Attachment B - FY 2021-26 Art Plan
City of Phoenix — Land Use and Livability Subcommittee (2021-05-19)
Extracted text (via pymupdf)
49692 characters
PHOENIX OFFICE OF ARTS AND CULTURE
FY 2021-26 PUBLIC ART PLAN
Rio Del Rey Pedestrian Bridge, Artist Jody Pinto
Photo by Craig Smith, 2021
Attachment B
2
Table of Contents
Projects in Italics are new projects
Introduction and Background ............................................................................................................................. 4
The FY 2021-26 Public Art Plan Types of Projects............................................................................................ 5
2020-21 Substantially Completed Public Art Projects........................................................................................ 6
2021-26 Public Art Plan ..................................................................................................................................... 9
Project Title: 7
th Avenue at Melrose Curve .......................................................................................... 9
Project Title: North 32
nd Street and Drought Pipeline Enhancements ................................................. 9
Project Title: 107
th Avenue Streetscape .............................................................................................. 9
Project Title: Arizona Falls ................................................................................................................. 10
Project Title: Artists’ Initiative ............................................................................................................ 10
Project Title: Buckeye Road .............................................................................................................. 10
Project Title: Civic Space Sculpture and Lighting Retrofit ........................................................... 11
Project Title: Community Well Site 157 ............................................................................................. 11
Project Title: Community Water Site BS-2B ...................................................................................... 11
Project Title: Community Well Site 84/88 .......................................................................................... 11
Project Title: Community Well Site 156 ............................................................................................. 12
Project Title: Community Well Site Security Gates & Fences ........................................................... 12
Project Title: Cool Corridors ............................................................................................................ 12
Project Title: Cortez Park Well Site & Arizona Canal ........................................................................ 12
Project Title: Drought Pipeline Walls and Fences.......................................................................... 13
Project Title: Eastlake Park Civil Rights Memorial Retrofit .......................................................... 13
Project Title: El Reposo Park Public Art ........................................................................................ 13
Project Title: Happy Valley Road at I-17 Interchange ........................................................................ 13
Project Title: Lift Stations and Neighborhood Facilities ..................................................................... 14
3
Project Title: Maryvale Grand Canal Crossing ............................................................................... 14
Project Title: Mountain Preserve Enhancements ........................................................................... 14
Project Title: Paradise Valley Park Public Art ................................................................................ 14
Project Title: Perry Park Public Art ................................................................................................. 15
Project Title: PSHIA Portable Works Collection ................................................................................ 15
Project Title: PSHIA Sky Train Stage II - 24th Street Station Terrazzo .............................................. 15
Project Title: PSHIA Sky Train Stage II - RCC Station Weather Fence............................................. 15
Project Title: PSHIA Sky Train Stage II - RCC Station Terrazzo ....................................................... 16
Project Title: PSHIA Terminal 3 Modernization North Concourse Bridge .......................................... 16
Project Title: PSHIA Terminal 3 Modernization West Atrium ............................................................. 16
Project Title: PSHIA Terminal 4 S1 Concourse ................................................................................. 16
Project Title: Public Works – 27
th Avenue Solid Waste Management Facility .................................... 17
Project Title: Shade ........................................................................................................................... 17
Project Title: South Mountain Loop 202 Pedestrian Bridge at Elwood Street.................................... 17
Project Title: SR51 Artwork Retrofit ................................................................................................... 17
Project Title: Sueño Park Public Art ................................................................................................ 18
Project Title: Surrey Park Public Art ............................................................................................... 18
Project Title: Thomas Road Overpass Retrofit .................................................................................. 18
Project Title: Tres Rios Wetlands ...................................................................................................... 19
Project Title: Water Public Art Master Plan ....................................................................................... 19
Project Title: Water Services West Yard ........................................................................................... 19
FY 2021-26 Major Multi-Year Projects ............................................................................................................. 20
2021-26 Public Art Plan Summary ................................................................................................................... 21
Projects by Council Districts ............................................................................................................................ 22
Interactive Map ................................................................................................................................................ 23
FY2021-26 Public Art Plan Budget .................................................................................................................. 24
4
Introduction and Background
The Phoenix City Council established the Phoenix Office of Arts and Culture Public Art Program in 1986 to help create a
more beautiful and vibrant city. The program is funded through an ordinance that allocates one percent of the Phoenix
Capital Improvement Program to enhance the design of public buildings, infrastructure and spaces. Since its inception, it
has created more than 200 major projects and become a national leader in developing unique collaborations with artists
and other design professionals to build a better Phoenix. The projects range from new airport facilities, parks, community
centers and canal trails, to bridges, streetscapes, overpasses, transit centers, recycling centers, and other key infrastructure.
Phoenix public art has garnered numerous awards for design excellence, including two Design for Transportation Awards
from the U.S. Department of Transportation and the National Endowment for the Arts, numerous Arizona Forward
Environmental Excellence Awards, including the 2001 President's Award, and other local and national recognition. The
Public Art Program has brought positive national and international media attention to the City of Phoenix through articles
in The New York Times, Newsweek, The Wall Street Journal, Art in America, The Atlantic Monthly, and Landscape
Architecture, among others.
Each year, the Phoenix Office of Arts and Culture works with funding City departments and the Mayor and City Council
to develop the annual Public Art Plan that identifies capital improvement projects in all areas of Phoenix that offer the
greatest opportunity for artist involvement and public accessibility. The plan is presented to the Mayor and City Council
for review and approval. The total budget for each project includes funds to contract for design, fabrication, installation
and project administration. Art projects, like other public works, are funded in part through City-issued bonds and other
capital improvement funds. The projects are scheduled to be in step with priorities in the City’s CIP program.
Artists are recommended for projects through a competitive procurement process that involves selection panels of arts
professionals, staff from the funding City departments and representatives of the community where public art projects will
be located. Project architects and City staff may serve as non-voting advisors to the panel. The panels review applications
usually submitted in response to a Call to Artists. The selection panels base their recommendations on the quality of the
artists’ works, their suitability for the project, and their ability to work well with the community and other design
professionals. The panel’s recommendation must be reviewed by the Phoenix Arts and Culture Commission, a volunteer
citizen advisory board, and approved by the Mayor and City Council before artists can be contracted to begin work.
For more information about the Phoenix Office of Arts and Culture,
Please visit phoenix.gov/arts or call (602)262-4637
5
The Phoenix Office of Arts and Culture has developed the FY 2021-26 Public Art Plan with input and assistance from the
Mayor and City Council, City residents, artists, funding City departments, and the Phoenix Arts and Culture Commission.
1. Design Team Projects
Artists on design teams collaborate with architects, landscape architects, engineers and community members to
plan major capital construction projects. Design team projects often create significant enhancements for new
infrastructure, stand-alone structures fabricated by the artist, or both.
2. Site-Specific Commissions
These projects often respond to the opportunities and history of a community or place. Site-specific commissions
may be incorporated into new construction or existing public facilities.
3. Purchase of Existing Artwork
The City maintains an extensive portable works collection of more than 1,000 works of art displayed in more than
20 public buildings, and at The Gallery @ City Hall.
4. Temporary Commissions
Temporary commissions include a range of short-term projects that provide professional development for artists
and that respond to selected locations or opportunities. Temporary projects may include new media, art
installations, sculptures and other changing displays.
5. Art Refurbishment and Retrofit
The City must periodically refurbish public art in the City’s collection. Sometimes major modifications or retrofits
are needed to accommodate changing site conditions or to renew the appearance of works that have been damaged
by the elements. Major modifications funded through the City’s Capital Improvement Program go beyond routine
maintenance.
6. Master Planning
The City periodically develops master plans to determine the best opportunities for incorporating art into public
projects. Master plans often recommend where specific projects or series of projects should be sited to achieve the
greatest public benefit.
The FY 2021-26 Public Art Project Plan includes the following types of public art projects:
6
2020–21 Substantially Completed Public Art Projects
Community Well Site 84/88
Artist Bobby Zokaites (AZ) worked with landscape architect Dig Studios to enhance the security and appearance of this
Community Well Site in Maryvale. The improvements included landscaping, fencing, pathways, lighting and a sculptural
landmark.
South Mountain Loop 202 Pedestrian Bridge at Elwood
Artist Jody Pinto (NY) worked with the Connect 202 and ADOT design team to design the pedestrian bridge spanning
the new 202 freeway section at Elwood Street. The perforated aluminum cladding and multicolored skylights create a
vibrant interior. The bridge glows with blue light at night. The approximately 415-foot span provides a critical pedestrian
link between residential neighborhoods and a nearby school.
7
Happy Valley Road I-17 Interchange Bridges
Artist Daniel Mayer (AZ) worked with an ADOT design team to enhance the design of the newly retrofitted interchange.
The project upgraded designs for the overpass fencing, support columns and concrete work.
107th Avenue Streetscape
Artists Laura Haddad and Tom Drugan (WA) created streetscape amenities as part of the
107th Avenue Street Improvement between Indian School Rd. and Camelback Rd. The featured birds and
planes highlight the work of nearby Luke Air Force Base.
2020–21 Substantially Completed Public Art Projects
8
2020–21 Partially Completed Public Art Projects
Artists’ Initiative (Influx Cycle IX)
The Phoenix Office of Arts and Culture has commissioned six Arizona artists and teams to create performances and
installations as part of the IN FLUX series of temporary public art projects. The Projects will continue to debut throughout
2021 as public health and safety permit. Some of the works will be featured online.
The series kicked off with a January 2021 film screening of The Story of Our Journey, a 51-minute video that combines
an original musical score with interviews of refugees detailing their journeys to America by clarinetist Csaba Jevtic-
Somlai and composer Dylan Findley. Other featured performers will include the Central AZ Chapter of Barbershop
Harmony Society, the team of dancer Nicole L. Olson and ceramic artist Patricia Sannit, Katharine Leigh Simpson, Erin
V. Sotak, and the artist collective Whistling Moon. The City’s In FLUX web page, https://www.phoenix.gov/arts/influx,
will provide ongoing updates and information about the projects and their schedules.
9
(Listed alphabetically – the budget summary in the appendix provides detailed information. New projects are italicized.)
Project Title
7th Avenue at Melrose Curve
Project #
AR63000025
Location
7th Ave. & West Glenrosa St.
Type of Project
Temporary Commission
Funding Source
Public Works Capital Funds
2021-26 Budget
$35,647
Council District
4
Description:
This continuing project features works about recycling and the environment by Arizona artists, bolstering City efforts to
increase household recycling. The art is displayed in the three double-sided, back-lighted canopied shelters at 7th Ave. at
West Glenrosa St. The project has featured more than 30 Arizona artists and more than 25 poets since it was initiated in
FY 2004-05.
Project Title
North 32nd Street Improvements
Project Number
AR63000030
Location
Pipeline Corridor, from Shea Blvd to Bell Rd.
Type of Project
Design Team Commission
Funding Sources
Streets & Water Capital Funds
2021-26 Budget
$574,161
Council District
3, 2
Description
An artist will be contracted to work with the community, Street Transportation and Water Services Departments
to enhance the design of N. 32nd Street between Shea Blvd. and Bell Rd. along the Drought Pipeline corridor.
This project is in the planning phase.
Project Title
107th Avenue Streetscape
Project Number
AR63000031
Location
107th Ave. between Indian School & Camelback Rds.
Type of Project
Site-Specific Commission
Funding Source
Street Transportation Capital Funds
2021-26 Budget
$45,722
Council District
5
Description:
Artists Laura Haddad and Tom Drugan (WA) created streetscape amenities to enhance pedestrian safety and comfort as
part of the 107th Avenue Street Improvement between Indian School Rd. and Camelback Rd. This project is in closeout
phase.
2021-26 Public Art Project Plan
10
Project Title
Arizona Falls
Project #
AR84850019
Location
Arizona Canal at 56th St.
Type of Project
Artwork Refurbishment
Funding Source
Water Capital Funds
2021-26 Budget
$180,093
Council District
6
Description:
Major safety features, such as security lighting, drainage and fencing, will be upgraded as part of retrofits to improve the
site. The project is in the planning phase.
Project Title
Artists' Initiative
Project Number
AR74000014
Location
Various Sites
Type of Project
Temporary Commission
Funding Sources
Water Capital Funds
2021-26 Budget
$190,883
Council District
Citywide
Description:
This continues a successful series of temporary projects for Arizona artists new to public art. It has activated public
buildings and spaces with a wide range of artistic installations, performances and media. The artists will present
temporary projects online or at community facilities citywide, as public health allows.
Project Title
Buckeye Road
Project Number
AR67000012
Location
Buckeye Rd., 16th St. to 7th St.
Type of Project
Site Specific Commission
Funding Sources
Water and Transit Capital Funds
2021-26 Budget
$186,036
Council District
8
Description
An artist will be contracted to work with City departments and the community to create works that improve pedestrian and
transit shade and comfort at bus stops along the corridor. This will be coordinated with ongoing City efforts to reduce the
impact of urban heat and improve pedestrian and transit mobility. This project is in the planning phase, and is partly
funded with an “Our Town” grant from the National Endowment for the Arts.
11
Project Title
Civic Space Sculpture and Lighting Retrofit
Project Number
AR74000017
Location
Civic Space Park at 1st Ave. & Taylor St.
Type of Project
Major Retrofit
Funding Sources
Parks Capital Funds
2021-26 Budget
$108,000
Council District
7
Description
Contractors will be hired to fabricate and install a new net and replace existing lighting with more efficient LED fixtures
for the park’s award-winning landmark sculpture, Her Secret is Patience.
Project Title
Community Well Site 157
Project Number
AR84850027
Location
55th Ave. and West Edgemont Ave.
Type of Project
Design Team Commission
Funding Sources
Water Capital Funds
2021-26 Budget
$18,306
Council District
4
Description:
Arizona artist Kevin Berry was contracted to work with landscape architect Janet Waibel to enhance the security and
appearance of Community Well Site #157. The improvements include fencing, shade trees, walking paths and a sculptural
landmark. This project is in the warranty closeout phase.
Project Title
Community Water Site BS-2B
Project Number
AR84850034
Location
1439 East Alta Vista Rd.
Type of Project
Design Team Commission
Funding Sources
Water Capital Funds
2021-26 Budget
$177,627
Council District
8
Description
An artist will be selected to improve the security and appearance of this Water Services Department Community Site (BS-
2B). This project is in the planning phase.
Project Title
Community Well Site 84/88
Project Number
AR84850029
Location
73rd Ave. & West Crittenden Ln.
Type of Project
Design Team Commission
Funding Sources
Water Capital Funds
2021-26 Budget
$18,808
Council District
5
Description:
Arizona artist Bobby Zokaites worked with landscape architect Dig Studios to reduce the urban heat island impact and
enhance the security and appearance of this Community Well Site in Maryvale. This project is in the closeout phase.
12
Project Title
Community Well Site 156
Project Number
AR84850031
Location
63rd Ave. & West Osborn Rd.
Type of Project
Design Team Commission
Funding Sources
Water Capital Funds
2021-26 Budget
$145,000
Council District
7
Description:
Artist Jeff Zischke (AZ) has been contracted to work with engineers Wood Patel and landscape architect Janet Waibel to
enhance the security and appearance and reduce the urban heat island impact of this community well site in west Phoenix.
This project is in the construction phase.
Project Title
Community Well Site Security Gates and Fences
Project Number
AR84850035
Location
Various
Type of Project
Design Team Commission
Funding Sources
Water Capital Funds
2021-26 Budget
$600,000
Council District
Citywide
Description
Artists will be commissioned to work with the Water Services Department to enhance the design of security gates and
fences at Water facilities. This project is in the planning phase.
Project Title
Cool Corridors
Project Number
AR63000032
Location
Citywide
Type of Project
Design Team Commission
Funding Sources
Streets Capital Funds
2021-26 Budget
$235,000
Council District
Citywide
Description
Artists will be commissioned to work with the Street Transportation Department to enhance pedestrian experience as part
of the City's Cool Corridors Initiative.
Project Title
Cortez Park Well Site and Arizona Canal
Project Number
AR84850036
Location
35th Ave. & Arizona Canal
Type of Project
Design Team Commission
Funding Sources
Water Capital Funds
2021-26 Budget
$498,055
Council District
1
Description
Artist John Randall Nelson (AZ) was selected to work with the Water, Parks and Neighborhood Services Departments to
design site enhancements to improve the safety and security of this Aquifer Storage and Recovery well site and
surrounding public spaces along the Arizona Canal and Cortez Park. This project is in the design phase.
13
Project Title
Drought Pipeline Walls and Fences
Project Number
AR84850037
Location
20th St. & Northview – Maryland Ave. & 22nd St.
Type of Project
Design Team Commission
Funding Sources
Water Capital Funds
2021-26 Budget
$500,000
Council District
6
Description
Arizona artist Mary Shindell will be contracted to work with a Water Services Department engineering team and the
community to design two walls being built as a part of the Drought Pipeline Relocation Project. One wall will be located
along 20th Street at Northview Avenue, the second along Maryland Avenue near 22nd Street. This project is in the design
phase.
Project Title
Eastlake Park Civil Rights Memorial Retrofit
Project Number
AR74000018
Location
16th St. & Jefferson St.
Type of Project
Major Retrofit
Funding Sources
Parks Capital Funds
2021-26 Budget
$73,780
Council District
8
Description:
Contractors will be hired to retrofit the sculpture and timeline of Civil Rights history for Peace, the Arizona Civil Rights
Memorial, created in 1997.
Project Title
El Reposo Park Public Art
Project Number
AR84850040
Location
502 East Alta Vista Rd.
Type of Project
Site Specific
Funding Sources
Water Capital Funds
2021-26 Budget
$300,000
Council District
7
Description:
An artist will be commissioned to work with the Parks Department and the community to enhance the experience of El
Reposo Park. This project is in the planning phase.
Project Title
Happy Valley Road at I-17 Interchange
Project Number
AR63850018
Location
Happy Valley Rd. at I-17
Type of Project
Design Team Commission
Funding Source
Street Transportation Capital Funds
2021-26 Budget
$190,825
Council District
1
Description:
Arizona artist Daniel Mayer worked with City departments, the community, HDR engineering and the Arizona
Department of Transportation to enhance the design of the completed interchange retrofit. The public art improvements
include upgraded designs for overpass fencing, support columns and concrete work. The project improves traffic flow and
safety and serves as a gateway. This project is in the closeout phase.
14
Project Title
Lift Stations and Neighborhood Facilities
Project Number
AR84900011
Location
Citywide
Type of Project
Site-Specific Commission
Funding Source
Wastewater Capital Funds
2021-26 Budget
105,536
Council District
Citywide
Description:
Artists will be contracted to work with City consultants to enhance or upgrade the design of new or existing lift stations
and other neighborhood facilities essential to the City's wastewater collection system. In addition to wall enhancements,
the projects may include upgraded landscaping, security fencing and other features. This project is in the planning phase.
Project Title
Maryvale Grand Canal Crossing
Project Number
AR84850038
Location
Grand Canal & 51st Ave.
Type of Project
Design Team Commission
Funding Sources
Water Capital Funds
2021-26 Budget
$550,150
Council District
5
Description
An artist will be commissioned to work with City departments and the community to enhance the design of the Grand
Canal trail and crossing at 51st Ave. This project is in the planning phase.
Project Title
Mountain Preserve Enhancements
Project Number
AR74000019
Location
North & South Mountain Preserves
Type of Project
Site Specific
Funding Sources
Parks Capital Funds
2021-26 Budget
$70,588
Council District
3, 6, 7, 8
Description:
Artists will be commissioned to work with the Parks Department to enhance the experience of Phoenix Mountain Preserve
public areas. This project is in the planning phase.
Project Title
Paradise Valley Park Public Art
Project Number
AR84850042
Location
17642 North 40th St.
Type of Project
Site Specific
Funding Sources
Water Capital Funds
2021-26 Budget
$296,584
Council District
2
Description:
An artist will be commissioned to work with the Parks Department and the community to enhance the experience of
Paradise Valley Park. This project is in the planning phase.
15
Project Title
Perry Park Public Art
Project Number
AR84850039
Location
2700 North 32nd St.
Type of Project
Design Team
Funding Sources
Water Capital Funds
2021-26 Budget
$475,000
Council District
8
Description:
An artist will be commissioned to work with the Parks Department and the community to enhance the experience of Perry
Park. This project is in the planning phase.
Project Title
PSHIA Portable Works Collection
Project Number
AR66000021
Location
Phoenix Sky Harbor International Airport
Type of Project
Purchase & Commission of Existing Artworks
Funding Source
Aviation Capital Funds
2021-26 Budget
$ 6,414
Council District
8
Description:
Artworks will be commissioned or purchased to expand Phoenix Airport Museum programming in new public exhibition
areas created by the Terminal Modernizations. This will include purchasing recommended works from temporary museum
exhibitions and POAC projects for the museum's permanent collection, and 2) purchasing collections of works by
contemporary artists. POAC staff will work closely with the Aviation Department to identify the Portable Works projects.
This project is in the planning phase.
Project Title
PSHIA Sky Train Stage II - 24th Street Station Terrazzo
Project Number
AR66000043
Location
Phoenix Sky Harbor International Airport
Type of Project
Design Team Commission
Funding Source
Aviation Capital Funds
2021-26 Budget
$2,473
Council District
8
Description:
Artist Frank Gonzales (AZ) was contracted to work with the Aviation Department and its Gannett Fleming/Hensel Phelps
project team to design a terrazzo floor for this PHX Sky Train station. This project is in the closeout phase.
Project Title
PSHIA Sky Train Stage II Rental Car Center Station Weather Fence
Project Number
AR66000041
Location
Phoenix Sky Harbor International Airport Rental Car Center
Type of Project
Design Team Commission
Funding Source
Aviation Capital Funds
2021-26 Budget
$200,152
Council District
8
Description:
The artist team of Roberto Behar and Rosario Marquardt (FL) was contracted to work with the Aviation Department and
its Gannett Fleming/Hensel Phelps project team to design two protective weather fences for this PHX Sky Train station
platform. Each fence runs approximately 260 feet along the north and south sides of the station. This project is in the
closeout phase.
16
Project Title
PSHIA Sky Train Stage II Rental Car Center Station Terrazzo
Project Number
AR66000042
Location
Phoenix Sky Harbor International Airport
Type of Project
Design Team Commission
Funding Source
Aviation Capital Funds
2021-26 Budget
$43,478
Council District
8
Description:
Artist Bill Dambrova (AZ) was contracted to work with the Aviation Department and its Gannett Fleming/Hensel Phelps
project team to design a terrazzo floor for this PHX Sky Train station. This project is in the closeout phase.
Project Title
PSHIA Terminal 3 Modernization North Concourse Bridge
Project Number
AR66000037
Location
Phoenix Sky Harbor International Airport
Type of Project
Design Team Commission
Funding Source
Aviation Capital Funds
2021-26 Budget
$214,769
Council District
8
Description:
Artist James Carpenter (NY) was contracted to integrate a major artwork into the modernization of the Terminal 3 North
Concourse bridge. In addition to completing the warranty phase of this project, artists will be commissioned or their
works purchased to expand Phoenix Airport Museum programming in new public exhibition areas created by the
Terminal 3 Modernization Project.
Project Title
PSHIA Terminal 3 Modernization West Atrium
Project Number
AR66000036
Location
Phoenix Sky Harbor International Airport
Type of Project
Design Team & Site-Specific Commission
Funding Source
Aviation Capital Funds
2021-26 Budget
$97,172
Council District
8
Description:
Artists Michael Anderson (AZ), Mitch Fry (AZ), Patricia Sannit (AZ) and Matt Wedel (OH) were contracted to create
sculptures for the west side of the Terminal 3 Atrium. The works will be combined with other large-scale sculptures
already in the Phoenix Airport Museum Collection to enhance the terminal and create an outdoor sculpture and botanical
garden in the Terminal 3 West Plaza. This project is in the closeout phase.
Project Title
PSHIA Terminal 4 S1
Project Number
AR66000040
Location
Phoenix Sky Harbor International Airport
Type of Project
Design Team Commission
Funding Source
Aviation Capital Funds
2021-26 Budget
$1,829,218
Council District
8
Description:
Artist Susan Logoreci was contracted to work with the Aviation Department and its project team to enhance the design of
the Connector Bridge terrazzo and walls to the new South Concourse (S1) at Terminal 4. In addition to completing the
fabrication and installation phase of this project, artists will be commissioned or their works purchased to expand Phoenix
Airport Museum programming in new public exhibition areas created by the Terminal 4 Modernization Project. The
project is in the construction phase.
17
Project Title
Public Works – 27th Avenue Solid Waste Management Facility
Project Number
AR70160001
Location
3060 S. 27th Ave. (at Lower Buckeye Rd.)
Type of Project
Site-Specific Commission
Funding Source
Solid Waste Capital Funds
2021-26 Budget
$364,369
Council District
7
Description:
Artists will be contracted to create artworks from materials commonly found in the City’s recycling stream. This
successful series of projects has bolstered City efforts to increase awareness about recycling and resource management by
introducing new ways to re-use materials. This project is in the design phase.
Project Title
Shade
Project Number
AR67000011
Location
Citywide
Type of Project
Site Specific Commission
Funding Sources
Street Transportation, Transit & Water Capital Funds
2021-26 Budget
$246,173
Council District
Citywide
Description
Arizona artists will be contracted to create designs for shade and weather screens for new city bus shelters and heat
mitigating personal umbrellas to improve pedestrian and transit comfort citywide. These projects are in the planning
phase. The project team is also working with ASU heat research partners to develop a heat awareness handbook that is in
the design phase. This range of projects have received funds from the National Endowment for the Arts and will be
coordinated with Citywide efforts to raise awareness about and reduce the impact of urban heat.
Project Title
South Mountain Loop 202 Pedestrian Bridge at Elwood Street
Project Number
AR63850017
Location
Loop 202 Freeway at Elwood St. Alignment
Type of Project
Design Team Commission
Funding Source
Street Transportation Capital Funds
2021-26 Budget
$60,487
Council District
7
Description:
Artist Jody Pinto (NY) worked with City departments, the Arizona Department of Transportation and the Connect 202
development team to design the pedestrian bridge spanning the South Mountain Loop 202 Freeway at Elwood Street. The
bridge provides a critical pedestrian link between residential neighborhoods and a nearby school. This project is in
closeout phase.
Project Title
SR51 Artwork Retrofit
Project Number
AR39000003
Location
Sites along SR51, between McDowell Rd. & Bethany Home Rd.
Type of Project
Artwork Refurbishment
Funding Sources
Street Transportation Capital Funds
2021-26 Budget
$39,057
Council District
4, 6, 8
Description:
Arizona artists and contractors will complete major retrofits of the Wall Cycle to Ocotillo Public Art Project integrated
into the design of SR 51 in the early 1990s. The works require major renovations due to exposure to the elements and
damage by vandals. This project is in the fabrication phase.
18
Project Title
Sueño Park Public Art
Project Number
AR84850041
Location
4401 West Encanto Blvd.
Type of Project
Site Specific
Funding Sources
Water Capital Funds
2021-26 Budget
$303,416
Council District
4
Description:
An artist will be commissioned to work with the Parks Department and the community to enhance the experience of
Sueño Park. This project is in the planning phase.
Project Title
Surrey Park Public Art
Project Number
AR84900014
Location
3835 West Joan De Arc Ave.
Type of Project
Site Specific
Funding Sources
Wastewater Capital Funds
2021-26 Budget
$200,000
Council District
1
Description:
Artists will be commissioned to work with the Parks Department and the community to enhance the experience of Surrey
Park. This project is in the planning phase.
Project Title
Thomas Road Overpass Retrofit
Project Number
AR63850020
Location
SR 51 & Thomas Rd.
Type of Project
Major Retrofit
Funding Source
Streets Capital Funds
2021-26 Budget
$144,885
Council District
4
Description:
This project will contract Arizona fabricators to assess and restore sections of the adobe wall panels integrated into the SR
51 overpass at Thomas Rd. Portions of the panels, which were produced through a collaboration between artist Marilyn
Zwak (AZ) and community residents in 1990, have been damaged by vandals and exposure to the elements. The Thomas
Road. Overpass was the first of the City’s many award-winning public art projects created by design teams.
19
Project Title
Tres Rios Wetlands
Project Number
AR84900010
Location
91st Ave. & Baseline Rd.
Type of Project
Design Team Commission
Funding Source
Wastewater Capital Funds
2021-26 Budget
$1,921,660
Council District
7
Description:
Artist Adam Kuby (OR) was contracted to work with a design team, City departments, consultants and the community to
create significant recreation and environmental education experiences as part of this multi-year effort to improve the
seven-mile, 1,500-acre wetland at the confluence of the Salt and Gila Rivers in southwestern Phoenix. Kuby and the team
have designed raptor towers, viewing areas, paths and demonstration gardens in the wetlands. This project is in the design
phase.
Project Title
Water Public Art Master Plan
Project Number
AR84850013
Location
Citywide
Type of Project
Master Planning
Funding Source
Wastewater Capital Funds
2021-26 Budget
$100,000
Council District
Citywide
Description:
Develop a comprehensive computerized mapping system (GIS mapping) to determine the best public art sites and
opportunities citywide for using Water and Wastewater Percent-for-Art funds. The project will enable City staff to refine
the ongoing mapping of City projects and more efficiently integrate art into City’s Capital Improvement Program. This
project is ongoing.
Project Title
Water Services West Yard
Project Number
AR84850033
Location
North 47th Ave. & West Camelback Rd.
Type of Project
Design Team Commission
Funding Sources
Wastewater Capital Funds
2021-26 Budget
$1,136,389
Council District
5
Description
An artist will be contracted to work with the Water Services Department and its project team to add enhancements to
publicly accessible areas of the planned West Yard Facility and Customer Service Center. This project is in the planning
phase.
20
FY 2021-26 Public Art Project Plan Major Multi-Year Projects
Completion of the following projects will require significant funding resources over the next five fiscal years. Funding for
the planning and implementation of these projects is included in the FY 2021-26 Public Art Plan. Funding of all projects
is subject to City Council approval through future Public Art Plans.
Community Water Facilities Improvements
Multiple Arizona artists have been contracted to work with the community and the Water Services Department to
improve the security and appearances of community water facilities citywide.
Streetscape Shade and Cooling Improvements
Artists will be contracted to work with the community and City departments to enhance pedestrian and transit shade and
connectivity. The enhancements will be coordinated with City efforts to reduce the impact of urban heat and improve
mobility citywide.
Public Works Recycling and Sustainability Initiative
The Public Art Program has worked with the Public Works Department since 1990 to involve artists in the design of
innovative recycling centers, and in building awareness of the need for recycling and sustainable resource
management. Artists will be contracted to create artworks that expand educational outreach about recycling and bolster
City efforts to increase recycling citywide.
PSHIA Terminal Modernizations, Sky Train Phase 2, and Terminal 4 New Concourse Public Art
Phoenix Sky Harbor International Airport future terminal modernizations represent the City's most significant opportunity
to reach the widest public with great public art and integrated design. PSHIA handles more than 40 million passengers
annually. Public Art staff is working with Aviation staff and its design teams to carry out a comprehensive plan to
integrate significant art and design to enhance the experience of travelers. Projects will be implemented in step with the
airport modernization phases.
Tres Rios Wetlands
Artist Adam Kuby has been contracted to work with City departments, consultants and the community to create
significant environmental recreation and education opportunities at Tres Rios. This project is part of this multi-year effort
to improve the seven-mile, 1,500-acre wetland at the confluence of the Salt and Gila Rivers in southwestern Phoenix.
21
FY 2021-26 Public Art Project Plan Summary
Number of New Projects
11
$ 3,112,518
Number of Continuing Projects
29
$ 9,373,395
Total Funded Projects
40
$12,485,913
Arizona Artists
Of the 36 projects in the 2021-26 Public Art Plan that are expected to result in contracts with artist/contractors, at least 22
(61%) are expected to involve artists or teams with an Arizona member. Four projects address major project retrofits and
long- range planning. Artists who live in Arizona are eligible and encouraged to apply for all projects.
22
DISTRICT 1
Cortez Park Well and Canal Project
Happy Valley/I-17 Interchange Improvement
Surrey Park Public Art
DISTRICT 2
Paradise Valley Park Public Art
DISTRICT 2, 3
North 32nd Street Drought Pipeline Neighborhood Enhancements
DISTRICT 3, 6, 7, 8
Mountain Preserve Enhancements
DISTRICT 4
7th Avenue at Melrose Curve
Community Well Site 157
Sueño Park Public Art
Thomas Road Overpass Retrofit
DISTRICT 4, 6, 8
SR 51 Wall Cycle to Ocotillo Refurbishment
DISTRICT 5
107th Avenue Streetscape
Community Well Site 84/88
Maryvale Grand Canal Crossing
Water Services West Yard
DISTRICT 6
Drought Pipeline Walls and Fences Project
Arizona Falls
DISTRICT 7
Civic Space Sculpture and Lighting Retrofit
Community Well Site 156
El Reposo Park Public Art
Public Works 27th Avenue Solid Waste Management Facility
South Mountain Freeway Loop 202 Pedestrian Bridge at Elwood Street
Tres Rios Wetlands
DISTRICT 8
Buckeye Road
Community Well Site BS-2B
Eastlake Park Civil Rights Memorial Retrofit
Perry Park Public Art
PSHIA Portable Works Collection
PSHIA Terminal 3 Modernization West Atrium
PSHIA Terminal 3 Modernization North Concourse Bridge
PSHIA Terminal 4 South (S1) Concourse
PSHIA Sky Train Stage II Rental Car Center Weather Fence
PSHIA Sky Train Stage II Rental Car Center Terrazzo
PSHIA Sky Train Stage II 24th Street Station Terrazzo
CITYWIDE
Artists’ Initiative
Cool Corridors
Community Well Site Security Gates & Fences
Lift Station Projects
Shade
Water Public Art Master Plan
Council Districts
Public Art Projects
23
See the interactive Google Map for the locations and details of projects in the Art Plan. Use the link or click on the map
below, then click on the yellow stars to learn more about each project. You can also view City Council districts and the
locations of completed public art projects.
MAP –
https://www.google.com/maps/d/edit?mid=1oaPpeSru0bVU-cJ_r-
gX1wII7wPMvnz8&usp=sharing
Interactive Map
24
FY 2021-2026
Public Art Program Budget
Project Name
Project
Fund
Fund Name
FY
21-22
FY
22-23
FY
23-24
FY
24-25
FY
25-26
Total
21-26
7th Avenue at Melrose
Curve
AR63000025
65909
Solid Waste - Mega IV
35,647
0
0
0
0
35,647
Total
35,647
0
0
0
0
35,647
N 32nd St and Drought
Pipeline Neighborhood
Enhancements
AR63000030
0007
AZ Highway Users 30%
- Street Improvements
173,370
0
0
0
0
173,370
1021
Capital Construction
39,709
0
0
0
0
39,709
1736
2022 CIC Water Bond
242,669
100,000
0
0
0
342,669
Total
455,748
100,000
0
0
0
555,748
107th Avenue
Streetscape
AR63000031
0007
AZ Highway Users 30%
- Street Improvements
45,722
0
0
0
0
45,722
Total
45,722
0
0
0
0
45,722
Arizona Falls
AR84850019
1736
2022 CIC Water Bond
105,093
0
25,600
0
0
130,693
1734
2020B CIC Water Sustain
49,400
49,400
105,093
0
75,000
0
0
180,093
Artists' Initiative
AR74000014
1736
Water CIC Bond
50,220
50,220
0051
Water Revenue
0
35,663
35,000
35,000
35,000
140,663
Total
50,220
35,663
35,000
35,000
35,000
190,883
Buckeye Road
AR67000012
2050
Tax Transit
27,333
0
0
0
0
27,333
2051
Streets
123,932
0
0
0
0
123,932
1736
Water CIC Bond
34,771
34,771
Total
186,036
0
0
0
0
186,036
Civic Space Sculpture and
Lighting Retrofit
AR74000017
0024
Sports facilities
8,000
0
0
0
0
8,000
1022
Parks & Preserves Initiat
100,000
0
0
0
0
100,000
Total
108,000
0
0
0
0
108,000
Community Well Site 157
AR84850027
1736
2022 CIC Water Bond
18,306
0
0
0
0
18 ,306
Total
18,306
0
0
18,306
Community Well Site
84/88
AR84850029
1736
2022 CIC Water Bond
18,808
0
0
0
0
18,808
Total
18,808
0
0
0
0
18,808
Community Well Site 156
AR84850031
0051
Water Revenue
120,000
25,000
0
0
0
145,000
Total
120,000
25,000
0
0
0
145,000
Community Water
Site -Mineral Road
AR84850034
0051
Water Revenue
0
150,000
0
0
0
150,000
1736
2022 CIC Water Bond
27,627
0
0
0
0
27,627
Total
27,627
150,000
0
0
0
177,627
Community Well Site
Security Gates and
Fences
AR84850035
1736
2022 CIC Water Bond
50,000
0
50,000 200,000 300,000
600,000
Total
50,000
0
50,000 200,000 300,000
600,000
Cool Corridors
AR63000032
0007
AHUR 30% St. Improv
50,000
0 100,000
0
0
150,000
2051
Transport Tax Streets
0
85,000
0
0
0
85,000
Total
50,000
85,000 100,000
0
0
235,000
Cortez Park Well
Site/Arizona Canal Project
AR84850036
1736
2022 CIC Water Bond
448,055
50,000
0
0
0
498,055
Total
448,055
50,000
0
0
0
498,055
25
2021-2026 Public Art Program Budget
Project Name
Project
Fund
Fund Name
FY
21-22
FY
22-23
FY
23-24
FY
24-25
FY
25-26
Total
21-26
Drought Pipeline Walls
and Fences
AR84850037
1734
2020B CIC Water Sustain
500,000
0
0
0
0
500,000
Total
500,000
0
0
0
0
500,000
Eastlake Park Civil Rights
Memorial Retrofit
AR74000018
1022
Parks & Preserves Initia
73,780
0
0
0
0
73,780
Total
73,780
0
0
0
0
73,780
El Reposo Park
Public Art
AR84850040
0051
Water Revenue
50,000
0
0
0
0
50,000
1734
2020B CIC Water Sustain
0
0 250,000
0
0
250,000
Total
50,000
0
0
0
0
300,000
Happy Valley/I-17
Interchange
AR63850018
0007
AZ Highway Users
165,466
0
0
0
0
165,466
Total
165,466
0
0
0
0
165,466
Lift Stations and
Neighborhood Facilities
AR84900011
1701
Wastewater Bond 2019
0
0
52,768
52,768
105,536
Total
0
0
52,768
52,768
105,536
Maryvale Grand Canal
Crossing
AR84850038
1734
2020B CIC Water Sustain
100,000
450,150
0
0
0
550,150
Total
100,000
450,150
0
0
0
550,150
Mountain Preserve
Enhancements
AR74000019
1437
PPPI 40% Mtn & Desert
0
0
20,588
25,000
25,000
70,588
Total
0
0
20,588
25,000
25,000
70,588
Paradise Valley Park
Public Art
AR84850042
1734
2020B CIC Water Sustain
0
10,000 250,000
0
0
260,000
1736
2022 CIC Water Bond
0
36,584
0
0
0
36,584
Total
0
46,584 250,000
0
0
296,584
Perry Park Public Art
AR84850039
1734
2020B CIC Water Sustain
0
0 400,000
0
0
400,000
0051
Water Revenue
75,000
0
0
0
0
75,000
Total
75,000
0
0
0
0
475,000
PSHIA Portable Works
Collection
AR66000021
0042
Airport Improvement -
Sky Harbor
6,414
0
0
0
0
6,414
Total
6,414
0
0
0
0
6,414
PSHIA Sky Train Stage II
AR66000041
1731
CFC 2020 Bond
200,152
0
0
0
0
200,152
Total
200,152
0
200,152
RCC Sky Train Terrazzo
AR66000042
1731
CFC 2020 Bond
43,478
0
0
0
0
43,478
Total
43,478
0
0
0
0
43,478
24th Street Sky Train
Terrazzo
AR66000043
1430
PFC Non-Bond
2,473
0
0
0
0
2,473
Total
2,473
0
0
0
0
2,473
PSHIA T4 S1 Concourse
AR66000040
1732
2020 Airport Rev Bond
1,829,218
0
0
0
0
1,829,218
Total
1,829,218
0
0
0
0
1,829,218
PSHIA Terminal 3
Mod. West Atrium
AR66000036
1732
2020 Airport Rev. Bond
97,172
0
0
0
0
97,172
Total
97,172
0
0
0
0
97,172
PSHIA T-3 Mod. North
Concourse Bridge
AR66000037
1732
2020 Airport Rev. Bond
214,769
0
0
0
0
214,769
Total
214,769
0
0
0
0
214,769
26
2021-26 Public Art Program Budget
Project Name
Project
Fund
Fund Name
FY
21-22
FY
22-23
FY
23-24
FY
24-25
FY
25-26
Total
21-26
Public Works – 27th
Avenue Solid Waste
Management Facility
AR70160001 65909
Solid Waste - Mega IV
114,187
50,000
0
0
50,000
214,187
0037
Solid Waste- Disp. Oper.
0
30,182
0
0
0
30,182
68031
SWD Eq. Facilities Bond
0
0
60,000
60,000
120,000
Total
114,187
80,182
60,000
60000
0
364,369
Sueño Park Public Art
AR84850041 0051
Water Revenue
0
42,894
0
0
0
42,894
1734
2020B CIC Water Sustai
0
10,522
250,000
0
0
260,522
Total
0
53,416
250,000
0
0
303,416
Shade Project
AR67000011 2050
Transport Tax Transit
80,093
40,877
0
0
0
120,970
2051
Transport Tax Streets
125,203
0
0
0
0
125,203
Total
205,296
40,877
0
0
0
246,173
South Mountain Loop
202 Pedestrian Bridge
AR63850017 0007
AHUR 30% Streets Imp
60,487
0
0
0
0
60,487
Total
60,487
0
0
0
0
60,487
SR51 Artwork Retrofit
AR39000003 2051
Transport Tax Streets
39,057
0
0
0
0
39,057
Total
39,057
0
0
0
0
39,057
Surrey Park Public Art
AR84900014 1701
2018 CIC Wastewater
Bond
0
0
50,000 150,000
200,000
Total
0
0
50,000 150,000
0
200,000
Thomas Rd Overpass
AR63850020 0007
AHUR 30% Street Imp
46,981
0
0
0
0
46,981
2051
T2050 Streets
97,904
0
0
0
0
97,904
Total
144,885
0
0
0
0
144,885
Tres Rios Wetlands
AR84900010 1701
2018 CIC Wastewater
Bond
167,055
1,500,000
0
0
0
1,667,055
0090
Wastewater Revenue
0
254,605
0
0
0
254,605
Total
167,055
1,754,605
0
0
0
1,921,660
Water Public Art Master
Plan
AR84850013 1734
2020B CIC Water Sustai
20,000
20,000
20,000
20,000
20,000
100,000
Total
20,000
20,000
20,000
20,000
20,000
100,000
Water Services West
Yard
AR84850033 1701
Wastewater Bond 2019
117,142
819,247
0
0
0
936,389
0007
AHUR 30% Streets Imp
50,000
150,000
0
0
0
200,000
Total
167,142
969,247
0
0
0
1,136,389
TOTAL
6,039,065
3,860,724 1,560,588
542,768
482,768
12,485,913