JOB ORDER CONTRACT DELIVERY ORDER
BETWEEN
THE CITY OF BUCKEYE
AND
HITT CONTRACTING, INC.
CONTRACT NO. 2025088
DELIVERY ORDER NO. 2
CHANGE ORDER #1
THIS CHANGE ORDER #1
is entered into as of __________________,
between the City of Buckeye, an Arizona municipal corporation
HITT
Contracting, Inc., a Virginia corporation
. This Change Order modifies certain
sections of Delivery Order No. 2 to Contract No. 2025088
Delivery Order , with those
sections not expressly modified remaining in full effect pursuant to their terms.
RECITALS:
The City and Contractor entered into Delivery Order No. 2 to Contract No. 2025088 dated
February 3, 2026. Pursuant to which Contractor was to provide construction services for the Miller
Road Landscape Improvements: Lower Buckeye Pima Street Phase I project with the completion
of the Work eight weeks from the issuance from the Notice to Proceed and a not-to-exceed amount
of $400,000.00.
DELIVERY ORDER CHANGES:
1.
Article 1 Scope of Work and Exhibit A of the Original Delivery Order - Proposal,
are amended to incorporate the additional services set forth in Exhibit 1 of Change Order #1.
2.
Article 2
Schedule of Completion of Work, is amended by revising the
completion date for the Work from eight (8) weeks from the effective date of the Notice to Proceed,
to ten (10) weeks from the effective date of the Notice to Proceed.
3.
Article 3 Cost of Construction, is amended by increasing the total not-to-exceed
amount by $139,624.72, from $400,000.00 to $539,624.72.
ADDITIONAL PROVISIONS:
Except as amended herein, all provisions of the Delivery Order and Contract remain in full
force and effect.
In the event of any conflict or discrepancy between the terms of this Change Order, the
Delivery Order, the Contract, and any other contract documents, the documents shall govern in
that order.
Miller Road Landscape Improvements:
Lower Buckeye - Pima Street Phase I
Contract No. 2025088, Delivery Order #2, Change Order #1
1
HITT Contracting, Inc.
(REV. 6.23.25)
This Change Order may be canceled pursuant to the provisions of A.R.S. ยง 38-511.
IN WITNESS WHEREOF, the parties hereto have executed this Change Order as of the date
first set forth above.
CITY:
CONTRACTOR:
THE CITY OF BUCKEYE,
HITT CONTRACTING, INC.,
an Arizona municipal corporation
a Virginia corporation
By:
Doug Sandstrom, City Manager
Its:
ATTEST:
Lucinda Aja, City Clerk
RECOMMENDED:
Rob Roach, Grant Program and Procurement Manager
APPROVED AS TO FORM:
Tosca Henry, City Attorney
Miller Road Landscape Improvements:
Lower Buckeye - Pima Street Phase I
Contract No. 2025088, Delivery Order #2, Change Order #1
2
HITT Contracting, Inc.
(REV. 6.23.25)
Exhibit 1
Miller Road Landscape Improvements:
Lower Buckeye - Pima Street Phase I
Contract No. 2025088, Delivery Order #2, Change Order #1
3
HITT Contracting, Inc.
(REV. 6.23.25)
C.O.R. NO.
1
Job: COG Main Library Mason Repairs
Project #: 26-308
Date:
4/15/2026
Change Order Description:
Brycon's Work:
MH
Labor Rate
Labor $
Material
Equipment
Other
Subtotal
Subcontractors / Vendors:
1
Allowance for APS
2
Electrical - Tekline
3
Additional 2 Weeks Schedule
4
5
6
7
8
9
10
Contractors/Vendors Direct Cost Subtotal
Brycon Construction's Work Direct Cost Subtotal
Remarks:
Net Subtotal
Subcontractor Bond
Subtotal
General Conditions
10.00%
Subtotal
BC Bond
0.90%
Subtotal
BC Ins.
1.09%
Subtotal
Fee
6.38%
Total Change:
$139,624.72
Subtotal
.
Contract time:
10 days
Sales Tax
5.700%
This C.O.R. valid for:
30 Days
Submitted by:
Brycon
Brycon C.O.R. No.
1
6915 W. Frye Rd.
Architect Acceptance
Chandler, AZ 85226
Date
Shannon Ballard, Project Manager
Owner Acceptance
Project Manager Name / Title
Date
Note: This modification constitutes compensation in full on behalf of the contractor and its subcontractors and suppliers
for direct costs only which are attributable to the changes ordered herein. We reserve the rights to time extensions,
time-related costs and any indirect costs that result or flow from the changes ordered herein.
$7,100.83
$139,624.72
Gross Total
Attached is the change order request to provide the electrical panel and electrical connections for the two irrigation controllers.
This includes the assumption that all underground raceways are existing and clear. We have included a $75,000 allowance for
the APS design, once the design is provided it will be priced and submitted for a separate change order. We are requesting an
additional 10 days to complete this scope of work.
$1,099.20
$123,232.71
$1,343.24
$124,575.94
$7,947.95
$132,523.89
$111,030.46
$111,030.46
$11,103.05
$122,133.51
$111,030.46
BRYCON
CHANGE ORDER REQUEST
PRICING BREAKDOWN
SUB / VENDOR $
$75,000.00
$27,600.00
$8,430.46
Miller Road Landscape Improvements:
Lower Buckeye - Pima Street Phase I
Contract No. 2025088, Delivery Order #2, Change Order #1
4
HITT Contracting, Inc.
(REV. 6.23.25)
Brycon
Phoenix, AZ
Attn: John Patterson
SUBJECT:
COB Miller road landscape
ELECTRICAL PROPOSAL Revised with expedite adder
We are SBE/DBE/MBE Certified
We are pleased to offer you the following proposal:
Documents
Drawings dated: 6/3/2025
Specifications on drawings
We have seen no addendum
Scope of Work
Light Fixtures and branch circuiting
Lighting control as shown on the drawings
Switchgear
Devices and branch circuitry, branch underground installed by standard trenching methods
Breakouts are for accounting purposes only
Per plans and specifications
Proposal good for 10 days
Exclusions
Utility company charges
Utility and switchgear feeders not shown and not included
Underground boring
All sleeves, conduit across roads are by others
Not responsible for sleeve or conduit condition across roads or other areas
All concrete bases for light fixtures and switchgear equipment are by others
Sales Taxes on materials
Traffic control, permits & barricades
Participation in a LEEDS type program
Hoisting or lifting
Furnishing or installation of access doors
Cutting or patching of concrete, masonry, brick, sheetrock, plaster, etc
Placing or forming of concrete
Miller Road Landscape Improvements:
Lower Buckeye - Pima Street Phase I
Contract No. 2025088, Delivery Order #2, Change Order #1
5
HITT Contracting, Inc.
(REV. 6.23.25)
Painting or priming of any kind
Civil engineering and layout of concrete pole bases or concrete pads.
Warranty of existing electrical work
Payment and performance bond
Rock excavation, if encountered
Spoil removal from site
Overtime charges
Telephone, computer, or data cabling
Fire alarm system, raceway, or wiring
Temperature control and interlock wiring
Loose motor starters for equipment furnished by others
Patching of concrete for floor boxes
Roof Jacks
Trash removal from site (however, trash will be deposited in GC's dumpster)
Base Bid
$214,500
(1) Power Pedestal, Conduit, wire for (2) irrigation controller
$25,600
Does not include Primary/Secondary conduit, wire for Utility
Estimated lead time for pedestal is 5-7 weeks
(1) Power Pedestal expedite fee adder 6-8 weeks $2,000
Thank you for the opportunity to provide a proposal for this project and please do not hesitate to
call me if you have any questions or concerns.
Sincerely,
Eric Myers
Estimator
541-292-3894
ericm@teklineservices.com
Miller Road Landscape Improvements:
Lower Buckeye - Pima Street Phase I
Contract No. 2025088, Delivery Order #2, Change Order #1
6
HITT Contracting, Inc.
(REV. 6.23.25)