CITY OF BUCKEYE
Finance Department
530 E Monroe Ave. • Buckeye, Arizona 85326
Phone 623-349-6165 • www.buckeyeaz.gov
FY 2027 Congressional Directed Spending: State Route 85 and Baseline Road Application – Summary
Recap
Project Description:
The City of Buckeye seeks to address the safety concerns at the intersection of SR 85 and Baseline Road
by submitting a grant application that entails installing a traffic signal at each intersection, widening
Baseline Road to provide two eastbound and westbound through lanes through the intersection for the
creation of northbound and southbound turn lanes, installation of conduit and fiber optic cables for
traffic signal timing optimization, installation of Wrong Way Vehicle Detection Equipment, and the
installation of overhead Variable Message Signs that are connected to the ADOT Traffic Management
Center to allow messages to be displayed to drivers to warn them of potential hazards. This project is
currently in the CIP plan.
Project Cost
$ 6,576,127
Required Match
$ 902,269
Grant Amount
$ 5,673,858
Plans Once Grant Expires:
After all grant funds have been expended, any future maintenance for this intersection will become a
part of the Public Works Department’s budget.
Objectives and Expected Outcomes
The objective is to provide increased roadway safety at SR 85 and Baseline Road for all roadway users.
The expected outcome is a reduction in the number of crashes and fatalities through the installation
of traffic signals and Variable Message Signs.
Another expected outcome is a reduction in traffic-related emissions through the installation of
integrated traffic signal timing optimization.
Time Period for the Grant
FY 2027