To: Mayor & City Council Date: November 22, 2022 From: Sharon Harper, Chairwoman General Obligation Bond Executive Committee Subject: GENERAL OBLIGATION BOND COMMITTEE RECOMMENDATIONS The General Obligation (GO) Bond Committee was charged by the City Council with an important and challenging task: to identify projects representing the highest priority needs totaling no more than $500M. Over the course of 34 committee meetings, and after extensive public input including approximately 1,000 resident comments, the committee arrived at recommendations totaling $500M for your consideration. A summary of recommendations by subcommittee program area is included below, and the full list of recommendations is attached for your reference (Attachment A). The total population of projects recommended by the GO Bond Subcommittees totaled $717M requiring difficult decisions to be made to arrive at our recommendations. The City Manager recommended targets by subcommittee program area for our consideration to serve as a starting point for deliberations. Determinants in development of each target included the ability of City staff to execute projects over the next five years, impacts to ongoing operating costs, and equitable distribution of projects throughout the City. The committee considered these factors and feedback from residents in our decision making. GO Bond Executive Committee Recommendations Program Area $ GO Bond Arts & Culture $50,385,000 Economic Development & Education 38,000,000 Environment & Sustainability 26,000,000 Housing, Human Services & Homelessness 63,000,000 Neighborhoods & City Services 44,615,000 Parks & Recreation 64,000,000 Public Safety 132,500,000 Streets & Storm Drainage 81,500,000 Total $500,000,000 Attachment A Additionally, the Executive Committee requested the City Council consider the below projects in the future if additional funding becomes available: Symphony Hall Theatrical Venue Improvements - $5.7M Expansion of the Parsons Center for Health and Wellness - $6.9M It was an honor to serve as Chair of the GO Bond Executive Committee. I would like to thank my fellow committee members for their time and commitment to the process. I believe our recommendations reflect the highest priority needs of the City and will benefit all members of the community. Sincerely, Sharon Harper Chair, GO Bond Executive Committee 2023 GO Bond Program Executive Committee Recommendations to City Council Project Summary GO Bond Funds Ongoing Cost Project Name Rank Arts & Culture District(s) Latino Cultural Center 21,626,050 512,216 1 7 Valley Youth Theatre Permanent Home 14,022,720 271,040 2 7 Children's Museum of Phoenix Expansion 5,373,988 105,230 3 8 Phoenix Center for the Arts Theater Improvements 1,194,312 0 4 7 Phoenix Theatre Company ADA Accesssibility 5,772,506 0 5 4 Arizona Jewish Historical Society Renovation & Expansion 2,010,424 0 6 7 Cultural Facilities Critical Equipment Replacements 385,339 0 7 Citywide 50,385,339 888,486 Arts & Culture Recommended Total GO Bond Funds Ongoing Cost Project Name Rank Economic Development & Education District(s) Rio Reimagined Land Acquisition 23,500,000 0 1 7, 8 ASU Health Technology Center 12,000,000 0 2 Citywide Spark Area Land Acquisition - Reuse and Redevelopment Strategy Implementation 2,500,000 0 3 8 38,000,000 0 Economic Development & Education Recommended Total GO Bond Funds Ongoing Cost Project Name Rank Environment & Sustainability District(s) Energy and Water Efficiency and Renewable Energy Upgrades at City Facilities 14,000,000 0 1 Citywide Heat Resiliency 7,700,000 171,053 2 Citywide Brownfields Redevelopment Program for City-Owned Properties 3,000,000 0 3 Citywide City Facility Vehicle Electrification Stations 1,300,000 20,000 4 Citywide 26,000,000 191,053 Environment & Sustainability Recommended Total GO Bond Funds Ongoing Cost Project Name Rank Housing, Human Services & Homelessness District(s) Affordable Housing Property Preservation - Phase I 33,170,454 0 1 Citywide Cesar Chavez Senior Center 5,734,913 331,705 2 7, 8 McDowell Senior Center Renovation 1,773,692 0 3 8 Choice Neighborhoods Housing Development Gap Funding 21,320,941 0 4 8 Innovation in Affordable Housing 1,000,000 0 5 Citywide 63,000,000 331,705 Housing, Human Services & Homelessness Recommended Total 2023 GO Bond Program Executive Committee Recommendations to City Council Project Summary GO Bond Funds Ongoing Cost Project Name Rank Neighborhoods & City Services District(s) Branch Library at Estrella Civic Space 8,574,460 856,621 1 7 City Facility ADA Improvements 10,100,000 0 2 Citywide Yucca Branch Library Expansion 10,626,991 1,288,064 3 5 Branch Library at Desert View Civic Space 10,313,210 856,621 4 2 Historic Preservation Programs 5,000,000 0 5 Citywide 44,614,661 3,001,306 Neighborhoods & City Services Recommended Total GO Bond Funds Ongoing Cost Project Name Rank Parks & Recreation District(s) Citywide Funding for Parks Minor Capital Projects 1,501,777 0 1 Citywide Esteban Park Recreation Center 4,505,333 296,572 2 8 South Mountain Roadway Safety Enhancements - Phase I 7,695,631 0 3 6, 8 Harmon Park Regional Pool and Three Splash Pad Sites 12,789,840 279,540 4 7, 8 Maryvale Park Regional Pool and Two Splash Pads Sites 14,367,712 464,060 5 4, 5 Estrella Civic Space - Phase I 8,352,835 1,600,000 6 7 Desert View Civic Space - Phase I 8,385,263 686,000 7 2 Telephone Pioneers of America Park Recreation Center Improvements 2,204,642 0 8 1 Mountain View Community Center Sports Complex Improvements 1,193,412 0 9 2, 3 Margaret T Hance Park Improvements 3,003,555 0 10 7 64,000,000 3,326,172 Parks & Recreation Recommended Total GO Bond Funds Ongoing Cost Project Name Rank Public Safety District(s) Fire Station 7 / Community Assistance Program (7th Street & Hatcher Road) 21,408,057 3,727,000 1 3 Fire Station 13 / Community Assistance Program (44th Street & Thomas Road) 21,753,090 3,727,000 2 6, 8 Fire Station 15 / Community Assistance Program (45th Avenue & Camelback Road) 21,408,055 3,727,000 3 5 Cactus Park Precinct Replacement 37,338,657 0 4 1 Fire Station 51 (51st Avenue & SR 303) 18,577,682 7,529,000 5 1 Police Property Management Warehouse Renovation 9,027,896 0 6 7 Maryvale Police Precinct Renovation 2,986,563 0 7 4, 5, 7 132,500,000 18,710,000 Public Safety Recommended Total 2023 GO Bond Program Executive Committee Recommendations to City Council Project Summary GO Bond Funds Ongoing Cost Project Name Rank Streets & Storm Drainage District(s) Vision Zero Implementation 16,922,765 258,393 1 Citywide Equity Based Transportation Mobility - T2050 Mobility Implementation 12,570,371 127,343 2 Citywide Laveen Flood Mitigation 8,230,401 0 3 7 Pavement Maintenance Supplement 22,030,869 0 4 Citywide Hohokam Drainage Program 19,245,594 0 5 8 Storm Drain Replacement Program 2,500,000 0 6 Citywide 81,500,000 385,736 Streets & Storm Drainage Recommended Total 500,000,000 26,834,458 Executive Committee Bond Program Recommended Total ARTS & CULTURE 2023 GO Bond Program Executive Committee Recommendations to City Council Other Funds GO Bond Funds Ongoing Cost Total Cost Project Name Rank Latino Cultural Center 21,626,050 0 21,626,050 512,216 1 Location: 1202 North 3rd Street (North Building at Hance Park) District: 7 Valley Youth Theatre Permanent Home 14,022,720 0 14,022,720 271,040 2 Location: 525 North 1st Street District: 7 Children's Museum of Phoenix Expansion 5,373,988 0 5,373,988 105,230 3 Location: 215 North 7th Street District: 8 Phoenix Center for the Arts Theater Improvements 1,194,312 0 1,194,312 0 4 Location: 1202 North 3rd Street District: 7 Phoenix Theatre Company ADA Accesssibility 7,774,993 2,002,487 5,772,506 0 5 Location: 1825 North Central Avenue District: 4 Arizona Jewish Historical Society Renovation & Expansion 2,010,424 0 2,010,424 0 6 Location: 122 East Culver Street District: 7 Cultural Facilities Critical Equipment Replacements 385,339 0 385,339 0 7 Location: Various District: Citywide 52,387,826 2,002,487 50,385,339 888,486 Arts & Culture Recommended Total Latino Cultural Center 1202 North 3rd Street (North Building at Hance Park) (District: 7) ARTS & CULTURE 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 1 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 1,718,400 0 0 0 0 0 17,487,000 0 0 0 0 2,228,596 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 376,696 135,520 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $21,626,050 PERCENT FOR ART TOTAL PROJECT COST 1,718,400 19,715,596 0 0 0 0 0 1,718,400 17,487,000 2,228,596 0 192,054 21,626,050 5-YR TOTAL 0 512,216 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL The Latino Cultural Center will be a premier center that celebrates the diversity, legacies, and influences of Latino culture in America's Southwest region. The center will be inclusive, welcoming, participatory, and accessible to all residents of Phoenix and beyond. It will provide programs and activities focusing on education for all ages in arts, culture, and critical issues to the Latino community. The cultural center will be adaptive and responsive to a wide range of representation and needs for optimal participation and experience. Finally, the center will be an administrative and artistic conduit for the existing Latino arts and culture community and programming defined by partnerships and collaboration. BENEFIT Design and construct a world-class Latino Cultural Center in accordance with the Latino Center Ad Hoc Committee recommendations that were approved by City Council in September 2020. The funding level anticipates that a 22,000 square foot center would be located at the North Building at Hance Park. SCOPE $0 OTHER FUNDING $21,626,050 TOTAL PROJECT COST Valley Youth Theatre Permanent Home 525 North 1st Street (District: 7) ARTS & CULTURE 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 2 GO BOND FUNDING 435,234 0 0 0 0 0 0 0 0 0 3,046,638 0 0 0 0 0 4,429,084 4,520,644 0 0 0 0 1,471,156 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 271,040 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $14,022,720 PERCENT FOR ART TOTAL PROJECT COST 3,481,872 4,429,084 5,991,800 0 0 435,234 0 3,046,638 8,949,728 1,471,156 0 119,964 14,022,720 5-YR TOTAL 0 271,040 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL The current home of The Valley Youth Theatre was acquired by ASU through an agreement with the City and is slated to be incorporated in the ASU Downtown Campus, displacing The Valley Youth Theatre. The new Valley Youth Center for the Arts will provide a permanent home for The Valley Youth Theatre while allowing for significant expansion of youth arts programs and events in Phoenix. BENEFIT Secure land, design and construct a new Valley Youth Center for the Arts to provide a permanent home for the Valley Youth Theatre. The Center includes a 300-seat feature theatre plus a 99-seat studio theatre for smaller productions. Also included are office and meeting space, rehearsal/workshop space, dance studios, galleries and space for set, costumes, prop shops and storage. SCOPE $0 OTHER FUNDING $14,022,720 TOTAL PROJECT COST Children's Museum of Phoenix Expansion 215 North 7th Street (District: 8) ARTS & CULTURE 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 3 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 103,320 0 0 0 0 0 3,937,049 1,000,000 0 0 0 0 283,215 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 105,230 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $5,373,988 PERCENT FOR ART TOTAL PROJECT COST 103,320 3,937,049 1,283,215 0 0 0 0 103,320 4,937,049 283,215 0 50,404 5,373,988 5-YR TOTAL 0 105,230 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL The renovation will increase public space by over 1/3, increasing annual capacity by 150,000+ visitors. The Children's Museum will increase the number and variety of exhibits and programs they offer, which will directly impact young children and families who have suffered social, emotional, and developmental learning losses because of COVID. There will be increased access to the Museum by community partners, schools, and other social impact organizations; and the Children's Museum will be able to move forward with its plans to develop an early childhood educator training institute - increasing the number of high-quality childcare providers in the city. Additional revenue generation will benefit the Children's Museum's financial resiliency. BENEFIT Renovate and upgrade all unfinished spaces in the historic Monroe School building, including 17,621 square feet of public space for exhibits and programs, and 9,922 square feet of under-finished service support space, to make the entire building usable and bring it up to current building codes. Work needed includes abatement, demolition, structural, mechanical/HVAC, plumbing, electrical, flooring, drywall, finishes, windows/doors and ADA compliance. Two rooms require major structural improvements, 8 rooms do not have certificates-of-occupancy, 5 rooms have no air conditioning, 8+ areas need lead abatement, and all 11 unfinished rooms need drywall, electrical upgrades and lighting. SCOPE $0 OTHER FUNDING $5,373,988 TOTAL PROJECT COST Phoenix Center for the Arts Theater Improvements 1202 North 3rd Street (District: 7) ARTS & CULTURE 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 4 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,194,312 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $1,194,312 PERCENT FOR ART TOTAL PROJECT COST 1,194,312 0 0 0 0 0 0 0 0 1,194,312 0 0 1,194,312 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL The Phoenix Center for the Arts Third Street Theater facility will be brought up to current industry standards to better serve the needs of the community, including artists, performers, students, patrons, and residents. Repairs are not possible as replacement parts are no longer manufactured. As a result, the non-profits, youth theater, choral, and dance groups that utilize this performance space are forced to work around dark spots on the stage, or opt for a venue with newer technology. Failure to fund this project may result in cancellation of services, programs and theatatrical events. BENEFIT Replace/upgrade theatrical lighting, audio systems, seating, rigging, and the outdoor marquee at the Phoenix Center for the Arts Third Street Theater. The facility hosts over 150 performances a year from resident companies and rentals. SCOPE $0 OTHER FUNDING $1,194,312 TOTAL PROJECT COST Phoenix Theatre Company ADA Accesssibility 1825 North Central Avenue (District: 4) ARTS & CULTURE 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 5 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 1,613,513 0 0 0 0 4,101,839 0 0 0 0 2,002,487 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES Phoenix Theater Company OTHER FUNDING 2,002,487 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $5,772,506 PERCENT FOR ART TOTAL PROJECT COST 7,717,839 0 0 0 0 0 0 1,613,513 4,101,839 2,002,487 0 57,154 7,774,993 5-YR TOTAL 2,002,487 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL The Phoenix Theatre Company's main rehearsal hall and dance studio are located on the second floor of its administrative section. They are not ADA accessible and cannot be retrofitted due to the physical constraints of the two stairwells that provide entry. There are no other accessible spaces on the campus that approximate the layout of the Mainstage. The Phoenix Theater Company cannot hire actors, directors, musicians, stage management and other artists with mobility issues. The second floor also contains the administrative conference room and a third of the administrative offices, which are similarly inaccessible to staff with mobility issues. Ground floor administrative offices are additionally difficult to access, requiring a staff member who uses a wheelchair to pull himself hand-over-hand up a ramp that is not ADA compliant. The proposed new building would provide ADA accessible rehearsal, office and classroom/studio spaces, remediating these significant ADA deficiencies. BENEFIT Construct a 3-floor, approximately 13,000 square-foot building on land at the southwest corner of Alvarado Road and Coronado Road, adjacent to the Phoenix Theater Company's existing facility. The building would address urgent accessibility issues, offering ADA accessible office, classroom/studio and rehearsal spaces. These improvements would accompany separate improvements planned by the Phoenix Theater Company to expand the Hormel Theater from 250 to 500 seats and increase its technical capabilities. Bond funding would be supplemented by $2 million in cost share from the Phoenix Theater Company. SCOPE $2,002,487 OTHER FUNDING $7,774,993 TOTAL PROJECT COST Arizona Jewish Historical Society Renovation & Expansion 122 East Culver Street (District: 7) ARTS & CULTURE 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 6 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,990,519 0 0 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $2,010,424 PERCENT FOR ART TOTAL PROJECT COST 1,990,519 0 0 0 0 0 0 0 1,990,519 0 0 19,905 2,010,424 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Phoenix is the largest U.S. City that does not have a Holocaust museum. This center will provide students, teachers and the community an opportunity to see, hear and learn the history and lessons of the Holocaust and its global relevancy. BENEFIT Update and expand the Cutler Plotkin Jewish Heritage Center to include a 17,000 square foot addition, a state-of-the-art Holocaust Education Center, the Robert Stutz We Remember art collection, a special exhibit gallery, classrooms and event space. The upgrades includes new displays, technology, and lighting. The new design will update the existing building while preserving the historical integrity. SCOPE $0 OTHER FUNDING $2,010,424 TOTAL PROJECT COST Cultural Facilities Critical Equipment Replacements Various (District: Citywide) ARTS & CULTURE 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 7 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 385,339 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $385,339 PERCENT FOR ART TOTAL PROJECT COST 385,339 0 0 0 0 0 0 0 0 385,339 0 0 385,339 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Ensure long-term service continuity of the City's cultural centers and facilities, and prevent conditions from becoming unsafe to the public and staff as a result from continued deferred maintenance. Failure to properly maintain infrastructure and replace aging equipment can lead to disruptive facility shutdowns, cause irreparable damage, and lead to costly repairs. BENEFIT Extend the functional life of City-owned cultural facilities by replacing critical equipment and plumbing/mechanical systems, performing maintenance on necessary structural elements (e.g. parking lots and roofing), and completing cosmetics updates where needed. SCOPE $0 OTHER FUNDING $385,339 TOTAL PROJECT COST ECONOMIC DEVELOPMENT & EDUCATION 2023 GO Bond Program Executive Committee Recommendations to City Council Other Funds GO Bond Funds Ongoing Cost Total Cost Project Name Rank Rio Reimagined Land Acquisition 23,500,000 0 23,500,000 0 1 Location: TBD District: 7, 8 ASU Health Technology Center 12,000,000 0 12,000,000 0 2 Location: TBD District: Citywide Spark Area Land Acquisition - Reuse and Redevelopment Strategy Implementation 2,500,000 0 2,500,000 0 3 Location: Various District: 8 38,000,000 0 38,000,000 0 Economic Development & Education Recommended Total Rio Reimagined Land Acquisition TBD (District: 7, 8) ECONOMIC DEVELOPMENT & EDUCATION 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 1 GO BOND FUNDING 0 0 4,750,000 0 4,750,000 4,750,000 0 4,750,000 0 4,500,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $23,500,000 PERCENT FOR ART TOTAL PROJECT COST 4,750,000 4,750,000 4,750,000 4,750,000 4,500,000 0 23,500,000 0 0 0 0 0 23,500,000 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Establish development-ready sites along the Rio Salado which have been positioned to facilitate the City’s long term vision of this area. BENEFIT Acquire land and perform predevelopment activities that may include environmental assessments and cleanup necessary to prepare economically attractive sites along the Rio Salado for development. SCOPE $0 OTHER FUNDING $23,500,000 TOTAL PROJECT COST ASU Health Technology Center TBD (District: Citywide) ECONOMIC DEVELOPMENT & EDUCATION 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 2 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11,881,188 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $12,000,000 PERCENT FOR ART TOTAL PROJECT COST 0 0 11,881,188 0 0 0 0 0 11,881,188 0 0 118,812 12,000,000 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Develop a new set of programs in Public Health Technology, including advanced training and degree programs (including advanced nursing) and retraining of existing workforce. BENEFIT In partnership with Arizona State University, invest in infrastructure and public building improvements related to the development of a $75 million to $130 million Health Technology Center. SCOPE $0 OTHER FUNDING $12,000,000 TOTAL PROJECT COST Spark Area Land Acquisition - Reuse and Redevelopment Strategy Implementation Various (District: 8) ECONOMIC DEVELOPMENT & EDUCATION 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 3 GO BOND FUNDING 0 0 500,000 0 500,000 500,000 0 500,000 0 500,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $2,500,000 PERCENT FOR ART TOTAL PROJECT COST 500,000 500,000 500,000 500,000 500,000 0 2,500,000 0 0 0 0 0 2,500,000 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL This program would help implement the City’s long-term vision for Spark areas. Consolidating small fragmented parcels will improve marketability and facilitate the reuse and redevelopment of these parcels to help reactivate commercial areas with strong potential. BENEFIT The Land Reuse Strategy Planning Area Plan was developed in 2017 to address the reuse and redevelopment of fragmented City-owned parcels located roughly between 7th and 16th Streets, Washington Street and University Drive. This program will fund the acquisition of private parcels, as they become available, to fill in ownership gaps and facilitate redevelopment in these areas. SCOPE $0 OTHER FUNDING $2,500,000 TOTAL PROJECT COST ENVIRONMENT & SUSTAINABILITY 2023 GO Bond Program Executive Committee Recommendations to City Council Other Funds GO Bond Funds Ongoing Cost Total Cost Project Name Rank Energy and Water Efficiency and Renewable Energy Upgrades at City Facilities 14,000,000 0 14,000,000 0 1 Location: Various District: Citywide Heat Resiliency 7,700,000 0 7,700,000 171,053 2 Location: Citywide District: Citywide Brownfields Redevelopment Program for City-Owned Properties 3,000,000 0 3,000,000 0 3 Location: Citywide District: Citywide City Facility Vehicle Electrification Stations 1,300,000 0 1,300,000 20,000 4 Location: Various District: Citywide 26,000,000 0 26,000,000 191,053 Environment & Sustainability Recommended Total Energy and Water Efficiency and Renewable Energy Upgrades at City Facilities Various (District: Citywide) ENVIRONMENT & SUSTAINABILITY 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 1 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4,500,000 4,500,000 1,750,000 1,750,000 1,500,000 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $14,000,000 PERCENT FOR ART TOTAL PROJECT COST 4,500,000 4,500,000 1,750,000 1,750,000 1,500,000 0 0 0 0 14,000,000 0 0 14,000,000 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Avoid service disruptions that may result from unplanned equipment and/or systems failures. Reduce operating expenses of certain City facilities by integrating the best available technologies. Reduce greenhouse gas emissions and other climate impacts caused by City operations. BENEFIT Install energy efficient HVAC equipment or other climate control systems to reduce energy consumption and greenhouse gas emissions from City facilities. Facility Condition Assessments identified the need to replace aging and inefficient HVAC systems at many facilities including City-operated community and recreation centers, arts and cultural facilities, and administrative buildings. Additionally, implement renewable energy solutions, such as solar, where appropriate. SCOPE $0 OTHER FUNDING $14,000,000 TOTAL PROJECT COST Heat Resiliency Citywide (District: Citywide) ENVIRONMENT & SUSTAINABILITY 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 2 GO BOND FUNDING 400,650 0 0 0 0 0 0 0 0 0 0 360,875 360,875 0 0 0 3,254,645 3,254,645 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 117,053 54,000 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $7,700,000 PERCENT FOR ART TOTAL PROJECT COST 400,650 3,615,520 3,615,520 0 0 400,650 0 721,750 6,509,290 0 0 68,310 7,700,000 5-YR TOTAL 0 171,053 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Reduce the impacts of climate change and urban heat on resident and visitor health. This program will be most impactful in locations where residents tend to have limited access to vehicles, and must walk or bike to their destinations with greater frequency. This program can help to address historical equity issues in parts of the City where residents are more vulnerable to heat-related hazards. BENEFIT Expand the City’s Tree Planting, Green Infrastructure, Cool Roofs, Cool Corridors and Cool Pavements programs. Implement other emerging ideas to address heat resiliency within City facilities, infrastructure, land or rights-of-way. SCOPE $0 OTHER FUNDING $7,700,000 TOTAL PROJECT COST Brownfields Redevelopment Program for City-Owned Properties Citywide (District: Citywide) ENVIRONMENT & SUSTAINABILITY 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 3 GO BOND FUNDING 1,000,000 1,000,000 0 1,000,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $3,000,000 PERCENT FOR ART TOTAL PROJECT COST 1,000,000 1,000,000 1,000,000 0 0 3,000,000 0 0 0 0 0 0 3,000,000 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Mayor and Council approved the Phoenix Climate Action Plan (PCAP) in 2021. This program supports the PCAP by addressing public health and environmental hazards, expanding green space, and creating sustainability opportunities (e.g. green buildings and infrastructure). Without this funding source, contaminated properties may remain blighted, undeveloped, and a burden to the local community. BENEFIT Funding to assist City departments with pre-development costs associated with environmentally contaminated properties. Preference would be given to projects located within the following targeted areas: Rio Reimagined Project Area, West Phoenix Revitalization Area, Infill Incentive Area, Transit-Oriented Development Areas, Downtown Development Area, Designated Redevelopment Areas and Neighborhood Initiative Areas. SCOPE $0 OTHER FUNDING $3,000,000 TOTAL PROJECT COST City Facility Vehicle Electrification Stations Various (District: Citywide) ENVIRONMENT & SUSTAINABILITY 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 4 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 650,000 650,000 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 20,000 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $1,300,000 PERCENT FOR ART TOTAL PROJECT COST 650,000 650,000 0 0 0 0 0 0 0 1,300,000 0 0 1,300,000 5-YR TOTAL 0 20,000 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Mayor and Council approved the Phoenix Climate Action Plan (PCAP) in 2021. This program supports the PCAP by reducing aggregate greenhouse gas emissions related to automobile activity. Not funding this program could delay the availability of charging infrastructure. BENEFIT Provide electrification infrastructure at city facilities to support the city’s fleet, residents and employees. The number and type of installations funded by this item are driven by capital needs identified by an ongoing fleet electrification study. SCOPE $0 OTHER FUNDING $1,300,000 TOTAL PROJECT COST HOUSING, HUMAN SERVICES & HOMELESSNESS 2023 GO Bond Program Executive Committee Recommendations to City Council Other Funds GO Bond Funds Ongoing Cost Total Cost Project Name Rank Affordable Housing Property Preservation - Phase I 33,170,454 0 33,170,454 0 1 Location: Various District: Citywide Cesar Chavez Senior Center 9,734,913 4,000,000 5,734,913 331,705 2 Location: Cesar Chavez Regional Park District: 7, 8 McDowell Senior Center Renovation 1,773,692 0 1,773,692 0 3 Location: 1845 East McDowell Road District: 8 Choice Neighborhoods Housing Development Gap Funding 21,320,941 0 21,320,941 0 4 Location: Edison-Eastlake Community District: 8 Innovation in Affordable Housing 1,000,000 0 1,000,000 0 5 Location: Various District: Citywide 67,000,000 4,000,000 63,000,000 331,705 Housing, Human Services & Homelessness Recommended Total Affordable Housing Property Preservation - Phase I Various (District: Citywide) HOUSING, HUMAN SERVICES & HOMELESSNESS 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 1 GO BOND FUNDING 229,120 0 0 0 0 0 0 0 0 0 1,704,653 0 1,713,456 0 0 0 14,455,920 0 14,741,153 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $33,170,454 PERCENT FOR ART TOTAL PROJECT COST 1,933,773 14,455,920 1,713,456 14,741,153 0 229,120 0 3,418,109 29,197,073 0 0 326,152 33,170,454 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Mayor and Council approved the Housing Phoenix Plan (HPP) in 2020 that established a goal to create and preserve 50,000 housing units by 2030. The 7th initiative of the HPP is: Expand Efforts to Preserve Existing Housing Stock. This program supports the HPP's mission to preserve affordable housing units in the Housing Department portfolio for low to moderate income families, individuals, seniors, and special populations. All affordable rental properties that benefit from this program are owned by the City and managed by professional management companies. There are no federal funding programs available for on-going maintenance and repairs at these properties. Not funding this program would result in fewer affordable housing units that are suitable for occupancy, higher cost of future repairs and equipment replacements, more frequent disruptions from system outages, and potential safety issues for residents. BENEFIT Renovate and preserve up to 610 affordable housing units at 4 properties where physical condition assessments have been completed and identified critical needs. Renovations include structural repairs, electrical and mechanical improvements, HVAC replacements, and other updates. Complete Facility Condition Assessments at 16 additional Housing Department properties. SCOPE $0 OTHER FUNDING $33,170,454 TOTAL PROJECT COST Cesar Chavez Senior Center Cesar Chavez Regional Park (District: 7, 8) HOUSING, HUMAN SERVICES & HOMELESSNESS 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 2 GO BOND FUNDING 171,840 0 0 0 0 0 0 0 0 0 0 2,644,034 0 0 0 0 0 6,746,733 0 0 0 0 116,680 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES 2006 Bond / Sale of parcel OTHER FUNDING 171,840 2,644,034 1,184,126 0 0 209,813 93,531 1,200 27,161 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $5,734,913 PERCENT FOR ART TOTAL PROJECT COST 171,840 2,644,034 6,863,413 0 0 171,840 0 2,644,034 6,746,733 116,680 0 55,626 9,734,913 5-YR TOTAL 4,000,000 331,705 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL The new Cesar Chavez Senior Center would serve seniors in the immediate area as well as many neighboring zip codes. Human Services currently has membership of more than 1,000 seniors that reside near the location of the proposed Cesar Chavez Senior Center. BENEFIT Design and construct a new 12,600 square foot multi-purpose senior center adjacent to the Cesar Chavez Community Center. SCOPE $4,000,000 OTHER FUNDING $9,734,913 TOTAL PROJECT COST McDowell Senior Center Renovation 1845 East McDowell Road (District: 8) HOUSING, HUMAN SERVICES & HOMELESSNESS 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 3 GO BOND FUNDING 57,280 0 0 0 0 0 0 0 0 0 0 87,435 0 0 0 0 0 1,189,900 0 0 0 0 0 69,334 0 0 0 356,970 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $1,773,692 PERCENT FOR ART TOTAL PROJECT COST 57,280 87,435 1,546,870 69,334 0 57,280 0 87,435 1,189,900 69,334 356,970 12,773 1,773,692 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Preserve a historic City-owned and maintained building. Extend the useful life of critical equipment and infrastructure. Improve functionality of the building and visitor experience. Ensure continuity of service by reducing the potential for unplanned closures from equipment failure. BENEFIT Renovate the historic McDowell Senior Center. Modernize HVAC equipment, update the electrical system, replace existing plumbing, update the fire suppression system, and restore the building envelope, interior office and meeting spaces. SCOPE $0 OTHER FUNDING $1,773,692 TOTAL PROJECT COST Choice Neighborhoods Housing Development Gap Funding Edison-Eastlake Community (District: 8) HOUSING, HUMAN SERVICES & HOMELESSNESS 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 4 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6,873,600 6,994,800 7,241,443 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $21,320,941 PERCENT FOR ART TOTAL PROJECT COST 6,873,600 6,994,800 7,241,443 0 0 0 0 0 21,109,843 0 0 211,098 21,320,941 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Mayor and Council approved the Housing Phoenix Plan (HPP) in 2020 that established a goal to create and preserve 50,000 housing units by 2030. The 3rd Initiative of the HPP is: Redevelop City-Owned Land with Mixed-income Housing. The Edison-Eastlake Community redevelopment project replaces 577 obsolete public housing units with over 1,000 new mixed income units. The City was awarded a $30 million Choice Neighborhoods Grant from the U.S. Department of Housing and Urban Development in 2018 to transform and revitalize the Edison-Eastlake Community. No additional federal grant funds are available to complete Phase IV of the redevelopment project. Without additional funding, 286 affordable and 78 market rate new rental housing units would not be completed, and community revitalization would be delayed. BENEFIT Cover the increased cost for construction, materials, and labor necessary to complete the final phase (Phase IV) of the Edison-Eastlake redevelopment project. Phase IV consists of 364 new, modern, mixed-income rental housing units (286 affordable and 78 market rate). SCOPE $0 OTHER FUNDING $21,320,941 TOTAL PROJECT COST Innovation in Affordable Housing Various (District: Citywide) HOUSING, HUMAN SERVICES & HOMELESSNESS 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 5 GO BOND FUNDING 1,000,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $1,000,000 PERCENT FOR ART TOTAL PROJECT COST 1,000,000 0 0 0 0 1,000,000 0 0 0 0 0 0 1,000,000 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Phoenix is in the middle of a housing and homelessness crisis with imminent risk of ongoing displacement without substantial action. This project seeks to help the City reach its affordable and total unit goals. BENEFIT Create preapproved designs for Accessory Dwelling Units, Duplexes, Single Family/Tiny Home, and other forms of infill identified in the Housing Phoenix Plan, potentially saving on project costs and time to help develop more affordable units and meet the City's Housing Phoenix Goal of 50,000 new homes by 2030. SCOPE $0 OTHER FUNDING $1,000,000 TOTAL PROJECT COST NEIGHBORHOODS & CITY SERVICES 2023 GO Bond Program Executive Committee Recommendations to City Council Other Funds GO Bond Funds Ongoing Cost Total Cost Project Name Rank Branch Library at Estrella Civic Space 11,574,460 3,000,000 8,574,460 856,621 1 Location: 99th Avenue & Lower Buckeye Road District: 7 City Facility ADA Improvements 10,100,000 0 10,100,000 0 2 Location: Public Works Properties - All District: Citywide Yucca Branch Library Expansion 10,626,991 0 10,626,991 1,288,064 3 Location: 5648 North 15th Avenue District: 5 Branch Library at Desert View Civic Space 11,813,210 1,500,000 10,313,210 856,621 4 Location: Deer Valley Drive & Tatum Boulevard District: 2 Historic Preservation Programs 5,000,000 0 5,000,000 0 5 Location: Multiple District: Citywide 49,114,661 4,500,000 44,614,661 3,001,306 Neighborhoods & City Services Recommended Total Branch Library at Estrella Civic Space 99th Avenue & Lower Buckeye Road (District: 7) NEIGHBORHOODS & CITY SERVICES 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 1 GO BOND FUNDING 286,400 0 0 0 0 0 0 0 0 0 0 2,125,545 0 0 0 0 0 6,574,198 0 0 0 0 2,409,800 0 0 0 0 0 121,520 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES Impact Fees (1043, 2613, 3033) OTHER FUNDING 0 2,125,545 874,455 0 0 630,777 101,306 17,474 68,064 39,000 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $8,574,460 PERCENT FOR ART TOTAL PROJECT COST 286,400 2,125,545 8,983,998 121,520 0 286,400 0 2,125,545 6,574,198 2,409,800 121,520 56,997 11,574,460 5-YR TOTAL 3,000,000 856,621 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Provide the public with robust access to free internet computers, as well as free Wi-Fi and other technology amenities, complemented by a collection of approximately 30,000 library materials. In addition, meeting room spaces would be available for public rental and for use by Library staff for programming such as storytimes, Kindergarten Bootcamp, workforce efforts, and more. Non-implementation of the project will mean that the public in this community will need to continue to travel further in order to receive similar services. BENEFIT Design and construct a new 13,000 square foot branch library as part of Phase 1 of the Estrella Village Civic Space. Phase 1 consists of the civic space master plan, design of a regional park, construction of park amenities, and a branch library. At final completion the Estrella Village Civic Space is expected to include a 93 acre regional park, a community center, an aquatic center, and a branch library. SCOPE $3,000,000 OTHER FUNDING $11,574,460 TOTAL PROJECT COST City Facility ADA Improvements Public Works Properties - All (District: Citywide) NEIGHBORHOODS & CITY SERVICES 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 2 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $10,100,000 PERCENT FOR ART TOTAL PROJECT COST 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 0 0 0 10,000,000 0 0 100,000 10,100,000 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Establish a multiyear funding program (considered a best practice) for continued compliance with ADA standards. Not funding this item would likely have the effect of unduly restricting building access for individuals with disabilities. BENEFIT Ensure ongoing compliance with the Americans with Disabilities Act at City facilities. Complete prioritized improvements to signage, restrooms, parking lots, ramps, doors, and other barriers to maximize access. SCOPE $0 OTHER FUNDING $10,100,000 TOTAL PROJECT COST Yucca Branch Library Expansion 5648 North 15th Avenue (District: 5) NEIGHBORHOODS & CITY SERVICES 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 3 GO BOND FUNDING 196,860 0 0 0 0 1,947,520 0 0 0 0 1,606,704 0 0 0 0 0 4,954,650 0 0 0 0 0 1,784,850 0 0 0 0 70,793 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 981,534 135,542 17,474 84,514 69,000 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $10,626,991 PERCENT FOR ART TOTAL PROJECT COST 3,751,084 4,954,650 1,855,643 0 0 196,860 1,947,520 1,606,704 4,954,650 1,784,850 70,793 65,614 10,626,991 5-YR TOTAL 0 1,288,064 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Increase the capacity for serving customers and improve the experience of visitors that attend library programs, access public computers, and make use of other library services at the City's 4th busiest library location. The Automated Materials Handling System will improve the efficiency of checking-in and sorting returned library materials. BENEFIT Add 10,000 square feet to Yucca Branch Library to improve visitor experience by adding new amenities and reducing wait times. The additional space will provide new meeting and study rooms, allow for additional public computers, and accommodate an Automated Materials Handling System. SCOPE $0 OTHER FUNDING $10,626,991 TOTAL PROJECT COST Branch Library at Desert View Civic Space Deer Valley Drive & Tatum Boulevard (District: 2) NEIGHBORHOODS & CITY SERVICES 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 4 GO BOND FUNDING 286,400 0 0 0 0 0 0 0 0 0 0 0 2,169,485 0 0 0 0 0 6,713,980 0 0 0 0 2,445,400 0 0 0 0 0 124,110 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES Impact Fees OTHER FUNDING 0 0 1,500,000 0 0 630,777 101,306 17,474 68,064 39,000 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $10,313,210 PERCENT FOR ART TOTAL PROJECT COST 286,400 0 2,169,485 9,159,380 124,110 286,400 0 2,169,485 6,713,980 2,445,400 124,110 73,835 11,813,210 5-YR TOTAL 1,500,000 856,621 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL This new branch library will enhance local library services in the rapidly growing Desert View Village including free internet and other computer technology amenities, access to approximately 30,000 library materials, community meeting space, and library programs for all ages such as children’s story times, Kindergarten Bootcamp, workforce-related programs, and more. Additionally, a new branch library will help relieve crowding at the closest existing branch library that is more than 6 miles away and already the busiest branch in the City. If the project is not approved local access to library services will remain limited for the residents of Desert View Village, and neighboring branch library locations can be expected to experience growing crowds, longer wait times, and overall reduced service levels. BENEFIT Design and construct a new 13,000 square foot branch library as part of Phase 1 of the Desert View Civic Space. Phase 1 consists of the civic space master plan, design of a regional park, construction of park amenities, and a branch library. At final completion the Desert View Village Civic Space is expected to include a 40 acre regional park, and a community center. SCOPE $1,500,000 OTHER FUNDING $11,813,210 TOTAL PROJECT COST Historic Preservation Programs Multiple (District: Citywide) NEIGHBORHOODS & CITY SERVICES 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 5 GO BOND FUNDING 0 0 1,000,000 0 1,000,000 1,000,000 0 1,000,000 0 1,000,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $5,000,000 PERCENT FOR ART TOTAL PROJECT COST 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 0 5,000,000 0 0 0 0 0 5,000,000 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL SCOPE Provide funding for historic preservation programs including demonstration project grants, exterior rehabilitation grants, protection of downtown warehouses and other threatened historic buildings, and rehabilitation of historic properties owned by the City. BENEFIT Economic benefits of preservation include job creation, increased property values, visitor attraction though heritage tourism, and support of local businesses, while environmental benefits include sustainability and adaptive reuse of existing vacant structures. $0 OTHER FUNDING $5,000,000 TOTAL PROJECT COST PARKS & RECREATION 2023 GO Bond Program Executive Committee Recommendations to City Council Other Funds GO Bond Funds Ongoing Cost Total Cost Project Name Rank Citywide Funding for Parks Minor Capital Projects 1,501,777 0 1,501,777 0 1 Location: Citywide District: Citywide Esteban Park Recreation Center 5,005,333 500,000 4,505,333 296,572 2 Location: 3345 East Roeser Road District: 8 South Mountain Roadway Safety Enhancements - Phase I 7,695,631 0 7,695,631 0 3 Location: 10919 South Central Avenue District: 6, 8 Harmon Park Regional Pool and Three Splash Pad Sites 12,789,840 0 12,789,840 279,540 4 Location: Various District: 7, 8 Maryvale Park Regional Pool and Two Splash Pads Sites 14,367,712 0 14,367,712 464,060 5 Location: Various District: 4, 5 Estrella Civic Space - Phase I 12,352,835 4,000,000 8,352,835 1,600,000 6 Location: 91st Avenue & Lower Buckeye Road District: 7 Desert View Civic Space - Phase I 8,385,263 0 8,385,263 686,000 7 Location: Deer Valley Drive & Tatum Boulevard District: 2 Telephone Pioneers of America Park Recreation Center Improvements 2,204,642 0 2,204,642 0 8 Location: 1946 West Morningside Drive District: 1 Mountain View Community Center Sports Complex Improvements 1,193,412 0 1,193,412 0 9 Location: 1104 East Grovers Road District: 2, 3 Margaret T Hance Park Improvements 3,003,555 0 3,003,555 0 10 Location: 67 West Culver Street District: 7 68,500,000 4,500,000 64,000,000 3,326,172 Parks & Recreation Recommended Total Citywide Funding for Parks Minor Capital Projects Citywide (District: Citywide) PARKS & RECREATION 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 1 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 27,000 27,000 27,000 27,000 27,000 271,908 270,000 270,000 270,000 270,000 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $1,501,777 PERCENT FOR ART TOTAL PROJECT COST 298,908 297,000 297,000 297,000 297,000 0 0 135,000 1,351,908 0 0 14,869 1,501,777 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL The Parks and Recreation Department frequently receives requests from individuals and community organizations to add various amenities or make improvements to existing amenities. These requests can vary from recreational equipment such as sports courts, playgrounds, and fitness equipment to other park amenities such as water fountains, improved lighting, and shade structures. Oftentimes, funding is not available to fulfill these community requests. This project would provide a potential source of funding for unfunded requests. This will allow community members to enjoy desired amenities and the department to continue to be responsive to community needs. BENEFIT Provide funding for communities citywide to request currently unfunded parks amenities. Parks staff would develop an application and selection process to evaluate proposed projects to be funded under this program. SCOPE $0 OTHER FUNDING $1,501,777 TOTAL PROJECT COST Esteban Park Recreation Center 3345 East Roeser Road (District: 8) PARKS & RECREATION 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 2 GO BOND FUNDING 655,333 0 0 0 0 0 0 0 0 0 1,300,000 0 0 0 0 0 2,610,000 0 0 0 0 400,900 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES Private Grant OTHER FUNDING 500,000 0 0 0 0 225,582 66,560 1,680 2,750 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $4,505,333 PERCENT FOR ART TOTAL PROJECT COST 1,955,333 3,010,900 0 0 0 655,333 0 1,300,000 2,610,000 400,900 0 39,100 5,005,333 5-YR TOTAL 500,000 296,572 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Esteban Park is an active regional park that includes park amenities such as open space, playgrounds, fitness equipment, a dog park, identified drone launching area, sports courts and sports fields that support softball, soccer and football leagues. The design and construction of the new recreation center will provide the community with additional recreation programing options for youth of all ages. Programming would include a daily after-school recreation program, games, activities, events, educational support and family services. Currently, the closest recreation facility to Esteban Park is 2.5 miles away and is located at Hermoso Park. The construction of this new facility will provide the opportunity for recreation programing to a part of the City that is currently underserved. BENEFIT Design and construct a new recreation center at Esteban Park. The facility will include: a gathering area, a teen room, restrooms, storage space, a mechanical room, office space, and a kitchen area. SCOPE $500,000 OTHER FUNDING $5,005,333 TOTAL PROJECT COST South Mountain Roadway Safety Enhancements - Phase I 10919 South Central Avenue (District: 6, 8) PARKS & RECREATION 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 3 GO BOND FUNDING 286,400 0 0 0 0 0 0 0 0 0 0 874,350 0 0 0 0 4,663,200 1,798,322 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $7,695,631 PERCENT FOR ART TOTAL PROJECT COST 286,400 5,537,550 1,798,322 0 0 286,400 0 874,350 6,461,522 0 0 73,359 7,695,631 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Provide a safer, more enjoyable park road system to help reduce the number of accidents and fatalities that occur within the South Mountain Park and Preserve. Improve safety of pedestrian passage to ramadas, trailheads, and lookouts. Reduce liability and avoid more costly roadway repairs in the future. South Mountain Park roadways are utilized by over 2.5 million yearly visitors, and approximately 40 accidents/incidents occur annually with vehicles, pedestrians, and bicycles. BENEFIT Design and construct a first phase of safety improvements to the 15 miles of South Mountain Park roadways. Repave and structurally solidify the roadways where possible. SCOPE $0 OTHER FUNDING $7,695,631 TOTAL PROJECT COST Harmon Park Regional Pool and Three Splash Pad Sites Various (District: 7, 8) PARKS & RECREATION 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 4 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 0 0 951,920 0 0 0 0 0 11,711,288 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 274,404 20,256 -10,836 -4,284 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $12,789,840 PERCENT FOR ART TOTAL PROJECT COST 0 0 951,920 11,711,288 0 0 0 951,920 11,711,288 0 0 126,632 12,789,840 5-YR TOTAL 0 279,540 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL A regional pool at Harmon Park would allow for enhanced play features and amenities that provide recreational opportunities for residents of all ages. The new facilities would meet or exceed current ADA requirements offering additional options and a better experience for individuals with mobility challenges or other disabilities. Installation of a pool heater would allow programming to continue in winter months and expand opportunities to teach lifeguard certification classes. Replacement of three pools with new splash pads provides operational cost savings while continuing to offer popular water-play options for the surrounding neighborhoods. BENEFIT Repurpose four pools in south Phoenix to provide a regional pool at Harmon Park, and 3 splash pads at Alkire, Grant, and University Parks. The regional pool will feature a 25-meter lap pool with dive boards, zero depth entry, water play area, swimming lesson area, water slide, shade structures, pool heater, and playground. Construct an ADA accessible bath house with a lifeguard room for training. SCOPE $0 OTHER FUNDING $12,789,840 TOTAL PROJECT COST Maryvale Park Regional Pool and Two Splash Pads Sites Various (District: 4, 5) PARKS & RECREATION 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 5 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 801,920 0 0 0 0 0 13,423,536 0 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 398,757 53,363 8,557 3,383 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $14,367,712 PERCENT FOR ART TOTAL PROJECT COST 801,920 13,423,536 0 0 0 0 0 801,920 13,423,536 0 0 142,256 14,367,712 5-YR TOTAL 0 464,060 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL A regional pool at Maryvale Park would allow for enhanced play features and amenities that provide recreational opportunities for residents of all ages. The new facilities would meet or exceed current ADA requirements offering additional options and a better experience for individuals with mobility challenges or other disabilities. Installation of a pool heater would allow programming to continue in winter months and expand opportunities to teach lifeguard certification classes. Replacement of two pools with new splash pads provides operational cost savings while continuing to offer popular water-play options for the surrounding neighborhoods. BENEFIT Repurpose three deteriorating pools in the Maryvale area to provide a first-rate regional pool at Maryvale Park and install two new splash pads at Marivue Park and Holiday Park. The regional pool will feature a 25-meter lap pool with dive boards, zero depth entry, interactive water play area, swimming lesson area, water slide, shade structures, pool heater, and water playground. SCOPE $0 OTHER FUNDING $14,367,712 TOTAL PROJECT COST Estrella Civic Space - Phase I 91st Avenue & Lower Buckeye Road (District: 7) PARKS & RECREATION 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 6 GO BOND FUNDING 279,106 0 0 0 0 0 0 0 0 0 0 1,165,800 0 0 0 0 0 10,828,090 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES PPPI / Impact Fees OTHER FUNDING 0 0 4,000,000 0 0 800,000 400,000 200,000 100,000 100,000 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $8,352,835 PERCENT FOR ART TOTAL PROJECT COST 279,106 1,165,800 10,828,090 0 0 279,106 0 1,165,800 10,828,090 0 0 79,839 12,352,835 5-YR TOTAL 4,000,000 1,600,000 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Initiate the park development plan envisioned when the City acquired the property in 2002. This project will increase capacity and access to recreational amenities in an under-served location. BENEFIT Design and construct Phase 1 of the Estrella Village Civic Space. At completion the Estrella Village Civic Space is expected to include a 93 acre regional park, a community center, an aquatic center, and a branch library. Phase 1 consists of the civic space master plan, regional park design, construction of 1/3 of regional park amenities, and a 20,000 square foot branch library. SCOPE $4,000,000 OTHER FUNDING $12,352,835 TOTAL PROJECT COST Desert View Civic Space - Phase I Deer Valley Drive & Tatum Boulevard (District: 2) PARKS & RECREATION 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 7 GO BOND FUNDING 0 0 0 247,905 0 0 0 0 0 0 0 0 0 486,080 0 0 0 0 0 7,570,710 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 365,000 156,000 32,000 120,000 13,000 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $8,385,263 PERCENT FOR ART TOTAL PROJECT COST 0 0 247,905 486,080 7,570,710 247,905 0 486,080 7,570,710 0 0 80,568 8,385,263 5-YR TOTAL 0 686,000 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Initiate the regional park development plan envisioned when the City acquired the property in 2007. This project will increase capacity and access to recreational amenities in an under-served location. BENEFIT Design and construct Phase 1 of the Desert View Village Civic Space. At completion, the Desert View Village Civic Space is expected to include a 40 acre regional park, a community center, a branch library, and a park and ride. Phase 1 consists of the civic space master plan, regional park design, construction of 1/2 of regional park amenities, and a 13,000 square foot branch library. SCOPE $0 OTHER FUNDING $8,385,263 TOTAL PROJECT COST Telephone Pioneers of America Park Recreation Center Improvements 1946 West Morningside Drive (District: 1) PARKS & RECREATION 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 8 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 343,680 0 0 0 0 0 1,839,134 0 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $2,204,642 PERCENT FOR ART TOTAL PROJECT COST 343,680 1,839,134 0 0 0 0 0 343,680 1,839,134 0 0 21,828 2,204,642 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Improve accessibility to support Ability 360, a nonprofit partner that promotes programs designed to empower individuals with disabilities to help them achieve or continue independent lifestyles within the community. Ability 360 has an operating and maintenance agreement with the City through 2028. BENEFIT Renovate the recreation center at Telephone Pioneers of America Park. Reconfigure doors and entrances, improve flooring and update restroom facilities to comply with ADA standards, replace fire suppression and intrusion alarm systems, reconfigure landscaping to eliminate roof access, replace deteriorating cabinets and work stations, and upgrade interior and exterior lighting. SCOPE $0 OTHER FUNDING $2,204,642 TOTAL PROJECT COST Mountain View Community Center Sports Complex Improvements 1104 East Grovers Road (District: 2, 3) PARKS & RECREATION 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 9 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,181,596 0 0 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $1,193,412 PERCENT FOR ART TOTAL PROJECT COST 1,181,596 0 0 0 0 0 0 0 1,181,596 0 0 11,816 1,193,412 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Increase opportunities for recreational activities. Respond to the growing demand for additional pickleball courts in the City. Extend the life of existing basketball and tennis courts. Promote increased visitation and positive activities to help discourage vandalism and other deviant behaviors. BENEFIT Renovate the exterior sports courts at the Mountain View Community Center, including existing basketball and tennis courts, and construct 16 (or more) pickleball courts. SCOPE $0 OTHER FUNDING $1,193,412 TOTAL PROJECT COST Margaret T Hance Park Improvements 67 West Culver Street (District: 7) PARKS & RECREATION 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 10 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 500,000 0 0 0 0 0 2,473,817 0 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $3,003,555 PERCENT FOR ART TOTAL PROJECT COST 500,000 2,473,817 0 0 0 0 0 500,000 2,473,817 0 0 29,738 3,003,555 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL These projects will improve the continued service delivery to the public and Margaret T Hance Park will continue to attract and host prominent events. Additionally, the regional park will provide expected service to the growing residential population in the downtown corridor. BENEFIT Design and construct improvements to Margaret T Hance Park. The nature of improvements will be determined in the future in collaboration with community and stakeholder groups. SCOPE $0 OTHER FUNDING $3,003,555 TOTAL PROJECT COST PUBLIC SAFETY 2023 GO Bond Program Executive Committee Recommendations to City Council Other Funds GO Bond Funds Ongoing Cost Total Cost Project Name Rank Fire Station 7 / Community Assistance Program (7th Street & Hatcher Road) 21,408,057 0 21,408,057 3,727,000 1 Location: 7th Street & Hatcher Road District: 3 Fire Station 13 / Community Assistance Program (44th Street & Thomas Road) 21,753,090 0 21,753,090 3,727,000 2 Location: 44th Street & Thomas Road District: 6, 8 Fire Station 15 / Community Assistance Program (45th Avenue & Camelback Road) 21,408,055 0 21,408,055 3,727,000 3 Location: 45th Avenue & Camelback Road District: 5 Cactus Park Precinct Replacement 37,338,657 0 37,338,657 0 4 Location: TBD District: 1 Fire Station 51 (51st Avenue & SR 303) 24,577,682 6,000,000 18,577,682 7,529,000 5 Location: 51st Avenue & SR 303 District: 1 Police Property Management Warehouse Renovation 9,027,896 0 9,027,896 0 6 Location: 100 East Elwood Street District: 7 Maryvale Police Precinct Renovation 2,986,563 0 2,986,563 0 7 Location: 6180 West Encanto Boulevard District: 4, 5, 7 138,500,000 6,000,000 132,500,000 18,710,000 Public Safety Recommended Total Fire Station 7 / Community Assistance Program (7th Street & Hatcher Road) 7th Street & Hatcher Road (District: 3) PUBLIC SAFETY 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 1 GO BOND FUNDING 82,895 0 0 0 0 4,467,840 0 0 0 0 1,317,440 0 0 0 0 0 13,115,250 0 0 0 0 2,133,414 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 3,318,000 270,000 60,000 79,000 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $21,408,057 PERCENT FOR ART TOTAL PROJECT COST 5,868,175 15,395,555 0 0 0 82,895 4,467,840 1,317,440 13,115,250 2,133,414 146,891 144,327 21,408,057 5-YR TOTAL 0 3,727,000 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Reduce response times within this station’s area of responsibility by providing sufficient apparatus and staffing to respond to current and anticipated future service calls. Mitigate service impacts on neighboring stations by reducing redirection of resources. Current call volume is 57% above industry standards. Provide a facility for the Community Assistance Program. BENEFIT Replace and upgrade Fire Station #7. Acquire 3 acres of land in the vicinity of 7th Street and Hatcher Road. Construct a new 18,000 square foot, 4-bay fire station to support additional emergency response personnel and equipment. Acquire 2 new apparatus (1 pumper and 1 rescue vehicle). The existing fire station building will be retained and utilized to support the Community Assistance Program. SCOPE $0 OTHER FUNDING $21,408,057 TOTAL PROJECT COST Fire Station 13 / Community Assistance Program (44th Street & Thomas Road) 44th Street & Thomas Road (District: 6, 8) PUBLIC SAFETY 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 2 GO BOND FUNDING 83,491 0 0 0 0 4,467,840 0 0 0 0 0 1,340,670 0 0 0 0 0 13,386,375 0 0 0 0 2,177,517 0 0 0 0 149,927 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 3,318,000 270,000 60,000 79,000 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $21,753,090 PERCENT FOR ART TOTAL PROJECT COST 4,551,331 1,340,670 15,713,819 0 0 83,491 4,467,840 1,340,670 13,386,375 2,177,517 149,927 147,270 21,753,090 5-YR TOTAL 0 3,727,000 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Reduce response times within this station’s area of responsibility by providing sufficient apparatus and staffing to respond to current and anticipated future service calls. Mitigate service impacts on neighboring stations by reducing redirection of resources. Current call volume is 43% above industry standards. Provide a facility for the Community Assistance Program. BENEFIT Replace and upgrade Fire Station #13. Acquire 3 acres of land in the vicinity of 44th Street and Thomas Road. Construct a new 18,000 square foot, 4-bay fire station to support additional emergency response personnel and equipment. Acquire 2 new apparatus (1 pumper and 1 rescue vehicle). The existing fire station building will be retained and utilized to support the Community Assitance Program. SCOPE $0 OTHER FUNDING $21,753,090 TOTAL PROJECT COST Fire Station 15 / Community Assistance Program (45th Avenue & Camelback Road) 45th Avenue & Camelback Road (District: 5) PUBLIC SAFETY 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 3 GO BOND FUNDING 82,893 0 0 0 0 4,467,840 0 0 0 0 1,317,440 0 0 0 0 0 13,115,250 0 0 0 0 2,133,414 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 3,318,000 270,000 60,000 79,000 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $21,408,055 PERCENT FOR ART TOTAL PROJECT COST 5,868,173 15,395,555 0 0 0 82,893 4,467,840 1,317,440 13,115,250 2,133,414 146,891 144,327 21,408,055 5-YR TOTAL 0 3,727,000 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Reduce response times within this station’s area of responsibility by providing sufficient apparatus and staffing to respond to current and anticipated future service calls. Mitigate service impacts on neighboring stations by reducing redirection of resources. Current call volume is 51% above industry standards. Provide a facility for the Community Assistance Program. BENEFIT Replace and upgrade Fire Station #15. Acquire 3 acres of land in the vicinity of 45th Avenue and Camelback Road. Construct a new 18,000 square foot, 4- bay fire station to support additional emergency response personnel and equipment. Acquire 2 new apparatus (1 pumper and 1 rescue vehicle). The existing fire station building will be retained and utilized to support the Community Assistance Program. SCOPE $0 OTHER FUNDING $21,408,055 TOTAL PROJECT COST Cactus Park Precinct Replacement TBD (District: 1) PUBLIC SAFETY 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 4 GO BOND FUNDING 0 0 0 0 0 14,957,454 0 0 0 0 0 1,702,366 0 0 0 0 0 17,796,390 0 935,731 0 0 0 1,657,718 0 0 0 0 0 84,653 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $37,338,657 PERCENT FOR ART TOTAL PROJECT COST 14,957,454 1,702,366 17,796,390 1,657,718 1,020,384 0 14,957,454 1,702,366 18,732,121 1,657,718 84,653 204,345 37,338,657 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Modernize and improve police operations and training facilities to ensure officers and staff are well-equipped to serve the Cactus Park Precinct and respond to community needs. Extend the life of police vehicles and reduce energy consumption by providing solar covered parking. The current precinct location at the NEC of 39th Avenue and Cactus Road may be repurposed as the future site of Fire Station #70. BENEFIT Relocate the Cactus Park Police Precinct. Acquire 10 acres in a suitable location, including sufficient land for a future relocation of the Northern Command Center. Construct the following facilities: 13,225 square foot precinct, 4,100 square foot mechanic shop with an attached firearm training facility, and solar covered parking. Demolish the existing precinct facility. SCOPE $0 OTHER FUNDING $37,338,657 TOTAL PROJECT COST Fire Station 51 (51st Avenue & SR 303) 51st Avenue & SR 303 (District: 1) PUBLIC SAFETY 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 5 GO BOND FUNDING 89,448 0 0 0 0 2,749,440 0 0 0 0 0 1,457,250 0 0 0 0 0 14,873,750 0 0 0 0 5,065,999 0 0 0 0 178,485 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES IMPACT FEES / FED OTHER FUNDING 1,000,000 0 5,000,000 0 0 7,001,000 300,000 60,000 168,000 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $18,577,682 PERCENT FOR ART TOTAL PROJECT COST 2,838,888 1,457,250 20,118,234 0 0 89,448 2,749,440 1,457,250 14,873,750 5,065,999 178,485 163,310 24,577,682 5-YR TOTAL 6,000,000 7,529,000 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Provide the emergency response resources needed to serve the technology park developing on the north side of SR 303, as well as future residential development anticipated west of I-17. Mitigate service impacts on neighboring stations by reducing redirection of resources. BENEFIT Construct new Fire Station #51. Acquire 3 acres of land in the vicinity of 51st Avenue and SR 303. Construct a new 20,000 square foot, 5-bay fire station. Acquire 5 new fire apparatus (1 ladder, 1 ladder tender, 1 pumper, 1 hazardous material support vehicle and 1 rescue vehicle), as well as 1 new battalion chief vehicle. SCOPE $6,000,000 OTHER FUNDING $24,577,682 TOTAL PROJECT COST Police Property Management Warehouse Renovation 100 East Elwood Street (District: 7) PUBLIC SAFETY 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 6 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 487,500 1,884,000 0 0 0 1,822,041 1,740,472 3,004,498 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $9,027,896 PERCENT FOR ART TOTAL PROJECT COST 2,309,541 3,624,472 3,004,498 0 0 0 0 2,371,500 6,567,011 0 0 89,385 9,027,896 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Ensure crime scene evidence is preserved and protected consistent with industry standards. Maintain existing public facilities and mechanical systems to reduce service disruptions and avoid costs of replacement in the future. BENEFIT Renovate the Police Property Management Warehouse and secure the property for vehicle evidence currently stored at a different location. Construct a 1,600 square foot administrative building for the vehicle lot. Update and improve aging evidence preservation and storage equipment and spaces to optimize space utilization and provide a visitor lobby. SCOPE $0 OTHER FUNDING $9,027,896 TOTAL PROJECT COST Maryvale Police Precinct Renovation 6180 West Encanto Boulevard (District: 4, 5, 7) PUBLIC SAFETY 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 7 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,721,229 1,235,764 0 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $2,986,563 PERCENT FOR ART TOTAL PROJECT COST 1,721,229 1,235,764 0 0 0 0 0 0 2,956,993 0 0 29,570 2,986,563 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Extend the functional life of critical equipment and building systems at the Maryvale Police Precinct building. Improve the functionality of the building to ensure officers and staff are well-equipped to serve the Maryvale Precinct and respond to community needs. Ensure continuity of service by reducing the potential for failure of equipment and/or building systems. BENEFIT Renovate and update the Maryvale Police Precinct. SCOPE $0 OTHER FUNDING $2,986,563 TOTAL PROJECT COST STREETS & STORM DRAINAGE 2023 GO Bond Program Executive Committee Recommendations to City Council Other Funds GO Bond Funds Ongoing Cost Total Cost Project Name Rank Vision Zero Implementation 16,922,765 0 16,922,765 258,393 1 Location: Citywide District: Citywide Equity Based Transportation Mobility - T2050 Mobility Implementation 12,570,371 0 12,570,371 127,343 2 Location: Various District: Citywide Laveen Flood Mitigation 23,384,187 15,153,786 8,230,401 0 3 Location: Various District: 7 Pavement Maintenance Supplement 22,030,869 0 22,030,869 0 4 Location: Citywide District: Citywide Hohokam Drainage Program 54,708,715 35,463,121 19,245,594 0 5 Location: Baseline Road to Dobbins Road & 14th Street to 21st Street District: 8 Storm Drain Replacement Program 2,500,000 0 2,500,000 0 6 Location: Various District: Citywide 132,116,907 50,616,907 81,500,000 385,736 Streets & Storm Drainage Recommended Total Vision Zero Implementation Citywide (District: Citywide) STREETS & STORM DRAINAGE 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 1 GO BOND FUNDING 300,000 300,000 100,000 300,000 100,000 100,000 0 0 0 0 700,000 700,000 700,000 0 0 0 4,500,000 4,500,000 4,467,094 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 245,893 4,700 7,800 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $16,922,765 PERCENT FOR ART TOTAL PROJECT COST 1,100,000 5,600,000 5,600,000 4,467,094 0 900,000 300,000 2,100,000 13,467,094 0 0 155,671 16,922,765 5-YR TOTAL 0 258,393 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Improve roadway safety with a specific emphasis on projects that reduce serious vehicle collisions. Recognition as a Vision Zero City will help raise awareness of roadway safety projects and promote the goal of eliminating serious injuries and fatalities on Phoenix roadways. BENEFIT Supplement the Council-approved Road Safety Action Plan and leverage various Federal funding opportunities toward becoming a Vision Zero City. Identify, design, and implement roadway safety countermeasures that address locations and behaviors related to fatal and serious injury accidents. SCOPE $0 OTHER FUNDING $16,922,765 TOTAL PROJECT COST Equity Based Transportation Mobility - T2050 Mobility Implementation Various (District: Citywide) STREETS & STORM DRAINAGE 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 2 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 1,000,000 1,000,000 611,478 0 0 0 4,000,000 4,000,000 1,834,434 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 117,053 2,790 3,900 3,600 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $12,570,371 PERCENT FOR ART TOTAL PROJECT COST 1,000,000 5,000,000 4,611,478 1,834,434 0 0 0 2,611,478 9,834,434 0 0 124,459 12,570,371 5-YR TOTAL 0 127,343 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Accelerate implementation of mobility projects that support historically disadvantaged communities where access to safe transportation options is limited. Equity-based mobility projects take into account the prevalence of zero-car households, areas of persistent poverty, school areas with a high rate of walking enrollment, high daily bus boardings, high bike-on-bus boardings, ADA non-accessible and non-compliant bus stops, streets and intersections that have a high number of crashes between vehicles and people walking and riding bicycles, gaps in the bikeway network, areas that lack pedestrian crossing signals. Completed mobility projects will address hazards, reduce roadway user stress, and improve multi-model connectivity. Improved access to safe transportation options will help reduce socio-economic inequities that are more pronounced in underserved and disadvantaged neighborhoods. BENEFIT Design and construct recommended mobility improvements including curb, gutter, sidewalk, ADA ramps, streetlights, traffic calming, safe HAWK crossings, traffic signals, and tree/shade landscaping. Low Impact Development and Green Infrastructure may be considered in the design of these projects. SCOPE $0 OTHER FUNDING $12,570,371 TOTAL PROJECT COST Laveen Flood Mitigation Various (District: 7) STREETS & STORM DRAINAGE 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 3 GO BOND FUNDING 229,120 0 0 0 2,892,647 0 0 0 0 0 0 2,940,148 0 0 0 0 0 0 10,059,426 7,192,175 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES FCDMC OTHER FUNDING 148,928 1,911,096 1,880,221 6,538,627 4,674,914 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $8,230,401 PERCENT FOR ART TOTAL PROJECT COST 229,120 2,940,148 2,892,647 10,059,426 7,192,175 229,120 2,892,647 2,940,148 17,251,601 0 0 70,671 23,384,187 5-YR TOTAL 15,153,786 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Provide flood protection to existing homes and other structures. Leverage cost share opportunities with the Flood Control District of Maricopa County for final design and construction. BENEFIT Implement drainage mitigation options to reduce flood impacts in four areas of Laveen. These projects were recommended in the 2022 Laveen Area Drainage Feasibility Study. SCOPE $15,153,786 OTHER FUNDING $23,384,187 TOTAL PROJECT COST Pavement Maintenance Supplement Citywide (District: Citywide) STREETS & STORM DRAINAGE 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 4 GO BOND FUNDING 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7,812,742 7,000,000 7,000,000 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $22,030,869 PERCENT FOR ART TOTAL PROJECT COST 7,812,742 7,000,000 7,000,000 0 0 0 0 0 21,812,742 0 0 218,127 22,030,869 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Local street mill and overlay helps preserve neighborhood character and quality. Well-maintained roads are safer, quieter and reduce wear and tear on vehicles. This proposal would reduce deferred maintenance needs and degradation of neighborhood streets. BENEFIT Supplement the Accelerated Pavement Maintenance Program with additional funding for neighborhood street mill and overlay projects at an estimated $1 million per residential quarter section. SCOPE $0 OTHER FUNDING $22,030,869 TOTAL PROJECT COST Hohokam Drainage Program Baseline Road to Dobbins Road & 14th Street to 21st Street (District: 8) STREETS & STORM DRAINAGE 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 5 GO BOND FUNDING 1,116,960 0 5,228,613 0 5,336,702 0 0 0 0 0 0 3,485,742 2,668,946 0 0 0 0 0 18,167,240 18,554,445 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES FCDMC OTHER FUNDING 726,024 5,664,331 5,203,671 11,808,706 12,060,389 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $19,245,594 PERCENT FOR ART TOTAL PROJECT COST 1,116,960 8,714,355 8,005,648 18,167,240 18,554,445 1,116,960 10,565,315 6,154,688 36,721,685 0 0 150,067 54,708,715 5-YR TOTAL 35,463,121 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Provide flood protection to existing homes and other structures. Reduce roadway safety hazards that result during storm events. Leverage cost share opportunities with the Flood Control District of Maricopa County for final design and construction. BENEFIT Implement the Hohokam Area Drainage Master Plan that was prepared in collaboration with the Flood Control District of Maricopa County. Design and construct a series of storm sewer drainage basins and pipes that extends the storm drainage system in the area south of Baseline Road to Dobbins Road, and 14th Street to 21st Street. SCOPE $35,463,121 OTHER FUNDING $54,708,715 TOTAL PROJECT COST Storm Drain Replacement Program Various (District: Citywide) STREETS & STORM DRAINAGE 2023 GO Bond Program Executive Committee Recommendations to City Council Project Detail Rank: 6 GO BOND FUNDING 2,500,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 STUDY REAL PROPERTY COST ELEMENTS 2024-25 2025-26 2026-27 2027-28 2028-29 DESIGN / ENGINEERING CONSTRUCTION / DEMO EQUIPMENT MOVE-IN EXPENSES N/A OTHER FUNDING 0 0 0 0 0 0 0 0 0 0 STAFF CONTRACTUALS ON-GOING EXPENSES COMMODITIES INTERDEPARTMENTAL ON-GOING CAPITAL ANNUAL COST $2,500,000 PERCENT FOR ART TOTAL PROJECT COST 2,500,000 0 0 0 0 2,500,000 0 0 0 0 0 0 2,500,000 5-YR TOTAL 0 0 TOTAL OPERATING 2024-25 2025-26 2026-27 2027-28 2028-29 5-YR TOTAL Much of the street stormwater system was built more than 30 years ago with corrugated metal pipe, which has deteriorated and is past its useful life. Failures of the piping have led to reactive responses with numerous sink holes occurring in City streets that result in disruption to traffic, as well as safety issues. Not funding this project will result in additional damage to City streets, flooding in neighborhoods, and potential claims against the City due to property damage and potential loss of human life. BENEFIT Replace deteriorating metal storm drain pipe with new reinforced concrete pipe. Approximately one to two miles of pipe would be replaced each year. SCOPE $0 OTHER FUNDING $2,500,000 TOTAL PROJECT COST