PLZZ-25-0011 Silver Rock Major CMPA - CC Staff Report - PZ 7-7-26.docx

City of Buckeye — Regular Council Meeting (2026-07-07)

View PDF Meeting page

Extracted text (via pymupdf) 17707 characters
Case PLZZ-25-0011 Silver Rock Major CMP Amendment 
Page 1 of 8 
 
 MAJOR CMP AMENDMENT  
Report to the Mayor and City Council 
 
 
CASE NUMBER: 
PLZZ-25-0011 
TITLE: 
Silver Rock Major Community Master Plan (CMP) Amendment 
MEETING DATE: 
July 7, 2026 
 
Applicant: 
Rob Gubser, Colliers Engineering & Design  
Owner(s): 
UGK Farms Limited Partnership, B Bar G Farms LP, J Bar R Farms 
Limited Partnership, Triple G Farms LLC, KEMF WWG 1 LLC, KEMF 
SR West LLC, KEMF SR North LLC, and KEMF SR East LLC 
 
Request: 
Major Amendment to the 1,241-acre Silver Rock Community 
Master Plan (CMP), removing approximately 741 acres north of the 
RID Canal from the CMP to facilitate inclusion of those acres in the 
expanded Westpark Community Master Plan, while maintaining all 
previously approved land uses, densities, development standards 
and design requirements for the development of the remaining 
500 acres. 
District(s): 
1 
Location: 
Area generally bounded by Turner Road to the east, Palo Verde 
Road to the west, approximately, Lower Buckeye Road to the 
north, and Southern Avenue to the south (Exhibits A, B, and C)  
Site size: 
Approximately 1,241 acres 
 
Public input: 
An advertised neighborhood meeting was held on June 11, 2026; 
not including the applicant team, one owner within the Silver 
Rock CMP boundary attended the meeting and indicated support 
for the various Westpark-related requests on this agenda. All 
required notices of this public hearing have been completed. 
 
Recommendation: 
Conduct a public hearing and adopt an Ordinance approving the 
proposed Major CMP Amendment

Case PLZZ-25-0011 Silver Rock Major CMP Amendment 
Page 2 of 8 
 
PROJECT DESCRIPTION 
 
1. Rob Gubser, Colliers Engineering & Design, on behalf of multiple property owners, is 
requesting approval (Exhibit D) of a Major Community Master Plan Amendment (CMPA) 
to the Silver Rock Community Master Plan (CMP). The 1,241-acre CMP area is generally 
located east of Palo Verde Road, west of Turner Road, south of Lower Buckeye Road, and 
north of Southern Avenue (Exhibits A, B, and C). 
2. The Silver Rock CMP currently in effect was approved by City Council in 2005 and provides 
for development of a mixed-use master planned community consisting primarily of 
residential neighborhoods featuring up to 5,397 homes, parks, schools, public facilities, 
and supporting commercial and employment uses. Though portions of the CMP have 
changed ownership over time, the CMP remains largely undeveloped today. 
3. The proposed CMPA removes approximately 741 acres located north of the Roosevelt 
Irrigation District (RID) Canal from the Silver Rock CMP boundary, reducing the size of the 
CMP from approximately 1,241 acres to approximately 500 acres. The acreage proposed 
for removal is currently owned by multiple entities and is located north of the RID Canal 
and south of Lower Buckeye Road. 
4. The purpose of the request is to facilitate incorporation of the removed acreage into the 
expanded Westpark Community Master Plan (CMP), which is being considered 
concurrently through a related CMP Amendment request on this agenda. Consolidation 
of these properties into the Westpark CMP will allow them to be planned in conjunction 
with other employment-focused properties west of SR-85 under a single CMP framework. 
The approximately 500 acres remaining within the Silver Rock CMP will continue to be 
governed by the land use plan, development standards, and design requirements 
previously approved by City Council in 2005. The total number of residential units that 
would be permitted within the remaining Silver Rock CMP would be 2,187.  
5. Other than modifications necessary to remove the acreage north of the RID Canal from 
the CMP boundary, no substantive changes to the approved Silver Rock CMP are 
proposed. The CMPA revises the CMP narrative, exhibits, land use budget, and related 
graphics to reflect the reduced CMP boundary while preserving the previously approved 
land uses, densities, development standards, and design requirements applicable to the 
remaining 500 acres.

Case PLZZ-25-0011 Silver Rock Major CMP Amendment 
Page 3 of 8 
 
AREA CONTEXT: 
 
 
PUBLIC PARTICIPATION SUMMARY: 
 
6. A neighborhood meeting, providing an opportunity for interested parties to learn more 
about the request, was held on June 11, 2026 at 6:00 P.M. at the Watson Road Holiday 
Inn Express. As required by Buckeye Development Code, written notices to property 
owners within 500 feet of the subject site were mailed fifteen (15) days prior to the date 
of the meeting. The Westpark Homeowners Association, which owns common area tracts 
within the notification boundary, was included in the mailed notice area.  Other than the 
project applicant, one adjacent property owner attended the meeting and indicated no 
concerns with the various Westpark-related requests.  
 
LAND USE 
GENERAL PLAN 
ZONING 
Amendment 
Area 
Primarily active 
agricultural land with 
portions of 
unimproved desert 
Master Planned 
Community (MPC) 
Planned Community (PC) 
North  
Primarily unimproved 
desert 
Primarily Business 
Commerce east of 
Wilson Avenue and 
Airport Activity Center 
west of Wilson Avenue 
Multiple districts including 
General Commerce (GC), 
Planned Community (PC) with 
Westwind CMP Overlay, 
Commercial Cetner (CC), Rural 
Residential (RR) and Maricopa 
County Rural 43 (RU-43) 
East 
Active and inactive 
agricultural land and 
unimproved desert 
Primarily Master Planned 
Community 
Primarily Planned Community 
(PC) with Westpark CMP 
overlay 
South 
Primarily active 
agricultural land 
Employment east of 
Turner Road and 
Neighborhood and 
Master Planned 
Community (MPC) west 
of Turner Road 
Multiple districts including 
General Commerce (GC), Light 
Industrial (I-1), Planned 
Residential (PR), Planned 
Community (PC), and Maricopa 
County Rural 43 (RU-43) 
West  
Buckeye Municipal 
Airport, active and 
inactive agricultural 
lands, and , 
unimproved desert 
Primarily Airport Activity 
Center with Employment 
south of Broadway Road 
Primarily General Commerce 
(GC) and Maricopa County 
Rural 43 (RU-43)

Case PLZZ-25-0011 Silver Rock Major CMP Amendment 
Page 4 of 8 
 
7. The Planning and Zoning Commission was scheduled to conduct a public hearing and 
make a recommendation on this request at its June 23, 2026 meeting. Because that 
meeting occurred after the deadline for submittal of this staff report, staff will summarize 
the Commission's discussion, recommendation, and any public comment received during 
the public hearing as part of the July 7, 2026 City Council presentation. 
8. All required notifications of this public hearing were completed at least fifteen (15) days 
in advance of the meeting date, as follows:  
Notification Element 
Date 
Published in the Arizona Business Gazette 
Republic Edition 
June 6, 2026 
Site Posted 
June 5, 2026 
Mailing Notice to Property Owners Within 500 
Feet of Site 
June 3, 2026 
 
BACKGROUND: 
 
9. The Silver Rock Community Master Plan (CMP) was approved in 2005 through adoption 
of Ordinance 13-05. The 1,241-acre CMP established a master planned community 
consisting primarily of single-family residential neighborhoods, parks, schools, public 
facilities, and supporting commercial and employment uses. The approved CMP provided 
for development of up to 5,397 dwelling units. 
10. In June 2022, the City Council unanimously approved a Major General Plan Amendment 
redesignating more than 2,600 acres within the State Route 85 corridor to Employment. 
This amendment established a new vision for the corridor as Buckeye’s primary light 
industrial employment center. While the amendment did not directly modify the Silver 
Rock CMP, it increased the viability of non-residential development on lands west of SR-
85. 
11. In December 2022, the City Council adopted Ordinance 35-22 approving a Major 
Amendment to the Westpark Community Master Plan. The amendment incorporated 
approximately 79 acres west of SR-85 into the Westpark CMP boundary and modified land 
uses, development standards, and design requirements for approximately 530.7 
undeveloped acres within the western portion of Westpark with a focus on light industrial 
development. This amendment represented the first significant transition of a CMP west 
of SR-85 from a predominantly residential vision toward an employment-focused 
development pattern.

Case PLZZ-25-0011 Silver Rock Major CMP Amendment 
Page 5 of 8 
 
12. Since approval of the 2022 General Plan Amendment and Westpark CMP Amendment, 
the City’s long-term vision for lands west of SR-85 has continued to evolve toward 
employment-generating development.  
13. The Planning and Zoning Commission was scheduled to conduct a public hearing and 
make a recommendation on this request at its June 23, 2026 meeting. Because that 
meeting occurred after the deadline for submittal of this staff report, staff will summarize 
the Commission's discussion, recommendation, and any public comment received during 
the public hearing as part of the July 7, 2026 City Council presentation. 
 
ANALYSIS: 
14. The proposed CMPA does not modify the land use plan, permitted uses, residential 
densities, development standards, or design requirements applicable to the 
approximately 500 acres that will remain within the Silver Rock CMP. Rather, the 
amendment primarily consists of revisions necessary to remove approximately 741 acres 
north of the RID Canal from the CMP boundary and to update related exhibits, tables, and 
graphics to reflect the reduced planning area. 
15. The original Silver Rock CMP authorized development of up to 5,397 dwelling units across 
the 1,241-acre master plan area; as a result of the proposed reduction in CMP acreage, 
the maximum number of dwelling units permitted within the remaining Silver Rock CMP 
would be proportionately reduced to 2,187 dwelling units, resulting in no increase in 
residential density or dwelling unit entitlements. 
16. The acreage proposed for removal from the Silver Rock CMP is intended to be 
incorporated into the expanded Westpark Community Master Plan through a concurrent 
CMP Amendment request. Staff finds that planning these properties under a single CMP 
framework is appropriate given their proximity to one another, shared relationship to the 
State Route 85 corridor, and anticipated role in accommodating future employment-
generating development. Consolidation of these properties within the Westpark CMP will 
facilitate coordinated planning and implementation of infrastructure, circulation, land 
use, and design standards for the broader area west of SR-85. 
17. The proposed amendment is also consistent with the City's long-term planning efforts for 
the land between State Route 85 and the Buckeye Municipal Airport. Since approval of 
the 2022 Employment General Plan Amendment and subsequent Westpark CMP 
Amendment, the City has increasingly focused on creating opportunities for employment-
generating commercial, business park, and light industrial development west of SR-85. 
Removal of these properties from the Silver Rock CMP supports that vision while allowing 
the remaining Silver Rock acreage to continue developing in accordance with the 
residentially oriented land use framework approved by City Council in 2005.

Case PLZZ-25-0011 Silver Rock Major CMP Amendment 
Page 6 of 8 
 
18. Staff finds that the proposed amendment represents a logical adjustment to CMP 
boundaries that better reflects current ownership patterns, planning objectives, and 
anticipated development trends in the area. Because the amendment does not modify 
the approved development framework applicable to the remaining 500 acres of Silver 
Rock, staff does not anticipate any adverse impacts to future development opportunities 
within the retained CMP area. 
RECOMMENDATION: 
19. Staff recommends the City Council conduct a public hearing and adopt an Ordinance 
approving the proposed Silver Rock Major CMP Amendment, Application PLZZ-25-0011, 
subject to conditions (a) through (j), for the reasons outlined within the analysis section 
of this staff report.  
General 
a) Unless specifically addressed within the Community Master Plan, all City of Buckeye 
laws and regulations shall apply. 
Planning 
b) Development of the property shall be in general conformance to the project narrative 
entitled “SilverRock Community Master Plan Amendment”, consisting of 112 pages, 
dated May 11, 2026, and stamped received on May 11, 2026, except as modified by 
these conditions of approval.   
c) The Property Owner/s and their successor waive any and all claims for diminution in 
value of the property with regard to any action taken by City of Buckeye as result of 
the CMP approval.  
d) Unless expressly modified by these stipulations, all conditions of approval established 
by Ordinance 13-05 (2005 Silver Rock CMP approval) shall remain in full force and 
effect. 
Engineering 
e) Prior to any development within the remaining portion of Silver Rock, the CMP, 
Master Plans & Reports, and accompanying exhibits shall be amended in accordance 
with current City Engineering Design Standards. Said CMP Amendment shall be 
considered a Minor Amendment.  
Transportation 
f) Prior to approval of any site plan, pre-plat or planning entitlement project, a 
MASTER Traffic Impact Analysis is required to be submitted and approved.  All 
requirements of the Traffic Impact Analysis shall be reflected on the approved 
construction drawings. This MASTER TIA should also analyze the proposed initial 
phase of development in addition to the entire development at full build out. Each

Case PLZZ-25-0011 Silver Rock Major CMP Amendment 
Page 7 of 8 
 
subsequent proposed phase will be required to provide an update to the MASTER 
TIA that supports the phase being proposed. 
g) Roadway alignments must match the City Council adopted Transportation Master 
Plan. Any variations that are proposed may require additional analysis or additional 
City approval.  
h) Prior to the release of any civil permit, the Property Owner/Developer shall pay a 
pro rata share cost of up to nine (9) regional future traffic signals to be installed 
within this section of land.  The pro rata share is based on a ratio of the project 
acreage to the developable acreage within the section. The sectional contribution is 
to be based on the following allocation of costs: (i) 25 percent share of four (4) 
possible signals at arterial street intersections; (ii) 50 percent share of four (4) 
possible signals at half-mile collector street intersections or project entries; and (iii) 
100 percent share of one (1) possible signal internal to this project.  The cost shall be 
based on an anticipated signal cost as determined by the City. 
i) All non-regional traffic signals that are required by this project shall be funded and 
constructed by this project prior to C of O. 
j) All regional traffic signals required by this project shall be constructed by this project 
prior to C of O. This may have a reimbursable component from the regional signal 
fees collected by the City from other parcels per City Engineer approval.  
k) All medians required for controlling site access (RI/RO, ¾ (RI/RO/LI)) shall be 
constructed with this development. 
l) In the event that access to and within the project is deemed a threat to public safety 
and security by the City, the City has broad authority to take such action as it deems 
necessary to address such a threat until such time as the Property Owner/Developer 
eliminates the safety concerns to the City’s satisfaction.  The Property 
Owner/Developer is responsible for revising the roadway and access layout to 
alleviate the City’s concerns with respect to public safety and security.  Any such 
changes will be considered a minor change to existing site plan approvals and shall 
be approved by the City. 
m) ITS conduits (2 7-way micro-ducts) must be installed along all major arterial, arterial, 
major collector and collector streets (as needed) per City standards, including any 
necessary splice boxes.  
n) Driveway spacing and storage requirements shall be per Table 1 of the COB 
Engineering Design Standards (EDS) Section 6-3. 
o) All major intersections will require right turn slip lanes and dual left turn lanes per 
City Detail 63300. 
p) Roadway classifications and cross sections will need to be verified with the TIA and 
may need to be updated to current standards.  
q) On major local or local streets with a running length longer than 1200', traffic 
mitigation must be shown on the plat. Traffic calming mitigation can include

Case PLZZ-25-0011 Silver Rock Major CMP Amendment 
Page 8 of 8 
 
elements such as chicanes and footballs and must be implemented with initial 
design. These traffic mitigation strategies may require no parking signs in areas 
where the traffic mitigation elements make on street parking unsafe or unfeasible. 
Additional ROW to ensure these mitigations are feasible may be required.  
r) 4-legged intersections will require 2 way stop signs at a minimum and all way stops 
at major intersections as determined by the City at time of pre-plat submittal. 
s) 3-legged intersections that have higher traffic volumes and non-typical traffic 
patterns are required to have a minimum of a 2 way stop.  
ATTACHMENTS: 
 Exhibit A – Aerial Vicinity Map 
 Exhibit B – Zoning Vicinity Map 
 Exhibit C – General Plan Land Use Map 
 Exhibit D – Silver Rock CMP Amendment Narrative 
 Exhibit E – Citizen Participation Report 
Prepared By: 
Ken Galica, Planning Manager 
 
Reviewed By: 