Copper Falls Project Narrative
2025 Major Community Master
Plan Amendment
Parcel 1
Miller Road and Southern
Bowman Project No.
050965-01-001
City of Buckeye Case No.
PLZZ-23-00011
Melcor Developments Arizona, Inc.
Bowman
6751 North Sunset Blvd
Suite 325
Glendale, AZ 85305
623.299.8980 | bowman.com
December 29, 2025
3R PLZZ-23-00001 RECEIVED DEC 30 2025 MW
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 1
PROJECT TEAM
Developer/Owner
Melcor Developments Arizona, Inc.
6930 E. Chauncey Lane, Suite 135
Phoenix, Arizona 85054
Contact: Graeme Melton
Regional Manager
t. (403) 818-6344
e. gmelton@melcor.ca
Project Planner
Bowman
6751 N. Sunset Boulevard
Glendale, Arizona 85305
Contact: Dawn Marie Fortuna, AICP
Principal Planner
t. (480) 772-7271
e. dfortuna@bowman.com
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 2
Overview
As the community desires change, landowners work to develop their properties to meet those demands and
support Buckeye’s vision. Melcor has long been committed to Buckeye with their holdings in Algodon and Miller
60. As markets change, Melcor requests flexibility from the City to allow a permitted use change within the Copper
Falls Community Master Plan (CMP). This step requires a Major CMP Amendment to allow multifamily as a
permitted use within the Commercial land use designation of Parcel 1.
While the proposed CMP Amendment includes the overall Copper Falls CMP, Parcel 1 comprises the subject
request. The overall Copper Falls CMP lies within the City of Buckeye jurisdictional limits, as shown in Figure 1
below.
Figure 1
Regional Location Map
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 3
Existing and Proposed Community Master Plan History
2005 Approved Community Master Plan (CMP)
The 275-acre Copper Falls Community Master Plan (CMP) was approved on October 18, 2005, by the Buckeye City
Council. The CMP Land Use Plan consisted of two Commercial parcels and one Medical/Office parcel totaling 46
net acres, as well as six Single-Family Residential development parcels totaling 229 acres and supporting 857
residential lots.
The CMP was planned with several goals in mind. Among those are providing a blend of single-family residential
neighborhoods that support a mix of lots sizes and well-planned open space and providing commercial and
potential employment development opportunities for the development and immediate region. The CMP land use
plan from 2005 is reflected below.
CMP Land Use Plan (2005)
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 4
2018 Approved Community Master Plan Amendment (CMPA)
In 2018, the TGV Investments LLC development team proposed a CMPA to modify approximately 176.5 acres of
the overall 275-acre approved CMP. Within the 2005 CMP approval, this 176.5-acre area included four residential
development parcels. The Revised CMPA was modified to reflect three residential parcels and one elementary
school parcel and superseded the 2005 CMP. As reflected below in CMP Land Use Plan (2018).
CMP Amendment Land Use Plan (2018)
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 5
2023 Approved Community Master Plan Amendment (CMPA)
In 2023 (approved 2024), the IndiCap Inc. development team proposed a CMPA to modify approximately 72.29
acres of the overall 275-acre approved CMP and denoted it as Copper Falls III. Within the 2005 CMP approval, this
176.5-acre area included four residential development parcels. The Revised CMPA was modified to allow for the
development of a combination of multi-family residential (including areas restricted to single story), commercial
and open space. The 2023 Amendment Area currently consists of Parcels 6-9, and the proposed Conceptual Land
Use Plan includes an additional parcel: Parcel 10 for commercial uses. Parcels 6 and 7 are designated MF, Single
Story; Parcel 8 is designated as MF, Two Story; Parcel 9 is designated as MF, Multi-Story; and Parcel 10 is
designated Commercial. As reflected below in CMP Land Use Plan (2023).
Copper Falls III CMP Amendment Land Use Plan (2023)
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 6
2025 Proposed Community Master Plan Amendment – Subject Request
This proposed Amendment is presented by Melcor and solely encompasses a change of allowed uses for the Parcel
of interest, Parcel 1 (±19.48 gross acres, ±17.09 net acres). The CMPA, once approved, will allow for multifamily
as a development option on Parcel 1 under its current Commercial land use within Copper Falls. Currently, the CC
obsolete zoning district allows for multiple family dwellings, which mirrors the adjacent commercial zoning on all
remaining corners of Miller Road and Southern Ave. With the proposed CMPA, Parcel 1 will therefore provide
development options conforming with existing adjacent commercial zoning.
Site and Surrounding Area
The subject parcel is located on the northwest corner of Miller Road and Southern Avenue within the Copper Falls
CMP and City of Buckeye jurisdictional limits. Known as Parcel 1, the site is further identified by Maricopa County
Assessor Parcel Number (APN) 504-40-011D within Section 30, Township 1 North, Range 3 West of the Gila and
Salt River Base and Meridian, Maricopa County, Arizona.
The site is bounded on the east by Miller Road and on the south by Southern Avenue and is currently an
agricultural farm. Refer to Table 1 below for the list of existing land uses surrounding the subject property.
Table 1 – Existing Surrounding Land Uses of Parcel 1
Direction
Existing Zoning
Existing Land Use
General Plan Land Use Designation
North
Planned Community (PC)
with CMP Overlay
Single Family Residential
(Copper Falls)
Master Planned Community
East
Planned Residential (PR)
and Commercial Center
(CC)
Single Family Residential
(Miller Manor), and
Commercial (Vacant)
Neighborhood
South
Commercial Center (CC)
Commercial (Vacant)
Neighborhood
West
Planned Community (PC)
with CMP Overlay
Single Family Residential
(Copper Falls), Vacant
Master Planned Community
Description of Request
This CMPA proposes an additional permitted land use within the Commercial designation for Parcel 1 within
Copper Falls to allow multifamily residential. Parcel 1 will remain within the existing CMP with an underlying
Commercial land use but will better complement the area with the added permitted multifamily use. With this
option, the subject parcel can serve as a density buffer for the adjacent single-family homes within Copper Falls.
Allowing multifamily as an opportunity for future development of Parcel 1 provides flexibility depending on what
the ultimate development demand is when the property is in the site planning phase. The adjacent commercial
zoning (CC) reflected by Table 1 presents the possibilities of residential development and allowing Parcel 1 to have
that consideration will emulate existing conditions. Development standards for the proposed added multifamily
use are provided in Table 3.
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 7
Land Use Table
An updated Land Use Summary (See Table 2 below) has been provided with the CMP Amendment. Parcel 1
represents the Amendment Area.
Table 2: Land Use Summary
Parcel
Ownership
Land Use
Acres
(Gross)
Units
(Range)
Density
(Range)
2
Forestar USA Real Estate Group Inc
SF - Residential
83.27
250-416
3-5
3
Pulte Home Company LLC
SF - Residential
58.47
175-292
3-5
4A
Buckeye Elementary School District
Educational
8.95
NA
NA
4B
Buckeye Elementary School District
Open Space
7.56
NA
NA
5
Pulte Home Company LLC
SF - Residential
18.26
55-91
3-5
6
Copper Falls Buckeye 72 Acres LLC
MF - Residential
9.28
92
10
7
Copper Falls Buckeye 72 Acres LLC
MF - Residential
13.90
139
10
8
Copper Falls Buckeye 72 Acres LLC
MF - Residential
18.47
277
15
9
Copper Falls Buckeye 72 Acres LLC
MF - Residential
14.79
369
25
10
Copper Falls Buckeye 72 Acres LLC
Commercial
16.48
NA
NA
2025 - CMP Amendment Area
1
Melcor Developments Arizona Inc
Commercial (with
MF as added
Permitted Use) *
±19.48
292-468
15-24
*Note: Development standards for multifamily development can be found in Table 3.
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 8
Development Standards
The guidelines below mirror those of a development zoned MF-2 to best represent a multifamily development.
Table 3 below will provide clarity on standards. All regulations not covered within this CMPA will follow the most
current version of the Buckeye Municipal Code.
Table 3: Development Standards
Development Standards
Commercial Option
Multifamily Option
Maximum Density
N/A
No max
Minimum Building Separation
N/A
10’
Minimum Front Setback
20’
20’
Minimum Side Setback *
0’/20’ **
20’***
Minimum Rear Setback
20’
20’***
Site Perimeter (Street-Side)
Landscaping
15’
15’
Minimum Driveway Aisle
N/A
24’
Maximum Building Height
45’, not including 8’ parapet
45’, not including 8’ parapet ***
Maximum Building Coverage
50%
95%
Open Space % (of gross area)
10%
10%
Park Space % (of gross area)
No Minimum
5%
*: 0’ side setback (attached commercial, commercial condo, etc.) allowed between similar uses, i.e., commercial
adjacent to commercial.
**: Separate building pads for commercial uses adjacent to residential uses require a 20’ side setback.
***: Separate building pads for multifamily uses adjacent to residential uses require the following building
setbacks based on height:
Adjacent to single family residential***
Distance from property line (20’ Min.) Maximum Height
20-29’
25’
30-39’
35’
40’+
45’
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 9
Land Uses
CMP Amendment Commercial Permitted Uses
Two commercial parcels within Copper Falls total over 43 gross acres. The sites are located along a central corridor
for ease of access. The two parcels are designated to serve individuals within the CMP, surrounding residences,
and office areas, whether developed with a commercial or residential use. Surrounding commercial properties at
the Miller Road and Southern Avenue intersection complement this parcel, and the added permitted use (Item x
in Table 4) will mirror development possibilities for this area.
Table 4: Permitted Uses
Permitted Uses
a. Commercial, retail, and service establishments
b. Retail sales, showroom, and office
c. Professional, business, and administrative offices
d. Personal service businesses including, but not limited to, beauty and barber shops, laundry, and
dry-cleaning establishments
e. Restaurants and restaurants with bars
f. Drive through businesses including, such as but not limited to, fast food restaurants, banks, dry
cleaning, and pharmacies
g. Banking and financial services
h. Childcare facilities
i. Libraries
j. Educational Uses
k. Copying and printing businesses
l. Medical offices and clinical laboratories
m. Veterinary offices and clinical laboratories
n. Convenience uses including drive-in uses
o. Gas/Service stations, including automobile repair and/or convenience stores;
p. Grocery stores
q. Health clubs, including but not limited to, aerobics/dance/gymnastics and martial arts studios
r. Sales/leasing offices and association
s. Cellular communications facilities with a Conditional Use Permit
t. Religious facilities
u. Entertainment uses including museums, theaters, cinemas, auditoriums, and places of public
assembly, excluding adult theaters and adult live entertainment
v. Mini storage
w. Other appropriate uses as approved by the Community Development Director
on a case-by-case basis
x. Multiple family dwelling
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 10
Land Use Master Plan
The Non-Amendment land use areas of Copper Falls will remain a mix of residential and nonresidential land use
parcels incorporating the 2018 and 2023 amendments. Please refer to Proposed CMP Amendment Land Use Plan
(2025) below reflecting the revised unit and density range for a multifamily land use option on Parcel 1 only.
Proposed CMP Amendment Land Use Plan (2025)
Ownership for Parcels 6-10 changed from the 2023 CMP Amendment and is reflected in the Land Use Plan above.
Public Utilities and Services
Water and Wastewater
Given the residential developments within and surrounding Copper Falls, the allowance of a multifamily housing
option will not put excess strain on existing infrastructure, alter acceptable land use patterns, nor affect the
existing character of the area. The proposed change to allow multifamily development on Parcel 1 does not pose
a threat to the existing plans for the area and instead presents an exciting opportunity for the developer, existing
community, and the potential residents it will serve.
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 11
While a proposed multifamily residential use would require more water and sewer capacity demands than a
commercial site would, as shown with the comparison demand calculations below, the impacts to the surrounding
infrastructure would be minimal. The project is a part of the Phase 3 water demands and sewer Outfall #1 South,
as detailed in the Preliminary Master Water and Wastewater Reports for Copper Falls CMP, prepared by Wood
Patel in 2018.
Based on Table 3 of Section 3-1 of the Buckeye Engineering Design Standards, required fire flow for commercial
developments is 3,000 gallons per minute, whereas the required fire flow for high-density residential
developments is 2,000 gallons per minute. Because of this, the change from commercial to high-density residential
will not have negative impacts on the existing infrastructure in Miller Road and Southern Avenue. Based on the
2017 City of Buckeye Integrated Water Master Plan, the existing 15-inch sewer in Miller Road has adequate
capacity to receive additional flows from this project.
Water and sewer service is provided by City of Buckeye. To take a conservative approach, the numbers calculated
in the table below are based on 24 du/acre, representing a highest-case scenario for water demands and
wastewater flows. Actual demands, flows, and infrastructure capacities will need to be computed and evaluated
during the site planning phase of any future developments. If it is determined during the site planning phase that
additional capacity cannot be supported, developers will need to address that at that time.
Water and wastewater demand calculations for the 2018 CMP and 2025 CMP Amendment are included in the
Appendix for further reference as well.
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 12
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 13
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 14
Copper Falls CMP Amendment Sewer Pipe Capacity
Location
Peak Flow
Diameter
Min. Slope
Manning’s
n
Normal
Depth
d/D
(gpd)
(gpd)
(%)
(in)
Connection to
Southern Ave
Sewer
252,720
8.0
0.40
0.013
4.1
0.51
Southern Ave
Connection to Ex.
Miller Sewer
504,944
10.0
0.24
0.013
6.3
0.63
Fire Protection
The site will be serviced with fire protection from the City of Buckeye. Fire Station 706 is located at 25821 W.
Magnolia Street, Buckeye, AZ 85326 approximately 3 miles northwest of the site.
Police Protection
The site will be serviced with police protection from the City of Buckeye. The nearest police station is located at
100 N Apache Road, Suite D, Buckeye, AZ 85326 approximately 2.3 miles southeast of Parcel 1.
Maintenance & Streetlight Improvement District
The amended area is still within the Copper Falls Community Master Plan Maintenance Improvement District
(MID) and Streetlight Improvement District (SLID) and will conform as needed to these stipulations.
Traffic
Traffic mitigation measures will be considered using a Traffic Impact Analysis to provide proper access points on
the arterial roadways (Miller and Southern) and any warranted traffic signals. Environmental resources will be
maintained or preserved if needed, while the provision of open spaces on-site will promote active lifestyles.
City of Buckeye Development Code
The proposed amendment area will comply with the City of Buckeye Development Code. The CMP Amendment
has been prepared with reliance on and under consideration of the current Buckeye Development Code (last
amended November 20, 2025).
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 15
Conformance with City of Buckeye General Plan
With the need to provide adequate housing options within the City’s boundaries, developers’ ability to foster
quality and livable residences is a necessity in the City’s vision. This proposed CMPA supports Buckeye’s ambition
by allowing developers to implement innovative housing opportunities that align with Buckeye’s goals of
administering a sustainable and functional residential community.
Demand for housing in the state continues to increase, with a November 2022 study from the ASU Morrison
Institute for Public Policy reflecting a 270,000-housing unit shortage. Buckeye is a prospering city and attractive
opportunities for employment and livability will continue to drive the demand for housing in the city. The
provision of multifamily as an option for Parcel 1 provides an effective transition from the single-family
residences in the Copper Falls community to potential commercial uses on the NEC of Miller Road and Southern
Road. The following section demonstrates that the additional permitted use for multifamily aligns with Buckeye’s
need for housing and overall development guidelines. Providing Parcel 1 with this discretion contains mutual
benefits for the developer, City, and its residents.
a) Goal G-1
a. To guide a pattern of land use that provides opportunities for diverse, active lifestyles, and
excellent quality of life.
By creating an innovative housing option that complements the existing single family housing
stock in the area, the provision of high-quality and amenities/open spaces will foster better lives
for the residents within it.
b. Policy G-1.1
i. Development within the Neighborhood land use designation should provide opportunities for inte
grated community uses that support and complement the area, such as schools,
places of worship, preserved open spaces like parks, public safety facilities, and suportive neighbo
rhood commercial and high-density residential uses at appropriate intensities and locations.
The proposed permitted use change and addition will allow the parcel to provide the
necessary open space requirements while providing higher density housing options.
b) Goal G-2
a. Residential development is considerate of existing adjacent residential development.
With the proposed multifamily residential product, there is an opportunity to provide a needed
transition between the single family in the Copper Falls Community Master Plan and the
commercial areas adjacent to the site.
b. Policy G-2.2
i. Multifamily development should provide enhanced architectural and / or site design
features and provide appropriate buffers and/or setbacks when adjacent to existing
single‐family residential uses.
The proposed product will feature intentional design features with high quality amenities
and housing for potential residents. The appropriate setbacks and landscape buffers will
be provided according to the Development Code.
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 16
c) Goal G-7
a. Buckeye has a strong employment base providing a range of job opportunities with competitive
salaries.
The continued attractiveness of Buckeye as a hub for economic activity and job growth will
warrant the need for increased housing supply as the population living and working in the City
expands.
d) Goal G-17
a. Buckeye has a diverse stock of housing types, styles, and options for all incomes.
The provision of high-quality multi-family housing can assist the City in reaching its goal to
diversify the housing available in Buckeye while also accommodating a variety of incomes.
Allowing multifamily housing on this parcel will provide the possibility to develop increased
affordable residential product in Buckeye.
e) Goal G-19
a. Buckeye has attractive, high quality, and healthy neighborhoods.
This proposed permitted use, and the adjacent residential developments can cohesively function
to provide diverse housing opportunities that mirror the General Plan’s goals for thriving
neighborhoods with character.
Conclusion
Melcor is a committed partner in the City of
Buckeye and looks forward to moving this
development forward with an option for
multifamily development in the future. We are
respectfully asking for support and approval of
the Major Community Master Plan Amendment
request proposed in this narrative.
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 17
APPENDIX
UPDATED CMP EXHIBITS
Land Use Master Plan
CMPA EXHIBITS
Legal Description
Copper Falls 2018 CMP & 2025 CMPA Water and Sewer Calculations
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 18
LAND USE MASTER PLAN
intended merely to assist in exploring how the project might be developed. Signage
shown is for illustrative purposes only and does not necessarily reflect municipal
code compliance. All colors shown are for representative purposes only. Refer to
material samples for actual color verification.
PAGE
4
25111 BROADWAY RD
BUCKEYE, AZ - PHX22-0088-00
06.05.2023
EXHIBIT 5 -
LAND USE MASTER PLAN
Parcel
Ownership
Use
Acres
Unit Range
(EST)
Density Range
(EST)
1
MELCOR DEVELOPMENTS ARIZONA INC
Commercial
19.48
2
Forestar USA Real Estate Group Inc
Residential
83.27
250 to 416
3 to 5
3
Pulte Homes Company LLC
Residential
58.47
175 to 292
3 to 5
4A
Buckeye Elementary School District
Education
8.95
NA
NA
4B
Buckeye Elementary School District
Open Space
7.56
NA
NA
5
Pulte Homes Company LLC
Residential
18.26
55 to 91
3 to 5
6
Residential (MF - Single
Story)
9.28
92
10
7
Residential (MF - Single
Story)
13.9
139
10
8
Residential
(MF - Two Story)
18.47
277
15
9
Residential
(MF - Multi Story)
14.79
369
25
10
Commercial
16.48
NA
NA
This conceptual design is based upon a preliminary review of entitlement requirements
and on unverified and possibly incomplete site and/or building information, and is
2023 COMMUNITY MASTER PLAN - EXHIBIT 5 - LAND USE MASTER PLAN
APPROVED
SUBJECT TO CONDITIONS
Buckeye City Council
June 18, 2024
292 to 468
15 to 24
Copper Falls Buckeye 72 Acres LLC
Copper Falls Buckeye 72 Acres LLC
Copper Falls Buckeye 72 Acres LLC
Copper Falls Buckeye 72 Acres LLC
Copper Falls Buckeye 72 Acres LLC
2019
2023
2025 CMP AMENDMENT AREA
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 19
LEGAL DESCRIPTION
PAGE 1 OF 1
Bowman • 1600 N Desert Drive, Suite 210 • Tempe, Arizona 85288 • P: 480.629.8830
January 16, 2023
Project # 050965-01-406
LEGAL DESCRIPTION
THAT PORTION OF THE SOUTHEAST QUARTER OF SECTION 30, TOWNSHIP 1 NORTH, RANGE 3 WEST, OF
THE GILA AND SALT RIVER BASE AND MERIDIAN, MARICOPA COUNTY, ARIZONA, DESCRIBED AS
FOLLOWS:
BEGINNING AT THE SOUTHEAST CORNER OF SAID SECTION 30, FROM WHICH POINT THE EAST QUARTER
CORNER OF SAID SECTION 30 BEARS NORTH 00°38’11” EAST, A DISTANCE OF 2618.75 FEET;
THENCE SOUTH 88°41’26” WEST, ALONG THE SOUTH LINE OF SAID SOUTHEAST QUARTER, A DISTANCE
OF 849.34 FEET;
THENCE DEPARTING SAID SOUTH LINE, NORTH 00°37’21” EAST, A DISTANCE OF 834.53 FEET;
THENCE NORTH 44°39’05” EAST, A DISTANCE OF 266.22 FEET;
THENCE NORTH 88°41’11” EAST, A DISTANCE OF 599.42 FEET;
THENCE SOUTH 89°21’49” EAST, A DISTANCE OF 65.00 FEET TO THE EAST LINE OF SAID SOUTHEAST
QUARTER;
THENCE SOUTH 00°38’11” WEST, ALONG SAID EAST LINE, A DISTANCE OF 1017.54 FEET TO THE POINT
OF BEGINNING.
CONTAINING 848,518 SQ.FT. OR 19.4793 ACRES, MORE OR LESS.
2025 Major CMP Amendment
Copper Falls Project Narrative
NWC Miller Rd & Southern Ave
December 29, 2025
Page | 20
2018 CMP & 2025 CMPA WATER AND SEWER DEMAND
CALCULATIONS
Phase 1
Low and Medium Density Residential (Parcel 2)
2408
83.27
200,514
360,925
601,542
School (Parcels 4A and 4B)
2600
16.51
42,926
77,267
128,778
Phase 1 Total
.243 MGD
.438 MGD
.73 MGD
Phase 2
Low and Medium Density Residential (Parcels 3 & 5)
2408
76.73
184,766
332,579
554,298
Phase 2 Total
.185 MGD
.333 MGD
.554 MGD
Phase 3
-
Commercial (Parcel 1)
2000
17.09
34,180
61,524
102,540
Low and Medium Density Residential (Parcels 6 & 7)
2408
50.81
122,350
220,231
367,051
Commercial/Office (Parcels 8 & 9)
2000
29.41
58,820
105,876
176,460
Phase 3 Total
.215 MGD
.388 MGD
.646 MGD
Grand Total
.644 MGD
1.158 MGD
1.931 MGD
*These values are based on the preliminary planning numbers from the 2025 Buckeye Engineering Standards Manual: Chapter 3 and the acreage per the land use table.
Water Demand Calculations
Copper Falls 2018 CMP
Project No. 050965
Land Use
Demand
(GPD/ac)
Area (ac)
Average Day
demand (gpd)
Maximum Day
Demand 1.8 x
ADD
Peak Day
Demand 3.0 x
ADD
Phase 1
Low and Medium Density Residential (Parcel 2)
2408
-
83.27
-
200,514
360,925
601,542
School (Parcels 4A and 4B)
2600
-
16.51
-
42,926
77,267
128,778
Phase 1 Total
.243 MGD
.438 MGD
.73 MGD
Phase 2
Low and Medium Density Residential (Parcels 3 & 5)
2408
-
76.73
-
184,766
332,579
554,298
Phase 2 Total
.185 MGD
.333 MGD
.554 MGD
Phase 3
High Density Residential (Parcel 1)**
-
235
17.09
468
135,685
244,233
407,055
Low and Medium Density Residential (Parcels 6 & 7)
2408
-
50.81
-
122,350
220,231
367,051
Commercial/Office (Parcels 8 & 9)
2000
-
29.41
-
58,820
105,876
176,460
Phase 3 Total
.317 MGD
.57 MGD
.951 MGD
Grand Total
.745 MGD
1.341 MGD
2.235 MGD
** The High Density Residential is assuming 10% Turf Open Space (4,325 gpd/ac) and 60% Developed Open Space/Public Right-of-Way (1,786 gpd/ac) for Landscaping Water Demand
*These values are based on the preliminary planning numbers from the 2025 Buckeye Engineering Standards Manual: Chapter 3 and the acreage per the land use table
Water Demand Calculations
Copper Falls 2025 CMP
Project No. 050965
Land Use
Demand
(GPD/ac)
Units
Average Day
demand (gpd)
Maximum
Day Demand
1.8 x ADD
Peak Day
Demand 3.0 x
ADD
Demand
(GPD/unit)
Area (ac)
Outfall 1
Low and Medium Density Residential (Portion of Parcel 2)
1536
41.05
63,056
4
252,224
Commercial (Parcel 1)
1500
17.09
25,635
4
102,540
Outfall 1 Total
88,691
4
354,764
Outfall 2
Low and Medium Density Residential (Portion of Parcel 2)
1536
42.22
64,847
4
259,387
Outfall 2 Total
64,847
4
259,387
Outfall 3
Low and Medium Density Residential (Parcel 5)
1536
18.26
28,047
4
112,189
Low and Medium Density Residential (Portion of Parcel 3)
1536
17.54
26,943
4
107,772
School (Parcels 4A & 4B)
1820
16.51
30,048
4
120,193
Outfall 3 Total
85,039
4
340,154
Outfall 4
Low and Medium Density Residential (Portion of Parcel 3)
1536
40.93
62,867
4
251,468
Outfall 4 Total
62,867
4
251,468
Outfall 5
Low and Medium Density Residential (Parcels 6 & 7)
1536
50.81
78,044
4
312,177
Office (Parcel 9)
1500
5.47
8,205
4
32,820
Outfall 5 Total
86,249
4
344,997
Outfall 6
Commercial (Parcel 8)
1500
23.94
35,910
4
143,640
Outfall 6 Total
35,910
4
143,640
Grand Total
423,602
4
1,694,409
*These values are base.d on the preliminary planning numbers from the 2025 Buckeye Engineering Standards Manual: Chapter 4 and the acreage per the land use table
Sewer Demand Calculations
Copper Falls CMP 2018
Project No. 050965
Land Use
Demand
(GPD/ac)
Area (ac)
Average Day
demand (gpd)
Peaking
Factor
Peak Day
Demand 4.0 x
ADD
Outfall 1
Low and Medium Density Residential (Portion of Parcel 2)
1536
-
41.05
-
63,056
4
252,224
High Density Residential (Parcel 1)
-
135
468
63,180
4
252,720
Outfall 1 Total
126,236
4
504,944
Outfall 2
Low and Medium Density Residential (Portion of Parcel 2)
1536
-
42.22
-
64,847
4
259,387
Outfall 2 Total
64,847
4
259,387
Outfall 3
Low and Medium Density Residential (Parcel 5)
1536
-
18.26
-
28,047
4
112,189
Low and Medium Density Residential (Portion of Parcel 3)
1536
-
17.54
-
26,943
4
107,772
School (Parcels 4A & 4B)
1820
-
16.51
-
30,048
4
120,193
Outfall 3 Total
85,039
4
340,154
Outfall 4
Low and Medium Density Residential (Portion of Parcel 3)
1536
-
40.93
-
62,867
4
251,468
Outfall 4 Total
62,867
4
251,468
Outfall 5
Low and Medium Density Residential (Parcels 6 & 7)
1536
-
50.81
-
78,044
4
312,177
Office (Parcel 9)
1500
-
5.47
-
8,205
4
32,820
Outfall 5 Total
86,249
4
344,997
Outfall 6
Commercial (Parcel 8)
1500
-
23.94
-
35,910
4
143,640
Outfall 6 Total
35,910
4
143,640
Grand Total
461,147
4
1,844,589
*These values are based on the preliminary planning numbers from the 2025 Buckeye Engineering Standards Manual: Chapter 4 and the acreage per the land use table
Sewer Demand Calculations
Copper Falls CMP 2025
Project No. 050965
Land Use
Demand
(GPD/ac)
Units
Average Day
demand (gpd)
Peaking
Factor
Peak Day
Demand 4.0 x
ADD
Area (ac)
Demand
(GPD/unit)