Exhibit D - Proposed Westpark CMPA Narrative.pdf

City of Buckeye — Planning & Zoning Commission (2026-06-23)

View PDF Meeting page

Extracted text (via pymupdf) 198402 characters
5R PLZZ-25-0010 RECEIVED JUN 4 2026 WD
Exhibit D

Colliers Engineering & Design 
 
 
Developer: 
Garrett Development Corporation 
Tyler Garrett 
6900 East Camelback Road, Suite 240 
Scottsdale, Arizona 85251 
Owners: 
KEMF SR East LLC; KEMF SR North LLC; KEMF SR West LLC; KEMF Westwind East LLC; KEMF Westwind 
North LLC; KEMF Westwind SH LLC; KEMF Westwind West LLC; KEMF WP 2.3 LLC; KEMF WP 3 East 
LLC, KEMF WP 3 West LLC, KEMF WP COMMERCIAL LLC, KEMF WWG 1, LLC 
Nancy Ball, Vice President 
PO Box 10392  
Phoenix, AZ 85064  
 
GDC OZ, LLC 
Jeff Garrett, Manager 
6900 East Camelback Road, Suite 240 
Scottsdale, Arizona 85251 
 
Triple G Farms 
Kenneth Gingg 
29115 West Broadway Road 
Buckeye, AZ 85326 
Planning & Engineering: 
Colliers Engineering & Design 
Rob Gubser, AICP 
Zach Hilgart, PE  
4742 N 24th Street, Suite 270 
Phoenix, AZ 85016 
Traffic: 
United Civil Group 
Keith Winney, PE 
2803 N. 7th Avenue  
Phoenix, AZ 85007 
 
**Concurrent Application Submittals include an Amendment to the SilverRock Community 
Master Plan, a General Plan Amendment, Abandonment and Annexation Application. 
Development Team

Colliers Engineering & Design 
 
 
 
 
A. 
Project Introduction and History ....................................................................................... 1 
B. 
Executive Summary ............................................................................................................. 3 
C. 
Current Site Conditions ...................................................................................................... 5 
D. Development Plan ............................................................................................................... 6 
Land Uses ........................................................................................................................................ 8 
Open Space, Pathways and Trails, and Parks ............................................................................... 9 
Access and Circulation .................................................................................................................. 10 
Schools ........................................................................................................................................... 11 
Public Facilities .............................................................................................................................. 11 
Phasing ........................................................................................................................................... 12 
E. Land Uses and Zoning Districts ........................................................................................... 13 
Residential Zoning Districts .......................................................................................................... 15 
Non-Residential Zoning Districts ................................................................................................. 20 
F. Development Standards....................................................................................................... 25 
Residential Use Standards (MDR, MDR Overlay & HDR) ............................................................ 25 
Non-Residential Standards (IND, BP, RC & CC) ........................................................................... 29 
G. Project Infrastructure ........................................................................................................... 34 
Master Drainage Plan ................................................................................................................... 34 
Water Master Plan ........................................................................................................................ 35 
Wastewater Master Plan .............................................................................................................. 36 
Traffic Impact Analysis .................................................................................................................. 36 
 
 
 
 
 
Table of Contents

Colliers Engineering & Design 
 
Tables 
TABLE 1 
PARKS REQUIRED AND PROVIDED 
TABLE 2 
LAND USE TABLE 
TABLE 3 
PERMITTED RESIDENTIAL DISTRICTS 
TABLE 4 
MDR DIMENSIONAL STANDARDS 
TABLE 4a 
MDR OVERLAY DIMENSIONAL STANDARDS 
TABLE 5 
HDR DIMENSIONAL STANDARDS 
TABLE 6 
PERMITTED NON-RESIDENTIAL DISTRICTS 
TABLE 7 
BUSINESS PARK DIMENSIONAL STANDARDS 
TABLE 8 
INDUSTRIAL DIMENSIONAL STANDARDS 
Figures 
FIGURE 1 
AERIAL VICINITY MAP  
FIGURE 2 
EXISTING CMP  
FIGURE 3 
EXISTING AND PROPOSED GENERAL PLAN DESIGNATION  
FIGURE 4 
EXISTING ZONING  
FIGURE 5 
COMMUNITY MASTER PLAN 
FIGURE 5A 
COMMUNITY MASTER PLAN WITH APS SUBSTATION 
FIGURE 6A 
STREET & CIRCULATION PLAN  
FIGURE 6B 
STREET CROSS-SECTIONS  
FIGURE 6C 
STREET CROSS-SECTIONS  
FIGURE 7 
PARKS & OPEN SPACE PLAN 
FIGURE 8 
POCKET PARK CONCEPTS 
FIGURE 9 
LANDSCAPING REPRESENTATIVE EXAMPLES 
Appendices 
APPENDIX A 
CITY OF BUCKEYE TABLE OF ALLOWED USES 
APPENDIX B 
INDUSTRIAL BUILDING ELEVATION EXAMPLES 
APPENDIX C 
LEGAL DESCRIPTION AND EXHIBIT 
APPENDIX D 
DRAINAGE MASTER PLAN 
APPENDIX E 
WATER MASTER PLAN  
APPENDIX F 
WASTEWATER MASTER PLAN  
APPENDIX G 
OWNERSHIP EXHIBIT 
APPENDIX H 
DEVELOPMENT AGREEMENT EXHIBIT 
APPENDIX I 
ECONOMIC & FISCAL IMPACT ANALYSIS’ WESTPARK COMMUNITY MASTER PLAN 
APPENDIX J 
TRAFFIC IMPACT ANALYSIS  
APPENDIX K 
ACKNOWLEDGEMENT AND CONSENT REGARDING SILVERROCK CMP

1 
 
 
         WESTPARK CMP  
A. 
Project Introduction and History 
The Westpark 2026 Community Master Plan Amendment (“2026 CMPA”) shall (i) expand the 
boundaries of and (ii) amend portions of the existing Westpark CMP approvals. The original 
Westpark CMP was approved in 2000 as a 1,060-acre Community Master Plan (CMP). The 
CMP was approved for a mix of land uses including single-family detached and multifamily 
residential, schools, park/open spaces, a community park, and community/regional services. 
A Minor CMP Amendment was administratively approved in 2008 for Phases 3, 4, and a 
portion of Phase 2 offering a commercial/residential overlay and permit a higher density 
residential product. With this amendment the overall unit count was increased to 3,470 
dwelling units (3,906 units when applying the commercial residential overlay options). A 
second Amendment to the CMP was approved in 2022 with modifications including the 
incorporation of an industrial overlay west of SR-85, adding an additional 79-acre industrial 
property into the Westpark CMP, also introducing optional active adult uses.  
Phase 1 of the original Westpark CMP is fully constructed and includes an elementary school, 
parks and 1086 single family residential homes. Portions of Phase 2.1 have been constructed 
and are currently under construction. Phase 2.1 includes existing detached single family 
rental homes and has been platted to include approximately 475 lots. Phase 2.2 includes 847 
planned units, 446 of which are currently under construction while the remaining 401 within 
Parcels 25, 26 and 27 are not platted. Parcels within Phase 2.2 Parcel 25, 26 and 27 (also 
known as Parcels 5, 6 and 18N within the preliminary plat) are included with this 2026 CMPA 
and are discussed in detailed later herein and are assigned new Parcel numbers with this 
CMPA. 
The original Westwind CMP was approved in 2005 and included 807-acres of residential, 
commercial and public facilities. No amendments have occurred with this CMP, and the land 
uses have not been revised since the original 2005 approved CMP.  This 2026 CMPA proposes 
to dissolve the Westwind CMP and incorporate 807-acres of land within the Westwind CMP 
into the Westpark CMP. 
The original SilverRock CMP was approved in 2004 and included approximately 1240-acres 
of residential, commercial and public facilities, including a wastewater treatment facility. The 
2026 CMPA proposes to incorporate the 782-acres north of the RID canal in the SilverRock 
CMP into the Westpark CMP. The 2026 CMPA will also add two additional properties totaling 
approximately 130-acres into the Westpark CMP. These properties include a 50-acre 
property located west of the West Connector Rd (also known as 269th Avenue) and south of 
Lower Buckeye Road and an approximately 80-acre property located at the northern 
boundary of the Westwind CMP east of the Wilson Road alignment.  
Except for changes to Parcels 25, 26 and 27, the 2026 CMPA does not include changes to 
Westpark Phases 1, 2.1, and 2.2.  Further, these three phases are used in Westpark’s open 
space area totals for single-family residential park requirements.

2 
 
 
         WESTPARK CMP  
In summary, the 2026 CMPA for Westpark is a 2,000-acre community master plan (also 
known as “Community”, “Development” or “Project”) located north of the RID canal and south 
of Interstate 10 between Palo Verde to the west and Rooks Road to the east. See Figure 1, 
Aerial Vicinity Map for a detailed boundary of the overall Development. This 2026 CMPA 
proposes to incorporate portions of the existing Westpark CMP, portions of the SilverRock 
CMP, the Westwind CMP and two additional contiguous parcels into one cohesive Project 
known as Westpark. A variety of uses within the boundaries of the Community will ensure 
that the Westpark CMP will be a destination point for employment and shopping as well as 
a beautiful residential community offering a variety of housing options.  
 
 
 
 
CMP 2026

3 
 
 
         WESTPARK CMP  
B. 
Executive Summary 
This proposed 2026 CMPA will address changing market trends and the evolution of the area 
that was once anticipated for large residential master-planned communities. The CMPA 
introduces flexibility in development of residential, commercial, business and industrial uses 
within the Westpark development area. Buckeye is poised to be a major economic 
destination and regional entry point for businesses, jobs and housing options. With ease of 
access and proximity to Interstate 10 and Buckeye Municipal Airport, an amendment to the 
Westpark CMP that addresses current and future needs of the City all under one cohesive 
plan is vital. Following the approval of the 2022 Westpark CMP amendment, this area has 
seen the introduction of the Burlington 2 million square foot industrial development utilizing 
one of the CMP’s industrial overlays at the southwest corner of 269th Avenue and Warner 
Street.  
In 2025, after working with the landowner and City staff for over two years, APS acquired a 
120 acre parcel south of the southwest corner of Lower Buckeye and Turner Roads. This 
acquisition by APS and subsequent construction, will accommodate a 500KV substation, a 
230KV substation, a 69KV substation, and a 12KV substation (“APS Substation”). The ultimate 
design of the APS Substation show that it will be served by 7 overhead 500KV power lines 
and 11 overhead 230KV power lines (“Transmission Lines”).   The Transmission Lines have 
the capacity to bring 16 gigawatts of power to the APS Substation.  Power from the APS 
Substations will be distributed throughout Buckeye by 11 overhead 69KV lines while the 
immediate area surrounding the APS Substation will be distributed by underground power 
lines from the 12KV substation (“Distribution Lines”). 
The APS Substation, Transmission Lines and Distribution Lines (collectively, “TS35”) is a 
critical piece of infrastructure in APS’s portfolio that will cost well over $1 billion.  TS35 gives 
the City and the landowner a strategic advantage to accommodate large power users such 
as data centers, technology manufacturers, and power intensive logistics users.  TS35 
combined with the Westpark landowner that has over 2,000 acres surrounding TS35, 
provides a rare opportunity to develop a flexible entitlement CMP that takes full advantage 
of these combined assets.  Few cities are afforded such an opportunity.    
Two economic and fiscal studies were completed by Elliot Pollack for the portion of Westpark 
running from SR85 to Palo Verde Road and is included in the Appendices of this report. The 
studies detail the creation of between 23,000 and 30,000 new jobs and additional tax 
revenue of $613.9 million to $823 million dollars to the City of Buckeye.  This 2026 CMPA will 
eliminate antiquated entitlements and provide the City with a cohesive Development within 
a prime economic and employment corridor adjacent to the City’s airport. The proposed 
CMPA does not directly impact any of the already developed portions of Westpark and 
retains the current permitted uses and development standards within those sections.

4 
 
 
         WESTPARK CMP  
This 2026 CMPA proposes to revise and expand the Westpark development in the following 
ways: 
1. Allow a diversity of employment generating land uses, primarily industrial and business 
park, to meet current and future market demands and to take advantage of the APS TS35 
infrastructure investment.  
2. Create an overall cohesive CMP document, per the revised CMP zoning district, that will 
direct development for remaining undeveloped parcels, while maintaining existing 
approved development rights and agreements created with past approvals. 
3. Provide High Density Residential (HDR) to allow for multi-family development near 
employment and commercial uses not to exceed 30 du/ac and 991 units, as well as 
incorporating attached and detached residential at a lower density.  
4. Revise three parcels (approved previously as Parcels 25, 26 and 27 and now Parcels 23, 
24 and 25) within Phase 2.2 of the original Westpark CMP from LDR to MDR to permit 
flexibility in development allowing either a standard single family detached platted 
development or permit single family detached rental development on a single parcel with 
public or private roadways. Note: These are known as Parcels 5, 6, and 18N in the vested 
2006 Phase 2 Preliminary Plat. 
5. Dissolve the Westwind CMP and incorporate all of the former CMP property into the 
Westpark CMP (excluding the APS Substation site.)  
6. Incorporate the property north of the RID canal within the existing SilverRock CMP into 
the Westpark CMP. Please note, an amendment to SilverRock CMP removing the property 
north of the RID canal within the boundary of the SilverRock CMP has been submitted 
under separate application. 
7. Incorporate the 50-acre GDC OZ LLC property into the Westpark CMP. Please note, a 
Minor General Plan Amendment and Annexation is under a separate application. 
8. Incorporate the 80-acre Sonoran Heights property into the Westpark CMP. 
9. Extend the Industrial and Community Commercial Zoning with MDR overlay to the 
centerline of the Warner Street Bridge ROW centerline. Please note, an abandonment of 
the planned Warner Street Bridge MC-85 crossing is under separate application. 
10. Revise and straighten the alignment of Lower Buckeye Road from Palo Verde Road to 
Turner Road. 
11. Revise and straighten the alignment of Warner Street from Turner to the West Connector 
Road (269th Avenue). 
12. Remove the alignment of Warner Street between Turner Road and Palo Verde Road to 
create a larger contiguous development parcel. 
13. An accompanying General Plan Amendment, Abandonment, and Annexation are a part 
of separate submittals.

5 
 
 
         WESTPARK CMP  
C. 
Current Site Conditions 
The Project and surrounding General Plan land use designations, zoning districts, and land 
uses are outlined in the table below.  General Plan uses and zoning districts are shown in 
Figure 3, Existing and Proposed General Plan Designation and Figure 4, Existing Zoning.   
 
Location 
General Plan 2040 
Zoning 
Current Use 
Site 
Master Planned 
Community, 
Business Commerce 
Planned Community, 
Light Industrial,  
R1-43 (pending Annexation 
approval) 
Vacant, agriculture 
pre-platted vacant 
subdivision, 
water campus 
North 
Neighborhood, 
Business Commerce 
Rural-43 (Maricopa County) 
General Commerce, 
Community Center 
Large lot residential and 
vacant desert 
East 
Master Planned 
Community 
Planned Community, 
General Commerce 
Single Family residential, 
agriculture 
South 
Employment, 
Neighborhood 
Planned Residential, 
Light Industrial,  
General Commerce 
Rural-43 (Maricopa County) 
Residential multi-family 
Future 2M SF Burlington  
Development 
Future APS TS35 
Vacant 
Agricultural 
West 
Master Planned 
Community, 
Neighborhood 
Planned Community 
Vacant and Agricultural, 
Buckeye Municipal Airport

6 
 
 
         WESTPARK CMP  
D. 
Development Plan 
Pursuant to the 2026 CMPA, Westpark is a proposed residential, commercial and industrial 
development that will provide nearby employment, recreation and service opportunities.  
The following provides additional details of elements proposed with the 2026 CMPA. 
1. Revise PODs 1 and 2 as approved with the 2022 Westpark CMP Amendment (2022 CMPA), 
which are identified as Parcels 18 and 19 in the 2026 CMPA, from LDR and MDR 
respectively to HDR to allow multi-family developments not to exceed 30 du/ac as well as 
densities as low as 6 du/ac. The HDR would permit R1-1, MF-1 and MF-2 residential 
developments and will adhere to the development standards within the Buckeye 
Development Code or as otherwise modified by this CMP. 
2. Revise 2022 CMPA Parcels 5, 6 and 18N (identified as parcels 23, 24 and 25 in this CMP) 
from LDR to MDR, without any increase in previously approved density, to permit 
flexibility in development allowing either a standard single family detached platted 
development or permit a single family detached rental development. These parcels are 
already planned for single family residential development. The 2026 CMPA will allow for 
these parcels to be developed with a detached single-family development on a single-
family lot with a minimum lot size of 45’ x 115’ or on leased premises of similar size 
dimensions all while retaining the same street network and infrastructure required by 
the City. Meaning while these parcels would accommodate “for rent residences” the 
parcels will be developed similarly to any for-sale single family subdivision in the City of 
Buckeye and there would be no visual difference to anyone driving through the 
community. Under MDR, Developer may record a plat at any time, after obtaining City 
approvals, to subdivide the parcels into single family lots. Platted and maximum unit 
counts and densities are provided in Table 2 of this 2026 CMPA. Local residential streets 
can be developed as either public or private roadways within these parcels. These parcels 
may be developed under the R1-3 or R1-6 permitted housing types as defined by the 
Buckeye Development Code or as otherwise modified by this 2026 CMPA. 
3. Incorporate properties within the existing boundaries of the Westwind CMP (identified 
generally as parcel 3, a portion of parcels 4-6, and parcels 7 & 8) in this CMP) into the 
Westpark CMP and revise land uses to Industrial, Regional Commercial, and Business 
Park (this excludes land within the boundary of the future APS substation).  Parcels will 
be developed per the Buckeye Development Code unless otherwise modified by this 
2026 CMPA. 
4. Incorporate properties north of the RID canal within the SilverRock CMP (identified as a 
portion of parcel 5 and 6, and parcel 9 in this CMP) into the Westpark CMP and revise 
land uses to Industrial. Parcels will be developed per the Buckeye Development Code 
unless otherwise modified by this CMP. Please see Appendix K for Acknowledgement 
and Consent Regarding Silver Rock CMP document. A separate amendment to the

7 
 
 
         WESTPARK CMP  
SilverRock CMP has been submitted to the City of Buckeye, to allow the remainder of the 
SilverRock CMP to maintain existing zoning and entitlements, independent of this CMPA. 
5. Incorporate the 50-acre GDC OZ LLC property (included as parcel 11 in this CMP) into the 
Westpark CMP and revise land uses to Industrial, supporting potential large scale 
industrial developments. This property may be developed as I-1   Development will follow 
the Buckeye Development Code unless otherwise modified by this CMP. An annexation 
application for the 50-acre GDC OZ LLC property has been submitted to the City of 
Buckeye.  An annexation and a general plan amendment for the 50-acre area has also 
been submitted to the City of Buckeye. 
6. Incorporate the 80-acre Sonoran Heights property (identified as Parcels 1 and 2 in this 
CMP) into the Westpark CMP and revise land uses to Business Park and Commercial uses. 
These parcels and uses may be developed as Business Park (BP) and Regional 
Commercial (RC) within the Buckeye Development Code unless otherwise modified by 
this CMP. A General Plan Amendment has been submitted to the City of Buckeye. 
7. Extend the adjacent zoning to the centerline of the current Warner Street Bridge ROW 
centerline (assumed center line of the Warner Street Bridge alignment is identified as the 
parcel boundaries of parcel 14 and 15 and parcels 16 and 17 within this CMP). The Warner 
Street Bridge is no longer necessary, and as such an abandonment of the Warner Street 
Bridge ROW has been recently approved by City Council under a separate application. 
The removal of the planned ROW and the extension of the zoning to the centerline of the 
Warner Street alignment will allow development of the fully zoned parcels. 
8. Revise and straighten the alignment of Lower Buckeye Road from Palo Verde Road to 
Turner Road matching the existing improvement plan alignment. See attached letter 
showing that City engineering and adjacent property owners support this action. 
9. Revise and straighten the alignment of Warner Street from Turner Road to West 
Connector Road. 
10. Remove the alignment of Warner Street west of Turner Road and Palo Verde Road to 
create a secure, private, and larger contiguous parcel for potential end user. 
Refer to Figure 5, Community Master Plan for proposed land uses.

8 
 
 
         WESTPARK CMP  
Land Uses  
Residential land uses proposed with this 2026 CMPA include MDR, and existing MDR Overlay 
(Parcels 16 & 17 only), and HDR. MDR and MDR Overlay land uses may include single-family 
homes, two–family homes (duplexes), townhomes, zero-lot-line homes, court homes, and 
other similar product types. Refer to Table 3: Permitted Residential Districts for permitted 
MDR and MDR Overlay districts. As approved in the 2022 CMPA, the MDR Overlay in Parcels 
16 & 17 may also be developed as MF-1. MDR identified as Parcels 23, 24, and 25, may be 
developed as either a single-family subdivision or via a map of dedication under one 
ownership to allow for construction of an attached or detached single family residential 
rental development. Development within the MDR or MDR Overlay will not exceed densities, 
and maximum unit counts as shown on Table 2, Land Use Table.  
HDR land uses, for the areas east of SR85, may include multifamily residential products such 
as apartments and condominiums not to exceed 30 du/ac and 991 units. HDR development 
will provide housing variety and enhance workforce mobility to employment created by 
industrial and Business Park developments in the area, and in turn will also act as a buffer 
between the high intensity SR85 transportation corridor to the east and the single-family 
master planned community to the east.  Also, included within the HDR are two-family homes, 
townhomes, cottages, cluster type housing, providing the potential for diversification and 
options of housing product. Refer to Table 3: Permitted Residential Districts for permitted 
HDR districts and Figure 5, Community Master Plan for proposed and existing land uses. 
The areas between Palo Verde to the west, Turner to the east, the RID canal to the south 
(excluding the APS Substation property) and extending north of Lower Buckeye Road by 
approximately ½ mile are proposed primarily as Industrial development. The ultimate 
development of this area may be one large Industrial Mega-Site or broken up into smaller 
individual parcels, depending on market needs. An area adjacent to the frontage of Palo 
Verde Road is established for Business Park development for a depth of 660 feet from back 
of right-of-way which is coupled with a 12.5 acre Regional Commercial parcel at the 
southwest corner of Palo Verde and Lower Buckeye. A mix of approximately 76 acres of 
Regional Commercial and Business Park uses have been ideally situated east of Wilson Road 
and just south of I-10 along the northern boundary of Westpark.  
Two economic and fiscal studies were completed by Elliot Pollack for the portion of Westpark 
running from SR85 to Palo Verde Road and is included in the Appendices of this report. The 
studies detail the creation of between 23,000 and 30,000 new jobs and additional tax 
revenue of $613.9 million to $823 million dollars to the City of Buckeye.  See Appendix I for 
the Economic & Fiscal Impact Analysis for the Westpark Community Master Plan. Refer 
to Figure 5, Community Master Plan for land use locations.

9 
 
 
         WESTPARK CMP  
Open Space, Pathways and Trails, and Parks 
A series of interconnected pathways and trails were approved within Westpark and 
subsequent Westpark amendments. Recreation areas and open spaces within Westpark 
residential districts form a hierarchy of parks, pathways, trails, and open spaces, including 
pocket parks, a 25-acre Community Park, and appropriate connectivity between open 
spaces.  Since the number of anticipated single-family housing units within all of the original 
Westpark falls within the 3,000-4,999 range, a 25-acre Community Park has been provided 
per City requirements. The details outlining the development of the Community Park can be 
found in the 2022 CMPA and related Development Agreement. 
Pocket parks in the proposed MDR parcels 23, 24 and 25 will be provided as previously 
approved in the 2022 CMPA. No additional park space is proposed within these parcels.   See 
Figure 7, Parks & Open Space Plan for existing approved park and trail and pathway 
locations.  
Westpark will meet the landscape and open space requirements per Section 5.4.3 of the 
Buckeye Development Code and the City of Buckeye’s Parks and Recreation Master Plan 
(PRMP). Table 1: Parks Required and Provided for specific park requirements and park 
areas previously provided within Westpark.  
HDR, and multi-family residential developments which are being incorporated into this CMP, 
will provide open space and landscaping per Section 5.4.3 of the Buckeye Development 
Code. As these are multi-family developments, landscaping and open space will be calculated 
individually and separately from Westpark park requirements. Parks as shown on Table 1: 
Parks Required and Provided, will be provided only for Parcels developed with single-family 
residential uses. Pocket Parks will not be provided for parcels that are developed with non-
residential uses. Pocket parks will be owned and maintained by the respective Homeowner’s 
Associations (HOA). Conceptual Pocket Park amenities and plant types are depicted on 
Figure 8, Pocket Park Concepts.  
Refer to Figure 7, Parks & Open Space Plan for locations of proposed trails and paths. Due 
to the location of the APS substation, associated power easements, with 29 major overhead 
power lines and extensive heavy truck traffic combined with high employee traffic occurring 
in 3 shifts per day throughout, the Westpark Industrial area is not well suited for any regional 
trails. However, the City Staff has shared that the 2025 Buckeye Parks and Recreation Master 
Plan show a secondary path running east/west between 269th Ave and Palo Verde Rd north 
of the RID canal (“RID Trail”) and additional secondary paths running north/south along Turner 
Road and Palo Verde Road alignments (“ROW Trails”). A secondary path is shown along 
Turner Road for the north/south length of the Project. As it relates to the RID Trail, the 
Primary Trails cross section as identified in the Buckeye Parks and Recreation Master Plan 
will be constructed along the canal as each adjacent property develops. The above trail 
networks combined with the sidewalks and multiuse trails provide excellent pedestrian 
connectivity throughout the industrial park and the region.

10 
 
 
         WESTPARK CMP  
TABLE 1: PARKS REQUIRED AND PROVIDED 
 
 
Access and Circulation 
A hierarchy of streets will provide vehicular and pedestrian connectivity throughout and to 
the adjacent transportation network.  Westpark Loop Road continues its unique design with 
its wide, detached, sidewalks on both sides of the vehicular travel lanes; providing safe and 
enjoyable passage for pedestrians, hikers, and bikers.  The local streets will conform to the 
City of Buckeye local street details, and remaining streets will be proposed as shown in 
Figure 6A, Street & Circulation Plan and Figures 6B/6C Street Cross Sections. 
Modifications to the street sections in this CMP as approved by City Traffic Engineer and City 
Engineer can be completed without the need for an amendment to this CMP. Under no 
circumstance shall the street cross sections, medians, street lighting, theming and 
landscaping requirements be greater than what is required by the City’s current design 
standards.   
The Westpark circulation plan has been developed using a hierarchy of streets.  The streets 
will typically be public streets, but collector and local streets may be developed as private 
2025 CMP 
Parcels (1)
2000 & 
2022 CMP 
Residential 
Parcel/Pod
Community 
Park (3)
(ac)
Neigh. 
Park (3)
(ac)
Pocket 
Parks (3)
(ac)
Total Area (3)
(ac)
Total 
Percent
(%)
16
Pod 9
CC (MDR Overlay)
17.4
0.5
0.5
17
Pod 8
CC (MDR Overlay)
27.8
0.5
0.5
18
Pod 1
HDR(4)
16.9
19
Pod 2
HDR(4)
16.1
22
Pod 5
COMMUNITY PARK
-
25.1
25.1
23
18
MDR
32.6
0.5
0.5
24
5
MDR
44.5
0.5
0.5
25
6
MDR
22.2
0.5
0.5
99.3
5.0
25.1
1.5
26.6
27%
144.4
7.2
25.1
2.5
27.6
19%
-
-
Phase 1 Total(5)
290.9
14.5
9.5
9.5
3%
-
-
Phase 2.1 Total(5)
115.5
5.8
1.5
1.5
1%
-
-
Phase 2.2 Total(5)
209.9
10.5
3.0
3.0
1%
616.3
30.8
0.0
14.0
14.0
2%
715.6
35.8
25.1
15.5
40.6
6%
760.7
38.0
25.1
16.5
41.6
5%
(1) 2026 Parcels are depicted in Figure 5, Community Master Plan. As the Project develops, areas may be divided into smaller parcels.
Park Area 
Required at 
5%  (4)(ac)
Residential 
Gross Area (2) (4) 
(ac)
Land Use Category
Park Area Provided
PARCEL
Total without SF Residential Overlays
Total with SF Residential Overlays
Westpark Total without SF Residential Overlays
Westpark Total with SF Residential Overlays
Not a Part of 2025 CMP Amendment
(2) Acreages are approximate.  Subtotals and totals may not exactly add up due to rounding.
(3) Parks will be provided only for Pods, or portions of Pods, developed with residential uses.  Parks will not be provided for Pods that are developed with non-
residential. uses.
(4) HDR Parcels shown on Figure 5, Community Master Plan will provide open space an common areas as required in the City of Buckeye Development 
Code and are not included in the Park Area required.
(5) Phases 1, 2.1, & 2.2 are not a part of this amendment. They are provided for reference only and show park area for the overall Westpark development. 
Calculations are from the City of Buckeye General Plan for Phase 1 and projects for Phases 2.1 & 2.2.

11 
 
 
         WESTPARK CMP  
streets as deemed appropriate by the developer. Private or public streets may be used within 
any MDR parcel. Private streets may be utilized internally in industrial developments for 
safety and security. Private streets will be maintained by an owner or owner’s association. 
Private streets and utilities must be designed to minimum City standards for any future 
conversation of any private street to a public street. 
Gated communities and single-family rental communities are permitted in Westpark 
provided they meet the following provisions: 
a) An alternative private street section may be considered, subject to the review and 
approval of the City of Buckeye. 
b) Water, sewer, public utility, refuse collection, and emergency vehicle easements 
shall be granted over all private streets, subject to the review and approval of the 
City of Buckeye.   
c) Gates shall be automated and include emergency access per the City of Buckeye 
Fire Department requirements. 
Schools 
Westpark resides in two different elementary school districts.  The area east of SR 85 is within 
the Buckeye Elementary School District. Westpark Elementary was constructed in Phase 1.  
As previously noted, the school was initially planned for Phase 2 but moved to Phase 1 to 
meet the needs of the school district.   
The area west of SR 85 is within the Palo Verde Elementary School District. This area is largely 
planned for industrial and employment uses with only a few HDR or HDR overlay parcels. 
This area is not anticipated to trigger the need for a school site.  
The entire Project is located within the Buckeye Union High School District and no high school 
is planned within Westpark. Skyview is the nearest public charter high school and is 
approximately 1.5 miles southeast of the Project.  Youngker is the nearest public high school 
and is approximately 1.5 miles east of the Project at 3000 South Apache Road. 
The CMPA from primarily residential master planned communities to an industrial focused 
master plan is not anticipated to have negative impacts to the respective school districts.   
Public Facilities 
A water campus adjacent to the Community Park is under design and completion will be 
dictated by water needs.  Water and the water campus is further discussed in Appendix E, 
Water Master Plan. An existing temporary fire station is located in Phase 1. A permanent 
fire station site and a Community Park are also included in the eastern section of Westpark 
on Warner Street between the east Connector Road and Westpark Loop Road. As previously 
mentioned, the fire station site, community park, and water campus site will be dedicated to 
the City.

12 
 
 
         WESTPARK CMP  
As noted previously, APS will be constructing a 500KV substation, a 230KV substation, a 69KV 
substation, and a 12KV substation (“APS Substation”) south of the southwest corner of Lower 
Buckey Road and Turner Road. Power to and from the APS Substations will be transmitted 
and distributed throughout the site by 7 overhead 500KV power lines, 11 overhead 230KV 
power lines, and 11 overhead 69KV lines while the immediate area surrounding the APS 
Substations will be distributed by underground power lines from the 12KV substation. 
Phasing 
As with any large CMP, market economics will have a significant impact on the overall phasing 
of the Project. The developer may phase Westpark as deemed appropriate, as long as each 
phase is properly engineered with adequate utilities and streets to serve each phase.  
Ultimate utility phasing, as discussed in each utility master plan, will be determined with each 
site plan and/or preliminary plat submittal. Master planning for engineering will be provided 
to ensure well-planned and coordinated development.  
It should be noted that while in the initial planning and processing of this CMPA, the 
Burlington site is now under development and APS purchased their 120-acre site. New 
development and the establishment of critical electrical and transportation related 
infrastructure is rapidly changing the dynamic of this area of Westpark.

13 
 
 
         WESTPARK CMP  
E. Land Uses and Zoning Districts 
Land Uses proposed with this CMP include Medium Density Residential (MDR), High Density 
Residential (HDR), Regional Commercial (RC), Industrial (I), Business Park (BP), Community 
Commercial (CC) and MDR overlay.  
The most recent Westpark CMP Amendment completed in 2022 permitted 2,377 single 
family dwelling units within Phases 1, 2.1 and 2.2. It is anticipated that the three parcels 
included with this CMP that are part of phase 2.2, (identified as parcels 23, 24 and 25 in this 
CMP) will include a maximum of 401 dwelling units, maintaining the permitted number of 
units. This maximum number of units can be obtained through a traditional subdivision plat 
or through a map of dedication allowing multiple units per parcel for the development of a 
single-family attached or detached rental development with a minor subdivision plat 
containing public rights of way, community parks and tracts and leased premises as all 
detailed in the 2006 vested preliminary plats for these parcels. Refer to Table 2: Land Use 
Table and Table 3: Permitted Residential Districts for the maximum number of dwelling 
units allowed within each Parcel including MDR, MDR Overlay, and HDR. The target density 
in a residential Parcel can be achieved by using a combination of lot sizes and housing types. 
For the MDR parcels a developer or home builder can elect to provide larger lots or, where 
appropriate, smaller lots with more open space.  
HDR parcels 18 and 19 are anticipated to reach 30.0 dwelling units per acre (du/ac). Refer to 
Table 2: Land Use Table and Table 3: Permitted Residential Districts for proposed land 
uses, maximum units and maximum density as represented on Figure 5, Community 
Master Plan. 
Other uses included in this CMP, Regional Commercial (RC), Industrial (I), Business Park (BP), 
Public Facilities, Community Park, and Community Commercial (CC) and related 
development standards are detailed in the next section. Table 2: Land Use Table and Table 
6: Permitted Non-Residential Districts for proposed districts as represented on Figure 5, 
Community Master Plan. 
As the Project develops, Parcels may be further subdivided for development as long as the 
development standards in this PAD are adhered to.

14 
 
 
         WESTPARK CMP  
TABLE 2: LAND USE TABLE 
 
 
 
 
Parcel
2000 & 
2022 CMP 
Parcels
Primary
Overlay
Gross 
Area(2)
(Acres)
Gross 
Area 
Overlay
Maximum 
Density (5)
Max Units 
Allowed Per 
Parcel (3) (4)
1
-
RC
-
50.0
-
-
-
2
-
BP
-
38.3
-
-
-
3
-
RC
-
20.0
-
-
-
4
-
BP
-
208.3
-
-
-
5
-
BP (6)
-
75.0
-
-
-
6
-
IND
(BP OPTIONAL OVERLAY)
-
550.6
132.9
-
-
6a
-
RC
-
12.6
7
-
IND
-
158.8
-
-
-
8
-
IND
-
54.7
-
-
-
9
-
IND
-
350.7
-
-
-
10
Pod 14
IND
-
79.2
-
-
-
11
-
IND
-
49.4
-
-
-
12
Pods 6 & 7
IND
-
48.3
-
-
-
13
Pod 13
IND
-
30.8
-
-
-
14
Pod 10
IND
-
27.6
-
-
-
15
Pod 11
IND
-
29.6
-
-
-
16
Pod 9
CC
MDR
17.5
17.5
15.0
263
17
Pod 8
CC
MDR
27.8
27.8
15.0
416
18
Pod 1
HDR
-
16.9
-
30.0
508
19
Pod 2
HDR
-
16.1
-
30.0
483
20
Pod 3
Fire Station
-
2.0
-
-
-
21
Pod 4
Water Campus
-
9.1
-
-
-
22
Pod 5
Community Park
-
25.1
-
-
-
23
5
MDR
-
32.6
-
5.0
164
24
6
MDR
-
44.5
-
4.7
153
25
18
MDR
-
22.2
-
2.6
84
TOTAL
1997.6
178.2
1.0
2,071
(6) In addition to BP uses and additional uses as identified under Westpark Business Park , Parcel 5 may be developed with a maximum 1.2 million 
square foot use with cross-docks. 
(5) Target Density, Target Units and Maximum Units Allowed Per Parcel for Parcels 10 through 25 are consistent with the approved  2000 CMP and 
2022 CMP Amendment.
(1) Parcels are depicted in Figure 5, Community Master Plan.  As the Project develops, Parcels may be subdivided for development.
(2) Acreages are approximate and are based on a measurement to the centerline of collector and arterial roads. An exception to this is the ROW 
surrounding the Community Park and ROW south of Parcel 21.  Subtotals and totals may not add up due to rounding.
(3) Total dwelling units for MDR Overlay within Parcels 16 & 17 are calculated assuming the Parcel is developed as residential.
(4) Total single family residential units allowed within 2022 Westpark CMP including all phases without overlay zoning was 2,752. With residential 
overlays 3,906 single family units were permitted.
PARCEL
LAND USES
ACREAGE AND DENSITIES

15 
 
 
         WESTPARK CMP  
Residential Zoning Districts 
Several zoning districts, per the City of Buckeye Development Code, are permitted for each 
land use within residential parcels.  To provide flexibility and ability to respond to market 
demands as Westpark develops and future residential preferences are known. 
 
TABLE 3: PERMITTED RESIDENTIAL DISTRICTS 
 
LAND USE 
RESIDENTIAL DISTRICT 
MDR 
R1-6, R1-3 
MDR Overlay 
R1-6, R1-3, MF-1 
HDR 
R1-1, MF-1, MF-2 
 
The residential zoning districts, and MDR Overlay (if developed as residential) shall comply 
with the City of Buckeye Development Code Section 2.3, Residential Districts and Article 4.1: 
Dimensional Standards, in effect at the time of CMP amendment approval, except as 
modified herein.  The development standards shown in Table 4: Residential R1-6 and R1-3 
Dimensional Standards and Table 5: Residential R1-1, MF-1, and MF-2 Dimensional 
Standards. 
Residential Districts listed in Table 3 will be identified at the time of Site Plan (MF-1 and MF-
2) or preliminary plat submittal (R1-1, R1-3, R1-6) by the applicant and will be identified on 
plans submitted for approval by the City of Buckeye.

16 
 
 
         WESTPARK CMP  
TABLE 4: MDR DIMENSIONAL STANDARDS  
COMPARISON TO BASE ZONING  
 
 
 
 
 
Conventional
Alternative
-
-
-
-
-
6,000
4,500
3,000
4,000
2,700
55
45
30
40
30
Front-loaded 
garage - 20
Side-loaded 
garage - 15
Living - 10
Front-loaded 
garage - 18 [6]
Side-loaded 
garage - 10
Living - 10
8
Front-loaded 
garage - 18 
[6]
Side-loaded 
garage - 10
Living - 10
8
5 w/ 13 
aggregate
5 w/ 10-13 
aggregate [7]
5
5
0 w/ 10 
aggregate
20
20
[8][9]
10
10
[8][9]
10
[8][9]
60
N/A 
[10]
70
N/A
[10]
N/A 
[10]
35
35
45
30
45
R1-3 Base 
Zone
CMP 
R1-3
Lot Coverage, maximum (%)
Building Height, maximum (ft.)
(1) Lot width is measured at the front building line.
(2) An additional 5 feet, or an open space tract a minimum of 5' in width, of setback shall be required for all corner lots adjacent to 
public right-of-way.
(3) For accessory buildings, a 5' minimum setback.
(4) A maximum 2' projection will be allowed into the  setbacks for bay windows, fireplaces, overhangs, etc.
(5) All corners shall have a 33'x33' sight visibility triangle.
(6) A minimum 20' distance is required from back of sidewalk to the face of garage.
(7) SF-6 lots less than 58' in width shall have side yard setbacks that total no less than 10' in width, SF-6 lots 58'-63' in width shall 
have side yard setbacks that total 13' in width, and SF-6 lots greater than 63' in width shall have side yard setbacks that total no 
(8) Rear yard setback can be reduced to 3' where garage is not accessed from public street but is accessed from an alley, 
courtyard, or shared drive.
(9) Patio covers may encroach to within 10' of rear property line.
(10) Maximum lot coverage does not apply and lot coverage will be controlled by the required yard setbacks. 
Density, maximum
(du/gross acre)
District
R1-6 Base 
Zone
CMP 
R1-6 [7]
Setbacks, minimum [4]
Lot Size (sq. ft.)
Lot Width (ft.) [1]
Rear (ft.) [3]
Front (ft.) [5]
Side (ft.) [2][5]
Lot 
Dimensions, 
minimum

17 
 
 
         WESTPARK CMP  
TABLE 4a: MDR OVERLAY DIMENSIONAL STANDARDS 
COMPARISON TO BASE ZONING  
 
 
 
 
 
 
Conventional
Alternative
-
-
-
-
-
15.0
15.0
6,000
4,500
3,000
4,000
2,700
-
-
55
45
30
40
30
-
-
Front-loaded 
garage - 20
Side-loaded 
garage - 15
Living - 10
Front-loaded 
garage - 18 [6]
Side-loaded 
garage - 10
Living - 10
8
Front-loaded 
garage - 18 
[6]
Side-loaded 
garage - 10
Living - 10
8
15
15
5 w/ 13 
aggregate
5 w/ 10-13 
aggregate [7]
5
5
0 w/ 10 
aggregate
5
5
20
20
[8][9]
10
10
[8][9]
10
[8][9]
15
[3]
15
[3][11]
60
N/A 
[10]
70
N/A
[10]
N/A 
[10]
70
70
35
35
45
30
45
50
50
District
R1-6 Base 
Zone
CMP 
R1-6 [7]
R1-3 Base 
Zone
CMP 
R1-3
Density, maximum
(du/gross acre)
Lot 
Dimensions, 
minimum
Lot Size (sq. ft.)
Lot Width (ft.) [1]
Setbacks, minimum [4]
Front (ft.) [5]
Side (ft.) [2][5]
Rear (ft.) [3]
(5) All corners shall have a 33'x33' sight visibility triangle.
(6) A minimum 20' distance is required from back of sidewalk to the face of garage.
(7) SF-6 lots less than 58' in width shall have side yard setbacks that total no less than 10' in width, SF-6 lots 58'-63' in width shall have side 
yard setbacks that total 13' in width, and SF-6 lots greater than 63' in width shall have side yard setbacks that total no less than 13' in width. 
(8) Rear yard setback can be reduced to 3' where garage is not accessed from public street but is accessed from an alley, courtyard, or shared 
drive.
Lot Coverage, maximum (%)
Building Height, maximum (ft.)
MF-1 
Base 
Zone
CMP
MF-1
(1) Lot width is measured at the front building line.
(2) An additional 5 feet, or an open space tract a minimum of 5' in width, of setback shall be required for all corner lots adjacent to public right-
of-way.
(3) For accessory buildings, a 5-foot minimum setback.
(4) A maximum 2' projection will be allowed into the  setbacks for bay windows, fireplaces, overhangs, etc.
(9) Patio covers may encroach to within 10' of rear property line.
(10) Maximum lot coverage does not apply and lot coverage will be controlled by the required yard setbacks. 
(11) 25' minmum setback when directly adjacent to single family residential land use. 10' minimum setback when adjacent to open space or 
any other land use.

18 
 
 
         WESTPARK CMP  
TABLE 5: HDR DIMENSIONAL STANDARDS 
COMPARISON TO BASE ZONING  
 
 
-
-
15.0
15.0
No max; 15.1 
min
30.0 max ;   
6.0 min
1,000
1,000
-
-
-
-
20
20
-
-
-
-
0
0
15
15
[11]
0
15/25 
[11]
0 w/ 5 aggregate
0
5
5
0
0/25
[11]
8
[3]
8
[3][7][8]
15
[3]
15
[3][10]
10
[3]
10/25
[3][10]
65
N/A 
[9]
70
70
95
95
50
50
50
50
-
50
CMP
MF-1
R1-1 Base 
Zone
MF-1 Base 
Zone
(11) 25' minimum landscape setback along street frontage.
Lot 
Dimensions, 
minimum
Lot Size (sq. ft.)
Lot Width (ft.) [1]
Setbacks, minimum [4]
Rear (ft.)
MF-2 Base 
Zone
CMP
MF-2
Front (ft.) [5]
Side (ft.) [2][5]
CMP
R1-1
(10) 25' minmum setback when directly adjacent to single family residential land use. 10' minimum setback when adjacent to open space or 
any other land use.
(9) Maximum lot coverage does not apply and lot coverage will be controlled by the required yard setbacks. 
(8) Patio covers may encroach to within 10' of rear property line.
(7) Rear yard setback can be reduced to 3' where garage is not accessed from public street but from an alley, courtyard, or shared drive.
(6) A minimum 20' distance is required from back of sidewalk to the face of garage.
(5) All corners shall have a 33'x33' sight visibility triangle.
(4) A maximum 2' projection will be allowed into the  setbacks for bay windows, fireplaces, overhangs, etc.
(3) For accessory buildings, a 5' minimum setback.
(2) An additional 5 feet, or an open space tract a minimum of 5' in width, of setback shall be required for all corner lots adjacent to public ROW.
(1) Lot width is measured at the front building line.
Lot Coverage, maximum (%)
Building Height, maximum 
(ft.)
District
Density, maximum
(du/gross acre)

19 
 
 
         WESTPARK CMP  
Residential zoning districts (including overlays if developed as residential) shall comply with 
the City of Buckeye Development Code Article 3: Use Regulations, in effect at the time of CMP 
amendment approval, except as modified herein. Refer to Appendix A. 
The following uses, which differ from or are not mentioned in the Table of Allowed Uses in 
Section 3.1, are permitted within Westpark. 
• 
Public Facilities, electric substations and other similar facilities  
• 
Build-to-Rent developments (BTR), provided the parcel allows for residential uses 
and the development complies with the permitted densities identified within this 
CMP.  
The following uses, which are allowed per the Table of Allowed Uses in Section 3.1, are not 
permitted within Westpark. 
• 
Dwelling, manufactured. Home; Boarding house/ guest room; Shelter care facility, 
homeless; and Cemetery. 
• 
Dwelling, manufactured. Home and Boarding house/ guest room. 
• 
Dwelling, manufactured. Home. 
• 
MF-1: Boarding house; Shelter care facility, homeless; and Cemetery. 
Group home and group recovery home are subject to the following: 
• 
Group homes and/or Group recovery homes shall not be permitted within 800 
radial feet (as measured from the closest property lines) of another Group home 
or Group recovery home.

20 
 
 
         WESTPARK CMP  
Non-Residential Zoning Districts 
Commercial, Business Park and Industrial districts bolster the economic base and offer 
economic opportunities for the residents of Westpark and the nearby communities.  Table 
6, Permitted Non-Residential Districts lists the non-residential districts permitted with 
each land use category. 
 
TABLE 6: PERMITTED NON-RESIDENTIAL DISTRICTS 
 
 
 
 
 
 
 
 
 
Commercial  
Commercial uses shall comply with the City of Buckeye Development Code Section 2.5, Office 
and Commercial Districts, Article 3: Use Regulations, Article 4: Dimensional Standards, and 
the allowed uses within each Commercial district shall be per Section 3.1, Table of Allowed 
Uses in effect at the time of CMP amendment approval, except as modified herein.  
 
The following additional uses are permitted within the Westpark Commercial districts as 
described below: 
 
• 
Public Facilities, electric substations and other similar facilities are allowed within any 
zoning district. 
 
The following Commercial uses listed per non-residential zoning districts are not permitted 
within Westpark. 
• 
C-2: 
Cemetery and crematorium or funeral parlor.  
• 
C-3: 
Cemetery, crematorium or funeral parlor, and sexually oriented business 
 
The following use is a conditional use within Westpark. 
• 
C-2/C-3: 
Heliport as an ancillary use to Hospital. 
 
LAND USE 
NON-RESIDENTIAL DISTRICT 
CC (Community Commercial) 
C-2 
RC (Regional Commercial) 
C-3 
BP (Business Park) 
BP 
Industrial 
I-1

21 
 
 
         WESTPARK CMP  
 
Business Park  
Business Park uses shall comply with the City of Buckeye Development Code Section 2.5, 
Office and Commercial Districts, Article 3: Use Regulations, Article 4: Dimensional Standards, 
and the allowed uses within each Business Park district shall be per Section 3.1, Table of 
Allowed Uses in effect at the time of CMP amendment approval, except as modified herein.  
 
The following additional uses are Permitted Use within the Westpark Business Park district 
as described below: 
• 
Public Facilities, electric substations, electric generation, electric storage and other 
similar facilities. 
• 
Light Manufacturing 
• 
Data centers 
• 
Service businesses 
• 
Small to medium-scale light industrial uses  
• 
Distribution warehouses allowing single dock configurations and a maximum building 
size of 200,000 square feet 
• 
Battery storage, subject to current Buckeye Development Code requirements 
 
The following Business Park use listed per non-residential zoning districts are not permitted 
within Westpark. 
• 
BP: Cemetery, crematorium or funeral parlor 
 
 
 
 
 
 
TABLE 7 ON FOLLOWING PAGE

22 
 
 
         WESTPARK CMP  
TABLE 7: BUSINESS PARK DIMENSIONAL STANDARDS  
COMPARISON TO BASE ZONING 
 
 
 
Industrial District 
Industrial land uses provide employment opportunities to residents of Westpark and 
neighboring communities. There has been a growing and strong interest in providing 
industrial uses near the junction of I-10 and SR 85, I-10 and Palo Verde Road and along other 
major transportation routes within ease of access to I-10. Refer to Appendix A 
 
The Industrial land use areas are depicted on Figure 5, Community Master Plan. The 
comparable zoning district within the City of Buckeye is I-1 Light Industrial, as modified 
herein. Dimensional standards are shown in Table 8, Industrial Dimensional Standards. 
In the event that industrial and residential parcels are developed within proximity to one 
another, mitigation efforts will be taken to buffer the residential land uses directly adjacent 
to an industrial use.  The interface between these uses are prescribed in Table 4.1.3 and 
Article 5 of the City of Buckeye Development Code. Mitigation efforts include: 
 
• 
When a right of way does not provide a buffer, incorporating a 75-foot building 
setback adjacent to a residential district (this can be on either the industrial district, 
-
80
5
N/A
Adjacent to arterial - 30
All others - 15
Adjacent to residential 
district - 50
All others - 15
Adjacent to residential 
district - 50
All others - 15
50
75
-
200,000
Arterial/Parkway -25
All other lower street 
classifications - 15
Arterial/Parkway -25 
All other lower street 
classifications - 15
Lot Coverage, 
maximum (%)
District Size, 
minimum (acres)
Building Height, 
maximum (ft.)
Setbacks, minimum
Front (ft.)
Side (ft.)
Rear (ft.)
Setback from
peripheral property
line: 25
Adjacent to
residential
district: 50
District 
BP
Base Zoning
CMP
BP 
Building Size, 
maximum (s.f.)
Landscape Setback 
(ft.)

23 
 
 
         WESTPARK CMP  
the residential district or a combination of both districts). 
 
• 
Designing buildings that are generally consistent with the attached Appendix B – 
Industrial Building Elevation Examples. 
 
• 
When residential uses of 4.5 dwelling units an acre or greater and industrial uses are 
located adjacent to one another, a public street or a minimum 50-foot landscape and 
parking buffer shall be provided within the setback between the two uses as specified 
in Table 8, Industrial Dimensional Standards.  
 
Industrial districts shall comply with the City of Buckeye Development Code Section 2.6, 
Industrial Districts, Article 3: Use Regulations, Article 4: Dimensional Standards, Article 5, 
Section 9: Industrial Building Standards and Guidelines, and the allowed uses within the I-1 
district shall be per Section 3.1, Table of Allowed Uses in effect at the time of CMP 
amendment approval, except as modified herein.  
  
In addition to the I-1district uses, the following uses are permitted within the Westpark 
Industrial district as described below, all of which must occur within enclosed buildings 
unless explicitly stated.  
 
• 
Public Facilities and other similar facilities. 
• 
Service Businesses 
• 
Any Federally Approved Power Generation Resource(s), subject to a Conditional Use 
Permit 
• 
Storage and Storage Yard – As an accessory use to another allowed use. 
• 
Research and Development Organizations 
 
The following uses are listed as permitted uses in the Buckeye Development Code as shown 
in Appendix A. These uses are anticipated uses within Westpark and are reiterated below. 
• 
Battery and/or Alternative Electricity Storage 
• 
Truck Repair & Overhaul 
• 
Logistics and Distribution Facilities & Centers 
• 
Warehousing 
• 
Utility facility, major 
• 
Any Federally Approved Power Generation Resource(s), subject to a Conditional Use 
Permit 
• 
Wholesale Operations 
• 
Regional Drainage/Retention 
• 
Cross-Dock Facilities

24 
 
 
         WESTPARK CMP  
TABLE 8: INDUSTRIAL DIMENSIONAL STANDARDS 
COMPARISON TO BASE ZONING 
 
 
 
 
 
 
-
80
15
15
Adjacent to arterial - 40
All others - 20
Adjacent to arterial - 40
All others - 20
Adjacent to residential 
district - 75
Adjacent to rail ROW - 0
All others - 20
Adjacent to residential 
district - 50
Adjacent to rail ROW - 0
All others - 20
Adjacent to residential 
district - 75
Adjacent to rail ROW - 0
All others - 20
Adjacent to residential 
district - 75 (3)
Adjacent to rail ROW - 0
All others - 20
55 at setback; increase 
1 ft for every 3 ft in 
additional setback to a 
max of 120
75 at setback; increase 
1 ft for every 3 ft in 
additional setback to a 
max of 150
Arterial/Parkway -25
All other lower street 
classifications - 15
Arterial/Parkway -25 
All other lower street 
classifications - 15
CMP
I-1(1, 2)
Lot Coverage, 
maximum (%)
District Size, 
minimum (acres)
Setbacks, minimum
Front (ft.)
Side (ft.)
Rear (ft.)
Landscape Setback 
(ft.)
(1) Areas identified as I-1 with BP Limit as shown on Figure 5 of this CMP may 
be developed as I-1 with no overlay limitation if developed as part of an 
Industrial Mega-site 80 acres or larger. 
(2) See Table 7: Business Park Dimensional Standards for any development 
within the I-1 with BP Limit area that is not a part of an Industrial Mega-Site. 
Building Height, 
maximum (ft.)
District 
I-1 
Base Zoning

25 
 
 
         WESTPARK CMP  
F. Development Standards  
Article 5, Development and Design Standards and Guidelines of the City of Buckeye 
Development Code, in effect at the time of CMP amendment approval, shall govern, except 
as modified within this CMP.  Following are specific amendments to the Development Code. 
Residential Standards (MDR, MDR Overlay & HDR) 
Building Standards and Guidelines  
Development within Westpark shall comply with the City of Buckeye Development Code 
Sections 5.6, Off-Street Parking, 5.7, to the extent applicable, Residential Building Standards 
and Guidelines, and 5.8, Commercial Building Standards and Guidelines, in effect at the time 
of CMP amendment approval, except as modified herein. 
Section “5.7.3.B.3.a – Maximum Garage Width” is amended by deleting the existing section 
within the code and replacing it with the following: 
1. The maximum width of garage doors on front loaded garages, including the garage door 
but excluding any architectural elements on each side of the garage door, shall not exceed 
40% of the overall building façade on lots having a typical width greater than 80 feet, 50% 
of the overall building façade on lots having typical widths 60 feet and greater but less 
than or equal to 80 feet, and 57% of the façade on lots having a typical lot width less than 
60 feet. 
This maximum garage width shall not apply to any building fronting a street or open space 
whose garage orientation is other than the front street, including those that front on an 
alley, courtyard or similar shared drive, or detached from the principal building and 
located in the rear yard. 
2. On homes that incorporate an RV Garage, the maximum aggregate width of the garage 
doors attached to the primary residence and facing the front of the lot shall not exceed 
55% of the overall building façade. Unless the individual doors are separated by 4 feet, 
and one of the garage doors is setback at least 6 feet, in which case the maximum 
aggregate width shall not exceed 58% of the overall building façade. 
3. The maximum number of homes that incorporate an RV garage within a subdivision shall 
not exceed 50%. 
Building façade is defined as:  Front of home parallel to the street plus the following: Where livable 
area or side entry garage is forward of the front facing garage, the length of the wall return from 
the forward livable area or side entry garage to the front facing garage shall be added to the 
overall façade length. The length of the wall return from the garage to the livable area shall not 
be included when the garage is forward of the livable area.

26 
 
 
         WESTPARK CMP  
Section “5.7.3.B.1 – Orientation of Dwellings to the Street” is amended by deleting the 
existing section within the code and replacing it with the following: 
i. 
On lots 40 feet or less in width, the home may have a primary doorway entrance not facing 
the front lot line provided the entrance is well lit and the entrance is visible from neighboring 
units. 
ii. 
On all lots less than 55 feet in width but greater than 40 feet, each home shall have at least 
one primary doorway for access to the dwelling located on the elevation of the dwelling 
facing the front lot line of the property, and clearly visible from the street or public area 
adjacent to the front lot line. 
iii. 
On lots 55 feet in width or more, the home may have a primary doorway entrance not facing 
the front lot line provided the entrance is well lit and the entrance is visible from neighboring 
units. 
Section “5.7.3.B.2.a- Architectural Variety” is amended to add the following:  
v. 
As a standard feature, stone, brick, or accent façade material shall be provided on at least 
one elevation for each floor plan. 
Section “5.7.6.C – Building and Parking Location, Layout, and Orientation” is amended 
by deleting the existing section within the code and replacing it with the following: 
2. 
When more than one multi-family structure is constructed, except for horizontal single-
family apartments: 
a. No side, end, or rear wall of a multi-family structure shall be located within 20 feet of 
a side, end, or rear wall of any other multi-family structure: 
b. No side, end, or rear wall of a multi-family structure shall be located within 30 feet of 
the front wall of any other multi-family structure: 
c. No front wall of a multi-family structure shall be located within 40 feet of the front wall 
of any other multi-family structure. 
Section “5.7.6.D – Building Mass and Articulation” is amended by deleting the existing 
section within the code and replacing it with the following: 
2. The facades of all multi-family buildings shall be articulated through the incorporation of 
at least two or more for horizontal single-family apartments, or three or more for other 
multi-family, of the following: 
a. Balconies (wrap-around balconies at building corners shall be counted as meeting two 
of the required three features); 
b. Windows that recess or project at least 18 inches from the face of the adjacent wall; 
c. Porches or covered entries; 
d. Dormers; 
e. At least two distinct variations in materials;

27 
 
 
         WESTPARK CMP  
f. Variations in roof forms and/or parapet heights; 
g. Architecturally integrated awnings over windows and doorways if not used in a 
repeating predictable pattern;  
h. Vertical elements that demarcate building modules; and/or 
i. 
Changes in wall plane six feet or more.  
Section “5.7.6.E – Roof Form” is amended by deleting the existing section within the code 
and replacing it with the following: 
1. Multi-family residential buildings shall be designed to avoid any continuous roofline longer 
than 60 feet for horizontal single-family apartments or longer than 50 feet for other multi-
family use.  Rooflines longer than 60 feet for horizontal single-family apartment or 50 feet 
for other multi-family use, shall include at least one vertical elevation change of at least 
two feet. Rooflines longer than 100 feet shall include at least two such changes.  
Section “5.7.6.G – Entrances and Porches” is amended by deleting the existing section 
within the code and replacing it with the following: 
1. At least one main building entry shall face the primary adjacent public street except 
for horizontal single-family apartments. 
 
Landscaping 
Landscaping will be themed in keeping with the Sonoran Desert setting. Land uses, 
roadways, pathways and trails, and landscaping will be designed to create an overall 
community character and theme.  Landscaping in all residential and commercial uses shall 
comply with the City of Buckeye Development Code Section 5.4, in effect at the time of CMP 
amendment approval, except as modified herein. Plant material shall follow the ADWR 
Approved Plant List.  
An enhanced landscape buffer has been established along several of the prominent project 
roadways. This buffer, coupled with strategic placement of monument signage, will provide 
a marketing opportunity identifying a cohesive master planned development. As depicted 
on Figure 9, Landscaping Examples, the following roadways will have a 50’ Enhanced 
Landscape Buffer that will include two rows of trees, staggered and planted every 25’ on 
center:  
• 
Palo Verde Road;  
• 
Lower Buckeye Road between Palo Verde Road and Turner Road; and 
• 
Wilson Avenue north of Lower Buckeye Road. 
The landscape buffer may include driveways, screen walls up to a maximum 3’ 6” in height, berming, 
retention basins, utility and signal boxes, guardhouse, and similar elements as approved by the 
Zoning Administrator.

28 
 
 
         WESTPARK CMP  
Off-Street Parking 
Off-Street Parking shall comply with the development standards defined in the City of 
Buckeye Development Code Section 5.6, Off-Street Parking, in effect at the time of CMP 
amendment approval, except as modified herein. 
Section “5.6 – Off-Street Parking Requirements, Table 5.6-1: Off-Street Parking 
Schedule A” is amended to add the following sentences: 
1) Off-street parking is not required for pocket parks or for neighborhood parks 5 acres or 
less in size. 
2) A study may be completed in accordance with “5.6.3.C-Schedule C” by the developer or 
property owner, when the developer or property owner believes that the use of Schedule A 
or Schedule B would result in too much or too little parking based on the intended use of 
the development. The study shall be reviewed by the City and approved by the Zoning 
Administrator. This applies to all land uses within the Westpark CMP.  
 
Screening 
Fences, walls, and screening in all residential and commercial uses shall comply with the City 
of Buckeye Development Code Section 5.4.5, Fences, Walls, and Screening, in effect at the 
time of CMP amendment approval, except as modified herein. 
Section “5.4.6.B.1 – Fences and Walls, Height, Front, Side and Rear” is amended to add 
the following: 
c. The maximum height of any privacy wall, excluding retaining wall, shall not exceed 7 feet 
adjacent to collector streets and 8 feet adjacent to arterial streets. Additional height may 
be granted for retaining walls, security walls/fences or sites with elevated foundations or if 
additional height is required for the purposes of screening or security, as determined by 
the Zoning Administrator or designee.  
 
Lighting 
Street lighting shall conform to Section 5.11, Exterior Lighting of the City of Buckeye 
Development Code and Section 7.2, Public Street Lights of the City of Buckeye Engineering 
Design Standards and Details. 
 
Signage 
Signage shall conform to Section 5.12, Signs.

29 
 
 
         WESTPARK CMP  
Non-Residential Standards (IND, BP, RC & CC) 
Development within Westpark shall comply with the City of Buckeye Development Code 
Article 5 Development and Design Standards and Guidelines in effect at the time of CMP 
amendment approval, except as Sections are modified herein.  Justification for modifications 
to all referenced sections are driven by achieving an overall objective of developing a master 
planned industrial park in an efficient and cohesive manner that will be geared toward large 
scale industrial buildings and occupiers. 
Section “5.4 Landscaping”   
Landscape design for the overall project will be themed with the Sonoran Desert vernacular 
in mind.  Site development and associated landscaping will be designed to create an overall 
cohesive character and theme for the Industrial Districts.  Landscaping in all industrial areas 
shall comply with the City of Buckeye Development Code Section 5.4, in effect at the time of 
CMP amendment approval, except as modified herein.  
Section “5.4.3 Landscape Required” - Table 5.4-1 is amended to read that Industrial 
Minimum percentage of parcel to be landscaped is as follows: 
 
Industrial parcels   0.00 – 10.00 acres  
 
10.0% 
 
Industrial parcels 10.01 – 15.00 acres 
 
7.5% 
 
Industrial parcels greater than 15.00 acres  
5.0% 
It is the intent of master planning the industrial land to achieve a cohesive landscape theme 
across industrial developments.  Site planning large scale industrial projects typically entail 
larger buildings on deeper parcels requiring a higher degree of overall building coverage to 
efficiently operate.  Adjusting the minimum landscape requirement as parcel sizes increase 
is not intended to lessen required landscape buffering but allows flexibility in 
accommodating larger buildings without forcing additional landscaping to meet the broad-
based classification assigned within the Buckeye Development Code. 
Section “5.4.3.D - Building Foundation Plantings” is amended such that no building 
foundation planting will be required for inside screened truck court areas.  
Section “5.4.6.C.1.a - Screening Required” is amended such that individual screening of 
specialty or oversized rooftop mechanical equipment is not prohibited.  Standard sized HVAC 
rooftop equipment will require screening via parapet or “penthouse style” grouping in 
accordance with the Buckeye Development Code. 
Section “5.6 - Off-Street Parking” 
Off-Street Parking shall comply with the development standards defined in the City of 
Buckeye Development Code Section 5.6, Off-Street Parking, in effect at the time of CMP 
amendment approval, except as modified herein. 
Table “5.6-2: Off-Street Parking Schedule B” is amended so that uses classified as Indoor 
Storage/Warehousing/Vehicle Service/Manufacturing Area shall provide the minimum

30 
 
 
         WESTPARK CMP  
number of off-street parking spaces calculated across a building as follows: 
• 
Buildings up to 50,000 square feet: 
Office Areas  
 
 
1 parking space per 300 square feet of area 
Manufacturing Areas 
 
1 parking space per 1,500 square feet of area 
Warehousing Areas  
 
1 parking space per 1,250 square feet of area 
• 
Building between 50,001-200,000 square feet: 
Office Areas  
 
 
1 parking space per 300 square feet of area 
Manufacturing Areas 
 
1 parking space per 1,650 square feet of area 
Warehousing Areas  
 
1 parking space per 1,750 square feet of area 
• 
Buildings greater than 200,000 square feet: 
Office Areas  
 
 
1 parking space per 300 square feet of area 
Manufacturing Areas 
 
1 parking space per 1,800 square feet of area 
Warehousing Areas  
 
1 parking space per 2,000 square feet of area 
 
The industrial development within Westpark is anticipated to be large scale industrial 
buildings, data centers, and other unique users with occupants that require a lesser degree 
of parking spaces than the broad-based classification assigned within the Buckeye 
Development Code.  The alternate compliance request (i) is intended to minimize unused 
parking fields and heat producing paved areas within a given development and (ii) correlates 
with similar recently approved industrial developments within neighboring municipalities, 
with examples of industrial uses as shown below. Additional uses not shown below may also 
be included in the alternative compliance request for parking reduction. 
Recent Representative 
Industrial Buildings 
Building SF 
Required Parking Standard 
Dicks Sporting Goods - Goodyear 
600,000 
1 parking space per 2,400 SF 
of overall area 
REI - Goodyear 
400,000 
1 parking space per 2,198 SF 
of overall area 
5 Below - Buckeye 
1,202,964 
1 parking space per 2,096 SF 
of overall area 
Spec Development - VanTrust – 
Glendale PAD 
542,978 
1 parking space per 2,000 SF 
of warehouse area 
2 Bldg Spec Development – 
VanTrust - Phoenix 
181,090 
1 parking space per 1,000 SF 
of warehouse area 
 
Section “5.6.6.A - Off-street Loading Requirements” is amended by adding the following: 
“A typical loading dock berth space is considered to meet the requirement of the Off-Street 
Loading Requirements.”

31 
 
 
         WESTPARK CMP  
Section 5.10 Industrial Building Standards and Guidelines  
As approved with the 2022 Westpark CMPA, development within Westpark shall comply with 
Industrial Building Standards as defined herein.  All industrial buildings that generally follow 
the level of architectural detail of the example depicted on Appendix “B” shall be deemed to 
be in compliance with Industrial Building Standards and Guidelines as identified below.  
Site Design 
1. Primary Entrances 
Orient buildings so that the principal building entrances are clearly visible from 
automobile access points to the site.  In cases where the building entrances are not visible 
from site access points, these entrances are to be visible from automobiles as they enter 
parking fields. 
Building Design 
1. Theming 
Organize the architectural design of buildings around a consistent architectural theme.  
Precise replication is not required or desirable.  Instead, use similar materials, textures, 
and colors, along with repeating patterns and compatible proportions and scale, to 
reinforce the connections between the various buildings. 
2. Articulation 
a. See building elevation examples included in Appendix “B“.  Design buildings to reduce 
apparent mass by dividing facades into smaller components through the following: 
i. Variations in roof form or parapet height of two feet or more; 
ii. Incorporation of recessed glass and/or canopies at building entry elements; 
iii. Changes in texture, materials, or colors; and 
iv. Use of clerestory windows 
3. Roof Materials 
b. All roofs shall be flat (or appear flat), incorporating a parapet(s) of sufficient height to 
screen the roof deck surface from all property lines. 
4. Architectural Details, Materials, and Colors 
a. The following materials are permitted for use on exterior building walls, individually 
or in combination: 
i. 
Brick, including realistic veneers; 
ii. 
Stone, including realistic veneers; 
iii. 
Painted, stained, exposed aggregate, or integrally-colored concrete masonry 
units (CMU), split face or ground face;

32 
 
 
         WESTPARK CMP  
iv. 
Tilt-up concrete panels, painted or textured, with reveals and/or formliner; 
v. 
Stucco or Exterior Insulation and Finish System (EIFS); 
vi. 
Clear, tinted, and/or spandrel glass; 
vii. 
Tile (allowed as an accent only) 
viii. 
Wood (allowed as an accent only) 
ix. 
Architectural-grade metal panels (not including paneling used on pre-designed 
building kits or pre-manufactured metal buildings);  
x. 
Metal posts, columns, beams, or similar structural support; 
xi. 
Scuppers and exterior downspouts may be permitted if they are designed as 
architecturally integrated into the building style and serve as a decorative 
function; and 
xii. 
Other materials of comparable quality, durability, and character, as determined 
by the Zoning Administrator. 
b. Exterior Building and Roof Colors. Select materials and colors that are abundant in 
the Sonoran Desert environment. 
i. 
Reflective building materials (other than windows) and roofing materials, 
including materials with high gloss finishes and bright, untarnished copper, 
aluminum, galvanized steel, or other metallic surfaces, must be textured or 
have a matte or non-reflective surface treatment to reduce the reflection of 
sunlight; 
ii. 
Materials used for exterior surfaces of all structures must blend in color, hue, 
and tone with the surrounding natural desert setting to avoid high contrast; 
iii. 
Excluding shades of white, bright colors (LRV greater than 70) and contrasting 
colors are appropriate only for accents, such as on doors, limited trim, and 
window mullions. Corporate color and material palettes may be incorporated 
into the building design. Fluorescent colors are prohibited, even for use as an 
accent; and 
iv. 
The surface materials of walls, retaining walls, or fences must be similar to and 
compatible with those of the adjacent main buildings. 
c. Prohibited Wall Materials 
i. 
Corrugated metal siding as primary wall material; 
ii. 
Prefabricated metal panels, excluding architectural grade metal panel systems 
described above, and any pre-manufactured metal building kits; 
iii. 
Poor quality veneers and other engineered materials that have an unnatural 
appearance not reflective of the product they are attempting to simulate; and

33 
 
 
         WESTPARK CMP  
iv. 
Mirrored surfaces or any treatments which changes ordinary glass into a 
mirrored or highly reflective surface.

34 
 
 
         WESTPARK CMP  
G. Project Infrastructure  
Master Drainage Plan 
The Project is located within the City of Buckeye, Arizona and is currently comprised of 
undeveloped desert rangeland and agricultural fields that generally slope from north to 
south. Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) 
coverage for the Project is provided on FIRM panels 04013C2095L and 04013C2115L, dated 
October 16, 2013. According to these FIRM maps, the Project resides primarily within a flood 
Zone X (Shaded) with four isolated AH Zones located along the north side of the Roosevelt 
Irrigation District (RID) Canal within the Westpark and SilverRock Communities. FEMA defines 
these flood zones as follows: 
 
Zone X (Shaded): 
Areas of 0.2% Annual chance flood hazard, areas of 1% annual chance flood with average 
depth less than one foot or with drainage areas of less than one square mile. 
 
Zone AH: 
Areas subject to inundation by the 1% annual chance shallow flooding (usually areas of 
ponding) where average depths are between one and three feet. Base Flood Elevations 
(BFEs) derived from detailed hydraulic analyses are shown in this zone. 
In existing conditions, a majority of the flows approaching from the north are intercepted 
and by the Buckeye Flood Retarding Structure (FRS) No.1 and No.2. The Buckeye FRS No.1 
and No.2 are two of three retarding structures located along the north side of Interstate 10 
(I10) and south of the White Tanks Mountains, which control runoff from the mountains. 
These earth-filled dams detain floodwater and convey it via pipe and open floodway to the 
Hassayampa River. Together the three structures detain runoff from a 90-square mile area. 
These three flood retarding structures are operated and maintained by the Flood Control 
District of Maricopa County (FCDMC). 
With the aforementioned flood control structures in place, the Project is currently affected 
by localized offsite flows produced between the FRS No.1 and FRS No.2 and the Project’s 
northern boundary. Interstate 10 (I10) is equipped with culverts allowing runoff generated 
south of the FRS No. 1 and No.2 to pass under the I10 and enter the Project site. Upon 
entering Project boundaries this runoff continues south within a series of man-made and 
natural drainage ways and as sheet flow. More specifically, runoff produced west of Highway 
85 enters a series of channels located just south of Lower Buckeye Road that convey the flow 
west and then south down the east side of Palo Verde Road or the runoff enters an existing 
channel located along the east side of Turner Road, with both channel systems ultimately

35 
 
 
         WESTPARK CMP  
outfalling to the Roosevelt Irrigation District (RID) Canal. The remainder of the runoff that 
does not enter the aforementioned channels proceeds south as sheet flow and ponds along 
the RID Canal ultimately overtopping the northern bank and entering the canal. Runoff 
generated east of Highway 85 is captured by a system of existing collector basins located 
along the northern boundary of the mass graded Westpark Phase 1. Runoff enters the 
existing basins before entering an overflow pipe which outfalls to an earthen channel that is 
located along the west side of Westpark Phase 2.3. The earthen channel conveys the flow 
south along Westpark Phase 2.3 before it ultimately outfalls to the regional park that is just 
north of the RID Canal. The other portion of the flow generated east of Highway 85 is 
captured within an existing overflow ditch that conveys the flow southwest towards the 
highway. Upon reaching Highway 85, the runoff enters a set of culverts that convey the flow 
southwest, under Highway 85 and discharges to a concrete lined channel (ADOT Channel) 
along the west side of the highway. The runoff within the ADOT Channel proceeds south, 
along the west side of Ogelsby Road and away from the Project. 
In proposed conditions, offsite runoff impacting the site is proposed to be captured and 
conveyed within a system of proposed and existing channels located within and along 
Project boundaries. The proposed channels will capture runoff that impacts the Project’s 
northern boundary and either route it directly south towards one of the basins proposed in 
the Westpark CLOMR  or route it to existing channels that are located along the boundaries 
of the Project and within Project boundaries. It is worth noting that Colliers Engineering and 
Design has submitted a CLOMR to the City of Buckeye and the Flood Control District of 
Maricopa County for the four Zone AH floodplains located along the north side of the RID 
Canal. The purpose of the CLOMR is to reduce the extents of the existing Zone AH floodplains 
by providing compensatory volume within a series of basins along the north side of the RID 
Canal. Developed conditions peak flows leaving the site will not exceed those of the pre-
development condition. No adverse impacts are anticipated to adjacent or downstream 
properties as a result of this development. 
Onsite drainage flows will be managed by retention basins designed to accommodate the 
100-year, 2-hour storm runoff volume produced by their respective tributary drainage areas. 
The precise geometry and location of the retention basins will be refined and adapted as the 
development process proceeds. Retention basins within the development will be dewatered 
in 36 hours or less. The dewatering of the basin will be accomplished via the use of drywells 
and natural infiltration. As the development process proceeds, more detailed drainage 
design and documentation will be prepared in support of future site plan improvement plan 
submittals for the Project. 
Appendix D, Drainage Master Plan is provided under separate cover. 
Water Master Plan 
The Project is located roughly 0.5 miles south of the intersection of Interstate 10 and SR-85 
in Buckeye, Arizona, and within the City of Buckeye (COB) Pressure Zone 2 as shown in the 
COB Water Infrastructure Master Plan and will be served by the COB. Well locations within

36 
 
 
         WESTPARK CMP  
the site have been identified as potential sources of supply for the project and will supply 
raw water to the existing Water Supply Facility 2 (WSF-2) east of SR-85 for treatment and 
distribution. The WSF-2 will provide storage and booster pumping for the entire Project. 
Existing infrastructure in the surrounding area consists of 8-inch and 16-inch water lines 
within Westpark Loop and the neighboring Westpark Phase 2.1 and 2.2 developments, as 
well as an existing 20-inch raw water supply line underneath SR-85 that runs west to Turner 
Road and transitions to a 24-inch line that runs south towards the Roosevelt Irrigation 
District (RID) Canal. The proposed water infrastructure for serving the Project includes 
domestic wells, water transmission lines, centralized water treatment (if required based on 
groundwater quality), storage, and booster pumping at the existing WSF-2, and distribution 
water mains within Westpark Phase 3. Water mains to serve the Project range in size from 8-
inch to 24-inch. Refer to Appendix E, Water Master Plan which is provided under separate 
cover. 
Wastewater Master Plan 
The Project is located roughly 0.5 miles south of the intersection of Interstate 10 and SR-85 
in Buckeye, Arizona, and within collection basin 1 and 4 of the City of Buckeye (COB) 
Wastewater Infrastructure Master Plan. There is currently existing wastewater infrastructure 
just west of SR-85, and east of SR-85 within Westpark Phases 1, 2.1 and 2.2. Portions of the 
proposed wastewater infrastructure within collection basin 4 will be routed east across SR-
85 to existing infrastructure within collection basin 1, while the remainder of the proposed 
infrastructure within collection basin 4 will be routed to a sewer trunk line within Wilson 
Avenue and temporarily outfall to a packaged wastewater treatment plant located south of 
the site along the Roosevelt Irrigation District (RID) Canal.  
Ultimately, the packaged wastewater treatment plant will be replaced with a lift station to 
pump wastewater flows to either the planned Water Reclamation Facility (WRF) 4 or the WRF 
5, as shown in the COB Wastewater Infrastructure Master Plan. The wastewater 
infrastructure for the Project will be owned and operated by the COB. The Project area slopes 
generally to the south/southwest and is capable of being served by gravity sewer. The 
collection system layout has been designed based on existing topography at the Site and will 
be refined as each individual parcel develops. The proposed sewer mains range in depth 
from 9-feet to 30-feet. Sewer mains to serve the Project range in size from 8-inch to 24-inch. 
Each sewer alignment was analyzed to minimize the pipe depth wherever possible, and 
depths are anticipated to be refined as the final site grading is completed. Refer to Appendix 
F, Wastewater Master Plan which is provided under separate cover. 
Traffic Impact Analysis 
Floor Area Ratio (FAR) utilized within the Master Traffic Impact Analysis will not limit or guide 
the square footage developed on the project site. At the time of site plan review, a Traffic 
Impact Analysis (or Traffic Statement, if applicable) will be provided for City review and 
administrative approval. Dedication of additional right-of-way and/or construction of

37 
 
 
         WESTPARK CMP  
additional street improvements beyond those improvements identified in this CMP may be 
required based upon the findings of the Traffic Statement or updated TIA. 
A Master Traffic Impact Analysis for the overall Westpark development is provided under a 
separate cover.

WESTPARK CMP  
 
 
 
 
 
 
 
Figures

WESTPARK CMP  
 
 
 
 
 
 
 
Appendix A 
 
CITY OF BUCKEYE  
TABLE OF ALLOWED USES*  
 
 
*Residential districts (including overlays if developed as residential) shall comply with the City of 
Buckeye Development Code Article 3: Use Regulations, in effect at the time of CMP amendment 
approval, except as modified within the CMP amendment. 
 
*Commercial districts shall comply with the City of Buckeye Development Code Article 3: Use 
Regulations, and the allowed uses within each Commercial district shall be per Section 3.1, Table of 
Allowed Uses in effect at the time of CMP amendment approval, except as modified within the CMP 
amendment.  
 
*Business Park districts shall comply with the City of Buckeye Development Code Article 3: Use 
Regulations and the allowed uses within each Business Park district shall be per Section 3.1, Table of 
Allowed Uses in effect at the time of CMP amendment approval, except as modified within the CMP 
amendment.  
 
*Industrial districts shall comply with the City of Buckeye Development Code Article 3: Use Regulations 
and the allowed uses within the I-1 district shall be per Section 3.1, Table of Allowed Uses in effect at 
the time of CMP amendment approval, except as modified within the CMP amendment.

Created: 2024-07-26 11:50:35 [EST] 
(Supp. No. 20, Update 2) 
 
Page 4 of 73 
3.1.5. Table of Allowed Uses. 
Table 3.1-1: TABLE OF ALLOWED USES 
P=Permitted       C=Conditional Use      Blank cell = Use is prohibited 
Use 
Category 
Use Type 
 RESIDENTIAL 
MIXED-USE 
NONRESIDENTIAL 
  
AG 
R1-43 
R1-18 
R1-10 
R1-6 
R1-3 
R1-1 
MF- 1 
MF- 2 
MH 
NMU 
CMU 
 
RMU 
 
IMU 
DC 
 
DR 
PO 
C- 1 
C-2 
 
C-3 
 
BP 
 
I -1 
 
I -2 
 
Use 
Standards 
RESIDENTIAL USES 
Household 
Living 
Accessory 
Dwelling Unit 
P 
P 
P 
P 
P 
P 
P 
P 
  
  
  
  
  
  
  
P 
  
  
  
  
  
  
  
3.3.4.A 
Bungalow 
community 
  
  
  
  
  
  
P 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
 
Dwelling, 
duplex 
  
  
  
P 
P 
P 
P 
P 
  
  
P 
P 
P 
  
  
P 
  
  
  
  
  
  
  
3.2.1.E 
Dwelling, 
fourplex 
 
 
 
 
 
P 
P 
P 
P 
 
 
 
 
 
 
P 
 
 
 
 
 
 
 
3.2.1.E 
Dwelling, 
live/work 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
P 
 
 
 
 
 
 
 
 
5.13.4.J.3 
Dwelling, 
mfd. home 
P 
P 
P 
P 
P 
P 
P 
  
  
P 
  
  
  
  
  
  
  
  
  
  
  
  
  
3.2.1.B 
Dwelling, 
mobile home 
  
  
  
  
  
  
  
  
  
P 
  
  
  
  
  
  
  
  
  
  
  
  
  
3.2.1.C 
Dwelling, 
multi-family 
  
  
  
  
  
  
  
P 
P 
  
P 
P 
P 
  
P 
P 
  
  
  
  
  
  
  
  
Dwelling, 
single-family 
attached 
  
  
  
  
  
P 
P 
P 
P 
  
  
  
  
  
  
P  
  
  
  
  
  
  
  
  
Dwelling, 
single-family 
detached 
P 
P 
P 
P 
P 
P 
P 
C 
  
  
  
  
  
  
  
P 
  
  
  
  
  
  
  
  
Dwelling, 
townhome 
 
 
 
 
 
P 
P 
P 
P 
 
 
 
 
 
 
P 
 
 
 
 
 
 
 
3.2.1.E 
Dwelling, 
triplex 
 
 
 
 
 
P 
P 
P 
 
 
 
 
 
 
 
P 
 
 
 
 
 
 
 
3.2.1.E 
Dwelling, 
zero lot line 
  
  
  
  
P 
P 
P 
P 
P 
  
  
  
 
  
  
P 
  
  
  
  
  
  
  
3.2.1.G 
Mfd. 
home/mobile 
  
  
  
  
  
  
  
  
  
P 
  
  
  
  
  
  
  
  
  
  
  
  
  
3.2.1.D

Created: 2024-07-26 11:50:35 [EST] 
(Supp. No. 20, Update 2) 
 
Page 5 of 73 
Table 3.1-1: TABLE OF ALLOWED USES 
P=Permitted       C=Conditional Use      Blank cell = Use is prohibited 
Use 
Category 
Use Type 
 RESIDENTIAL 
MIXED-USE 
NONRESIDENTIAL 
  
AG 
R1-43 
R1-18 
R1-10 
R1-6 
R1-3 
R1-1 
MF- 1 
MF- 2 
MH 
NMU 
CMU 
 
RMU 
 
IMU 
DC 
 
DR 
PO 
C- 1 
C-2 
 
C-3 
 
BP 
 
I -1 
 
I -2 
 
Use 
Standards 
home 
subdivision 
Mobile home 
park 
  
  
  
  
  
  
  
  
  
P 
  
  
  
  
  
  
  
  
  
  
  
  
  
3.2.1.F 
Group 
Living 
Refer to 
Section 3.5 
for buffering 
distances if 
applicable 
Assisted 
living, 
commercial 
 
 
 
 
 
 
 
P 
P 
 
 
 
 
P 
P 
 
 
 
 
P 
P 
P 
 
 
 
 
Assisted 
living, 
residential 
P 
P 
P 
P 
P 
P 
P 
P 
P 
  
  
C 
C 
  
  
  
  
C 
C 
C 
  
  
  
  
Boarding 
house/guest 
room 
P 
  
  
C 
C 
C 
  
C 
C 
  
  
  
  
  
  
C 
  
  
  
  
  
  
  
  
Group home  
C 
C 
C 
C 
C 
  
  
C 
C 
  
C 
C 
C 
  
  
C 
  
C 
C 
C 
  
  
  
  
Group 
recovery 
home 
C 
C 
C 
C 
  
  
  
C 
C 
  
C 
C 
C 
  
  
C 
  
C 
C 
C 
  
  
  
  
Nursing 
home 
  
  
  
  
  
  
  
C 
C 
  
C 
C 
C 
  
  
C 
  
P 
P 
P 
  
  
  
 
Shelter care 
facility 
P 
P 
P 
P 
C 
  
  
C 
C 
  
 
 
 
  
  
C 
  
P 
P 
P 
  
  
  
  
Shelter care 
facility, 
homeless 
C 
C 
C 
C 
C 
  
  
C 
C 
  
 
 
 
 
  
C 
  
C 
C 
C 
  
P 
  
  
PUBLIC/INSTITUTIONAL USES 
Community 
Service 
Cemetery 
P 
C 
C 
C 
C 
  
  
C 
C 
  
  
 
 
 
  
  
  
P 
P 
 
 
 
  
3.2.2.B 
Crematorium 
or funeral 
parlor  
  
  
  
  
  
  
  
  
  
  
  
P 
P 
C 
  
  
  
P 
P 
 
 
 
  
 
Government 
admin. and 
 P 
P 
P  
P  
P  
P 
 P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
 P 
P 
P 
P 
P 
P

Created: 2024-07-26 11:50:35 [EST] 
(Supp. No. 20, Update 2) 
 
Page 6 of 73 
Table 3.1-1: TABLE OF ALLOWED USES 
P=Permitted       C=Conditional Use      Blank cell = Use is prohibited 
Use 
Category 
Use Type 
 RESIDENTIAL 
MIXED-USE 
NONRESIDENTIAL 
  
AG 
R1-43 
R1-18 
R1-10 
R1-6 
R1-3 
R1-1 
MF- 1 
MF- 2 
MH 
NMU 
CMU 
 
RMU 
 
IMU 
DC 
 
DR 
PO 
C- 1 
C-2 
 
C-3 
 
BP 
 
I -1 
 
I -2 
 
Use 
Standards 
civic 
buildings 
Government 
maintenance 
and 
operations 
yards/ 
buildings 
C 
C 
  
  
  
  
  
  
  
  
  
  
  
P 
  
  
  
  
  
  
  
P 
P 
  
Public safety 
facility 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
 
Social 
service 
facility 
  
  
  
  
  
  
  
C 
C 
  
P 
P 
P 
P 
  
P 
P 
P 
P 
P 
P 
  
  
  
Child Care 
Facility 
  
Day care, 
commercial 
  
  
  
  
  
  
  
C 
C 
  
P 
P 
P 
C 
  
P 
P 
P 
P 
P 
P 
C 
  
  
Day care, 
residential 
P 
P 
P 
C 
C 
C 
C 
P 
  
P 
P 
P 
P 
  
  
P 
  
  
  
  
  
  
  
  
Health Care 
Facility
 
  
Hospital 
  
  
  
  
  
  
  
  
  
  
  
C 
C 
C 
C 
  
C 
  
C 
P 
P 
P 
  
 
Medical 
office or 
clinic  
  
  
  
  
  
  
  
 
 
  
P 
P 
P 
P 
P 
  
P 
P 
P 
P 
P 
  
  
  
Wireless 
Facilities 
Alternative 
tower 
structure 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
3.2.2.D  
Amateur 
radio 
antennae 
P 
P 
P 
P 
P 
  
  
  
  
  
  
  
  
  
  
P 
  
  
  
  
  
  
  
3.2.2.D  
Amateur 
radio 
antennae 
greater than 
35 feet in 
height 
C 
C 
C 
C 
C 
  
  
  
  
  
  
  
  
  
  
C 
  
  
  
  
  
  
  
3.2.2.D

Created: 2024-07-26 11:50:35 [EST] 
(Supp. No. 20, Update 2) 
 
Page 7 of 73 
Table 3.1-1: TABLE OF ALLOWED USES 
P=Permitted       C=Conditional Use      Blank cell = Use is prohibited 
Use 
Category 
Use Type 
 RESIDENTIAL 
MIXED-USE 
NONRESIDENTIAL 
  
AG 
R1-43 
R1-18 
R1-10 
R1-6 
R1-3 
R1-1 
MF- 1 
MF- 2 
MH 
NMU 
CMU 
 
RMU 
 
IMU 
DC 
 
DR 
PO 
C- 1 
C-2 
 
C-3 
 
BP 
 
I -1 
 
I -2 
 
Use 
Standards 
Broadcasting 
or recording 
studio (no 
tower) 
  
  
  
  
  
  
  
  
  
  
  
P 
P 
P 
P 
  
P 
P 
P 
P 
P 
P 
  
3.2.2.D 
Cell on 
wheels 
(COW) 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
3.2.2.D 
Satellite 
earth station 
C 
  
  
  
  
  
  
  
  
  
  
  
  
P 
  
  
  
  
  
  
P 
P 
P  
3.2.2.D  
Tower 
(including 
any facility 
with a tower) 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
3.2.2.D  
Wireless 
facility not 
defined in 
this Article 
C 
C 
C 
C 
C 
C 
C 
C 
C 
C 
C 
C 
C 
C 
C 
C 
C 
C 
C 
C 
C 
C 
C 
3.2.2.D 
Transporta-
tion Facility 
Airport 
C 
  
  
  
  
  
  
  
  
  
  
  
  
C 
  
  
  
  
  
  
  
C 
C 
  
Bus terminal 
  
  
  
  
  
  
  
  
  
  
  
  
  
P 
C 
  
  
  
C 
P 
P 
P 
P 
  
Heliport 
 
  
  
  
  
  
  
  
  
  
  
C 
C 
C 
C 
  
C 
  
C 
P 
P 
P 
C 
  
Utility 
Battery 
Energy 
Storage 
System 
(BESS) 
C 
C 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
P 
P 
3.2.2.A 
Solar 
generation 
station  
P 
P 
  
  
  
  
  
  
  
  
  
  
  
C 
  
  
  
  
  
  
  
P 
P 
3.2.2.C 
Utility 
facility, 
major 
C 
C 
  
  
  
  
  
  
  
  
  
  
  
C 
  
  
  
  
C 
C 
C 
C 
P

Created: 2024-07-26 11:50:35 [EST] 
(Supp. No. 20, Update 2) 
 
Page 8 of 73 
Table 3.1-1: TABLE OF ALLOWED USES 
P=Permitted       C=Conditional Use      Blank cell = Use is prohibited 
Use 
Category 
Use Type 
 RESIDENTIAL 
MIXED-USE 
NONRESIDENTIAL 
  
AG 
R1-43 
R1-18 
R1-10 
R1-6 
R1-3 
R1-1 
MF- 1 
MF- 2 
MH 
NMU 
CMU 
 
RMU 
 
IMU 
DC 
 
DR 
PO 
C- 1 
C-2 
 
C-3 
 
BP 
 
I -1 
 
I -2 
 
Use 
Standards 
Utility 
facility, 
minor 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
  
P 
P 
P 
P 
P 
P 
P 
  
RECREATION, EDUCATION, AND ASSEMBLY USES 
Assembly 
Assembly 
hall, private 
  
  
  
  
  
  
  
 
 
  
C 
C 
P 
C 
P 
  
  
P 
P 
P 
P 
  
  
 3.2.3.B 
Assembly 
hall, public 
 
C 
 C 
C 
C 
C 
C 
C 
C 
  
C 
C 
P 
C 
P 
P 
  
P 
P 
P 
P 
C 
  
3.2.3.B 
Auditorium, 
private 
  
  
  
  
  
  
  
  
  
  
  
P 
P 
C 
P 
  
  
  
P 
P 
P 
  
  
 3.2.3.B 
Community 
recreation 
center 
  
P 
P 
P 
P 
P 
P 
P 
P 
P 
  
P 
P 
  
P 
P 
C 
  
P 
P 
P  
  
  
  
Country club, 
private 
membership 
  
P 
P 
P 
P 
P 
P 
P 
P 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
 3.2.3.B 
Event venue 
C 
C 
 
 
 
 
 
 
 
 
 
C 
P 
 
C 
 
 
P 
P 
P 
 
 
 
3.2.3.B 
Fraternal or 
social club, 
nonprofit 
  
  
  
  
  
  
  
C 
C 
  
  
P 
P 
C 
P 
  
  
P 
P 
P 
P 
  
  
 3.2.3.B 
Religious 
Assembly 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
3.2.3.B 
Cultural 
Facility 
Art gallery 
or museum, 
public 
 
  
  
  
  
  
  
  
  
  
P 
P 
P 
P 
P 
P 
C 
P 
P 
P 
P 
  
  
 
Library, 
public 
 P 
 P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P  
  
  
  
  
Education 
Private 
college or 
university 
  
  
  
  
  
  
  
  
  
  
C 
C 
P 
  
P 
P 
  
C 
C 
P 
P 
  
  
  
Private 
elementary  
  
P 
P 
P 
P 
P 
P 
P 
P 
  
  
C 
P 
  
  
C 
  
C 
C 
C

Created: 2024-07-26 11:50:35 [EST] 
(Supp. No. 20, Update 2) 
 
Page 9 of 73 
Table 3.1-1: TABLE OF ALLOWED USES 
P=Permitted       C=Conditional Use      Blank cell = Use is prohibited 
Use 
Category 
Use Type 
 RESIDENTIAL 
MIXED-USE 
NONRESIDENTIAL 
  
AG 
R1-43 
R1-18 
R1-10 
R1-6 
R1-3 
R1-1 
MF- 1 
MF- 2 
MH 
NMU 
CMU 
 
RMU 
 
IMU 
DC 
 
DR 
PO 
C- 1 
C-2 
 
C-3 
 
BP 
 
I -1 
 
I -2 
 
Use 
Standards 
or middle 
school 
Private high 
school 
  
P 
P 
P 
P 
P 
P 
P 
P 
  
  
C 
P 
  
  
C 
  
C 
C 
P 
  
  
  
 
Parks and 
Open Space 
Arboretum  
or botanical 
garden 
P 
C 
C 
C 
C 
  
  
P 
P 
  
  
C 
P 
P 
P 
  
  
  
C 
P 
P 
  
  
3.2.3.A  
Campground 
P 
C 
C 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
Community 
playfields 
and parks 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
  
  
  
Parks and 
nature 
preserves, 
not-for-profit 
P 
P 
P 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
Recreation 
and 
Entertain-
ment, 
Outdoor 
General 
outdoor 
recreation, 
commercial 
  
  
  
  
  
  
  
  
  
  
  
C 
P 
  
C 
P 
  
  
P 
P 
P 
  
  
  
Golf course, 
unlighted 
P 
P 
P 
P 
P 
P 
P 
P 
P 
  
  
  
P 
C 
  
  
P 
P 
P 
P 
P 
  
  
 
Golf course/ 
driving 
range, 
lighted 
C 
C 
C 
C 
C 
C 
C 
C 
C 
  
  
  
P 
C 
  
  
P 
P 
P 
P 
P 
  
  
 
Major enter-
tainment 
facility, 
outdoor 
C 
C 
  
  
  
  
  
  
  
  
  
  
P 
C 
C 
  
  
  
  
P 
P 
C 
  
 
Race track 
(auto, dog, 
and horse) 
C 
C 
  
  
  
  
  
  
  
  
  
  
  
C 
  
  
  
  
  
C 
C 
C 
  
 
RV 
campground 
P 
P 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
 3.2.4.F

Created: 2024-07-26 11:50:35 [EST] 
(Supp. No. 20, Update 2) 
 
Page 10 of 73 
Table 3.1-1: TABLE OF ALLOWED USES 
P=Permitted       C=Conditional Use      Blank cell = Use is prohibited 
Use 
Category 
Use Type 
 RESIDENTIAL 
MIXED-USE 
NONRESIDENTIAL 
  
AG 
R1-43 
R1-18 
R1-10 
R1-6 
R1-3 
R1-1 
MF- 1 
MF- 2 
MH 
NMU 
CMU 
 
RMU 
 
IMU 
DC 
 
DR 
PO 
C- 1 
C-2 
 
C-3 
 
BP 
 
I -1 
 
I -2 
 
Use 
Standards 
RV park 
P 
P 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
3.2.4.G 
Shooting 
range, 
outdoor 
C 
C 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
 
Zoo 
C 
C 
  
  
  
  
  
  
  
  
  
  
C 
  
  
  
  
  
  
C 
  
  
  
 
Recreation 
and 
Entertainme
nt, Indoor 
Art gallery 
or museum, 
private 
  
  
  
  
  
  
  
C 
C 
  
P 
P 
P 
P 
P 
P 
C 
P 
P 
P 
C 
  
  
  
Fitness and 
recreational 
sports center 
  
  
  
  
  
  
  
C 
C 
  
P 
P 
P 
C 
P 
P 
P 
P 
P 
P 
P 
P 
P  
  
General 
indoor 
recreation, 
commercial 
  
  
  
  
  
  
  
  
  
  
C 
P 
P 
C 
P 
  
  
P 
P 
P 
P 
P 
  
  
Major enter-
tainment 
facility, 
indoor 
  
  
  
  
  
  
  
  
  
  
  
C 
P 
C 
P 
  
  
P 
P 
P 
P 
P 
  
  
Movie 
theater 
  
  
  
  
  
  
  
  
  
  
  
C 
P 
  
P 
  
  
P 
P 
P 
C 
  
  
  
COMMERCIAL USES 
Agriculture 
and 
Ranching 
Agriculture 
P 
P 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
3.2.4.A 
Commercial 
ranch 
P 
P 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
3.2.4.A  
Dairy 
P 
C 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
P 
3.2.4.A  
Meat 
processing 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
P 
3.2.4.A  
Residential 
ranch 
P 
P 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
3.2.4.A  
Animal 
hospital 
P 
C 
  
  
  
  
  
  
  
  
  
  
  
P 
  
  
  
  
C 
C 
P 
P

Created: 2024-07-26 11:50:35 [EST] 
(Supp. No. 20, Update 2) 
 
Page 11 of 73 
Table 3.1-1: TABLE OF ALLOWED USES 
P=Permitted       C=Conditional Use      Blank cell = Use is prohibited 
Use 
Category 
Use Type 
 RESIDENTIAL 
MIXED-USE 
NONRESIDENTIAL 
  
AG 
R1-43 
R1-18 
R1-10 
R1-6 
R1-3 
R1-1 
MF- 1 
MF- 2 
MH 
NMU 
CMU 
 
RMU 
 
IMU 
DC 
 
DR 
PO 
C- 1 
C-2 
 
C-3 
 
BP 
 
I -1 
 
I -2 
 
Use 
Standards 
Animal 
Sales and 
Services 
Animal pet 
shop, retail 
  
  
  
  
  
  
  
  
  
  
P 
P 
P 
C 
P 
  
  
P 
P 
P 
P 
  
  
  
Animal 
training 
school 
P 
P 
  
  
  
  
  
  
  
  
  
C 
C 
P 
C 
  
  
  
P 
P 
P 
  
  
 
Kennel, 
indoor only 
P 
P 
  
  
  
  
  
  
  
  
  
P 
P 
C 
  
  
  
  
P 
P 
P 
  
  
 
Kennel, 
indoor/ 
outdoor 
P 
P 
  
  
  
  
  
  
  
  
  
  
  
C 
  
  
  
  
  
C 
  
  
  
 
Veterinary 
clinic 
P 
P 
  
  
  
  
  
  
  
  
P 
P 
P 
P 
P 
  
  
P 
P 
P 
P 
  
  
 
Financial 
Service 
Financial 
institution, 
with drive-
through 
  
  
  
  
  
  
  
  
  
  
  
 
 
 
C 
  
  
P 
P 
P 
P 
  
  
  
Financial 
institution, 
without 
drive-
through 
  
  
  
  
  
  
  
  
P 
  
P 
P 
 P 
P 
P 
  
P 
P 
P 
P 
P 
  
  
  
Nontradition
al financial 
institutions 
  
  
  
  
  
  
  
  
  
  
  
  
  
C 
  
  
  
C 
C 
C 
C 
P 
  
3.2.4.E 
Food and 
Beverage 
Service 
Bar, lounge, 
or tavern 
  
  
  
  
  
  
  
  
  
  
P 
P 
P 
C 
P 
  
  
P 
P 
P 
P 
  
  
  
Catering 
service 
  
  
  
  
  
  
  
  
  
  
 
 
 
 
 
 
 
 
 
 
P 
C 
  
  
Drive-in 
restaurant 
  
  
  
  
  
  
  
  
  
  
  
 
 
 
C 
  
  
  
P 
P 
P 
  
  
  
Farmers 
market 
P 
P 
  
  
  
  
  
  
  
  
P 
P 
P 
P 
P 
 
  
C 
P 
P

Created: 2024-07-26 11:50:35 [EST] 
(Supp. No. 20, Update 2) 
 
Page 12 of 73 
Table 3.1-1: TABLE OF ALLOWED USES 
P=Permitted       C=Conditional Use      Blank cell = Use is prohibited 
Use 
Category 
Use Type 
 RESIDENTIAL 
MIXED-USE 
NONRESIDENTIAL 
  
AG 
R1-43 
R1-18 
R1-10 
R1-6 
R1-3 
R1-1 
MF- 1 
MF- 2 
MH 
NMU 
CMU 
 
RMU 
 
IMU 
DC 
 
DR 
PO 
C- 1 
C-2 
 
C-3 
 
BP 
 
I -1 
 
I -2 
 
Use 
Standards 
Food sales, 
wholesale 
  
  
  
  
  
  
  
  
  
  
  
  
 
 
  
  
  
 
 
P 
P 
P 
  
  
Food Truck 
Court 
(Mobile food 
vendor) 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
C 
C 
  
  
  
  
  
  
  
  
Nightclub 
  
  
  
  
  
  
  
  
  
  
  
C 
C 
C 
P 
  
  
  
P 
P 
P 
  
  
  
Restaurant, 
with drive-
through 
  
  
  
  
  
  
  
  
  
  
  
 
 
 
 
  
  
P 
P 
P 
P 
  
  
  
Restaurant, 
without 
drive-
through 
  
  
  
  
  
  
  
  
 
  
P 
P 
P 
P 
P 
  
P 
P 
P 
P 
P 
  
  
  
Office 
Data Center 
  
  
  
  
  
  
  
  
  
  
  
  
 
C 
  
  
C 
  
  
  
C 
C 
C 
  
Office, 
business or 
professional 
  
  
  
  
  
  
  
  
 
  
P 
P 
P 
P 
P 
  
P 
P 
P 
P 
P 
P  
P  
  
Research 
laboratory 
  
  
  
  
  
  
  
  
  
  
  
P 
P 
P 
  
  
P 
  
C 
P 
P 
P 
P 
  
Personal 
Services  
Dry cleaning 
and laundry 
processing 
  
  
  
  
  
  
  
 
 
  
 
 
 
 
  
  
 
 
 
 
P 
P 
 P 
  
General 
personal 
services 
  
  
  
  
  
  
  
 
 
  
P 
P 
P 
  
P 
  
P 
P 
P 
P 
P 
  
  
  
Instructional 
services or 
trade school 
  
  
  
  
  
  
  
  
  
  
C 
P 
P 
P 
P 
  
P 
P 
P 
P 
P 
P 
P 
  
Retail 
(Sales) 
Alcoholic 
beverages, 
retail sale 
  
  
  
  
  
  
  
  
  
  
P 
P 
P 
  
P 
  
  
P 
P 
P

Created: 2024-07-26 11:50:35 [EST] 
(Supp. No. 20, Update 2) 
 
Page 13 of 73 
Table 3.1-1: TABLE OF ALLOWED USES 
P=Permitted       C=Conditional Use      Blank cell = Use is prohibited 
Use 
Category 
Use Type 
 RESIDENTIAL 
MIXED-USE 
NONRESIDENTIAL 
  
AG 
R1-43 
R1-18 
R1-10 
R1-6 
R1-3 
R1-1 
MF- 1 
MF- 2 
MH 
NMU 
CMU 
 
RMU 
 
IMU 
DC 
 
DR 
PO 
C- 1 
C-2 
 
C-3 
 
BP 
 
I -1 
 
I -2 
 
Use 
Standards 
Building 
materials 
sales, indoor 
retail 
  
  
  
  
  
  
  
  
  
  
  
P 
P 
P 
  
  
  
  
P 
P 
P 
P 
  
3.2.4.B 
Convenience 
store with 
gas sales 
  
  
  
  
  
  
  
 
 
  
C 
P 
P 
P 
  
  
  
P 
P 
P 
C 
P 
C 
  
Feed store 
P 
C 
  
  
  
  
  
  
  
  
  
  
  
C 
  
  
  
  
 
 
  
P 
P  
  
General 
retail 
  
  
  
  
  
  
  
  
  
  
P 
P 
P 
  
P 
  
P 
P 
P 
P 
P 
  
  
3.2.4.C 
Large format 
retail 
  
  
  
  
  
  
  
  
  
  
  
  
P 
  
  
  
  
  
P 
P 
C 
  
  
3.2.4.D   
Nursery and 
plant sales, 
wholesale 
P 
P 
  
  
  
  
  
  
  
  
  
  
  
P 
  
  
  
  
  
C 
P 
P 
  
  
Open-air 
market or 
flea market 
P 
P 
  
  
  
  
  
  
  
  
 
 
  
 C 
C 
  
  
 
 
 
  
 C 
  
  
Plant sales, 
retail 
P 
P 
 
 
 
 
 
 
 
 
P 
P 
 
 
C 
 
 
P 
P 
P 
 
 
 
 
Sexually 
oriented 
business 
  
  
  
  
  
  
  
  
  
  
  
  
  
C 
  
  
  
  
  
C 
  
C 
C 
3.2.4.H 
Tobacco- 
Oriented 
Retailer 
  
  
  
  
  
  
  
  
  
  
C 
P 
P 
  
C 
  
  
C 
P 
P 
  
  
  
3.2.4.I 
Visitor 
Accommoda
tions 
Bed and 
breakfast  
C 
C 
C 
C 
C 
C 
C 
C 
C 
  
P 
P 
P 
  
C  
 C 
  
P 
P 
  
  
  
  
  
Hotel or 
motel 
  
  
  
  
  
  
  
  
 
  
C 
P 
P 
C 
P 
  
C 
P 
P 
P 
P 
  
  
  
Resort 
  
  
  
  
  
  
  
  
  
  
  
C 
P 
  
P 
  
  
  
P 
P

Created: 2024-07-26 11:50:35 [EST] 
(Supp. No. 20, Update 2) 
 
Page 14 of 73 
Table 3.1-1: TABLE OF ALLOWED USES 
P=Permitted       C=Conditional Use      Blank cell = Use is prohibited 
Use 
Category 
Use Type 
 RESIDENTIAL 
MIXED-USE 
NONRESIDENTIAL 
  
AG 
R1-43 
R1-18 
R1-10 
R1-6 
R1-3 
R1-1 
MF- 1 
MF- 2 
MH 
NMU 
CMU 
 
RMU 
 
IMU 
DC 
 
DR 
PO 
C- 1 
C-2 
 
C-3 
 
BP 
 
I -1 
 
I -2 
 
Use 
Standards 
MARIJUANA USES 
Marijuana 
Sales and 
Cultivation 
Dual License  
Marijuana 
Establishment 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
C 
3.2.5.A.3 
Medical 
Marijuana 
Dispensary 
  
  
  
  
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
  
 
C 
3.2.5.A.1 
Medical 
Marijuana 
Dispensary, 
Offsite 
Cultivation 
Location 
  
  
  
  
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
  
 
C 
3.2.5.A.2 
VEHICLE SALES AND SERVICES USES 
Vehicles 
and 
Equipment 
Boat, RV 
sales and 
rental 
  
  
  
  
  
  
  
  
  
  
  
  
  
P 
  
  
  
  
  
 
  
P 
P 
 3.2.6.B 
Car wash  
  
  
  
  
  
  
  
  
  
  
  
 
 
 
  
  
  
 
P 
P 
P 
P 
  
  3.2.6.A 
Gasoline 
sales  
C 
C 
  
  
  
  
  
  
  
  
 
 
 
 
  
  
  
 
P 
P 
C 
P 
  
  3.2.6.B 
Parking 
structure 
  
  
  
  
  
  
  
C 
P 
  
C 
P 
P 
P 
P 
  
P 
P 
P 
P 
P 
P 
P 
  3.2.6.B 
Truck repair 
and overhaul 
C 
  
  
  
  
  
  
  
  
  
  
  
  
 C 
  
  
  
  
  
  
  
C 
P 
  3.2.6.B 
Truck stop 
C 
  
  
  
  
  
  
  
  
  
  
  
  
 
  
  
  
  
  
  
  
C 
P 
3.2.6.C 
Vehicle sales 
and rental 
  
  
  
  
  
  
  
  
  
  
 
 
 
P 
  
  
  
  
P 
P 
P 
P 
C 
  3.2.6.B 
Vehicle 
service and 
repair, major 
  
  
  
  
  
  
  
  
  
  
 
 
 
P 
  
  
  
  
P 
P 
  
P 
P 
 3.2.6.B  
Vehicle 
service and 
repair, minor 
  
  
  
  
  
  
  
  
  
  
 
 
  
P 
  
  
  
 
P 
P 
  
P 
P 
  3.2.6.B

Created: 2024-07-26 11:50:35 [EST] 
(Supp. No. 20, Update 2) 
 
Page 15 of 73 
Table 3.1-1: TABLE OF ALLOWED USES 
P=Permitted       C=Conditional Use      Blank cell = Use is prohibited 
Use 
Category 
Use Type 
 RESIDENTIAL 
MIXED-USE 
NONRESIDENTIAL 
  
AG 
R1-43 
R1-18 
R1-10 
R1-6 
R1-3 
R1-1 
MF- 1 
MF- 2 
MH 
NMU 
CMU 
 
RMU 
 
IMU 
DC 
 
DR 
PO 
C- 1 
C-2 
 
C-3 
 
BP 
 
I -1 
 
I -2 
 
Use 
Standards 
Vehicle and 
boat storage 
P  
  
  
  
  
  
  
  
  
  
  
  
 
P 
  
  
  
  
 
 
  
P 
P 
  3.2.6.B 
 
INDUSTRIAL USES 
Industrial 
Service 
Building 
material 
sales, 
outdoor or 
wholesale 
  
  
  
  
  
  
  
  
  
  
  
 
 
P 
  
  
  
  
  
P 
  
P 
P 
  
Drilling 
company, no 
outside 
storage 
  
  
  
  
  
  
  
  
  
  
  
  
  
P 
  
  
  
  
  
  
  
P 
P 
  
Drilling 
company, 
with outside 
storage 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
P 
  
Equipment 
Rental Yard 
C 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
C 
C 
  
P 
P 
  
Equipment 
Rental Yard, 
Heavy 
C 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
P 
P 
  
General 
industrial 
service 
  
  
  
  
  
  
  
  
  
  
  
  
  
P 
  
  
  
  
  
  
  
P 
P 
3.2.7.C 
Resource 
extraction 
C 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
C 
  
Manufacturi
ng and 
Production 
Assembly, 
Light 
 
 
 
 
 
 
 
 
 
 
 
 
 
P 
 
 
 
 
 
 
P 
P 
P 
 
Batch Plant, 
Permanent 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
P 
 3.2.7.A 
Maker 
Space, up to 
a maximum 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
P

Created: 2024-07-26 11:50:35 [EST] 
(Supp. No. 20, Update 2) 
 
Page 16 of 73 
Table 3.1-1: TABLE OF ALLOWED USES 
P=Permitted       C=Conditional Use      Blank cell = Use is prohibited 
Use 
Category 
Use Type 
 RESIDENTIAL 
MIXED-USE 
NONRESIDENTIAL 
  
AG 
R1-43 
R1-18 
R1-10 
R1-6 
R1-3 
R1-1 
MF- 1 
MF- 2 
MH 
NMU 
CMU 
 
RMU 
 
IMU 
DC 
 
DR 
PO 
C- 1 
C-2 
 
C-3 
 
BP 
 
I -1 
 
I -2 
 
Use 
Standards 
of 30,000 
square feet 
Mfg., heavy 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
P 
  
Mfg., light 
  
  
  
  
  
  
  
  
  
  
  
  
  
P 
  
  
  
  
  
  
P 
P 
P 
  
Warehouse 
and Freight 
Movement 
Distribution 
Warehouse 
  
  
  
  
  
  
  
  
  
  
  
  
  
P 
  
  
  
  
  
  
P 
P 
P 
 3.2.7.B 
Mini-storage, 
indoor 
  
  
  
  
  
  
  
  
  
  
  
 
 
P 
  
  
  
  
P 
P 
P 
P 
P 
 3.2.7.E 
Mini-storage, 
outdoor 
  
  
  
  
  
  
  
  
  
  
  
 
 
P 
  
  
  
  
 
 
C 
P 
P 
 3.2.7.E 
Motor freight 
terminal 
  
  
  
  
  
  
  
  
  
  
  
  
  
C 
  
  
  
  
  
  
  
C 
P 
  
Office 
warehouse 
  
  
  
  
  
  
  
  
  
  
  
  
  
P 
  
  
  
  
  
  
P 
P 
P 
  
Storage 
yard 
  
  
  
  
  
  
  
  
  
  
  
  
  
C 
  
  
  
  
  
  
  
C 
P 
  
Warehouse 
  
  
  
  
  
  
  
  
  
  
  
  
  
P 
  
  
  
  
  
  
C 
P 
P 
  
Wholesale 
establishment 
  
  
  
  
  
  
  
  
  
  
  
  
  
P 
  
  
  
  
C 
C 
P 
P 
P 
  
Waste and 
Salvage 
Auto 
wrecking 
and salvage 
yard 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
C 
 
Landfill 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
C 
3.2.7.D 
Recycling 
center indoor 
  
  
  
  
  
  
  
  
  
  
  
  
  
C 
  
  
  
  
  
  
C 
P 
P 
  
Recycling 
center 
outdoor 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
P 
  
TEMPORARY USES 
Temporary 
Uses 
Antennas, 
temporary 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
3.4.2.A

Created: 2024-07-26 11:50:35 [EST] 
(Supp. No. 20, Update 2) 
 
Page 17 of 73 
Table 3.1-1: TABLE OF ALLOWED USES 
P=Permitted       C=Conditional Use      Blank cell = Use is prohibited 
Use 
Category 
Use Type 
 RESIDENTIAL 
MIXED-USE 
NONRESIDENTIAL 
  
AG 
R1-43 
R1-18 
R1-10 
R1-6 
R1-3 
R1-1 
MF- 1 
MF- 2 
MH 
NMU 
CMU 
 
RMU 
 
IMU 
DC 
 
DR 
PO 
C- 1 
C-2 
 
C-3 
 
BP 
 
I -1 
 
I -2 
 
Use 
Standards 
Batch plant, 
temporary 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
3.4.2.B 
Expansion or 
replacement 
facilities, 
temporary 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
3.4.2.C 
Food Trucks; 
Mobile Food 
Vendor 
P 
  
  
  
  
  
  
  
  
  
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
3.4.2.D 
Hot air 
balloons 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
3.4.2.E 
Office 
space/ 
equipment 
storage, 
temporary 
P 
  
  
  
  
  
  
  
  
  
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
 
Other 
temporary 
uses 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
3.4.2.L 
Portable 
restroom, 
temporary 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
3.4.2.F 
Portable 
storage 
container, 
temporary 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
3.4.2.G 
Retail sales, 
temporary 
P 
  
  
  
  
  
  
  
  
  
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
3.4.2.H 
Roadside 
stand 
P 
P 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
3.4.2.I 
Sales/leasin
g office, 
temporary 
  
P 
P 
P 
P 
P 
P 
P 
P 
P 
P  
P  
P  
 P 
 P 
P  
  
  
  
  
  
  
  
3.4.2.J

Created: 2024-07-26 11:50:35 [EST] 
(Supp. No. 20, Update 2) 
 
Page 18 of 73 
Table 3.1-1: TABLE OF ALLOWED USES 
P=Permitted       C=Conditional Use      Blank cell = Use is prohibited 
Use 
Category 
Use Type 
 RESIDENTIAL 
MIXED-USE 
NONRESIDENTIAL 
  
AG 
R1-43 
R1-18 
R1-10 
R1-6 
R1-3 
R1-1 
MF- 1 
MF- 2 
MH 
NMU 
CMU 
 
RMU 
 
IMU 
DC 
 
DR 
PO 
C- 1 
C-2 
 
C-3 
 
BP 
 
I -1 
 
I -2 
 
Use 
Standards 
Yard sale, 
temporary 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
P 
  
  
P  
  
  
  
  
  
  
  
3.4.2.K

WESTPARK CMP  
 
 
 
 
 
 
 
 
Appendix B 
 
INDUSTRIAL BUILDING ELEVATION EXAMPLES

123456
Signage
123456
Signage
Westpark Conceptual Elevations
5.16.22

WESTPARK CMP  
 
 
 
 
 
 
 
Appendix C 
 
LEGAL DESCRIPTION AND EXHIBIT

U:\1300\1386\SURVEY\DOCS\LEGALS\1386-WESTPARK OVERALL-LEGAL.docx 
Page 1 of 13 
WESTPARK 
OVERALL PROPERTY  
LEGAL DESCRIPTION 
 
A parcel of land situate within Sections 15, 21, 22, 23, and 27, Township 1 
North, Range 4 West of the Gila and Salt River Meridian, Maricopa County, 
Arizona, more particularly described as follows:  
 
PARCEL NO 1: 
 
BEGINNING at the West Quarter Corner of said Section 21, monumented by a 
PK Nail with tag RLS 36888; 
 
Thence North 00°10'11" East along the westerly line of the Northwest Quarter 
of said Section 21, a distance of 2613.04 feet as the Basis of Bearings to the 
Northwest Corner of said Section 21, monumented by a rebar no ID; 
 
Thence South 89°37'12" East along the northerly line of said Northwest 
Quarter, 2621.85 feet to the North Quarter Corner of said Section 21; 
 
Thence South 89°37'12" East along the northerly line of the Northeast Quarter 
of said Section 21, a distance of 2621.85 feet to the Northeast Corner of said 
Section 21, monumented by a ¾” rebar with no ID; 
 
Thence North 00°44'55" East along the westerly line of the Southwest Quarter 
of said Section 15, a distance of 2621.90 feet to the West Quarter corner of 
said Section 15, monumented by 1” iron pipe with cap, RLS 31034; 
 
Thence North 00°24'07" East along the westerly line of the Northwest Quarter 
of said Section 15, a distance of 1270.21 feet to the northerly line of the South 
Half of said Northwest Quarter; 
 
Thence North 89°22'06" East along said northerly line, 2608.03 feet to the 
easterly line of said Northwest Quarter; 
 
Thence South 00°28'21" West along said easterly line, 1270.24 feet to the 
Center of said Section 15 monumented by Maricopa County aluminum cap 
with RLS 33307, dated 2009;

U:\1300\1386\SURVEY\DOCS\LEGALS\1386-WESTPARK OVERALL-LEGAL.docx 
Page 2 of 13 
 
Thence North 89°22'06" East along the northerly line of the Southeast Quarter 
of said Section 15, a distance of 2624.18 feet to the East Quarter Corner of said 
Section 15, monumented by a ¾” rebar in concrete; 
 
Thence South 00°06'39" West along the easterly line of said Southeast 
Quarter, 2624.67 feet to the Southeast Corner of said Section 15 monumented 
by a rebar with tag RLS 38862; 
 
Thence South 89°23'59" East along the northerly line of the Northwest Quarter 
of said Section 23, a distance of 1310.72 feet; 
 
Thence leaving said northerly line, South 00°00'51" West, 2305.24 feet; 
 
Thence South 89°02'30" East, 1312.37 feet; 
 
Thence North 63°47'30" East, 1456.02 feet; 
 
Thence North 70°36'40" East, 960.03 feet to the easterly line of State Route 85; 
 
Thence along said easterly line of State Route 85 the following 4 courses: 
 
Thence South 00°15'19" East, 1050.92 feet; 
 
Thence South 00°13'20" West, 600.03 feet; 
 
Thence South 04°58'56" West, 1205.02 feet; 
 
Thence South 07°59'42" West, 84.59 feet to the northerly line of the Roosevelt 
Irrigation District Canal; 
 
Thence along said northerly line the following 15 courses; 
 
Thence South 64°41'40" West, 2111.44 feet to the beginning of a tangent 
curve, concave northwesterly, having a radius of 1460.00 feet; 
 
Thence southwesterly along said curve to the right, through a central angle of 
13°22'43", an arc length of 340.91 feet to a point of tangency;

U:\1300\1386\SURVEY\DOCS\LEGALS\1386-WESTPARK OVERALL-LEGAL.docx 
Page 3 of 13 
Thence South 78°04'23" West, 2285.37 feet to the beginning of a tangent 
curve, concave northwesterly, having a radius of 4675.00 feet; 
 
Thence southwesterly along said curve to the right, through a central angle of 
03°11'49", an arc length of 260.86 feet to a point of tangency; 
 
Thence North 00°08'12" West, 9.18 feet to the beginning of a non-tangent 
curve, concave northerly, whose radius point bears North 08°26'35" West, 
3550.00 feet; 
 
Thence westerly along said curve to the right, through a central angle of 
02°21'50", an arc length of 146.46 feet to a point of tangency; 
 
Thence South 83°55'14" West, 991.14 feet to the beginning of a tangent curve, 
concave northerly, having a radius of 1650.00 feet; 
 
Thence southerly along said curve to the right, through a central angle of 
14°48'17", an arc length of 426.35 feet to a point of tangency also being 
referred hereon as Point "B"; 
 
Thence North 81°16'29" West, 3683.66 feet; 
 
Thence North 81°16'29" West, 836.27 feet to the beginning of a tangent curve, 
concave northeasterly, having a radius of 1600.00 feet; 
 
Thence northwesterly along said curve to the right, through a central angle of 
02°09'43", an arc length of 60.37 feet to the beginning of a tangent compound 
curve, concave northeasterly, having a radius of 1600.00 feet; 
 
Thence northwesterly along said curve to the right, through a central angle of 
09°33'22", an arc length of 266.86 feet to a point of tangency; 
 
Thence North 69°33'24" West, 655.58 feet to the beginning of a tangent curve, 
concave northeasterly, having a radius of 3050.00 feet; 
 
Thence northwesterly along said curve to the left, through a central angle of 
05°55'43", an arc length of 315.60 feet to a point of tangency;

U:\1300\1386\SURVEY\DOCS\LEGALS\1386-WESTPARK OVERALL-LEGAL.docx 
Page 4 of 13 
Thence North 75°29'07" West, 3363.88 feet to the westerly line of the 
Southwest Quarter of said Section 21; 
 
Thence North 00°10'30" East along said westerly line, 1381.34 feet to the 
POINT OF BEGINNING; 
 
EXCEPT FROM PARCEL NO. 1: 
 
A parcel of land situate within the East half of Section 22, Township 1 North, 
Range 4 West of the Gila and Salt River Meridian, Maricopa County, Arizona, 
more particularly described as follows:  
 
BEGINNING at the East Quarter corner of said Section 22, monumented by an 
aluminum cap with RLS 31034; 
 
Thence South 00°03'31" West along the easterly line of the Southwest Quarter 
of said Section 22, a distance of 328.17 feet; 
 
Thence leaving said easterly line, South 89°31'30" West, 2614.49 feet to the 
westerly line of said East Half; 
 
Thence North 00°06'24" West along said westerly line, 2044.03 feet; 
 
Thence leaving said westerly line, North 89°31'30" East, 2620.21 feet to the 
easterly line of the Northeast Quarter of said Section 22; 
 
Thence South 00°03'10" West along said easterly line, 1715.90 feet to the 
POINT OF BEGINNING. 
 
ALSO EXCEPT FROM PARCEL NO. 1: 
 
A parcel of land situate within Sections 22, 23, 26, and 27, Township 1 North, 
Range 4 West of the Gila and Salt River Meridian, Maricopa County, Arizona, 
more particularly described as follows:  
 
BEGINNING at the aforementioned said Point “B”;

U:\1300\1386\SURVEY\DOCS\LEGALS\1386-WESTPARK OVERALL-LEGAL.docx 
Page 5 of 13 
Thence South 78°04'23" West along the northerly line of the Roosevelt 
Irrigation District Canal, 2285.37 feet to the beginning of a tangent curve, 
concave northwesterly, having a radius of 4675.00 feet; 
 
Thence southwesterly along said northerly line of the Roosevelt Irrigation 
District Canal and curve to the right, through a central angle of 03°04'23", an 
arc length of 250.74 feet to a point of non-tangency; 
 
Thence North 00°08'12" West, 14.67 feet to the beginning of a tangent curve, 
concave westerly, having a radius of 1740.00 feet; 
 
Thence northerly along said curve to the left, through a central angle of 
05°40'53", an arc length of 172.53 feet to a point of tangency; 
 
Thence North 05°49'04" West, 518.24 feet to the beginning of a tangent curve, 
concave easterly, having a radius of 1860.00 feet; 
 
Thence northerly along said curve to the right, through a central angle of 
05°52'36", an arc length of 190.77 feet to a point of tangency; 
 
Thence North 00°03'31" East, 1245.96 feet; 
 
Thence North 89°56'29" West, 6.00 feet; 
 
Thence North 00°03'31" East, 542.00 feet; 
 
Thence South 89°56'29" East, 126.00 feet; 
 
Thence South 44°56'29" East, 63.64 feet; 
 
Thence South 89°56'29" East, 377.00 feet; 
 
Thence South 00°03'31" West, 10.00 feet; 
 
Thence South 89°56'29" East, 769.62 feet; 
 
Thence North 45°03'31" East, 50.91 feet; 
 
Thence South 89°56'29" East, 67.80 feet;

U:\1300\1386\SURVEY\DOCS\LEGALS\1386-WESTPARK OVERALL-LEGAL.docx 
Page 6 of 13 
 
Thence South 44°56'29" East, 36.77 feet; 
 
Thence South 89°56'29" East, 278.00 feet; 
 
Thence South 00°03'31" West, 6.00 feet; 
 
Thence South 89°56'29" East, 252.20 feet; 
 
Thence North 45°03'31" East, 50.91 feet; 
 
Thence South 89°56'29" East, 83.80 feet; 
 
Thence South 44°56'29" East, 42.43 feet; 
 
Thence South 89°56'29" East, 492.58 feet; 
 
Thence South 00°03'31" West, 10.00 feet; 
 
Thence South 89°56'29" East, 729.97 feet; 
 
Thence North 00°03'31" East, 6.00 feet; 
 
Thence South 89°56'29" East, 502.83 feet; 
 
Thence North 44°47'44" East, 63.35 feet to the beginning of a non-tangent 
curve, concave easterly, whose radius point bears North 89°45'35" East, 
5670.00 feet; 
 
Thence northerly along said curve to the right, through a central angle of 
03°19'13", an arc length of 328.58 feet to a point of tangency; 
 
Thence South 86°55'12" East, 15.00 feet to the beginning of a non-tangent 
curve, concave easterly, whose radius point bears South 86°55'12" East, 
5655.00 feet; 
 
Thence northerly along said curve to the right, through a central angle of 
00°12'58", an arc length of 21.33 feet to a point of non-tangency;

U:\1300\1386\SURVEY\DOCS\LEGALS\1386-WESTPARK OVERALL-LEGAL.docx 
Page 7 of 13 
Thence South 86°42'14" East, 126.00 feet to the beginning of a non-tangent 
curve, concave easterly, whose radius point bears South 86°42'14" East, 
5529.00 feet; 
 
Thence northerly along said curve to the left, through a central angle of 
03°50'34", an arc length of 370.83 feet to a point of non-tangency; 
 
Thence South 45°38'05" East, 58.11 feet; 
 
Thence South 01°18'19" East, 63.28 feet; 
 
Thence South 43°08'17" West, 41.07 feet; 
 
Thence South 01°51'43" East, 322.17 feet; 
 
Thence South 88°08'17" West, 12.00 feet; 
 
Thence South 01°51'43" East, 48.38 feet to the beginning of a tangent curve, 
concave westerly, having a radius of 1871.00 feet; 
 
Thence southerly along said curve to the right, through a central angle of 
03°21'03", an arc length of 109.42 feet to a point of tangency; 
 
Thence South 01°29'20" West, 859.75 feet to the northerly line of the 
Roosevelt Irrigation District Canal; 
 
Thence South 64°41'40" West along said northerly line of the Roosevelt 
Irrigation District Canal, 1273.49 feet to the beginning of a tangent curve, 
concave northwesterly, having a radius of 1460.00 feet; 
 
Thence southwesterly along said northerly line of the Roosevelt Irrigation 
District Canal and curve to the right, through a central angle of 13°22'43", an 
arc length of 340.91 feet to the POINT OF BEGINNING. 
 
The above described Parcel No. 1 contains an area of 75,547,908 square feet 
or 1734.3413 acres more or less and being subject to any easements, 
restrictions, rights-of-way of record or otherwise.

U:\1300\1386\SURVEY\DOCS\LEGALS\1386-WESTPARK OVERALL-LEGAL.docx 
Page 8 of 13 
PARCEL NO. 2: 
 
A parcel of land situate within Section 24, Township 1 North, Range 4 West of 
the Gila and Salt River Meridian, Maricopa County, Arizona, more particularly 
described as follows:  
 
COMMENCING at the West Quarter Corner of said Section 24, monumented 
by a ADOT brass cap in hand hole with RLS 38862, dated 2010 from which the 
Northwest Corner of said Section 24, monumented by an ADOT brass cap in 
hand hole bears as the Basis of Bearings, North 00°06’26” West, 2662.93 feet; 
 
Thence South 89°23’26” East, 54.82 feet to the easterly line of State Route 85 
being the POINT OF BEGINNING; 
 
Thence North 00°06'26" West along said easterly line, 1331.34 feet; 
 
Thence South 89°15'48" East, 1285.16 feet to the westerly line of the Final Plat 
of “Westpark Phase 2.2 Parcel 8” recorded at Book 1825, Page 50, Maricopa 
County Recorders Office, Maricopa County, Arizona; 
 
Thence South 23°19'09" East along said westerly line, 721.49 feet to the 
northerly right of way line of Warner Road recorded at Book 750, Page 28, 
Maricopa County Recorders Office, Maricopa County, Arizona; 
 
Thence South 66°15'05" West along said northerly right of way line, 39.12 feet 
to the westerly line said Warner Road ; 
 
Thence South 23°23'43" East along said westerly line, 110.00 feet to the 
southerly line said Warner Road; 
 
Thence along said southerly line the following 6 courses: 
 
Thence North 66°36'17" East, 444.39 feet to the beginning of a tangent curve, 
concave southeasterly, having a radius of 570.00 feet; 
 
Thence northeasterly along said curve to the right, through a central angle of 
13°32'15", an arc length of 134.68 feet to a point of tangency;

U:\1300\1386\SURVEY\DOCS\LEGALS\1386-WESTPARK OVERALL-LEGAL.docx 
Page 9 of 13 
Thence North 80°08'32" East, 143.14 feet to the beginning of a tangent curve, 
concave northwesterly, having a radius of 570.00 feet; 
 
Thence northeasterly along said curve to the left, through a central angle of 
19°20'45", an arc length of 192.46 feet to the beginning of a reverse tangent 
curve, concave southerly, having a radius of 200.00 feet; 
 
Thence easterly along said curve to the right, through a central angle of 
63°16'34", an arc length of 220.87 feet to the beginning of a reverse non-
tangent 
curve, 
concave 
northeasterly, 
whose 
radius 
point 
bears 
North 35°35'06" East, 650.93 feet; 
 
Thence southeasterly along said curve to the left, through a central angle of 
32°43'54", an arc length of 371.86 feet to a point of non-tangency; 
 
Thence South 01°22'33" West, 132.58 feet; 
 
Thence South 10°00'27" East, 715.70 feet to the northerly line of the Roosevelt 
Irrigation District Canal; 
 
Thence South 79°59'33" West along said northerly line, 740.22 feet to the 
beginning of a tangent curve, concave southeasterly, having a radius of 
1590.00 feet; 
 
Thence southwesterly along said curve to the left, through a central angle of 
15°17'53", an arc length of 424.53 feet to a point of tangency; 
 
Thence South 64°41'40" West continuing along said northerly line, 2169.52 
feet to the easterly line of said State Route 85; 
 
Thence North 00°46'31" West along said easterly line, 1312.52 feet to the 
POINT OF BEGINNING. 
 
The above described Parcel No. 2 contains an area of 4,990,192 square feet or 
114.5590 acres more or less and being subject to any easements, restrictions, 
rights-of-way of record or otherwise. 
 
PARCEL NO. 3:

U:\1300\1386\SURVEY\DOCS\LEGALS\1386-WESTPARK OVERALL-LEGAL.docx 
Page 10 of 13 
A parcel of land situate within Sections 24 and 13, Township 1 North, Range 4 
West of the Gila and Salt River Meridian, Maricopa County, Arizona, more 
particularly described as follows:  
 
COMMENCING at the Southeast Corner of said Section 13, monumented by 
rebar with no ID, from which the East Quarter Corner of said Section 13, 
monumented by a 3” aluminum cap, bears as the Basis of Bearings North 
00°08’03” East, 2640.62 feet; 
 
Thence North 00°08’03” East along the easterly line of the Southeast Quarter 
of said Section 13, a distance of 1320.31 feet to the POINT OF BEGINNING; 
 
Thence leaving said easterly line, South 89°39'35" East, 83.54 feet; 
 
Thence South 00°01'20" East, 1264.03 feet; 
 
Thence South 00°01'21" East, 828.50 feet to the northerly line of the Final Re-
plat of Westpark Parcel 18S recorded at Book 1700, Page 45, Maricopa County 
Recorders Office, Maricopa County, Arizona; 
 
Thence along said northerly line the following 11 courses: 
 
Thence South 89°59'43" West, 460.05 feet; 
 
Thence North 88°25'57" West, 56.41 feet; 
 
Thence North 83°03'53" West, 56.29 feet; 
 
Thence North 77°30'22" West, 56.27 feet; 
 
Thence North 72°52'08" West, 828.41 feet; 
 
Thence North 12°47'56" West, 46.38 feet to the beginning of a tangent curve, 
concave easterly, having a radius of 180.00 feet; 
 
Thence northerly along said curve to the right, through a central angle of 
18°46'26", an arc length of 58.98 feet to a point of non-tangency; 
 
Thence North 81°24'32" West, 40.03 feet;

U:\1300\1386\SURVEY\DOCS\LEGALS\1386-WESTPARK OVERALL-LEGAL.docx 
Page 11 of 13 
 
Thence North 83°32'55" West, 12.28 feet; 
 
Thence South 88°24'31" West, 110.00 feet; 
 
Thence North 89°18'27" West, 138.12 feet to the easterly line of the Final Plat 
of Westpark Phase 2.2 Parcel 19 recorded at Book 1025, Page 41, Maricopa 
County Recorders Office, Maricopa County, Arizona; 
 
Thence along said easterly line the following 14 courses; 
 
Thence North 00°53'57" East, 52.97 feet; 
 
Thence North 60°27'39" West, 41.38 feet to the beginning of a tangent curve, 
concave northeasterly, having a radius of 50.00 feet; 
 
Thence northwesterly along said curve to the right, through a central angle of 
78°53'05", an arc length of 68.84 feet to the beginning of a tangent reverse 
curve, concave northwesterly, having a radius of 20.00 feet; 
 
Thence northeasterly along said curve to the left, through a central angle of 
30°15'08", an arc length of 10.56 feet to a point of non-tangency; 
 
Thence South 84°11'47" East, 113.14 feet; 
 
Thence North 05°48'13" East, 149.00 feet; 
 
Thence North 00°00'00" East, 140.85 feet; 
 
Thence North 00°00'00" East, 91.74 feet; 
 
Thence North 04°18'59" East, 53.15 feet; 
 
Thence North 00°00'00" East, 53.00 feet; 
 
Thence North 90°00'00" West, 113.95 feet; 
 
Thence North 06°01'38" East, 47.10 feet;

U:\1300\1386\SURVEY\DOCS\LEGALS\1386-WESTPARK OVERALL-LEGAL.docx 
Page 12 of 13 
 
Thence North 00°00'00" East, 50.00 feet; 
 
Thence North 46°32'31" East, 43.83 feet; 
 
Thence leaving said easterly line, North 03°25'33" East, 80.00 feet to the 
beginning of a non-tangent curve, concave southwesterly, whose radius point 
bears South 03°25'33" West, 2040.00 feet being the northerly right of way line 
of the Westpark Loop North recorded at Book 750, Page 28, Maricopa County 
Recorders Office, Maricopa County, Arizona; 
 
Thence northwesterly along said curve to the left, through a central angle of 
02°45'29", an arc length of 98.20 feet to a point of tangency; 
 
Thence continuing along said northerly right of way line, 
North 89°19'55" West, 517.37 feet to the beginning of a tangent curve, 
concave southeasterly, having a radius of 740.00 feet; 
 
Thence southwesterly along said curve to the left, through a central angle of 
31°00'09", an arc length of 400.41 feet to a point of non-tangency being the 
easterly line of the Final Plat of Westpark Phase 2.2 Parcel 7N recorded at Book 
1825, Page 38, Maricopa County Recorders Office, Maricopa County, Arizona; 
 
Thence along said easterly line the following 8 courses: 
 
Thence North 19°00'32" East, 139.06 feet; 
 
Thence North 39°49'09" East, 45.62 feet; 
 
Thence North 34°35'28" West, 116.03 feet; 
 
Thence North 32°24'56" East, 12.26 feet to the beginning of a non-tangent 
curve, concave southeasterly, whose radius point bears South 39°08'57" East, 
188.22 feet; 
 
Thence northeasterly along said curve to the right, through a central angle of 
10°16'18", an arc length of 33.74 feet to a point of non-tangency; 
 
Thence North 22°02'47" West, 155.00 feet;

U:\1300\1386\SURVEY\DOCS\LEGALS\1386-WESTPARK OVERALL-LEGAL.docx 
Page 13 of 13 
 
Thence South 67°10'48" West, 28.42 feet; 
 
Thence North 00°11'27" East, 105.08 feet to the North-South Mid-Section line 
of said Section 13; 
 
Thence North 00°12'11" East along said North-South Mid-Section line, 493.52 
feet; 
 
Thence leaving said North-South Mid-Section line, South 89°12'09" East, 
2683.52 feet to the POINT OF BEGINNING. 
 
The above described Parcel No. 3 contains an area of 4,325,734 square feet or 
99.3052 acres more or less and being subject to any easements, restrictions, 
rights-of-way of record or otherwise. 
 
Parcels 1, 2, and 3 combined contains an area of 84,863,834 square feet or 
1948.2056 acres. 
 
The description shown hereon is not to be used to violate any subdivision 
regulation of the state, county and/or municipality or any land division 
restrictions. 
 
Prepared by: Colliers Engineering and Design 
                     4742 North 24th Street, Suite 270 
                     Phoenix, AZ 85016 
                     Project No. 1386 
                     Date June 2025 
 
2/13/2026

DRAWN BY:
CHECKED BY:
PROJ.NO.:
SCALE:
DATE:
U:\1300\1386\SURVEY\DOCS\LEGALS\
1386-WESTPARK OVERALL-EXHIBIT.dwg
  2/13/2026 11:07
4742 N 24th Street, Suite 270
PHOENIX, AZ 85016
P: 602.490.0535 / F: 602.368.2436
© 2026, COLLIERS ENGINEERING & DESIGN, INC.
Engineering
& Design
Formerly
  WESTPARK  
OVERALL PROPERTY
BUCKEYE, ARIZONA
SHEET INDEX MAP
1386
FEB 2026
1" = 2500'
JK
DMS
PARCEL NO. 1
PARCEL NO. 2
PARCEL NO. 3
SHEET 1
SHEET 3
SHEET 2
SHEET 4
SHEET 5
SHEET 6
APS
PALO VERDE ROAD
LOWER BUCKEYE ROAD
ROOSEVELT IRRIGATION
DISTRICT CANAL
WILSON AVENUE
STATE ROUTE 85
BROADWAY ROAD
BURLINGTON
SHEET 7
PARCEL NO. 1 AREA 75,547,908 SQ FT OR 1734.3413 ACRES
PARCEL NO. 2 AREA 4,990,192 SQ FT OR 114.5590 ACRES
PARCEL NO. 3 AREA 4,325,734 SQ FT OR 99.3052 ACRES
COMBINED AREA 84,863,834 SQ FT OR 1948.2056 ACRES
2/13/2026

R=3050.00'
D=5°55'43"
L=315.60'
PARCEL NO. 1
N81°16'29"W
836.27'
R=1600.00'
D=2°09'43"
L=60.37'
R=1600.00'
D=9°33'22"
L=266.86'
N69°33'24"W
655.58'
N75°29'07"W 3363.88'
(BASIS OF BEARINGS)
N00°10'11"E 2613.04'
S89°37'12"E 2621.85'
S89°37'12"E 2621.85'
N00°10'30"E
1381.34'
PALO VERDE ROAD
LOWER BUCKEYE ROAD
WILSON AVENUE
BROADWAY ROAD
S00°10'30"W 2607.97'
1226.63'
S89°40'02"E 2638.15'
N89°53'57"E 2616.03'
S00°02'16"W 2613.13'
N00°01'06"E 2583.81'
NORTHWEST CORNER OF SECTION 21
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND REBAR W/ NO ID
NORTH QUARTER
CORNER OF SECTION 21
TOWNSHIP 1 NORTH,
RANGE 4 WEST
NOTHING FOUND
NORTHEAST CORNER
OF SECTION 21
TOWNSHIP 1 NORTH,
RANGE 4 WEST
FOUND 3/4" REBAR W/
NO ID
WEST QUARTER CORNER OF SECTION 21
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND PK NAIL W/ TAG RLS 36888
POINT OF BEGINNING
SOUTHWEST CORNER OF SECTION 21
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND MCDOT BRASS CAP IN HAND
HOLE, RLS 54704, DATED 2018
SOUTHEAST CORNER OF SECTION 21
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND 2" BRASS CAP W/ RLS 15919,
DATED 1992
SOUTH QUARTER CORNER OF SECTION 21
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND REBAR W/ NO ID
EAST QUARTER CORNER OF SECTION 21
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND REBAR W/ CAP RLS 31034
MATCH LINE SHEET 2
PAGE 1 OF 11
© 2026, COLLIERS ENGINEERING & DESIGN, INC.
DRAWN BY:
CHECKED BY:
PROJ.NO.:
SCALE:
DATE:
U:\1300\1386\SURVEY\DOCS\LEGALS\
1386-WESTPARK OVERALL-EXHIBIT.dwg
  2/13/2026 11:08
4742 N 24th Street, Suite 270
PHOENIX, AZ 85016
P: 602.490.0535 / F: 602.368.2436
Engineering
& Design
Formerly
WESTPARK
OVERALL PROPERTY
BUCKEYE, ARIZONA
  EXHIBIT  
1386
FEB 2026
1" = 1000'
JK
DMS
ROOSEVELT IRRIGATION
DISTRICT CANAL
2/13/2026

R=3550.00'
D=2°21'50"
L=146.46'
S83°55'14"W
991.14'
R=1650.00'
D=14°48'17"
L=426.35'
N81°16'29"W 3683.66'
N00°06'24"W 2044.03'
N89°31'30"E 2620.21'
S00°03'10"W
1715.90'
S00°03'31"W
328.17'
S89°31'30"W 2614.49'
LOWER BUCKEYE ROAD
WILSON AVENUE
BROADWAY ROAD
S00°02'16"W 2613.13'
N00°01'06"E 2583.81'
S89°19'12"W 2637.04'
S89°29'21"W 2622.76'
N00°03'10"E 2625.17'
S00°03'31"W 2625.38'
PARCEL NO. 1
NORTHWEST CORNER
OF SECTION 22
TOWNSHIP 1 NORTH,
RANGE 4 WEST
FOUND 3/4" REBAR W/
NO ID
SOUTHWEST CORNER OF
SECTION 22
TOWNSHIP 1 NORTH,
RANGE 4 WEST
FOUND 2" BRASS CAP W/
RLS 15919, DATED 1992
WEST QUARTER CORNER
OF SECTION 22
TOWNSHIP 1 NORTH,
RANGE 4 WEST
FOUND REBAR W/ CAP
RLS 31034
NORTH QUARTER
CORNER OF SECTION 22
TOWNSHIP 1 NORTH,
RANGE 4 WEST
FOUND 3/4" REBAR W/
NO ID
SOUTHEAST CORNER OF
SECTION 22
TOWNSHIP 1 NORTH,
RANGE 4 WEST
FOUND ALUMINUM CAP
W/ RLS 32222
NORTHEAST CORNER OF SECTION 22
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND REBAR W/ TAG RLS 38862
MATCH LINE SHEET 1
MATCH LINE SHEET 4
MATCH LINE SHEET 3
PAGE 2 OF 11
A = EAST QUARTER CORNER OF SECTION 22
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND ALUMINUM CAP W/ RLS 31034
POINT OF BEGINNING FOR EXCEPTION
© 2026, COLLIERS ENGINEERING & DESIGN, INC.
DRAWN BY:
CHECKED BY:
PROJ.NO.:
SCALE:
DATE:
U:\1300\1386\SURVEY\DOCS\LEGALS\
1386-WESTPARK OVERALL-EXHIBIT.dwg
  2/13/2026 11:08
4742 N 24th Street, Suite 270
PHOENIX, AZ 85016
P: 602.490.0535 / F: 602.368.2436
Engineering
& Design
Formerly
WESTPARK
OVERALL PROPERTY
BUCKEYE, ARIZONA
  EXHIBIT  
1386
FEB 2026
1" = 1000'
JK
DMS
ROOSEVELT IRRIGATION DISTRICT CANAL
A
EXCEPTION TO
PARCEL NO. 1
2/13/2026

N89°22'06"E 2608.03'
S00°28'21"W
1270.24'
N89°22'06"E 2624.18'
S00°06'39"W 2624.67'
N00°44'55"E 2621.90'
N00°24'07"E
1270.21'
LOWER BUCKEYE ROAD
S89°19'12"W 2637.04'
S89°29'21"W 2622.76'
S00°24'07"W 2612.60'
S89°13'39"W 2609.82'
S89°12'42"W 2609.46'
S00°28'21"W 2619.12'
N00°08'53"E 2625.96'
N89°22'06"E 5230.65'
S00°04'52"W 2619.08'
1348.84'
1342.39'
PARCEL NO. 1
NORTH QUARTER CORNER
OF SECTION 15
TOWNSHIP 1 NORTH,
RANGE 4 WEST
FOUND REBAR W/ NO ID
NORTHEAST CORNER
OF SECTION 15
TOWNSHIP 1 NORTH,
RANGE 4 WEST
FOUND 2" MARICOPA
COUNTY ALUMINUM CAP, RLS
33307, DATED 2009
WEST QUARTER CORNER
OF SECTION 15
TOWNSHIP 1 NORTH,
RANGE 4 WEST
FOUND 1" IRON PIPE W/
CAP RLS 31034
EAST QUARTER CORNER
OF SECTION 15
TOWNSHIP 1 NORTH,
RANGE 4 WEST
FOUND 3/4" REBAR IN
CONCRETE
SOUTHWEST CORNER
OF SECTION 15
TOWNSHIP 1 NORTH,
RANGE 4 WEST
FOUND 3/4" REBAR W/
NO ID
SOUTHEAST CORNER
OF SECTION 15
TOWNSHIP 1 NORTH,
RANGE 4 WEST
FOUND REBAR W/ TAG RLS
38862
CENTER OF SECTION 15
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND MARICOPA COUNTY ALUMINUM
CAP W/ RLS 33307, DATED 2009
PAGE 3 OF 11
MATCH LINE SHEET 2
© 2026, COLLIERS ENGINEERING & DESIGN, INC.
DRAWN BY:
CHECKED BY:
PROJ.NO.:
SCALE:
DATE:
U:\1300\1386\SURVEY\DOCS\LEGALS\
1386-WESTPARK OVERALL-EXHIBIT.dwg
  2/13/2026 11:08
4742 N 24th Street, Suite 270
PHOENIX, AZ 85016
P: 602.490.0535 / F: 602.368.2436
Engineering
& Design
Formerly
WESTPARK
OVERALL PROPERTY
BUCKEYE, ARIZONA
  EXHIBIT  
1386
FEB 2026
1" = 1000'
JK
DMS
MATCH LINE SHEET 1
MATCH LINE SHEET 3
2/13/2026

S89°23'59"E
1310.72'
S00°00'51"W 2305.24'
S89°02'30"E
1312.37'
N63°47'30"E
1456.02'
N70°36'40"E
960.03'
S00°15'19"E
1050.92'
L41
L42
L43
S64°41'40"W 2111.44'
R=1460.00'
D=13°22'43"
L=340.91'
S78°04'23"W 2285.37'
R=4675.00'
D=3°11'49"
L=260.86'
N00°08'12"W
9.18'
W
LOWER BUCKEYE ROAD
BROADWAY ROAD
N00°03'10"E 2625.17'
S00°03'31"W 2625.38'
1310.72'
N89°23'59"W 2621.43'
S89°24'13"E 2621.44'
S00°01'27"E 2643.96'
S88°59'26"E 2625.23'
S88°59'26"E 2625.58'
S88°34'56"E 2629.43'
S88°35'02"E 2629.47'
N00°05'57"W 2662.94'
N00°06'26"W 2662.93'
PARCEL NO. 1
PAGE 4 OF 11
SOUTHWEST CORNER OF SECTION 23
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND ALUMINUM CAP W/ RLS
32222
NORTHWEST CORNER OF SECTION 23
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND REBAR W/ TAG RLS 38862
WEST QUARTER CORNER OF SECTION 23
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND ALUMINUM CAP W/ RLS 31034
SOUTH QUARTER CORNER OF SECTION 23
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND ALUMINUM CAP W/ RLS 32222
SOUTHEAST CORNER OF SECTION 23
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND ADOT BRASS CAP IN HAND
HOLE W/ RLS 38862, DATED 2010
EAST QUARTER CORNER OF SECTION 23
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND ADOT BRASS CAP IN HAND HOLE
W/ RLS 38862, DATED 2010
NORTHEAST CORNER OF SECTION 23
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND ADOT BRASS CAP IN HAND HOLE
MATCH LINE SHEET 2
© 2026, COLLIERS ENGINEERING & DESIGN, INC.
DRAWN BY:
CHECKED BY:
PROJ.NO.:
SCALE:
DATE:
U:\1300\1386\SURVEY\DOCS\LEGALS\
1386-WESTPARK OVERALL-EXHIBIT.dwg
  2/13/2026 11:07
4742 N 24th Street, Suite 270
PHOENIX, AZ 85016
P: 602.490.0535 / F: 602.368.2436
Engineering
& Design
Formerly
WESTPARK
OVERALL PROPERTY
BUCKEYE, ARIZONA
  EXHIBIT  
1386
FEB 2026
1" = 1000'
JK
DMS
STATE ROUTE 85
RIDC
RIDC = ROOSEVELT IRRIGATION DISTRICT CANAL
EXCEPTION TO PARCEL NO. 1
SEE SHEET 7 FOR DETAIL
POINT "B"
2/13/2026

PARCEL NO. 2
N00°06'26"W
1331.34'
S89°15'48"E
1285.16'
L1
L2
L3
L4
C
1
L5
C2
C3
C
4
L6
L7
S79°59'33"W
740.22'
R=1590.00'
D=15°17'53"
L=424.53'
S64°41'40"W
2169.52'
N00°46'31"W
1312.52'
N00°05'57"W 2662.94'
N00°06'26"W 2662.93'
S89°38'57"E 2670.10'
N00°02'14"E 5301.68'
S89°23'26"E 5354.45'
N89°08'04"W 2683.39'
54.82'
PAGE 5 OF 11
SOUTHWEST CORNER OF SECTION 24
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND ADOT BRASS CAP IN HAND
HOLE W/ RLS 38862, DATED 2010
WEST QUARTER CORNER OF SECTION 24
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND ADOT BRASS CAP IN HAND HOLE
W/ RLS 38862, DATED 2010
POINT OF COMMENCEMENT
NORTHWEST CORNER OF SECTION 24
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND ADOT BRASS CAP IN HAND
HOLE
SOUTH QUARTER CORNER OF SECTION 24
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND CHISELED X IN HAND HOLE
© 2026, COLLIERS ENGINEERING & DESIGN, INC.
DRAWN BY:
CHECKED BY:
PROJ.NO.:
SCALE:
DATE:
U:\1300\1386\SURVEY\DOCS\LEGALS\
1386-WESTPARK OVERALL-EXHIBIT.dwg
  2/13/2026 11:08
4742 N 24th Street, Suite 270
PHOENIX, AZ 85016
P: 602.490.0535 / F: 602.368.2436
Engineering
& Design
Formerly
WESTPARK
OVERALL PROPERTY
BUCKEYE, ARIZONA
  EXHIBIT  
1386
FEB 2026
1" = 1000'
JK
DMS
NORTH QUARTER CORNER
OF SECTION 24
TOWNSHIP 1 NORTH,
RANGE 4 WEST
NOTHING FOUND
POINT OF
BEGINNING
(BASIS OF BEARINGS)
STATE ROUTE 85
ROOSEVELT IRRIGATION
DISTRICT CANAL
FINAL PLAT OF WESTPARK
PHASE 2.2 PARCEL 8
BOOK 1825, PAGE 50
(NOT A PART)
WARNER ROAD
SEE SHEET 6 FOR LINE TABLE
SEE SHEET 7 FOR CURVE TABLE
2/13/2026

PARCEL NO. 3
C8
L32
C
9
L33
L34
L35
L36
C10
L37
L33
L38
L39
S89°12'09"E 2683.52'
S89°39'35"E
83.54'
S00°01'20"E 1264.03'
S00°01'21"E 828.50'
L9
L10
L11
L12
L13
L14
C5
L15
L16
L17
L18
L19
L20 C6
C7 L21
L22 L23
L24L25
L26 L27
L28 L29
L30 L31
(BASIS OF BEARINGS)
N00°08'03"E 2640.62'
S00°11'28"W
2637.74'
1320.31'
1320.31'
S39°08'57"E
RADIAL
PAGE 6 OF 11
EAST QUARTER CORNER OF SECTION 24
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND REBAR NO ID
SOUTHEAST CORNER OF SECTION 13
NORTHEAST CORNER OF SECTION 24
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND REBAR NO ID
POINT OF COMMENCEMENT
EAST QUARTER CORNER OF SECTION 13
TOWNSHIP 1 NORTH, RANGE 4 WEST
FOUND 3" ALUMINUM CAP
© 2026, COLLIERS ENGINEERING & DESIGN, INC.
DRAWN BY:
CHECKED BY:
PROJ.NO.:
SCALE:
DATE:
U:\1300\1386\SURVEY\DOCS\LEGALS\
1386-WESTPARK OVERALL-EXHIBIT.dwg
  2/13/2026 11:08
4742 N 24th Street, Suite 270
PHOENIX, AZ 85016
P: 602.490.0535 / F: 602.368.2436
Engineering
& Design
Formerly
WESTPARK
OVERALL PROPERTY
BUCKEYE, ARIZONA
  EXHIBIT  
1386
FEB 2026
1" = 1000'
JK
DMS
POINT OF
BEGINNING
FINAL RE-PLAT OF WESTPARK
PARCEL 18S
BOOK 1700, PAGE 45, MCR
(NOT A PART)
FINAL PLAT OF
WESTPARK PHASE 2.2
PARCEL 19
BOOK 1700, PAGE 45,
MCR
(NOT A PART)
FINAL RE-PLAT OF
WESTPARK PARCEL 18S
BOOK 1700, PAGE 45,
MCR
(NOT A PART)
SEE SHEET 6 FOR LINE TABLE
SEE SHEET 7 FOR CURVE TABLE
2/13/2026

R=4675.00'
D=3°04'23"
L=250.74'
L44
C12
L45
C1
3
L46
L47
L48
L49
L50
L51
L52
L53
L54
L55
L56
L57
L58
L59
L60
L61
L62
L63
L64
L65
L66
L67
L68
C14 L69
C15
L70
C16
L71
L72
L73
L74
L75
L76
C17
L77
S64°41'40"W 1273.49'
R=1460.00'
D=13°22'43"
L=340.91'
S78°04'23"W 2285.37'
DRAWN BY:
CHECKED BY:
PROJ.NO.:
SCALE:
DATE:
U:\1300\1386\SURVEY\DOCS\LEGALS\
1386-WESTPARK OVERALL-EXHIBIT.dwg
  2/13/2026 11:07
4742 N 24th Street, Suite 270
PHOENIX, AZ 85016
P: 602.490.0535 / F: 602.368.2436
© 2026, COLLIERS ENGINEERING & DESIGN, INC.
Engineering
& Design
Formerly
  WESTPARK  
OVERALL PROPERTY
BUCKEYE, ARIZONA
  EXHIBIT  
1386
FEB 2026
1" = 600'
JN
DMS
EXCEPTION TO PARCEL NO. 1
POINT "B"
POINT OF BEGINNING
OF EXCEPTION
PAGE 7 OF 11
N89°45'35"E
RADIAL
2/13/2026

LINE TABLE
LINE NO.
L1
L2
L3
L4
L5
L6
L7
L9
L10
L11
L12
L13
L14
L15
L16
L17
L18
DIRECTION
S23°19'09"E
S66°15'05"W
S23°23'43"E
N66°36'17"E
N80°08'32"E
S01°22'33"W
S10°00'27"E
S89°59'43"W
N88°25'57"W
N83°03'53"W
N77°30'22"W
N72°52'08"W
N12°47'56"W
N81°24'32"W
N83°32'55"W
S88°24'31"W
N89°18'27"W
LENGTH
721.49'
39.12'
110.00'
444.39'
143.14'
132.58'
715.70'
460.05'
56.41'
56.29'
56.27'
828.41'
46.38'
40.03'
12.28'
110.00'
138.12'
LINE TABLE
LINE NO.
L19
L20
L21
L22
L23
L24
L25
L26
L27
L28
L29
L30
L31
L32
L33
L33
L34
DIRECTION
N00°53'57"E
N60°27'39"W
S84°11'47"E
N05°48'13"E
N00°00'00"E
N00°00'00"E
N04°18'59"E
N00°00'00"E
N90°00'00"W
N06°01'38"E
N00°00'00"E
N46°32'31"E
N03°25'33"E
N89°19'55"W
S19°00'32"W
S67°10'48"W
N39°49'09"E
LENGTH
52.97'
41.38'
113.14'
149.00'
140.85'
91.74'
53.15'
53.00'
113.95'
47.10'
50.00'
43.83'
80.00'
517.37'
139.06'
28.42'
45.62'
PAGE 8 OF 11
© 2026, COLLIERS ENGINEERING & DESIGN, INC.
DRAWN BY:
CHECKED BY:
PROJ.NO.:
SCALE:
DATE:
U:\1300\1386\SURVEY\DOCS\LEGALS\
1386-WESTPARK OVERALL-EXHIBIT.dwg
  2/13/2026 11:08
4742 N 24th Street, Suite 270
PHOENIX, AZ 85016
P: 602.490.0535 / F: 602.368.2436
Engineering
& Design
Formerly
WESTPARK
OVERALL PROPERTY
BUCKEYE, ARIZONA
  EXHIBIT  
1386
FEB 2026
1" = 1000'
JK
DMS
2/13/2026

LINE TABLE
LINE NO.
L35
L36
L37
L38
L39
L41
L42
L43
L44
L45
L46
L47
L48
L49
L50
L51
L52
DIRECTION
N34°35'28"W
N32°24'56"E
N22°02'47"W
N00°11'27"E
N00°12'11"E
S00°13'20"W
S04°58'56"W
S07°59'42"W
N00°08'12"W
N05°49'04"W
N00°03'31"E
N89°56'29"W
N00°03'31"E
S89°56'29"E
S44°56'29"E
S89°56'29"E
S00°03'31"W
LENGTH
116.03'
12.26'
155.00'
105.08'
493.52'
600.03'
1205.02'
84.59'
14.67'
518.24'
1245.96'
6.00'
542.00'
126.00'
63.64'
377.00'
10.00'
LINE TABLE
LINE NO.
L53
L54
L55
L56
L57
L58
L59
L60
L61
L62
L63
L64
L65
L66
L67
L68
L69
DIRECTION
S89°56'29"E
N45°03'31"E
S89°56'29"E
S44°56'29"E
S89°56'29"E
S00°03'31"W
S89°56'29"E
N45°03'31"E
S89°56'29"E
S44°56'29"E
S89°56'29"E
S00°03'31"W
S89°56'29"E
N00°03'31"E
S89°56'29"E
N44°47'44"E
S86°55'12"E
LENGTH
769.62'
50.91'
67.80'
36.77'
278.00'
6.00'
252.20'
50.91'
83.80'
42.43'
492.58'
10.00'
729.97'
6.00'
502.83'
63.35'
15.00'
PAGE 9 OF 11
© 2026, COLLIERS ENGINEERING & DESIGN, INC.
DRAWN BY:
CHECKED BY:
PROJ.NO.:
SCALE:
DATE:
U:\1300\1386\SURVEY\DOCS\LEGALS\
1386-WESTPARK OVERALL-EXHIBIT.dwg
  2/13/2026 11:07
4742 N 24th Street, Suite 270
PHOENIX, AZ 85016
P: 602.490.0535 / F: 602.368.2436
Engineering
& Design
Formerly
WESTPARK
OVERALL PROPERTY
BUCKEYE, ARIZONA
  EXHIBIT  
1386
FEB 2026
1" = 1000'
JK
DMS
2/13/2026

LINE TABLE
LINE NO.
L70
L71
L72
L73
L74
L75
L76
L77
DIRECTION
S86°42'14"E
S45°38'05"E
S01°18'19"E
S43°08'17"W
S01°51'43"E
S88°08'17"W
S01°51'43"E
S01°29'20"W
LENGTH
126.00'
58.11'
63.28'
41.07'
322.17'
12.00'
48.38'
859.75'
PAGE 10 OF 11
© 2026, COLLIERS ENGINEERING & DESIGN, INC.
DRAWN BY:
CHECKED BY:
PROJ.NO.:
SCALE:
DATE:
U:\1300\1386\SURVEY\DOCS\LEGALS\
1386-WESTPARK OVERALL-EXHIBIT.dwg
  2/13/2026 11:07
4742 N 24th Street, Suite 270
PHOENIX, AZ 85016
P: 602.490.0535 / F: 602.368.2436
Engineering
& Design
Formerly
WESTPARK
OVERALL PROPERTY
BUCKEYE, ARIZONA
  EXHIBIT  
1386
FEB 2026
1" = 1000'
JK
DMS
2/13/2026

CURVE TABLE
CURVE NO.
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
C12
C13
C14
C15
C16
C17
RADIUS
570.00'
570.00'
200.00'
650.93'
180.00'
50.00'
20.00'
2040.00'
740.00'
188.22'
1740.00'
1860.00'
5670.00'
5655.00'
5529.00'
1871.00'
DELTA
13°32'15"
19°20'45"
63°16'34"
32°43'54"
18°46'26"
78°53'05"
30°15'08"
2°45'29"
31°00'09"
10°16'18"
5°40'53"
5°52'36"
3°19'13"
0°12'58"
3°50'34"
3°21'03"
LENGTH
134.68'
192.46'
220.87'
371.86'
58.98'
68.84'
10.56'
98.20'
400.41'
33.74'
172.53'
190.77'
328.58'
21.33'
370.83'
109.42'
PAGE 11 OF 11
© 2026, COLLIERS ENGINEERING & DESIGN, INC.
DRAWN BY:
CHECKED BY:
PROJ.NO.:
SCALE:
DATE:
U:\1300\1386\SURVEY\DOCS\LEGALS\
1386-WESTPARK OVERALL-EXHIBIT.dwg
  2/13/2026 11:07
4742 N 24th Street, Suite 270
PHOENIX, AZ 85016
P: 602.490.0535 / F: 602.368.2436
Engineering
& Design
Formerly
WESTPARK
OVERALL PROPERTY
BUCKEYE, ARIZONA
  EXHIBIT  
1386
FEB 2026
1" = 1000'
JK
DMS
2/13/2026

WESTPARK CMP  
 
 
 
 
 
 
 
 
Appendix D 
 
DRAINAGE MASTER PLAN 
(UNDER SEPARATE COVER)

WESTPARK CMP  
 
 
 
 
 
 
 
 
Appendix E 
WATER MASTER PLAN 
(UNDER SEPARATE COVER)

WESTPARK CMP  
 
 
 
 
 
 
 
 
Appendix F 
WASTEWATER MASTER PLAN 
(UNDER SEPARATE COVER)

WESTPARK CMP  
 
 
 
 
 
 
 
 
Appendix G 
OWNERSHIP EXHIBIT

Figure Number:
Drawn By:
Feb 2026
Date:
Project Number:
User: sidney.deaver
\\phxfil02\Legacy HW\J_Drive\Shared Folders\Project\1300\1386\GIS\1386.aprx
1
SKD
1386
Buckeye, Arizona
Land Ownership
0
1,500
Feet
±
SR-85
70
Flagstaff
Phoenix
Tucson
Ownership
GDC OZ LLC
KEMF SR EAST LLC
KEMF SR NORTH LLC
KEMF SR WEST LLC
KEMF WESTWIND EAST LLC
KEMF WESTWIND NORTH LLC
KEMF WESTWIND SH LLC
KEMF WESTWIND WEST LLC
KEMF WP 2 3 LLC
KEMF WP 2.3 LLC
KEMF WP 3 EAST LLC
KEMF WP 3 WEST LLC
KEMF WP COMMERCIAL LLC
KEMF WWG 1 LLC
GRED Escrow

WESTPARK CMP  
 
 
 
 
 
 
 
 
 
Appendix H 
DEVELOPMENT AGREEMENT EXHIBIT

WESTPARK CMP  
 
 
 
 
 
 
 
 
 
Appendix I 
ECONOMIC & FISCAL IMPACT ANALYSIS  
WESTPARK COMMUNITY MASTER PLAN

Economic & Fiscal Impact Analysis 
Westpark Community Master Plan 
Buckeye, Arizona 
 
 
 
 
 
 
 
 
 
 
 
Prepared for:  
 
Garrett Development Corporation 
 
July 15, 2025 
 
 
 
 
 
 
 
 
 
 
 
 
 
Prepared by:  
 
 
 
       Elliott D. Pollack & Company 
 
 
       Scottsdale, Arizona

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
           TOC 
 
 
www.arizonaeconomy.com 
 
Table of Contents 
 
Executive Summary  
 
 
 
 
 
 
 
 
 i 
 
1.0 
Introduction  
 
 
 
 
 
 
 
 
  1 
 
 
1.1  
Purpose of Study 
 
 
 
 
 
 
  1 
 
 
1.2 
Limiting Conditions 
 
 
 
 
 
 
  1 
 
2.0  
Assumptions & Methodology 
 
 
 
 
 
 
  3 
 
 
2.1 
Project Description & Analysis Assumptions  
 
 
  3 
 
 
2.2 
Economic Impact Methodology 
 
 
 
 
  5 
2.3  
Fiscal Impact Methodology 
 
 
 
 
 
  6 
 
3.0  
Impacts of Construction 
 
 
 
 
 
 
 
11 
3.1 
Economic Impact of Construction 
 
 
 
 
11 
3.2 
Fiscal Impact of Construction  
 
 
 
 
13 
 
4.0  
Impacts of Commercial Operations and New Residents  
 
 
 
15 
4.1 
Economic Impact of Operations 
 
 
 
 
15 
4.2 
Fiscal Impact of Operations  
 
 
 
 
17

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
i
Executive Summary 
 
The following is report provides an estimate of the economic and fiscal impacts associated with 
proposed developments within the Westpark Community Master Plan (Westpark CMP), a 
1,455-acre master-planned area located in Buckeye, Arizona. The plan is organized into Mega 
Sites 2, 3, and 4, and includes a diverse mix of land uses.   Mega Site 2 is approximately 546 
acres and has been designated for data center development.  Mega Site 3 (approximately 534 
acres) is proposed for various industrial uses such as warehousing, storage, logistics and 
advanced manufacturing and Mega Site 4 is about 375 acres and planned to incorporate multi-
family residential housing along with various commercial and business park uses.  
 
The proposed developments are expected to deliver substantial benefits, including significant 
job creation and increased tax revenues for the City of Buckeye, its school districts and other 
special jurisdictions. These benefits will arise from construction activities, ongoing commercial 
operations, and the spending of new residents throughout the year. 
 
Acres
Square feet
Construction 
Cost
Equipment
Mega Site 2
Data Center
                      546.4                7,536,700 
$5,275,690,000 
$26,378,450,000 
Mega Site 3
Advanced Industrial
                      178.0                2,893,067 
$723,267,000 
$2,893,067,000 
Logistics
                      178.0                2,893,067 
$578,613,000 
$1,446,533,000 
Warehousing/Storage
                      178.0                2,893,067 
$289,307,000 
$72,327,000 
Mega Site 4
Retail
                        28.3                   211,137 
$42,227,000 
$21,114,000 
Restaurant
                          7.6                     52,784 
$10,557,000 
$7,918,000 
Business Park; Warehousing
                        86.2                1,210,540 
$121,054,000 
$30,263,000 
Business Park; Light Industrial -                         86.2                1,210,540 
$242,108,000 
$605,270,000 
Business Park; Warehousing sto                        86.2                1,210,540 
$121,054,000 
$30,263,000 
Residential
Acres
Units
Construction 
Cost
Equipment
Multi-family 1
                        31.5                          339 
$50,887,000 
$1,018,000 
Multi-family 2
                        16.1                          174 
$26,034,000 
$521,000 
Multi-family 3
                        32.6                          462 
$69,355,000 
$1,387,000 
                   1,455.1 
$7,550,153,000 
$31,488,131,000 
Source: GDC Buckeye
Westpark Community Master Plan
(2025 Dollars)
 
 
Economic Impacts 
Since the impacts represent the entire construction phase, which will take a number of years, 
employment impacts are expressed as person years of employment.  Person years of 
employment are the aggregate of each construction job that is recreated each year throughout 
the construction period.  To derive the respective annual averages, employment, wages, and

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
ii 
economic output can be divided by the expected number of years it may take to complete the 
development.  Annual averages may be higher or lower depending on the timing of final 
buildout.  Additionally, these construction impacts will disappear when the development 
reaches completion. 
 
 Construction alone would generate 78,340 person years of employment, $5.9 billion in 
wages, and $14.9 million in economic impact during construction.  These impacts would 
occur over years and will depend on future absorption in terms of estimating average 
annual impacts.   
 
 Ongoing annual impacts within the proposed Westpark CMP at buildout, including impacts 
generated by the spending of the residents and the commercial operations would create a 
total of 23,374 jobs throughout the region, including 10,573 onsite jobs, $1.6 billion in 
wages and over $5.7 billion in annual economic activity.   
 
Construction Impact
Data Center
Commercial
Residential
Commercial
Total
Person Years of Employment
54,587
16,464
1,654
5,635
78,340
Wages ($ mil)
$4,127.0
$1,244.7
$122.8
$425.3
$5,919.8
Output ($ mil)
$10,436.3
$3,147.7
$266.5
$1,063.2
$14,913.6
Operations Impact
Direct jobs
500
6,037
136
3,900
10,573
Total jobs
2,705
13,629
204
6,836
23,374
Wages ($ mil)
$219.4
$1,005.7
$11.0
$397.1
$1,633.2
Output ($ mil)
$793.1
$3,619.6
$30.0
$1,230.8
$5,673.6
Source:   Elliott D. Pollack & Company;  IMPLAN
NOTE: The total may not equal the sum of the impacts due to rounding.  All dollar figures are in constant dollars.  Inflation has not been included in 
these figures.
Mega Site 4
Economic Impact Summary
Westpark Community Master Plan
Greater Phoenix
(2025 Dollars)
Mega Site 2
Mega Site 3
 
 
Fiscal Impacts 
Impacts During Construction 
 Construction would generate $613.9 million in tax revenues from the proposed 
developments within the Westpark Community Master Plan.  This includes both primary 
(direct) taxes such as construction sales tax as well as secondary taxes generated by the 
employees that will work on the project and spend money in the local economy.  
Manufacturing facilities are exempt from equipment use tax under ARS 42-5159.   Similarly, 
computer data center equipment is exempt from both transaction privilege tax (TPT) and 
use tax under ARS 41-1519. For the purposes of this report, it is assumed that 30% of the

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
iii
total construction value for data centers is taxable – representing the building shell and core 
infrastructure.  Additional revenues would be collected by the City for development and 
impact fees.   
 
 Of this total, the State of Arizona will collect an estimated $398.3 million, Maricopa County 
will receive $75.6 million, and Buckeye will collect an estimated $140.0 million.  The figures 
for the City include estimated residential impacts fees but exclude additional development 
impact fees levied on commercial development that will vary by development type. 
 
Fiscal Impact of Construction - All Jurisdictions
Data Center
Commercial
Residential
Commercial
Total
State of Arizona
Construction sales
$50,871,100
$51,143,700
$4,701,600
$17,260,200
$123,976,600
Use Tax
*
$85,056,100
$163,900
$5,015,200
$90,235,200
Secondary impacts from employees
$128,551,000
$38,772,100
$3,607,300
$13,163,100
$184,093,500
Maricopa County
Construction sales
$7,201,300
$7,239,900
$665,600
$2,443,300
$17,550,100
Secondary impacts from employees
$40,486,100
$12,210,900
$1,200,900
$4,166,000
$58,063,900
Buckeye
Construction/Spec Builder tax
$30,862,800
$32,579,600
$3,422,800
$11,467,300
$78,332,500
Permit/Impact Fees
N/A
N/A
$2,255,500
N/A
$2,255,500
Use Tax
**
$45,565,800
$87,700
$2,686,700
$48,340,200
Secondary impacts from employees
$7,731,300
$2,331,900
$232,600
$797,400
$11,093,200
Total all jurisdictions
$265,703,600
$274,900,000
$16,337,900
$56,999,200
$613,940,700
**Equipment used in manufacturing is exempt from sales (use) taxes under ARS 42-5159(B)(1)
Source: Elliott D. Pollack & Co.; IMPLAN; AZ Dept. of Revenue; AZ Tax Research Association
Fiscal Impact Summary of Construction
Westpark Community Master Plan
(2025 Dollars)
Mega Site 2
Mega Site 3
Mega Site 4
*Under ARS 41-1519, qualifying purchases of computer data center equipment are exempt from Arizona transaction privilege tax (TPT) and use tax when used in a certified computer data 
center.  This report assumes 30% of the construction value is dedicated to the shell and other non-exempt infrastructure.
 
 
 
Ongoing Annual Impacts from Operations  
 
 At build out, the operations of the data center, commercial developments and the spending 
of the new residents will generate an estimated nearly $248.5 million each year in new 
revenues from primary and secondary tax revenues.  Significant tax revenue would include 
new property taxes, utility sales tax, commercial lease tax, increases in state shared revenue 
from new population, and employee related tax impacts.  The secondary impacts take into 
account that only a portion of the employees will live within Buckeye. 
 
 The State of Arizona will collect an estimated $87.8 million annually, while Maricopa County 
will collect $39.1 million annually and Buckeye is projected to collect $56.4 million each 
year.

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
iv 
 Local school districts and special districts such as the community college district, libraries, 
flood control, fire district assistance, and others would receive an estimated $65.2 million in 
annual property taxes upon buildout of the projects.   
 
Fiscal Impact of Operations - All Jurisdictions
Data Center
Commercial
Residential
Commercial
Total
State of Arizona
Sales tax
--
--
$141,600
$4,687,200
$4,828,800
Utility tax
$40,584,900
$4,964,300
$46,200
$1,844,600
$47,440,000
Secondary impacts from employees
$5,452,300
$21,144,500
$44,000
$8,896,400
$35,537,200
Maricopa County
Personal property tax
$137,600
$41,500
--
$14,100
$193,200
Real property tax
$5,503,500
$1,659,900
$101,700
$560,300
$7,825,400
Sales tax
--
--
$23,000
$764,900
$787,900
Utility Tax
$6,622,600
$506,300
$7,500
$216,200
$7,352,600
Increased state shared revenue
--
--
$550,200
--
$550,200
Secondary impacts from employees
$3,436,100
$12,890,300
$497,300
$5,614,800
$22,438,500
Buckeye
Personal property tax
$190,800
$57,600
--
$19,500
$267,900
Real property tax
$7,633,600
$2,302,300
$141,100
$777,100
$10,854,100
Sales tax
--
--
$99,000
$3,277,900
$3,376,900
Lease
--
$1,916,400
--
$794,500
$2,710,900
Utility Tax
$28,382,400
$2,169,800
$32,200
$926,900
$31,511,300
Increased state shared revenue
--
--
$897,300
--
$897,300
Secondary impacts from employees
$1,085,100
$3,971,400
$21,100
$1,707,500
$6,785,100
Other Districts
School districts
Personal property tax
$6,254,900
$1,046,200
--
$164,800
$7,465,900
Real property tax
$30,023,300
$9,055,200
$555,000
$3,056,000
$42,689,500
Special districts
Personal property tax
$1,875,200
$313,600
--
$49,500
$2,238,300
Real property tax
$9,001,000
$2,714,800
$166,400
$916,100
$12,798,300
Total tax revenues
$146,183,300
$64,754,100
$3,323,600
$34,288,300
$248,549,300
Source: Elliott D. Pollack & Co.; IMPLAN; AZ Dept. of Revenue; AZ Tax Research Association
Mega Site 2
Mega Site 3
Mega Site 4
Fiscal Impact Summary of Operations
Westpark Community Master Plan
(2025 Dollars)
 
 
The cumulative effects of the ongoing construction and absorption of the development will be 
significant for the State of Arizona, Maricopa County, the City of Buckeye and other taxing 
jurisdictions.

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
1
1.0  Introduction 
 
1.1 Purpose of Study 
 
Elliott D. Pollack and Company was retained to perform an economic and fiscal impact analysis 
of the proposed Westpark Community Master Plan. The proposed development represents a 
broad array of uses – and encompasses a total of 1,455 acres.   Mega Site 2 is approximately 
546 acres and has been designated for data center development, Mega Site 3 (approximately 
534 acres) is proposed for various industrial uses such as warehousing, storage, logistics and 
advanced manufacturing.   Mega Site 4 is about 375 acres and planned to incorporate multi-
family residential housing along with various commercial and business park uses. 
 
Economic impact analysis examines the regional implications of an activity in terms of three 
basic measures: output, earnings and job creation.  Fiscal impact analysis, on the other hand, 
evaluates the public revenues created by a particular activity.  In fiscal impact analysis, the 
primary revenue sources of a city, county or state government are analyzed to determine how 
the activity may financially affect them. 
 
1.2 Limiting Conditions 
 
This study prepared by Elliott D. Pollack & Company is subject to the following considerations 
and limiting conditions.   
 
• It is our understanding that this study is for the client’s due diligence and other 
planning purposes.  Neither our report, nor its contents, nor any of our work were 
intended to be included and, therefore, may not be referred to or quoted in whole 
or in part, in any registration statement, prospectus, public filing, private offering 
memorandum, or loan agreement without our prior written approval.   
 
• The reported recommendation(s) represent the considered judgment of Elliott D. 
Pollack and Company based on the facts, analyses and methodologies described in 
the report. 
 
• Except as specifically stated to the contrary, this study will not give consideration to 
the following matters to the extent they exist:  (i) matters of a legal nature, including 
issues of legal title and compliance with federal, state and local laws and ordinances; 
and (ii) environmental and engineering issues, and the costs associated with their 
correction.  The user of this study will be responsible for making his/her own 
determination about the impact, if any, of these matters. 
 
• This study is intended to be read and used as a whole and not in parts.

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
2
• This study has not evaluated the feasibility or marketability of any site for planned 
uses.   
 
• Estimates regarding specific land use, construction costs and operating data were 
provided by the client as well as reputable market resources as specified in the 
tables within this report.  Data has been reviewed and verified to determine its 
reasonableness and applicability to the project.  
 
• The economic and fiscal impact results of this analysis could be higher or lower than 
estimated due to the uncertainty of the nature of the businesses that would locate to 
the project.  The figures used in this analysis have been taken from a broad average of 
users and are meant to represent an example of what could happen should the 
averages be met.   
 
• This economic and fiscal impact study evaluates the potential “gross impacts” of 
construction and operations activities.  The term “gross impacts” as used in this 
study refers to the total revenue, jobs and economic output that would be 
generated by the construction and operations.  The study does not consider the 
potential impact on other businesses or real estate property in the trade area that 
may occur as a result of the proposed project.   
 
• The analysis is based on the current tax structure and rates imposed by the State, 
counties, and local governments.  Changes in those rates would alter the findings of 
this study.   
 
• All dollar amounts are stated in current dollars and, unless indicated, do not take 
into account the effects of inflation. 
 
• Our analysis is based on currently available information and estimates and 
assumptions about long-term future development trends.  Such estimates and 
assumptions are subject to uncertainty and variation.  Accordingly, we do not 
represent them as results that will be achieved.  Some assumptions inevitably will 
not materialize, and unanticipated events and circumstances may occur; therefore, 
the actual results achieved may vary materially from the forecasted results.  The 
assumptions disclosed in this study are those that are believed to be significant to 
the projections of future results.

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
3
2.0  Assumptions & Methodology 
 
2.1  Project Description & Analysis Assumptions 
Westpark Community encompasses a total of 1,455 acres located in Buckeye, Arizona.  The 
proposed master plan includes several land uses and this report provides the impact of 
construction as well ongoing annual impacts once construction is complete and the 
developments have reached stabilization.   
 
Site Location Westpark Community Master Plan 
 
 
Assumptions used to estimate economic and fiscal impacts of the construction and operations 
of the sites are outlined in the following tables.  Primary inputs of the economic and fiscal 
impact model are based on (1) project assumptions supplied by the client regarding the scale 
and size of the project and (2) basic economic source data such as the Consumer Expenditure 
Survey to determine spending patterns of employees and Census surveys showing live-work 
relationships.  All values in this study are expressed in 2025 dollars.  Unless otherwise indicated, 
an inflation factor has not been included in this analysis. 
 
The proposed development includes approximately 7.5 million square feet of data center 
facilities, 12.6 million square feet of various commercial uses, and 975 multi-family residential 
units. The total estimated construction cost for these developments is approximately $7.6

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
4
billion, complemented by an additional $31.5 billion in equipment investment. The majority of 
this equipment expenditure is driven by the highly specialized and capital-intensive 
requirements of data center operations. 
 
Acres
Square feet
Construction 
Cost
Equipment
Mega Site 2
Data Center
                      546.4                7,536,700 
$5,275,690,000 
$26,378,450,000 
Mega Site 3
Advanced Industrial
                      178.0                2,893,067 
$723,267,000 
$2,893,067,000 
Logistics
                      178.0                2,893,067 
$578,613,000 
$1,446,533,000 
Warehousing/Storage
                      178.0                2,893,067 
$289,307,000 
$72,327,000 
Mega Site 4
Retail
                        28.3                   211,137 
$42,227,000 
$21,114,000 
Restaurant
                          7.6                     52,784 
$10,557,000 
$7,918,000 
Business Park; Warehousing
                        86.2                1,210,540 
$121,054,000 
$30,263,000 
Business Park; Light Industrial -                         86.2                1,210,540 
$242,108,000 
$605,270,000 
Business Park; Warehousing sto                        86.2                1,210,540 
$121,054,000 
$30,263,000 
Residential
Acres
Units
Construction 
Cost
Equipment
Multi-family 1
                        31.5                          339 
$50,887,000 
$1,018,000 
Multi-family 2
                        16.1                          174 
$26,034,000 
$521,000 
Multi-family 3
                        32.6                          462 
$69,355,000 
$1,387,000 
                   1,455.1 
$7,550,153,000 
$31,488,131,000 
Source: GDC Buckeye
Westpark Community Master Plan
(2025 Dollars)
 
 
 
Proposed commercial components within the Westpark Community Master Plan include a 
business commerce park, warehousing and storage, light and advanced manufacturing, logistics 
along with retail and restaurant space.  Each land use type was considered separately in terms 
of its ability to support employment and generate revenue for Buckeye. For employment, 
estimates per square foot for each commercial type are provided. This ranges from 100 square 
feet per employee for restaurants up to 15,000 square feet per employee for data centers.  
 
Sales revenue has been conservatively estimated at $400 per square foot per year for retail and 
$650 per square foot for restaurants. Lease rates of approximately $9-$30 per square foot per 
year restaurants are utilized in this analysis.  The expected occupancy rate is 92%.   
 
In terms of residential assumptions, the anticipated occupancy for the multi-family units was 
based on 92% annually.  Household size estimates were based on Census Bureau estimates for 
the City of Buckeye for single family and multi-family homes.

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
5
 
The following table illustrates these assumptions in detail. 
 
Square feet
Average
Stabilized
Utilities
Commercial
per employee
Rent/SF
Occupancy
per SF
Sales / SF
Data Center
15,000
               
$0
100%
$125.53
--
Advanced Industrial
1,000
                 
$15
92%
$15.00
--
Logistics
1,500
                 
$12
92%
$15.00
--
Warehousing/Storage
2,000
                 
$9
92%
$10.00
--
Retail
500
                    
$25
92%
$2.40
$400
Restaurants
100
                    
$30
92%
$2.40
$650
Units
Rent
Stabilized
Utilities
Income
Residential
per employee
per SF
Occupancy
per month
% on Rent
Multi-Family
45
                      
$2.0
92%
$100.00
30%
Source: Elliott D. Pollack & Company; GDC Buckeye; SIOR; ULI; DOE
Operating Assumptions
Westpark Community Master Plan
(2025 Dollars)
 
 
2.2  Economic Impact Methodology 
 
Economic impact analysis examines the economic implications of an activity in terms of output, 
earnings, and employment.  For this study, the analysis focuses on the impact during 
construction as well as the ongoing impact of the project once the commercial buildings and 
residential units are completed and occupied. 
 
The different types of economic impacts are known as direct, indirect, and induced, according 
to the manner in which the impacts are generated.  For instance, direct employment consists of 
permanent jobs held by construction employees during the construction phase and onsite 
employees of the various project components on an ongoing basis.  Indirect employment 
includes jobs created by businesses that provide goods and services essential to the 
construction and ongoing operations of the project.  These businesses range from 
manufacturers (who make goods) to wholesalers (who deliver goods), to services.  Finally, the 
spending of wages and salaries of direct and indirect employees on items such as food, housing, 
transportation and medical services creates induced employment in all sectors of the economy, 
throughout the region. These secondary effects are captured in the analysis conducted in this 
study.

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
6
Multipliers have been developed to estimate the indirect and induced impacts of various direct 
economic activities.  IMPLAN developed the multipliers used in this study.  The economic 
impact is categorized into three types of impacts: 
 
(1) Employment Impact – the total wage and salary and self-employed jobs in a 
region.  Jobs include both part time and full-time workers. 
 
(2) Earnings Impact – the personal income, earnings or wages, of the direct, indirect 
and induced employees.  Earnings include total wage and salary payments as 
well as benefits of health and life insurance, retirement payments and any other 
non-cash compensation. 
 
(3) Economic Output – also referred to economic activity, relates to the gross 
receipts for goods or services generated by a company’s operations. 
 
Economic impacts are by their nature regional in character.  Such impacts are best illustrated 
when not assigned to a specific city or locality, although clearly the primary impact of job 
creation would be on the municipality where the project is located.  However, many other 
communities in the County would also benefit from the construction and operations of the 
project.  People working at the development would commute to work from their homes in all 
parts of the region.  Therefore, the economic impact of the development project is expressed in 
this report as a regional benefit. 
 
 
2.3  Fiscal Impact Methodology 
 
Fiscal impact analysis studies the public revenues associated with a particular economic activity.  
The primary revenue sources of local, county, and state governments (i.e., taxes) are analyzed 
to determine how an activity may affect the various jurisdictions.  This section will evaluate the 
impact of the development on Buckeye as well as provide the project impacts for the State of 
Arizona, Maricopa County and various school and special districts.  
 
Fiscal impact figures cited in this report have been generated from information provided by a 
variety of sources including the U.S. Bureau of the Census; the U.S. Department of Labor; the 
Internal Revenue Service; the State of Arizona; the Arizona Tax Research Association; and the 
U.S. Consumer Expenditure Survey.  Elliott D. Pollack and Company has relied upon the 
estimates of construction cost and operating revenues outlined in this study.  Unless otherwise 
stated, all dollar values are expressed in 2025 dollars.   
Fiscal impacts are categorized by type in this study, similar to economic impact analysis.  The 
major sources of revenue generation for governmental entities are related to the proposed 
construction and ongoing operations.

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
7
Construction impacts relate to the revenues generated from construction of a project and 
include state and local sales taxes levied on construction materials.  These are the “primary” 
revenues generated from the construction.  In addition, the direct, indirect and induced 
employees supported by the construction activity also generate revenues to local and state 
governments.  For instance, employees will spend part of their salaries on retail goods (thereby 
paying sales taxes), pay property taxes on real estate they own and contribute to the other 
revenue sources that are shared by the State with counties and local cities.  In addition, part of 
the State’s collection of sales taxes on construction materials is also shared with counties and 
local cities.  All of these revenues create benefits for counties and local cities.  They are referred 
to in this report as “secondary” impacts. 
 
The ongoing operations of a real estate project also create beneficial fiscal effects for a 
community.  The primary source of revenue for this mixed-use development would be 
generated from property taxes, sales taxes, and lease taxes.  New residents will also create 
beneficial fiscal effects.  Households will spend part of their salaries on local goods and services.  
This spending will contribute to revenues collected by Buckeye.  Additionally, Buckeye will 
benefit in terms of state shared revenue as the project will increase the City’s population and 
the share of revenue that they receive from state sales taxes, state income taxes, and other 
fees as outlined below. 
 
The following is a description of the applicable revenue sources that will be considered for this 
analysis.   
 
• Prime Contracting Transaction Privilege Tax (Construction Sales Tax) 
The State, counties, and local governments levy a sales tax on the construction of 
buildings or development of land improvements.  That tax is calculated by State law 
under the assumption that 65% of the construction cost of the facility and its land 
improvements are taxable.  The sales tax rate is then applied to the 65% figure.   
 
In an attempt to encourage data center expansion in Arizona, the State of Arizona offers 
a prime contracting transaction privilege tax (construction sales tax) exemption as well 
as a use tax exemptions at the state, county and local levels, on qualifying data center 
equipment.  The exemption was established under ARS 41-1519 for up to ten full 
calendar years following certification.  This analysis assumes the proposed data centers 
on this site will qualify for state certification and that 70% of the total construction value 
will be allocated to equipment-related components—such as installation, racks, servers, 
cooling systems, generators, and networking gear—which are tax-exempt. The 
remaining 30% is assumed to be attributable to the building shell and core 
infrastructure, which is not exempt from tax. 
 
The sales tax on construction is a one-time collection by the governmental entity.  The 
State currently levies a temporary 5.6% sales tax on construction activity (a portion of

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
8
which is shared with local governments) while Maricopa County levies a rate of 0.7% 
and the City of Buckeye construction sales tax rate is 3.0%. 
 
• Use Tax 
The State of Arizona (and some local governments) levy a use tax on tangible property 
equipment which is purchased or leased for storage or use in the State.  The use tax for 
the State is 5.6%.  The City of Buckeye’s rate is 3.0% for taxable equipment and 1.1% for 
a single item over $5,000.  Equipment used in manufacturing is exempt from use tax 
under ARS 42-5159 and computer data center equipment is exempt under ARS 41-1519.   
 
• Transaction Privilege Tax (Sales Tax) 
The State, counties, and local cities in Arizona charge sales tax on retail goods, 
commercial leases and utility usage.  The sales tax rate for the State is 5.6%.  Portions of 
this tax are redistributed through revenue sharing to counties and cities throughout 
Arizona based on population.  Buckeye levies a 3.0% sales tax rate (2.0% for commercial 
leases).   
 
These tax rates are applied to retail sales, commercial leases, and utility usage from the 
entire master planned development as well as the spending of residents and employees.  
Conservative sales performance at the retail and restaurant establishments were used 
to determine sales tax revenue potential.   
 
Based on data from the U.S. Consumer Expenditure Survey, the projected extent of 
retail spending by new residents and the resulting sales tax receipts was calculated.   In 
addition, the employees of the project are projected to spend money at retail and 
restaurant establishments or purchase other local goods.   
 
• Property Tax   
The residential and commercial development will be subject to direct real property 
taxes.  Residential properties are levied at a 10% assessment ratio while commercial 
properties will be levied at a 15% assessment ratio (at time of completion).  Employees 
supported by operations of the businesses will also pay real property taxes on the 
homes they occupy.  In order to estimate these secondary property taxes, the assessed 
full cash value along with the projected value of a typical housing unit has been 
calculated. Once the net assessed values are calculated for real property, the following 
tax rates apply: 
 
• Personal Property Taxes 
Local taxing jurisdictions in Arizona levy a personal property tax on tangible equipment.  
The value of the property is depreciated at a rate of 2.5% and the assessment ratio used 
in this report is 15.0%.

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
9
Once the net assessed values are calculated for the property, the following tax rates 
apply: 
 
Rate
Buckeye
1.6077
                                
County General Fund
1.1591
                                
School Districts
Palo Verde Elementary
3.3570
                                
Buckeye High School
2.9662
                                
Special Districts
Central Arizona Water Conservation District
0.1400
                                
Flood Control
0.1470
                                
Fire District Assistance Tax
0.0080
                                
Library District
0.0470
                                
Maricopa Special Health District
0.2665
                                
Community College District
1.1047
                                
West-MEC
0.1825
                                
TOTAL
10.9857
Property Tax Rates
Westpark Community Master Plan
Source: County Treasurer
 
 
• State Shared Revenues 
Each city in Arizona receives a portion of State revenues from four different sources - 
State sales tax (see description above), State income tax, vehicle license tax and 
highway user tax.  The formulas for allocating these revenues are primarily based on 
population.  Counties also share in the revenue sources of the State, with the 
exception of income tax.   
 
State Income Tax 
The State of Arizona collects taxes on personal income.  The tax rate used in the 
analysis averages about 1.6% for earnings.  This percentage is based on the most 
recently available income tax data from the Arizona Department of Revenue.  The 
factor is applied to the projected wage levels of direct, indirect and induced 
employees supported by the construction and operations of the project.  Portions 
of this tax are redistributed through revenue sharing to cities throughout Arizona 
based on population. 
 
HURF Taxes 
The State of Arizona collects specific taxes for the Highway User Revenue Fund 
(HURF).  Both the registration fees and the motor vehicle fuel tax (gas tax) are

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
10 
considered in this analysis.  The motor vehicle fuel tax is $0.18 per gallon and is 
calculated based on a vehicle traveling 12,000 miles per year at 20 miles per 
gallon.  Registration fees average $66 per employee in the State of Arizona.  
These factors are applied to the projected direct and indirect employee count.  
Portions of these taxes are distributed to cities and counties throughout Arizona 
based on a formula that includes population and the origin of gasoline sales. 
 
Vehicle License Tax 
The vehicle license tax is a personal property tax placed on vehicles at the time of 
annual registration.  This factor is applied to the projected direct, indirect and 
induced employee count.  The average tax used in this analysis is $325 and 
portions of the total collections are distributed to the Highway User Revenue 
Fund.  The remaining funds are shared between cities and counties in accordance 
with population-based formulas. 
 
The above tax categories represent the largest sources of revenues that would be generated to 
city, county, and State governments.  This analysis considers gross tax collections and does not 
differentiate among dedicated purposes or uses of such gross tax collections.

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
11 
3.0 Impact of Construction 
 
Construction phase impacts are generally short-term effects related to onsite and offsite 
construction employment as well as other supporting industries.  However, a development of 
this size will likely take years to be fully built out, so the construction phase impacts will be 
ongoing for many years. 
 
The long-term recurring benefits of a project are operational phase impacts.   These include 
employment, earnings and expenditures that recur over the long-term after the project is built 
out as well as new resident spending impacts (Section 4.0).   
 
3.1  Economic Impact of Construction 
 
This portion of the report will outline economic impacts of the construction of proposed uses 
for the Westpark Community Master Plan.  The economic impact of construction includes total 
economic output, job creation and wages.  The results presented are based on the assumptions 
of land use described in Section 2.0 of this report.   
 
Since the impacts represent the entire construction phase, which will take decades, 
employment impacts are expressed as person years of employment.  Person years of 
employment are the aggregate of each construction job that is recreated each year throughout 
the construction period.  To derive the respective annual averages, employment, wages, and 
economic output can be divided by the expected number of years it may take to complete the 
development.  Annual averages may be higher or lower depending on the timing of final 
buildout.  Additionally, these construction impacts will disappear when the development 
reaches completion. 
 
The estimated $7.6 billion cost of construction for the residential and commercial 
developments will generate 45,558 direct person years of employment earning an estimated 
$3.6 billion in wages.  An additional 32,782 indirect and induced person years of employment 
will be created by ripple effects throughout the regional economy.  These employees will earn 
$2.3 billion and create $7.4 billion in economic activity.   
 
In total, 78,340, person years of employment will be created during all phases of the proposed 
residential development with wages of $5.9 billion and regional economic activity of $14.9 
billion.  The following table provides these impacts for the residential and the commercial 
portions of each of the development areas.

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
12 
Data Center
Commercial
Residential
Commercial
Total
Person Years of Employment
Direct
31,645
9,544
1,077
3,292
45,558
Indirect
7,484
2,257
118
751
10,610
Induced
15,458
4,662
460
1,593
22,173
Total
54,587
16,464
1,654
5,635
78,340
Wages ($ mil)
Direct
$2,517.4
$759.3
$84.9
$261.2
$3,622.8
Indirect
$614.8
$185.4
$8.3
$61.6
$870.1
Induced
$994.8
$300.0
$29.6
$102.5
$1,427.0
Total
$4,127.0
$1,244.7
$122.8
$425.3
$5,919.8
Economic Output ($ mil)
Direct
$5,275.7
$1,591.2
$146.3
$537.0
$7,550.2
Indirect
$2,004.9
$604.7
$26.3
$201.0
$2,837.0
Induced
$3,155.7
$951.8
$93.9
$325.2
$4,526.5
Total
$10,436.3
$3,147.7
$266.5
$1,063.2
$14,913.6
Source:   Elliott D. Pollack & Company;  IMPLAN
Economic Impact of Construction
Westpark Community Master Plan
(2025 Dollars)
NOTE: The total may not equal the sum of the impacts due to rounding.  All dollar figures are in constant dollars.  Inflation has not been included in these 
figures.
Mega Site 2
Megas Site 3
Mega Site 4

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
13 
3.2  Fiscal Impact of Construction 
 
The following table summarizes the revenues that would ultimately flow to the State, Maricopa 
County and City of Buckeye from the construction at Westpark Community.   
 
Some revenues are more direct and definable than others.  Revenues have been defined in this 
analysis as either primary or secondary, depending on their source and how the dollars flow 
through the economy into government tax accounts.  For instance, some revenues, such as 
construction sales taxes, are definable, straightforward calculations based on the value of 
construction.  These revenues are described in this study as primary revenues. 
 
Secondary revenues, on the other hand, flow from the wages of direct, indirect and induced 
employees who are supported by the project as well as revenues distributed by the State from 
various tax categories.  Revenue projections are based on typical wages of the employees 
working in the project, their spending patterns, projections of where they might live, and other 
assumptions outlined earlier in this report. 
 
The State of Arizona would collect an estimated $398.3 million in revenues during the 
development of Westpark Community Master Plan.  This includes both primary revenues 
generated by construction sales tax and residential impact fees as well as revenues generated 
by the employees.  Similarly, the developments will generate an estimated $75.6 million for 
Maricopa County and $140.0 million for the City of Buckey. 
 
In total, the development of Westpark Community Master Plan will generate $613.9 million in 
tax revenues during construction.

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
14 
Data Center
Commercial
Residential
Commercial
Total
State of Arizona
Construction sales
$50,871,100
$51,143,700
$4,701,600
$17,260,200
$123,976,600
Use Tax
--
$85,056,100
$163,900
$5,015,200
$90,235,200
Secondary impacts from employees
Spending sales tax
$32,854,700
$9,909,300
$985,200
$3,388,100
$47,137,300
Income tax
$73,203,900
$22,078,800
$1,940,300
$7,453,000
$104,676,000
Unemployment tax
$10,316,900
$3,111,700
$312,800
$1,065,000
$14,806,400
Vehicle license tax
$7,983,300
$2,407,900
$242,000
$824,200
$11,457,400
Gas tax
$4,192,200
$1,264,400
$127,000
$432,800
$6,016,400
Total for the State of Arizona
$179,422,100
$174,971,900
$8,472,800
$35,438,500
$398,305,300
Maricopa County
Construction sales
$7,201,300
$7,239,900
$665,600
$2,443,300
$17,550,100
Secondary impacts from employees
Spending sales tax
$5,659,300
$1,706,900
$169,800
$583,700
$8,119,700
Property tax
$16,220,100
$4,892,100
$491,600
$1,674,600
$23,278,400
State shared revenues
$18,606,700
$5,611,900
$539,500
$1,907,700
$26,665,800
Total for County
$47,687,400
$19,450,800
$1,866,500
$6,609,300
$75,614,000
Buckeye
Construction/Spec Builder tax
$30,862,800
$32,579,600
$3,422,800
$11,467,300
$78,332,500
Permit/Impact Fees
N/A
N/A
$2,255,500
N/A
$2,255,500
Use Tax
--
$45,565,800
$87,700
$2,686,700
$48,340,200
Secondary impacts from employees
Spending sales tax
$2,898,200
$874,100
$87,000
$298,900
$4,158,200
Property tax
$4,381,800
$1,321,600
$132,800
$452,200
$6,288,400
State shared revenues
$451,300
$136,200
$12,800
$46,300
$646,600
Total for City
$38,594,100
$80,477,300
$5,998,600
$14,951,400
$140,021,400
Total all jurisdictions
$265,703,600
$274,900,000
$16,337,900
$56,999,200
$613,940,700
Source: Elliott D. Pollack & Co.; IMPLAN; AZ Dept. of Revenue; AZ Tax Research Association
Mega Site 2
Mega Site 3
Mega Site 4
Fiscal Impact of Construction - All Jurisdictions
Westpark Community Master Plan
(2025 Dollars)

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
15 
4.0  Impact of Commercial Operations and New Residents 
 
As each portion of the development are completed, the State, Maricopa County, and City of 
Buckeye will benefit significantly in terms of new employment and ongoing annual tax 
revenues.   
 
Operational phase impacts are examined in this section of the report.  The impacts described 
below are anticipated to occur at build-out; when construction is completed, and the 
commercial space and residences are occupied to stabilized levels.   
 
4.1  Economic Impact of Operations  
 
Economic impact is centered primarily upon job creation and the impact that those employees 
would have on the economy.  Although the primary impact of the development would focus on 
Buckeye, the entire region would benefit.  Thus, the economic impacts are expressed as 
regional impacts.   
 
As new residents move into their homes in the Westpark Community Master Plan, they will 
begin to spend a portion of their disposable income in the community and support a significant 
number of jobs in the industries where their spending occurs. Resident spending on retail 
goods, services, entertainment and restaurant and bars would support direct, indirect, and 
induced jobs, wages, and annual economic activity.   
 
The commercial operations create direct onsite jobs in the local economy.  The job estimates 
are based on the square footage assumptions outlined in Section 2.0 of this report.   
 
In total, an estimated 23,374 direct, indirect, and induced employees would be supported by 
the residential spending and new commercial development within the Westpark Community 
Master Plan.  This employment would create $1.6 billion in wages and generate over $5.7 
billion in economic activity each year. 
 
The following table displays the results of the economic impact analysis from annual operations 
with the inclusion of reasonable vacancy rates.

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
16 
Mega Site 2
Mega Site 3
Mega Site 4
Total
Jobs
Direct
500
6,037
4,036
10,573
Indirect
1,383
3,825
1,475
6,682
Induced
822
3,768
1,529
6,119
Total
2,705
13,629
7,040
23,374
Wages ($ mil)
Direct
$67.5
$448.9
$209.2
$725.6
Indirect
$98.9
$314.2
$100.6
$513.6
Induced
$52.9
$242.6
$98.5
$394.0
Total
$219.4
$1,005.7
$408.2
$1,633.2
Economic Output ($ mil)
Direct
$349.2
$1,926.9
$617.3
$2,893.4
Indirect
$276.2
$923.1
$331.1
$1,530.4
Induced
$167.8
$769.6
$312.3
$1,249.8
Total
$793.1
$3,619.6
$1,260.8
$5,673.6
Source:   Elliott D. Pollack & Company;  IMPLAN
(2025 Dollars)
NOTE: The total may not equal the sum of the impacts due to rounding.  All dollar figures are in constant 
dollars.  Inflation has not been included in these figures.
Economic Impact of Operations
Westpark Community Master Plan

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
17 
4.2  Fiscal Impact of Operations  
 
Similar to the fiscal impact of construction, the effects of operations of the proposed uses of 
the development have been divided into primary and secondary impacts.  The primary impacts 
of the project would be generated from property taxes, retail sales taxes, commercial lease 
taxes, and utility taxes.  The secondary effects of the project relate to state shared revenue 
from an increase in population as well as from the employees who would work in the project 
including employee spending (which generates sales taxes) and various other tax payments 
such as income taxes, vehicle license taxes, and gasoline taxes. 
 
The State of Arizona will collect an estimated $87.8 million in primary and secondary taxes 
generated by the new developments in Westpark Community.  This includes the sales tax that 
would be generated by the spending of the new residents, sales tax generated at the retail and 
restaurant operations as well as the taxes generated by the employees.   
 
Similarly, Maricopa County would collect $39.1 million each year from both the residential and 
commercial operations and the secondary impact from employees and the City of Buckeye 
would collect an estimated $56.4 million each year of ongoing operations. 
 
Local school districts would collect an estimated $50.2 million each year from real property 
taxes and other special taxing jurisdictions would collect an additional $15.0 million each year 
at buildout. 
 
In total the Westpark Community Master Plan will generate an estimated $248.5 million each 
year from the ongoing operations of the development including the sales taxes collected from 
the commercial developments and the resident spending, property taxes, increased state 
shared revenues and taxes generated by employee spending.

Economic & Fiscal Impact of Westpark Community Master Plan– Buckeye, AZ 
Elliott D. Pollack & Company 
 
 
 
www.arizonaeconomy.com 
 
18 
Commercial
Commercial
Residential
Commercial
Total
State of Arizona
Sales tax
--
--
$141,600
$4,687,200
$4,828,800
Utility tax
$40,584,900
$4,964,300
$46,200
$1,844,600
$47,440,000
Secondary impacts from employees
Spending sales tax
$4,114,200
$14,502,900
$27,400
$5,674,400
$24,318,900
Income tax
$223,700
$1,025,800
$1,900
$405,100
$1,656,500
Unemployment tax
$511,200
$2,575,900
$6,700
$1,292,000
$4,385,800
Vehicle license tax
$395,500
$1,993,200
$5,200
$999,900
$3,393,800
Gas tax
$207,700
$1,046,700
$2,800
$525,000
$1,782,200
Maricopa County
Personal property tax
$137,600
$41,500
--
$14,100
$193,200
Real property tax
$5,503,500
$1,659,900
$101,700
$560,300
$7,825,400
Sales tax
--
--
$23,000
$764,900
$787,900
Utility Tax
$6,622,600
$506,300
$7,500
$216,200
$7,352,600
Increased state shared revenue
--
--
$550,200
--
$550,200
Secondary impacts from employees
Spending sales tax
$706,600
$2,499,500
$4,800
$988,200
$4,199,100
Property tax
$1,948,900
$7,217,500
$16,200
$3,230,300
$12,412,900
State shared revenues
$780,600
$3,173,300
$476,300
$1,396,300
$5,826,500
Buckeye
Personal property tax
$190,800
$57,600
--
$19,500
$267,900
Real property tax
$7,633,600
$2,302,300
$141,100
$777,100
$10,854,100
Sales tax
--
--
$99,000
$3,277,900
$3,376,900
Lease
--
$1,916,400
--
$794,500
$2,710,900
Utility Tax
$28,382,400
$2,169,800
$32,200
$926,900
$31,511,300
Increased state shared revenue
--
--
$897,300
--
$897,300
Secondary impacts from employees
Spending sales tax
$361,900
$1,280,100
$2,500
$506,000
$2,150,500
Property tax
$702,000
$2,599,800
$5,800
$1,163,500
$4,471,100
State shared revenues
$21,200
$91,500
$12,800
$38,000
$163,500
Other Districts
School districts
Personal property tax
$6,254,900
$1,046,200
--
$164,800
$7,465,900
Real property tax
$30,023,300
$9,055,200
$555,000
$3,056,000
$42,689,500
Special districts
Personal property tax
$1,875,200
$313,600
--
$49,500
$2,238,300
Real property tax
$9,001,000
$2,714,800
$166,400
$916,100
$12,798,300
Total tax revenues
$146,183,300
$64,754,100
$3,323,600
$34,288,300
$248,549,300
Source: Elliott D. Pollack & Co.; IMPLAN; AZ Dept. of Revenue; AZ Tax Research Association
Mega Site 3
Mega Site 4
Mega Site 2
Fiscal Impact of Operations - All Jurisdictions
Westpark Community Master Plan
(2025 Dollars)

WESTPARK CMP  
 
 
 
 
 
 
 
 
 
Appendix J 
TRAFFIC IMPACT ANALYSIS 
(UNDER SEPARATE COVER)

WESTPARK CMP  
 
 
 
 
 
 
 
 
 
Appendix K 
ACKNOWLEDGEMENT AND CONSENT REGARDING 
SILVERROCK CMP