CITY OF BUCKEYE
Finance Department
530 E Monroe Ave. • Buckeye, Arizona 85326
Phone 623-349-6165 • www.buckeyeaz.gov
FY 2027 Congressional Directed Spending: Gila River Aquatic Restoration and Habitat Protection
Project Feasibility Study Application– Summary Recap
Project Description:
Between the City’s eastern boundary with the City of Avondale and west to the State Route 85 bridge,
the Gila River ecosystem is degraded, including but not limited to large-scale invasion of approximately
5,900 acres of non-native and invasive Salt Cedar or tamarisk trees. Invasive Salt Cedars are an
environmental and ecological disaster. These trees are known to consume more than 250 to 400
gallons of water per day and out-compete native riparian species, which provide critical habitat to
multiple federally listed bird and aquatic species. In addition, these trees cannot simply be cut down or
burned. They must be removed and completely uprooted, or they will continue to proliferate, which
makes their removal timely and cost-prohibitive.
Project Cost
$ 300,000
Required Match
$ 0
Grant Amount
$ 300,000
Plans Once Grant Expires:
After all grant funds have been expended, any future maintenance for the Gila River will become a
part of the Community Services Department’s budget.
Objectives and Expected Outcomes
The City is keen to leverage federal funds in our investment to make a more significant and
holistic improvement to this critical ecosystem. The proposed and requested project will save
potentially 200,000 acre-feet of water per year. This saved water could provide water for
approximately 800,000 residents, which is critical in this time of drought.
Time Period for the Grant
FY 2027