2912-1 Recreation and Public Purposes Lease & Exhibits Combined for Council Packet.pdf

City of Buckeye — Regular Council Meeting (2026-05-19)

View PDF Meeting page

Extracted text (via pymupdf) 108441 characters
Form 2912-1
(May 2001)
UNITED STATES 
DEPARTMENT OF THE INTERIOR 
BUREAU OF LAND MANAGEMENT 
Serial Number 
RECREATION OR PUBLIC PURPOSES LEASE 
Act of June 14,1926, as amended (43 U.S.C. 869 et. seq.) 
This lease entered into on this 
authorized officer of the Bureau of Land Management, and 
day of 
, 20 
, by the United States of America, the lessor, through the 
, hereinafter 
called the lessee, pursuant and subject to the terms and provisions of the Recreation and Public Purposes Act and to all reasonable regulations of the 
Secretary of the Interior now or hereafter in force when not inconsistent with any express and specific provisions herein, which are made a part 
hereof, 
Sec. 1. The lessor, in consideration of the rents to be paid and the conditions to be observed as hereinafter set forth, does hereby grant and lease to the 
lessee the right and privilege of using for the purposes hereinafter set forth in the following-described lands: 
containing 
acres, together with the right to construct and maintain thereon all buildings or other improvements necessary for such use 
for a periodof 
years, the rental to be $
per annum. If, at the expiration date of the lease the authorized officer shall determine 
that the lease may be renewed, the lessee herein will be accorded the privilege of renewal upon such terms as may be fixed by the lessor. The lessee may 
use the premises for 
There are reserved to the United States all mineral deposits in 
said lands, together with the right to mine and remove the same under 
applicable laws and regulations to be established by the Secretary of 
the Interior. 
The lessor reserves the right of entry, or use, by 
(a) any authorized person, upon the leased area and into the
(b) Federal agents and game wardens upon the leased area on 
(c) the United States, its permittees and licensees, to mine and
buildings constructed thereon for the purpose of inspection; 
official business; 
remove the mineral deposits referred to in Sec. 2, above. 
Sec. 4. In consideration of the foregoing, the lessee hereby agrees: 
(a) To improve and manage the leased area in accordance with the
plan of development and management designated as 
and approved by an authorized officer on 
or any modification thereof hereinafter approved by an authorized 
officer, and to maintain all improvements, during the term of this lease, 
in a reasonably good state of repair. 
(b) To pay the lessor the annual rental above set forth in advance
during the continuance of this lease. 
WITNESSETH:
Sec. 2.
Sec. 3.
(Continued on page 2)
AZAZ105906946
            
26
 
City of Buckeye 
530 E. Monroe Ave 
Buckeye, Arizona 85326
 
Gila and Salt River Meridian, Arizona 
T. 2 N., R. 3 W.,  
     sec. 14, E1/2; 
     sec. 26, N1/2. 
(The total acreage described aggregate 640 acres.) 
                                                                                                         
   640 
    25
 0
 
a recreational park, which may include, but is not limited to, the following features: trails to connect to the existing and planned Skyline 
Regional Park trail network, barrier-free trail (south parcel), trailhead parking, rest nodes, restrooms, shade structures, seating and site 
furnishings, signage, access roads, entry features, entry monument signage, vehicular control gates, and a non-motorized bike skills area (north 
parcel only). 
 
 
Future park master plans and or Plan of Development amendments shall be reviewed by the Bureau of Land Management prior to ground 
disturbing implementation.
Plan of Development Dated December 5, 2025 (Exhibit B)
03/03/2026

(c) Not to allow the use of the lands for unlawful purposes or for any
purpose not specified in this lease unless consented to under its terms: 
not to prohibit or restrict, directly or indirectly, or permit its agents, 
employees, contractors (including, without limitation, lessees, sub- 
lessees, and permittees), to prohibit or restrict the use of any part of the 
leased premises or any of the facilities thereon by any person because of 
such person’s race, creed, color, sex, or national origin. 
(d) Not to assign this lease or to change the use of the land without
first receiving the consent of the authorized officer of the Bureau of 
Land Management. 
That this lease may be terminated after due notice to the lessee 
upon a finding by the authorized officer that the lessee had failed to 
comply with the terms of the lease; or has failed to use the leased lands 
for the purposes specified in this lease for a period of 
consec- 
utive years; or that all or part of the lands is being devoted to some other 
use not consented to by the authorized officer; or that the lessee has not 
complied with his development and management plans referred to in 
subsection 4(a). 
That upon the termination of this lease by expiration, surrender, 
or cancellation thereof, the lessee, shall surrender possession of the 
premises to the United States in good condition and shall comply with 
such provisions and conditions respecting the removal of the improve- 
ments of and equipment on the property as may be made by an 
authorized officer. 
To take such reasonable steps as may be needed to protect the 
surface of the leased area and the natural resources and improvements 
thereon. 
(h) Not to cut timber on the leased area without prior permission of,
or in violation of the provisions and conditions made by an authorized 
officer. 
(i) That nothing contained in this lease shall restrict the acquisition,
granting, or use of permits or rights-of-way under existing laws by an 
authorized Federal officer. 
Sec. 5. Equal Opportunity Clause. Lessee will comply with all provi- 
sions of Executive Order No. 11246 of September 24,1965, as amended, 
and the rules, regulations, and relevant orders of the Secretary of 
Labor. Neither lessee nor lessee’s subcontractors shall maintain 
segregated facilities. 
FOR EXECUTION BY LESSEE
I N WITNESS WHEREOF: 
Equal Access Clause. Lessee shall comply with all provisions of 
the American Disabilities Act of July 26, 1990 the Architectural Barriers 
Act of  1968 and Section 504 of the Rehabilitation Act of 1973, as 
amended. 
These Acts require that programs and public facilities 
constructed or renovated he accessible to and usable by persons with 
disabili tics. 
The lessee may surrender this lease or any part thereof by filing 
a written relinquishment in the appropriate BLM office. The relin- 
quishment shall be subject to the payment of all accrued rentals and to 
relinquishment in accordance with the applicable lease terms in 
subsections 
and 4(g) and the appropriate regulations. 
The lessee further agrees to comply with and be bound by those 
additional terms and conditions identified as 
and which are made a part hereof. 
Sec. 9. No Member of, or Delegate to, the Congress, or Resident 
Commissioner, after his election or appointment, and either before or 
after he has qualified, and during his continuance in office, and no 
officer, agent, or employee of the Department of the Interior, except as 
otherwise provided in 43 CFR, Part 7, shall be admitted to any share or 
part of this lease, or derive any benefit that may arise there from, and 
the provisions of Title 18 U.S.C. Sections 431-433, relating to con- 
tracts, enter into and form a part of this lease, so far
the same may be 
applicable. 
THE UNITED STATES OF AMERICA 
By 
(Signature of Lessee’s Authorized Officer) 
(Authorized Officer) 
(Signature of Witness) 
(Title) 
(Date) 
(Date) 
This form does not constitute an information collection as defined by 44 U.S.C. 3502 and therefore does not require OMB approval. 
(e) 
(f) 
(g) 
Sec. 6.
Sec. 7.
Sec. 8.
4(f) 
(Form 2912-1, page 2)
the continued obligation of the lessee to place the lands in condition for
as
   10
Exhibit C - Stipulations 
Exhibit D - Avoidance Area 
 
SIGN
SIGN
SIGN
                    Field Manager, Hassayampa Field Office

SKYLINE
REGIONAL
PARK
T1N
R3W
T2N
R2W
T2N
R4W
T3N
R3W
T2N
R3W
32
19
25
1
31
13
10
36
36
5
21
25
30
11
6
1
17
27
4
12
24
26
16
35
8
7
15
34
18
33
28
20
13
29
2
3
23
24
9
22
12
North
Parcel
South
Parcel
0
1 Miles
0
1 Kilometers
Map Produced by BLM Hassayampa Field Office 
Coordinate System: NAD 1983 UTM Zone 12N 
Scale: 1:60,000 at 8.5x11 page output
Date: 03/03/2026
While every effort has been made to ensure the 
quality of the information presented, the Bureau 
of Land Management (BLM) makes no warranty 
regarding the accuracy or completeness of this 
map. This map and data are representational and 
are to be used as intended by the BLM. Map data 
are compiled from various sources. This map and 
the data from which it was derived are not binding 
on the BLM and may be revised at any time.
Skyline Regional Park R&PP Lease Additional Parcels
AZAZ105906946 Exhibit A
Bureau of Land Management - Phoenix District - Hassayampa Field Office
Service Layer Credits: World Topographic Map: City of Glendale, City of Phoenix, Esri, TomTom, Garmin, FAO, NOAA, USGS, Bureau of Land Management, EPA, NPS, USFWS
World Imagery: Maxar
World Hillshade: Esri, USGS
0
50 mi
0
50 km
Addtional Parcels
Skyline Regional Park
Bureau of Land Management
Local or State Parks
Military
Private
State

BUCKEYE,AZ 
Skyline Regional Park Outlying Parcels 
PLAN OF DEVELOPMENT 
Exhibit B 
Approved 3/3/2026
December 5, 2025

Skyline Regional Park Outlying Parcels 
Recreation and Public Purposes Act Lease 
PLAN OF DEVELOPMENT 
Submitted to: 
U.S. Department of the Interior 
Bureau of Land Management 
Hassayampa Field Office 
2020 E Bell Road 
Phoenix, Arizona 85022 
623-580-5500
December 5, 2025
It is the mission of the Bureau of Land Management to 
sustain the health, diversity, and productivity of the 
public lands for the use and enjoyment of present and 
future generations.

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
i 
Table of Contents 
1.
Introduction 1
1.1 
Background ............................................................................................................................... 2 
1.2 
Statement of Need ..................................................................................................................... 2 
1.3 
Community Support .................................................................................................................. 4 
1.4 
Location ..................................................................................................................................... 4 
1.4.1 
North Parcel .................................................................................................................. 5 
1.4.2 
South Parcel .................................................................................................................. 8 
1.4.3 
Legal Descriptions ...................................................................................................... 10 
1.4.4 
Acreages ..................................................................................................................... 11 
1.5 
Site Evaluations ....................................................................................................................... 11 
2.
Proposed Facilities .......................................................................................................................... 12 
2.1 
Trails ........................................................................................................................................ 12 
2.2 
Trailhead Parking .................................................................................................................... 18 
2.3 
Rest Nodes ............................................................................................................................... 21 
2.3.1 
Restrooms ................................................................................................................... 23 
2.3.2 
Shade Structures ......................................................................................................... 25 
2.3.3 
Seating and Site Furnishings ...................................................................................... 25 
2.3.4 
Signage ....................................................................................................................... 26 
2.4 
Access Roads ........................................................................................................................... 28 
2.5 
Entry Features.......................................................................................................................... 29 
2.5.1 
Entry Monument Signage ........................................................................................... 29 
2.5.2 
Vehicular Control Gates ............................................................................................. 30 
2.6 
Bike Skills Area ....................................................................................................................... 31 
3.
Project Infrastructure ..................................................................................................................... 32 
3.1 
Water Service........................................................................................................................... 32 
3.2 
Electric Service........................................................................................................................ 33 
3.3 
Sewer Service .......................................................................................................................... 33 
3.4 
Site Operations ........................................................................................................................ 33 
4.
Summary of Site Impacts ............................................................................................................... 34 
5.
Consideration of an Alternative ..................................................................................................... 37 
6.
Phasing Recommendations ............................................................................................................. 39 
6.1 
Priority Level 1: South Parcel Access Road, Utility Lines, and Parking ................................ 39 
6.2 
Priority Level 2: South parcel rest node .................................................................................. 39 
6.3 
Priority Level 3: South parcel trails ......................................................................................... 40 
6.4 
Priority Level 4: North parcel trails ......................................................................................... 40 
6.5 
Priority Level 5: North parcel access road, utility lines, and parking ..................................... 40 
6.6 
Priority Level 6: North parcel rest node .................................................................................. 40 
6.7 
Priority Level 7: North parcel bike skills area ......................................................................... 40 
7.
Cost Evaluations .............................................................................................................................. 41 
8.
Management Plan ........................................................................................................................... 47

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
ii 
 
List of Appendices 
Appendix A. 
A Class III Cultural Resources Survey of Skyline Regional Park Outlying Parcels 
North, Buckeye, Maricopa County, Arizona 
Appendix B. 
A Class III Cultural Resources Survey of Skyline Regional Park Outlying Parcels 
South, Buckeye, Maricopa County, Arizona 
Appendix C. 
Buckey City Council Resolution Supporting the Addition of the Outlying Parcels 
Appendix D. 
Skyline Regional Park Outlying Parcels R&PP Lease Application 
Appendix E. 
Letter of Support from DMB – Verrado for the addition of the Outlying Parcels 
 
List of Figures 
Figure 1. 
Vicinity map of the subject parcels.................................................................................. 1 
Figure 2. 
Population growth in Buckeye ........................................................................................ 3 
Figure 3. 
Existing parking in the vicinity of the R&PP parcels ...................................................... 4 
Figure 4. 
Vicinity and land ownership surrounding the proposed R&PP parcels ........................... 5 
Figure 5. 
View looking north of the north parcel and existing road beyond .................................. 5 
Figure 6. 
Elevational analysis of north parcel................................................................................. 6 
Figure 7. 
Slope analysis of north parcel .......................................................................................... 7 
Figure 8. 
View looking west at the south parcel from the Verrado property line ........................... 8 
Figure 9. 
Elevational analysis of south parcel ................................................................................ 9 
Figure 10. 
Slope analysis of south parcel ....................................................................................... 10 
Figure 11. 
Areas of steep terrain excluded from cultural surveys .................................................. 11 
Figure 12. 
North parcel trails .......................................................................................................... 13 
Figure 13. 
South parcel trails .......................................................................................................... 14 
Figure 14. 
South barrier-free trail loop system ............................................................................... 15 
Figure 15. 
Pedestrian bridge over wash crossing at Watson Road trailhead at Skyline Regional 
Park ................................................................................................................................ 16 
Figure 16. 
Mountain Wash Trail at Skyline Regional Park, a moderate hike ................................. 17 
Figure 17. 
Valley Vista Trail at Skyline Regional Park, a difficult hike ......................................... 17 
Figure 18. 
Example of a main trail with challenge obstacle on alternative route ........................... 18 
Figure 19. 
Accessible parking stalls at the Watson Road trailhead ................................................ 18 
Figure 20. 
North parcel site plan concept ....................................................................................... 19 
Figure 21. 
South parcel site plan concept ....................................................................................... 20 
Figure 22. 
Example rest node at the Watson Road trailhead .......................................................... 21 
Figure 23. 
North parcel rest node enlargement ............................................................................... 22 
Figure 24. 
South parcel rest node enlargement ............................................................................... 23 
Figure 25. 
Custom restroom building at Watson Road trailhead .................................................... 24 
Figure 26. 
Solar panels on the roof of the Watson Road trailhead restroom .................................. 24 
Figure 27. 
Watson Road trailhead picnic ramadas .......................................................................... 25 
Figure 28. 
Seat wall at the Watson Road trailhead ......................................................................... 26 
Figure 29. 
Custom waste and recycling station at the Watson Road trailhead ............................... 26 
Figure 30. 
Examples of kiosks and sign graphics at the Watson Road trailhead ............................ 27 
Figure 31. 
 “Happy Trails” Checklist and Heat/Fire Advisory notices ........................................... 27

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
iii 
Figure 32. 
Example of a low-water culvert trail crossing on the New River in Peoria, Arizona .... 28 
Figure 33. 
Portion of the Watson Road trailhead entry signage with rolling gate behind .............. 30 
Figure 34. 
Decorative steel panels on the Watson Road trailhead vehicular gate ........................... 30 
Figure 35. 
Sedona Posse Grounds Park pump track with preserved vegetation ............................. 31 
Figure 36. 
Access to the underground water tank at the Watson Road trailhead ............................ 32 
Figure 37. 
North parcel site disturbance area ................................................................................. 34 
Figure 38. 
South parcel site disturbance area ................................................................................. 35 
Figure 39. 
North parcel alternative site plan concept ..................................................................... 37 
Figure 40. 
South parcel site plan concept ....................................................................................... 38 
 
List of Tables 
Table 1 
Proposed R&PP Land Legal Descriptions ..................................................................... 10 
Table 2 
Park and Facility Acreages ............................................................................................ 11 
Table 3 
Summary of Site Impacts for the North Parcel .............................................................. 36 
Table 4 
Summary of Site Impacts for the South Parcel .............................................................. 36 
Table 5 
South Parcel Order-of-Magnitude Cost Evaluation ....................................................... 41 
Table 6 
South Parcel Annual Projected Cost Escalation ............................................................ 42 
Table 7 
North Parcel Order-of-Magnitude Cost Evaluation ....................................................... 43 
Table 8 
North Parcel Annual Projected Cost Escalation ............................................................ 44 
Table 9 
South Parcel Parking Expansion Order-of-Magnitude Cost Evaluation ....................... 45 
Table 10 
South Parcel Parking Expansion Annual Projected Cost Escalation ............................. 46

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
1 
1. 
INTRODUCTION 
The City of Buckeye (City) is applying to the Bureau of Land Management (BLM) Hassayampa Field 
Office under the Recreation and Public Purposes (R&PP) Act to lease two parcels of BLM-managed land 
totaling approximately 640 acres for the purpose of expanding the public trail system and amenities at 
Skyline Regional Park.  
The existing R&PP lease for Skyline Regional Park is an 8,675-acre mountain preserve in the southern 
White Tank Mountains in Buckeye, Arizona, on the western edge of metropolitan Phoenix (Figure 1). It 
was developed by the City after entering a 25-year, no-cost lease agreement under Lease #AZA-32053 
(01) with the BLM in 2010. 
East of the currently leased lands, between Skyline Regional Park and the community of Verrado, are two 
BLM parcels totaling approximately 640 acres that are the subject of this Plan of Development (POD). 
Both parcels occur in the Sonoran desertscrub biotic community in the foothills of the White Tank 
Mountains. Typical plant species include creosote (Larrea tridentata), foothills palo verde (Parkinsonia 
microphylla), brittlebush (Encelia farinosa), triangle-leaf bursage (Ambrosia deltoidea), saguaro 
(Carnegiea gigantea), teddy bear cholla (Cylindropuntia bigelovii), and buckhorn cholla (Cylindropuntia 
acanthocarpa). Both parcels also occur in Desert Tortoise Habitat Management Category 3, which refers 
to areas of desert tortoise habitat that are not essential to maintain viable populations.1 
 
Figure 1. 
Vicinity map of the subject parcels 
 
1Bureau of Land Management, Arizona State Office. Suitable Desert Tortoise Habitat, Arizona. Available at: 
https://databasin.org/datasets/0d6d36166e4744569ad6af870cdf38d1/#:~:text=Category%202%3A%201.,
Most%20conflicts%20are%20resolvable, accessed May 2023.

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
2 
This POD describes the design intent for artfully and sensitively arranging trails and trailhead facilities 
while minimizing impacts to the natural environment. Supporting infrastructure improvements are 
proposed to provide services for restrooms and maintenance and are intended to maintain the natural and 
suburban character of the area for the public benefit. 
1.1 
Background 
In 2002, the City submitted an R&PP lease application for approximately 9,315 acres in the southern 
White Tank Mountains, south of Maricopa County’s White Tank Mountain Regional Park with the 
intention of including all 9,315 acres in Skyline Regional Park. Initial drafts of the City’s environmental 
assessment and POD for Skyline Regional Park included the two subject parcels. Additionally, the City 
commissioned a Class II cultural survey for the northern parcel and a Class III cultural survey for the 
southern parcel, reports for which were submitted to the BLM in March 2006. 
However, in 2005 while the City was advancing the POD, DMB – Verrado (DMB), who is developing the 
master planned community of Verrado to the east, began conversations with the City regarding the two 
subject BLM parcels. At that time, DMB had interest in developing the two subject parcels as an open 
space buffer and expansion of several adjacent Verrado neighborhoods. DMB believed the lands suitable 
for disposal under Section 206 of the Federal Land Policy and Management Act and was considering a 
land exchange with BLM for the two subject parcels with other DMB-owned lands. At DMB’s request, 
the City withdrew the two subject parcels from its R&PP lease application, ultimately leasing 8,675 acres 
for Skyline Regional Park in its current boundary extent. Also, in response to DMB’s request, BLM 
classified the two subject parcels as suitable for sale or exchange in the Bradshaw–Harquahala Approved 
Resource Management Plan approved in 2010.2 
Over the past few years, DMB has reevaluated the use of the two subject parcels in its future community 
plans and believes the lands to be better suited for inclusion in the City’s existing R&PP lease for Skyline 
Regional Park. Adding the two subject parcels into the City’s lease agreement will allow the City to 
enhance trail connectivity between the existing Skyline Regional Park and its many users coming from 
the Verrado community. 
1.2 
Statement of Need 
Buckeye consistently ranks in the top 10 fastest growing communities nationwide (Figure 2).3 In 2000, 
the rural farming community had a population of 6,500 residents. In 2010; Buckeye had a population of 
51,876, which surged to 91,502 in the 2020 census, for an increase of almost 40 percent, or 40,000 people 
over a 10-year period. The City’s 2023 population estimate was 114,000 based on residential permits 
issued since the 2020 census data was collected.4 Buckeye is Arizona’s largest city in land area with a 
638.8-square-mile planning area and is poised to become one of the largest populated cities in the 
Phoenix metropolitan area.5 There are also more than 300,000 proposed dwelling units approved in 
various master planned communities within Buckeye, and population estimates show Buckeye to be home 
 
2Bureau of Land Management. 2010. Bradshaw-Harquahala Approved Resource Management Plan, Available at: 
https://eplanning.blm.gov/public_projects/lup/1350/13345/13413/Bradshaw-Harquahala_Record_of_Decision_and_
Approved_Resource_Management_Plan_pdf.pdf, accessed April 2023. 
3United States Census Bureau. 2022. Fastest-Growing Cities Are Still in the West and South. Available at: 
https://www.census.gov/newsroom/press-releases/2022/fastest-growing-cities-population-estimates.html, accessed April 2023. 
4City of Buckeye. City of Buckeye Open Data. Available at: https://opendata.buckeyeaz.gov, accessed May 2023. 
5City of Buckeye. City of Buckeye Open Data. Available at: https://opendata.buckeyeaz.gov, accessed May 2023.

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
3 
to more than 1.5 million residents at total build out. The Maricopa Association of Governments (MAG) 
estimates Buckeye will grow to nearly 460,000 people by 2055.6 
 
Figure 2. 
Population growth in Buckeye 
The Verrado community on the east side of Skyline Regional Park comprises 8,800 acres and is projected 
to include up to 14,080 homes and 4 million square feet of office, light industrial, and retail space at full 
build out. The open space that Skyline Regional Park provides is vital to the growing community and 
serves as a recreation destination for the entire West Valley area, drawing in thousands of visitors 
annually. In 2016, the City installed traffic counters at the main entrance to Skyline Regional Park to 
gauge the number of park visitors. Visitation continually increased, and over the following five-year 
period, the City estimates visitation grew from 189,000 visitors in 2016 to 425,000 visitors in 2020, about 
a 122 percent increase annually. These high visitation numbers demonstrate the desire for mountain parks 
and preserves in the West Valley area of metropolitan Phoenix. 
Skyline Regional Park currently offers about 22 miles of City-maintained trails for hikers, mountain 
bikers, and horseback riders as well as picnic areas and campsites.7 The park also provides support 
facilities such as a restroom, programming area, gatehouse, and parking at the trailhead off Watson Road. 
Parking demand at this trailhead, however, is starting to outpace the availability of parking stalls 
(Figure 3). Visitors accessing the Skyline Regional Park trails from the east side currently park at a 
temporary trailhead on Verrado property and use an existing jeep trail through the south parcel to connect 
to Skyline Regional Park’s Lost Creek Trail. This popular trailhead, however, will be removed in 
Verrado’s next phase of development, leaving the nearest visitor parking access to Skyline Regional Park 
via the subject parcels more than a mile away at either Meck Park, a temporary trailhead farther north of 
Meck Park, and the Watson Road Trailhead, all of which are already providing other recreational parking 
demands. The Canyon Vista Trailhead is also planned in the area approximately two miles from the Lost 
Creek Trailhead. 
 
6Maricopa Association of Governments. 2019. Socioeconomic Projections: Population and Employment by Municipal Planning Area, 
Jurisdiction, and Regional Analysis Zone. Available at: https://azmag.gov/Portals/0/Documents/maps-data/Socioeconomic-Projections-2018-
Full-Report_June-2019.pdf, accessed April 2023. 
7City of Buckeye. Skyline Regional Park Trail Map. Available at: https://www.buckeyeaz.gov/home/ 
showpublisheddocument/6318/636752984973170000, accessed April 2023. 
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
1900
1910
1920
1930
1940
1950
1960
1970
1980
1990
2000
2010
2020
Population
200
684
726
1,077
1,305
1,932
2,286
2,599
3,434
4,436
6,537 50,876 91,502
Population

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
4 
 
Figure 3. 
Map of existing parking in the vicinity of the R&PP parcels 
Including the two subject parcels in the City’s R&PP lease for Skyline Regional Park will allow the City 
to continue providing trail connectivity to the broader community and will facilitate consistency with 
Skyline Regional Park for trail marker signage, emergency trail marker signage, tread surfacing, trail 
maintenance, policing, staffing, and volunteerism. 
1.3 
Community Support 
The City Council adopted Resolution 21-16 on April 19, 2016, authorizing the submission of an R&PP 
lease application to BLM for the two subject parcels east of Skyline Regional Park, which total 
approximately 640 acres (Appendix C). The City then filed the R&PP lease application with the BLM in 
May of 2016 (Appendix D). This POD builds on that lease application with additional information about 
the proposed facilities. 
DMB fully supports the City’s efforts to add the two subject parcels into its existing R&PP lease with the 
BLM for Skyline Regional Park (see Appendix E for the letter of support from Daniel T. Kelly, Senior 
Vice President of DMB Associates). 
1.4 
Location 
The two subject parcels are east of Skyline Regional Park and west of the Verrado community (Figure 4). 
Both parcels have existing dirt trails or roads that are currently used by hikers, mountain bikers, and 
equestrians. The east side of Skyline Regional Park is accessed off Verrado Way, roughly a mile east of 
the two parcels. Additional large undeveloped landowners within a 6-mile radius include BLM, Arizona 
State Trust (AST), and the Buckeye Military Reserve.

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
5 
 
Figure 4. 
Map of land ownership in the vicinity of the proposed R&PP parcels 
1.4.1 
North Parcel 
 
Figure 5. 
View looking north of the north parcel and existing road beyond 
The north parcel is mountainous in character, ranging from approximately 1,455 feet to 2,345 feet in 
elevation (Figure 6). The site is bounded by Skyline Regional Park on the west and the community of 
Verrado to the north, east, and south. The site was once used by Caterpillar, a construction and mining 
equipment manufacturer, as a proving grounds for their products. Caterpillar developed a dirt road 
approaching the parcel from the east along the Camelback Road alignment. At the southeast corner of the 
parcel, the road turns north and runs parallel to and just outside the eastern perimeter of the parcel for

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
6 
about 0.6 mile. From there, the road heads northwest, crossing through the north parcel into the White 
Tank Mountains. A historical 100-foot-wide right-of-way for the road through the north parcel was 
relinquished in 2024 (serial number AZA 001525). The road serves as an alternative access route to 
communication sites on top of the White Tank Mountains and as a path for mountain bikers and hikers; 
however, the portion of the road on Verrado property will not remain once this area of Verrado is 
developed in a future phase of the community. Additionally, a Special Use Airspace zone for Luke Air 
Force Base roughly covers the northern third of the parcel.  
 
Figure 6. 
Elevational analysis of the north parcel 
Most of the parcel exceeds 25 percent grade with a few areas west of the existing dirt road with grades 
that are less than 8 percent (Figure 7). While the steep areas may be utilized for trails, facilities that may 
accommodate vehicular access or accessible amenities are better suited in the flatter areas of the site to

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
7 
minimize grading impacts. The entirety of the north parcel is classified as BLM Visual Resource 
Management Class II, which has the objective to retain the existing character of the landscape. The level 
of change to the characteristic landscape should be low. Management activities may be seen but should 
not attract the attention of the casual observer. Any changes must repeat the basic elements of form, line, 
color, and texture found in the predominant natural features of the characteristic landscape. 
 
Figure 7. 
Slope analysis of the north parcel

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
8 
1.4.2 
South Parcel 
 
Figure 8. 
View looking west at the south parcel from the Verrado property line 
Most of the south parcel is in the foothills zone of the White Tank Mountains, characterized by flatter 
terrain segmented by drainage arroyos. Steeper, mountainous topography occurs along the southern 
perimeter and in the northwest corner of the site. The site is bordered by Skyline Regional Park to the 
west and south and by the Verrado community on the north and east. Verrado is planning to develop 
residential lots along the eastern perimeter of the parcel in its next phase of development, along with an 
extension of Lost Creek Drive, and is conceptually planning additional residential lots north of the site in 
a later phase. 
Elevations range from roughly 1,405 feet to 1,920 feet (Figure 9). Most drainage flows east into the 
Verrado community though a minor portion of drainage that is directed south from the southwest corner 
of the parcel. An existing dirt road, approximately 10 feet wide, runs parallel to and about 250 feet south 
of the northern boundary line, connecting Verrado to Skyline Regional Park’s Lost Creek Trail and overall 
trail system.

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
9 
 
Figure 9. 
Elevational analysis of the south parcel 
About one-third of the parcel has grades that are less than 8 percent, mostly in the northern half of the 
parcel (Figure 10). These flatter areas are better suited for developing trailhead facilities than the steep, 
rugged areas to the south and west. Hiking trails are easily adaptable to development in steep terrain, 
allowing this portion of the site to be utilized for making trail connections to Skyline Regional Park. The 
entirety of the south parcel is classified as BLM Visual Resource Management Class IV, which has the 
objective to provide for management activities that require major modifications of the existing character 
of the landscape. The level of change to the characteristic landscape can be high. These management 
activities may dominate the view and be the major focus of viewer attention. However, every attempt 
should be made to minimize the impact of these activities through careful location, minimal disturbance, 
and repeating the basic elements.

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
10 
 
Figure 10. 
Slope analysis of the south parcel 
1.4.3 
Legal Descriptions 
Table 1 lists legal descriptions for the two subject parcels within the Gila and Salt River Meridian.  
Table 1 
Proposed R&PP Land Legal Descriptions 
Site 
Township 
Range 
Section 
Aliquot 
North parcel 
02N 
03W 
14 
E½ 
South parcel 
02N 
03W 
26 
N½

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
11 
1.4.4 
Acreages 
An overview of the R&PP parcels is tallied in Table 2 to list the overall approximate acreage of each 
parcel as well as the anticipated site disturbance of the proposed recreational amenities. The anticipated 
site disturbance includes allowance for construction staging around the facility perimeter. Site disturbance 
is described in further detail in Section 4. 
Table 2 
Park and Facility Acreages 
Proposed Site 
R&PP Boundary (in acres) 
Net Site Impact (in acres) 
Percent of Site Impacted 
North parcel 
320 
13.3 
4.2% 
South parcel 
320 
12.0 
3.8% 
Total 
640 
25.3 
4.0% 
1.5 
Site Evaluations 
In July of 2024, the City submitted to the BLM two Class III cultural reports, one for the north parcel and 
one for the south parcel (Appendices A and B). The surveys evaluated the full parcel extents except where 
steep terrain (exceeding 30 percent slope) limited access. The steep terrain area excluded from the surveys 
totaled 203 acres in the north parcel and 126.5 acres in the south parcel (Figure 11). In this hilly terrain, 
the area was examined from saddles and ridge tops where feasible. 
 
Figure 11. 
Areas of steep terrain excluded from cultural surveys 
Biological reports evaluating of the subject parcels are underway. The threatened and endangered species 
field review evaluated the full area of both parcels except where, similar to the cultural surveys, steep 
terrain limited access. Except for proposed trail alignments, areas of the site that exceed 30 percent slope 
are not intended for development.

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
12 
2. 
PROPOSED FACILITIES 
The site plan concepts shown in the following subsections for the proposed facilities represent what 
would be considered the full build out of the subject parcels. During the design process, the proposed 
facilities will be developed in further detail to respond to site constraints, comply with applicable zoning 
and ordinance requirements in effect at that time, and align with future adjacent development in the 
neighboring Verrado community, which is not finalized nor completely defined at this time. However, the 
plans shown in this POD have been thoughtfully laid out to work with existing topography to minimize 
site disturbance. Potential design or engineering adjustments are not anticipated to be substantial in nature 
or extend beyond the biological and cultural surveys conducted in support of this POD. While Verrado’s 
future community plans are still in design, the City will work closely with Verrado through its plan 
approval process to ensure access and utility accommodations are made for the proposed improvements in 
this POD. The proposed facilities shown are intended to be developed over time as funding and 
supporting infrastructure become available (see Section 5).  
The program for each parcel includes the following elements in different scales and configurations: 
◼ 
Trails to connect to the existing and planned Skyline Regional Park trail network 
◼ 
Trailhead parking 
◼ 
Rest nodes with restrooms, shade structures, seating and site furnishings, and signage 
◼ 
Access roads from the future Verrado road network 
◼ 
Entry features 
The south parcel trailhead is intended to be the more developed of the two subject parcels, in part because 
it will serve an existing population of trail users that are currently using the temporary trailhead on the 
adjacent Verrado property. The flatter topography of the south parcel is also better suited to accommodate 
a larger trailhead parking area. 
The rugged terrain of the north parcel offers the opportunity for challenging, picturesque trails and a bike 
skills area. The smaller scale of the north trailhead facilities suits both the site character and the more 
remote location. 
The hours of use for the proposed subject parcel facilities will likely follow those currently in place for 
Skyline Regional Park. The hours of operation for the Watson Road trailhead are currently from sunrise to 
10:00 p.m. due to the presence of campsites; however, the Skyline Regional Park trails are only open 
from sunrise to sunset. The City will determine the hours of access to the subject parcels at the time of 
opening. 
2.1 
Trails 
Intended Users: The users of the trails will be the general public, including all age groups and varying 
physical ability. The adjacent community of Verrado has an active bike community, and it is anticipated 
that many mountain bikers will use the trails.  
North Parcel Trails Description: The mountainous terrain of the parcel may be well suited for more 
physically challenging trails with higher difficulty ratings. The trail shown as a planned Skyline Regional 
Park trail on Figure 12 is an existing blazed trail within the Skyline Regional Park boundary that has not 
yet been incorporated into Skyline Regional Park trail network as a designated, maintained trail; however,

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
13 
when the Skyline Regional Park trail network expands in the future, this trail is planned to be included. 
The two proposed trails will connect to the planned trail along new trail alignments to provide better 
access to the surrounding community. Drainage crossings will likely be at-grade crossings. 
 
Figure 12. 
North parcel trails

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
14 
South Parcel Trails Description: The trails in the south parcel are more varied in their topographic 
profile and difficulty (Figure 13). The main east-west trail follows an existing two-track road that 
connects to Lost Creek Trail in Skyline Regional Park. The trail is characterized by relatively flat terrain 
punctuated by steep wash crossings. Most of the crossings would be at-grade crossings, but a pedestrian 
bridge is shown at the wash crossing west of the trailhead rest node (Figure 21). The bridge would be 
similar in character to the pedestrian bridge at the Watson Road trailhead, though about half the length 
(Figure 15). An existing at-grade crossing of the wash south of the proposed restroom will be used as a 
secondary crossing. A series of barrier-free loop trails close to the proposed trailhead provide an 
accessible trail experience (Figure 14). The remaining proposed trails connect to the existing Skyline 
Regional Park trail network south and west of the parcel boundary and range from moderate to difficult. 
 
Figure 13. 
South parcel trails

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
15 
 
Figure 14. 
South barrier-free trail loop system

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
16 
 
Figure 15. 
Pedestrian bridge over wash crossing at Watson Road trailhead at Skyline Regional 
Park 
Design Criteria: The trails are anticipated to be single-track, non-motorized trails for hiking and 
mountain biking use consistent with the trails constructed at Skyline Regional Park. The trails will follow 
the natural undulation of the topography with minimal cut and fill grading required to achieve a 2- to 4-
foot-tread width and 1- to 2-foot-wide shoulders. More popular trails may be wider, especially when using 
existing old jeep trails. Barrier-free trails will have a low level of difficulty and comply with Americans 
with Disabilities Act (ADA) requirements for slopes (maximum 5 percent longitudinal slope and 
maximum 2 percent cross-slope) and surfacing (concrete, asphalt, chip seal, or stabilized decomposed 
granite). Difficult, strenuous trails tend to be narrower as they navigate rocky terrain, and easy to 
moderate trails tend to be wider to accommodate a larger number of trail users and range of physical 
ability (Figure 16 and Figure 17). Challenge obstacles tailored to mountain bikers, such as drops, jumps, 
rock gardens, and or rock rolls may be incorporated into the shared-use trails as short detours off the main 
trail (Figure 18). Varying the difficulty level of the challenges creates interest and provides opportunities 
for skill progression. Beginner obstacles are usually around 6 inches of height or drop. Intermediate 
obstacles would be within the 1- to 3-foot range. Advanced obstacles could be 3 feet or more. All trails 
will include directional trail markers at trail intersections and emergency signage posted every quarter 
mile.

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
17 
 
Figure 16. 
Mountain Wash Trail at Skyline Regional Park, a moderate hike 
 
Figure 17. 
Valley Vista Trail at Skyline Regional Park, a difficult hike

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
18 
 
Figure 18. 
Example of a main trail with challenge obstacle on alternative route 
2.2 
Trailhead Parking 
Intended Users: The day-use trailhead areas will provide vehicular parking for trail users of all ages that 
live too far to comfortably walk or bike to the proposed trails. While the trails are intended to be shared-
use for hiking, mountain biking, and equestrian, the parking shown is not intended to accommodate 
equestrian trailers since trailer parking is already available at the main Watson Road trailhead.  
 
Figure 19. 
Accessible parking stalls at the Watson Road trailhead

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
19 
North Trailhead Parking Description: Situated west of the existing excavated pit on the adjacent Verrado 
property on one of the flatter areas of the site, the north parcel trailhead parking is shown on Figure 20 as 
58 total stalls grouped in six bays along the singular access drive extending from the Verrado residential 
community to the turnaround at the rest node, though the exact number and configuration of parking stalls 
will be determined during design. The parking islands between the bays are sited at existing drainage  
 
Figure 20. 
North parcel site plan concept

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
20 
washes to support landscape in the islands and minimize the length and impact of drainage crossings. The 
parking bays may be constructed in a later phase after the rest node and access road have been added so 
that the City can gauge whether parking is needed at this location or if most of the trail users are walking 
or cycling to the trails from the adjacent neighborhoods. The turnaround at the end of the parking aisle is 
intended to provide the necessary turning movements for larger emergency-access vehicles. It is 
important to note that the road location, alignment, and connection into Verrado is schematic as Verrado’s 
development layout is not known at this time. 
South Trailhead Parking Description: The south parcel trailhead is shown on Figure 21 as 48 initial 
parking stalls with room for 78 additional parking stalls that may be added in a future expansion if 
parking demand and public interest warrant. The final layout and number of parking stalls will be 
determined during design. The drive aisles are designed to accommodate turning movements of large 
emergency vehicles around the outer loop of the parking. The large parking islands between drive aisles  
 
Figure 21. 
South parcel site plan concept

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
21 
are intended to help screen parking views from future residential lots and to collect and distribute 
rainwater from the parking and drive surfaces to preserve the existing vegetation. 
Design Criteria: The parking area will accommodate standard vehicle sizes (e.g., sedans and pickup 
trucks) and include accessible parking stalls in accordance with ADA and City standards in place at the 
time of permitting. The parking bays on both sites are aligned roughly parallel to the site contours to 
minimize longitudinal slopes along the bays, thereby facilitating the accommodation of accessible routes 
to the rest node facility with less grading impact. The parking layout shown is configured with 
perpendicular parking stalls that are 9.5 feet wide by 20 feet long and two-way drive aisles that are 24 feet 
wide in accordance with current City requirements; however, these dimensions may be slightly modified 
during design to reflect changes in programming or permitting requirements.8 The trailhead parking area 
will feature asphalt surfacing, for which the thickness and subgrade preparation will be based on 
geotechnical recommendations made during the design phase. The parking stalls designated as accessible 
may be paved in concrete to aid in visual contrast (Figure 19). The parking edging may incorporate a 
combination of flush curbs with mounted wheel stops or vertical concrete curbs with curb openings at 
drainage outlets based on MAG Standard Details 220 and 2229 and the Greater Phoenix Metro Green 
Infrastructure Handbook Standard Details LID-02 and LID-0310 (or similar) to direct stormwater runoff 
into adjacent landscape areas for rainwater harvesting and first-flush treatments. Boulders may be used in 
lieu of wheel stops to designate the end of the parking stall. Low retaining walls may be incorporated in 
sections to minimize site disturbance of cut-fill operations and preserve existing vegetation. 
2.3 
Rest Nodes 
Intended Users: The rest node will consist of a restroom, shade structure, seating, and signage to serve 
trail users (Figure 22, Figure 23, and Figure 24). It will serve as a resting place where people can wait for  
 
Figure 22. 
Example rest node at the Watson Road trailhead 
 
8City of Buckeye, 2023. Code of Ordinances: Chapter 7 Development Code, Article 5.6 Off-street Parking. Available at 
https://library.municode.com/az/buckeye/codes/code_of_ordinances? nodeId=CD_ORD_CH7DECO_ART5DEDESTGU_5.6OREPA, accessed 
April 2023. 
9Maricopa Association of Governments, 2023. Uniform Standard Details for Public Works Construction. Available at 
https://azmag.gov/Portals/0/Documents/MagContent/2023-MAG-DETAILS-for-Public-Works-Construction.pdf, accessed June 2023. 
10City of Scottsdale and Arizona State University Sustainable Cities Network, 2019. Greater Phoenix Metro Green Infrastructure Handbook. 
Available at https://www.phoenix.gov/oepsite/Documents/SCN%20GI%20Handbook_January%202019.pdf, accessed May 2023.

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
22 
their hiking partners or catch their breath in shade after a strenuous ride. The rest node will also be used 
by park staff who will use this hub as a location to connect with trail users and maintain the facilities.  
 
Figure 23. 
North parcel rest node enlargement

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
23 
 
Figure 24. 
South parcel rest node enlargement 
2.3.1 
Restrooms 
Description: The restrooms at the north and south parcels will present a consistent architectural character 
to the restroom at the Watson Road trailhead, whether they be customized prefabricated buildings or fully 
customized architectural designs (Figure 25). The restrooms shown on the site plans (Figure 20 and 
Figure 21) are the same size as the Watson Road trailhead, which accommodates two men’s and two 
women’s toilet fixtures as well as storage space. The restrooms will meet current applicable building and 
accessibility standards at the time of permitting. The number of toilet fixtures and sinks will be 
determined during the design process and will be based on estimated demand, though the building 
footprint will be close to what is shown. The restrooms at both the north and south parcels may be vault 
toilets, on septic systems, or connected to Verrado’s sewer network. Since Verrado’s sewer engineering is

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
24 
unknown at this time, the restroom will connect to Verrado’s infrastructure if feasible. The preference for 
supplying water to the developed areas for hand washing sinks and flushable toilets would be to connect 
to Verrado waterlines; however, the City may opt to truck in water to be stored in large tanks. If the water 
supply is connected to the Verrado service lines, the City may incorporate drinking fountains into the 
restroom building or provide them as freestanding units with jug fillers. For the electric service, if not 
connected to electric utility lines in Verrado, solar panels may be installed on the restroom roofs to 
provide power for low-level security lighting, hand dryers, and maintenance equipment similar to the 
Watson Road trailhead (Figure 26). Lighting will be shielded per the State’s dark sky ordinance 
ARS 49-1101 to 49-1106. 
 
Figure 25. 
Custom restroom building at Watson Road trailhead 
 
Figure 26. 
Solar panels on the roof of the Watson Road trailhead restroom

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
25 
2.3.2 
Shade Structures  
Description: The shade structure will be either a custom cantilevered, weathered steel structure to match 
the picnic ramadas at the Watson Road trailhead or a manufactured shade structure product with a 
comparable aesthetic (Figure 27). The shade structure shown on the site plans (Figure 20 and Figure 21) 
is 12 feet by 20 feet; however, the size and configuration will be determined in the design phase. The 
trailhead may close at sunset, but the shade structures will include low-level lighting for security. 
 
Figure 27. 
Watson Road trailhead picnic ramadas 
2.3.3 
Seating and Site Furnishings 
Description: The seating is envisioned as cast-in-place concrete under the shade structure and, where 
possible, near existing trees to match the weathered, board-form finish of the seat walls at the Watson 
Road trailhead (Figure 28). These concrete seat walls are intended to be used in lieu of manufactured site 
furnishing products like picnic tables or benches; however, the seating may be modified during design to 
best fit the site needs and configuration. Support furnishings, such as waste, recycling, and pet waste bag 
dispensers, will also be included (Figure 29).

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
26 
 
Figure 28. 
Seat wall at the Watson Road trailhead 
 
Figure 29. 
Custom waste and recycling station at the Watson Road trailhead 
2.3.4 
Signage 
Description: The signage will include wayfinding maps, general information about the area, and 
important considerations for safe trail use. The signage may include a centralized kiosk and individual 
signs at the start of the trails similar to signs already installed at the Watson Road trailhead (Figure 30). 
The City’s “Happy Trails” Checklist signs currently at the Watson Road Trailhead include information 
about heat-related safety considerations for trail use and will be added near the start of trails on the 
subject parcels along with notices for heat advisories and fire bans at trailheads. Interpretive signage will 
also be added to provide information about the historic and prehistoric context of the site as well as about 
native flora and fauna.

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
27 
 
 
 
 
 
Figure 30. 
Examples of kiosks and sign graphics at the Watson Road trailhead 
 
 
Figure 31. 
“Happy Trails” checklist and heat/fire advisory notices

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
28 
2.4 
Access Roads 
Intended Users: The vehicular access road to the north parcel trailhead may be used solely by park staff 
and emergency services if public parking is ultimately not needed or desired at this location. The 
vehicular access road to the south trailhead will be open to the public during the hours of operation and 
open to park staff and emergency services both during and after hours of operation. Both trailhead access 
roads will include walkways that will serve residents in the vicinity going to the sites on foot.  
North Parcel Access Road Description: The Verrado community residential areas shown on the 
conceptual site plan (Figure 20) east of this parcel are conceptual in nature and have not yet been platted 
so the exact connection alignment from the north trailhead access road to the Verrado street network 
would have to be engineered after Verrado’s street rights-of-way in the vicinity have been dedicated. It is 
anticipated that the streets planned in this area will be two-way local streets that may terminate in a cul-
du-sac. The access road connection as shown on the site plan may shift north or south of where it is 
shown, but the access road will keep a similar north-south alignment along most of its length. The City 
will work with Verrado during platting to ensure adequate accommodations are made to access the north 
parcel by vehicle and include signage indicating users are leaving Verrado and entering Skyline Regional 
Park. Regardless of where the connection point ultimately ties in, the access road will need to cross one 
wash that runs between the east property line and a parallel existing dirt road. The wash crossing may be 
an at-grade crossing or an all-weather culvert crossing, depending on anticipated drainage flows, available 
funding, and considerations for future maintenance needs. 
South Parcel Access Road Description: The south parcel trailhead will extend from Lost Creek Drive, a 
collector street with a wide median that will be extended west from its current terminus northeast of the 
parcel boundary by Verrado in its next planned phase of expansion (Figure 21). The City is working with 
Verrado to align the access road intersection at Lost Creek Drive to avoid directing headlights into 
residential properties on the opposite side of the street. The City will post signage indicating users are 
leaving Verrado and entering Skyline Regional Park. The access road will cross a significant wash that 
may be bridged, culverted, or crossed at grade depending on drainage engineering recommendations, 
available funding, and considerations for future road maintenance needs (Figure 32 shows an example of 
a low-water culvert crossing). Construction of the crossing may require cultural monitoring along the 
wash terraces during ground disturbance activities. 
 
Figure 32. 
Example of a low-water culvert trail crossing on the New River in Peoria, Arizona

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
29 
Design Criteria: The drive lanes and turn radii will be designed to facilitate the two-way driving 
movements of the public’s vehicles along with emergency and service vehicles that need access to the 
trailhead parking areas and the associated facilities. The access roads will be engineered to: 
◼ 
Comply with the City’s geometric design criteria for rural and hillside streets11 
◼ 
Accommodate site drainage and topography 
◼ 
Fit the available budget 
◼ 
Factor in the anticipated life cycle and maintenance needs of the road 
The access road will be paved with asphalt over a structural subgrade based on geotechnical and 
engineering recommendations. The road may or may not feature curbing, depending on drainage needs. 
The curbing is drawn on the site plans as flush ribbon curbs per MAG Standard Detail 220-1 Type B to 
allow stormwater to pass easily into adjacent landscape areas, but it could also be vertical curbs per MAG 
Standard Detail 220-1 Type A or Detail 222. If vertical curbs are used, it is recommended that curb 
openings per the Greater Phoenix Metro Green Infrastructure Handbook12 Standard Details LID-02 and 
LID-03 (or similar) be integrated at regular intervals in accordance with the grading and drainage plans to 
distribute runoff more evenly into surrounding landscape areas. 
2.5 
Entry Features 
Intended Users: The entry features will consist of entry monument signage and a vehicular control gate. 
The entry signage will serve the public and emergency services in a wayfinding capacity to define arrival 
at the park. The gates will be operated by park maintenance staff and, after park hours, notify people that 
the park is closed. Police, fire, and rescue personnel will also operate the vehicular gates should an 
emergency occur in the area after hours. Additional signage may be posted indicating users are leaving 
Verrado and entering Skyline Regional Park. 
2.5.1 
Entry Monument Signage  
Description: The entry monument will be either consistent with the Watson Road trailhead or wayfinding 
signage within the Verrado community (Figure 33) in terms of aesthetic style and material selection. The 
entry monuments for both parcels will likely occur outside the parcel boundaries at the access road 
intersections to Verrado’s streets. The signage will be scaled proportionately to the roadway context 
(i.e., the south parcel signage along a collector road may be larger than that of the north parcel sign if that 
sign is along a local neighborhood street). Both entry monument signs shall include the address for their 
respective facilities to aid emergency services and the public in wayfinding. 
 
11City of Buckeye, 2012. Section 6-3 Street Planning and Design Criteria. Available at 
https://www.buckeyeaz.gov/home/showpublisheddocument/446/636430711407570000, accessed March 2023. 
12City of Scottsdale and Arizona State University Sustainable Cities Network, 2019. Greater Phoenix Metro Green Infrastructure Handbook. 
Available at https://www.phoenix.gov/oepsite/Documents/SCN%20GI%20Handbook_January%202019.pdf, accessed May 2023.

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
30 
 
Figure 33. 
Portion of the Watson Road trailhead entry signage with rolling gate behind 
2.5.2 
Vehicular Control Gates  
Description: Where the Watson Road trailhead features a gatehouse with rolling gates, the vehicular 
control gates for the two subject parcels will likely be simpler in construction, such as swinging gate arms 
with locking posts. Aesthetic consistency could be achieved by using similar weathered steel panels on 
the gate arms (Figure 34). As at the Watson Road trailhead, no park entrance fee is intended for use of the 
sites’ recreational facilities. The gate locking system will be designed to allow any one of multiple 
agencies (City staff and emergency service providers) to unlock the gate. 
 
Figure 34. 
Decorative steel panels on the Watson Road trailhead vehicular gate

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
31 
2.6 
Bike Skills Area 
Intended Users: The bike skills area is intended for riders ranging in skill level from beginner to 
advanced as well as spectators. The adjacent community of Verrado has an active bike community, and it 
is anticipated that many mountain bikers will use the bike skills course. 
 
Figure 35. 
Sedona Posse Grounds Park pump track with preserved vegetation 
Description: The bike skills area would utilize the varied terrain of the White Tank Mountains foothills to 
offer a variety of bike recreation opportunities, such as pump track style courses, BMX challenge courses, 
flow trails, mountain bike trails ranging in difficulty, and training areas for beginners. Surface track 
materials could include concrete, asphalt, native dirt treated with a dust palliative, and exposed rocky 
outcroppings. Challenge features may include jumps, skinnies, and wall rides. The bike skills trails and 
challenges would be sited so that large pockets of natural desert vegetation would remain in place to 
preserve the character of the setting. Shaded seating areas may be incorporated as respite areas for riders 
and as viewing areas for spectators. As part of the City’s regular maintenance activities, the ranger staff 
will inspect the facilities and identify wildcat trails being created by users and block them off with 
boulders and vegetation.

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
32 
3. 
PROJECT INFRASTRUCTURE 
Currently, there are limited infrastructure improvements in the immediate area of the two subject parcels. 
As more homes are developed in the surrounding community, the demand for trail and recreation services 
will increase as will the availability of utility services. The City will continue to coordinate with Verrado 
through the permitting process to ensure the necessary utility access and engineering criteria will be 
incorporated into its development plans to meet the City’s needs for the subject parcels. To reduce 
disturbance while still providing reasonable access for repairs to utility lines, it is recommended that 
utilities be buried next to the edge of the access drives. 
3.1 
Water Service 
Water, particularly potable water, is a precious resource in the desert. The City currently pays to have 
water delivered to the Watson Road trailhead where it is stored in a 5,000-gallon underground tank for use 
in the restroom (Figure 36). During the height of the winter visitor season, the tank is refilled two times a 
week. As the ongoing maintenance of this process is costly, the City would prefer to connect to waterlines 
in the Verrado community when they are expanded with Verrado’s road network. Digging an onsite well is 
another water delivery possibility; however, the expense and uncertainty of well exploration and Arizona 
Department of Environmental Quality restrictions on groundwater pumping make this alternative 
unlikely. 
 
Figure 36. 
Access to the underground water tank at the Watson Road trailhead

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
33 
3.2 
Electric Service 
While it may be possible to connect to future electric lines as Verrado develops, the power requirements 
of the proposed facilities are low, primarily limited to hand dryers and security lighting for the restroom 
and shade canopies, which can be supplied through onsite solar panel generation.  
3.3 
Sewer Service 
The graywater from handwashing sinks and, potentially, drinking fountains as well as the wastewater 
from toilets can be directed to: 
◼ 
Sewer lines in the Verrado community 
◼ 
Septic systems onsite with leach fields 
◼ 
Vaults where the waste would be periodically pumped out and hauled offsite 
For both the north and south site plan layouts, gravity sewer lines connecting to the Verrado sanitary 
sewer lines are not possible as existing wash crossings and force sewer lines with lift pumps are 
maintenance intensive. Septic systems with leach fields provide an alternative sewer option that addresses 
wastewater onsite as was done on the Watson Road trailhead. The City and their utility design consultant 
will need to evaluate the costs and benefits associated with the options to determine the best alternative 
for the given site and budgetary conditions. 
3.4 
Site Operations 
Site operations for both parcels will be based at the Skyline Watson Road trailhead in terms of 
maintenance yard space and storage. Trash enclosures and dumpsters will be located at both the north and 
south parcel for collected trash. The subject parcels will not have a separate onsite operation base, though 
storage space for incidentals may be incorporated into restroom buildings.  
The Verrado community has been an active partner with the City in ensuring trail users respect the land 
and park rules. Many Verrado community members currently use the existing trails and are helpful in 
notifying the City of issues that require maintenance or enforcement.

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
34 
4. 
SUMMARY OF SITE IMPACTS 
The site plans shown (Figure 20 and Figure 21) sensitively minimize the footprint of the proposed 
facilities to increase users’ enjoyment of the site and limit disturbance to natural habitat. The proposed 
facilities have been laid out to scale in AutoCAD on the compiled base topography. The objective of the 
park design is to lay lightly on the site to minimize impacts to the beauty of the natural desert 
surroundings. To account for disturbance for associated grading and construction activities outside the 
trailhead facility footprint (parking, access roads, rest nodes, bike skills area, and barrier-free trail area), a 
30-foot offset was used to approximate the average disturbance along the perimeter. This disturbance area 
is shown in dark green on Figure 37 and Figure 38.  
 
Figure 37. 
North parcel site disturbance area

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
35 
 
Figure 38. 
South parcel site disturbance area 
The ultimate configuration of the facilities may shift slightly within this disturbance area during final 
design to allow for modifications needed to accommodate site conditions and engineering requirements 
that may arise when designing to a more accurate, surveyed topographic base file. While the facility 
layouts may be modified slightly, the amount of disturbance is intended to be comparable. The facility 
area for the non-barrier-free trails is calculated as a 50-foot buffer on both sides of the proposed trail 
alignments (Figure 12 and Figure 13).  
The site impact calculations listed in Table 3 for the north parcel and Table 4 for the south parcel include 
both the proposed disturbance area of both the trailhead facilities and the trails. Areas within the proposed 
facility footprint that are already disturbed are then subtracted from the facility footprint.

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
36 
Table 3 
Summary of Site Impacts for the North Parcel 
Facility 
Proposed 
Disturbance 
Acreage 
Previously 
Disturbed 
Acreage 
Net Impacted 
Acreage 
Percentage of 
Parcel 
Trailhead, access drive, rest node, and bike 
skills area with a 30-foot average disturbance 
offset (onsite) 
12.5 
0.0 
12.5 
3.9% 
Trails, with 4-foot disturbance width along 
alignments 
0.8 
0.0 
0.8 
0.3% 
Total 
13.3 
0.0 
13.3 
4.2% 
 
Table 4 
Summary of Site Impacts for the South Parcel 
Facility 
Proposed 
Disturbance 
Acreage 
Previously 
Disturbed 
Acreage 
Net Impacted 
Acreage 
Percentage of 
R&PP Parcel 
Trailhead, access drive, rest node, and 
barrier-free trail loop area with a 30-foot 
average disturbance offset (onsite) 
11.7 
0.3 
11.4 
3.6% 
Trails, with 6-foot disturbance width along 
alignments 
1.5 
0.9 
0.6 
0.2% 
Total 
13.5 
1.2 
12.0 
3.8%

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
37 
5. 
CONSIDERATION OF AN ALTERNATIVE  
The facilities and infrastructure proposed for development as described in Sections 2 and 3 represent the 
City’s Preferred Alternative. They are in keeping with the character of the site and adjacent land uses and 
reflect recreational needs and interests of the surrounding community as voiced by residents. For the 
purposes of exploring an alternative development option, the site plans shown on Figure 20 and Figure 21 
have been modified below to show a reduced scope of the improvements for the BLM’s consideration.  
In the north parcel, two parking bays have been eliminated (24 parking stalls) and the bike skills area has 
been reduced in size. The access road remains as it is critical to providing emergency services. The rest 
node remains unchanged as it provides a welcome respite for users and provides the City the opportunity 
to post important trail and hazard information at the beginning of the trails. The same trails have also been 
included in this alternative as they are the primary recreational use for most visitors. 
 
Figure 39. 
North parcel alternative site plan concept

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
38 
In the south parcel, the alternative proposal reduces the scope of the parking by 31 parking stalls but 
preserves the trails, rest node, access road, entry feature, and infrastructure. 
 
Figure 40. 
South parcel alternative site plan concept 
While these options may meet the needs of current park visitors and reduce the proposed disturbance by 
1.6 acres to the north parcel and 0.6 acres to the south parcel, the City would prefer to plan for the full 
buildout of facilities to accommodate the growing need for outdoor recreation amenities in Buckeye (see 
Section 1.2 for the project’s Statement of Need).

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
39 
6. 
PHASING RECOMMENDATIONS  
The long-term objective of the City will be to improve the two park parcels to provide public recreational 
opportunities that support and enhance Skyline Regional Park. The funding and resources needed for the 
implementation, operation, and maintenance of the subject parcels will have to be approved and 
incorporated in the sequential funding structure of the City. This, along with the anticipation of future 
Verrado expansion to provide street and utility infrastructure for the facilities, will necessitate developing 
the trailhead facilities in a series of phases over an extended period. The City does not intend to build the 
facilities before Verrado has developed its roadway and utility improvements. Improvements may be 
phased beyond 25 years or may be advanced sooner depending on the City’s capital improvement funds 
forecasting. 
It is likely that the full build out of improvements for the south parcel will be achieved before starting 
development of the north parcel. The exception to this assumption is the expanded parking to the south, 
which would only be built if public demand for parking exceeds the capacity of the initially provided 
parking area and the resulting parking overflow causes a nuisance for neighboring residents. The need and 
timing for the expansion is not known and is partially dependent upon Verrado’s continuing and future 
development. 
Additionally, some facilities may be phased to implement improvements over time. For example, an 
initial trailhead development may include vehicular access and parking that are rustic, chip-sealed graded 
roadbeds during the initial construction phase. Over time as funding becomes available and as user 
demand increases, the chip-sealed roadways may be paved with asphalt as an improvement to enhance 
user experience and reduce maintenance. 
The phasing priorities outlined below represent the anticipated order of buildout, though the City may 
modify this sequence or combine phases to respond to availability of infrastructure, requests from the 
public for specific amenities, and available funding.  
6.1 
Priority Level 1: South Parcel Access Road, Utility 
Lines, and Parking 
Because Lost Creek Trail already connects Verrado to the Skyline Regional Park trail network via an 
existing two-track dirt road, the highest priority after trail access for this parcel is vehicular access, 
particularly to meet public demand for parking with the nearby temporary Verrado trailhead that is soon to 
be removed. The construction would also include underground utilities aligned under the drives, even if 
the restrooms using those utility connections are constructed in a latter phase. Some basic wayfinding 
signage at the Lost Creek Drive intersection and at the start of the trails would also be needed. 
6.2 
Priority Level 2: South parcel rest node 
Once vehicular access is provided, the demand for features that increase comfort and enjoyment of the 
site will become important to trail users. While it is possible that the south parcel trails may take 
precedence over the restroom and rest node, it is foreseeable that the proposed trails shown on Figure 13 
that follow existing two-track and single-track trails will sufficiently serve the needs of trail users in their 
current state, and may, therefore, be delayed to a future phase.

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
40 
6.3 
Priority Level 3: South parcel trails 
As access to the site is improved, improving the conditions of existing two-track and single-track trails 
already onsite will help park staff provide consistency in the level of service provided across Skyline 
Regional Park. It will also provide better access to emergency responders in case of emergencies. 
6.4 
Priority Level 4: North parcel trails 
The trails in the north parcel can be constructed and used whether or not additional improvements are 
made to the north parcel at the same time. The proposed trails can connect to an existing unimproved trail 
through Skyline Regional Park west of the subject parcel and be accessed on the Verrado side by nearby 
residents that can walk or cycle to the trails via existing dirt roads. It is possible that the trail construction 
for both the south and north parcels could be combined into one phase to reduce the cost associated with 
multiple mobilizations for the trail contractor. 
6.5 
Priority Level 5: North parcel access road, utility 
lines, and parking 
This phase would be timed to occur after the Verrado streets near the east side of the north parcel property 
line have been constructed and utilities extended for the City to connect to. Until that time, park staff 
would continue to use existing dirt roads to access this parcel. The parking bays shown along the access 
drive in the site plan would likely be constructed as part of this phase if they are deemed an appropriate 
use at this site, though they could be developed in a later phase. 
6.6 
Priority Level 6: North parcel rest node 
The rest node at the north parcel could be added to provide similar access to comfort amenities to those 
provided at the south parcel. 
6.7 
Priority Level 7: North parcel bike skills area 
The final buildout component would likely be the bike skills area at the north parcel. This feature would 
be built if there is enough community support for this type of amenity. It could also be scaled back 
depending on interest.

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
41 
7. 
COST EVALUATIONS 
Order-of-magnitude cost evaluations are presented to provide a high-level overview for budgetary 
planning purposes with the understanding that prices may vary significantly depending on the options 
selected for a particular line item (e.g., electric line vs. solar power) and economic fluctuations over the 
term of the lease. The order-of-magnitude cost evaluations are broken out separately for the south parcel 
(Table 5), north parcel (Table 7), and south parcel parking expansion (Table 9) and reflect the City’s 
Preferred Alternative and the phasing priorities discussed in Section 6. The annual project cost escalations 
that follow each of the three cost evaluations (Table 6, Table 8, and Table 10) span the 25-year lease and 
are intended for City budgetary planning purposes. 
Table 5 
South Parcel Order-of-Magnitude Cost Evaluation 
Phase 
Facility 
Unit Quantity 
Unit Cost 
Total 
Phase 1 
Phase 2 
Phase 3 
1, 2 
Clear and grub 
AL 
 1  
$50,000 
$50,000  
$47,500  
$2,500  
 
1, 2 
Earthwork 
AL 
 1  
$110,000 
$110,000  
$104,500  
$5,500  
 
1, 2 
SWPPP/dust control 
AL 
 1  
$60,000 
$60,000  
$57,000  
$3,000  
 
1, 2 
Construction surveying 
AL 
 1  
$60,000 
$60,000  
$57,000  
$3,000  
 
1 
Traffic control 
AL 
 1  
$6,500 
$6,500  
$6,500  
 
 
1, 2 
Slash and desert pavement 
AL 
 1  
$40,000 
$40,000  
$38,000  
$2,000  
 
1 
Cactus salvage 
AL 
 1  
$60,000 
$60,000  
$60,000  
 
 
1, 2 
Landscape grading 
AL 
 1  
$50,000 
$50,000  
$45,000  
$5,000  
 
1 
Asphalt pavement 
SY 
 4,615  
$90 
$415,350  
$415,350  
 
 
1 
Concrete curbing 
LF 
 2,780  
$25 
$69,500  
$69,500  
 
 
1, 2 
Concrete paving 
SF 
 3,750  
$15 
$56,250  
$22,500  
$33,750  
 
2 
Concrete seat walls 
LF 
 50  
$200 
$10,000  
 
$10,000  
 
1 
¼” minus stabilized DG 
SF 
 8,465  
$2 
$16,930  
$16,930  
 
 
3 
Single-track paths 
LF 
 14,600  
$14 
$204,400  
 
 
$204,400  
1, 2 
Signage 
AL 
 1  
$35,000 
$35,000  
$17,500  
$17,500  
 
2 
Restroom/septic system 
LS 
 1  
$275,000 
$275,000  
 
$275,000  
 
2 
Shade canopy, 12'×20' 
LS 
 1  
$45,000 
$45,000  
 
$45,000  
 
2 
Site furnishings 
AL 
 1  
$25,000 
$25,000  
 
$25,000  
 
1 
Control gate 
LS 
 1  
$15,400 
$15,400  
$15,400  
 
 
2 
Septic system 
AL 
 1  
$90,000 
$90,000  
 
$90,000  
 
2 
Water service 
AL 
 1  
$130,000 
$130,000  
 
$130,000  
 
2 
Electrical service 
AL 
 1  
$80,750 
$80,750  
 
$80,750  
 
1, 2 
Hydroseed and restoration 
SY 
 9,890  
$2 
$19,780  
$17,802  
$1,978  
 
1 
Wheel stops 
EA 
 48  
$400 
$19,200  
$19,200  
 
 
1 
Pavement striping 
LS 
 1  
$10,000 
$10,000  
$10,000  
 
 
1 
Major drainage crossing 
AL 
 1  
$250,000 
$250,000  
$250,000  
 
 
1 
Minor drainage crossing 
EA 
 2  
$25,000 
$50,000  
$50,000  
 
 
1 
Pedestrian bridge 
LS 
 1  
$130,000 
$130,000  
$130,000  
 
 
Construction Costs Subtotal 
$2,384,060  $1,449,682  
$729,978  
$204,400  
Design costs (10%) 
$238,406  
$144,969  
$72,998  
$20,440  
Agency costs for mobilization, bonding, permit fees, inspections, 
insurance, taxes, etc. (35%) 
$834,421 
$507,389  
$255,493  
$71,540  
Contingency (25%) 
$596,015  
$362,421  
$182,495  
$51,100  
Administrative Costs Subtotal 
$1,668,842  $1,014,779  
$510,986  
$143,080  
 
 
 
 
 
Total Project Costs 
$4,052,902  $2,464,461  $1,240,964  
$347,480

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
42 
 
Table 6 
South Parcel Annual Projected Cost Escalation 
Construction 
Start Year 
Percent 
Escalation 
Total 
Escalation 
Phase 1 
Escalation 
Phase 2 
Escalation 
Phase 3 
Escalation 
2024 
5% 
$4,255,547  
$2,587,684  
$1,303,012  
$364,854  
2025 
5% 
$4,468,324  
$2,717,068  
$1,368,163  
$383,097  
2026 
5% 
$4,691,740  
$2,852,921  
$1,436,571  
$402,252  
2027 
5% 
$4,926,327  
$2,995,567  
$1,508,400  
$422,365  
2028 
5% 
$5,172,643  
$3,145,345  
$1,583,820  
$443,483  
2029 
5% 
$5,431,275  
$3,302,612  
$1,663,011  
$465,657  
2030 
5% 
$5,702,839  
$3,467,743  
$1,746,162  
$488,940  
2031 
5% 
$5,987,981  
$3,641,130  
$1,833,470  
$513,387  
2032 
5% 
$6,287,380  
$3,823,187  
$1,925,144  
$539,056  
2033 
5% 
$6,601,749  
$4,014,346  
$2,021,401  
$566,009  
2034 
5% 
$6,931,836  
$4,215,063  
$2,122,471  
$594,309  
2035 
5% 
$7,278,428  
$4,425,816  
$2,228,595  
$624,024  
2036 
5% 
$7,642,349  
$4,647,107  
$2,340,025  
$655,225  
2037 
5% 
$8,024,466  
$4,879,462  
$2,457,026  
$687,986  
2038 
5% 
$8,425,689  
$5,123,435  
$2,579,877  
$722,385  
2039 
5% 
$8,846,973  
$5,379,607  
$2,708,871  
$758,504  
2040 
5% 
$9,289,322  
$5,648,587  
$2,844,315  
$796,429  
2041 
5% 
$9,753,788  
$5,931,016  
$2,986,531  
$836,250  
2042 
5% 
$10,241,477  
$6,227,567  
$3,135,858  
$878,063  
2043 
5% 
$10,753,551  
$6,538,945  
$3,292,651  
$921,966  
2044 
5% 
$11,291,229  
$6,865,892  
$3,457,284  
$968,064  
2045 
5% 
$11,855,790  
$7,209,187  
$3,630,148  
$1,016,467  
2046 
5% 
$12,448,580  
$7,569,646  
$3,811,655  
$1,067,290  
2047 
5% 
$13,071,009  
$7,948,128  
$4,002,238  
$1,120,655  
2048 
5% 
$13,724,559  
$8,345,534  
$4,202,350  
$1,176,688

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
43 
Table 7 
North Parcel Order-of-Magnitude Cost Evaluation 
Phase 
Facility 
Unit 
Qty. 
Unit Cost 
Total 
Phase 4 
Phase 5 
Phase 6 
Phase 7 
5, 6 
Clear and grub 
AL 
 1 
$45,000 
$45,000 
 
$38,250 
$6,750 
 
5, 6 
Earthwork 
AL 
 1 
$80,000 
$80,000 
 
$68,000 
$12,000 
 
5, 6 
SWPPP/dust control 
AL 
 1 
$75,000 
$75,000 
 
$67,500 
$7,500 
 
5, 6 
Construction surveying 
AL 
 1 
$75,000 
$75,000 
 
$67,500 
$7,500 
 
5 
Traffic control 
AL 
 1 
$6,500 
$6,500 
 
$6,500 
 
 
5, 6 
Slash and desert pavement AL 
 1 
$50,000 
$50,000 
 
$45,000 
$5,000 
 
5 
Cactus salvage 
AL 
 1 
$10,000 
$10,000 
 
$10,000 
 
 
5, 6 
Landscape grading 
AL 
 1 
$25,000 
$25,000 
 
$21,250 
$3,750 
 
5 
Asphalt pavement 
SY 
 3,765 
$90 
$338,850 
 
$338,850 
 
 
5 
Concrete curbing 
LF 
 1,770 
$25 
$44,250 
 
$44,250 
 
 
6 
Concrete paving 
SF 
 1,585 
$15 
$23,775 
 
 
$23,775 
 
6 
Concrete seat walls 
LF 
 50 
$200 
$10,000 
 
 
$10,000 
 
5 
¼” minus stabilized DG 
SF 
 4,420 
$2 
$8,840 
 
$8,840 
 
 
4 
Single-track paths 
LF  15,800 
$14 
$221,200 $221,200 
 
 
 
7 
Bike skills area 
LF 
 5,150 
$200 $1,030,000 
 
 
 $1,030,000 
5, 6 
Signage 
AL 
 1 
$30,000 
$30,000 
 
$15,000 
$15,000 
 
6 
Restroom/septic system 
LS 
 1 
$225,000 
$225,000 
 
 
$225,000 
 
6 
Shade canopy, 12'×20' 
LS 
 1 
$45,000 
$45,000 
 
 
$45,000 
 
6 
Site furnishings 
AL 
 1 
$20,000 
$20,000 
 
 
$20,000 
 
5 
Control gate 
LS 
 1 
$15,400 
$15,400 
 
$15,400 
 
 
6 
Septic system 
AL 
 1 
$75,000 
$75,000 
 
 
$75,000 
 
6 
Water service 
AL 
 1 
$100,000 
$100,000 
 
 
$100,000 
 
6 
Electrical service 
AL 
 1 
$62,000 
$62,000 
 
 
$62,000 
 
5, 6 
Hydroseed and restoration 
SY 
 4,000 
$2 
$8,000 
 
$7,200 
$800 
 
5 
Wheel stops 
EA 
 58 
$400 
$23,200 
 
$23,200 
 
 
5 
Pavement striping 
LS 
 1 
$8,000 
$8,000 
 
$8,000 
 
 
5 
Major drainage crossing 
AL 
 1 
$200,000 
$200,000 
 
$200,000 
 
 
5 
Minor drainage crossing 
EA 
 2 
$25,000 
$50,000 
 
$50,000 
 
 
Construction Costs Subtotal 
$1,875,015 $221,200 $1,034,740 
$619,075 $1,030,000 
Design costs (10%) 
$290,502 
$22,120 
$103,474 
$61,908 
$103,000 
Agency costs for mobilization, bonding, permit fees, inspections, 
insurance, taxes, etc. (35%) 
$656,256 
$77,420 
$362,159 
$216,677 
$360,500 
Contingency (25%) 
$468,754 
$55,300 
$258,685 
$154,769 
$257,500 
Administrative Costs Subtotal 
$2,033,512 $154,840 
$724,318 
$433,354 
$721,000 
 
 
 
 
 
 
Total Project Costs 
$4,938,527 $376,040 $1,759,058 $1,052,429 $1,751,000

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
44 
Table 8 
North Parcel Annual Projected Cost Escalation 
Construction 
Start Year 
Percent 
Escalation 
Total 
Escalation 
Phase 4 
Escalation 
Phase 5 
Escalation 
Phase 6 
Escalation 
2024 
5% 
$5,185,453  
$394,842  
$1,847,011  
$1,105,050  
2025 
5% 
$5,444,726  
$414,584  
$1,939,362  
$1,160,303  
2026 
5% 
$5,716,963  
$435,313  
$2,036,330  
$1,218,318  
2027 
5% 
$6,002,812  
$457,079  
$2,138,147  
$1,279,234  
2028 
5% 
$6,302,953  
$479,933  
$2,245,054  
$1,343,196  
2029 
5% 
$6,618,101  
$503,930  
$2,357,307  
$1,410,356  
2030 
5% 
$6,949,007  
$529,127  
$2,475,172  
$1,480,874  
2031 
5% 
$7,296,458  
$555,583  
$2,598,931  
$1,554,918  
2032 
5% 
$7,661,281  
$583,362  
$2,728,878  
$1,632,664  
2033 
5% 
$8,044,346  
$612,530  
$2,865,322  
$1,714,297  
2034 
5% 
$8,446,564  
$643,157  
$3,008,588  
$1,800,012  
2035 
5% 
$8,868,893  
$675,315  
$3,159,017  
$1,890,013  
2036 
5% 
$9,312,338  
$709,081  
$3,316,968  
$1,984,514  
2037 
5% 
$9,777,955  
$744,535  
$3,482,816  
$2,083,740  
2038 
5% 
$10,266,853  
$781,762  
$3,656,957  
$2,187,927  
2039 
5% 
$10,780,196  
$820,850  
$3,839,805  
$2,297,323  
2040 
5% 
$11,319,206  
$861,893  
$4,031,795  
$2,412,189  
2041 
5% 
$11,885,167  
$904,988  
$4,233,385  
$2,532,798  
2042 
5% 
$12,479,426  
$950,237  
$4,445,054  
$2,659,438  
2043 
5% 
$13,103,398  
$997,749  
$4,667,307  
$2,792,410  
2044 
5% 
$13,758,568  
$1,047,636  
$4,900,672  
$2,932,031  
2045 
5% 
$14,446,497  
$1,100,018  
$5,145,706  
$3,078,633  
2046 
5% 
$15,168,822  
$1,155,019  
$5,402,991  
$3,232,565  
2047 
5% 
$15,927,264  
$1,212,770  
$5,673,141  
$3,394,193  
2048 
5% 
$16,723,628  
$1,273,409  
$5,956,798  
$3,563,903

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
45 
Table 9 
South Parcel Parking Expansion Order-of-Magnitude Cost Evaluation 
Facility 
Unit 
Quantity 
Unit Price 
Total 
Clear and grub 
AL 
 1  
$20,000 
$20,000  
Earthwork 
AL 
 1  
$60,000 
$60,000  
SWPPP/dust control 
AL 
 1  
$70,000 
$70,000  
Construction surveying 
AL 
 1  
$70,000 
$70,000  
Slash and desert pavement 
AL 
 1  
$33,000 
$33,000  
Cactus salvage 
AL 
 1  
$10,000 
$10,000  
Landscape grading 
AL 
 1  
$25,000 
$25,000  
Asphalt pavement 
SY 
 3,815  
$90 
$343,350  
Concrete curbing 
LF 
 1,980  
$25 
$49,500  
¼” minus stabilized DG 
SF 
 2,064  
$2 
$4,128  
Signage 
AL 
 1  
$5,000 
$5,000  
Hydroseed and restoration 
SY 
 4,300  
$2 
$8,600  
Wheel stops 
EA 
 78  
$400 
$31,200  
Pavement striping 
LS 
 1  
$10,000 
$10,000  
Minor drainage crossing 
EA 
 2  
$25,000 
$50,000  
Construction Costs Subtotal 
$789,778 
Design costs (10%) 
$78,978 
Agency costs for mobilization, bonding, approvals, inspections, insurance, taxes, etc. (35%) 
$276,423  
Contingency (25%) 
$197,445  
Administrative Costs Subtotal 
$552,846  
 
 
Total Project Costs 
$1,342,624

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
46 
Table 10 
South Parcel Parking Expansion Annual Projected Cost Escalation 
Construction Start Year 
Percent Escalation 
Total Escalation 
2024 
5% 
$1,409,756  
2025 
5% 
$1,480,244  
2026 
5% 
$1,554,257  
2027 
5% 
$1,631,970  
2028 
5% 
$1,713,569  
2029 
5% 
$1,799,248  
2030 
5% 
$1,889,211  
2031 
5% 
$1,983,672  
2032 
5% 
$2,082,856  
2033 
5% 
$2,186,999  
2034 
5% 
$2,296,349  
2035 
5% 
$2,411,167  
2036 
5% 
$2,531,726  
2037 
5% 
$2,658,313  
2038 
5% 
$2,791,229  
2039 
5% 
$2,930,791  
2040 
5% 
$3,077,331  
2041 
5% 
$3,231,198  
2042 
5% 
$3,392,758  
2043 
5% 
$3,562,396  
2044 
5% 
$3,740,516  
2045 
5% 
$3,927,542  
2046 
5% 
$4,123,920  
2047 
5% 
$4,330,116  
2048 
5% 
$4,546,622

Skyline Regional Park Outlying Parcels R&PP Lease Plan of Development 
 
Environmental Planning Group, a Terracon Company, June 2025 
p a g e 
47 
8. 
MANAGEMENT PLAN 
The management of the proposed facilities will be the responsibility of the City’s Community Services 
Department. Emergency services for the park are intended to be provided by the Buckeye Police 
Department and Fire Department. The City will commit to maintain the area by: 
1. Annexing both parcels from unincorporated Maricopa County. 
2. Maintaining the subject property, which is open to use by the public, without discrimination or 
favor. 
3. Developing and managing the lands in accordance with the POD as submitted in the R&PP 
application. Any proposed changes to the POD will be sent to BLM for review and concurrence. 
The City will provide final development plans to the BLM for review prior to commencement of 
construction activities. Depending on the modifications made during final engineering, a separate 
NEPA review may be required if the area impacted is not covered by the current Environmental 
Assessment. 
4. Maintaining the facilities on the parcels in satisfactory condition. 
5. Charging no more than reasonable fees for the use of the facilities (whether by concession or 
otherwise) and charging no more for entrance than is charged at other comparable facilities 
managed by state and local agencies. All charges will be subject to review and modification by 
the Secretary of the Interior under due process procedures.

Exhibit C 
March 3, 2026 
Stipulations 
Recreation and Public Purpose Act Lease 
AZAZ105906946 (AZA-03205302) 
1 
 
INTERIOR REGION 8 • LOWER COLORADO BASIN 
 
ARIZONA, CALIFORNIA*, NEVADA* 
*PARTIAL 
 
 
The lease of the land herein described is subject to the following conditions: 
 
A. 
The lease is subject to City of Buckeye (Lessee) compliance with all applicable regulations 
contained in Title 43, Code of Federal Regulations, Parts 2740 and 2912. 
 
B. 
The Lessee shall develop the leased lands in accordance with the approved Plan of Development 
(POD) and Environmental Assessment (EA) and shall avoid sensitive resources. Any 
modifications not analyzed in EA require prior approval from the Bureau of Land Management 
(BLM). 
 
1. Any significant deviation from the POD requires prior written approval from the BLM 
Authorized Officer (AO). 
 
C. 
The Lessee will follow the BLM Phoenix District Office’s (PDO’s) Integrated Weed 
Management Plan (BLM PDO 2015), which would be utilized on site during construction and 
through the life of the lease. 
 
D. 
Lessee must obtain a Maricopa County dust control permit prior to construction. 
E. 
Any cultural and/or paleontological resources (historic or prehistoric site or object) discovered 
by the lessee or any person working on the lessee’s behalf, on public or federal land shall be 
immediately reported to the AO. The lessee shall suspend all operations in the immediate area 
of such discovery until written authorization to proceed is issued by the AO. An evaluation of 
the discovery will be made the AO to determine the appropriate actions to prevent the loss of 
significant cultural or scientific values. The lessee will be responsible for the cost of the 
evaluation and any decision as to the proper mitigation measures will be made by the AO after 
consulting with the lessee. 
F. 
If any changes are proposed for improvements or developments (ground disturbance) that may 
impact cultural resources, consultation needs to be initiated with the BLM Hassayampa Field 
Manager. The Hassayampa Field Office Archaeologist would assist the manager in evaluating 
the effect of the proposal and recommend appropriate measures to reduce or minimize the 
impacts, under Section 106 of the National Historic Preservation Act (NHPA). 
 
G. 
The BLM, with possible assistance from the Arizona Site Steward Program, may monitor the 
condition of all known cultural sites. If patrols of the known sites indicate that the visitors are 
negatively impacting the sites, consultation with the BLM Hassayampa Field Manager and the 
archaeologist would be required to address the impacts and develop alternative methods for 
deterring such impacts. 
H. 
Construction and development of the park on BLM administered public land will avoid the 
“avoidance area” identified in Exhibit D. This area will be flagged or marked on the ground 
before construction begins. All construction workers will be required to stay within the 
designated work zones and keep vehicles within marked boundaries. Construction personnel 
will also be trained to recognize these markers and understand the associated 
equipment‑movement restrictions. Any deviation from this restriction requires prior written

Exhibit C 
March 3, 2026 
Stipulations 
Recreation and Public Purpose Act Lease 
AZAZ105906946 (AZA-03205302) 
2 
 
INTERIOR REGION 8 • LOWER COLORADO BASIN 
 
ARIZONA, CALIFORNIA*, NEVADA* 
*PARTIAL 
 
 
approval from the BLM Authorized Officer (AO). 
 
I. 
If human remains are encountered during ground-disturbing activities, all work must 
immediately cease within 30 meters (100 feet) of the discovery, and the area must be secured. 
The Arizona State Museum, lead agency, SHPO, and appropriate Tribes must be notified of the 
discovery. All discoveries will be treated in accordance with NAGPRA (Public Law 101-601; 
25 U.S.C. 3001-3013) or Arizona Revised Statutes (A.R.S. § 41-844 and A.R.S. § 41-865), as 
appropriate, and work must not resume in this area without authorization from ASM and the 
lead agency. 
 
J. 
Migratory Bird Stipulations 
 
1. Prior to project initiation, surveys shall be conducted by a qualified wildlife 
biologist for the following species: 
 
• 
Bendire’s thrasher 
• 
Gilded flicker 
• 
Western burrowing owl 
 
2. It is strongly recommended that any activities requiring vegetation removal occur 
outside the nesting season (March 1 – August 31) when feasible. 
 
3. If western burrowing owls are detected and the proposed action will impact the 
species, the owls shall be relocated by a qualified entity. BLM can facilitate contact 
with an organization specializing in burrowing owl relocation. 
 
4. If either Bendire’s thrasher or gilded flicker is detected, a 100‑foot protection buffer 
shall be implemented around active nests during the nesting season (March 1 – 
August 31).  
 
K. 
During construction and operations of the park facilities, “Guidelines for Handling Sonoran 
Desert Tortoises Encountered on Development Projects” (Arizona Game and Fish Department 
2014) would be followed. (attached) 
 
L. 
The following measures from the Recommended Standard Mitigation Measures for Projects in 
Sonoran Desert Tortoise Habitat (Arizona Interagency Desert Tortoise Team 2008) would also 
be implemented to minimize potential impacts to BLM sensitive species: 
 
1. To the extent possible, construction activities would be scheduled when tortoises are 
inactive (typically November 1 to March 1). 
 
2. A desert tortoise protection education program would be presented to all employees, 
inspectors, supervisors, contractors, and subcontractors who carry out proposed 
construction activities at the project site. 
 
3. Areas of any future proposed new construction or disturbance would be flagged or 
marked on the ground prior to construction. All construction workers would strictly 
limit their activities and vehicles to areas that have been marked. Construction

Exhibit C 
March 3, 2026 
Stipulations 
Recreation and Public Purpose Act Lease 
AZAZ105906946 (AZA-03205302) 
3 
 
INTERIOR REGION 8 • LOWER COLORADO BASIN 
 
ARIZONA, CALIFORNIA*, NEVADA* 
*PARTIAL 
 
 
personnel would be trained to recognize markers and understand the equipment 
movement restrictions involved. 
 
4. Always inspect the work area and beneath all vehicles and equipment prior to starting 
and moving equipment to ensure there are no wildlife species in harm’s way, and limit 
vehicle use to existing routes to the extent possible. Project-related vehicles should not 
exceed 25 mph on unpaved roads within desert tortoise habitat. 
 
5. Project features that might trap or entangle desert tortoises, such as open trenches, pits, 
open pipes, etc., would be covered or modified to prevent entrapment and backfilled as 
soon as possible. 
 
6. If desert tortoises are encountered during implementation, activities should be modified 
to avoid injuring or harming it. If the activities cannot be modified, the tortoise will be 
moved according to the Arizona Game and Fish Department’s Guidelines for Handling 
Sonoran Desert Tortoises Encountered on Development Projects (AGFD 2014). Take, 
possession or harassment of a desert tortoise is prohibited by State law, unless 
specifically authorized by AZGFD. 
 
7. Any amendment to the POD that includes additional surface disturbance 
would have to be analyzed by the BLM prior to implementation. 
 
M. 
The lessee shall comply with all applicable Federal, State and local laws and regulations, 
existing or hereafter enacted or promulgated, with regard to any hazardous material, as defined 
in this paragraph, that will be used, produced, transported or stored on or within the lease or any 
of the lease facilities, or used in the construction, operation, maintenance or termination of the 
lease or any of its facilities. “Hazardous material” means any substance, pollutant or 
contaminant that is listed as hazardous under CERCLA of 1980, as amended, 42 U.S.C. 9601 et 
seq., and its regulations. The definition of hazardous substances under CERCLA includes any 
“hazardous waste” as defined in the RCRA of 1976, as amended, 42 U.S.C. 2011 et seq. The 
term does not include petroleum, including crude oil or any fraction thereof that is not otherwise 
specifically listed or designated as a hazardous substance under CERCLA section 101(14), 
U.S.C. 9601 (14), nor does the term include natural gas. 
 
N. 
During the period of this lease, the United States, acting through the BLM, shall have the right 
to inspect the land covered by the lease at any time, without advance notice. During such 
inspections, officials of the BLM may be accompanied by other appropriate federal, state or 
local officials. 
 
O. 
The lessee or its successor in interest shall comply with and shall not violate any of the terms or 
provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 241) and requirements of the 
regulations, as modified or amended, of the Secretary of the Interior issued pursuant thereto (43 
CFR 17) for the period that the land leased herein is used for the purpose for which the lease 
was issued pursuant to the act cited or for another purpose involving the provision of similar 
services or benefits. 
 
P. 
If the lessee or its successor in interest does not comply with the terms or provisions of Title VI

Exhibit C 
March 3, 2026 
Stipulations 
Recreation and Public Purpose Act Lease 
AZAZ105906946 (AZA-03205302) 
4 
 
INTERIOR REGION 8 • LOWER COLORADO BASIN 
 
ARIZONA, CALIFORNIA*, NEVADA* 
*PARTIAL 
 
 
of the Civil Rights Act of 1964 and the requirements imposed by the Secretary of the Interior 
issued pursuant to that title during the period which the land described herein is used for the 
purpose for which the lease was issued pursuant to the act cited or for another purpose 
involving the provision of similar services or benefits, said Secretary or his delegate may 
declare the terms of this lease terminated in whole or in part. 
Q. 
The lessee, by acceptance of this lease, agrees for itself and its successors in interest that a 
declaration of termination in whole or in part of this lease shall, at the option of the Secretary of 
the Interior or his delegate, operate to revest in the United States full title to the land involved in 
the declaration. 
 
R. 
The lessee further agrees to not transfer the property conveyed by this instrument for purposes 
designated or for another purpose involving the provision of similar services or benefits, unless 
and until the transferee gives similar written assurance to the AO. 
 
S. 
All structures, signs, and site furnishings shall use colors, materials, and finishes that blend with 
the natural environment and meet VRM Class II (North Parcel) and Class IV (South Parcel) 
objectives. 
T. 
Disturbed areas not containing facilities shall be restored using native seed and vegetation. 
 
U. 
Vegetation removal shall be minimized, with preservation of existing screening vegetation 
where possible. 
V. 
The lessee shall manage public access, parking, and roadway use to prevent congestion or unsafe 
conditions. 
W. 
If a fire ignites within the lease area, burns on to the lease area, or threatens the lease area, 
the lessee shall cooperate with the BLM in its efforts to respond to, investigate, and 
suppress all fires. 
X. 
Any operational, construction, or maintenance requirement contained in the POD that is 
not explicitly restated in these stipulations shall remain binding on the lessee.