilities
Carl
Montgomery
Transit Asset
Manager
Albert Crespo
Deputy Director – Operations,
Technology, & Planning
Joe Bowar
Deputy Director – Facilities &
Contracts
Les Scott
Deputy Director – Management
Services
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-5
Table 3. Safety Roles and Responsibilities
Role
Name of Staff Member
Safety Responsibilities
Public Transit
Department
Director
Accountable
Executive
Management
Jesús Sapien
•
Ensure compliance with FTA’s safety
policies.
•
Oversee the Plan for PTD.
•
Control and direct staff and capital
resources needed to create and maintain
the PTASP.
•
Create a safety-oriented culture across the
Department.
•
Work with the CSO to monitor safety
performance.
•
Ensure that PTD’s Contractors are working
toward achieving the safety performance
targets.
•
Periodically review customer comments
related to safety concerns.
Management
Assistant II -
Director’s
Office
Chief Safety
Officer
Lars Jacoby
Chief Safety Officer
•
Promote safety awareness throughout the
organization.
•
Ensure that safety documentation and
training are current.
•
Communicate changes in safety processes
to all applicable personnel.
•
Monitor the effectiveness of corrective
actions.
•
Provide periodic reports on safety
performance.
•
Render independent advice to managers
and other personnel on safety-related
matters as needed.
•
Ensure that safety is a high priority
throughout the organization.
•
Review customer comments related to
safety concerns.
•
Work with other divisions within PTD to
implement safety practices.
•
Promote a safety culture across the
Department and to contractors.
•
Provide oversight of contractor safety plans
through periodic reviews and audits.
•
Provide oversight of contractor, RPTA,
VMR, Scottsdale, Glendale, and Peoria
safety plans through periodic reviews and
formal internal audits.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-6
Role
Name of Staff Member
Safety Responsibilities
Deputy
Director -
Facilities &
Contracts
Management
Joe Bowar
Deputy Director – Facilities
•
Ensure transit facilities are well-maintained
and meet state of good repair
requirements.
•
Implement hazard mitigation strategies
related to transit infrastructure.
•
Collaborate with other divisions to address
safety concerns related to facilities and
operations.
•
Review customer comments related to
safety concerns.
•
Communicate safety practices and policies
to staff in the Division.
Deputy
Director -
Operations,
Technology &
Planning
Management
Albert Crespo
•
Communicate safety practices and policies
to staff within the Division.
•
Ensure Contractor compliance with their
safety plan, policies, and training
requirements and internal PTD safety
programs.
•
Collaborate with other divisions to address
safety concerns related to operations and
facilities.
•
Review customer comments related to
safety concerns.
Assistant
Director
Management
Ken Kessler
•
Communicate safety practices and policies
to staff within the Division.
Deputy
Director -
Management
Services
Management
Les Scott
•
Communicate safety practices and policies
to staff within the Division.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-7
Role
Name of Staff Member
Safety Responsibilities
Transit
Superintendent
(Operations,
Technology &
Planning)
Key Staff
Roberto Valentin
•
Supervise the contract monitoring for bus
service Contractors: First Transit and
Transdev.
•
Respond to and communicate safety
concerns with bus service Contractors and
vice versa back to PTD.
•
Ensure bus service Contractors implement
their safety plan and related policies and
training as well as uphold PTD’s overall
SMP.
•
Track safety performance for bus
Contractors.
•
Monitor the quality of maintenance and
repairs performed by Contractors on
vehicles owned by PTD.
•
Oversee the inspection of all transit
vehicles for safety and direct corrective
action.
•
Review all customer comments related to
safety concerns.
Administrative
Assistant II
(Operations,
Technology &
Planning)
Key Staff
Barbara Paez
•
Serve as the contract monitor for the
paratransit service Contractor: MV
Transportation.
•
Respond to and communicate safety
concerns with paratransit service
Contractor.
•
Ensure paratransit service Contractor
implements their safety plan and related
policies and training as well as the PTD
SMP.
•
Track safety performance of the paratransit
service Contractor.
•
Review all customer comments related to
safety concerns.
Transit
Superintendent
(Facilities &
Contracts)
Key Staff
Herb Muñoz
•
Oversee maintenance at all transit
facilities.
•
Inspect transit facilities for safety issues
and recommend corrective action.
•
Incorporate safety requirements for
contractors in on-site contracted
maintenance and repairs.
•
Review customer comments related to
safety concerns at facilities.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-8
Role
Name of Staff Member
Safety Responsibilities
Transit Asset
Manager
(Facilities &
Contracts)
Key Staff
Carl Montgomery
•
Manage PTD’s Transit Asset Management
Plan.
•
Provide oversight and technical assistance
to regional partners with their own Transit
Asset Management Plans.
•
Oversee the State of Good Repair
program.
Contractors
First Transit
• Jesse Saavadra, Location
General Manager
• Adrian Green,
Location Safety Manager
MV Transportation
• Thomas Egan,
General Manager
• Andrew Higuera,
• Area Safety Manager
Transdev
• Rob Killebrew,
General Manager
• Jackie Hampton,
Director of Safety and Training
•
Update PTASPs for compliance with
federal regulations.
•
Update PTASPs as necessary in response
to safety issues and provide training to
facilitate those changes to the safety plan.
•
Perform regular safety checks.
•
Implement safety policies applicable to
operating and maintaining transit vehicles
and maintaining a safe work environment.
•
Report and investigate safety hazards and
safety events.
•
Implement and track regular safety training
for employees.
•
Receive employee and customer
comments related to safety concerns.
See Appendices B through D for specific
safety practices of each Contractor.
7.4.2
Contractors
Each of the Contractors have identified authorities, roles and responsibilities related to safety within their
individual organizations and are responsible for also upholding the PTD SMP and overall PTASP. As part
of their safety plans, Contractors identified a respective CSO, an Accountable Executive, as well as
supporting safety staff. For each role, the Contractors specify the responsibilities that each person has
related to safety.
For specific details on each Contractor’s authorities, roles, and responsibilities, see:
•
First Transit – Appendix B.5 (Authorities, Accountabilities, and Responsibilities)
•
Transdev – Appendix C.4 (Safety Accountability and Responsibility)
•
MV Transportation – Appendix D.4 (Authorities, Accountabilities, and Responsibilities)
7.5
Employee Safety Reporting Program
7.5.1
PTD
Reporting safety observations and safety events is an important part of every employee’s role in creating
a safe environment. PTD encourages all employees to report potential hazards and any safety events
that occur through the safety reporting program. The safety reporting program includes anonymous
contact methods such as the city of Phoenix employee-wide integrity hotline (602-262-7555, or email
hrc@phoenix.gov), in addition to the PTD employee exclusive work order hotline (602-495-7011) that
provides contact information for safety observations and safety events to be communicated to appropriate
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-9
PTD staff. PTD management also maintains an open-door policy allowing for prompt communication of
safety concerns.
PTD utilizes the MPulse work order system to aid in communicating potential safety issues in the transit
system. The MPulse program is a computerized work order maintenance management system that
centralizes data, organizes maintenance data and facilitates the processes of maintenance operations.
Safety issues can be entered into MPulse for mitigation and resolution. Identified PTD staff and
contractors are notified by either email, the Work Order line or in person. The issue(s) are then entered
into MPulse as a request for service and tracked through closure.
MPulse tracks the operation and inventory of assets such as equipment, vehicles, machinery, and facility
infrastructure. Asset data that are collected via the MPulse program are utilized to determine the transit
system’s state of good repair condition and potential future asset replacement needs.
For more information on the PTD safety reporting program, see Administrative Regulation 1.2 (Fraud
Prevention and Reporting Policy [Integrity Line]) (Appendix G).
7.5.2
Contractors
Each Contractor has developed and documented an Employee Safety and Reporting Program as a part
of their individual safety plan and maintain an open door policy for safety concerns. Contractors
additionally utilize their own systems for reporting safety concerns.
For specific information on each Contractor’s employee safety reporting program, see:
•
First Transit – Appendix B.5 (Employee Safety Reporting Program)
•
Transdev – Appendix C.4 (Employee Safety Reporting)
•
MV Transportation – Appendix D.4 (Employee Safety Reporting Program)
7.6
Administrative Regulation Reporting Policy
7.6.1
PTD
PTD is committed to providing a safe transit operating environment. To achieve this, PTD maintains
unrestricted and confidential reporting of all incidents and occurrences that may compromise the safe
conduct of operations. Every employee is responsible for the communication of any information that may
affect the integrity of transit safety to management as outlined in AR 2.31 (Appendix F).
The department’s management hold the primary responsibility for providing and maintaining a safe
workplace. Any safety problems that are beyond the supervisor’s control shall be reported to
management immediately upon detection as outlined in AR 2.31 (Appendix F).
PTD will not retaliate or take punitive actions in any way against an employee, applicant, or former
employee who, in good faith, makes a complaint, safety report or report of discrimination/harassment or
participates in the investigation of such complaint or report. This policy shall not apply to information that
involves an illegal act, or a deliberate or willful disregard of promulgated regulations or procedures.
The PTD method of collecting, recording, and disseminating information obtained from transit safety
reports is intended to protect, to the extent permissible by law, the identity of any employee who provides
transit safety information and wishes to remain anonymous.
For further information on PTD’s reporting policies, refer to the City of Phoenix Administrative Regulations
(Appendix F).
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-10
7.6.2
Contractors
Each Contractor has their own administrative regulation reporting policy. All Contractors strive to deliver
safe transit service and to accomplish this each Contractor has developed its own system to encourage
employees to report safety incidents and observations and determine the necessary actions that need to
be taken following an incident.
For more details on each Contractor’s Administrative Regulation Reporting Policy, see:
•
First Transit – Appendix B.5 (Employee Safety Reporting Program)
•
Transdev – Appendix C.4 (Employee Safety Reporting)
•
MV Transportation – Appendix D.4 (Employee Safety Reporting Program)
7.7
Safety Risk Management
The SRM process is a process that aims to provide a standard method for identifying, assessing, and
mitigating safety hazards in the bus transit system as defined in the NSP (Figure 4). Descriptions of each
step are detailed in the following sections. The risk management process allows for careful examination
of hazards, assessment of existing mitigation sufficiency, and the determination of additional mitigation
measures.
Figure 4. Safety Risk Management Eight Step Process
7.7.1
Safety Hazard Identification
7.7.1.1
PTD
An effective hazard identification program is fundamental to safety management.
PTD’s safety risk management process starts with an effort to proactively identify safety hazards that
could result in negative safety outcomes.
Identify and
document
hazard
Assign
Hazard Type
Assign
Hazard
Probability
Assign
Hazard
Severity
Determine
Hazard Level
of Risk
Determine
Hazard Risk
Index
Catalog
Hazard
Information
Take Hazard
Mitigation
Action
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-11
The first step of the safety risk management process is visualized in the hazard identification and
documentation flow chart (Figure 5).
First, upon receiving communication from the on-site staff of a potential hazard, the supervisor
communicates the hazard to the division safety representative or the CSO for review and formal
documentation.
Figure 5. Hazard Identification and Documentation (Step 1)
Hazard identification focuses on conditions that need special attention or immediate action, including new
procedures or training to resolve the condition. PTD uses a variety of mechanisms for identifying and
documenting hazards, namely:
•
Through training and reporting procedures, PTD ensures employees can identify hazards and that
each employee understands the responsibility to report any safety hazards to the employee’s
supervisor or the safety representative. Continued refresher training helps employees improve skills
to identify hazards as outlined in AR 2.31 (Appendix F).
This regulation outlines the responsibility of supervisors to keep informed on safety subjects through
training courses, and employees to attend all job required safety training and refresher courses as
needed. The regulation also sets operational procedures to ensure employees receive and document
the appropriate safety and health training.
•
In an effort to identify potential hazard recurrence, PTD uses incident reports and records to
determine specific areas of training, whether individually or for a group or common classification, that
need to be covered with employees.
•
Incident reports are analyzed by safety staff to identify recurring patterns, as well as known patterns
or themes that would help identify underlying hazards and root causes of the event to mitigate or
prevent recurrence.
Document
Hazard
Safety
Communication
(supervisory or
CSO)
Hazard
Identified in
field or through
trends
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-12
•
To increase safety knowledge, staff is encouraged to participate in professional development
activities, including peer-to-peer exchanges, which are a source to share information on lessons
learned and best practices.
Other sources for hazard identification include:
•
Employee safety reporting program
•
State of Good Repair reports
•
Trend analysis of personnel job performance, vehicles, facilities, and other data
•
Investigations of safety events
•
Lessons learned from root cause analysis after safety incidents
•
Safety trend analysis on data currently collected
•
Training and evaluation records
•
Internal safety audits
External sources of hazard information could include:
•
FTA and other federal, state, county, or city authorities, including peer transit agencies
•
Reports from the public
•
Safety bulletins from manufacturers or industry associations
Following the identification of the safety hazard, the second step of the risk management process
determines the hazard by type – organizational, technical or environmental – to assist in identifying the
expertise needed to assess the hazard.
Hazard types are also categorized by subcategory as shown in the Safety Hazard Type Identification
chart in Table 4. For example, organizational hazards can be further detailed in a subcategory as either a
resource, procedural, training, or supervisory hazard. Each subcategory helps later define the different
types of mitigation strategies and potential effects of the safety hazard in the following steps.
Table 4. Safety Hazard Type Identification (Step 2)
Organizational
Technical
Environmental
Resourcing
Operational
Weather
Procedural
Maintenance
Natural
Training
Design
Supervisory
Equipment
Hazard types may be defined using the following descriptions:
•
Organizational
o
Resourcing – A hazard that is related to the supply of resources.
o
Procedural – A hazard that is linked to established procedures.
o
Training – A hazard that is related to inadequate or incomplete training.
o
Supervisory – A hazard that is related to ineffective supervision.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-13
•
Technical
o
Operational – A hazard that relates to standard operations.
o
Maintenance – A hazard that is linked to asset maintenance.
o
Design – A hazard that is related to inadequate design.
o
Equipment – A hazard that is linked to inappropriate, incorrect, or faulty equipment.
•
Environmental
o
Weather – A hazard that is linked to unfavorable weather conditions.
o
Natural – A hazard that is related to unfavorable natural environmental conditions.
In the third step of the safety risk management process, the hazard’s probability is then identified by
matching the hazard to each probability description shown in the Safety Hazard Risk Probability chart in
Table 5.
Table 5. Safety Hazard Risk Probability (Step 3)
Probability
Criteria
Frequent
A hazard that is likely to occur frequently,
Probable
A hazard that is likely to occur several times.
Occasional
A hazard that is likely to occur sometime.
Remote
A hazard that is likely to occur sometime.
Improbable
A hazard that is so unlikely that it can be rejected from consideration.
Eliminated
A hazard that is incapable of occurrence.
In the fourth step of the safety risk management process, the hazard’s severity can then be categorized
with the use of the Safety Hazard Risk Severity Categories chart in Table 6 by comparing the hazard to
the listed severity criteria.
Table 6. Safety Hazard Risk Severity Categories (Step 4)
Severity
Criteria
Catastrophic
A hazard that may cause death or system loss.
Critical
A hazard that may cause severe injury, severe occupational illness, or major
system damage.
Marginal
A hazard that may cause minor injury, minor occupational illness, or minor
system damage.
Negligible
A hazard that may cause less than minor injury, occupational illness, or
system damage.
Insignificant
Operating conditions are such that human error, subsystem or component
failure or procedural deficiencies will result in no injury, none or minor
damage to equipment, no adverse reputational damage.
7.7.1.2
Contractors
To identify safety hazards, Contractors hold monthly safety meetings and facility inspections to identify
safety risks and determine if prior issues and risks had been addressed. In addition to these practices,
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-14
Contractors encourage employees to report safety observations to management so they can be assessed
and mitigated before an incident occurs.
For more detail about each Contractor’s individual policies and procedures for safety hazard identification,
see
•
First Transit – Appendix B.6 (Safety Risk Management)
•
Transdev – Appendix C.5 (Safety Hazard Identification)
•
MV Transportation – Appendix D.5 (Safety Risk Management)
7.7.2
Safety Risk Assessment
7.7.2.1
PTD
Identified hazards are assessed to determine the potential consequences of each hazard. Factors that
are used in assessing safety hazards are:
•
probability of occurrence
•
severity of the consequences should there be an occurrence
•
level of exposure to the hazard
In the fifth step of the safety risk management process, the Risk Assessment Matrix (Table 7) takes
identified hazards and assesses the level of risk based on the hazard’s probability and severity of the
hazard’s consequences. The results of the risk assessment matrix process aids in determining whether
the risk should be managed, controlled, or eliminated in the following safety risk management steps.
Table 7. Safety Hazard Risk Assessment Matrix (Step 5)
The sixth step of the safety risk management process is completed by inputting the Risk Assessment
Matrix results into the Safety Hazard Risk Index Matrix (Table 8). This allows staff to determine the safety
hazard’s risk index for each hazard that was identified.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-15
Table 8. Safety Hazard Risk Index Matrix (Step 6)
Hazards are further defined as the following:
•
Unacceptable Hazards – Hazards with a Hazard Risk Index of 1A, 1B, 1C, 2A, 2B, 3A are
“unacceptable” and must be mitigated in the most expedient manner possible to eliminate or
control them prior to the project initiating service, by reducing the severity and/or probability
of the hazard to an acceptable level.
•
Undesirable Hazards – Hazards with a Hazard Risk Index of 1D, 2C, 2D, 3B, 3C, 4A are
“undesirable.” A management decision is required by Scottsdale on the specific method of
corrective action to mitigate the risk based on additional considerations such as the
availability of acceptable alternative measures (workarounds), availability of resources, on a
permanent or temporary basis.
•
Acceptable with Review Hazards – Hazards with a Hazard Risk Index of 1E, 2E, 3D, 3E, 4B,
4C, 4D, 5A, 5B, 5C are “acceptable with review” by the bus transit agencies. Scottsdale may
accept the risk associated with retaining the identified hazard in an “as is” condition with no
further corrective action. Alternatively, the Scottsdale may prescribe periodic tests and
inspections or other preventative measures to ensure, on a continuing basis, that the original
severity and probability ratings are not invalidated over time by degradation of conditions in
the subject item.
•
Acceptable without Review Hazards – Hazards with a Risk Index of 44E, 5D, 5E are
“acceptable” without review. The results of the analysis will be shared by the CSO with the
Accountable Executive on an ongoing basis to identify appropriate actions. All “unacceptable”
hazards must be eliminated, and measures will be taken for the remaining risk acceptance
categories to minimize risk. The results of such analysis will be shared with agency staff and
law enforcement agencies on a quarterly basis for awareness and support.
If the risk index is acceptable, the hazard must be monitored. If the risk index is undesirable, the hazard
requires careful monitoring and may also require steps taken to lower the risks at the discretion of
Executive Management. If the risk index is unacceptable, steps are taken by PTD to lower the risk to an
acceptable or tolerable level, or to remove or avoid the hazard.
7.7.2.2
Contractors
Each Contractor has developed a procedure to assess safety hazards that includes the use of a Safety
Hazard Risk Matrix that determines the severity and probability of the hazard. Based on the matrix, each
Contractor has a process to determine the level of risk a safety hazard poses to the organization.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-16
For more information on the procedures each Contractor has on assessing safety risks, see:
•
First Transit – Appendix B.6 (Safety Risk Management)
•
Transdev – Appendix C.5 (Safety Hazard Assessment)
•
MV Transportation – Appendix D.5 (Safety Risk Management)
A third party may conduct a Contractor’s risk assessment review.
7.7.3
Safety Risk Mitigation
7.7.3.1
PTD
The risk assessment process may indicate that certain hazards are low risk, while others require
mitigation to achieve an acceptable level. In the seventh step of the safety risk management process,
staff catalogue hazard information as illustrated in the Hazard Risk Register (Table 9). After the
completion of the exercises previously detailed, the hazard ID, type, source, description, rating
(probability and severity), mitigation, status, and new hazard rating information can be populated in the
risk register.
The previous steps of the risk management process are summarized in Table 9.
Table 9. Hazard Risk Register (Step 7)
Hazard
ID
Hazard
Type
Source
Identification
Date
Description
Hazard Rating
(Likelihood and
Consequence)
Mitigation
Status of
feedback
with
reporter (if
applicable)
Updated
Hazard
Rating (after
mitigation)
Hazar
d ID
Hazard
Type
Source
Identificatio
n Date
Location
Descripti
on
Hazard
Rating
(Likelihoo
d and
Conseque
nce)
Mitigatio
n
Status
of
feedbac
k with
reporter
(if
applica
ble)
Updated
Hazard
Rating
(after
mitigatio
n)
Haz-
09302
022-01
Mainten-
ance
Employe
e Report
9-30-2022
NW side of
shop floor
Employee
identified
an
ongoing
slip/fall
hazard on
the shop
floor due
to a roof
leak.
3B
(Undesirab
le)
Fix roof
leak
Open
F
(eliminate
d)
Haz-
10042
022-01
Maintena
nce
Employe
e Report
10-4-2022
Intersectio
n of X and
Y
Operator
identified a
line of
sight
hazard
due to
overgrown
foliage
which may
result in a
potential
collision
with
individual,
vehicle, or
object.
2D
(Undesirab
le)
Work
with City
Public
Works to
cut back
the
overgrow
n foliage
Closed
2E
(Accepta
ble with
review)
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-17
The intention of the Table 9 Hazard Risk Register is to ensure that all available safety hazard information
is considered when determining the appropriate hazard mitigation measures. This table includes sample
hazards as an example of how the Risk Register may be used
In the eighth and final step of the safety risk management process, PTD may determine and implement
safety mitigation actions to reduce or eliminate all identified safety hazards.
Safety risk mitigations may come in various forms in order to address the specific hazard accordingly.
Ultimately, the ideal mitigation is total elimination, but in scenarios where this is impossible, there are
varying degrees of protection, ranging from engineering controls, administrative controls/behavioral
modifications, and the least protective, personal protective equipment, as further laid out in Figure 6.
Figure 6 Hierarchy of Controls to Mitigate Risks
Once a mitigation action has been identified, staff will assess all changes that result from the mitigating
actions and their impacts to the transit safety performance targets. If existing mitigation measures are
sufficient, then no further mitigation actions are necessary. If a change is determined to impact a safety
performance target, then the change is evaluated through the safety risk management process.
For clarity, a scenario that properly utilizes the safety risk management process is detailed in Figure 7.
Elimination
Engineered controls
•Includes objects and technologies that are engineered to discourage, warn
against, or prevent inappropriate action or mitigate the consequences of
events (e.g., traffic control devices, fences, safety restraining systems, transit
controls/signals, transit monitoring systems), and corrective maintenance.
Administrative controls/behavioral modification
•Procedures and practices that mitigate the probability of accident/incident
•Behavioral interventions i.e. education and public awareness campaigns to
reduce risky behavior from factors outside of the agency's control.
Personal Protective Equipment
•The required use of equipment as a safety mitigation, which is the least
desirable mitigation due to the possibility of human error. Such equipment
includes hard hats, safety glasses, and safety vests
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-18
Figure 7. Safety Risk Management Scenario
7.7.3.2
Contractors
Contractors undergo independent safety risk mitigation of all identified hazards. Contractors utilize, at a
minimum, the same hazard information that is illustrated in Table 7, 8, and 9 to help prioritize all hazards
and all safety risks are documented and prioritized according to the level of risks.
Each Contractor outlines their Safety Risk Management Scenarios in each of their own safety plans:
•
First Transit – Appendix B.6 (Safety Risk Mitigation)
Safety Hazard Scenario
Staff discovered that the wheel balancer has not been calibrated since 2017. Although a specialist is
brought in to calibrate the machine, a transit safety specialist decides to complete the safety risk
management process to determine whether further mitigation is needed on the vehicles the machine
directly serves.
Step 1: The hazard is identified by staff to be “an out of calibration wheel balancer” and is
communicated to a safety representative, as depicted on Figure 4.
Step 2: Using Table 4, the hazard is determined to be of a “Technical Equipment” type, as the hazard
most closely resembles that description.
Step 3: Using Table 5, the probability is determined to be in the “Not Likely” category based on
available historical information that most closely resembles that probability criteria.
Step 4: Using Table 6, the severity is determined to be in the “Critical” category, as the worst credible
outcome to maintaining the hazard closely matches that criteria.
Step 5: Using Table 7, the risk assessment matrix results in a “High” level of risk after considering the
information from Table 5 and Table 6.
Step 6: Using Table 8, the risk index determines the level of risk to be “unacceptable” based on the
level of risk determined by Table 7.
Step 7: Using Table 9, the relevant information for the determination of the necessary risk mitigation
actions, if any, is noted to be the following:
•
A wheel balancer is out of calibration.
•
There is a technical equipment hazard.
•
The hazard is not likely to occur.
•
The hazard’s consequences are critical to the transit system’s operation.
•
The risk to the transit system posed by the hazard is determined to be unacceptable.
Step 8: Staff determined, in part with the use of Table 10, that an “Administrative Action” will reduce
the level of risk posed by the hazard to an acceptable level. The administrative actions may
include the introduction of wheel balancer calibration training and the establishment of routine
calibration maintenance procedures, for example.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-19
•
Transdev – Appendix C.5 (Safety/Risk Hazard Mitigation)
•
MV Transportation – Appendix D.5 (Hazard Resolution)
7.8
Safety Assurance
Safety assurance is a process that functions to ensure the implementation and effectiveness of safety risk
mitigation, and to ensure that PTD meets or exceeds its safety objectives through the collection, analysis,
and assessment of information.
7.8.1
Safety Performance Monitoring and Measurement
Contractors collect and monitor data on safety performance indicators through a variety of mechanisms,
including collecting data on key metrics on a regular basis and preparing regular reports on safety
performance. Contractors then use that data to measure effectiveness of current mitigation strategies, to
identify safety problems and track the organization’s overall progress towards meeting their performance
targets.
For specific details about each Contractor’s Safety Performance Monitoring and Measurement methods,
see:
•
First Transit – Appendix B.7 (Safety Performance Monitoring and Measurement)
•
Transdev – Appendix C.6 (Performance Monitoring and Measurement)
•
MV Transportation – Appendix D.6 (Safety Performance Monitoring and Measurement)
7.8.1.1
Monitoring Compliance and Sufficiency of Procedures
PTD Employee and Contractor Safety Monitoring
PTD employee compliance with standard safety operating procedures is monitored by Department staff
through observation and review of information and data submitted from both employees and customers.
Contractor compliance is monitored by PTD staff through the routine and frequent monitoring activities at
transit facilities and in the field. Staff complete inspection reports that include safety reporting (Appendix
F.4). PTD staff also submits monthly compliance reports to their respective supervisors. This reporting
system addresses non-compliance with standard procedures for operations and preventive maintenance
activities through a variety of actions, including revising training materials, and when necessary, providing
systemwide employee and supervisor training.
When non-compliance is situational, mitigation activities can include individualized training, coaching and
heightened management oversight. When non-compliance is determined to be a result of inadequate
operations or preventive maintenance procedures, the identified deficient procedures are submitted to the
risk management process. At the conclusion of the risk management process, the deficiencies are
addressed to resolve the non-compliant issue.
PTD assigns specific staff to the role of a contract monitor. Each contract monitor oversees the
Contractors for compliance with PTD contracts, SPTs, compliance with NTD safety reporting standards,
information accuracy and adherence to operations and safety procedures. In addition, each month, or as
needed, Contractors share their safety performance data, incident and safety reports, and safety
observations with PTD and hold an Operations meeting as illustrated on Figure 7. The performance data
is communicated to FTA’s NTD monthly using the Uniform System of Accounts document as
circumstances dictate.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-20
Figure 8. PTD and Contractor Monthly Communication
Contractors
On a monthly basis, Contractors document safety performance data, incident and safety reports, recap
reports, and safety observations, and present this information to PTD during the Operations meeting.
Contractors also monitor bus and paratransit systems for compliance with PTD and FTA operations and
maintenance procedures and communicate findings to PTD monthly. In addition, Contactors are
responsible for independently monitoring their employee’s compliance with the company’s standard
operating procedures as outlined in their individual safety plans, found in:
•
First Transit – Appendix B.7 (Safety Performance Monitoring and Measurement)
•
Transdev – Appendix C.6 (Performance Monitoring and Measurement)
•
MV Transportation – Appendix D.6 (Safety Performance Monitoring and Measurement)
7.8.1.2
Safety Events
PTD
All investigation reports of safety events and risk management resolution reports are monitored by
assigned staff and reported to the CSO and the Accountable Executive. These reports are provided by
the Contractor upon the conclusion of a safety event investigation conducted by the Contractor.
Additionally, Contractors provide PTD with monthly NTD safety reports that staff use to identify safety
trends and SRM measures that may be ineffective, inappropriate, or not implemented as intended.
If the safety risk mitigation measure does not bring the risk to an acceptable level or otherwise fails to
meet safety objectives, then staff resubmit the safety risk/hazard to the risk management process. The
CSO then works with staff, the Contractor, and subject matter experts, to identify and implement
additional mitigation measures.
Contractors
Each Contractor develops their own individual procedures for monitoring the effectiveness of safety
hazard mitigation measures. The Contractors closely manage their safety performance data and conduct
audits to ensure they are effectively addressing safety risks within their organization.
Safety Performance
Data
Incident & Safety
Reports
Safety Observations
Operations Meeting
Contractor
Department
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-21
For specific safety monitoring procedures, see:
•
First Transit – Appendix B Section 7 (Safety Performance Monitoring and Measurement) and
SOP #700-Accident & Safety Data Acquisition
•
Transdev – Appendix C.6 (Performance Monitoring and Measurement)
•
MV Transportation – Appendix D.6 (Safety Performance Monitoring and Measurement)
7.8.1.3
Safety Event Investigation
PTD
PTD employees follow the Department’s operational safety procedures as outlined in AR 2.31 (Appendix
F). These operational procedures help identify initial information that may be utilized in a safety event
investigation and include the following:
•
Establish and maintain a system for reporting accidents.
•
Analyze accidents to learn cause and prevention.
•
Solicit suggestions from employees and promptly adopt good ideas that will promote better
safety.
•
Solicit the advice of the safety committees where applicable.
For example, at the scene of a collision, PTD employees follow the Action at Scene of Collison steps that
are outlined in AR 2.31 (Appendix F.3). Steps to be taken are categorized by severity and include
drivable vehicles, non-drivable vehicles, injury accidents, non-injury accidents, and vary in their
prescribed actions.
If an event meets the criteria as an accident, employees would then take steps to first contact the
appropriate emergency services and then their supervisor.
Contractors
Contractors conduct their own investigations of safety events and notify PTD staff for tracking and NTD
reporting. The PTD CSO may assign internal Department staff to the event investigation and request a
debrief of the safety event investigation, as well as review all related investigation documentation. The
objective of the review of the Contractor safety event investigation is to determine whether the event is
considered preventable and if there were any policy violations. Additionally, assigned CSO
representatives may develop strategies that the Contractor and staff can employ to address the
identifiable root cause of any organizational, technical, or environmental hazards.
Each Contractor has created their own procedures and subject matter experts for investigating safety
events, and their company practice include using data and statements from the involved parties to
determine the cause of the incident, and mitigation measures that need to be taken to ensure the safety
event does not reoccur.
For specific details about the Contractors’ safety event investigation procedures, see:
•
First Transit – Appendix B.7 (Safety Performance Monitoring and Measurement)
•
Transdev – Appendix C.6 (Performance Monitoring and Measurement)
•
MV Transportation – Appendix D.6 (Safety Performance Monitoring and Measurement)
7.8.1.4
Monitoring Internal Safety Reporting Programs
PTD
PTD employees are encouraged to report any safety-related issues and incidents to their supervisor or
using the department’s escalation ladder. However, when an employee wishes to remain anonymous, the
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-22
city of Phoenix’s City Auditor operates the “Integrity Line,” as outlined in Administrative Regulation 1.2
(Fraud Prevention and Reporting Policy [Integrity Line]) (Appendix G).
Safety reports that are directly communicated to a supervisor for evaluation, and management is informed
as prescribed, or when the issue is out of the supervisor’s control. When a report is submitted to the city’s
Integrity Line, it is initially reviewed by the Integrity Line Committee, which is comprised of representatives
from offices of the City Auditor, the City Attorney, and the City Manager. The committee then refers the
issue(s) to PTD’s Director and CSO for review and possible investigation.
Contractors
Through their respective agreements with the city, each Contractor is tasked to identify safety hazards
and monitor performance metrics and prepare investigation reports on safety incidents for the city’s
review. All the Contractors use the data to identify trends of reoccurring safety events that need to be
mitigated.
For the specific procedures for monitoring internal safety reporting programs for each individual
Contractor, see:
•
First Transit – Appendix B.6 (Safety Performance Monitoring and Measurement)
•
Transdev – Appendix C.5.1 (Performance Monitoring and Measurement)
•
MV Transportation – Appendix D.6 (Safety Performance Monitoring and Measurement)
7.8.2
Management of Change
7.8.2.1
PTD
Proposed or future changes in the public transit system may introduce new hazards and safety risk into
transit operations. Therefore, staff are charged with identifying system changes and determining when a
change must be evaluated through the safety risk management process.
To accomplish this, staff proactively monitor planned changes and utilize PTD and Contractor field
monitoring personnel to identify any changes in the transit system. Following the identification of a
change, the change is submitted to the risk management process to assess the change and determine
whether mitigation measures for newly identified hazards, if any, are appropriate.
7.8.2.2
Contractors
Each Contractor has developed procedures to assess how changes may create new hazards and impact
safety performance. The Contractors all have a process to review the proposed change and assess how
the change could impact safety. Depending on the level of impact the proposed change is anticipated to
have on safety, the Contractors takes actions to minimize and/or eliminate the safety risk associated with
the proposed change.
For specific details about each Contractor’s process for reviewing proposed changes, see:
•
First Transit – Appendix B.7 (Management of Change)
7.8.3
Continuous Improvement
7.8.3.1
PTD
Evaluation of the SMS is necessary to ensure that allows PTD to meet safety objectives and performance
targets. As a result, PTD reviews the system safety plan during annual self-certification.
PTD also uses this data to assess identified deficiencies in SMS organizational structures, processes and
resources. If deficiencies are found as part of the safety performance assessment, staff then develops
and implements a plan to address any identified deficiencies.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-23
7.8.3.2
Contractors
Each Contractor has their own procedures to ensure their organizations are constantly striving to improve
safety. The Contractors have committed to regularly reviewing and updating their safety policies and
procedures, both through the annual review process and other review processes and audits that are
specific to each company.
For more detailed information on each Contractor’s process for continuous improvement, see:
•
First Transit – Appendix B.7 (Continuous Improvement)
•
Transdev – Appendix C.6 (Continuous Improvement)
7.9
Safety Promotion
Management support is essential for developing and implementing SMS. Safety promotion includes all
aspects of “who, what, when, where, why, and how” PTD and its Contractors communicate safety related
topics.
7.9.1
Safety Communication
7.9.1.1
PTD
PTD regularly communicates safety information regarding hazards and safety risks relevant to employee
roles and responsibilities and informs employees of safety actions taken in response to all reports
submitted. Methods of communication include:
•
The Employee Critical & Emergency Incident Communication Map (Appendix G.2)
•
Safety updates incorporated in quarterly PTD meetings
•
Safety information uploaded to PTD’s employee accessible SharePoint site
•
On-site management and inspections
PTD collects, catalogs and, where appropriate, analyzes and reports safety and performance information
to all staff. Staff answer the following questions to help facilitate accurate safety reporting:
•
What information does this individual need to do their job?
•
How can we ensure the individual understands what is communicated?
•
How can we ensure the individual understands what action must be taken because of the
information?
•
How can we ensure the information is accurate and kept up to date?
•
Are there any privacy or security concerns to consider when sharing information? If so, what
should we do to address these concerns?
In addition, staff routinely reviews existing communication strategies to determine if additional measures
are needed to effectively reach staff and Contractors. As part of this effort, PTD uses a “safety culture
survey” to understand how safety is perceived in the workplace and what areas should be addressed to
fully implement a culture of safety. The CSO and relevant PTD staff are responsible for preparing and
distributing all related safety materials and communications.
7.9.1.2
Contractors
Each Contractor has adopted a comprehensive safety communication program to communicate safety
information to their employees. This includes monthly safety meetings to brief staff in safety sensitive
positions about safety trends and other safety related topics. The Contractors also have programs where
they use various means to promote safety within the company, including having a safety bulletin board
and sending out emails about safety.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-24
For specific details about how each Contractor disseminates safety information to its employees, see:
•
First Transit – Appendix B.7 (Safety Communication)
•
Transdev – Appendix C.6.2 (Safety Communication)
•
MV Transportation – Appendix D.7 (Safety Communication)
7.9.2
Safety Training
7.9.2.1
PTD
PTD has a safety training program aimed at informing employees who are directly responsible for safety
of potential hazards and understand safety policies. The city’s Human Resources Department is
responsible for assigning the appropriate training to PTD staff as outlined in the city of Phoenix
Administrative Regulation 2.31 (Safety Program) (Appendix G).
PTD has developed and provides safety training for all staff who are directly responsible for safety and/or
have safety risks associated with their responsibilities, per 49 U.S.C. 5329(d)(1)(H). To develop a safety
training program compliant with FTA requirements, PTD:
•
Reviewed general staff categories (e.g., administrative, driving position, supervisor, maintenance)
and respective safety related responsibilities.
•
Assessed the training requirements of 49 CFR 672 and 49 U.S.C. 5329 and the courses required
for different positions.
•
Assessed the training material available on the FTA PTASP Technical Assistance Center
website.
•
Reviewed other training material available from industry sources such as the Community
Transportation Association of America and the American Public Transportation Association
websites.
•
Developed a set of competencies and trainings required to meet the safety related activities for
each general staff category.
o
Per 49 USC 5329, the PTD and Contractor personnel responsible for operations and
maintenance of facilities and buses will also begin to receive all necessary safety training
under the training program and will receive de-escalation training.
•
Developed expectations for ongoing safety training and safety meeting attendance.
•
Adjusted job notices associated with general staff categories to ensure that new personnel
understand the safety related competencies and training needs, and the safety related
responsibilities of the job.
The following training programs are implemented by PTD:
•
New hire and orientation safety training
•
Initial safety training program for operations and maintenance personnel
•
Annual training to include new hazards and refresher courses
•
De-escalation training for operations and maintenance personnel
•
Safety meetings
7.9.2.2
Contractors
PTD contract monitors actively monitor each Contractor, which in turn provide their staff with appropriate
safety training. Contractors are required to administer the appropriate safety training to their employees,
including transit system administrative, operators, mechanics, fuelers, cleaners, and other staff
responsible for safety within their organization. Each Contractor has developed comprehensive training
programs for these employees that include new hire training, as well as ongoing training for their
employees.
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
7-25
For details about each Contractor’s training programs, see:
•
First Transit – Appendix B.8 (Competencies and Training)
•
Transdev – Appendix C.7 (Competency & Training Program)
•
MV Transportation – Appendix D.7 (Competencies and Training)
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
1
Appendix A.
City Council Minutes or Resolution
To be added
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
2
Appendix B.
First Transit Abbreviated Safety Plan (see attachment)
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
Appendix C.
Transdev Abbreviated Safety Plan (see attachment)
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
Appendix D.
MV Transportation Abbreviated Safety Plan (see
attachment)
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
Appendix E
PTASP Performance Target Log
MB (per 100,000 VRM)
Mode -
MB
Fatalities
Rate* of
Fatalities
Injuries
Rate* of
Injuries
Safety
Events
Rate* of
Safety
Events
Mean Distance
Between Mechanical
Failure
2019
Actual
0
0.00
39
0.18
71
0.32
19,810
2020
Actual
0
0.00
35
0.17
105
0.51
15,241
2021
Actual
5
0.02
51
0.25
157
0.78
18,365
Average
1.67
0.01
42
0.20
111
0.54
17,805
2023
SPT
(MB)
1.67
0.01
42
0.20
111.00
0.54
17,805
DR (per 100,000 VRM)
Mode -
DR
Fatalities
Rate* of
Fatalities
Injuries
Rate* of
Injuries
Safety
Events
Rate* of
Safety Events
System
Reliability
2019
Actual
0
0.00
1
0.03
1
0.03
18,989
2020
Actual
0
0.00
0
0.00
2
0.07
22,554
2021
Actual
0
0.00
1
0.03
2
0.06
19,036
Average
0
0
0.67
0.02
1.67
0.06
20,193
2023 SPT
(DR)
0
0
0.67
0.02
1.67
0.06
20,193
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
Appendix F. PTASP Supporting Documents
1. PTD’s Critical & Emergency Incident Communication Map
2. Employee Critical Incident Training
3. City of Phoenix Administrative Regulations
4. Public Transit Department Facility Inspection Report
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
F-1. PTD’s Critical & Emergency Incident Communication Map
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
F-2. Employee Critical Incident Training
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
F-3. City of Phoenix Administrative Regulations
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
System:
City of Phoenix Public Transit Department
Document No:
PTASP
Revision #
1
Issue Date:
11/2/2022
F-4. Public Transit Department Facility Inspection Report