To: 
City of Phoenix Planning Commission 
Date: September 1, 2022 
 
 
From: 
Racelle Escolar, AICP 
Principal Planner 
 
 
Subject: Item No. 17 (Z-28-22-8) – Northwest corner of 23rd Avenue and 
Baseline Road 
 
This memo is to address the South Mountain Village Planning Committee 
recommendation which included an additional stipulation regarding funding for traffic 
calming device/s on 23rd Avenue. 
 
On July 12, 2022, the South Mountain Village Planning Committee continued the case 
to the August 9, 2022 hearing to give the applicant time to work on elevations, and 
access concerns expressed by the Committee. 
 
On August 9, 2022, the Committee recommended approval, per the staff 
recommendation with additional stipulations by a vote of 7 to 4. A stipulation was added 
to require that building elevations be presented for review and comment to the Village 
Planning Committee prior to final site plan approval. Staff has no concerns with this 
added stipulation. A stipulation was also added to require that funds be provided for 
traffic calming device/s on 23rd Avenue. 
 
Funding for traffic calming devices on 23rd Avenue will require additional input from the 
Street Transportation Department. Staff recommends modifying this added stipulation to 
require that the developer work with the neighborhood and the Street Transportation 
Department to pursue a traffic calming solution. 
 
Staff recommends approval, subject to the revised stipulations below: 
 
1. 
The development shall not exceed a maximum of 55 lots. 
 
 
2. 
A minimum of 10% of the gross site area, exclusive of required landscape 
setbacks, shall be provided as open space, as approved by the Planning and 
Development Department. 
 
 
3. 
A minimum landscape setback of 20 feet shall be provided along 23rd and 24th 
Avenues. The landscape setback may be reduced to 17 feet for up to 50% of 
this frontage for the purpose of staggering setbacks for the perimeter theme 
wall, as approved by the Planning and Development Department. 
 
 
4. 
A minimum landscape setback of 50 feet shall be provided along Baseline 
Road. The landscape setback may be reduced to 47 feet for up to 50% of this 
Attachment D

Planning Commission Memo – Z-28-22-8 
September 1, 2022 
Page 2 of 5 
 
frontage for the purpose of staggering the perimeter theme wall and screening 
utility boxes, as approved by the Planning and Development Department. 
 
 
5. 
All required landscape setbacks shall be planted with minimum 75-percent 2-
inch caliper and 25-percent 3-inch caliper large canopy drought-tolerant trees, 
planted 25 feet on center or in equivalent groupings, with five 5-gallon shrubs 
per tree, as approved by the Planning and Development Department. 
 
 
6. 
A minimum of one milkweed shrub, or other native nectar species, shall be 
planted for every required tree in addition to the required shrubs, and shall be 
planted in groups of three or more, as approved by the Planning and 
Development Department. 
 
 
7. 
A minimum of 75 percent of the standard building elevations provided shall 
include a covered front porch in the front yard with a minimum of 60 square feet 
in area and a minimum depth of 6 feet. No porch shall terminate within the 
plane of a door or window, as approved by the Planning and Development 
Department. 
 
 
8. 
Fences and walls shall be in general conformance with the wall plan and wall 
details (wall elevations) date stamped April 1, 2022, as modified by the 
following stipulations, and approved by the Planning and Development 
Department: 
 
 
 
 
a. 
Partial view fencing, which may include solid columns up to 24 inches in 
width, shall be utilized where walls are proposed around open space 
areas, the partial view fencing shall be a maximum 3-foot solid wall and 
3-foot view fencing. 
 
 
 
 
b. 
Perimeter walls bounding the rear or side yard property lines of 
residential lots along 23rd Avenue, 24th Avenue, and Baseline Road 
shall include minimum three-foot offsets, and material and textural 
differences, such as stucco, and/or split face or slump block or a 
decorative element, such as tile or stamped designs, as approved by the 
Planning and Development Department. 
 
 
 
 
c. 
The wall layout depicted in the wall details (wall elevations) plan shall be 
modified where necessary to accommodate site layout changes that 
avoid conflicts with the Zoning Ordinance or City Code requirements. 
 
 
9. 
Project entry/exit drives along 23rd and 24th Avenues shall incorporate 
decorative pavers, stamped or colored concrete, or similar alternative material, 
as approved by the Planning and Development Department. 
 
 
10. 
Project entry/exit drives along 23rd and 24th Avenues shall incorporate 
enhanced landscaping on both sides planted with a variety of at least three 
plant materials, as approved by the Planning and Development Department. 
Each landscaped area shall be a minimum of 250-square feet.

Planning Commission Memo – Z-28-22-8 
September 1, 2022 
Page 3 of 5 
 
 
 
11. 
A tot lot with shade equipment shall be provided in the central/primary open 
space amenity area, as approved by the Planning and Development 
Department. 
 
 
12. 
The following shall be provided in each open space amenity area, as approved 
by the Planning and Development Department: Modify 
 
 
 
a. 
One picnic area with a barbeque grill, shade ramada, and a picnic table; 
 
 
 
 
b. 
Two benches or seating features; and 
 
 
 
 
c. 
A minimum of 6 bicycle parking spaces shall be provided through 
inverted U, and/or artistic racks. The racks shall be shaded by a tree or 
structure and installed per the requirements of Section 1307.H. of the 
Phoenix Zoning Ordinance. Artistic racks shall adhere to the City of 
Phoenix Preferred Designs in Appendix K or the Comprehensive Bicycle 
Master Plan, as approved by the Planning and Development 
Department. 
 
 
13. 
All sidewalks along 23rd Avenue and 24th Avenue shall be a minimum of 5 feet 
in width and detached with a minimum 5-foot wide landscape strip located 
between the sidewalk and back of curb and planted to the following standards, 
as approved by the Planning and Development Department. 
 
 
 
a. 
Minimum 2-inch caliper single-trunk large canopy drought-tolerant shade 
trees planted to provide a minimum of 75% shade, at maturity. 
 
 
 
 
b. 
Drought tolerant vegetation to achieve 75% live coverage at maturity. 
 
 
 
Where utility conflicts exist, the developer shall work with the Planning and 
Development Department on alternative design solutions consistent with a 
pedestrian environment for installing the required plants. 
 
 
14. 
All sidewalks along Baseline Road shall be a minimum of 6 feet in width and 
detached with a minimum 11-foot-wide landscape strip located between the 
sidewalk and back of curb and planted to the following standards, as approved 
by the Planning and Development Department. 
 
 
 
 
a. 
Minimum 75% 2-inch caliper single-trunk large canopy drought-tolerant 
shade trees, and minimum 25% 3-inch caliper single-trunk large canopy 
drought-tolerant shade trees. 
 
 
 
 
b. 
Drought tolerant vegetation to achieve 75% live coverage at maturity.

Planning Commission Memo – Z-28-22-8 
September 1, 2022 
Page 4 of 5 
 
 
Where utility conflicts exist, the developer shall work with the Planning and 
Development Department on alternative design solutions consistent with a 
pedestrian environment for installing the required plants. 
 
 
15. 
All sidewalks within the development shall be detached with a minimum 5-foot 
wide landscaped strip located between the sidewalk and back of curb and shall 
include minimum 2-inch caliper single trunk shade trees planted at a rate of 
one tree per lot. 
 
 
 
a. 
Where adjacent to open space areas, trees shall be planted a minimum 
of 20 feet on center or in equivalent groupings. 
 
 
 
 
b. 
Drought tolerant vegetation to achieve 75% live coverage at maturity. 
 
 
 
Where utility conflicts exist, the developer shall work with the Planning and 
Development Department on alternative design solutions consistent with a 
pedestrian environment for installing the required plants. 
 
 
16. 
The developer shall dedicate a multi-use trail easement (MUTE) along the 
north side of Baseline Road and construct a minimum 10-foot-wide multi-use 
trail (MUT) within the easement in accordance with the MAG supplemental 
detail, as approved by the Planning and Development Department. The 
developer shall work with the Site Planning section on an alternate design for 
this requirement through the technical appeal process. 
 
 
17. 
The developer shall dedicate a minimum of 30 feet of right-of-way and 
construct the west side of 23rd Avenue, as approved by the Planning and 
Development Department. 
 
 
18. 
The developer shall dedicate 25 feet of right-of-way for the east side of 24th 
Avenue, as approved by the Planning and Development Department. 
 
 
19. 
The existing irrigation facilities along 23rd Avenue are to be undergrounded 
and relocated outside of City right-of-way. Contact SRP to identify existing land 
rights and establish the appropriate process to relocate the facility. Relocations 
that require additional dedications or land transfer require completion prior to 
obtaining plat and or civil plan review approval. 
 
 
20. 
The developer shall connect to 23rd Drive, or dedicate a 50-foot radius cul-de-
sac and construct a 45-foot turning radius on site at the termination of 23rd 
Drive, as modified and approved by the Planning and Development 
Department. 
 
 
21. 
The developer shall construct all streets within and adjacent to the 
development with paving, curb, gutter, sidewalk, curb ramps, streetlights, 
median islands, landscaping and other incidentals, as per plans approved by

Planning Commission Memo – Z-28-22-8 
September 1, 2022 
Page 5 of 5 
 
the Planning and Development Department. All improvements shall comply 
with all ADA accessibility standards. 
 
 
22. 
The property owner shall record documents that disclose the existence, and 
operational characteristics of Phoenix Sky Harbor International Airport (PHX) to 
future owners or tenants of the property. The form and content of such 
documents shall be according to the templates and instructions provided which 
have been reviewed and approved by the City Attorney. 
 
 
23. 
If determined necessary by the Phoenix Archaeology Office, the applicant shall 
conduct Phase I data testing and submit an archaeological survey report of the 
development area for review and approval by the City Archaeologist prior to 
clearing and grubbing, landscape salvage, and/or grading approval. 
 
 
24. 
If Phase I data testing is required, and if, upon review of the results from the 
Phase I data testing, the City Archaeologist, in consultation with a qualified 
archaeologist, determines such data recovery excavations are necessary, the 
applicant shall conduct Phase II archaeological data recovery excavations 
 
 
25. 
In the event archaeological materials are encountered during construction, the 
developer shall immediately cease all ground-disturbing activities within a 33-
foot radius of the discovery, notify the City Archaeologist, and allow time for the 
Archaeology Office to properly assess the materials. 
 
 
26. 
Prior to preliminary site plan approval, the landowner shall execute a 
Proposition 207 Waiver of Claims forms. The waiver shall be recorded with the 
Maricopa County Recorder’s Office and delivered to the City to be included in 
the rezoning application file for record. 
 
 
27. 
BUILDING ELEVATIONS SHALL BE PRESENTED FOR REVIEW AND 
COMMENT TO THE SOUTH MOUNTAIN VILLAGE PLANNING COMMITTEE 
PRIOR TO FINAL SITE PLAN APPROVAL.  
 
 
28. 
THE DEVELOPER SHALL SET ASIDE FUNDS FOR TRAFFIC CALMING 
DEVICE/S ON 23RD AVENUE. 
THE DEVELOPER SHALL WORK WITH THE NEIGHBORHOOD AND THE 
STREET TRANSPORTATION DEPARTMENT TO PURSUE TRAFFIC 
MITIGATION ON 23RD AVENUE, PRIOR TO FINAL SITE PLAN APPROVAL, 
AS MODIFIED AND APPROVED BY THE STREET TRANSPORTATION 
DEPARTMENT.