Attachment B - Non-GF Proposed Supplementals.pdf
Extracted text (via pymupdf)
15164 characters
Department/Program 2022-23 Total Aviation 1. Administration $0 Add funding for 27 positions to enhance existing operations at Phoenix Sky Harbor International, Deer Valley and Goodyear airports as activity returns to pre- pandemic levels. These positions will support the following divisions of the Aviation Department: Facilities and Services, Operations, and Technology. Funding also includes the addition of six vehicles. To offset ongoing costs, two existing positions that are no longer needed will be eliminated. The annual cost is $2,225,000, however the cost for FY 2022-23 will be absorbed utilizing contractual savings within Aviation's operating budget. 25.0 2. Administration $0 Add funding for a new sustainability section within the Facilities and Services Division to establish a formal sustainability management team in the Aviation Department. This addition includes funding for one Administrative Assistant I, one Economic Development Program Manager, and one Energy Management Superintendent position. The annual cost is $309,000, however the cost for FY 2022-23 will be absorbed utilizing contractual savings within Aviation's operating budget. 3.0 3. Administration $0 Add funding for a new Asset Management section within the Facilities and Services Division to centralize asset management and effectively ensure all buildings, equipment and grounds are safe and clean, user friendly, and efficient. This addition includes funding for one vehicle and four positions including an Aviation Superintendent, two Facilities Project Managers, and a Special Projects Administrator. To offset ongoing costs, three existing positions that are no longer needed will be eliminated. The annual cost is $257,000, however the cost for FY 2022-23 will be absorbed utilizing contractual savings within Aviation's operating budget. 1.0 ATTACHMENT B 2022-23 PROPOSED SUPPLEMENTALS NON-GENERAL FUND View the Inventory of Programs published online for program details. Department/Program 2022-23 Total 4. Capital Management & Support $0 Add funding to support the expansion of grant programs to allow the department to seek and apply for more state and federal grants. This addition includes funding for an Economic Development Program Manager and a Planner III position. The annual cost is $226,000, however the cost for FY 2022-23 will be absorbed utilizing contractual savings within Aviation's operating budget. 2.0 Total Aviation $0 31.0 Housing 1. Project Implementation $0 Convert one temporary Project Management Assistant position, one temporary Project Manager position, and one temporary Housing Manager position to ongoing status. The Project Management Assistant supports the Home Investment Partnerships Program (HOME) Down Payment Assistance program, which assists low-income first-time homebuyers. The Project Manager ensures department-wide compliance with federal regulations, enabling critical Housing initiatives to continue. The Housing Manager oversees the HOME American Rescue Plan program, which assists vulnerable populations with affordable housing, rental assistance, and/or supportive services, and purchases and/or develops non-congregate shelter. 0.0 Total Housing $0 0.0 Neighborhood Services 1. Administration $231,000 Convert one Management Assistant II and one Project Manager position in the Grants Compliance Capital Improvement Program from temporary to ongoing status. This will assist the department in timely completion of City Council approved grant funded neighborhood enhancement infrastructure projects. These positions work with multiple City departments and federal agency representatives and provide guidance and monitoring to multiple departments and contractors related to grant compliance activities. 2.0 Department/Program 2022-23 Total 2. Housing Rehab Programs $402,000 Convert Lead Safe Phoenix grant funded temporary positions to ongoing status and add a new ongoing Administrative Assistant I position. These positions are needed due to increased complexity and reporting requirements per the U.S. Department of Housing and Urban Development and to perform critical financial and programmatic analysis and oversight. The new Administrative Assistant I position will assist staff, community partners such as Maricopa County and Arizona Department of Health Services, as well as federal agency representatives to provide services and education to residents pertaining to lead hazard remediation. The position will develop and provide targeted education and outreach, data collection and analysis, manage enrollment activities, and support sufficient and timely responses to ongoing and changing requirements tied to grant reporting. 4.0 Total Neighborhood Services $633,000 6.0 Parks and Recreation 1. Administration $0 Convert a temporary Deputy Parks Development Director position to ongoing status to oversee the Parks Development section. The Parks Development Section is made up of eight positions and has an annual Capital Improvement Program budget of approximately $30 million. The Parks Development section is responsible for planning and implementing a variety of new park construction projects and existing park renovations, improvements and building repair projects. The cost of this position will be charged to the Capital Improvement Program budget. 1.0 Total Parks and Recreation $0 1.0 Planning and Development 1. Administration $0 Add two Management Assistant II positions and supplies to establish an ombudsman program to provide additional support to customers with unresolved concerns regarding planning, permitting or plan reviews and inspections. The ombudsman positions will serve as a liaison to understand and identify root causes, investigate, resolve and communicate information between customers and city staff. The ombudsman program will also make suggestions for further action or revisions to policies, procedures and amendments to improve the customer experience. The annual cost is $222,000, however the cost for FY 2022- 23 will be absorbed utilizing savings from vacant positions. 2.0 Department/Program 2022-23 Total 2. Growth and Infrastructure $0 Add a Special Projects Administrator position to the Growth and Infrastructure Section to evaluate complex analysis of short-term infrastructure funding costs and long-term impacts to city budgets to ensure that new development does not negatively impact City services for existing residents and businesses. The annual cost is $140,000, however the cost for FY 2022-23 will be absorbed utilizing savings from vacant positions. 1.0 3. Administration $0 Convert two temporary Information Technology Analyst/Programmer III positions to ongoing status and add two new Lead Business Systems Analyst positions for the continued support of the SHAPE PHX project. SHAPE PHX will replace the department's current permitting and inspection software applications. The annual cost is $430,000, however, the cost for FY 2022-23 will be absorbed utilizing savings from vacant positions and consultant and professional services. 4.0 4. Various $0 Add a Building Code Examiner, a General Inspections Field Supervisor and an Architect position to the Commercial Plan Review and Residential Inspections sections due to increasing workloads. These positions will assist the department in responding to field inspection issues quicker and reducing turnaround times. The annual cost is $406,000, however the cost for FY 2022-23 will be absorbed utilizing savings from vacant positions. 3.0 Total Planning and Development $0 10.0 Public Transit 1. Local Fixed Route Bus Service $241,000 Add funding to extend fixed route bus service in north Phoenix on Norterra Parkway and North Valley Parkway north of Happy Valley Road effective April 24, 2023. The extension will operate at a 30-minute frequency Monday through Sunday and will connect neighborhoods and businesses into the region’s extensive transit network. The full-year ongoing cost will be $1,440,000. 0.0 2. Federal Grants Administration & Oversight (Designated Recipient Role) $430,000 Add a Special Projects Administrator and three Contract Specialist II positions to address the increasing workload and complexity for managing additional programs, funding, and new requirements resulting from an increase in Federal Transit Administration (FTA) grant funds. The recently enacted federal Bipartisan Infrastructure Law has increased FTA formula funding by roughly 30%, approximately doubled the FTA Capital Investment Grant program funding, and added several new FTA discretionary/competitive grant programs. These positions will provide support in the areas of applications, funds management, reporting, compliance, subrecipient oversight, grant closeout and complex and specialized procurement activities. 4.0 Department/Program 2022-23 Total 3. Light Rail $214,000 Add two Management Assistant II positions; one to serve as liaison for Light Rail Transit (LRT) and the other to directly support Bus Rapid Transit (BRT). The LRT position will manage oversight of public engagement, community relations, and administrative tasks for implementation of two additional light rail extensions as well as serve as back up to the Light Rail Administrator. The BRT position will support the BRT Administrator in the design, development, and implementation of the BRT program and oversight of BRT consultant teams for transit planning, community outreach, preliminary design and engineering, and contract management activities. 2.0 Total Public Transit $885,000 6.0 Public Works 1. Contained Residential Collection $228,000 Add funding to support the refuse and recycle collection service growth needed to efficiently maintain existing and future service levels. The request is consistent with the financial plan recommended by the Solid Waste Rate Advisory Committee and approved by Mayor and City Council. The funding will add one Equipment Operator IV position and two Solid Waste Equipment Operator positions. 3.0 2. Administration $40,000 Add funding for part-time Administrative Interns to assist with implementing innovations and operational efficiencies. The Solid Waste Administrative Internship Program attracts graduate level students interested in solid waste, sustainability, and environmentally focused careers within the public sector. The ongoing positions will eliminate the need for temporary positions currently used in the program. 1.0 3. Contained Residential Collection $825,000 Add four Solid Waste Foreman and seven Solid Waste Equipment Operator (SWEO) positions to support the expansion of the SWEO Apprenticeship Program which aides in workforce development. The program focuses on diversifying the workforce by performing outreach to youth, women, and veterans. The ongoing positions will eliminate the need for temporary positions currently used in the program. 11.0 Total Public Works $1,093,000 15.0 Department/Program 2022-23 Total Street Transportation 1. Various $0 Add a Project Manager position for the Street Lighting program, and a Senior IT Systems Specialist, Lead User Technology Specialist, Civil Engineer III, and an Accountant III position. This will also convert a temporary Senior Human Resources Clerk and Procurement Manager position to ongoing status. These administrative and technical support positions are necessary to provide internal and external support for Street Transportation staff, programs, projects, and services focused on several Council priorities, including management and implementation of community driven street lighting requests. The annual cost is $813,000, however the cost for FY 2022-23 will be absorbed utilizing savings from vacant positions. 7.0 2. Street Maintenance $0 Convert a temporary Administrative Assistant II and Street Maintenance Supervisor position associated with the Street Maintenance Worker Apprenticeship Program to ongoing status. Per changes in the Street Maintenance Worker (SMW) job classification, all new hires will be hired as SMW Apprentices. For the program to be successful it will need staff to manage the program, recruit, and train new hires. The annual cost is $258,000, however the cost for FY 2022-23 will be absorbed utilizing savings from vacant positions. 2.0 3. Development Coordination $0 Add three positions and two vehicles for the Long-Range Transportation Team. The team will partner with the Arizona State Land Department, the City of Phoenix Planning & Development and Community & Economic Development departments, as well as other regional partners to support the city’s planned growth. The Civil Engineer III, Principal Planner, and Traffic Engineer II positions will provide analysis and infrastructure planning to attract and spur economic development, help address road safety, and determine future transportation needs. The annual cost is $396,000, however the cost for FY 2022-23 will be absorbed utilizing savings from vacant positions. 3.0 Total Street Transportation $0 12.0 Water Services 1. Water Production $1,508,000 Add funding for staff, utilities, materials, and vehicles required to operate and maintain three new water production wells and eight aquafer, storage and recovery (ASR) wells scheduled to be completed by December 2022. The water from these wells will supplement the potable water system, and augment Phoenix’s potable water resources during times of water shortages and emergency outages. The full-year ongoing cost, excluding initial vehicle and equipment purchases, will be $1,192,000. 6.0 Department/Program 2022-23 Total 2. Water Production $449,000 The Lake Pleasant Water Treatment Plant is owned by the City of Phoenix and is currently operated and maintained by a service agreement with Veolia Water. The initial 15-year service agreement is set to expire in June 2022. A five-year extension of the contract is being discussed. The requested staff and equipment would be necessary should the city exercise the right within the contract to take over the current operations of the plant within the next three to five years during the extension period. The request includes all the required positions needed to progressively staff the plant over the transition time period. The FY 2022-23 costs shown represent the initial set of positions and equipment that would be needed in the first year of planning. The timing of any transition may shift as contract discussions progress. 41.0 3. Water Resource Management and Development Planning $356,000 Convert six temporary positions to ongoing status including an Accountant II, Management Assistant II, Senior Human Resources Analyst, Water Customer Services Supervisor II, and two Water Services Project Coordinators. These positions will address substantial, multi-year business needs that are continuous in nature based on increased work effort and new or expanded programs. 4.0 Total Water Services $2,313,000 51.0 TOTAL PROPOSED NON-GENERAL FUND ADDITIONS $4,924,000 132.0